Revised Inspection Schedule Arising from Reorganization of the NRC Region IV Division of Reactor Safety
ML033500160
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 11/17/2003
From: Chamberlain D
Division of Reactor Safety IV
To: Ridenoure R
Omaha Public Power District
References
Download: ML033500160 (5)


Text

November 17, 2003 R. T. Ridenoure Division Manager - Nuclear Operations Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.

P.O. Box 550 Fort Calhoun, NE 68023-0550

Subject:

REVISED INSPECTION SCHEDULE ARISING FROM REORGANIZATION OF THE NRC REGION IV DIVISION OF REACTOR SAFETY

Dear Mr. Ridenoure:

The U.S. Nuclear Regulatory Commission (NRC), Region IV, has reorganized its Division of Reactor Safety (DRS) effective December 28, 2003.

The Divisions inspection duties were formerly divided among three branches:

Operations Branch Plant Support Branch Engineering & Maintenance Branch

  1. Operator licensing # Security # Safety System Design and
  1. Identification and # Radiological Performance Capability Resolution of Controls # Permanent Plant Problems (PI&R) # Emergency Modifications Preparedness # Inservice Inspection Activities
  1. Evaluation of Changes, Tests or Experiments
  1. Fire Protection
  1. Heat Sink Performance
  1. Maintenance Effectiveness Beginning in January, 2004, there will be four DRS inspection branches with inspection responsibilities as follows:

Operations Branch Performance Evaluation Branch

  1. Initial Operator Licensing # PI&R Lead Responsibility
  1. Operator Requalification Program # Fire Protection
  1. Emergency Preparedness # Heat Sink Performance
  1. PI&R Support # Maintenance Effectiveness

Omaha Public Power District Engineering Branch Plant Support Branch

  1. Safety System Design and # Security Performance Capability # Radiological Controls
  1. Permanent Plant Modifications # PI&R Support
  1. Inservice Inspection Activities
  1. Evaluation of Changes, Tests or Experiments
  1. PI&R Support The reorganization of DRS and the reallocation of inspection duties required changes to the 2004 calendar year inspection schedule. The new DRS inspection schedule for your plant is attached.

Sincerely,

/RA/

Dwight D. Chamberlain, Director Division of Reactor Safety

Enclosure:

as stated Docket: 50-285 License: DPR-40 cc w/enclosure:

John B. Herman, Manager Nuclear Licensing Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.

P.O. Box 550 Fort Calhoun, NE 68023-0550 Richard P. Clemens, Division Manager Nuclear Assessments Fort Calhoun Station P.O. Box 550 Fort Calhoun, NE 68023-0550 David J. Bannister, Manager - Fort Calhoun Station Omaha Public Power District Fort Calhoun Station FC-1-1 Plant P.O. Box 550 Fort Calhoun, NE 68023-0550

Omaha Public Power District James R. Curtiss Winston & Strawn 1400 L. Street, N.W.

Washington, DC 20005-3502 Chairman Washington County Board of Supervisors P.O. Box 466 Blair, NE 68008 Sue Semerena, Section Administrator Nebraska Health and Human Services System Division of Public Health Assurance Consumer Services Section 301 Centennial Mall, South P.O. Box 95007 Lincoln, NE 68509-5007 Daniel K. McGhee Bureau of Radiological Health Iowa Department of Public Health 401 SW 7th Street, Suite D Des Moines, IA 50309

Omaha Public Power District Electronic distribution by RIV:

Regional Administrator (BSM1)

DRP Director (ATH)

DRS Director (DDC)

Senior Resident Inspector (JGK)

Branch Chief, DRP/C (KMK)

Senior Project Engineer, DRP/C (WCW)

Staff Chief, DRP/TSS (PHH)

RITS Coordinator (NBH)

ADAMS: G Yes G No Initials: ______

G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive C:EMB C:OB C:PSB C:PBC D:DRS CSMarschall/lmb ATGody TWPruett KKennedy DDChamberlain

/RA/ /RA/ /RA/ /RA/ /RA/

11/13/03 11/10/03 11/13/03 11/14/03 11/17/03 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax