ML12172A177

From kanterella
Jump to navigation Jump to search
2012 Quad Cities Power Plant Initial License Examination Miscellaneous Correspondence
ML12172A177
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 04/23/2012
From: Palagi B, Caroline Tilton
NRC/RGN-III/DRS/OLB
To: Pacilio M
Exelon Nuclear
Shared Package
ML12166A570 List:
References
Download: ML12172A177 (60)


Text

{{#Wiki_filter:2012 QUAD CITIES POWER PLANT INITAL LICENSE EXAMINATION MISCELLANEOUS CORRESPONDENCE

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 April 10, 2012 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

OPERATOR LICENSING EXAMINATION APPROVAL

Dear Mr. Pacilio:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Quad Cities Nuclear Power Station. The U. S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and will separately provide a list of approved applicants to Mr. Karl Moser, Training Manager. Note that any examination waivers and application denials have been addressed in separate correspondence. The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9 of NUREG~1 021, "Operator Licensing Examination Standards for Power Reactors," one day during the week of April 30, 2012. The NRC staff will administer the operating tests during the week of April 23, 2012. Please contact Mr. Bruce B. Palagi, Chief Examiner, at 630-829-9611, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access

M Padlio -2 and Management System (ADAMS), accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.qov/readinq-rm/adams.html. Sincerely, IRA! Caroline Tilton, Acting Chief Operations Branch Division of Reactor Safety Docket Nos. 50-254; 50-265\ License Nos. DPR-29; DPR-30 cc: Distribution via ListServ'

M Pacilio -2 and Management System (ADAMS), accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.govlreading-rm/adams.html. Sincerely, IRA! Caroline Tilton, Acting Chief Operations Branch Division of Reactor Safety Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 cc: Distribution via ListServ' DISTRIBUTION: Breeda Reilly RidsNrrDorlLpl3-2 Resource RidsNrrPMQuadCities Resource RidsNrrDirslrib Resource Chuck Casto Cynthia Pederson Jennifer Uhle Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak J. McHale, NRR J. R. Kweiser, DRS DOCUMENT NAME: G:\Exam Approval Ltr-Quad Cities 2012.doc To receive ' document. indicate in the box 'e' = Copy wlo attach/enc! "E" = Copy with attach/IN

      . a copy 0 fthiS                                                                              enc" "= N0 copy OFFICE          RIII:DRS           Ic         RIII:DRS            IN         RIII:DRS              IN              I NAME            JRKweiser:jb                  BBPalagi:                      CTilton:

DATE 04/04/12 04/09/12 04/10/12 OFFICIAL RECORD COPY

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 January 13, 2012 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 SUB..IECT: QUAD CITIES NUCLEAR POWER STATION CONFIRMATION OF INITIAL LICENSE EXAMINATION

Dear Mr. Pacilio:

In a telephone conversation on January 11,2012, between Mr. E. Pannell, Operations Training and Mr. Bruce Palagi, Chief Examiner, arrangements were made for the administration of licensing examinations at the Quad Cities Nuclear Power Station during the weeks of April 23, 2012 and April 30, 2012. In addition, the NRC will make an examination validation visit to your facility the week of April 2, 2012. As agreed upon during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 9, Supplement 1, of NUREG-1021 , "Operator Licensing Examination Standards for Power Reactors." The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered. To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by February 7,2012. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due by March 5, 2012. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3>>, an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready to use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final. Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

M. Pacilio -2 To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date. This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 etseq.). These information collections were approved by the Office of Management and Budget, approval number3150-0018. The public reporting burden for this collection is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIAlPrivacy Services Branch (T-5 F52), U. S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503. The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room). Thank you for your cooperation in this matter. Mr. Pannell has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Bruce Palagi at 630-829-9611, or me at 630-829 9707. Sincerely, IRA! Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 cc: Distribution via ListServ

M. Pacilio -2 To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date. This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018. The public reporting burden for this collection is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIAlPrivacy Services Branch (T-5 F52), U. S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503. The NRC may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room}. Thank you for your cooperation in this matter. Mr. Pannell has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Bruce Palagi at 630-829-9611, or me at 630-829-9707. Sincerely, IRA! Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 cc: Distribution via ListServ DISTRIBUTION: See next page DOCUMENT NAME: G:\DRSIII\DRS\WORK IN PROGRESS\LTR 011312 QUA DRS OL 120-DAY LTR.DOCX To receive a copy of this document, Indicate in the concurrence box "CD = Copy without attach/encl hE" = Copy with attach/encl ION" = No copy OFFICE RIII:DRS I RIII:DRS I I I NAME BPalagi:jb HPeterson il"\J\TI:: i ..... ' 01/12/12 01/13/12 OFFICIAL RECORD COpy

Letter to Michael J. Pacilio from Hironori Peterson dated January 13, 2012. SLlBJECT: QUAD CITIES NUCLEAR POWER STATION CONFIRMATION OF INITIAL LICENSE EXAMINATION DISTRIBUTION: Amy Snyder RidsNrrDorlLpl3-2 Resource RidsNrrPMQuadCities Resource RidsNrrDirslrib Resource Cynthia Pederson Jennifer Uhle Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak

Exelon. www.exeloncorp.com Nuclear KKM-ll-OOI March 10,2011 Mr. Hironori Peterson U.S. NRC Region III 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352

Dear Mr. Peterson:

Quad Cities Generating Station requests a date change for the CY2012 Initial Operator License Examination. The current Nuclear Regulatory Commission schedule shows a start date of March 26,2012 and end date of Apri16, 2012. Quad Cities Station requests a start date of Apri123, 2012 and end date of May 4,2012. The requested change in dates is to add one month of exam development time. This is due to a month long simulator outage required to replace critical hardware components. Additionally, conversations with the Region III scheduler indicate the requested time period is available. If additional information is required, please contact me at (309) 227-4000 or Frank Schulte at (309) 227-4137. Sincerely yours, Karl K. Moser Training Director Quad Cities Nuclear Station KKMlFS/gmj cc: Letterbook MAR 2,1 20\1

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 June 1, 2011 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville,lL 60555

SUBJECT:

CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATIONS: QUAD CITIES NUCLEAR POWER STATION

Dear Mr. Pacilio:

We have received your corporate letter RS-10-130. In that letter, you requested an initial operator licensing examination be scheduled at the Quad Cities Nuclear Power Station for September 2013 and February 2015. In response, we have scheduled an initial operator licensing examination for the weeks of October 14 and 21, 2013, at the Quad Cities Nuclear Power Station. Additionally, we have scheduled an initial operator licensing exam for the week of March 23, 2015. On-site validation of these examinations is tentatively scheduled approximately three weeks prior to the examination dates. We note that you were previously scheduled for an initia.l operator licensing exam the week of March 26, 2012. Per your request, we have rescheduled this exam for the weeks of April 23 and April 30, 2012. We have scheduled an onsite validation date of April 2, 2012. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date. We understand that your staff will develop the examinations unless we determine it is necessary for the NRC to develop an examination in which case, we will notify you immediately upon discovery of that need. Because your letter indicated that there were more than nine applicants being considered for each of these examinations, the examinations were each scheduled for two weeks. Please inform us if the number of candidates change for any examination as this will impact the examination schedule. Also, please inform us at your earliest opportunity if you discover you need to change the scheduled dates for the examinations. A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the training program.

M. Pacilio -2 In accordance with 10 CFR 2.930 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at httg:llww.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room). Sincerely, IRA by D. McNeil forI Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-254; 50-265 License Nos. DPR 29; DPR 30 cc: Distribution via ListServ

M. Pacilio -2 In accordance with 10 CFR 2.930 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or 'from the Publically Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://ww.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room). Sincerely, IRA by D. McNeil fori Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-254; 50-265 License Nos. DPR 29; DPR 30 cc: Distribution via ListServ DISTRIBUTION: Daniel Merzke RidsNrrDorlLpl3-2 Resource RidsNrrPMQuad Cities RidsNrrDirslrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak DOCUMENT NAME: G:\DRSIII\DRS\WORK IN PROGRESS\OL EXAM CONFIRMATION LETTERS\QUA 060111 DRS OL.DOCX o Publicly Available o Non-Publicly Available o Sensitive o Non-Sensitive To receive aeopy of this document indicate in the box: "C": COpy without attachmenVenclosure "E" = COpy with attachment/enclosure "N": No copy OFFICE Rill I Rill IN I I NAME RKWalton:co HPeterson DM for DATE 06/01/2011 06/01/2011 OFFICIAL RECORD COpy

                                                               ,.., * .1 "

www.exeloncorpcom r Exelon Exelon Generation 4300 Winfield Road Nuclear Warrcnvi11e, IL 60555 RS-10-130 July 28,2010 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-71 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Dock§t Nos. STN 50-454 and STN 50-455 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Facility Operating License Nos. DPR-2, (Renewed) DPR-19 and DPR-25 NRC Docket Nos. 50-10. 50-237. and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Dock§t Nos. 50-373 and 50-374 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket Nos, 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Facility Operating license Nos, DPR-12, (Renewed) DPR-44, and DPR-56 NRC DQck§t NQs, 50-277 and 50-27& Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC DQcket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRC Dock§t No. 50-289

                                                                                     /")           ,
                                                                                               £1 f~*

AU' Z' C./ AUG 2 - 2010

July 28,2010 U. S. Nuclear Regulatory Commission Page 2

Subject:

Exelon Generation Company, LLC (EGG) Response to NRC Regulatory Issue Summary 2010-08, "Preparation and Scheduling of Operator Licensing Examinations"

Reference:

NRC Regulatory Issue Summary 2010-08, "Preparation and Scheduling of Operator licenSing Examinations," dated June 28, 2010 The referenced Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2012 through 2015, and the number of candidates requiring Generic Fundamentals Examinations for calendar years 2012 and 2013. Attachments 1 through 10 provide responses to RIS 2010-08 for the EGC plants identified above. The requested information for each facility is provided on a separate NRC Form 536. There are no regulatory commitments contained within this letter. Should you have any questions about this letter, please contact Mitchel Mathews at (630) 657-2819. - Completed NRC Form 536 for Braidwood Station - Completed NRC Form 536 for Byron Station - Completed NRC Form 536 for Clinton Power Station - Completed NRC Form 536 for Dresden Nuclear Power Station - Completed NRC Form 536 for LaSalle County Station - Completed NRC Form 536 for Limerick Generating Station - Completed NRC Form 536 for Oyster Creek Nuclear Generating Station - Completed NRC Form 536 for Peach Bottom Atomic Power Station - Completed NRC Form 536 for Quad Cities Nuclear Power Station 0 - Completed NRC Form 536 for Three Mile Island Nuclear Station - Unit 1

Attachment 1 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3150-0131 EXPIRES: 10131/2011 (10-2006) Estimated burden per res~onse to comply with this voluntary Information collection request: 1 hour. hiS Information collection is used to plan budgets lind resources for operator examinations. Send comments rf.ardln~ burde n estimate to the Records and FOINPrivacy Services Branch -5 F 3), U.S. OPERATOR LICENSING Nuclear R~ulatOry Commission. Washington, DC 20555-000 , or ~ internet e-mail to in 0 "80'1, and to the Desk Officer, Office of t ormauon EXAMINATION DATA and Regutat~ 8-10202. (3150-0131), Office of ManaQement and Budget, Wash! 20503. If a means used to Impose an !nformatlon collection does not display a currently valid OM8 control number, the NRC may not conduct or srconsor. and a person is not required to respond to, the information collect on. FACILITY NRC REGION Braidwood Station, Units J and 2 FacUlty Operating License Nos. NPF-72 and NPF-77 III NRC Docket Nos. STN 50-456 and STN S0-457 II A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2012 CY 2013 CY 2014 Cy 2015 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS Cy20U CY 2013 CY 2014 Cy2015 PROPOSED NUMBER NUMBER OF REACTOR 0 8 6 0 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 0 12 6 0 NUMBER OF SENIOR REACTOR OPERATORS*UPGRADE 0 0 0 0 NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS* LIMITED PROPOSED DATES PRIMARY DATE N/A 3/25/2013 12/08/2014 N/A ALTERNATE DATE N/A 41812013 115/2015 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED ~~--- NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 0 12 0 CANDIDATES NRC FORM 536 (1()"2008) PRINTED ON RECYCLED PAPER

