ML12194A652: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 14: Line 14:
| page count = 5
| page count = 5
}}
}}
See also: [[followed by::RIS 2012-07]]


=Text=
=Text=
{{#Wiki_filter:Tennessee  
{{#Wiki_filter:Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 July 11, 2012 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Units 1 and 2 Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328  
Valley Authority, 1101 Market Street, Chattanooga, Tennessee  
 
37402 July 11, 2012 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory  
==Subject:==
Commission
Response to NRC Regulatory Issue Summary 2012-07, Preparation and Scheduling of Operator Licensing Examinations
Washington, D.C. 20555-0001
 
Sequoyah Nuclear Plant, Units 1 and 2 Facility Operating  
==Reference:==
License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328 Subject: Response to NRC Regulatory  
: 1. NRC Regulatory Issue Summary 2012-07, "Preparation and Scheduling of Operator Licensing Examinations," dated June 8, 2012 2. Letter from TVA to NRC, "Response to NRC Regulatory Issue Summary 2011-04, Preparation and Scheduling of Operator Licensing Examinations," dated July 7, 2011 Nuclear Regulatory Commission's (NRC) Regulatory Issue Summary (RIS) 2012-07 (Reference
Issue Summary 2012-07, Preparation
: 1) requested specific information regarding the Sequoyah Nuclear Plant's (SQN) projected operator licensing examination schedules and the estimated number of applicants.
and Scheduling  
The enclosure to this letter addresses the NRC's request and provides an estimate of the examination requirements for the SQN on NRC Form 536,"Operator Licensing Examination Data." SQN has no initial operator license examination planned for calendar year 2014.Please note that the information provided in the enclosure updates the information previously provided in Reference
of Operator Licensing  
: 2. Information on the proposed Generic Fundamentals Examination (GFE) schedule for calendar year 2013 is provided since the estimated number of candidates has been revised and also includes a change from June to September.
Examinations
Printed on recycled paper U.S. Nuclear Regulatory Commission Page 2 July 11, 2012 There are no regulatory commitments associated with this submittal.
Reference:  
If you have any questions related to this response, please contact Rusty Proffitt at (423) 843-6651.Res tfully, Shea cV c President, Nuclear Licensing  
1. NRC Regulatory  
 
