| issue date = 11/30/1995 | | issue date = 11/30/1995 | ||
| title = Vols I & | | title = Vols I & II of Third 10-Yr Interval Long-Term Inservice Exam Plan for Class,1,2 & 3 Sys & Components for DC Cook Nuclear Plant,Unit 1, Final Plan | ||
| author name = ANDERSON A R, JACOBS B M | | author name = ANDERSON A R, JACOBS B M | ||
| author affiliation = SOUTHWEST RESEARCH INSTITUTE | | author affiliation = SOUTHWEST RESEARCH INSTITUTE |
Revision as of 20:40, 19 April 2019
ML17334B566 | |
Person / Time | |
---|---|
Site: | Cook |
Issue date: | 11/30/1995 |
From: | ANDERSON A R, JACOBS B M SOUTHWEST RESEARCH INSTITUTE |
To: | |
Shared Package | |
ML17334B565 | List: |
References | |
PROC-951130, NUDOCS 9601310028 | |
Download: ML17334B566 (739) | |
Text
THIRD 10-YEAR INTERVAL LONG-TERM INSERVICE EXAMINATION PLAN FOR GLASS 1, 2, AND 3 SYSTEMS AND COMPONENTS FOR DONALD C.GOOK NUCLEAR PLANT, UNlT 1 VOLUME I FINAL PLAN SwRI Project 17-7208 Prepared for American Electric Power Service Corporation 1 Riverside Plaza Columbus, Ohio 43216-6631 Prepared by Nondestructive Evaluation Science and Technology Division November 1995 Written by Approved by Alfred R.Anderson Project Manager NDE Engineering Section Department of NDE Services ruce M.Ja bs Director Department of NDE Services Nondestructive Evaluation Science and Technology Division 960 i3i 0028 960125 PDR ADQCK 05000315 8 PDR ii VOLUME I-FINAL PLAN TABLE OF CONTENTS~Pa e LIST OF ABBREVIATIONS INTRODUCTION A.Applicable Documents B.Examination Areas LONG-TERM EXAMNATION PLAN A.Introduction to the Long-Term Examination Tables B.Examination Area Identification System.......~..III.BASIS FOR PREPARATION A.Class 1 Components B.Class 2 Components C.Class 3 Components D.Class 1, 2, and 3 Component Supports E.Code Relief F.System Pressure Test...9 9 9 9 10 10 IV.LONG-TERM EXAMINATION TABLE-CLASS 1 COMPONENTS (Reference ASME Section XI;Subsection IWB)LONG-TERM EXAMINATION TABLE-CLASS 2 COMPONENTS (Reference ASME Section XI;Subsection IWC)VI.LONG-TERM EXAMINATION TABLE-CLASS 3 COMPONENTS (Reference ASME Section XI;Subsection IWD)VII.LONG-TERM EXAMINATION TABLE-CLASS 1, 2, AND 3 COMPONENTS (Reference ASME Section XI;Subsection IWF)VOLUME II-APPENDICES APPENDICES A B C D E F Weld Identification Figures-Class 1 Weld Identification Figures-Class 2 Ultrasonic Calibration Block Drawings/Sketches and Certifications Allocation Tables for Class 1, 2, and 3 Components Donald C.Cook Nuclear Plant, Unit 1, Relief Requests Donald C.Cook Nuclear Plant, Unit 1, Line Listing LIST OF ABBREVIATIONS AEP ASME CL CS Cook 1 FB FW HL HT I IE IMP IRS ISI IST LD LHM Lig LD LT LTP LU M MB M MB MEF MS MI'0 PR PRZ PS PT RC RH RHE RHRHEX RPV RT SI STM SwRI USNRC UT Vol VS American Electric Power Service Corporation American Society of Mechanical Engineers Cladding Chemical and Volume Control System Donald C.Cook Nuclear Plant, Unit 1 Flange Bolting Feedwater System Hanger Lug Hydrostatic Test Inside or Inlet Integral Extension Indianan 8c Michigan Electric Company Inside Radius Section Inservice Examination Inservice Testing Longitudinal Seam Downstream Lower Head Meridional Ligament Zero Reference Location Leak Test Long-Term Plan Longitudinal Seam Upstream Meridional Manway Bolting Meridional Manway Bolting Moderate Energy Fluid System Main Steam System Magnetic Particle Examination Nozzle Outside or Outlet Pipe Restraint Pressurizer Pipe Support Liquid Penetrant Examination Reactor Coolant System Residual Heat Removal Regenerative Heat Exchanger Residual Heat Removal Heat Reactor Pressure Vessel Radiographic Examination Safety Injection System Steam Generator Southwest Research Institute United States Nuclear Regulatory Commission Ultrasonic Examination Volumetric Vessel Support Visual Examination Waster Disposal System
I.INTRODUCTION This document presents the Long-Term Plan (LTP)for inservice examination of Class 1, 2, and 3 systems and components for Indiana Michigan Power Company's (IMP)Donald C.Cook Nuclear Plant, Unit 1 (Cook 1).The examinations are scheduled to be performed during the third 10-year interval for Class 1, 2, and 3 systems and components.
The third 10-year interval begins on July 1, 1996, and continues through June 30, 2006.Volumes I and II contain the plan for Class 1, 2, and 3 systems and components (Subsection IWB, IWC, IWD, and IWF)examinations.
The inservice testing (IST)of pumps and valves (Subsections IWP and IWV)will be submitted separately from the ISI program.A.Applicable Documents The areas to be examined were selected in accordance with the following documents.
