IR 05000285/2016401: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 24: Line 24:
Fort Calhoun Station P.O. Box 550  
Fort Calhoun Station P.O. Box 550  


Fort Calhoun, NE 68023-0550
Fort Calhoun, NE 68023-0550 SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR FORT CALHOUN STATION (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBER 05000285/2016401)
 
SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR FORT CALHOUN STATION (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBER 05000285/2016401)


==Dear Mr. Marik:==
==Dear Mr. Marik:==
Line 33: Line 31:
The enclosed inspection plan lists the security-related inspections scheduled through June 30, 2018. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to dis cuss changes to the inspection plan should circumstances warrant any changes.
The enclosed inspection plan lists the security-related inspections scheduled through June 30, 2018. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to dis cuss changes to the inspection plan should circumstances warrant any changes.


While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country. Thus due to the security-related information contained in this correspondence, and in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS).
While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country. Thus due to the security-related information contained in this correspondence, and in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS).


Please contact me at (817) 200-1527 with any questions you have regarding this letter.
Please contact me at (817) 200-1527 with any questions you have regarding this letter.

Revision as of 10:42, 17 May 2019

Non-Public Security Inspection Plan for Calhoun Station (NRC Physical Security Inspection Report Number 05000285/2016401)
ML16242A110
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 08/31/2016
From: Haire M S
Division of Reactor Safety IV
To: Marik S M
Omaha Public Power District
References
IR 2016401
Download: ML16242A110 (4)


Text

SECURITY-RELATED INFORMATIO " " August 31, 2016

Mr. Shane M. Marik, Vice President and Chief Nuclear Officer Omaha Public Power District

Fort Calhoun Station P.O. Box 550

Fort Calhoun, NE 68023-0550 SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR FORT CALHOUN STATION (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBER 05000285/2016401)

Dear Mr. Marik:

On August 11, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Fort Calhoun Station. The results of that review have been transmitted to you separately in a publicly av ailable assessment letter. This letter informs you of the NRC's plans for future security-related inspections at your facility.

The enclosed inspection plan lists the security-related inspections scheduled through June 30, 2018. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to dis cuss changes to the inspection plan should circumstances warrant any changes.

While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country. Thus due to the security-related information contained in this correspondence, and in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS).

Please contact me at (817) 200-1527 with any questions you have regarding this letter.

Sincerely,

/RA/

Mark S. Haire, Chief

Plant Support Branch 1 Division of Reactor Safety Docket No. 50-285 License No. DPR-40

Enclosure: Inspection Plan

cc w/encl:

Mr. Dennis A. Bakalar

Manager, Site Security Omaha Public Power District Fort Calhoun Station

Mail Stop FC-2-1

9610 Power Lane

Blair, NE 68008 cc w/o encl:

Electronic Distribution for

Fort Calhoun Station