ML17348A168: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 04/06/1990
| issue date = 04/06/1990
| title = Forwards List of Steam Generator Tubes Either Plugged or Replugged & Inspected from 900228-0323
| title = Forwards List of Steam Generator Tubes Either Plugged or Replugged & Inspected from 900228-0323
| author name = HARRIS K N
| author name = Harris K
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  

Revision as of 10:34, 18 June 2019

Forwards List of Steam Generator Tubes Either Plugged or Replugged & Inspected from 900228-0323
ML17348A168
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 04/06/1990
From: Harris K
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-90-122, NUDOCS 9004170137
Download: ML17348A168 (5)


Text

..ACCELERATED D UTION DEMONSTI'&TION SYSTEM REGULATORY INFORMATION DISTRIBUTION

'SYSTEM (RIDS)ACCESSION NBR:9004170137 DOC.DATE: 90/04/06 NOTARIZED:

NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C AUTH.NAME AUTHOR AFFILIATION HARRIS,K.N.

Florida Power 6 Light Co.RECIP.NAME RECIPIENT AFFILIATION Document'Control Branch (Document Control Desk)

SUBJECT:

Advises that.facility steam generators inspected E plugged during 900228-0323.

DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE: TITLE: OR Submittal:

General Distribution NOTES: DOCKET g 05000250 RECIPIENT ID CODE/NAME PD2-2 LA EDISON,G INTERNAL: NRR/DET/ECMB 9H NRR/DST 8E2 NRR/DST/SICB 7E NUDOCS-ABSTRACT OGC/HDS2 RES/DS IR/EI B EXTERNAL: LPDR Nslc COPIES LTTR ENCL 1 1.5 5 1 1 1 1 1 1 1 1 1 0 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD2-2 PD NRR/DOEA/OTSB11 NRR/DST/SELB 8D NRR/DST/SRXB 8E OC G FILE 01 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 0 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP, US TO REDUCE WASTE(CONTACT THE, DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL 19 II P L 0 J P.O.Box14000, Juno Beach, FL 33408-0420 APR 6 19SO L-90-122 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:

Re: Turkey Point Unit 3 Docket No.50-250 Technical S ecification 4.2.5.5.a t The Turkey Point Unit 3 Steam Generators were inspected and plugged February 28, 1990 through March 23, 1990.As a result of this inspection the tubes listed on Attachment

.1 were either plugged or replugged as noted.Should you have any questions please contact us.Very truly yours, K..Harris Vice resident Turkey Point-Nuclear KNH/DRP/GLB/rat attachment cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant p04170>37 9pp4pg AppcK puppp25p PDC an FPL Group company 0PB d R'~A ATTACHMENT 1 STEAM GENERATOR A A A A ROW 7 7 9 33 COL 5 13 32 44 REASON FOR PLUGGING Preventative

-Stub Tube Preventative

-Stub Tube Degraded)40%Preventative

-AVB Wear B B B B B B B B B 7 7 42 25 45 45 40 41 42 5 13 30 32 43 44 39 42 43 Preventative

-Stub Tube Preventative

-Stub Tube Replaced Hot Leg Plug Replaced Hot Leg Plug Replaced Hot Leg Plug Replaced Hot Leg Plug Degraded)40%Degraded 2 40%Preventative

-AVB Wear C C C C C C C C C 7 7 14 14 13 40 35 38 38 5 13 89 6 89 38 47 53 54 Replaced Hot Leg Stub Tube Plug Replaced Hot Leg Stub Tube Plug Replaced Hot Leg Plug Degraded 2 40%Degraded 2 40%Preventative

-AVB Wear Preventative

-AVB Wear Preventative

-AVB Wear Preventative

-AVB Wear