1.Section XI of the American Society of Mechanical Engineers (ASME)Boiler and Pressure Vessel Code,"Rules for Inservice Inspection of Nuclear Power Plant Components," 1989 Edition 2.Section XI of the ASME Boiler and Pressure Vessel Code,"Rules for Inservice Inspection of Nuclear Power Plant Components," 1974 Edition with Addenda through Summer 1975 (for Class 1 B-J piping welds only).3.Donald C.Cook Nuclear Plant, Unit 1, Technical Specifications 4.Southwest Research Institute (SwM)"Second 10-year interval Long-Term Inservice Testing Plan for Class 1, 2, and 3 Systems and Components for Donald C.Cook Nuclear Power Plant, Unit 1," December 1985 5."Rules and Regulations, Title 10, Chapter 1, Code of Federal Regulations, Part 50.55a" 6.United States Nuclear Regulatory Commission (USNRC)Regulatory Guide 1.150, Revision 1,"Ultrasonic Testing of Reactor Vessel Welds During Preservice and Inservice Examinations"'7.USNRC Regulatory Guide 1.65,"Materials and Inspections for Reactor Vessel Closure Studs," October 1973 8.USNRC Regulatory Guide 1.14, Revision 1,"Reactor Coolant Pump Flywheel Integrity," August 1975 9.USNRC Regulatory Guide 1.26, Revision 3,"Quality Group Classifications and Standards for Water, Steam, and Radioactive Waste Containing Components of Nuclear Power Plants" 10.USNRC I.E.Bulletin 82-02,"Degradation of Threaded Fasteners in the Reactor Coolant Pressure Boundary of PWR Plants" 11.USNRC Bulletin 88-08, Supplement 2,"Thermal Stresses in Piping Connected to Reactor Coolant Systems" 12.USNRC Information Notice 90-30,"Ultrasonic Inspection Techniques for Dissimilar Metal Welds" 13.ASME Code Case N-491-1"Alternative Rules for Examination of Class 1, 2, 3, and MC Component Supports of Light Water Cooled Power Plants,"Section XI, Division 1 14.ASME Code Case N498-1,"Alternative Rules for 10-year Hydrostatic Pressure Testing for Class 1 and Class 2 Systems,"Section XI, Division 1 15.ASME Code Case N-509,"Alternative Rules for the Selection and Examination of Class 1, 2, and 3 Integrally Welded Attachments" 16.ASME Code Case N-521, Supplement 6,"Alternative Rules for Deferral of Inspections of Nozzle-to-Vessel Welds, Inside Radius Sections, and Nozzle-to-Safe End Welds of a Pressurized Water Reactor (PWR)Vessel,"Section XI, Division 1 17.ASME Code Case N-524,"Alternative Examination Requirements for Longitudinal Welds in Class 1 and Class 2 Piping,"Section XI, Division 1 18.ASME Code Case N-481,"Alternative Examination Requirements for Cast Austenitic Pump Casings" B.Examination AreasThe components included in this LTP are as follows: Ve~~el~i Reactor Pressure Vessel and Closure Head Pressurizer Steam Generators (Primary side)~Pi in Reactor Coolant System Safety Injection System Chemical and Volume Control System Residual Heat Removal System Waste Disposal System Reactor Coolant Pumps Va ve Reactor Coolant System Safety Injection System Chemical and Volume Control System Residual Heat Removal System Waste Disposal System Class 2~Vs eel Steam Generators (Secondary Side)Regenerative Heat Exchanger Chemical and Volume Control Tank Containment Spray Heat Exchangers Residual Heat Removal Heat Exchangers Boron Injection Tank~Pi i~in Emergency Core Cooling System Chemical and Volume Control System Containment Spray System Feedwater System Main Steam System P~u Safety Injection Pumps Residual Heat Removal Pumps Valves Main Steam Isolation Valves i'n t'd Cla~)Emergency Core Cooling System/jinn Auxiliary Feedwater System Component Cooling Water System Emergency Service Water System Feedwater System Spent Fuel Cooling System Cla 2 an m et u Class I Component Supports Class 2 Component Supports Class 3 Component Supports Class 3 Integral Attachments THIS PAGE INTENTIONALLY LEFT BLANK II.LONG-TERM EXAMINATION PLAN A.Introduction to the Long-Term Examination Tables The accompanying LTP examination tables present an outline of the examinations scheduled for the Class 1, 2, and 3 components for Cook 1.Also included in this plan are the components shared between Units 1 and 2.Not all items listed in the tables are scheduled for examination, but for accountability purposes and to allow future flexibility in the program, each nonexempt component or system identified by SwRI and IMP has been listed.These tables are separated into sections according to major systems or components and further subdivided to list the actual component, area, or weld to be examined.A discussioh of the format and content of these tables follows and is presented in the order of the column headings appearing on each page of the tables.Figure 1, Page 11, provides further explanation of the LTP table format.N b*The number provides a unique sequential, six-digit reference for each table entry.It also provides a future reference to an Examination Summary Sheet which will precede the data package for each inspection area.2.Examination Area Identification Each component or system in this column is identified either by listing the name of the component or by a unique coded character as discussed in Section B.3.ASME Section XI Cate o and Item Number ASME Section XI Item Numbers and Categories are assigned for each component and are listed in the first and second columns, respectively.
The items and categories are specified in ASME Section XI, 1989 Edition.4.IDEM h d The nondestructive examination method is listed in this column.The various methods are used: (a)VT-1, VT-2, and Vl'-3 (Visual)(b)PT (Liquid Penetrant)(c)MT (Magnetic Particle)(d)UT (Ultrasonic)(e)AUT (Automated Ultrasonic)(f)RT (Radiographic)
At the request of IMP, RT is listed for those Class 2 nonexempt feedwater and main steam pipe welds requiring volumetric examinations (ASME Item Nos.C5.51 and C5.52).The examination method assigned to a given component is based on the requirements of the 1989 Edition of Section XI for the Category and Item Number of that component.
5.Plan Status The plan status is divided into ten columns to allow for ten 12-month refueling cycles for the inspection interval.For this program, six 18-month refueling outages were scheduled (two outages for each of the three periods).An"X" is placed to designate the cycle each component is scheduled, a"P" is placed to designate a partial examination is completed, and a"C" is placed to designate those examinations completed.
The unused columns for each period allow flexibility in scheduling during the 10-year interval should the requirement arise.6.Instructions The instructions column is used to provide additional information pertinent to the examinations.
Typical information includes the following:
I (a)Basic Calibration blocks(s)for each component scheduled for a UT examination.
This is to facilitate the users of this plan in selecting the correct calibration block(s)for use during a UT examination.(b)Special examination requirements unique to a given component or system.(c)Other information necessary to explain unique examination results or limitations.
B.Examination Area Identification System In the column, entitled"EXAMINATION AREA IDENTIFICATION," each component is identified either by listing the name of the component or by a unique coded character.
In most cases, component identifiers are preceded by the numeral 1, indicating Cook 1.1.Vessels a.Reactor Pressure Vessel (RPV)ircumferen ial Wel.Circumferential weld numbers are of the form 1-RPV-X, where X is a particular circumferential weld (e.g., A=vessel-to-flange weld, B=upper shell-to-middle shell weld, etc.).d..I dl dl d Id I fU f-IIPV-X is the location of the longitudinal weld in a particular shell, and Y is the unique number of that particular weld.For example, 1-RPV-VA1 is the first longitudinal weld (numbered clockwise from the vessel 0'osition) located in the upper shegl of the reactor pressure vessel.N**d..N**I d h*I h f I-NIXXP Nfdhf.I*Xf the number of the loop in which the nozzle functions and A or B designates the particular function of the nozzle (A for inlet or B for outlet).For example, N2B is the outlet nozzle for loop 2.U<<.df d d IN UhffPV M*I dl-NPV-X-YY, where X is the loop number and YY the unique number of that weld.For example, 1-RPV-3-01 is the outlet nozzle-to-safe end weld in loop 3.N d Id.fh\h d Id h fll U p<<fl-XXYY.where XX are letter(s)designating the type of weld and YY are number(s)designating the unique number of a particular weld.