Attachment 2 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150.()131 EXPIRES: 10131/2011 (10-2008) Estimated burden per res~onse to comply with this voluntary informatio n collection request: 1 hour. his informal ion collection is used to plan budgets and resources for operator examinations. Send comments rr.rdin~ burden estimate to the Records and FOIAIPrivacy Services Branch -5 F 3), U.S. OPERATOR LICENSING Nuclear Re~U!atory Commission, Washington, DC 20555-000 , or bf: intemat e-mail to in ocoliects@nrC'gov, and to the Desk Officer, Office of In ormation EXAMINATION DATA and Regulatory Affairs, NE B-l0202. (3150'()131). Office of Management and Budget, Washmgton. DC 20503. If a means used to impose an information collectlon does not display a currenUy valid OMB control number. llle NRC may not conduct or sponsor. and a person is not required to respond to, the informalion collectiOn. FACll.lTY NRC REGION Byron Station, Units I and 2 Facility Operating License Nos. NPF-37 and NPF-66 III NRC Docket Nos. STN 50-454 and STN 50-455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2012 Cy 2013 CY 2014 CY 2015 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE* PREPARED 1 t I J EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER Cy 2012

                                             -               CY 2013
                                                               -                            CY 2014 CY 2015 NUMBER OF REACTOR                       2                    6                                6                               0 OPERATORS NUMBER OF SENIOR REACTOR                                             6                               6                                6 6

OPERATORS* INSTANT NUMBER OF SENIOR REACTOR 0 0 I 0 OPERATORS* UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 1123/2012 112112013 1/27/2014 111912015 ALTERNATE DATE 1/1612012 1128/2013 1120/2014 1126/2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE Cy 2012 Cy 2013 PROPOSED --- NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 12 0 0 0 6 0 CANDIDATES NRC FORM 536 (1Q.2008) PRINTED ON RECYCLED PAPER

Attachment 3 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3150"()131 EXPIRES: 10/3112011 (10-2008) Estimated burden per response to comply with this volunlary informatkln collection request: 1 hour. This InformatJon collectJon is used to plan budgets and resources for operator examinations. Send comments r"N'rdin~ burde n estimate to the Records and FOINPrlvacy Services Branch \ -5 F 3). U.S . OPERATOR LICENSING Nuclear R~ulatory Commission, Washington, DC 20555..()OO

  • or ~ Internet a*mail to In ocollec!S@nrcsov. and to the Desk Officer. Office of In ormation EXAMINATION DATA and Regulatory Affalra. NE B-l0202, (3150-0131). Office of Management an d Budget. Washington, DC 20503. If a means used to impose an informatio n collection does not display a currently valid OMS control number, the NRC may not conduct or seonsor, and a parson is not required to respond to, lhe Information collect on.

FACILITY NRC REGION Clinton Power Station Facility Operating License No. NPF-62 III NRC Docket NO. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY2012 CY 2013 CY 2014

                                                                                               -                            CY 2015 LlCENSEE*PREPARED                0                           J                                0                               1 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED                  0                           0                                0                              0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                     Cy20U Cy2013 CY 2014 CY 2015 NUMBER OF REACTOR                      0                     6                               0                               6 OPERATORS NUMBER OF SENIOR REACTOR                                           4                                0                               4 0

OPERATORS* INSTANT NUMBER OF SENIOR REACTOR 0 2 0 2 OPERATORS* UPGRADE NUMBER OF SENIOR REACTOR OPERATORS* LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE N/A 08119/13 N/A 08117/15 ALTERNATE DATE N/A 08126/13 N/A 08/24/15 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 20.12 CY 2013 PROPOSED - - NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 10 0 () 0 0 () 0 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER

Attachment 4 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1

""RCFORM534                  u.s. NUCLEAR REGULATORY COMMISSION   APPROVED BY OM8; NO. 3150-0131                             EXPIRES; 10131/2011 1',0-200&)

Estlmal80 burden ~r r8S~n" to comply with till. vOluntary In!olmarlon coUec1ion request: hOUf. hie InlormaUon toI!ectiln is U$80 to plan budgets and 1911Oun::es ro, operalor axem!t\a!lon$. Send comment. :e:;.aralnB bUl'den eatWnate to Ihtl Records and FOIAIPtivacy Services Branch \ -5 F 3), U.S. OPERATOR LICENSING NUdear R~u\lItOry Commluion. Wnhlngton. DC 20555-000

  • Of b7c Inleme l e-lTIlIiI to In ocolleCfs@nro.~~, and to the Desk Officer, Offlee oJ In ormallon EXAMINATION DATA iI/ld ReguIalO:&.;JfIlIti. NE 8-10202. (315().(l1311. 0ft'Ice or Man.....enl and Budget. Wash ton, DC 2Cl503. If II means used 10 impoae an information con8ction does not d . y a eurrenUY valid OMS control number. the NRC may not conduct or 'pon50r, and
  • pel'1lon Is nol requIred 10 respond 10, thtl Inrotmation toIlldioo.

F....ClLlTY NRC REGION Dresden Nuelear Power Station, Unlts:z aud 3 Renewed Facility Operating License Nos. DPR-I9 and DPR-2! III NRC Docket Nos. 5"237 aDd 50-249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2011 CY 2013 CY 2014 CY lOts PROPOSED NUMBER ESTIMATED NUMBER OF LlCENSEE-PREPAREO 1 I 0 I EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPAAED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2012

                                              -               CylO13 CY2014                            Cy201!

NUMBER OF REACTOR 5 4 0 4 OPERATORS NUMBER OF SENIOR REACTOR 7 7 0 7 OPERATORS* INSTANT NUMBER OF SENIOR REACTOR J 0 OPERATORS-UPGRADE 0 J NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS - LIMITED 0 PROPOSED DATES PRIMARY DATE 816111 10/14/13 N/A 3/2115 ALTERNATE OATE 8/2on2 101Z8l13 N/A 3/23115 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 20U CY 1013 PROPOSED .'. NUMBER SEPTEMBER DECEMBER MARCH JUNE MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 12 0 0 0 0 0 12 CANDIDATES NRC"~ 530 Po-20(8) PRINTeO ON RECYCLeO PAPIR

Attachment 5 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3150.{l131 EXPIRES: 10/3112011 (10.2008) Estimated burden per res~onse to comply wilh this voluntary information collection request: 1 hour. his Information callectlan is used to plan budgets and resources far operator examinations. Send comments rel+ardin~ burden estimate to the Records and FOIAlPrlvacy Services Branch -5 F 3). U.S. OPERATOR LICENSING EXAMINATION DATA !t~~ti~~~~~~~ron, e-mail t .~v. and Washington. 10 the Desk 20555-0001, DCOfficer. or Inbr,ormation Office of internet B-l0202. (3150.{l131). Office of Management and 20503. If a means used to impose an Information collection does not display a currently valid OMB control number. the NRC may not conduct or sF-0nsor, and a person is not required to respond to, lhe informallon COllect on. FACILITY NRC REGION LaSalle County Station, Units 1 and 1 Facility Operating License Nos. NPF*t1 and NPF-18 NRC Docket Nos. STN 50-373 and 8TN 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE Cy 2015 PROPOSED NUMBER CY 2012

                                              -             CY 2013
                                                                --                           Cy 2014 ESTIMATED NUMBER OF LICENSEE-PREPARED                    1                 0                                I                                0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                      0                 0                                 0                               0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                       CY 2012            Cy2013                          CY 2014                         CY 2015 NUMBER OF REACTOR 8                  0                               6                                 0 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS -INSTANT S                  0                                6                                0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE                      2                  0                               2                                 0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED                   0                  0                                0                                It PROPOSED DATES PRIMARY DATE                 912412012            N/A                         10/13/2014                           N/A ALTERNATE DATE                 10/112012            N/A                         10120/2014                           N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY     2012                                                 CY 2013 PROPOSED                                 -

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATEO NUMBER OF 0 0 0 0 0 12 0 0 CANDIDATES NRC fORM 536 (1()'2008) PRINTED ON RECYCLED PAPER

Attachment 6 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO,3150-0131 EXPIRES: 10/31/2011 11O-Z(08) Estimated burden per res~onse to comply with this voluntary informalion collection request: 1 hour, his information collection Is used to plan budgets and resources for operator examinations, Send comments ~arding burden estimate to the Records and FOIA/Prlvacy Services Branch -5 F 3), U.S. OPERATOR LICENSING Nuclear Re~ulatory Commission. Washington. DC 20555-000

  • or bl: Internet e-mail to in oCollectS@nrc.gov, and 10 the Desk Officer. Office of In ormation EXAMINATION DATA and Regulatory Affairs. NE B-10202. (3150-0131). Office of Management and Budget. Washington. DC 20503. If a means used 10 impose an infomtation collection does not display II currently valid OMB control number. the NRC may not conduct or sponsor. and a person is not required to respond to. the Information collection.

FACILJTY NRC REGION Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-8S 1 NRC Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 20J2 Cy 2013 Cy 2014 Cy 2015 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS Cy20U CY 2013 CY 2014 CY 2015 PROPOSED NUMBER NUMBER OF REACTOR 8 0 8 0 OPERATORS NUMBER OF SENIOR REACTOR 7 0 6 0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR 2 0 2 0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS -LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 10/08/2012 N/A 10/06/2014 N/A ALTERNATE DATE 10llS/20U N/A 10/13/2014 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED -~ NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATEO NUMBER OF 0 0 0 0 0 14 0 0 CANDIDATES NRC FORM 536 (10-200a) PRINTED ON RECYCLED PAPER

Attachment 7 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010*08 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPRoveo BV OMS: NO. 315Q.0131 EXPIRES: 1013112011 (10.20<18) ESllmated burden per res~onse to comply wiln this vc;untery information ill COIlactIon request: 1 0011/'. his informallon ccllillCbon used !o plan budgets and rellOUrceII for operator examinations, Send comments 'rif:l esllmal8 to tile Records and FOIAlPrlVillCY SeNic>>. Branch *5 F 3). U,S. burden OPERATOR LICENSING NudNr R~ry Cornmi84lon. Waflninglon, DC 20555-000 . or ~ intllfl14ll e-mail Ie I tec1SQnrc,gt. and to the Ouk Olftcar. Office of In onnatlon EXAMINATION DATA and Regula:.r, Affairs. NE 8-10202, (315().()131). Office of Management and SqllC, We nglan, DC 20503, II a means used to 1Illp0s8 an information collBCtlon does not dispja~ II cummtly valid OMS controf nUmber. the NRC may not I;omlucl or sponsor. and II perlOn is nCI reqUired to r**pond to. tne informatlcn collacflOtl, FACll..IiY NRC REGION Oyster Creek Nudear Generating Station Renewed Faelllty Operating License No. DPR*16 I NRC Docket No. 50-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF Cy20U

