August 30, 2004 R. T. Ridenoure Vice President Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.

P.O. Box 550 Fort Calhoun, NE 68023-0550

SUBJECT:

MIDCYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - FORT CALHOUN STATION

Dear Mr. Ridenoure:

On August 5, 2004, the NRC staff completed its midcycle plant performance assessment of the Fort Calhoun Station. The midcycle review for the Fort Calhoun Station involved the participation of all technical divisions in evaluating performance for the first half of the calendar year 2004 assessment cycle. The process included a review of performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections that may conflict with your plant activities.

This performance review and inspection plan does not include physical protection information.

A separate letter designated and marked as Exempt from Public Disclosure in Accordance with 10 CFR 2.390 will include the physical protection review and resultant inspection plan.

Plant performance for the most recent quarter was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct only reactor oversight process (ROP) baseline inspections at your facility through March 31, 2006.

The enclosed inspection plan details the inspections, except those related to physical protection, scheduled through March 31, 2006. In addition to the baseline inspection program, Temporary Instruction 2515/150, Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC Bulletin 2002-02), will be performed at the Fort Calhoun Station, during your next refueling outage. The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 12 months of the inspection plan are tentative and may be revised at the end-of-cycle review meeting.

Omaha Public Power District On March 3, 2004, the annual assessment letter was issued for the Fort Calhoun Station. In the annual assessment letter, the Fort Calhoun Station plant performance for the fourth quarter of 2003 was determined to be within the Regulatory Response Column of the NRCs Action Matrix based on a White performance indicator for Occupational Exposure Control Effectiveness (Occupational Radiation Safety Cornerstone). The findings included three examples of failures to barricade, conspicuously post, and lock or guard restricted high radiation areas to prevent unauthorized entry as required by technical specifications.

As described in Nuclear Energy Institute (NEI) 99-02, Regulatory Assessment Performance Indicator Guideline, November 2001, Revision 2, your staff used the frequently asked question (FAQ) process to seek clarification on one of the three examples pertaining to control of a restricted high radiation area. On the basis of the NRC response to the FAQ, approved on April 22, 2004, it was determined that this finding should not have been reported. As a result of this determination, plant performance for the fourth quarter of 2003 was within the Licensee Response Column. Therefore, a supplemental inspection will not be conducted at Fort Calhoun Station.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (817) 860-8144 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/ PHHarrell for Kriss Kennedy, Chief Project Branch C Division of Reactor Projects Dockets: 50-285 Licenses: DPR-40

Enclosure:

Fort Calhoun Station Inspection/Activity Plan

Omaha Public Power District cc w/enclosure:

John B. Herman, Manager Nuclear Licensing Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.

P.O. Box 550 Fort Calhoun, NE 68023-0550 Richard P. Clemens, Division Manager Nuclear Assessments Fort Calhoun Station P.O. Box 550 Fort Calhoun, NE 68023-0550 David J. Bannister Manager - Fort Calhoun Station Omaha Public Power District Fort Calhoun Station FC-1-1 Plant P.O. Box 550 Fort Calhoun, NE 68023-0550 James R. Curtiss Winston & Strawn 1400 L. Street, N.W.

Washington, DC 20005-3502 Chairman Washington County Board of Supervisors P.O. Box 466 Blair, NE 68008 Sue Semerena, Section Administrator Nebraska Health and Human Services System Division of Public Health Assurance Consumer Services Section 301 Centennial Mall, South P.O. Box 95007 Lincoln, NE 68509-5007 Daniel K. McGhee Bureau of Radiological Health Iowa Department of Public Health 401 SW 7th Street, Suite D Des Moines, IA 50309

Omaha Public Power District Institute of Nuclear Power Operations (INPO)

Records Center 700 Galleria Parkway SE, Suite 100 Atlanta, GA 30339

Omaha Public Power District Electronic distribution by RIV:

Regional Administrator (BSM1)

DRP Director (ATH)

DRS Director (DDC)

Senior Resident Inspector (JGK)

Branch Chief, DRP/C (KMK)

Senior Project Engineer, DRP/C (WCW)

Staff Chief, DRP/TSS (PHH)

RITS Coordinator (KEG)

RidsNrrDipmLipb V. Dricks, PAO (VLD)

W. Maier, RSLO (WAM)

C. Gordon (CJG)

DRS Branch Chiefs (LJS, MPS1, ATG, JAC)

L. Reyes, EDO (LAR1)

S. Richards, Chief, NRR/DIPM/IIPB (SAR)

R. Frahm, PPR Program Manager, NRR/DIPM/IIPB (RKF)

C. Carpenter, Deputy Dir. for Inspection and Programs (CAC)

B. Sheron, Associate Dir. for Project Licensing and Technical Analysis (BWS)

T. Bergman, Chief, ROPMS, OEDO (TAB)

H. Berkow, Director, LPD4, NRR/DLPM (HNB)

S. Dembek, Chief, PDIV-2B, NRR/DLPM (SXD)

A. B. Wang, NRR Project Manager (ABW)

ADAMS: WYes G No Initials: __rva__

W Publicly Available G Non-Publicly Available G Sensitive W Non-Sensitive S:\DRP\DRPDIR\MIDCYCLE 2004\FCS.wpd RIV:PE/DRP/C C:DRP/C D:DRS D:DRP C:DRP/C signature RVAzua;mjs;dlf KMKennedy DDChamberlain ATHowell KMKennedy