b.Pressurizer 2 d.l'l*Id h h**II dll.h d lg I I I-Pgg-XX, where the XX is a unique number for each weld.Nozzle Inner Radii.For nozzle inner radii numbers, XX-1-RC-YY designates each nozzle, where XX is the diameter of the piping that is associated with that nozzle and YY the particular line number which is associated with that same nozzle.For example, 14-1-RC-5 is the surge nozzle of the pressurizer since the 14-inch diameter surge line is designated as 1-RC-5.c.Steam Generator The identifying character for the steam generator welds is STM-XX-YY, where XX is the number assigned to the particular steam generator and YY is the unique number of the weld.For example, STM-I1-01 is the lower head-to-tube sheet weld on steam generator number 11.d.Regenerative Heat Exchanger The identifying character for the regenerative heat exchanger weld is"RHE-1-" followed by the individual weld number, assigned sequentially m the direction of flow (e.g., RHE-1-01, RHE-1-02, etc.).e.Chemical and Volume Control Tank f I*d.C'f 2*Id h fd f X-CVCP-PVP-V.
where VS designates vessel support and X is a unique number for each weld.Ves.el Su ort Welds.Support weld numbers are of the form 1-CVCT-2VS-X, where VS designates vessel support and X is a unique number for each weld.CI'S Heat Exchanger ircumferential Weld..Circumferential weld numbers are of the form X-CTSHEX-Y, where X designates CTS heat exchanger (East)or W (West)and Y in a unique number for each weld.Ve el Su o t Weld.Support weld numbers are of the form X-CTSHEX-YVS, where VS designates vessel support and X is a unique number for each weld.g.RHR Heat Exchanger ircumferential Welds.Circumferential weld numbers are of the form X-RHRHEX-Y, where X designates RHR heat exchanger E (East)or W (West)and Y in a unique number for each weld.Vessel Su rt Weld..Support weld numbers are of the form X-RIBHEX-YVS where VS designates vessel support and Y is a unique number for each weld.h.Boron Injection Tank ircumfe ential Weld.Circumferential weld numbers are of the form 1-BIT-X, where X is a unique number for each weld.
Nozzle-to-Shell Welds.Nozzle weld numbers are of the form 1-BIT-VS-X, where X designates the flow direction.
Also, (i)refers to the inlet nozzle and (0)refers to the outlet nozzles.~IS.S pp Id h f U f I-Blg-PX-X.
h XI a unique number for each weld.2.Piping Reactor Coolant System Piping Welds ircumferential Weld and ranch onnection Weld.The general designation for each circumferential weld and branch connection weld is 1-RC-XXX-YY, where XXX is the system line number and YY is unique weld number assigned sequentially in the direction of flow.SES'dl I Id.E hl gl dl d*Id l*Id*p*I f circumferential weld and, as a result, each longitudinal weld is numbered with reference to the adjacent circumferential weld number (see above).The letters LU or LD are added to the reference weld number to indicate whether the longitudinal weld is upstream (LU)or downstream (LD)from the reference weld;the letter I or 0 is added to the LU or LD to indicate that the weld is on the inside (I)or outside (0)radius for the elbow.Therefore, the general designation for a longitudinal weld is 1-RC-XXX-YY (LD or LU)-(I or 0).For example, I-RC-1-05LD-I is the longitudinal weld on the inside of the elbow downstream from weld 05 on the RC line 1.Piping Welds, Exclusive of Reactor Cooling Piping.I'd fU pl gp.U g Mf to identify circumferential welds is 1-XX-YYY-ZZ.
The first group of characters, XX, indicates the system or function as shown in part (a)above (i.e., SI, CS, RH, WD).The second group of characters, YYY, indicates the line number as used on the isometric drawings.The individual weld number is then added, represented by the characters ZZ, sequentially numbered in the direction of flow.For example, weld number 1-SI-29-19 denotes safety injection system, line 29, weld No.19.We er an i u fere ial Weld.To identify those welds adjacent to but other than circumferential welds, the above format for circumferential welds is combined with the characters-BB-C;i.e., the general designation for such noncircumferential welds is 1-XX-YYY-ZZ-BB-C.
The characters BB describe the weld as follows: HL-Integrally welded hariger lug PS-Integrally welded pipe support Should there be more than one component of any certain BB category between successive circumferential welds, a unique number (C in the general designation above)is added to number each such weld, increasing either sequentially from the upstream weld or clockwise from L,.3.Component Supports The general designation for component supports is 1-XXY-ZZZ, where XXX gives the general system designation and Y-ZZZ is the unique number assigned to the support.
III.BASIS FOR PREPARATION A.Class 1 Components In accordance with Subarticle IWB-2420 of Section XI, the sequence of component weld examinations established during the second 10-year interval was repeated during the third 10-year interval to the extent practical.
The selection and allocation of Class 1 piping welds (Category B-J)were based on the 1974 Edition of Section XI with Addenda through Summer 1975, as allowed by 10CFR50.55a.
The selection and allocation of Class 1 vessels, pumps, and valves were based on the 1989 Section XI requirements.
The examination methods for all Class 1 components are based on the 1989 Section XI.Class 1 components were allocated among 6 outages occurring at approximately 18-month intervals.
B.Class 2 Components The selection and allocation of Class 2 vessels, pumps, valves, and piping welds were based on the 1989 Code requirements.
The examination methods for all Class 2 components are based on the 1989 Section XI requirements.
Based on IWC-1221 requirements, several new safety injection welds were added to the third inter val program.Also, AEP/IMP determined that the High Pressure Safety Injection Systems which experienced pressures greater than 600 psi needed to be added to the third interval program.An"H" has been placed after the ASME Section XI Item No.in the database tables to indicate these"High Pressure" areas.Class 2 components were allocated among 6 outages occurring at approximately 18-month intervals.
The examination sequence, as established during the first and second 10-year intervals, was repeated for this interval to the extent practical.
C.Class 3 Components Class 3 components were developed and incorporated into the Class 3 tables based on the requirements of IWD-2500 of the 1989 Code.The requirements for Class 3 components are visual examination of components during system pressure test and visual examinations of integral attachments.
It should be noted that the requirements for examination of integral attachments are the same as the requirements of Subsection IWF for system component supports.Since the Class 3 integral attachments and associated examinations correspond to those component supports listed in the component supports examination tables, a Class 3 table was not generated.