                                              -              Cy 2013 CY 2014                          CY 2015 LlCENSEE*PREPARED                 I                        0                                 r                              0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED                   0                        0                                0                              0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY 2015 PROPOSED NUMBER                      CylOU CY2013 CY 2014 NUMBER OF REACTOR                        6                  0                                6                              0 OPERATORS NUMBER OF SENIOR REACTOR                       3                  0                                 2                              0 OPERATORS* INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE                         2                  0                                5                              0 NUMBER OF SENIOR REACTOR                                          0                                                               0 OPERATORS* LIMITED                       0                                                   0 PROPOSED DATES PRIMARY DATE                05/29/2012           N/A                         0610211014                          N/A AlTERNATE DATE               06/04/2012           N/A                         06109/2014                          N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINAnON (GFE) SCHEDULE CY 20U                                                     CY 2013 PROPOSED                                                                                             ' ",

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 IJ 0 0 0 CANOIDATES NRC FORM 536 (1()'20Ga) PRINTEO ON RECYClEO PAPER

Attachment 8 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 536 U.S, NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3150-0131 EXPIRES: 10/31/2011 (1(}-2008) Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour. his information oollection is used to plan budgets and resources for operator examinations. Send comments rfardlng burden estimate to the Records and FOIAlPrivacy Services Branch -5 F 3), U.S. OPERATOR LICENSING Nuclear R~ulatOry Commission. Washington. DC 20555-000

  • or blc intemet e-mail to in ocollects@nrc-g0v. and to the Desk Officer. OffICe of In ormation EXAMINATION DATA and Regulatory Affairs. NE 8-10202. (3150-O131). Office of Management and Budget. Washington. DC 205()3. If a means used to impose an Information collection does not display a current'y valid OMS control number. the NRC may not conduct o~nsor. and a person is not required to respond to. th e information coli on.

FACILITY NRC REGION Peach Bottom Atomic Power Station, Units 2 and 3 Facility Operating License Nos. OPR-12, (Renewed) OPR-44, and OPR-56 I NRC Docket Nos. 50-277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE Cy 2012 Cy 2013 Cy 2014 PROPOSED NUMBER

                                            -                   -                                -                           CY 2015 ESTIMATED NUMBER OF LICENSEE-PREPARED                  0                  1                                0                                1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                    0                  0                                 0                               0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS Cy 2012            CY2013                          CY 2014                          CY 2015 PROPOSED NUMBER NUMBER OF REACTOR                                                                                                        6 OPERATORS                    0                   8                               0 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT                  0                   10                               0                               6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE                    0                   2                                0                                2 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED
  • SeeLGS
  • See LGS
  • See LGS '" See LGS PROPOSED DATES PRIMARY DATE N/A 211112013 N/A 2/9/2015 ALTERNATE DATE N/A 3/25/2013 N/A 3/23/2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED ----

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 0 12 0 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER

Attachment 9 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APf'ROVED BY OMS; NO. 3150-{)131 EXPIRES: 1013112011 (10.2008) Estimated burden per re$~onse to comply with this voluntary information collection request: 1 hour. his inrormation collection is used to plan budgets and resources for operator examinations. Send comments reifrding burden estimate to the Recorda and FOIAIPrivacy Services Branch ( *5 F 3). U.S. OPERATOR LICENSING Nuclear R~tory Commission. Washington. DC 20555-0001. or by' Internet e*mailto in lIects@nrc.gov. and to the Desk Officer. Office of In ormation EXAMINATION DATA and Regulatory Affairs. NE B*10202. (3150*0131). Office of Management and Budget. Washington. DC 20503. If a means used to impose an infonmatlon collection does not display a currently valid OMB control number. the NRC may not conduct or ~nsor. and a person is not required to respond to, the Information colle . FACILITY NRC REGION Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-19 and DPR-30 NRC Docket Nos. 50-254 and 50-265 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2012

                                            -                Cy 2013
                                                               -                           CY 2014 CY 2015 ESTIMATED NUMBER OF L1CENSEE*PREPARED                 1                          1                                0                                1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                   0                          0                                0                               0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS Cy 2015 PROPOSED NUMBER CY 2012 CY 2013 CY 2014 NUMBER OF REACTOR                       4                    5                                0 OPERATORS 5

NUMBER OF SENIOR REACTOR 5 0 5 OPERATORS -INSTANT 9 NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE 0 1 0 0 NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 3/2612012 9/2312013 N/A 2/912015 ALTERNATE DATE 4123/2012 10114/2013 N/A 2/2312015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED -- NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 10 0 0 0 0 0 10 CANDIDATES NRC FORM 536 (10*2008) PRINTED ON RECYCLED PAPER

Attachment 10 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2010-08 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-{)131 EXPIRES: 10/3112011 (10*Z008 ) Estimated burden per res~onse to comply with this voluntary info~~~~ collection request: 1 hour. his information collection is used 10 plan b and resources for operalOr examinations. Send comments ~rdi~ estimate to the Records and FOIAIPrivacy Services Branch \ -5 F 3. . . OPERATOR LICENSING Nuclear R~ulatOry Commission. Washington. DC 20555-000 ,or bt: internet e-mail 10 in ocollects@nrc'gov. and to the Desk Officer, Office of In ormation EXAMINATION DATA and Regulatory Affairs, NE B-10202, (315O-{)131). Office of Management and Budget, WashIngton, DC 20503. If a means used to Impose an information collection does not display iii currently valid OMS control number, the NRC may not conduct or sponsor, and a person Is not required to respond 10, the information collection. FACILITY NRC REGION Tbree Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR*50 I NRC Docket No. 50-289 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY 2012

                                             -                Cy 2013
                                                                 -                            Cy 2014 CY 2015 LICENSEE-PREPARED                  1                           1                                   I                              I EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                    0                           0                                   0                              0 EXAMINAnONS B. INITIAL OPERATOR LICENSE EXAMINATIONS Cy2015 PROPOSED NUMBER                       CY 2012 CY 2013 CY 2014 NUMBER OF REACTOR                         4                    5                                  4                               6 OPERATORS NUMBER OF SENIOR REACTOR                                             5                                   5                              6 OPERATORS -INSTANT 5

NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE 0 0 0 0 NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS* LIMITED PROPOSED DATES PRIMARY DATE 02/612012 6110/2013 6/16/2014 6/15/2015 ALTERNATE DATE 02113/2012 6/17/2013 6/23/2014 612212015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2012 CY 2013 PROPOSED -. NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 10 0 0 0 9 0 0 0 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER

, UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 February 19, 2010 Mr. Charles G. Pardee Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville IL 60555

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS: NRC REGION III EXELON STATIONS

Dear Mr. Pardee:

In a letter dated August 13, 2009 (RS-09-109), your staff responded to Regulatory Issue Summary (RIS) 2009-11, and requested we schedule initial license operator examinations for the Exelon Nuclear Plants. In a separate letter dated March 19, 2009 (U-603882), Clinton Power Station requested an examination be administered in October or November 2010 that was not included in your RIS response letter. That examination has been added to your examination schedule. In a separate letter dated November 18, 2009 (U-603924), Clinton Power Station requested we not schedule the examination requested in December 2011 per your letter, but retain an August 2011 examination scheduled from your response to the 2008 RIS for examination scheduling. In a separate letter dated January 6, 2010 (Byron 2010-0003), Byron Station requested we change the dates of their examinations proposed for 2011,2012, and 2013 to other dates. We were unable to accommodate the April 2013 examination requested for Quad Cities Nuclear Power Station. It is currently listed as uTo Be Determined" as we are currently negotiating a mutually acceptable examination date with Quad Cities training department personnel. This letter confirms scheduling of the requested examinations at the Region III Exelon power plants and incorporates the changes requested by Clinton Power Station and Byron Station. We have tentatively scheduled the requested examinations to occur as follows: Station 2010 2011 2012 2013 2014 Braidwood N/R 06/20 N/R 03/25 I N/R

 . Byron                     9/27              N/R             01/16        01/14          01/27     i Clinton            i      11/1       i 8122             N/R          8/19           N/R      I Dresden            i     03108             03107             3105         3/04           N/R i LaSalle                  09/13              N/R             09/24         N/R     !

N/R  ! Quad Cities N/R 5/30 3/26 TBD  ! N/R i N/R - None Requested TBD To Be Determined On-site validation of the examinations is tentatively scheduled to occur approximately three weeks before each scheduled examination. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you and the affected station'S training department immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date.

C. Pardee -2 We understand that your staff will develop the proposed examinations unless we discover it is necessary for the NRC to develop an examination. If an examination anticipates greater than nine anticipated applicants for the examination, the examination is scheduled for two weeks. Otherwise, the examination is scheduled for one week. Please inform us if the number of candidates declines below ten for any examination as this will impact the examination schedule. Please inform us at your earliest opportunity if you discover a need to change any of the dates of the scheduled examinations. A supplementary letter will be sent to each station's training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner's name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room}. Sincerely, IRA! Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 Docket No. 50-461 License No. NPF-62 Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18 Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 cc: Distribution via ListServ

C. Pardee -2 We understand that your staff will develop the proposed examinations unless we discover it is necessary for the NRC to develop an examination. If an examination anticipates greater than nine anticipated applicants for the examination, the examination is scheduled for two weeks. Otherwise, the examination is scheduled for one week. Please inform us if the number of candidates declines below ten for any examination as this will impact the examination schedule. Please inform us at your earliest opportunity if you discover a need to change any of the dates of the scheduled examinations. A supplementary letter will be sent to each station's training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner's name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737, In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room). Sincerely, IRA! Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 Docket No. 50-461 License No. NPF-62 Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18 Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 cc: Distribution via ListServ DISTRIBUTION: See next page DOCUMENT NAME: G:\DRS\Work in Progress\Exelon 021910 DRS OLdoc To receive

      . a cOP3  of tbis doeument, indicate in tbe box "e" = Copy w/o attach/encl "E" = Copy with attach/encl "N" = No copy I

OFFICE RIII:DRS r RIII:DRS I RIII:DRS I I NAME JKweiser:co DMcNeil HPeterson DATE 01125/10 02117/10 02/19/10 OFFICIAL RECORD COPY

Letter to Mr. Charles G. Pardee from Mr. Hironori Peterson, dated February 19, 2010.

