ML18068A079: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 3: | Line 3: | ||
| issue date = 03/15/2018 | | issue date = 03/15/2018 | ||
| title = Summary of Pre-Application Meeting with Tennessee Valley Authority Regarding a Planned License Amendment Request Associated with Modifications to the Control Bay Chillersystems at Browns Ferry Units 1, 2 and 3 | | title = Summary of Pre-Application Meeting with Tennessee Valley Authority Regarding a Planned License Amendment Request Associated with Modifications to the Control Bay Chillersystems at Browns Ferry Units 1, 2 and 3 | ||
| author name = Saba F | | author name = Saba F | ||
| author affiliation = NRC/NRR/DORL/LPLII-2 | | author affiliation = NRC/NRR/DORL/LPLII-2 | ||
| addressee name = Shea J | | addressee name = Shea J | ||
| addressee affiliation = Tennessee Valley Authority | | addressee affiliation = Tennessee Valley Authority | ||
| docket = 05000259, 05000260, 05000296 | | docket = 05000259, 05000260, 05000296 | ||
| license number = DPR-033, DPR-052, DPR-068 | | license number = DPR-033, DPR-052, DPR-068 | ||
| contact person = Saba F | | contact person = Saba F DORL/LPL2-2 301-415-1447 | ||
| case reference number = EPID L-2018-LRM-0009 | | case reference number = EPID L-2018-LRM-0009 | ||
| document type = Meeting Summary | | document type = Meeting Summary | ||
Line 28: | Line 28: | ||
On February 15, 2018, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of Tennessee Valley Authority (TVA, the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. | On February 15, 2018, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of Tennessee Valley Authority (TVA, the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. | ||
The purpose of the meeting was for TVA to present its planned license amendment request (LAR) regarding a design modification to utilize the Browns Ferry Unit 3 Control Bay Chiller as an alternate chilled-water source for Units 1 and 2 Electric Board Room Air Handling Units in order to support system operability. | The purpose of the meeting was for TVA to present its planned license amendment request (LAR) regarding a design modification to utilize the Browns Ferry Unit 3 Control Bay Chiller as an alternate chilled-water source for Units 1 and 2 Electric Board Room Air Handling Units in order to support system operability. | ||
The meeting notice and agenda, dated February 2, 2018, are available in the Agencywide Documents Access and Management System (ADAMS) under Accession No. | The meeting notice and agenda, dated February 2, 2018, are available in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML18045A711. | ||
A list of attendees is enclosed. | A list of attendees is enclosed. | ||
The licensee's presentation slides (ADAMS Accession No. | The licensee's presentation slides (ADAMS Accession No. ML18045A162) were provided prior to the meeting and the ADAMS Accession number associated with the slides was included in the meeting notice. During the meeting, the licensee described the plant configuration and prescribed the conditions resulting in the need for a Design Modification and LAR. The licensee also provided details on the proposed changes and its schedule for submittal and implementation of the LAR. The NRC staff asked clarifying questions and provided observations on key issues. The staff also communicated to the licensee that the General Design Criterion 5 evaluation would be very important for NRC staff review of the submittal and that compensatory measures should be considered where appropriate. | ||
The licensee agreed with NRC staff's proposal that a technical or engineering audit may be needed as part of this review. No regulatory decisions were made and no actions were taken during the meeting. There were no members of the public represented in the meeting. No Public Meeting Feedback forms were received. Please direct any inquiries to me at 301-415-1447 or Farideh.Saba@nrc.gov. | The licensee agreed with NRC staff's proposal that a technical or engineering audit may be needed as part of this review. No regulatory decisions were made and no actions were taken during the meeting. There were no members of the public represented in the meeting. No Public Meeting Feedback forms were received. Please direct any inquiries to me at 301-415-1447 or Farideh.Saba@nrc.gov. | ||
Docket Nos. 50-259, 50-260, and 50-296 | Docket Nos. 50-259, 50-260, and 50-296 | ||
Line 43: | Line 43: | ||
OF FEBRUARY 15, 2018, PRE-APPLICATION MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING A PLANNED LICENSE AMENDMENT REQUEST ASSOCIATED WITH MODIFICATIONS TO THE CONTROL BAY CHILLER SYSTEMS AT BROWNS FERRY NUCLEAR PLANT UNITS 1, 2, AND 3 (EPID L-2018-LRM-0009) | OF FEBRUARY 15, 2018, PRE-APPLICATION MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING A PLANNED LICENSE AMENDMENT REQUEST ASSOCIATED WITH MODIFICATIONS TO THE CONTROL BAY CHILLER SYSTEMS AT BROWNS FERRY NUCLEAR PLANT UNITS 1, 2, AND 3 (EPID L-2018-LRM-0009) | ||
DATED MARCH 15, 2018 DISTRIBUTION: | DATED MARCH 15, 2018 DISTRIBUTION: | ||
