July 14, 2016
SUBJECT:
FORT CALHOUN STATION - NRC SECURITY BASELINE INSPECTION
REPORT 05000285/2016403
Dear Mr. Marik:
On June 10, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the Fort Calhoun Station. The NRC inspector discussed the results of this inspection with Mr. T. Tierney, Plant Manager, and other members of your staff. The inspector documented the results of this inspection in the enclosed inspection report.
The NRC inspector documented one finding of very low security significance (Green) in this report. This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation consistent with Section 2.3.2.a of the Enforcement Policy.
If you contest the violation or significance of the non-cited violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Fort Calhoun Station.
If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region IV; and the NRC resident inspector at the Fort Calhoun Station.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRCs "Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E. LAMAR BLVD.
ARLINGTON, TX 76011-4511 Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA David A. Holman for/
Mark S. Haire, Chief
Plant Support Branch 1
Division of Reactor Safety
Docket No. 50-285 License No. DPR-40
Nonpublic Enclosure:
Inspection Report 05000285/2016403 w/Attachment: Supplemental Information
cc w/enclosure:
Mr. Herb Childs Manager, Site Security Omaha Public Power District Fort Calhoun Station Mail Stop FC-2-1 9610 Power Lane Blair, NE 68008
cc w/o encl: Electronic Distribution
ML16196A086 Entire Report:
SUNSI Review By:
Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword: NRC-002 MD 3.4 Non-Public A.3 Cover Letter Only:
SUNSI Review By:
Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword: NRC-002 SUNSI Review Complete OFFICE SPSI:PSB1 PSI:PSB1 C:PSB1 C:PBD C:PSB1
NAME JLarsen AMeyen MHaire GMiller MHaire
SIGNATURE
/RA/
/RA/
/RA/
/RA/ JRG for
/RA/ DAH for
DATE 7/7/2016 7/7/2016 7/7/2016 7/13/2016 7/14/2016 Letter to Shane from Mark S. Haire, dated July 14, 2016
SUBJECT: FORT CALHOUN STATION - NRC SECURITY BASELINE INSPECTION
REPORT 05000285/2016403
Distribution w/enclosure:
Security Specialist/NSIR (Eric.Wharton@nrc.gov)
Security Specialist/NSIR (Niry.Simonian@nrc.gov)
Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)
Security Specialist/NSIR (Douglas.Garner@nrc.gov)
Branch Chief, RI DRS/PSB1 (Raymond.McKinley@nrc.gov)
Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)
Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov)
Regional Administrator (Kriss.Kennedy@nrc.gov)
Deputy Regional Administrator (Scott.Morris@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Branch Chief, DRS/PSB1 (Mark.Haire@nrc.gov)
Senior Resident Inspector (Max.Schneider@nrc.gov)
Acting Resident Inspector (Shawn.Money@nrc.gov)
Acting Resident Inspector (Thomas.Sullivan@nrc.gov)
Site Administrative Assistant (Yvonne.Dubay@nrc.gov)
Branch Chief, DRP/D (Jeffrey.Sowa@nrc.gov)
Senior Project Engineer, DRP (Vacant)
Project Engineer, DRP/D (Jan.Tice@nrc.gov)
Distribution w/o enclosure:
Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (Fred.Lyon@nrc.gov)
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
SAIC (Gayle.Walker@nrc.gov)
RSLO (Bill.Maier@nrc.gov)
RidsOeMailCenter Resource