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS: NRC REGION III EXELON STATIONS DISTRIBUTION: RidsNrrDorlLpl3-2 Resource Susan Bagley RidsNrrPMBraidwood Resource RidsNrrPMByron Resource RidsNrrPMClinton Resource RidsNrrPMDresden Resource RidsNrrPMLaSalle RidsNrrPMQuad Cities RidsNrrDirslrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker DRPIII DRSIII Carole Ariano Linda Linn Patricia Buckley Tammy Tomczak

  • J Exelon Nuclear 4300 Winfield Road ear Warrenvllle,ll 6 osSS RS-09-109 August 13, 2009 U. S. Nuclear Regulatory Commission ATrN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and SO-374 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-8S NRC Docket Nos. 50-352 and 50-353 Oyster Creek Nuclear Generating Station Renewed Facility Operating license No. DPR-16 NRC Docket No. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 Quad Cities Nuclear Power Station, Units 1 and 2 'o.d=f'} j.O J~

Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Facility Operating license No. OPR-50 NRC Docket No. 50-289 AUG 1 7 200.9

August13,2009 U. S. NUclear Regulatory Commission Page 2

Subject:

Response to NRC Regulatory Issue Summary 2009-11, "Preparation and Scheduling of Operator Licensing Examinations"

Reference:

NRC Regulatory Issue Summary 2009-11, flPreparation and Scheduling of Operator Licensing Examinations," dated July 16, 2009 The referenced Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2010 through 2013, and the number of candidates requiring Generic Fundamentals Examinations (GFEs) for calendar years 2010 and 2011. Attachments 1 through 10 provide responses to RIS 2009-11 for the Exelon Generation Company, LLC (EGG) plants identified above. The requested information for each facility is provided on a separate NRC Form 536. In calendar year 2010, eight candidates are expected to take the dual-site Limited Senior Reactor Operator (LSRO) initial license examination as indicated on Attachment 6. The schedule for the indicated examination is as follows: the written examination and a portion of the operating examination will be given at Limerick Generating Station (LGS); the remainder of the operating examination will be completed at Peach Bottom Atomic Power Station (PBAPS). Since the LSRO examination is a dual-site examination that involves both LGS and PBAPS, rather than repeating the same information on both attachments, the examination scheduling information is provided on Attachment 6 for LGS. Attachment 8 for PBAPS references Attachment 6 where appropriate. There are no regulatory commitments contained within this letter. Should you have any questions about this letter, please contact Mitchel Mathews at (630) 657~2819. Je Man ger ~ licensing and Regulatory Affairs Attachment 1 - Completed NRC Form 536 for Braidwood Station Attachment 2 - Completed NRC Form 536 for Byron Station Attachment 3 - Completed NRC Form 536 for Clinton Power Station Attachment 4 ~ Completed NRC Form 536 for Dresden Nuclear Power Station Attachment 5 - Completed NRC Form 536 for LaSalle County Station Attachment 6 - Completed NRC Form 536 for Limerick Generating Station Attachment 7 - Completed NRC Form 536 for Oyster Creek Nuclear Generating Station Attachment 8 - Completed NRC Form 536 for Peach Bottom Atomic Power Station Attachment 9 - Completed NRC Form 536 for Quad Cities Nuclear Power Station Attachment 10 ~ Completed NRC Form 536 for Three Mile Island Nuclear Station - Unit 1

Attachment 1 Response to RIS 2009*11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 1013112011 (10.2008) Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour. his information collection is used to plan budgets and resources for operator examinatIons. Send comments r~ardlng burden estimate to the Records and FOIAlPrlvacy Services Branch *5 F 3), U.S. OPERATOR LICENSING Nuclear R~ulatOry Commission, Washington, DC 20555-000

  • or b{, internet a*mail to In oOOllects@nrc'gov, and to the Desk OffICer, Office olin ormaUon EXAMINATION DATA and Regulatory Affairs. NE B-l0202, (3150-0131). Office of Man8Qement and Budget, Washington, DC 20503. If a means used to impose an Information collection does not display a currently valid OMS control number, the NRC may not conduct or sfc0nsor, and a person is not required to respond to, the information coliect on.

FACILITY NRCREGtON Braidwood Station, Units 1 and 1 Facility Operating License Nos. NPF*71 and NPF*77 III NRC Docket Nos. STN 50-456 and STN 51)...457 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 1010 Cy 2011 PROPOSED NUMBER

                                            --                  -                            Cy 2011 CY 2013 ESTIMATED NUMBER OF LICENSEE-PREPARED                 0                           1                                 0                               1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                   0                           0                                 0                              0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 CylOll                          Cy2012
                                                                                                -                            CY20J3 NUMBER OF REACTOR                        0                    7                                0                               S OPERATORS NUMBER OF SENIOR REACTOR                      0                   12                                 0                             12 OPERATORS* INSTANT NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE                        0                    2                                0                               2 NUMBER OF SENIOR REACTOR                                            0                                0                               0 OPERATORS - LIMITED                      0 PROPOSED DATES PRIMARY DATE                       N/A         0612012011                                N/A                  03/24/2013 ALTERNATE OATE                       N/A        07/11/2011                                 N/A                 04/08/1013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY   2010                                                 CY PROPOSED                                ._                                                          -

2011 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 11 0 0 0 0 0 0 19 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER

Attachment 2 Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO,3150-0131 EXPIRES: 10/3112011 (10-2008) Estimated burden per res~onse to comply with this voluntary Information collection request: 1 hour. his .nformation collection is used to plan budgets and resources for operator examinations. Send comments r:rardin~ burden estimate to the Records and FOIAlPrivacy Services Branch *5 F 3), U.S. OPERATOR LICENSING Nuclear R~ulatory Commission. Washington. DC 20555-000 ,or bt: mtemet e-mail to in ocollects@nrc80v, and to the Desk Officer, Office of In ormation EXAMINATION DATA and Regulatory Affairs, NE B-10202. (3150..1)131). Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currenUy valid OMB control number, the NRC may not conduct or sponsor, and II person is not required to respond to, the information collection, FACILITY NRC REGION Byron Station, Units 1 and 2 FacUlty Operating License Nos. NPF-37 and NPF-66 III NRC Docket Nos. STN 50454 and STN 50-455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2010 CY 2011 CY 2012 CY 2013 PROPOSED NUMBER ESTIMATED NUMBER OF L1CENSEE*PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 CY2011 Cy2012

                                                                                                 -                           CY 2013 NUMBER OF REACTOR                         8                    0                                0                              6 OPERATORS NUMBER OF SENIOR REACTOR                       8                    (;                               6                              6 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE                           1                    1                               0                               0 NUMBER OF SENIOR REACTOR                                             0                               0                               0 OPERATORS - LIMITED                       0 PROPOSED DATES PRIMARY DATE                 09/27/2010         09/2612011                     09/24/2012                      09/23/2013 ALTERNATE DATE                   N/A             10/0312011                     10/0112012                      10/0712013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY     2610                                                 CY 2011 PROPOSED                                 ~--                                                         -

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 (; 0 0 0 6 0 0 CANDIDATES NRC FORM 536 (10-2008) F'RlNTED ON RECYCLED PAPER

Attachment 3 Response to RIS 2009-11 Page 1 of 1 NRC FORM 531 u.s. NUCLEAR REGULATORY COMMISSION APJ'ROVEO BY OMS: NO. 3150-0131 EXPIRES: 08l31J2008 (,,2005) E,lImatlid burd,n!r.' r..~n.. to comply with thl. voluntary Information codedlon requetl: hour. .. Inlonnatloil c::ohdlon ill uaed to plan budgllt.l and retourollll for operator eqmlllllliona. Send co_nil ~rdinl burilen OPERATOR LICENSING eilimate to the Re<:ord, and FOIAlPriv: SIlYlceto Branch -6 F 3). U.S. NueI_ R~UIaI!HY Commillion. Wuhlno n. DC 20555-000

  • Of ~temet IIMY1&H to In ocoOect.Onrcsr' and to the Delk Ot'lloet'. 0fIIat 011 EXAMINATION DATA and Regul:AffaIrS. NE .10202. (3150-0131). 0I!Ice of M_gementanct atlon Budget. Wa'" gton. OC 2050:3. If a mealll used to Impoae an Inforrn8llon COIIICIIon doel nol dlllpflly
  • cumlnUV valid OMS oonllOl number. the NRC may nol conduct o~n.or. and a peraon I. not required 10 r**pond to. Ihe Inronn.tJon COl n.

FACIUTY NRCREGIOH Clinton Power Station, Unit 1 Facility Operating Ucense No. NPF-62 III NRC Docket No. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY2010 CY2011 CY2012 CY2013 LICENsee-PREPAREO 1 1 0 1 EXAMINATIONS ESTlMATEO NUMBER OF NRc.PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2010 CY2011 CY2012 CY2013 NUMBER OF REACTOR 6 0 OPERATORS 6 6 NUMBER OF SENIOR REACTOR 4 0 4 OPERATORS* INSTANT 0 NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE 0 2 0 2 NUMBER OF SENIOR REACTOR OPERATORS* LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 1012512010 1210512011 MIA 08/19/2013 ALTERNATE DATE 1110112010 12111/2011 MIA 08l26I2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBEf; DECEMBER ESTIMATED NUMBER OF 0 0 9 0 0 0 0 0 CANDIDATES

Attachment 4 Response to RIS 2009*11 Page 1 of 1 NRC FORM 536 u.s. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3150-0131 EXPIRES: 10/3112011 (1 ()'ZOOS) Estimated burden per res~onse to comply with this voluntary information collection request: 1 hour, his information collection is used to plan budgets and resources for operator examinations, Send comments refrdlng burden estimate to the Records and FOIA/Privacy Services Branch -5 F 3), U.S. OPERATOR LICENSING Nuclear Re?,Ulatory CommiSSion. Washington. DC 20555-000

  • or bYt Internet lHTIaillo in oCOliects@nrc'gov. and to the Desk Officer. Office of In ormation EXAMINATION DATA and Regulatory Affairs, NE B-10202. (3150-0131). Office of Management and Budget, Washington. DC 20503. If a means used to Impose an information collection does not display a currently valid OMS control number. the NRC msy not conduct or sponsor. and a person Is not required to respond to. the information collecllon.

FACILITY NRCREOION Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 III NRC Docket Nos. 50-237 and 50-249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 CY 2011 Cy 2012 Cy 2013 ESTIMATED NUMBER OF LlCENSEE*PREPARED 1 1 I I EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 Cy2011

                                                                  -                            CY 2012 CY 2013 NUMBER OF REACTOR                        2                    3                                3                               3 OPERATORS NUMBER OF SENIOR REACTOR                        6                    4)                               9                               4)

OPERATORS -INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 1 1 1 1 NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS

  • LIMITED 0 PROPOSED DATES PRIMARY DATE 03/08/2010 03/0712011 03/05/2012 03/04/2013 ALTERNATE DATE 04/05/2010 04104/2011 04/02/2012 0410112013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED - -

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 12 0 0 0 12 CANDIDATES NRC FORM 536 (t()'2008) PRINTEO ON RECYCLEO PAPER

Attachment 5 Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3150..0131 EXPIRES: 10/31/2011 (10*2008) Estimated hurden per res~onse to comply with this voluntary information collection request: I hour. his Information collection is used to plan budgets and resources for operator examinations. Send comments re~ardlng buraen estimate to the Records and FOIA/Prlvacy Services Branch ~ *5 F 3). U.S. OPERATOR LICENSING Nuclear Re?culatory Commission. Washington, DC 20555*000 ,or b~ Internet

                                                                &omail to in ocollects@nrc-g0v, and to the Desk OffICer. Office of In ormation EXAMINATION DATA                         and Regulato~ Affairs, NE 9*10202. (3150..0131). OffiC8 01 Mana~ement and Budget. Wash nglon. DC 20503. If a means used to impose an "formation collection does not display a currently valid OMS control number, the NRC may not conduct or sponsor. and a person Is not required to respond to. the Information collection.

FACILITY NRC REGION LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-ll and NPF-tS III NRC Docket Nos. STN 50*373 and STN 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2010 Cy 2011 Cy 2012 Cy 2013 PROPOSED NUMBER ESTIMATED NUMBER OF LlCENSEE*PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 CY2011 CY2012 CY 2013 NUMBER OF REACTOR 3 0 6 0 OPERATORS NUMBER OF SENIOR REACTOR 11 0 8 0 OPERATORS* INSTANT NUMBER OF SENIOR REACTOR 0 2 0 OPERATORS-UPGRADE 0 NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS - LIMITED 0 PROPOSED DATES PRIMARY DATE 09114/2010 N/A 09/24/2012 N/A ALTERNATE DATE 0912112010 N/A 10/01/2012 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE Cy 2010 CY 20ll PROPOSED ~ NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 14 0 0 CANDIDATES NRC FORM 536 (10-2OOa) PRINTED ON RECYCLED PAPER

Attachment 6 Response to RIS 2009-11 Page 1 of 2

~'ORM53I                      U". NUCLEAR REGULATORY cotn_1ION APPAOIIeO BY OMS: NO. 3115C).()131                           EXPIRES: 1013112011 tOo:llOClll                                                   e.tnbMI burden        .f:

CGIIecdon I'IIPI'It lieu.