Issue Summary 2012-07, "Preparation  
==Enclosure:==
and Scheduling  
 
of Operator Licensing  
NRC Form 536, Operator Licensing Examination Data cc (Enclosure):
Examinations," dated June 8, 2012 2. Letter from TVA to NRC, "Response  
to NRC Regulatory  
Issue Summary 2011-04, Preparation  
and Scheduling  
of Operator Licensing  
Examinations," dated July 7, 2011 Nuclear Regulatory  
Commission's (NRC) Regulatory  
Issue Summary (RIS) 2012-07 (Reference  
1) requested  
specific information  
regarding  
the Sequoyah Nuclear Plant's (SQN) projected  
operator licensing  
examination  
schedules  
and the estimated number of applicants.  
The enclosure  
to this letter addresses  
the NRC's request and provides an estimate of the examination  
requirements  
for the SQN on NRC Form 536,"Operator  
Licensing  
Examination  
Data." SQN has no initial operator license examination  
planned for calendar year 2014.Please note that the information  
provided in the enclosure  
updates the information
previously  
provided in Reference  
2. Information  
on the proposed Generic Fundamentals  
Examination (GFE) schedule for calendar year 2013 is provided since the estimated  
number of candidates  
has been revised and also includes a change from June to September.
Printed on recycled paper  
U.S. Nuclear Regulatory  
Commission
Page 2 July 11, 2012 There are no regulatory  
commitments  
associated  
with this submittal.  
If you have any questions  
related to this response, please contact Rusty Proffitt at (423) 843-6651.Res tfully, Shea cV c President, Nuclear Licensing Enclosure:
NRC Form 536, Operator Licensing  
Examination  
Data cc (Enclosure):
NRC Regional Administrator  
NRC Regional Administrator  
-Region II NRC Senior Resident Inspector  
-Region II NRC Senior Resident Inspector  
-Sequoyah Nuclear Plant  
-Sequoyah Nuclear Plant ENCLOSURE NRC Form 536 Operator Licensing Examination Data Tennessee Valley Authority Sequoyah Nuclear Plant NRC Docket Nos. 50-327 and 50-328 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 0913012014 5-201"1) Estimated burden per response to comply with this voluntary information collection request: hour. This inforrnation collection is used to plan budgets and resources for operator examinations.
ENCLOSURE NRC Form 536 Operator Licensing  
Send comments-regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nudear Regulatory Commission, Washington, DC .or by nterna e-mail to lrfocolect&Resource@nrc.gov.
Examination  
and to the Desk Ofkcr, Office of Information and EXAMINATION DATA Regulatory Affairs, NEOB.-10202, (3150-0131), Ofttce of Management and Budget, Washington, DC 20503. If a means used'to impose an information collection does not display a currently valid OMBcontrol number, the NRC may not conduct or sponsor, and a person is riot required to respond to, the information cogection.
Data Tennessee  
FACILITY NRC REKGON Sequoyah Nuclear Plant Region II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2013 CY 2013 CY 2015 CY 2015 ESTIMATED NUMBER OF LICENSEE-PREPARED  
Valley Authority Sequoyah Nuclear Plant NRC Docket Nos. 50-327 and 50-328  
] 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2013 CY 2013 CY 2015 CY 2015 NUMBER OF REACTOR OPERATORS 7 8 8 NUMBER OF SENIOR REACTOR OPERATORS  
NRC FORM 536 U.S. NUCLEAR REGULATORY  
COMMISSION  
APPROVED BY OMB: NO. 3150-0131  
EXPIRES: 0913012014
5-201"1) Estimated  
burden per response to comply with this voluntary  
information  
collection  
request: hour. This inforrnation  
collection  
is used to plan budgets and resources  
for operator examinations.  
Send comments-regarding  
burden estimate to the Information  
Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nudear Regulatory  
Commission, Washington, DC .or by nterna e-mail to lrfocolect&Resource@nrc.gov.  
and to the Desk Ofkcr, Office of Information  
and EXAMINATION  
DATA Regulatory  
Affairs, NEOB.-10202, (3150-0131), Ofttce of Management  
and Budget, Washington, DC 20503. If a means used'to impose an information  
collection  
does not display a currently valid OMBcontrol  
number, the NRC may not conduct or sponsor, and a person is riot required to respond to, the information  
cogection.
FACILITY NRC REKGON Sequoyah Nuclear Plant Region II A. PROPOSED EXAMINATION  
PREPARATION  