Instead, the Class 3 tables list only the systems requiring examinations (see also Paragraph III.D).D.Class 1, 2, and 3 Component Supports Examination tables for Class'1, 2, and 3 component supports were developed in accordance with the requirements for Subsection IWF of the 1989 Code.The component supports are organized in the same order as the Class 1, 2, and 3 tables for ease of identification.
The guidelines of Code Case N-509, which do not require examinations for the third and fourth intervals, will be used in the performance and scheduling of examinations in lieu of the IWF, Category F-A requirements of.the 1989 Edition of Section XI.Scope of examination
-10 percent of the integral attachments will receive a surface examination on 100 percent of the required areas of each welded attachment.
In case of multiple components within a system of similar design, function, and service, only one of the integral attachments of only one of the multiple components shall be examined.The integral attachments selected for examination shall correspond to those component supports selected by IWF-2510(B).
The guidelines of Code Case N491 will be used to determine the component supports subject to examination and will establish examination requirements for Class 1, 2, and 3 components under Subsection IWF,Section XI.
Supports, hangers, and snubbers (and associated integral attachments) which support the weight of or provide structural stability for nonexempt Class 1, 2, and 3 components were selected for examination.
The requirements of IWF-5000 for snubber testing will be performed by IMP personnel in accordance with Cook 1 technical specifications and plant maintenance schedules.
Scheduling of snubber testing is not included in this plan.E.Code Relief A number of welds cannot be examined due to inaccessibility or component configuration.
Code relief for these areas was granted by the USNRC during the first and second intervals.
Since accessibility or configuration for these welds has not changed, and where Code examination requirements are the same, Code relief is requested for the third interval.Alternate examinations or supplementary requirements specified by the USNRC in granting Code relief have been scheduled and will be performed as originally required.These instances are noted in the"Remarks Column" of the summary tables.Details of the Code Relief are contained in Appendix E.F.System Pressure'est The guidelines of Code Case N-498-1 will be used in lieu of the Systems Hydrostatic testing requirements of Section XI, Table IWB-2500-1, Categories B-E and B-P;Table IWC-2500-1, Category C-H;and Table IWD-2500-1, Categories D-A, D-B, and D-C.In accordance with Code Case N-498-1, system leakage tests will be performed for the third inspection interval.10 DATE: REVISION: COOL NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPONENTS PAGE: SUHHART EXAHINATION AREA NUHBER IDENT IF ICATIOH INSPECTION INTERVAL REACTOR PRESSURE VESSEL AND CLOSURE NEAO FIRST ASHE PERIOD SEC.Xl I-CATGY NDE I ITEH NO HETH)1 2 3 PLAN STATUS SECOND PERIOD THIRD PERloD OUTAGE 1 2 3 4 1 2 3 I I I INSTRUCTIONS
~CALIBRATION BLOIX The Instructions/Calibration Block column is used to provide additional information such as limitations, amount of weld to be inspected, ultrasonic calibration blocks to be used, etc.The Inspection Interval column is subdivided into three periods.These periods are then subdivided into 10 cycles.Within each of the cycle columns, an"X" is placed to designate the cycle each component or weld is scheduled, a"P" is placed to designate a partial examination has been completed, and a"C" is placed to designate those examinations which have been completed.
The third or fourth cycle, as applicable, for each period does not have examinations scheduled to provide flexibility in scheduling during the 10-year interval should the requirement arise.The NDE method used for the inspection is listed in this column.The ASME Section XI Item Number and Category of the inspection area are listed in these columns.Each Examination Area Identiflcation is listed here.Details of the Weld ID System are located in Section H of Volume I.This column lists the individual weld or component reference number.Figure 1.Explanation of the Long-Term Plan Table Format 11 THIS PAGE INTENTIONALLY LEFT BLANK 12 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 1
SUMMARY
EXAMINATION AREA NUMBER IDENI'I F ICATION INSPECTION INTERVAL REACTOR PRESSURE VESSEL AND CLOSURE HEAD I ASME I SEC.XI I CATGY NDE I ITEH NO METH PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I-I-0 U T A G E------I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
<<*CALIBRATION BLOCK**VESSEL CIRCUMFERENTIAL