                                                                                         ~ to ~ wll/l1IIhI wIuIUy infonnadon InbmIiIcIiI coII<tcIIcIft It UMd D ~ ~
                                                               .., _           tilt' ~ ~.IIoI.. s.nd ~dII1Lbur1iIn
                                                               ....... 10 ltIe RecionIIIMCI F~ SeMcw 8I.a oe F ). u.s.

OPERATOR UCENSING NucIIIIIr ~ ComInIIoIIon. W'IIeNI'IIIII!!~ DC *<< ~ EXAMINATION DATA HIIIII D ~d'

                                                               ~ w
                                                                    ~~ 20lI03..

D 1M OM 0IIIcIr. 0Ib" I

                                                                                              'F;(3115C).()131),      0IIIce
                                                                                                        ~ UMd D IIIIp!:JM _
                                                                                                                               "-:c=:.'"

ooIIiCIIDn doeI nat ~

  • CUMrIIIy VIIIId ot.e CICIr*aI nurnt.... HAC f".IIY Ib I
                                                               ~           ~_. Mel
  • penlClIII_ not flICIUnd to ..._pond to. 1M FI'I::UfY NIRC~

Umerlck GeIleR" Statio.. u.1ts 1 ..<<11 FHUIty Oper_. . Licea" NOlo NPF-39 ..d NPF-85 I NRC Docket NOI. so.351 ... so.353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF cy 181' Cyl.11 CylOll Cyll13 UCENSEE.fIREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS 0

  • 0 B. INITIAL OPERATOR UCENSE EXAMINATIONS PROPOSED NUMBER NUMBER OF REACTOR CylOl.

CylOU Cy18U CylO13 6 8 11 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS

  • INSTANT 7 0 5 NUMBER OF SENIOR REACTOR OPeRATORS* UPGRADE 5
  • 2 NUM8EROFSENlORR~R OPERATORS* UMITED *
  • 0 0 PROPOSED DATES PftIUARY DATE 1010411018 N/A 1010112012 N/A AlTERNATE DATE 101181201' N/A otl24l2OU N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2ft. CY 2011 PROPOSED - -

NUMBER MARCH JUNE ~EPTEMBER DECEMBER MARCH JUNE !sEPTEMBER DECEMBER ESTIMATED NUMBER OF CANOIDATES

  • 0 0 0
  • 16 .
  • NRC FOIW UI (111-21lO1)

Attachment 6 Response to RIS 2009-11 Page 2 of2 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO,3150-0131 EXPIRES: 10/3112011 (10*2008) Estimated burden per res~onse to comply with thiS voluntary information collection request: 1 hour. his information collection Is used to plan budgets and resources for operator examinations, Send comments refrdln~ burden estimate to the Records and FOIAIPrivacy Services Branch *5 F 3), U.S. OPERATOR LICENSING Nuclear Ra~ulatOry Commission. Washington. DC 20555-000 ,or b~ Internet e*malito in ocoliects@nrc,gov. and to the Desk Officer. Office of In orm.Uoo EXAMINATION DATA and Regulat~ Alfalrs. NE 8*10202. (3150-0131), Office 01 Management and Budget, Washington. DC 20503, II a means used to impose an Information collection does not display a currenUy valid OMS control number. the NRC may not conduct or sponsor. and a person Is not required to respond to. the inforrnaUon caliecHon. FACILITY NRC REGION Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 I NRC Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY 2010 CY 2011 CY 2012 Cy 2013 LICENSEE-PREPARED I 0 0 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS Cy 20to Cy2011 Cy2013 PROPOSED NUMBER

                                              -                 -                           CY2012 NUMBER OF REACTOR                          0                  0                                0                              0 OPERATORS NUMBER OF SENIOR REACTOR                        0                   0                               0                               0 OPERATORS -INSTANT NUMBER OF SENIOR REACTOR                                           0                               0 OPERATORS*UPGRADE                           0                                                                                  0 NUMBER OF SENIOR REACTOR                                            0                               0 8                                                                                  0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE                 06/14/2010                 N/A                             N/A                           N/A ALTERNATE DATE                06/07/2010                N/A                               N/A                          N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY     2010                                               CY 2011 PROPOSED                                 -                                                         -~

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 0 0 0 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER

Attachment 7 Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED SY OMS: NO. 3150.0131 EXPIRES: 10/3112011 (10-20081 Estimated burden per res~onse to comply with this voluntary information coilectiOn request: 1 hour. his Information collection is used to plan budgets and resources for operator examinations. Send comments re~rding burden estimate 10 the Records and FOIAIPrivscy Services Branch -5 F 3). U.S. OPERATOR LICENSING Nuclear Re?,Ulatory Commission, WaShington. DC 20555-000

  • or brc internet e-mail to in ocollects@nrc.gov. and to tha Desk Officer. Office of In ormation EXAMINATION DATA and RagUlato~ Affairs. NE S*10202. (3150.0131). Office of Management and Budget. Wash ngton. DC 20503. If a means used to impose an Information collection does not display a currently valid OMS control number. the NRC may not conduct or se;;,nsor. and a person Is not required to respond to. the information collect .

FACILITY NACREGION Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 I NRC Docket No. 50-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY 2010 CY 2011 Cy 2012

                                                                                                  -                           Cy 2013 LICENSEE-PREPARED                   1                          1                                 1                              0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                     0                          0                                0                               0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                       CY 2010
                                              -               CY2011
                                                                 -                            CY2012 CY 2013 NUMBER OF REACTOR                         6                    6                                6                               0 OPERATORS NUMBER OF SENIOR REACTOR                       7                     7                                8                              0 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR                                             1                                2 OPERATORS* UPGRADE                         2                                                                                     0 NUMBER OF SENIOR REACTOR                                             0                                0                              0 OPERATORS - LIMITED                       0 PROPOSED DATES PRIMARY DATE                 05/1712010         0711112011                    05/2812011                                N/A ALTERNATE DATE                05/24/2010         0711812011                    0610412012                                N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010                                                    CY 2011 PROPOSED                                 -                                                           -

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 13 0 0 0 14 0 0 0 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLEO PAPER

Attachment 8 Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 315O'()131 EXPIRES: 1013112011 (10.2008) Esllmated burden per reS~On$6 to comply with this voluntary information collection request: 1 hour. his information collection is used to plan budgets and resources for operator examinations. Send comments r~arding burden estimate to the Records and FOIA/Prlvacy Services Branch *5 F 3). U.S. OPERATOR LICENSING Nuclear Ref,ulatory CommiSsion. Washington. DC 20555-000

  • or blt intamet a*mall to in OCOliects@nrc-S0v. and to the Desk Officer, Office of In ormation EXAMINATION DATA and R"gulalo~ Affairs. NE B*l0202, (315O'()131), Office of Management an d Budget, Wash nglon, DC 20503. If a means used to Impose an information collection does not display a currently valid OMS control number. the NRC may not conduct or ~onsor, and a person Is not required to respond to, the InformaUon colle on.

FACILITY NRC REGION Peach Bottom Atom Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 I NRC Docket Nos. 50-277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2010 CY 2011 CY 20ll PROPOSED NUMBER

                                           -                   -                                -                          CY 2013 ESTIMATED NUMBER OF LlCENSEE*PREPARED                0                           1                                0                                1 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED                  0                           0                                0                               0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER Cy 2010             CY2011 Cy20ll
                                                                                               -                            CY2013 NUMBER OF REACTOR                       0                    6                                0                               8 OPERATORS NUMBER OF SENIOR REACTOR                     0                    8                                0                              10 OPERATORS* INSTANT NUMBER OF SENIOR REACTOR OPERATORS* UPGRADE                        0                    3                               0                                2 NUMBER OF SENIOR REACTOR                                           0                               0 OPERATORS* LIMITED
  • 0 PROPOSED DATES PRIMARY DATE
  • 01131/2011 N/A 02/11/2013 ALTERNATE DATE
  • 03/21/2011 N/A 02/04/2013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED - -

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 0 18 0 CANDIDATES NRC FORM 536 (10-200S) PRINTED ON RECYCLED PAPER

       *See Attachment 6 (Limerick Generating Station) for Limited SRO numbers and exam dates

Attachment 9 Response to RIS 2009-11 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/3112011 (1()'2008) Estimated burden per res~onse to comply with this voluntary Informatio n collection request: 1 hour. his ,nformatlon collection is used 10 plan budgets and resources for operalor examinations. Send comments ~ftllng burden estimate 10 the Records and FOiNPrlvacy Services Branch *5 F 3), U.S. OPERATOR LICENSING Nuclear Re~ulalOry Commission, Washington, DC 20555-000 , or bl: internet e-mail 10 in ocollects@nrc'goll, and to Ihe Desk Officer, Office of In ormation EXAMINATION DATA and Regulatory Affairs, NE B*l0202, (3150-0131), OffiCe of Management and Budget, Washington. DC 20503. If a means used 10 impose an Information Collection does nol display a currenlly valid OMS control number, the NRC may not conduct or sponsor. and a person is no! required to respond to, the information collection. FACILITY NRC REGION Quad Cities Nuclear Power Station, Units t and 2 Renewed FaciUty Operating License Nos. DPR-29 and DPR-30 III NRC Docket Nos. 50-254 and 50-265 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2010 Cy 2011 Cy 2013 PROPOSED NUMBER

                                            -                   -                            CY 2011 ESTIMATED NUMBER OF LlCENSEE*PREPARED                0                           1                                 I                               1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                  0                           0                                0                               0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS Cy 2010             Cy 20tl                         CY2012                          CY1013 PROPOSED NUMBER NUMBER OF REACTOR                      0                     6                                4 OPERATORS 3

NUMBER OF SENIOR REACTOR tl 10 10 0 OPERATORS* INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 0 1 1 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE N/A 05/30/2011 03/1212012 04/15/2013 ALTERNATE DATE N/A 06/1312011 03/2612012 0411912013 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED - - NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 14 0 0 0 0 CANDIDATES NRC FORM 535 (10-2008) PRINTED ON RECYCLED PAPER

Attachment 10 Response to RIS 2009*11 Page 1 of 1 NRC FORM 538 U.S. NUClEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3160*1)131 EXPIRES; 1013112011 (10-2001) etUmal4ld burtten p41r ,..~n.e to comply with Ihlt volunlllY InformatIOn c:oIIedlon nlqlle81: 1 hour. I1Ilnfom1allon coft8Cllon Is used 10 plan budUela and rnourcea for operator examination.. Send commomll r~d~ bll'de n OPERATOR LICENSING eallmale to tn. Record. and FOllIIPrivacy ServIc:M Branch .fi" 3). U.S. Nudea, 1'1:1011' Commlulon. Waahlngton, DC 20566-000