/RA/ WCWalker for VLOrdaz for /RA/ PHHarrell for 8/18/04 8/18/04 8/25/04 8/27/04 8/27/04 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

Page 1 of 2 Fort Calhoun 08/27/2004 07:50:44 Inspection / Activity Plan Report 22 08/01/2004 - 03/31/2006 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB02/17B - 50.59 & PERMANENT PLANT MODS 2 1 IP 7111102 Evaluation of Changes, Tests, or Experiments 09/13/2004 09/17/2004 Baseline Inspections 1 IP 7111117B Permanent Plant Modifications 09/13/2004 09/17/2004 Baseline Inspections RP TEAM - RP SAFETY TEAM 4 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 09/20/2004 09/24/2004 Baseline Inspections 1 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 09/20/2004 09/24/2004 Baseline Inspections 1 IP 7112202 Radioactive Material Processing and Transportation 09/20/2004 09/24/2004 Baseline Inspections 1 IP 7112203 Radiological Environmental Monitoring Program 09/20/2004 09/24/2004 Baseline Inspections OB-RQ - OB-REQUALIFICATION 3 1 IP 7111111B Licensed Operator Requalification Program 10/04/2004 10/08/2004 Baseline Inspections ACCESSPI - ACRSA/PIV 1 1 IP 7112101 Access Control to Radiologically Significant Areas 10/04/2004 10/08/2004 Baseline Inspections OB-EP1 - EP PROGRAM INSPECTION 2 1 IP 7111402 Alert and Notification System Testing 11/01/2004 11/05/2004 Baseline Inspections 1 IP 7111403 Emergency Response Organization Augmentation Testing 11/01/2004 11/05/2004 Baseline Inspections 1 IP 7111404 Emergency Action Level and Emergency Plan Changes 11/01/2004 11/05/2004 Baseline Inspections 1 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 11/01/2004 11/05/2004 Baseline Inspections 1 IP 71151 Performance Indicator Verification 11/01/2004 11/05/2004 Baseline Inspections TI-150 - TEMPORARY INSTRUCTION TI-150 1 1 IP 2515/150 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC Bulletin 2002-02 02/25/2005 04/21/2005 Safety Issues ACRSA - ACCESS CONTROLS TO RAD SIGNIFICANT AREAS 1 1 IP 7112101 Access Control to Radiologically Significant Areas 03/21/2005 03/25/2005 Baseline Inspections ALARA2 - ALARA PLANNING AND CONTROLS 1 1 IP 7112102 ALARA Planning and Controls 04/04/2005 04/08/2005 Baseline Inspections EB08P - ISI - VESS VOL (TI 150/152) AS REQ 1 1 IP 7111108P Inservice Inspection Activities - PWR 04/11/2005 04/15/2005 Baseline Inspections 1 IP 7111108P Inservice Inspection Activities - PWR 04/18/2005 04/22/2005 Baseline Inspections PEB-12B - MAINTENANCE RULE BIENNIAL 1 1 IP 7111112B Maintenance Effectiveness 05/09/2005 05/13/2005 Baseline Inspections OB-INIT - INITIAL EXAM 4 1 X02281 FT. CALHOUN (04/05) - INITIAL EXAM 06/20/2005 06/24/2005 Not Applicable 1 X02281 FT. CALHOUN (04/05) - INITIAL EXAM 07/11/2005 07/15/2005 Not Applicable ALARA3 - ALARA PLANNING AND CONTROLS 1 1 IP 7112102 ALARA Planning and Controls 07/11/2005 07/15/2005 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Fort Calhoun 08/27/2004 07:50:44 Inspection / Activity Plan Report 22 08/01/2004 - 03/31/2006 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PEB-FP - TRIENNIAL FIRE PROTECTION INSPECTION 4 1 IP 7111105T Fire Protection 07/25/2005 07/29/2005 Baseline Inspections 1 IP 7111105T Fire Protection 08/08/2005 08/12/2005 Baseline Inspections PEB-52 - FCS PIR INSPECTION 3 1 IP 71152B Identification and Resolution of Problems 09/12/2005 09/16/2005 Baseline Inspections 1 IP 71152B Identification and Resolution of Problems 09/26/2005 09/30/2005 Baseline Inspections EP1 - EMERG PREPAREDNESS EXERCISE 4 1 IP 7111401 Exercise Evaluation 09/26/2005 09/30/2005 Baseline Inspections 1 IP 7111404 Emergency Action Level and Emergency Plan Changes 09/26/2005 09/30/2005 Baseline Inspections 1 IP 71151 Performance Indicator Verification 09/26/2005 09/30/2005 Baseline Inspections EB21 - SSD&PCI 4 1 IP 7111121 Safety System Design and Performance Capability 10/17/2005 10/21/2005 Baseline Inspections 1 IP 7111121 Safety System Design and Performance Capability 10/31/2005 11/04/2005 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.