'WELDS FIG NO A-1 000100 1-RPV.B 8-A AUT 1 UPPER SHELL TO MIDDLE SHELL 81.11 2-U.CONT.3-4 C EXAMINE IH ACCORDANCE WITH C-REG.GUIDE 1~150, REV.1.X<<*RV-1/11-CSCL-5.DCC**
000200 1-RPV-C HIDDLE SHELL TO LOWER SHELL U.CONT~8-A 81.11 AUT 1 2-3-4-C C X EXAMINE IN ACCORDANCE WITH RED~GUIDE 1.150, REV.1.**RV-1/11-CSCL-5-DCC**
000300 1-RPV.D LOWER SKELL TO LOWER HEAD U.CONT~8-A 81.11 AUT 1 2.3-4.C C X EXAHINE IN ACCORDANCE WITH REG.GUIDE 1.150, REV.1.<<*RV-3/11-CSCL-5-DCC**
VESSEL LONGITUDINAL WELDS FIG NO A-1 000400 1-RPV-VA1 UPPER SHELL AT 26.5 DEBS U.CONT~8-A 81~12 AUT 1 2-3-4-C C X EXAMINE IN ACCORDAHCE WITH REG.GUIDE 1.150, REV.1.**11-CSCL-5-DCC**
000500 1-RPV-VA2 UPPER SHELL AT 146.5 DEG.U.CONT.8-A 81.12 AUT 1 2-3-4-C C X EXAMINE IN ACCORDANCE WITH REG.GUIDE'1.150, REV.1.**11-CSCL-5-DCC**
000600 1-RPV-VA3 UPPER SHELL AT 266.5 DEG.U.CONT.8-A 81.12 AUT 2-3-4 C C X EXAMINE IN ACCORDANCE WITH REG.GUIDE 1.150, REV.1.*<<11-CSCL-5 DCC**i 000700 1-RPV-VB1 MIDDLE SHELL AT 0 DEG.U.CONT.B.A 81.12 AUT 1 2-3-4-C C X EXAHINE IN ACCORDANCE WITH REG.GUIDE 1.150, REV.'I~<<*RV-1/11-CSCL-5-DCC**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAH CLASS 1 ALL STATUS COHPOHEHTS PAGE: 2 SUHMARY EXAMINATION AREA NUMBER IDENT I F I CAT I OH INSPECTION INTERVAL REACTOR PRESSURE VESSEL AND CLOSURE HEAD I ASHE I SEC.XI I CATGY NDE I ITEM NO METH I PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I OUTAGE I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK<<*VESSEL LONGITUDINAL WELDS FIG HO A-1 000800 1-RPV-V82 MIDDLE SHELL AT 120 DEG.U.CONT.8-A 81.12 AUT 1 2-3-4-C C X EXAHINE IN ACCORDANCE WITH REG.GUIDE 1.150, REV.1.**RV-1/11-CSCL-5-DCC**
000900 1-RPV.V83 HIDDLE SHELL AT 240 DEG.U.CONT.81.12 2-3-4-8-A AUT 1 C C X EXAHINE IN ACCORDANCE
'WITH REG.GUIDE 1.150, REV.1~**RV-1/11-CSCL-5-DCC**
001000 1-RPV-VC1 LOWER SHELL AT 60 OEG.U.CONT.8-A 81.'12 AUT 1 2-3-4-C C X EXAHINE IN ACCORDANCE WITH REG.GUIDE I~150, REV.1.**RV-1/11-CSCL-5-DCC**
001100 1-RPV-VC2 LOWER SHELL AT 180 DEG.U.CONT.8-A 81~12 AUT 2-3-4 C C X EXAMINE IN ACCORDANCE WITH REG.GUIDE 1.150, REV.1.<<<<RV-1/11-CSCL-5-DCC<<<<
00'I200 1-RPV-VC3 LOWER SHELL AT 300 DEG.U.CONT~8-A 81~12 AUT 1-2-3-4-C X C EXAHIHE IH ACCORDANCE WITH REG.GUIDE'1.150, REV.1.**RV 1/11-CSCL-5 DCC**CLOSURE HEAD DOLLAR PLATE WELD FIG NO A-2 001300 1-C.02 DOLLAR PLATE WELD 8-A 81.21 UT 1C 2-3-4 DURING THE 1987 ISI, THIS WELD WAS DETERHINED TO BE INACCESSIBLE FOR EXAHINATIOH DUE TO CRD SHROUD.CODE RELIEF WAS GRANTED FROH EXAHINING BOTH SIDES.**RV 2<<<<
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLAHT UHIT 1 INSERVICE IHSPECT ION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 3
SUMMARY
EXAHINAT ION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL REACTOR PRESSURE VESSEL AND CLOSURE HEAD I ASME I SEC.XI I CATGY NDE I ITEM NO METH i 1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I-I-OUTAGE-----I 2 3 1 2 3 4 1 2 3 INSTRUCTIONS
- CALIBRATION BLOCK*>>CLOSURE HEAD MERIDIONAL WELDS FIG NO A-2 001400 1-M.01 MERIDIONAL WELD AT 0 OEG.8-A 81.22 UT 1C 2 C 3X 4 EXAHINE ACCESSIBLE LENGTH OF WELD IH ACCORDANCE WITH REG.GUIDE 1.150, REV.1.<<*RV 2**001500 1-H-02 MERIDIONAL WELD AT 60 DEG.B-A B1.22 UT 1--.C 2-3-4-<<*RV-2>>*001600 1.H.03 MERIDIONAL WELD AT 120 BEGS 8-A 81.22 UT 1-2-3-4*<<RV 2>>>>001700 1-M.04 B-A HERIDIONAL WELD AT 180 DEG.B1.22 U.CONT.UT 1C 2-3-4*<<RV 2**001800 1-M.05 MERIDIONAL WELD AT 240 DEG.8-A 81.22 UT 1---C 2.3-4*>>RV 2*<<001900 1-M-06 MERIDIONAL WELD AT 300 DEG.B-A B1~22 UT 1 2-3 X 4-**RV-2**LOWER HEAD DOLLAR PLATE WELD FIG NO A-3 002000 1-LHC-01 DOLLAR PLATE WELD B-A 81.21 AUT 1 2.3-4 WELD IS IHACCESSIBLE DUE TO INTERFEREHCE OF THE LOWER HEAD INSTRUMENT PEHETRATIONS
~RELIEF REQUESTED.
DATE: 11/15/95 REVI SI OH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAH CLASS 1 ALL STATUS COHPONEH'IS PAGE: 4 SUHHARY EXAHINATIOH AREA NUNBER IDENT I F I CAT I OH INSPECTION IHTERVAL REACTOR PRESSURE VESSEL AND CLOSURE HEAD I ASME I SEC.XI J CATGY NDE I ITEN NO NETH PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I I-OUTAGE-1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- <<CALIBRATION BLOCK**LOWER HEAD MERIDIONAL WELDS FIG NO A.3 002100 1-LHH-01 HERIDIONAL WELD AT 30 DEG.8-A 81.22 AUT 1 2-3-4-X C EXAHINE ACCESSIBLE LENGTH OF WELD IH ACCORDANCE MITH REG.GUIDE 1.150, REV.1.<<>>RV-3/11-CSCL-5-DCC*<<
002150 1-LHH-02 HERIDIONAL WELD AT 90 DEG.8-A 81.22 AUT 1 2-3-4-X C EXAMINE ACCESSIBLE LENGTH OF MELD IN ACCORDANCE WITH REG.GUIDE 1.150, REV.1.<<*RV.3/11-CSCL-5-DCC*>>