  • 01' ~ IiIIemeI e-mail 10 In l~nrc8:' and 10 the Dellk Olftcotr. 0fII0e of I rmllllon EXAMINATION DATA and AeaUIa:r, Alfari. NE 10202, (3150-0131), Omc. of M~I.nd B~.t. Wa lIQIon, DC 20503. If a ~A* uMd 10 Impoee an forrn<<tIOn coIleCtton doel nol dillpllly a curranUy \IIIIid OMS oontrol number. Itte NRC may not conduct O~lOt, and a parlon I, not required to ,e.pond 10, Ih l information col
  • FAClUlY NRCREOION Three MOe Islaad Nudear Station, Ualt 1 FaeWty OperadDI License no. DPR*!O I NRC Docket No. 50.289 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY 2010 CylOll Cy2011 CylO13 LICENSEE-PREPARED 1 I 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INlnAL OPERATOR LlC!NS! EXAMINATIONS PROPOSED NUMBER Cy 1010 Cy2011 CylOll Cy1013 NUMBER OF REACTOR I 10 0 OPERATORS 9 NUMBER OF SENIOR REACTOR 1 10 0 8 OPERATORS
  • INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0 1 0 1 NUMBER OF SENIOR REACTOR 0 0 0 OPERA~S - LIMITED 0

PROPOSED DATES PRIMARY DATE 011111l0l0 09JIlllOll N/A 09/0912013 AlTERNATE DATE 011%812010 09/l'/lOU N/A 0911612013 C. PROPOSED GENERIC FUNDAMENTALS !XAMINATION (GF!) SCHEDULE Cy 2010 CY lOll PROPOSED ----- -- NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE ~EPTEMBER DECEMBER ESTIMATED NUMBER OF 11 0 0 0 18 0 0 0 CANDIDATES NRC FORM 538 (10.:z001) PRINTED Of! RECYClEO PAPeR

October 7, 2008 Mr. Charles G. Pardee Chief Nuclear Officer and Senior Vice President Exelon Generation Company, LLC 4300 Winfield Road Warrenville IL60555

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS: NRC REGION III EXELON STATIONS

Dear Mr. Pardee:

In a letter dated July 22, 2008, (RS-08-092) your staff responded to Regulatory Issue Summary 2008-16 and requested we schedule initial license operator examinations for the Exelon Nuclear Plants. In a separate letter dated July 11, 2008, (KKM-08-001) the Quad Cities Nuclear Power Station Training Manager requested a change to the start date of the Station's 2009 examination. This letter confirms scheduling of the requested examinations at the Region III power plants and the change requested for the Quad Cities Nuclear Power Station 2009 examination. We have tentatively scheduled the requested examinations to occur as follows: Station 2009 2010 2011 2012 Braidwood 10105 N/R 6/20 N/R Byron N/R 9/27 9/12 9/10 Clinton 8/24 N/R 8/22 N/R Dresden 03/09 03/08 3107 3/05 LaSalle N/R 09/13 N/R I 9/17 Quad Cities 11/30 N/R 5/30 3/26 N/R - None Requested On-site validation of the examinations is tentatively scheduled to occur approximately three weeks before each scheduled examination. In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you and the affected station's training department immediately upon discovery of such conditions and make arrangements to administer the examination at a mutually acceptable date. We understand that your staff will develop the proposed examinations unless we discover it is necessary for the NRC to develop an examination. Because the examinations have greater than nine anticipated applicants, each examination is scheduled for two weeks. Please inform us if the number of candidates declines below ten for any examination as this will impact the examination schedule. Please inform us at your earliest opportunity if you discover a need to change any of the dates of the scheduled examinations.

C. Pardee -2 A supplementary letter will be sent to each station's training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner's name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rmladams.html. Sincerely, IRA! Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 cc: Site Vice President - Braidwood Station Plant Manager - Braidwood Station Regulatory Assurance Manager - Braidwood Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager licenSing - Braidwood, Byron and LaSalle Associate General Counsel Document Control Desk - Licensing Assistant Attorney General J. Klinger, State Liaison Officer, Illinois Emergency Management Agency Chairman, Illinois Commerce Commission Site Training Director - Braidwood Station

C. Pardee -2 A supplementary letter will be sent to each station's training department director approximately 120 days prior to the initial examination. The letter will provide the director with the chief examiner's name, an outline of examination security expectations, a list of the materials required by the NRC to conduct the examination, and it will reconfirm the examination dates and the number of candidates you have in the training program. If you have any questions concerning this information, please contact Mr. Dell McNeil of my staff at 630-829-9737. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html. Sincerely, IRA! Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 cc: Site Vice President - Braidwood Station Plant Manager - Braidwood Station Regulatory Assurance Manager - Braidwood Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Braidwood, Byron and LaSalle Associate General Counsel Document Control Desk - Licensing Assistant Attorney General J, Klinger, State Liaison Officer, Illinois Emergency Management Agency Chairman, Illinois Commerce Commission Site Training Director - Braidwood Station See Attached Distributions DOCUMENT NAME: G:\DRS\WORK IN PROGRESS\EXELON 100708 DRS OL.DOC o Publicly Available 0 Non-Publicly Available 0 Sensitive 0 Non-Sensitive T 'd"lcate ID tbe box "C" =Copy W! 0 attachienc I "E" = COPYWI°th attachiene'

     ' a COP) 0f t b'IS document, In o receIve                                                                                                  I 'N" =NocoPY OFFICE           RIII:DRS            I          RIII:DRS          J          RIII:DRS                 I                  I NAME             JKweiser:co                    DMcNeil                      HPeterson DATE             10/02/08                       10/02/08                     10/07/08 OFFICIAL RECORD COPY

C. Pardee -3 Docket Nos. 50-454; 50-455 license Nos. NPF-37; NPF-66 cc; Site Vice President - Byron Station Plant Manager - Byron Station Regulatory Assurance Manager - Byron Station P. Schmidt, State liaison Officer, State of Wisconsin Chairman, Illinois Commerce Commission Site Training Director - Byron Station B. Quigley, Byron Station Docket No. 50-461 license No. NPF-62 cc: Site Vice President - Clinton Power Station Plant Manager - Clinton Power Station Regulatory Assurance Manager - Clinton Power Station Manager licensing - Clinton, Dresden and Quad Cities Site Training Director - Clinton Power Station Docket Nos. 50-237; 50-249 license Nos. DPR-19; DPR-25 cc: Site Vice President - Dresden Nuclear Power Station Plant Manager - Dresden Nuclear Power Station Regulatory Assurance Manager - Dresden Nuclear Power Station Site Training Director - Dresden Nuclear Power Station Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18 cc; Site Vice President - LaSalle County Station Plant Manager - LaSalle County Station Regulatory Assurance Manager - LaSa"e County Station Site Training Director - LaSalle County Station Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 cc: Site Vice President - Quad Cities Nuclear Power Station Plant Manager - Quad Cities Nuclear Power Station Regulatory Assurance Manager Quad Cities Nuclear Power Station Vice President - Law and Regulatory Affairs D. Tubbs, Manager of Nuclear Associate General Counsel M. Rasmusson, State Liaison Officer, State of Iowa Chief Radiological Emergency Preparedness Section, Dept. of Homeland Security Site Training Director - Quad Cities Nuclear Power Station

Letter to Charles G. Pardee from Hironori Peterson dated October 7,2008

SUBJECT:

CONFIRMATION OF REQUESTED INITIAL OPERATOR LICENSE EXAMINATIONS: NRC REGION III EXELON STATIONS DISTRIBUTION: Russell Gibbs Tamara Bloomer Meghan Thorpe-Kavanaugh Joel Wiebe Stephen Sands Christopher Gratton RidsNrrDirslrib Resource Mark Satorius Kenneth OBrien Jared Heck Roland Lickus Carole Ariano Linda Linn Patricia Buckley DRPIII DRS III Patricia Buckley Tammy Tomczak

Janet Kweiser From: Carmen Olteanu Sent: Tuesday, October 21, 2008 11 :22 AM To: Russell Gibbs; Tamara Bloomer; Meghan Thorpe-Kavanaugh; Joel Wiebe; Stephen Sands; Christopher Gratton; RidsNrrOirslrib Resource; Mark Satorius; Kenneth OBrien; Jared Heck; Carole Ariano; Linda Linn; Patricia Buckley; ORPIII; ORSIII; Patricia Buckley; Tammy Tomczak

Subject:

Exelon Letter Re Confirmation of Initial Exam Attachments: Exelon 100708 DRS OL.doc The subject document has been completed and has been submitted to DPe to be declared in ADAMS. A Word copy of the document has been attached and the document has been assigned Accession

  1. ML082880559.

1

AmerGen~ An Exelon Company www.exeloncorp.COIn Exelcn AmerCen Energy Company, LLC Nuclear 4300 W:nficld Road Exelon GeneratIon WarrenvIlle. Il 60555 4300 Wmfield Road W3rrenvlllc.ll6oS55 RS-08-092 July 22, 2008 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF*37 and NPF*66 NRC Docket Nos.STN 50-454 and STN 50-455 Clinton Power Station, Unit 1 Facility Operating License No. NPF*62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR*19 and DPR-25 _ NRC Docket Nos. 50-237 and 50-249 . , LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket NOi. 50-373 and 50*374 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Nuclear Generating Station Facility Operating License No. DPR-16 NRC Docket No. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR*56 NRC Docket NOi, 50-277 and 50-278

July 22, 2008 U. S. Nuclear Regulatory Commission Page 2 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Facility Operating License No. DPR-50 NRC Docket No. 50-289

Subject:

Response to NRC Regulatory Issue Summary 2008-16, "Preparation and Scheduling of Operator Licensing Examinations"

Reference:

NRC Regulatory Issue Summary 2008-16. "Preparation and Scheduling of Operator Licensing Examinations," dated June 27,2008 The referenced Regulatory Issue Summary requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2009 through 2012, and the number of candidates requiring Generic Fundamentals Examinations for calendar years 2009 and 2010. Attachments 1 through 10 provide responses for the Exelon Generation Company, LLC and AmerGen Energy Company, LLC plants identified above. The requested information for each facility is provided on a separate NRC Form 536. In calendar year 2009, six candidates are expected to take the dual-site Limited Senior Reactor Operator (LSRO) initial license examination as indicated on Attachment 8. The schedule for the indicated examination is as follows: the written examination and a portion of the operating examination will be given at Limerick Generating Station (LGS); the remainder of the operating examination will be completed at Peach Bottom Atomic Power Station (PBAPS). Since the LSRO examination is a dual-site examination that involves both LGS and PBAPS, rather than repeating the same information on both attachments, the examination scheduling information is provided on for PBAPS. Attachment 6 for LGS references Attachment 8 where appropriate. There are no regulatory commitments contalned within this letter. Should you have any questions about this letter, please contact Mitchel Mathews at (630) 657-2819. Respectfully, .~YV\~L-Darin M. Benyak Director - Licensing and Regulatory Affairs

July 22, 2008 U. S. Nuclear Regulatory Commission Page 3 - Completed NRC Form 536 for Braidwood Station - Completed NRC Form 536 for Byron Station - Completed NRC Form 536 for Clinton Power Station - Completed NRC Form 536 for Dresden Nuclear Power Station - Completed NRC Form 536 for laSalle County Station - Completed NRC Form 536 for Limerick Generating Station - Completed NRC Form 536 for Oyster Creek Nuclear Generating Station - Completed NRC Form 536 for Peach Bottom Atomic Power Station - Completed NRC Form 536 for Quad Cities Nuclear Power Station 0 - Completed NRC Form 536 for Three Mile Island Nuclear Station - Unit 1

Response to RIS 2008-16 Attachment 1 Page 1 of 1 NRC FORM S36 li.S NUCI.EAR REGl'LtTORY COMMISSION APPROVED BY OMS: NO. .1 I5il*0I.l1 F.XPIRF.s: lltV)II2(MJ!!

