| issue date = 03/17/1980
| issue date = 03/17/1980
| title = Forwards Response to NRC 800223 Ltr Re LWR Primary Coolant Sys Pressure Isolation Valves.Surveillance Tests to Assess Check Valve Status Are Not Being Performed on Check Valves in Event V Arrangements.Flow Diagrams Encl
| title = Forwards Response to NRC 800223 Ltr Re LWR Primary Coolant Sys Pressure Isolation Valves.Surveillance Tests to Assess Check Valve Status Are Not Being Performed on Check Valves in Event V Arrangements.Flow Diagrams Encl
| author name = UHRIG R E
| author name = Uhrig R
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name = EISENHUT D G
| addressee name = Eisenhut D
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000250, 05000251
| docket = 05000250, 05000251

Revision as of 12:36, 18 June 2019

Forwards Response to NRC 800223 Ltr Re LWR Primary Coolant Sys Pressure Isolation Valves.Surveillance Tests to Assess Check Valve Status Are Not Being Performed on Check Valves in Event V Arrangements.Flow Diagrams Encl
ML17339A703
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/17/1980
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
L-80-84, NUDOCS 8003200384
Download: ML17339A703 (7)


Text

REGULATORY ORMATION DISTRIBUTION SY.M (RIDS)DOCKET 05000250 05000251 NO ES O P%~A OTES~ACCESSION NBR;8003200380 DOC~DATE'0/03/17 NOTARIZED; YES FACIL:50-250 Turkey Point P>>lanti Unjt 3i Florjda Power and Light C 50 251 Turkey Point Plantp Unit 4i Florida Power and Light C AUTH'$ME'UTHOR AFF ILIAT ION UHRIGF R~E'Q Florida Power 8 L:ight Co.REC IP~NAME RECIPIENT AFFILIATION EISENHUTFD;G

~Division of Operating Reactors

SUBJECT:

Forwards response to NRC 800223 ltr,re LWR primary coolant sys'ressure isolation valves, Surveillance tests to assess check valve status are not being petf*ormed on, check valves in Event V arrangements, Flow diagrams encl, DISTRIBUTION CODE: A001S COPIES,RECEIVED:LTR"ENCL>>SIZE: TITLEi General: Distribution for after Issuance-of Oper ating Lic RECIPIENT ID CODE'/NAME>>

ACTION!05 BC~p,~~INTERNAL!1 R I'17 ENGR BR 19 PLANT SYS BR 21 EFLT'RT SYS OELD EXTERNAL'I 03 LPDR 23 ACRS COPIES L>>TTR ENCL 7 7 1 1 2 1 1 1 1 1 1 1 0 1 1 16 16 RECIPIENT'D CODE/NAMEI 02 NRC" PDR 15 CORE PERF>>BR 18 REAC SFTY BR?0 EEB EPB~DOR STS GROUP LEADR OQ NSIC COPIES LTTR ENCL'1 1 1 1 1 1 1 1 1 1-1 1 Wc o'.P.Boa tc, B~tC~~it ge><~~k o TOTAL-NUMBER OF COPIES REQUIRED: LTTR M ENCL

.BOX 529100, MIAMI, FL 33152~yy(ll+~h ,.Pr~,~.A.FLORIDA POWER II LIGHT COMPANY March 17, 1980 L-80-84 Office of Nuclear Reactor Regulation Attention:

Mr.Darrell G.Eisenhut, Acting Director Division of Operating Reactors U.S.Nuclear Regulatory, Commission Washington, D.C.20555

Dear Mr.Eisenhut:

Re: TURKEY.POINT UNITS 3 6 4 DOCKET NOS.50-250 6 50-251 RCS PRESSURE ISOLATION The attached information is submitted in response to your letter of February 23, l980 on the subject of LWR primary coolant system pressure isolation valves.Very truly yours, Robert E.Uhrig Vice President Advanced Systems S Technology REU/MAS/GG/

VTC/pa Attachment cc: J.P.O'Reilly, Region II Harold Reis, Esctuire 8001g00 PEOPLE SERVING PEOPLE ATTACHMENT Re: TURKEY POINT UNITS 3 6 4 DOCKET NOS.50-250 6 50-251 RCS PRESSURE ISOLATION NRC REQUEST 1 Describe the valve configuration at your plant and indicate if an Event V isolation valve configuration exists within the Class I boundary of the high pressure piping connecting PCS (Primary Coolant System)piping to low pressure system piping;e.g., (1)two check valves in series, or (2)two check valves in series with a MOV.FPL RESPONSE 1.Attached are two simplified flow diagrams showing the isolation valve configurations identified as Event V arrangements.

for Turkey Point Units 3&4, respectively.