002200 1-LHH-03 MERIDIOHAL WELD AT 150 DEG.U.CONT.8-A 81.22 AUT 2-3-4 C C X EXAHINE ACCESSIBLE LEHGTH OF WELD IN ACCORDANCE WITH REG.GUIDE 1.150, REV.1.e<<*RV-3/'l1-CSCL-5 DCC>>*002250 1-LHH-04 MERIDIOHAL WELD AT 210 DEG.8-A 81.22 AUT 1 2-3-4-X C EXAHINE ACCESSIBLE LENGTH OF MELD IN ACCORDANCE WITH REG.GUIDE 1.150, REV.1.<<*RV-3/11-CSCL-5 DCC**002300 1-LHH-05 HERIDIONAL WELD AT 270 DEG.8-A 81.22 AUT 1 2.3-4 X C EXAHINE ACCESSIBLE LENGTH OF MELD IH ACCORDANCE MITH REGS GUIDE 1.150, REV.'I.**RV-3/11-CSCL-5-DCC**
002350 1-LHH.06 NERIDIONAL WELD AT 330 DEG.8-A 81.22 AUT 1 2-3-4 X C EXAHINE ACCESSIBLE LENGTH OF'MELD IN ACCORDANCE WITH REG.GUIDE 1.150, REV.1~<<*RV-3/11-CSCL-5-DCC*>>
VESSEL TO FLANGE'MELD FIG NO A-1 002600 1-RPV-A VESSEL TO FLANGE U.COH'f.8-A 81.30 UT 1-C---C AUT 2.C 3.4 C C X PARTIAL EXAHIHATIONS FROH SEAL SURFACE DEFERRED UNTIL 3RD PERIOD.SEE APPENDIX E RELIEF REQUEST.EXAHINE IH ACCORDANCE WITH REG.GUIDE 1.150, REV.1~<<*CSCL-5-DCC/CSCL-34-DCC*<<
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPONENTS PAGE: 5 SUHHARY EXAHI HAT ION AREA NUHBER IDEHT IF ICATION INSPECTION INTERVAL REACTOR PRESSURE VESSEL AND CLOSURE HEAD I ASHE I SEC.XI I CATGY NDE I ITEN NO HETH I PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I-I-OUTAGE---I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- iCALIBRATION BLOCK**CLOSURE HEAD TO FLANGE IIELD FIG NO A-2 002700 1-C-01 HEAD TO FLANGE U.CONT.8-A 81.40 HT 1C--C UT 2P--P 3X--X 4 C C X EXAHINE 33X EACH DESIGNATED OUTAGE.4*RV 2**NOZZLE TO SHELL AND SHELL TO NOZZLE NELDS FIG NO A 1 002800 1-N1A INLET NOZZLE TO SHELL U.CONT.8-D 83.90 AUI'-2-3-4-C C X EXAHINE IN ACCORDANCE llITH REG.GUIDE 1.150, REV.1, AND CC-N-521'*4-DCC/5-DCC/7-DCC**
002900 1-N18 OUTLEI'OZZLE TO SHELL U.CONT.8-D 83.90 AUT 1-C 2-C 3-4-C C X EXAHINE IN ACCORDANCE UITH REG.GUIDE 1.150, REV.1, AND CC.H-521.**4-DCC/5-DCC/7-DCC**
003100 1-N2A IHLET NOZZLE TO SHELL U.COHT.83.90 2-3-4 8-D AUT 1 C C X EXAMINE IN ACCORDANCE MITH REG.GUIDE 1~150, REV.1, AND CC-N-521.<<*4-DCC/5-DCC/7-DCC**
003200 1-H28 OUTLET NOZZLE TO SHELL U.CONT.8-D 83.90 AUT 1-C 2-C 3-4-C C X EXAHINE IN ACCORDANCE lllTH REG.GUIDE 1.150, REV.1, AND CC-N-521.**4-DCC/5-DCC/7 DCC**003300 1-N3A INLET NOZZLE TO SHELL U.CONT.83.90 2-3-4-8 D AUT 1 C C X EXAHINE IH ACCORDANCE NITH REG.GUIDE 1.150, REV.1, AND CC-N-521.**4-DCC/5-DCC/7-DCC**
003400 1-N38 OUTLET NOZZLE TO SHELL U.CONT.8 D 83.90 AUI'-2-C 3-4-C C C X EXAMINE IN ACCORDAHCE NITH REG.GUIDE 1.150, REV.1, AND CC-N-521.**4-DCC/5-DCC/7-DCC**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANI'NIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS'I ALL STATUS COMPONENTS PAGE: 6 SUMHARY EXAMINATION AREA NUHBER IDENT IF ICATION INSPECTION INTERVAL REACTOR PRESSURE VESSEL AND CLOSURE HEAD I ASME I SEC.XI I CATGY NDE ITEH NO METH I FIRST PERIOD PLAN STATUS SECOND THIRD P R OD PERIOD I---OUTAGE------I 2 3 1 2 3 4 1 2 3 I IHSTRUCI'IONS
- CALIBRATION BLOCK>>*NOZZLE TO SHELL AND SHELL TO NOZZLE TELOS FIG NO A-1 003500 1-N4A INLET NOZZLE TO SHELL U.CONT~8 D 83.90 AUT C C X EXAHINE IN ACCORDANCE NITH REG.GUIDE 1.150, REV.1, AND CC-H-521.>>>>4-DCC/5-DCC/7-DCC>>>>
003600 1-N4B OUTLET NOZZLE TO SHELL U.CONT~8-D 83.90 AUT C C C C X EXAHINE IN ACCORDANCE WITH REG.GUIDE 1.150, REV.1, AND CC-H.521.**4 DCC/5 DCC/7-DCC**
NOZZLE INSIDE RADIUS SECTION FIG NO A-3 003700 1-N1A-IRS IHLET NOZZLE AT 247 DEG.U.CONT.B-D AUT 83.100 C EXAMINE IN ACCORDANCE NITH C CC-N-521.X*>>IR-CSCL-8-DCC**
003800 1-N1B-IRS OUTLET NOZZLE AT 202 DEG.B D AUT B3.100 C C X EXAMINE IN ACCORDANCE NITH CC-N-521.*>>CSCL-4-DCC/IR-CSCL-8 DCC**004000 1-H2A-IRS INLET NOZZLE AT 293 DEG.U.CONT.8 D AUT B3.100 C EXAMINE IN ACCORDANCE MITH C CC-N-52'I.
X**IR-CSCL-8-DCC*>>
004100 1-N2B-IRS OUTLET NOZZLE AT 338 DEG.B D AUT B3.100 C C X EXAHINE IH ACCORDANCE
'NTH CC-N-521.**CSCL-4-DCC/IR-CSCL-8-DCC>>*
004300 1-N3A-IRS INLET NOZZLE AT 67 DEG.U.CONT.B-D AUT B3.100 C EXAMINE IH ACCORDAHCE MITH C CC-N-521.X>>>>IR-CSCL-8-DCC**
DATE: 11/15/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 7 REACTOR PRESSURE VESSEL AND SUMHARY EXAMINATION AREA NUMBER IDENT IF ICATION INSPECT ION INTERVAL CLOSURE HEAD I ASME I SEC.XI I CATGY NDE I ITEM NO METH PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERICO I I----OUTAGE--I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- ~CALIBRATIOH BLOCK~~NOZZLE INSIDE RADIUS SECTION FIG HO A-3 004400 1.H3B-IRS OUTLET NOZZLE AT 22 DEG.83.100 2-C 3.8-D AUT 1 C EXAMINE IH ACCORDANCE WITH CC-H-521.X~*CSCL-4-DCC/IR-CSCL-8 Dcc**004600 1-H4A-IRS INLET NOZZLE AT 113 DEG.U.GDH'r.83.100 2-3-4-B.D AUT 1-C C X EXAMINE IN ACCORDANCE WITH CC-H-521.**IR-CSCL-8-DCC**
004700 1-N4B-IRS OUTLET NOZZLE AT 158 DEG.83.100 2-C 3-4-B-D AUT 1 C X EXAMINE IH ACCORDANCE
'WITH CC-N-521.**CSCL-4-DCC/IR-CSCL 8 Dcc**LOWER HEAD PENETRATIONS FIG No A-3 004900 LOWER HEAD PENETRATIOHS 58 PEHETRATION WELDS RX PIT 8-E 84~13 VT-2 1-2-3-4-C X EXAMINE 25K (15 WELDS)DURING SYSTEM LEAKAGE TEST PER CC-H-498-1.