   ,H*lOO5)                                                                 E.stima~ed    burden per re~m~ to t.'umply wilh thi... \/1,l!umary information I..'olled klO rt'qiM!:~; I hour, The; j,nfb~m~'hHn (ullectiufl is ij~ (u pian budgets
                                                                            ;~~~~~~~,~/~~~~~!J}9I~;~~<;e~:i~:,":~*~fi~i~jf.re:s.

OPERATOR LICENSING NIK'~ar RegubtOl'), (,:'nmmi....k'ln. Washtn~tnn. DC 2O'SS*(MXlI. ,l( b~ ,memet e*m,ul to Inf'tt:Htft!I.'I ... @orc'f)v* .').M to t~ De\li. Officer, Otlit't' 1)1 in .rmatloll EXAMINATION DATA .,1<1 Re~ul3!"'y Affair.. NE B.lO:.'O~.131.50-0l3l)*. Off"" of "'.n.~e"",n; and Bud~. W:\:\hUl~tun, DC .!O503. ff 3 f'rlC!a~... u:.td In Impo~ an IMfurmahtHi

                                                                            ~,,)Uet:hun m~ not dl~pla)' a ~urren(ly vJ.lJd OMS CHolml number. the NRC                   may fin! t.:llnduct ur ~pon!W.)r. oJitd a per.....Hl i~ nut required to rt"~md to. the mti.lrmatilln ruHect.m.

F",CILITY NRC REGION Braidwood Station, Units 1 and 2 III Facility Operating License Nos. NPF~72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY2010 CY2011 CY 2012 ESTIMATED NUMBER OF LICENSEE*PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAM INATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2009 CY2010 CY 2011 CY 2012 NUMBER OF REACTOR OPERATORS 1 0 7 0 NUMBER OF SENIOR REACfOR OPERATORS* INSTANT 12 0 12 0 NUMBER OF SENIOR REAcroR OPERATORS-UPGRADE 1 0 2 0 NUMBER OF SENIOR REAcroR OPERATORS-LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 10/05/2009 NlA 6120/2011 N/A ALTERNATE DATE 10119/2009 NlA 711112011 NlA C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE cv2009 cv2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 21 0 0 0 CANDIDATES

Response to RIS 2008-16 Attachment 2 Page 1 of 1 NRC FORM S36 u.s NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 315{)nl~1 EXI'IRE5: OlV.1I,cIXlII 111-21105) EMhn~ed burden ~ relPl')n.~ ttl ~'Hmpf)' wIth thil' mluntary infurmatkln i,'oUe.:tttm noquesl: I l'k)ur.l11l~ information (ll Iltct inn is u:-.ed til plan budgets and resoun:ts for o~ratnr eJ.tlmin.ltKlns. Send 9ntunents reiJ:afdi~ burden

                                                                          .st'male'o the Re.:urd. and FOIAlPrivacy ServICe. Br:m<h (T*5 31. U.S.

OPERATOR LICENSING ~~!I~o~~~~~)tuz Cnmmi.l-1t.tun. Wa.l,hingtoo. DC' ;os55*{)(~I. or ~1. in'c!~~ EXAMINATION DATA ISO*1)131 t., Oftk. "I M.nal!<meOl and IDe'ans lJSC!d tu Irnp.)!\e an mfnrmafJun

                                                                          .:o1l;>.;tK'" '!'le' no, display a currently v,lid OMB "!lOIml number, the NRC may
                                                                          ~f~':t~~o~~rect~,Jnd J pen..on ill !\ttl required w res~lf1d U'. Ute FACILITY                                                                                                                                          NRC REGION Byron Station, Units 1 and 2                                                                                                              III Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                     CY2009                 CY2010                                  CY2011                                    CY2012 ESTIMATED NUMBER OF LlCENSEE*PREPARED                      0                         1                                         1                                      1 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED                        0                        0                                         0                                       0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                     CY2009                 CY 2010                                 CY2011                                    CY2012 NUMBER OF REACTOR OPERATORS                          0                        9                                         0                                       7 NUMBER OF SENIOR REACTOR OPERATORS*INSTANT                       0                        8                                        12                                       6 NUMBER OF SENIOR REACTOR OPERATORS*UPGRADE                        0                        1                                         1                                      2 NUMBER OF SENIOR REACTOR OPERATORS* LIMITED                      0                        0                                         0                                      0 PROPOSED DATES PRIMARY DATE                       NlA                9127/2010                              9/12/2011                                 9/10/2012 ALTERNATE DATE                      NlA               10104/2010                              9/2612011                                 9/24/2012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY~                                                                             cv2010 PROPOSED NUMBER            MARCH       JUNE       SEPTEMBER      DECEMBER             MARCH                        JUNE                   SEYrEMBER                 DECEMBER ESTIMATED NUMBER OF             0         17              0             0                    0                         12                             0                      0 CANDIDATES

Response to RIS 2008*16 Attachment 3 Page 1 of 1 NRCFORM5.l1i ll,S SUCLF.AR !U:(;ULATORY COMMISSION APPROVED BY OMS: NO. .1150-0131 EXPIRES,OlV31f.!(JOH

   ,3*2005)                                                                  l:."imJteC hurden per J"e"pon-.e 10 lJJmply with ibis vulunt.1ry infimna.inn
                                                                             \'"!dlecllOn requcst: I h!:)ur, Th~ Itlltlrmatl4'ln C\)lIet1ion I~ u!-ot!d tu plan budgett>>
                                                                             ;~~~~:~~}~/R~~d~~:JfbrAW;::~;e~~~~Br~~~f*r.~i~~r8:2.

OPERATOR LICENSING Nudc;ar ReJUlafUry Cnmmis.l\K)n. Washrn,tnn. OC ~n555~o(lOl. ur lnttrnet

                                                                             ~-m:nl to In OCull<<t~@nrc.T)v* ..md h) the Oe~k Otlicer, OffJCe vi In ormation bl EXAMINATION DATA                                       and Regul.101)' !\lfa' NE 8*10202, ,J 150*1)131). om". or M.ruI8tmtnt and Budget. Wll~hmgtnnt DC ~n~3, (fa meant. u!lCd tn tmp:>:'<ie an inform:nk}"

1.'0iltelion d\)e$ not dl~pby d t;'urremly v"hd OMS cOI.m) number. the NRC may not luod.uct m spomor, and a persoll is not requirc:d to res:pond tn. 100 infnrmatKln c{)11et.1ioll. FACILITY NRC REGION Clinton Power Station, Unit 1 11\ Facility Operating License No. NPF-62 NRC Docket No. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY~ CY2010 CY 2011 CY2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY~ CY2010 CY2011 CY2012 NUMBER OF REACTOR OPERATORS 6 0 6 0 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 6 0 3 0 NUMBER OF SEN lOR REACTOR OPERATORS-UPGRADE 2 0 3 0 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 8/24/2009 NJA 8/2212011 NJA ALTERNATE DATE 8/17/2009 NJA 8/29/2011 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (G.FE) SCHEDULE cv2009 cv2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECE1vlBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 9 0 0 CANDIDATES

Response to RIS 2008*16 Attachment 4 Page 1 of 1 NR('mRMS.16 I;,S NIJCLEAR REGlJI.ATORY COI'otMISSION APPROVED BY OMS: NO, 1150-0131 EXPIRES; flHl3IIZIXlil

   .8*2005)                                                                     EM:imated burden per re:\ponse ttl (\lInpfy with rhis \<nluntary infnnn:J(inn (nllection rcquel4: I htlur. Thi . . intt)rmallon 1,.'l}lteclH'm i:-. u~d to pian bud~ets
                                                                                ~~r:~~~~~f~~~~rd~~;xrF01~;i~~~;s~~*k~:rwr~~~rT.~ifl3f~1f~,

OPERATOR LICENSING  :,~~~g~~'k~rl~~r~~re~ 'I;r,:~)~~~ EXMUNATION DATA ~ld Regulatory Booijtl. Wa~tHnl!.t(}fl *. DC ::!O

2. {) 15()"H131 f. Office t1f Man.llfemenl and me:t~ used h"l impnse an m(ormauon
                                                                                \."oliection doe" iiI"It dl...play a l'urrently vatld OMS I."onuul number. the NRC m3)'

ml' (ondw.,:' fIT ,"pnn:-.lJr, 300 J per~," L't nI)l required to re:-pond to. the

                                                                                ,nfnrrrutftOn \.'{IU¢\.'(lt)n.

FACIUTV NRC REGION Dresden Nuclear Power Station, Units 2 and 3 III Renewed Facility Operating License Nos. DPR*19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY2010 CY2011 CY2012 ESTIMATED NUMBER OF LICENSEE*PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2009 CY2010 CY 2011 CY2012

-.lUMBER OF REACTOR OPERATORS 6 4 4 4 NUMBER OF SENIOR REACTOR OPERATORS*INSTANT 4 10 8 8 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 1 1 1 NUMBER OF SENIOR REACfOR OPERATORS-LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 3/09/2009 3/08/2010 310712011 3105/2012 ALTERNATE DATE 4/06/2009 4/05/2010 4/0412011 4/0212012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY2009 Cy2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 12 0 0 0 14 0 CANDIDATES

Response to RIS 2008-16 Attachment 5 Page 1 of 1 NReFORM SJ6 u.s NllCLEAR REGULA TORY COMMISSION APPRovED BY 011.18: NO. lIS!}'!)f31 EXPIRES: OIV3111((1II (11-21105) r;,"limJ:~ed burden Jl('r ~(X)I'I~ Ie) lOotmpl'f with {hi." voluruary inl(Urn.:ulon 1.:'\)II~tll1T1 req~l: I hUUf. 'nWi mll)r"l"Ilaltfln ...:uUecttnn IS used to pl;1n budp;et~

                                                                            ;~:3t~~~~Yt~/R~~rd~~'~3ro:~:~~;S~;~~"Br~~<y~i~f:'(ff~.

OPERATOR LICENSING Nudear Re~ulatory Cnmmis~uc)n, W.\.lJtmgton. DC ~0555*Jl)(H. tlf b~ mte~et e--m,lIl W II'! "-'Ollet.:t~@nn"f)v. and tt, fhe De~ Officer. Ofiit.:e \)f In }rm~flon EXAMINATION DATA ;md Reg"I",,,,}, Afr.",,, NE P*IO:!01. !JI5{)-(JlJII. Oflicc "r M.na~.ment;md Budget. Wj~h1n&tliU. DC ~OS03.1( 3 mea~\ ustd to unpo!te an information

                                                                            <<lII<CllOo due< "'>> di;pl.y" ,u",,01I~ valid 011.18 ".llInll numll<!r.lht NRC may OcJt i.'nod!lCf or  '9m~lor. and a penon ~ nnt required to re."-pond to. the lofnrmatRln t'olfttnun.

