Mid-Cycle Assessment Letter for Fort Calhoun Station (Report 05000285/2016005)
ML16237A038
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 08/31/2016
From: Geoffrey Miller
NRC/RGN-IV/DRP/RPB-D
To: Marik S
Omaha Public Power District
Miller G
References
IR 2016005
Download: ML16237A038 (6)


See also: IR 05000285/2016005

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E LAMAR BLVD

ARLINGTON, TX 76011-4511

August 31, 2016

Shane M. Marik, Site Vice President

and Chief Nuclear Officer

Omaha Public Power District

Fort Calhoun Station

Mail Stop FC-2-4

9610 Power Lane

Blair, NE 68008

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR FORT CALHOUN STATION

(REPORT 05000285/2016005)

Dear Mr. Marik:

On August 11, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle

performance review of the Fort Calhoun Station. The NRC reviewed the most recent quarterly

performance indicators (PIs) in addition to inspection results and enforcement actions from

July 1, 2015 through June 30, 2016. This letter informs you of the NRCs assessment of your

facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Fort Calhoun Station operated in a manner that preserved

public health and safety and met all cornerstone objectives. The NRC determined the

performance at Fort Calhoun Station during the most recent quarter was within the Licensee

Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all

inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your

performance was within the nominal, expected range (i.e., Green). Therefore, the NRC plans to

conduct ROP baseline inspections at your facility.

By letter dated June 24, 2016, Omaha Public Power District (OPPD) certified their intention to

permanently cease power operations at Fort Calhoun Station by December 31, 2016 (ADAMS

Accession No. ML16176A213). Following certification from OPPD that permanent shutdown

and permanent fuel removal from the reactor vessel has occurred, the Fort Calhoun Station

10 CFR Part 50 license will no longer authorize plant operation, and the station will transition to

NRC decommissioning oversight in accordance with Inspection Manual Chapter 2561,

Decommissioning Power Reactor Inspection Program.

The enclosed inspection plan lists the operating reactor ROP inspections scheduled through

June 30, 2018. In consideration of your June 24, 2016, letter, the inspection plan has been

adjusted to ensure inspections needed to verify safe operation during the transition to a

defueled plant condition are performed. Routine inspections performed by resident inspectors

are not included in the inspection plan. The NRC provides the inspection plan to allow for the

resolution of any scheduling conflicts and personnel availability issues. The NRC will contact

you as soon as possible to discuss changes to the inspection plan should circumstances

S. Marik

- 2 -

warrant any changes. This inspection plan does not include security related inspections, which

will be sent via separate, non-publicly available correspondence.

In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order

Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-

Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to

Reliable Spent Fuel Pool Instrumentation. The NRC conducted audits of licensee efforts

towards compliance with these Orders, and the information gathered will aid staff in

development of the ultimate Safety Evaluation for the site. After the NRC staff receives the

Final Compliance letter for the site, the Safety Evaluation will be issued. Then, the NRC staff

will confirm through inspections the full implementation of the orders mentioned above by

performing Temporary Instruction 191, Inspection of the Implementation of Mitigation Strategies

and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness

Communication/Staffing/Multi-Unit Dose Assessment Plans.

In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the

Integrated Prioritization and Re-Baselining of Agency Activities, the Commission approved the

NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning

in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue

to conduct quarterly assessment meetings and communicate changes in the assessment of

licensee performance in accordance with the guidance in Inspection Manual Chapter 0305,

Operating Reactor Assessment Program.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs

Rules of Practice, a copy of this letter will be available electronically for public inspection in the

NRC Public Document Room or from the Publicly Available Records (PARS) component of

NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public

Electronic Reading Room).

Please contact me at 817-200-1173 with any questions you have regarding this letter.