SCHEDULE PROPOSED NUMBER CY 2013 CY 2013 CY 2015 CY 2015 ESTIMATED  
NUMBER OF LICENSEE-PREPARED  
] 1 1 EXAMINATIONS
ESTIMATED  
NUMBER OF NRC-PREPARED  
0 0 0 0 EXAMINATIONS
B. INITIAL OPERATOR LICENSE EXAMINATIONS
PROPOSED NUMBER CY 2013 CY 2013 CY 2015 CY 2015 NUMBER OF REACTOR OPERATORS  
7 8 8 NUMBER OF SENIOR REACTOR OPERATORS  
-INSTANT 2 6 7 3 NUMBER OF SENIOR REACTOR OPERATORS  
-INSTANT 2 6 7 3 NUMBER OF SENIOR REACTOR OPERATORS  
-UPGRADE I I I I NUMBER OF SENIOR REACTOR OPERATORS  
-UPGRADE I I I I NUMBER OF SENIOR REACTOR OPERATORS  
-LIMITED 0 0 0 0 PROPOSED DATES PRIMARY D)ATE 05-13-20.13  
-LIMITED 0 0 0 0 PROPOSED DATES PRIMARY D)ATE 05-13-20.13 12-02-2013 03-02-201.5 11.-30-2.015 AL.TERNATE DATE 05-20-2013 12-09-2013 03-09-2015 12-07-2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 CY 2014 P RO PO SED I_.. ... _ ........ ,I...... .,,I___NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 15 011 0 0 CANDIDATES NRC FORM 536 (9-2011)
12-02-2013  
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO, 3150-0131 EXPIRES: 09/30/2014 I(9-2011)
03-02-201.5  
Estimated burden per response to comply with this voluntary information collection request: I hour. This intotmaiion coitectiorn is used to plan budgets and resources otI operator exaEminatons.
11.-30-2.015
Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemet e EXAMINATION DATA mai to hifocolects.RIsouroeurrc.gov, and to the Desk Officer, Office of Informat/on and Regulatory Affairs, NEOB-10202, (3150-0131), 0ffce of Management and Budget, Washington, DC 20503. It a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required:to respond to, the information collection.
AL.TERNATE  
FACILITY NRC REGION Sequoyah Nuclear Plant Region II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY 201.7 CY N/A CY N/A ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2016 CY2017 CY N/A CY N/A NUMBER OF REACTOR OPERATORS 8 8 NUMBER OF SENIOR REACTOR OPERATORS  
DATE 05-20-2013  
12-09-2013  
03-09-2015  
12-07-2015
C. PROPOSED GENERIC FUNDAMENTALS  
EXAMINATION (GFE) SCHEDULE CY 2013 CY 2014 P RO PO SED I_.. ... _ ........ ,I...... .,,I___NUMBER MARCH JUNE SEPTEMBER  
DECEMBER MARCH JUNE SEPTEMBER  
DECEMBER ESTIMATED NUMBER OF 0 0 15 011 0 0 CANDIDATES
NRC FORM 536 (9-2011)  
NRC FORM 536 U.S. NUCLEAR REGULATORY  
COMMISSION  
APPROVED BY OMB: NO, 3150-0131  
EXPIRES: 09/30/2014
I(9-2011)  
Estimated  
burden per response to comply with this voluntary  
information  
collection  
request: I hour. This intotmaiion  
coitectiorn  
is used to plan budgets and resources  
otI operator exaEminatons.  
Send comments regarding  
burden estimate to the Information  
Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory  
Commission, Washington, DC 20555-0001, or by intemet e EXAMINATION  
DATA mai to hifocolects.RIsouroeurrc.gov, and to the Desk Officer, Office of Informat/on  
and Regulatory  
Affairs, NEOB-10202, (3150-0131), 0ffce of Management  
and Budget, Washington, DC 20503. It a means used to impose an information  
collection  
does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required:to
respond to, the information  
collection.
FACILITY NRC REGION Sequoyah Nuclear Plant Region II A. PROPOSED EXAMINATION  
PREPARATION  
SCHEDULE PROPOSED NUMBER CY2016 CY 201.7 CY N/A CY N/A ESTIMATED  
NUMBER OF LICENSEE-PREPARED
EXAMINATIONS
ESTIMATED  
NUMBER OF NRC-PREPARED  
0 0 EXAMINATIONS
B. INITIAL OPERATOR LICENSE EXAMINATIONS
PROPOSED NUMBER CY 2016 CY2017 CY N/A CY N/A NUMBER OF REACTOR OPERATORS  
8 8 NUMBER OF SENIOR REACTOR OPERATORS  
-INSTANT 2 NUMBER OF SENIOR REACTOR OPERATORS  
-INSTANT 2 NUMBER OF SENIOR REACTOR OPERATORS  
-UPGRADE 1 2 NUMBER OF SENIOR REACTOR o 0 OPERArORS  
-UPGRADE 1 2 NUMBER OF SENIOR REACTOR o 0 OPERArORS  
-LIMITED PROPOSED DATES PRIMARY DATE 12-05-2016  
-LIMITED PROPOSED DATES PRIMARY DATE 12-05-2016 12-04-2017 ALTERNATE DATE 12-12-2016 12-11-2017 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 201.5 CY N/A PROPOSED I I NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 11 0 0 CANDIDATES NRC FORM 536 (9-2011)}}
12-04-2017
ALTERNATE  
DATE 12-12-2016  
12-11-2017
C. PROPOSED GENERIC FUNDAMENTALS  
EXAMINATION (GFE) SCHEDULE CY 201.5 CY N/A PROPOSED I I NUMBER MARCH JUNE SEPTEMBER  
DECEMBER MARCH JUNE SEPTEMBER  
DECEMBER ESTIMATED NUMBER OF 0 11 0 0 CANDIDATES
NRC FORM 536 (9-2011)
}}

