ML17006A431

From kanterella
Jump to navigation Jump to search
Commencement of Decommissioning Inspection Program Under Inspection Manual Chapter 2561
ML17006A431
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 01/18/2017
From: Mark Shaffer
Division of Nuclear Materials Safety IV
To: Marik S
Omaha Public Power District
R. Browder
References
Download: ML17006A431 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD.

ARLINGTON, TX 76011-4511 January 18, 2017 Shane M. Marik, Site Vice President and Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station Mail Stop FC-2-4 9610 Power Lane Blair, NE 68008

SUBJECT:

FORT CALHOUN STATION, COMMENCEMENT OF DECOMMISSIONING INSPECTION PROGRAM UNDER INSPECTION MANUAL CHAPTER 2561

Dear Mr. Marik:

By letter dated December 28, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16363A449), the U.S. Nuclear Regulatory Commission (NRC) informed you that the inspection program at Fort Calhoun Station would be performed under the provisions of Inspection Manual Chapter (IMC) 2561, Decommissioning Power Reactor Inspection Program. The objectives of the decommissioning inspection program are to verify that decommissioning activities are being conducted safely, that spent fuel is being stored safely, and that site operations and license termination activities are in compliance with applicable regulatory requirements, licensee commitments, and management controls. Implementation of the IMC 2561 inspection program does not alter the inspection schedule previously provided for the Independent Spent Fuel Storage Installation (ISFSI) and Emergency Preparedness inspections.

The enclosed inspection plan provides the inspection procedures scheduled through December 31, 2017, as part of the IMC 2561 inspection program. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you to discuss the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections. Information regarding security-related inspections will be sent under separate, non-publicly available correspondence.

In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter, its enclosure, and your response, if you choose to provide one, will be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response should not include any personal privacy or proprietary, information so that it can be made available to the Public without redaction.

S. Marik Please contact Mr. Max Schneider, Sr. Resident Inspector, at 402-533-6613 or Mrs. Rachel Browder, Sr. Health Physicist, Region IV office, at 817-200-1452, with any questions you have regarding this letter. If you have questions regarding the fee billing with the transition to IMC 2561, please contact Ms. Christine Glaster at 301-415-0662.

Sincerely,

/RA/

Mark R. Shaffer, Director Division of Nuclear Materials Safety Docket: 50-285 License: DPR-40

Enclosure:

Fort Calhoun Station Master Inspection Plan

Fort Calhoun Station Master Inspection Plan In accordance with the U.S. Nuclear Regulatory Commission (NRC) Inspection Manual Chapter 2561, Decommissioning Power Reactor Inspection Program, the NRC Region IV staff developed a Master Inspection Plan (MIP) for the Fort Calhoun Station for the calendar year 2017. The inspection plan is based on your schedule of activities planned for the period January through September 2017.

The following is a list of the routine and discretionary inspection procedures (IPs) that will be used during our inspections. The procedures used during each inspection will depend on the specific activities being conducted at the site and may be changed or modified from what is provided below. However, prior to the quarterly inspection, the inspection procedure numbers that will be used will be provided to Fort Calhoun Station staff. Additional discretionary inspection procedures may be used if decommissioning activities warrant.

Ft. Calhoun Station Report Numbers 17-08 17-## 17-## 17-##

Jan- Oct-Dates of Inspection for 2017 Apr-Jun Jul-Sep Mar Dec Lead Inspector CORE INSPECTIONS 36801 - Organiz, management, cost controls O O 37801 - Safety reviews, mods O 40801 - Self assess, audits, CA (revised) O O 71801 - Decommissioning Performance O O O O 62801 - Maintenance/surveillance O 71111.01 - Cold weather preps O O 60801 - Spent Fuel Pool Safety O O O O 83750 - Occupational Radiation Exposure O 83801 - Inspection of Final Surveys (as needed) 84750 - RadWaste Trmt, Effluent, Env. Monit. O 86750 - Solid RadWaste Mng and Trans. O DISCRETIONARY INSPECTIONS Radiological Controls 83723 - Trng & Qualifications (RP) O 83725 - Internal Exposure Control O 83726 - Control of RAM, Surveys, Monitor. O 86740 - Transportation Activities (71124.08) O Safety Assessment/Quality Verification 41500 - Training and Qualification (Eng) O O Plant Operations and Maintenance & Surveillance 61726 - Surveillance Observation O O O O 62706 - Maintenance Rule O O O O 42700 - Plant Procedures O O O O Other 64704 - Fire Protection Program O