Sincerely,

/RA/

Geoffrey B. Miller, Branch Chief

Projects Branch D

Division of Reactor Projects

Docket No. 50-285

License No. DPR-40

Enclosure:

Fort Calhoun Inspection/Activity Plan

Page 1 of 2

08/30/2016

09:34:47

Report 22

Unit

Number

Planned Dates

Start End

Inspection Activity

Title

No. of Staff

on Site

Fort Calhoun

Inspection / Activity Plan

07/01/2016 - 06/30/2018

RS1568PI

- RADIATION SAFETY - TEAM

4

1

IP

Radiological Hazard Assessment and Exposure Controls

71124.01

07/18/2016

07/22/2016

1

IP

Radiation Monitoring Instrumentation

71124.05

07/18/2016

07/22/2016

1

IP

Radioactive Gaseous and Liquid Effluent Treatment

71124.06

07/18/2016

07/22/2016

1

IP

Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation

71124.08

07/18/2016

07/22/2016

1

IP

Occupational Exposure Control Effectiveness

71151-OR01

07/18/2016

07/22/2016

1

IP

RETS/ODCM Radiological Effluent Occurrences

71151-PR01

07/18/2016

07/22/2016

EB1-17T

- FCS PERM PLANT MODS & 50.59 INSPECTION

3

1

IP

Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications

7111117T

07/25/2016

08/12/2016

INSP

- BIENNIAL REQUAL INSPECTION

2

1

IP

Licensed Operator Requalification Program

7111111B

08/29/2016

09/02/2016

RS 234

- RADIATION SAFETY

1

1

IP

Occupational ALARA Planning and Controls

71124.02

10/31/2016

11/10/2016

EP-1

- EP PERFORMANCE INDICATORS

1

1

IP

Drill/Exercise Performance

71151-EP01

11/28/2016

12/02/2016

1

IP

ERO Readiness

71151-EP02

11/28/2016

12/02/2016

1

IP

Alert & Notification System Reliability

71151-EP03

11/28/2016

12/02/2016

EP-2

- BIENNIAL EP PROGRAM INSPECTION

1

1

IP

Alert and Notification System Testing

7111402

11/28/2016

12/02/2016

1

IP

Emergency Preparedness Organization Staffing and Augmentation System

7111403

11/28/2016

12/02/2016

1

IP

Emergency Action Level and Emergency Plan Changes

7111404

11/28/2016

12/02/2016

1

IP

Correction of Emergency Preparedness Weaknesses and Deficiencies

7111405

11/28/2016

12/02/2016

RS 13 PI

- RADIATION SAFETY

2

1

IP

Radiological Hazard Assessment and Exposure Controls

71124.01

03/27/2017

03/31/2017

1

IP

In-Plant Airborne Radioactivity Control and Mitigation

71124.03

03/27/2017

03/31/2017

1

IP

Occupational Exposure Control Effectiveness

71151-OR01

03/27/2017

03/31/2017

1

IP

RETS/ODCM Radiological Effluent Occurrences

71151-PR01

03/27/2017

03/31/2017

ISFSI

- ROUTINE INSPECTION (ONE WEEK IN MONTH)

1

1

IP

Operation of an Independent Spent Fuel Storage Installation at Operating Plants

60855.1

04/01/2017

04/30/2017

EXAM

- INITIAL LICENSED OPERATOR EXAM

3

1

INITIAL EXAM FCS (09/2017)

X02594

08/21/2017

08/25/2017

1

INITIAL EXAM FCS (09/2017)

X02594

09/25/2017

09/29/2017

EB1-07T

- FCS HEAT SINK PERFORMANCE

1

1

IP

Heat Sink Performance

7111107T

05/22/2017

05/26/2017

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Attachment 2 - Proposed Inspection Plan

Official Use Only - Sensitive Internal Information/Security-Related Information

FC

Official Use Only - Sensitive Internal Information/Security-Related Information

Enclosure

Page 2 of 2

08/30/2016

09:34:47

Report 22

Unit

Number

Planned Dates

Start End

Inspection Activity

Title

No. of Staff

on Site

Fort Calhoun

Inspection / Activity Plan

07/01/2016 - 06/30/2018

RS 24

- RADIATION SAFETY

2

1

IP

Occupational ALARA Planning and Controls

71124.02

06/12/2017

06/16/2017

1

IP

Occupational Dose Assessment

71124.04

06/12/2017

06/16/2017

TSB 52B

- BIENNIAL PI&R

4

1

IP

Problem Identification and Resolution

71152B

09/11/2017

09/25/2017

1

IP

Problem Identification and Resolution

71152B

09/25/2017

09/29/2017

EB2-05XT

- TRIENNIAL FIRE PROTECTION INSPECTION

4

1

IP

Fire Protection - NFPA 805 (Triennial)