Revision as of 22:44, 29 April 2019

Response to NRC Regulatory Issue Summary 2012-07, Preparation and Scheduling of Operator Licensing Examinations
ML12194A652
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 07/11/2012
From: Shea J W
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS 2012-07
Download: ML12194A652 (5)


Text

Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 July 11, 2012 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Units 1 and 2 Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328

Subject:

Response to NRC Regulatory Issue Summary 2012-07, Preparation and Scheduling of Operator Licensing Examinations

Reference:

1. NRC Regulatory Issue Summary 2012-07, "Preparation and Scheduling of Operator Licensing Examinations," dated June 8, 2012 2. Letter from TVA to NRC, "Response to NRC Regulatory Issue Summary 2011-04, Preparation and Scheduling of Operator Licensing Examinations," dated July 7, 2011 Nuclear Regulatory Commission's (NRC) Regulatory Issue Summary (RIS) 2012-07 (Reference
1) requested specific information regarding the Sequoyah Nuclear Plant's (SQN) projected operator licensing examination schedules and the estimated number of applicants.

The enclosure to this letter addresses the NRC's request and provides an estimate of the examination requirements for the SQN on NRC Form 536,"Operator Licensing Examination Data." SQN has no initial operator license examination planned for calendar year 2014.Please note that the information provided in the enclosure updates the information previously provided in Reference

2. Information on the proposed Generic Fundamentals Examination (GFE) schedule for calendar year 2013 is provided since the estimated number of candidates has been revised and also includes a change from June to September.

Printed on recycled paper U.S. Nuclear Regulatory Commission Page 2 July 11, 2012 There are no regulatory commitments associated with this submittal.

If you have any questions related to this response, please contact Rusty Proffitt at (423) 843-6651.Res tfully, Shea cV c President, Nuclear Licensing

Enclosure:

NRC Form 536, Operator Licensing Examination Data cc (Enclosure):

NRC Regional Administrator

-Region II NRC Senior Resident Inspector

-Sequoyah Nuclear Plant ENCLOSURE NRC Form 536 Operator Licensing Examination Data Tennessee Valley Authority Sequoyah Nuclear Plant NRC Docket Nos. 50-327 and 50-328 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 0913012014 5-201"1) Estimated burden per response to comply with this voluntary information collection request: hour. This inforrnation collection is used to plan budgets and resources for operator examinations.

Send comments-regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nudear Regulatory Commission, Washington, DC .or by nterna e-mail to lrfocolect&Resource@nrc.gov.

and to the Desk Ofkcr, Office of Information and EXAMINATION DATA Regulatory Affairs, NEOB.-10202, (3150-0131), Ofttce of Management and Budget, Washington, DC 20503. If a means used'to impose an information collection does not display a currently valid OMBcontrol number, the NRC may not conduct or sponsor, and a person is riot required to respond to, the information cogection.

FACILITY NRC REKGON Sequoyah Nuclear Plant Region II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2013 CY 2013 CY 2015 CY 2015 ESTIMATED NUMBER OF LICENSEE-PREPARED

] 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2013 CY 2013 CY 2015 CY 2015 NUMBER OF REACTOR OPERATORS 7 8 8 NUMBER OF SENIOR REACTOR OPERATORS

-INSTANT 2 6 7 3 NUMBER OF SENIOR REACTOR OPERATORS

-UPGRADE I I I I NUMBER OF SENIOR REACTOR OPERATORS

-LIMITED 0 0 0 0 PROPOSED DATES PRIMARY D)ATE 05-13-20.13 12-02-2013 03-02-201.5 11.-30-2.015 AL.TERNATE DATE 05-20-2013 12-09-2013 03-09-2015 12-07-2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2013 CY 2014 P RO PO SED I_.. ... _ ........ ,I...... .,,I___NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 15 011 0 0 CANDIDATES NRC FORM 536 (9-2011)

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO, 3150-0131 EXPIRES: 09/30/2014 I(9-2011)

Estimated burden per response to comply with this voluntary information collection request: I hour. This intotmaiion coitectiorn is used to plan budgets and resources otI operator exaEminatons.

Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by intemet e EXAMINATION DATA mai to hifocolects.RIsouroeurrc.gov, and to the Desk Officer, Office of Informat/on and Regulatory Affairs, NEOB-10202, (3150-0131), 0ffce of Management and Budget, Washington, DC 20503. It a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required:to respond to, the information collection.

FACILITY NRC REGION Sequoyah Nuclear Plant Region II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY 201.7 CY N/A CY N/A ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2016 CY2017 CY N/A CY N/A NUMBER OF REACTOR OPERATORS 8 8 NUMBER OF SENIOR REACTOR OPERATORS

-INSTANT 2 NUMBER OF SENIOR REACTOR OPERATORS

-UPGRADE 1 2 NUMBER OF SENIOR REACTOR o 0 OPERArORS

-LIMITED PROPOSED DATES PRIMARY DATE 12-05-2016 12-04-2017 ALTERNATE DATE 12-12-2016 12-11-2017 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 201.5 CY N/A PROPOSED I I NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 11 0 0 CANDIDATES NRC FORM 536 (9-2011)