Form 2.1-1 Examination Preparation Checklist
ML23079A222
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 02/21/2023
From:
NRC/RGN-III/DORS/OB
To:
Constellation Energy Generation, Exelon Generation Co
Theodore Wingfield
Shared Package
ML22125A066 List:
References
Download: ML23079A222 (1)


Text

Form 2.1-1 Examination Preparation Checklist Facility: Qua_J c,;+,es Date of Examination: I /~/z,ez.3 Developed by: Written:

Facility ~NRC II Operating:

Facility ~

NRC Target Chief Task Description Examiner's Date*

Initials

1.

Examination administration date confirmed (A.1 -5). For NRC-prepared examinations,

-240 arrangements are made for the facility licensee to submit reference materials (8.4, C.4.g and V

F).

-210

2. NRC examiners and facility licensee contact assigned (8.1 and C.1 -3).

41,/

3.

Facility licensee contact briefed on examination security and other requirements (D.4). As

-210 applicable, the facility licensee contact submits to the NRC any prescreened K/As for

~

elimination from the written examination outline, with a description of the facility licensee's prescreening process (ES-4.1 A.1.a and ES-4.1 8.2).

-210

4. Reference material due for NRC-prepared examinations (F).

f'J/A

-210

5. Examination kick-off call held (C.4). The NRC sends the corporate notification letter (A.5).

~

-195

6. Written examination outline developed by the NRC and sent to the facility licensee contact 4,/

(must be on the examination security agreement) (8.2, ES-4.1 A. 1.b and ES-4.1 A.2.a).

7. Operating test outlines and checklists due: Forms 1.3-1, 2.3-1, 3.2-1, 3.2-2, 3.3-1, and 3.4-1, as

-150 applicable (8.6). Facility licensee provides a draft operating test administration schedule to the NRC (8.18).

-136

8. Operating test outlines reviewed by the NRC and feedback provided to the facility licensee V

(ES-2.3).

-100

9. NRC-prepared examinations approved by the NRC supervisor and forwarded for facility tJIA licensee review (ES-2.3).
10. Proposed examinations (written, JPMs, and scenarios, as applicable) and outline forms;

-75 quality checklists and supporting documentation (including Forms 2.3-2 and 2.3-4 and any Form 2.3-1, 1.3-1, and 3.4-1 updates); and reference materials due.

-60 11. Preliminary waiver/excusal requests due (ES-2.2 E.1 ).

N//f

-50

12. Written examination and operating test reviews completed (ES-2.3). The NRC supervisor's

/4/'

authorization to proceed with the facility review granted (ES-2.3 D).

-50

13. Examination review results discussed between the NRC and the facility licensee (8.14).

1V

-35

14. Examination preparatory week conducted by the NRC and the facility licensee (I).

v/

1

-30

15. Preliminary license applications, including any waiver/excusal requests, due (ES-2-2 C.1 ).

-1,/

-14

16. Final license applications, including any waiver/excusal requests, due and Form 2.2-1 ft,/

prepared (ES-2.2 C and E).

-7

17. Written examinations and operating tests approved by the NRC supervisor (C.9) v /

-7

18. Facility licensee management feedback on the examination requested by the NRC supervisor (C.10).

-7

19. Final applications reviewed; 10% of applications audited to confirm qualifications/eligibility V

(ES-2.2 G); and examination approval letter (Letter 2.3-1) and waiver/excusal letters sent.

-7

20. Written examination administration guidelines reviewed with the facility licensee (D.14).

-u/

-7 21. Approved scenarios and job performance measures distributed to NRC examiners (D.12).

~

  • Target dates are based on facility licensee-prepared examinations and the examination date identified in the corporate notification letter. These dates are for planning purposes and may be adjusted in coordination with the facility licensee.

Page 1 of 1