CLOSURE HEAD PEHETRATIONS FIG No A-2 005000 CLOSURE HEAD CRD PEHETRATIOHS 8-E VT-2 1--------C-EXAMINE 25'20 WELDS)DURING 79 PENETRATION WELDS 84.12 2----------SYSTEM LEAKAGE TEST PER U.cour.3--------X CC-N-498-1.
4 005010 CLOSURE HEAD VENT LINE u.cour.84.11 2-3-4 B-E VT-2 1-X EXAMIHE DURING SYSTEM LEAKAGE TEST PER CC-N-498-1.
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 8 SUMHARY EXAMINATION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL REACTOR PRESSURE VESSEL AND CLOSURE HEAD I ASME I SEC.XI I CATGY NDE I ITEH NO METH I PLAN STATUS FIRST SECOND PERIOD PERIOD-----OUTAGE-2 3 1 2 3 4 THIRD PERIOD 1 2 3 I I I I INSTRUCTIONS I**CALIBRATION BLOCK<<<<NOZZLE TO SAFE-END AND SAFE-END TO NOZZLE HELDS FIG NO A-3 005100 1-RPV-1-0'I 8-F PT NOZZLE TO SAFE-END"NOT LEG" 85.10 AUT 1 2 P 3-4 C-C C PERFORH AUT FROM ID IN LIEU OF PT.*<<CSCL-4-DCC/39-DCC**
005200'I.RPV-1-02 8-F PT SAFE-END TO NOZZLE"COLD LEG" 85.10 AUT U.CONT~2 3-4 C C C C X PERFORM AUT FROH ID IN LIEU OF PT.**CSCL-4-DCC/39-DCC**
005300 1-RPV-2-01 8-F HOZZLE TO SAFE-END"HOT LEG" 85.10 PT AUT 2-3-4 C-C C PERFORM AUT FROM ID IN LIEU OF PT.X<<*CSCL-4-DCC/39 DCC**005400 1-RPV-2-02 8-F SAFE-END TO NOZZLE"COLD LEG" 85.10 U.CONT~PT AUT 2-3-4-C C C X PERFORH AUT FROM ID IN LIEU OF PT.*<<CSCL-4-DCC/39-DCC*>>
005500 1-RPV-3-01 8-F NOZZLE TO SAFE-END<<NOT LEG" 85.10 PT AUT 2-3-4 C-C C C PERFORH AUT FROH ID IN LIEU OF PT.**CSCL-4 DCC/39 DCC**005600'I-RPV-3.02 SAFE-END TO NOZZLE"COLD LEG" U.CONT.8-F PT 85.10 AUT 2 P 3-4-C C C X PERFORH AUT FROH ID IN LIEU OF PT.**CSCL-4-DCC/39-DCC<<*
005700 1-RPV-4-01 8-F NOZZLE TO SAFE-END"NOT LEG" 85.10 Pr AUT 2 3-4 C C C X PERFORH AUT FROH ID IN LIEU OF PT.<<*CSCL-4-DCC/39 DCC**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECT'ION LOHG TERM PLAN CLASS 1 ALL STATUS COMPOHENTS PAGE: 9 INSPECTION INTERVAL REACTOR PRESSURE VESSEL AND CLOSURE HEAD I ASME I SEC.XI I CATGY HDE ITEM HO METH I PLAN STATUS FIRST SECOND PERIOD PERIOD THIRD PER I OD-OUTAGE-1 2 3 1 2 3 4 1 2 3 I IHSTRUCTIOHS
CLOSURE STUDS 005900 1-RPV-STUD
'I THROUGH 54 650'UX.B.G-1 86.30 MT Ul'C C 2P 3X 4 C C C P X C C X EXAMINE 33X (18 STUDS)EACH DESIGNATED OUI'AGE.<<*3378037 (WHIT-1 RPV STUD)**CLOSURE NUTS 006000 1-RPV NUT 1 THROUGH 54 650'UX.8-G-1 86.10 MT 1 C C-C C C-C C-EXAMINE 33X (18)HUtS EACH 2P--P---C DESIGNATED OUTAGE.3 X X X 4 CLOSURE WASHERS 006200 1-RPV-WASHER 1 THROUGH 54 650'UX.8-0-1 VT-1 1 C C 86.50 PT 2 P 3 X 4-C C C P X C C X EXAMINE 33X (18 WASHERS)EACH DESIGNATED OUtAGE.PERFORM PT IN ACCORDANCE WITH REG.GUIDE 1.65~RPV FLANGE THREADS 006300 1-RPV-FLANGE THREADS 1 THROUGH 54 U.CONT.B-G-1 86.40 2 P 3 X 4 P X UT 1C---C C C X EXAHINE 33X (18)OF THE FLANGE THREADS DURING EACH DESIGNATED OUTAGE.*~3378037 (UHIT-1 RPV STUD)**RPV INTERIOR SURFACES AND CORE SUPPORT STRUCTURES 007800 1-RPV-INTERIOR U.COHT.8-H-1 VT-3 813.10 2-C 3-X 4-C C X C C X EXAHIHE AREAS ACCESSIBLE DURING NORMAL REFUELING OUTAGES ONCE EACH PERIOD.
DATE: 11/IS/95 REVISION: 0 COOK NUCLEAR PLANT UHIT 1 IHSERVICE INSPECTION LONG TERM PLAH CLASS 1 ALL STATUS COMPONENTS PAGE: 10 INSPECTION INTERVAL REACTOR PRESSURE VESSEL AND CLOSURE HEAD I ASHE I SEC.XI I CATGY NDE ITEM HO METH I PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I I------0 U T A G E------I 1 2 3 1 2 3 4 1 2 3 INSTRUCTIONS
<<*CALIBRATION BLOCK<<<<RPV INTERIOR SURFACES AND CORE SUPPORT STRUCTURES 007900 1 RPV CS-LUGS 1 THROUGH 6 CORE SUPPORT LUGS U.CONT.8-H-2 VT-3 1-B13.60 2-3-4-C EXAMINE IIHEH CORE BARREL IS C REMOVED.X 008000 1-RPV-CORE SUPPORT STRUCTURE (WHEN REMOVED)U.CONT.8-H-3 VT-3 1-B13.70 2-3-4 X C EXAMINE HHEH REMOVED.CONTROL ROD DRIVE HOUSINGS WELDS 008100 CONTROL ROD DRIVE HOUSING MELD 8 0 PT 79 HELDS 814~10 U.CONT.1-2-3-4-EXAMIHE TNE MELDS ON 10X (8)OF THE PERIPHERAL CRDS.