FA<.:ILlTY NRC REGION LaSalle County Station, Units 1 and 2 III Facility Operating License Nos. NPF*l1 and NPF-18 NRC Docket Nos. 50-373 and 50*374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED i'l1JMBER CY2009 CY2010 CY 2011 CY2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2009 CY2010 CY 2011 CY2012 NUMBER OF REACTOR OPERATORS 0 4 0 4 NUMBER OF SENIOR REACfOR OPERATORS*INSTANT 0 8 0 8 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 2 0 2 NUMBER OF SENIOR REACfOR OPERATORS*LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE NlA 9/14/2010 NlA 9/1812012 ALTERNATE DATE NlA 9/21/2010 NlA 9/25/2012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY2009 Cy 2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DeCEMBER ESTIMATED NUMBER OF 0 12 0 0 0 0 0 0 CANDIDATES

Response to R!S 2008-16 Attachment 6 Page 1 of 1 NRC .'ORM SJ6 U.S NUCLEAR REG!JlATORY COMMISSION APPROVCD BY OMB: :-;0. 3151).1)131 EXPIRES: filii) !I~lOII IK*20051 E~ tmated burdtn per ~nse II t t."pmply wkh this vuluntary infnrmar Ion

                                                                          '-'lJtI(~;non reque~: I hour, Thl~ infnrmatK'fJ !':ull<<ltm'l I", u~d w pbn budgets
                                                                          ~~~~~~~;~'f~rf{~~~~~:JF6i~~:~~:~~~~~7r~~~fT~~j~~~f3~~.

OPERATOR LICENSING Nm:ltar R,i,>>~UlaJnry Comm.)i.,Wlf1, Wa)ohm~ton. DC ~055$~(XlOl, or bl internet e-mail tu It'! (X;nlJei,"l!o.@nREtlv*."Hi to the oe.. k OflICt:'T. om~'~ uf In ,)rmatiun EXAMINATION DATA and R,~u"'lmy Aff.,,,, N B* W2U2. {3 1S(l..lllJ II. om.." "f M.,wgement and Bud,er. Wa:o.hmgtnn. DC ':0503. If a ntea~~ used IH lmpo~ aft mfnrmauno c"IIe..:li"n oo"s lI<~ dISplay. currently "alld OMB ",,"n,1 number, tile NRC may

                                                                          !ltll t:'und~t or spunsor. and 3: pers)n is. not required to ~li"Htd 1u. lhe InfOrm3UOn ~UUel.1JOn.

FACILITY NRC REGION Limerick Generating Station, Units 1 and 2 I Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY2010 CY2011 CY 2012 ESTIMATED NUMBER OF . LICENSEE-PREPARED 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMlNATIONS PROPOSED NUMBER CY2009 CY2010 CY2011 CY 2012 NUMBER OF REACTOR OPERATORS 0 6 0 4 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 0 10 0 6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 2 0 3 NUMBER OF SENIOR REACTOR 0 0 OPERATORS-LIM I'TED " 0 PROPOSED DATES PRIMARY DATE .. 10/04/2010 NlA 10/08/2012 ALTERNATE DATE " 10/18/2010 NIA 10/15/2012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE cv2009 cv2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 16 0 0 0 0 0 0 CANDIDATES

  • See Attachment 8 (Peach Bottom Atomic Power StatIon) for LSRO numbers and exam dates

Response to RIS 2008-16 Attachment 7 . Page 1 of 1 NRCfORM5J6 u.s SlICLEA R REGULATORY COMMISSION APPROVED BY OMB; NO. JISO*lllJl EXPIRES; tWJU:;OOlI

   .JI..lOO51                                                               ['>limatltd burden per re~p()nse to cOInply with rh *.\ yoluntary mhltmalitm 1.:ulle'\linn request: I htlur. This tnforma1.!on \,oUo:llon I.... used to pian hudg","s
                                                                            ;~~~~~':hetw~~:~:J~;~~;~~*~:~k~n;:r~!::~fT~i~3~lt:S.

OPERATOR LICENSING on~~;~~~ *t;;*rt~~)~~~=

                                                                                                                                  ) I). orr",. of M.nagemefll and EXAMINATION DATA                                                                                      u~d w impnse In informal"

1.:uUa1itm \Jot!.\!lOlI displaY:t currently valKl OMS COnfRlj number, the NRC may not t:nnd~t M "ponsur. and a penon IS not requtrtd tu rt.*..pnnd rn. the InfilrTrullMtn collectJ()fl. FACILITY NRC REGION Oyster Creek Nuclear Generating Station I Facility Operating License No. DPR-16 NRC Docket No. 50-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CYgQ1Q CY 2011 CY 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2009 CYgQ1Q CY 2011 CY2012 NUMBER OF REACTOR OPERATORS 6 6 6 0 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 10 8 10 0 NUMBER OF SENIOR REACTOR OPERATOR~UPGRADE 0 2 2 0 NUMBER OF SENIOR REACTOR OPERATORS*LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 5/04/2009 5/17/2010 5/1612011 N/A ALTERNATE DATE 5/11/2009 5/24/2010 5/23/2011 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE cv2009 cv2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 14 0 0 16 0 0 0 0 CANDIDATES

Response to RIS 2008-16 Attachment 8 Page 1 of 1 NRl' fORM 536 (I.S NUClL\R REGULATORY COMMISSION APPROVED BY OMB: NO. J 150*0 1:\ 1 EXPIRES,1l1V31/}IlOIi l"'lllOSl E"'lm\,l~e" burden per f(>l'punr.t' to \-x)tnply wirh thIs ...,lIunCafY irtlt)!malton cnllel:ttun requesl: I tlI;)ur, This i.nfurrnaoon ('uHel'tlOn t,\ llsed Itl plan budgers

                                                                          ~~~~~~~~(~r~~rl~~~~~W~~~~~~7r,::~r~jf!!~~.~,

OPERATOR LICENSING , ,~g~'k~f~;r:'~~~~;;r,~rt)~:= EXAMINATION DATA 13150*0131). Otf""'<lfMa.'ge"",m and Budget. W3.."tungtllf'l. DC ';0503, If a mea~.. u!C.Cd to lmpt)'iC an inthrmatK1R cull<<1lOndoes "'I d;.pl.y. cu..,.ntl~ valid OMS ,v",lUl nunw.r. lhe NRC may

                                                                          ~)~ condoct or 'pomor, and a pe'f'\(Jn .:,. nut r(:Quired to      re~r-jnd to, rhe mlonruuion cllllet'tiuo.

FACILITY NRC REGION Peach Bottom Atomic Power Station, Units 2 and 3 I Renewed Facility Operating License Nos. DPR-44 and DPR~56 NRC Docket Nos. 50~277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2009 CY2010 CY 2011 CYZQ1g ESTIMATED NUMBER OF LICENSEE-PREPARED 1 and 1 LSRO 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC,PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2009 CY2010 CY2011 CY 2012 NUMBER OF REACTOR OPERATORS 2 6 0 6 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 9 10 0 10 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 1 2 0 2 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED 6 0 0 0 PROPOSED DATES 12107/2009 PRIMARY DATE 1210612010 NlA 12103/2012 8/03/2009 - LSRO 12114/2009 ALTERNATE DATE 12113/2010 N/A 12110/2012 8/10/2009 - LSRO C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE Cy 2009 CY2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 16 0 0 0 0 0 CANDIDATES

Response to RIS 2008-16 Attachment 9 Page 1 of 1 NRC FORM 5.16 u.s NUCLEAR RE(;UI.ATORY <?OMMISSION APPROVED BY 01'.18: NO. J151l-illJl EXPiRES: IllWlI:!OOa IH*ZUIIS, Et-tlm.1l:ed punkn per r('1ijpun~ W (.'Omply with Ihis ,~ltuntary inform.1tJ:Jo (ofla:tiun requt'~: I huur. nu~ mtb~atMm l,'HIIt\:11t1U i~ u~d III plan bud~els

                                                                            ~~~~~:*~~tW~~~!I::Jf~~:~*:e::~~~tB~~~~f.r~~j~1t:~~.

OPERATOR LICENSING Nudea!' Rf~ulalOrv Cnmmhs)un, Wa.,hln~lUn. oc* '))55.5:-tOOl, or bl intemtt e-m::ui If\ In fK.<ouecrsfitnn:'i),v,;tOO It! rhe De,,, Offtt:tT. Off<<:e ilf In i.lrmation EXAl\1INATION DATA "00 R.~ulal<1ry Mf."" NE 8*10202. [Ji.lll-0I31). Oifi,,, 01 Manasement .nd Budge!~ WiI:.l'unghill.; DC ~{J50.1. It a ml.!-ilns lJ~d tll impo,.:;e an InthrmatRIR

                                                                            ,'0110<:1;"" dI"" "0' dll'pl.y a cUlTClltly vaha OMS _",llmln.mber.!he NRC may 11111 cond~jd m "p.Jtl.Jr* ..tI'ld a person i~ 11111 required tH re:-.p.U1d ttl. the mformiJltnn ,nlk'\.'1ion.

FACILITY NRCREGJON Quad Cities Nuclear Power Station, Units 1 and 2 III Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 A. PROPOSED EXAl\1INATION PREPARATION SCHEDULE PROPOSED NUMBER CY2oo9 CY2010 CY2011 CY2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY~ CY2010 CY 2011 CY2012 NUMBER OF REAcroR OPERATORS 6 0 6 4 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 10 0 10 10 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 0 1 1 NUMBER OF SENIOR REACTOR OPERATORS-LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 11/30/2009 NlA 5129/2011 3/1212012 ALTERNATE DATE 1210712009 NlA 611212011 312612012 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE Cy2oo9 CY 2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 16 0 0 0 14 CANDIDATES

Response to RIS 2008-16 Attachment 10 Page 1 of 1 NRC fORM SJI> u.s NUCLEAR REGULATORY COMMISSION APPROVED 8Y OMS; NO. 3(51).0111 EXPIRES: O&'311~1~18 111-1085) EM:jm.ued burden per ~lM(! ltll'OmpJy with thj~,v()luntary lnft~fmation c!,ltectiun reque:r.t: I hI,ur, Thb t.nfO~I(Hl t,;ulla:tlon is useu to plan trudget~

                                                                          ~~~~~~:;:,~n;~f,":I~ro1~~~rS:;~~~"iir::~ff.~i~f)~rL1'].

OPERATOR LICENSING Nu..:~ar Re~UlJ;tnry Cnmmlso,;VH1. Wa,hlOghm. DC' .;osss*(n)}. Itf bl ime~ e*mJII ttl in t'k,;ollecfr.@orc'stV<and to the ~"k OffICer, OO'ke nl In tmnahJfl EXAMINATION DATA Jnd Resulutory Afl.,,;. NE B* HI2ill. (l150*013 I). Offi<:e of Managemenl and Budget. Wa.~hmgt()n. DC 1{1503. If" mean>;;. used III impose an Inttlnttah(Hl l.'olJe\!tJOn doe~ nul dbplay a ~UIT(ndy valJiJ OMB \:1)01"11 number. (he NRC may Ollt (noouct or sJXm:.or. and a per~)n i.. Rot required hi re~'nd 10. U,e mthrma.itln C'uUe\.'Tj.on. FACILITY NRC REGION Three Mile Island Nuclear Station, Unit 1 I Facility Operating License No. DPR-50 NRC Docket No. 50-289 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2009 CY2010 CY2011 CY 2012 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC*PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2009 CY2010 CY 2011 CY2012 NUMBER OF REACTOR OPERATORS 8 0 8 0 NUMBER OF SENIOR REACTOR OPERATORS*INSTANT 6 0 7 0 NUMBER OF SENIOR REACTOR OPERATORS*UPGRADE 0 0 2 0 NUMBER OF SENIOR REACTOR OPERATORS*LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 5/25/2009 N/A 5/3012011 NlA ALTERNATE DATE 6/01/2009 NlA 6/0612011 NlA C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE cv gQQ2 cv2010 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 15 0 0 0 CANDIDATES}}