PUBLIC PM File Copy RidsRgn2MailCenter Resource RidsNrrPMBrownsFerry Resource RidsNrrDorlLp12-2 Resource RidsNrrDssSbpb Resource NKaripineni, NRR DWarner, NRR TWertz, NRR NJordan, NRR RidsNrrLABClayton Resource RidsACRS_MailCTR Resource RidsNrrDorl Resource AHon, NRR MHamm, NRR LWheeler, NRR GMatharu, NRR LBurkhart, OEDO JBowen, OEDO ADAMS A ccess1on N | PUBLIC PM File Copy RidsRgn2MailCenter Resource RidsNrrPMBrownsFerry Resource RidsNrrDorlLp12-2 Resource RidsNrrDssSbpb Resource NKaripineni, NRR DWarner, NRR TWertz, NRR NJordan, NRR RidsNrrLABClayton Resource RidsACRS_MailCTR Resource RidsNrrDorl Resource AHon, NRR MHamm, NRR LWheeler, NRR GMatharu, NRR LBurkhart, OEDO JBowen, OEDO ADAMS A ccess1on N ML18068A079 o.: *b *1 ,y e-ma1 OFFICE DORL/LPL2-2/PM DORL/LPL2-2/LA NRR/DSS/SBPB/BC NAME NJordan BClayton BDennig* DATE 3/13/2018 3/13/2018 3/13/2018 OFFICE DORL/LPL2-2/BC (A) DORL/LPL2-2/PM NAME BTindell FSaba DATE 3/15/2018 3/15/2018 OFFICIAL RECORD COPY}} |
Revision as of 18:00, 17 June 2019
ML18068A079 | |
Person / Time | |
---|---|
Site: | Browns Ferry |
Issue date: | 03/15/2018 |
From: | Farideh Saba Plant Licensing Branch II |
To: | James Shea Tennessee Valley Authority |
Saba F DORL/LPL2-2 301-415-1447 | |
References | |
EPID L-2018-LRM-0009 | |
Download: ML18068A079 (3) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 15, 2018 LICENSEE:
Tennessee Valley Authority FACILITY:
Browns Ferry Nuclear Plant, Units 1, 2, and 3
SUBJECT:
SUMMARY
OF FEBRUARY 15, 2018, PRE-APPLICATION MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING A PLANNED LICENSE AMENDMENT REQUEST ASSOCIATED WITH MODIFICATIONS TO THE CONTROL BAY CHILLER SYSTEMS AT BROWNS FERRY NUCLEAR PLANT UNITS 1, 2, AND 3 (EPID L-2018-LRM-0009)
On February 15, 2018, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of Tennessee Valley Authority (TVA, the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland.
The purpose of the meeting was for TVA to present its planned license amendment request (LAR) regarding a design modification to utilize the Browns Ferry Unit 3 Control Bay Chiller as an alternate chilled-water source for Units 1 and 2 Electric Board Room Air Handling Units in order to support system operability.
The meeting notice and agenda, dated February 2, 2018, are available in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML18045A711.
A list of attendees is enclosed.
The licensee's presentation slides (ADAMS Accession No. ML18045A162) were provided prior to the meeting and the ADAMS Accession number associated with the slides was included in the meeting notice. During the meeting, the licensee described the plant configuration and prescribed the conditions resulting in the need for a Design Modification and LAR. The licensee also provided details on the proposed changes and its schedule for submittal and implementation of the LAR. The NRC staff asked clarifying questions and provided observations on key issues. The staff also communicated to the licensee that the General Design Criterion 5 evaluation would be very important for NRC staff review of the submittal and that compensatory measures should be considered where appropriate.
The licensee agreed with NRC staff's proposal that a technical or engineering audit may be needed as part of this review. No regulatory decisions were made and no actions were taken during the meeting. There were no members of the public represented in the meeting. No Public Meeting Feedback forms were received. Please direct any inquiries to me at 301-415-1447 or Farideh.Saba@nrc.gov.
Docket Nos. 50-259, 50-260, and 50-296
Enclosure:
List of Attendees cc: Listserv Farideh E. Saba, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LIST OF ATTENDEES FEBRUARY 15, 2018, PRE-APPLICATION MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING A PLANNED LICENSE AMENDMENT REQUEST ASSOCIATED WITH MODIFICATIONS TO THE CONTROL BAY CHILLER SYSTEMS AT BROWNS FERRY NUCLEAR PLANT (BROWNS Ferry) UNITS 1, 2, AND 3 Name Organization Natreon (Nate) Jordan U.S. Nuclear Regulatory Commission (NRC) Andrew Hon NRC Robert Dennig NRC Matthew Hamm NRC Nageswara Karipineni NRC Larry Wheeler NRC Daniel Warner NRC Gurcharan Matharu NRC Ed Schrull Tennessee Valley Authority (TVA) Gordon Williams TVA Erik Meisner TVA Todd Stafford TVA Ronald Hand TVA Matthew Kirschenheiter TVA Jamie Paul TVA Mike Oliver TVA Enclosure
SUBJECT:
SUMMARY
OF FEBRUARY 15, 2018, PRE-APPLICATION MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING A PLANNED LICENSE AMENDMENT REQUEST ASSOCIATED WITH MODIFICATIONS TO THE CONTROL BAY CHILLER SYSTEMS AT BROWNS FERRY NUCLEAR PLANT UNITS 1, 2, AND 3 (EPID L-2018-LRM-0009)
DATED MARCH 15, 2018 DISTRIBUTION:
PUBLIC PM File Copy RidsRgn2MailCenter Resource RidsNrrPMBrownsFerry Resource RidsNrrDorlLp12-2 Resource RidsNrrDssSbpb Resource NKaripineni, NRR DWarner, NRR TWertz, NRR NJordan, NRR RidsNrrLABClayton Resource RidsACRS_MailCTR Resource RidsNrrDorl Resource AHon, NRR MHamm, NRR LWheeler, NRR GMatharu, NRR LBurkhart, OEDO JBowen, OEDO ADAMS A ccess1on N ML18068A079 o.: *b *1 ,y e-ma1 OFFICE DORL/LPL2-2/PM DORL/LPL2-2/LA NRR/DSS/SBPB/BC NAME NJordan BClayton BDennig* DATE 3/13/2018 3/13/2018 3/13/2018 OFFICE DORL/LPL2-2/BC (A) DORL/LPL2-2/PM NAME BTindell FSaba DATE 3/15/2018 3/15/2018 OFFICIAL RECORD COPY