7111105X

10/23/2017

10/27/2017

1

IP

Fire Protection - NFPA 805 (Triennial)

7111105X

11/13/2017

11/17/2017

EP-2

- BIENNIAL EP EXERCISE INSPECTION

3

1

IP

Exercise Evaluation

7111401

10/16/2017

10/20/2017

1

IP

Emergency Action Level and Emergency Plan Changes

7111404

10/16/2017

10/20/2017

EP-3

- EP PERFORMANCE INDICATOR VERIFICATION

1

1

IP

Drill/Exercise Performance

71151-EP01

10/16/2017

10/20/2017

1

IP

ERO Readiness

71151-EP02

10/16/2017

10/20/2017

1

IP

Alert & Notification System Reliability

71151-EP03

10/16/2017

10/20/2017

EP-1

- EP PROGRAM INSPECTION

1

1

IP

Alert and Notification System Testing

7111402

05/14/2018

05/18/2018

1

IP

Emergency Preparedness Organization Staffing and Augmentation System

7111403

05/14/2018

05/18/2018

1

IP

Emergency Action Level and Emergency Plan Changes

7111404

05/14/2018

05/18/2018

1

IP

Correction of Emergency Preparedness Weaknesses and Deficiencies

7111405

05/14/2018

05/18/2018

1

IP

Drill/Exercise Performance

71151-EP01

05/14/2018

05/18/2018

1

IP

ERO Readiness

71151-EP02

05/14/2018

05/18/2018

1

IP

Alert & Notification System Reliability

71151-EP03

05/14/2018

05/18/2018

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Attachment 2 - Proposed Inspection Plan

Official Use Only - Sensitive Internal Information/Security-Related Information

FC

Official Use Only - Sensitive Internal Information/Security-Related Information

Enclosure

ML16237A038

SUNSI Review

By: GBM

ADAMS

Yes No

Publicly Available

Non-Publicly Available

Non-Sensitive

Sensitive

Keyword:

NRC-002

OFFICE: RIV

D: DRS

D: DRP

C: DRP/D

NAME

AVegel

TWPruett

GBMiller

SIGNATURE

/JAC for/

/RA/

/RA/

DATE

8/19/16

8/22/16

8/22/16

Letter to Michael R. Chisum from Geoffrey Miller, dated August 31, 2016

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR FORT CALHOUN STATION

(REPORT 05000285/2016005)

DISTRIBUTION:

Regional Administrator (Kriss.Kennedy@nrc.gov)

Deputy Regional Administrator (Scott.Morris@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Max.Schneider@nrc.gov)

Resident Inspector (vacant)

Administrative Assistant (vacant)

Senior Project Engineer, DRP/D (vacant)

Project Engineer (Jan.Tice@nrc.gov)

Project Engineer (Brian.Parks@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (Fred.Lyon@nrc.gov)

Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)

RIV RSLO (Bill.Maier@nrc.gov)

Director, DIRS, NRR (Chris.Miller@nrc.gov)

Deputy Director, DIRS, NRR (Shana.Helton@nrc.gov)

Director, DORL, NRR (Anne.Boland@nrc.gov)

Deputy Director, DORL, NRR (George.Wilson@nrc.gov)

Director, NSIR (Brian.Holian@nrc.gov)

Director, DPR, NSIR (Marissa.Bailey@nrc.gov)

DRP Branch Chiefs (R4DRPBC@nrc.gov)

DRS Branch Chiefs (R4DRSBC@nrc.gov)

ROPreports.Resource@nrc.gov

ROPassessment.Resource@nrc.gov