| title = Provides Nov 1989 Progress Summary of Select Sys Assessment
| title = Provides Nov 1989 Progress Summary of Select Sys Assessment
| author name = HARRIS K N
| author name = Harris K
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  

Revision as of 10:37, 18 June 2019

Provides Nov 1989 Progress Summary of Select Sys Assessment
ML17347B494
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/20/1989
From: Harris K
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-89-453, NUDOCS 9001020124
Download: ML17347B494 (6)


Text

ACCELERATED D UTION DEMON TION SYSIHM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)01020124 DOC.DATE: 89/12/20 NOTARIZED:

NO DOCKET I rkey Point Plant, Unit 3, Florida Power and Light C 05000250 rke Point, Plant Unit 4 Florida Power and Li ht C 05000251 ACCESSION NBR:90 FACIL:50-250 Tu 50-251 Tu y g AUTH.NAME AUTHOR AFFILIATION HARRIS,K.N.

Florida Power 6 Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)NOTES:

SUBJECT:

Provides Nov 1989 progress summary of select sys assessment.

DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE: TITLE: OR Submittal:

General Distribution RECIPIENT ID CODE/NAME PD2-2 LA EDISON,G INTERNAL: NRR/DET/ECMB 9H NRR/DST 8E2 NRR/DST/SICB 7E NUDOCS-ABSTRACT OGC/HDS2 RES/DSIR/EIB EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1 1 5 5 1 1 1 1 1 1 1 1 1 0 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD2-2 PD NRR/DOEA/OTS B1 1 NRR/DST/SELB 8D NRR/DST/SRXB 8E NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 0 1 1 I t I~I NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASIEI CONTACT THE.DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE, YOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL 19 P rr t,~I P.O.Box14000, Juno Beach, FL 33408-0420 DEC 20 1989 L-89-453 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Select S stem Assessment Pro ress Summar Pursuant to the Nuclear Regulatory Commission Order dated August 12, 1986, the attachment to this letter provides the November 1989 progress summary of the Select System Assessment.

Should there be any questions regarding this information, please contact us.Very truly yours, Vice Harris resident Turkey Point Nuclear Plant KNH/TCG/gp Attachment cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 9001020i24 89i220 PDR ADOCK 05000250 R PDC an FPL Group company

'<".', tJ~,)gb SELECT SYSTEM REVIEW NOVEMBER 1989 STATUS ORIGINAL 15 SYSTEMS WALKDOWN AS BUILT RECORDS Breaker List (IS Mod 1265)-Scheduled to be completed January 22, 1991 PAID's (IS Mod 1098)-Scheduled to be completed December 29, 1989 MISCELLANEOUS ITEMS Unit 3 RHR 887 Valve Replacement (IS Mod 519)-Scheduled completion during the next Unit 3 Refueling Outage Unit 4 Outage Related Modifications RHR 887 Valve Replacement (IS Mod 565)-Scheduled completion deferred until the next Unit 4 Refueling Outage EDG Redundant Set of Air Start Motors (IS Mod 576)Scheduled completion deferred to coincide with the Emergency Power System Upgrade Project Outage currently scheduled to begin in 1991 ADDITIONAL SYSTEMS ARMS PRMS NCC WALKDOWNS P 6 ID's (IS Mod 1042)-Scheduled for completion during next Unit 3 Refueling Outage P&ID Update Schedule to be determined following walkdowns