NRC REQUEST 2 If either of the above Event V configurations exist at your facility, indicate<<hethercontinuous surveillance or periodic tests are being accomplished on such valves to ensure integrity.

Also indicate whether valves have been known, or found, to lack integrity.

FPL RESPONSE 2.Specific surveillance tests to assess check valve status are not being performed on check valves in Event.V arrangements at Turkey Point Units 3&4.Review of operating records covering the past 5 years have not indicated problems with the check valves identified in an Fvent 5 arrangement.

NRC REQUEST 3 If either of the above Event V configurations exist at your facility, indicate wheth<<plant procedures should be revised or if plant modifications should be made to increase reliability,.

FPL RESPONSE Operating procedures for Turkey Point Units 3 s 4 will be revised to provide instructions for performi'ng and documenting periodic surveillance tests onheck valve nos.: 3-875A a~d 4-875A 3-875B and 4-875B 3-875C and 4-875C The tests will be performed to assess check valve integrity following cold shutdown or refueling shutdown.Each unit will be modified to provide for pressure measure-ments on the low pressure side of the check valve con-figurations identified as Event V arrangements.

The mod-ifications will be accomplished dur'ing the next scheduled outages of sufficient duration'when'the units are in the cold shutdown or refueling shutdown condition.

When these modifications are completed, procedures will be implemented to provide instructions for performing and documenting surveillance tests on'he subject.,check valves..

Z-g8A 5-875R 8i.S N.c.w-g5g g 3-8 14 A Act uwuLATog,"4 0 V tlat.v>-884~~~-81~ro I I'~m:o-I 4-I l LOV~~-7+4 R 3-86S 6 3-873$5-8756 S.3-8GQD s-88+0 3-875K I wl Ir I I il Lt ACCv~uLh'I'O(-'

t(OV i 5-86~S.X>-85OC--MCH hl--j I'5-8oS 3-8/65 S-gggC 3-873 C'h Q7f h-3-$76,C pc I,/LIJ)3-940 J, V 3 B75C 5~<~~-8soF I P-88eV-~-8/SF I~'l fl,CCOf-(Q

<lq1og 6, I'lo Y Rc S/y<~~-865C~-8<OE I I I 0 0 U}0 O 0 r S hhy,

<-8S8A 4--BrPA~(~-Seob 5 0-SCAB 4-R7S b-r~--J-PI+-$7G A 4-a76 E ACCuvuLATok D 5L"woV H.t.4-'E~0 A ip+-865 A, I'I HOV+.7$4A H.C.ec.4.961F 4-945 HOY 4-872 goY 4-84.Sa p" 4 4-8'R 5 QQV 4-sos~6-87.r, Acc.V H vpg a~p 5-876 D L.o.~g(5 74oY$8(r>f" I J 4-8~)cg A.(y gap(6 I+-88+0<-8 l5E I~1 I l'4 I<-87G 8 4-868c, 4-8736.pi((U HVLhTof.'(." I S~r AoV"'X+-S5og ,'4-SG-C I~I I I~'I I I-l~J Pg 6-'l>OL V H.(, 0-F74 C.NOV I-740 e ELI/CI LLj 0 K f lv*h 5 STATE OF FLORX DA))COUNTY OF DADE)ss.Robert E.Uhrig, being first duly sworn, deposes and says: That he is a Vice President of Florida Power 6 Light Company,'he Licensee herein;That he has executed the foregoing document;that the state-ments made in this said document are true and correct to the best of his knowledge, information, and belief, and that he is authorized to execute the document on behalf of said Licensee.Robert E.Uhrig Subscribed and sworn to before me this l7 may of NOTARY PUBLXC,'nd for the county of Dade, State of Florida Notary public, State of Florida at Large My Commission Expires October 30, 1983 nded thru Maynard Bonding Agency