DATE: 12/20/95 REVISIOH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LOHG TERN PLAM CLASS 1 ALL STATUS COMPONENTS PAGE: 11 PRESSURIZER SUHHARY EXAMINATION AREA HUHBER IDEHTIFICATIDH INSPECTION IHTERVAL I FIRST ASHE PERIOD SEC.XI I CATGY NDE ITEN MO METH J 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE------1 2 3 4 1 2 3 I I J I INSTRUCTIOHS I**CALIBRATIOH BLOCK**CIRCUMFERENTIAL WELDS FIG NO A-4 009000 1-PRZ-11 B-B LOWER SHELL TO LOWER HEAD 82.11 UT 1C 2C 3-4**RV 3*0 009100'I-PRZ-12 SHELL TO SHELL SEE 1.INST 2-3-4-C HOH SECTION Xl WELD.009200'I-PRZ-13 SHELL TO SHELL SEE INST 2-3-4 C NON SECTION Xl WELD.009300 1-PRZ-14 SHELL TO SHELL SEE 1 INST 2-3-4 C NON SECTION XI'WELD.009400 1-PRZ-15 UPPER SHELL TO UPPER HEAD PRESS.DH BB UT 82.11 1-2-3-4 C C X**RV 3i*LONGITUDIMAL WELDS FIG NO A-4 009500 1-PRZ-16 8-8 LONGITUDINAL SEAN AT+23 DEG.82.12 UT 1C 2 C 3 X 4 EXAMINE'I FOOT OF WELD LENGTH HEAR HEAD.**RV-3**009600 1-PRZ-17 LONGITUDIHAL SEAN AT-25 DEG.SEE 1 INST 2-3-4 C--NOH SECTIOH XI WELD~
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLAN'I UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS CONPONEN'IS PAGE: 12 PRESSURIZER SUHMARY EXAHI HAT ION AREA NUHBER IDENT IF ICATION INSPECTION IHTERVAL I FIRST ASME PER I OD SEC.XI I CATGY HDE ITEN NO NETH i 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD-OUTAGE-1 2 3 4 1 2 3 I I I I INSTRUCTIONS
>>*CALIBRATION BLOCK**LONGITUDINAL WELDS FIG NO A-4 009700 1-PRZ-18 LONGITUDINAL SEAN AT+48 DEG.SEE 1 INST 2-3-4-C NON SECTION XI MELD.009800 1-PRZ-19 B-B UT 1---C LONGITUDINAL SEAH AT-44 DEG.B2.12 2---C PRESS'H 3---X 4 EXAHINE 1 FOOT OF MELD LEHGTH HEAR HEAD.**RV 3>>>>NOZZLE INS'IDE RADIUS SECTIONS FIG NO A-4 009900 4".-1-RC-10-IRS SPRAY'NOZZLE PRESS.DH 8-D UT 1-83.120 2-3-4 X**IR-CSCL-24-DCC>>>>
010100 6"-1-RC IRS RELIEF NOZZLE B-D UT B3.120 1 C 2 C 3 X 4->>*IR-CSCL-24 DCC**010200 6"-1-RC IRS RELIEF NOZZLE PRESS.DH B.D UT 1 B3.120 2-3-4->>*IR-CSCL-24-DCC*>>
010300 6"-1-RC-8-IRS RELIEF NOZZLE PRESS.DH 83.120 2-3 X 4-B-D UT 1**IR-CSCL-24-DCC**
010400 6"-1-RC-9-IRS RELIEF NOZZLE 8-D UT 1 C 83.120 2 C 3 X 4-<<>>IR-CSCL-24-DCC**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UHIT 1 IHSERVICE INSPECTION LOHG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 13 PRESSURIZER SUMHARY EXAHIHATIOH AREA NUMBER IDENTIFICATION INSPECTION IHTERVAL I ASHE J SEC.XI I CATGY NDE I ITEM HO METH I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD-OUTAGE---1 2 3 1 2 3 4 1 2 3 INSTRUCTIONS
<<<<CALIBRATION BLOCK**NOZZLE INSIDE RADIUS SECTIONS FIG NO A-4 010500 14<<-1-RC IRS SURGE NOZZLE CONT.PRT BD UT 1 83.120 2-3-4 X C C**IR-CS-33.DCC**
PARTIAL PENETRATION
'MEI.DS FIG NO A-5 010800 HEATER PEHETRAT IONG 78 PEHETRATIOH l}ELDS CONT.PRT 8-E 84.20 VT-2 1 2-3-4 C EXAMINE ALL MELDS DURING SYSTEM LEAKAGE TEST PER CC-N.498.1.
010850 INSTRUMENT AND SAMPLE NOZZLES 8-E 9 PEHETRATIONS 84.13 PRESS.VT-2 1-2-3-4-X EXAMINE 25K (3 llELDS>DURING SYSTEM LEAKAGE TEST PER CC-N-498-1.
NOZZLE TO SAFE-END AHD SAFE-END TO NOZZLE MELDS FIG NO A-4 010900 1-PRZ-20 NOZZLE TO SAFE-EHD 8-F PT 1 85.40 UT 2 C 3X 4 C AUGMEHTED UT EXAMINATION REQUIRED USING 45 DEG.REFRACTED LONGITUDINAL l!AVE PER NRC I.N~90-30'*B-SS-'X-1.4-11-DCC**
011000 1-PRZ-21 NOZZLE TO SAFE-EHD PRESS.DH 8-F PT 1---C 85.40 UT 2-.-C 3-X 4-AUGMENTED UT EXAMINATION REQUIRED USING 45 DEG.REFRACTED LONGITUDINAL IIAVE PER HRC I.N.90-30.**B-SS-X-1.4-11.DCC**
011100 1.PRZ-22 NOZZLE TO SAFE-EHD PRESS.DH 8-F 85.40 PT 1---C Uj'---C 3-X 4 AUGMENTED UT EXAMIHATIOH REQUIRED USING 45 DEG.REFRACTED LONGITUDINAL l}AVE PER HRC I.N.90-30.<<<<B-SS-X-1.4-11-DCC<<<<
DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UHIT 1 IHSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPONEHTS PAGE: 14 PRESSURIZER SUHHARY EXAHINATION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE I ITEH NO NETH I PLAN STATUS FIRST SECOND THIRD I PERICO PERIOD PERIOD I-I OUTAGE-1 2 3 1 2 3 4 1 2 3 I IHSTRUCTIONS
<<<<CALIBRATIOH BLOCK*<<NOZZLE TO SAFE-END AND SAFE-END TO NOZZLE MELDS FIG NO A-4 011200 1-PRZ-23 HOZZLE TO SAFE-END 8-F 85.40 PT 1C C UT 2C 3X 4 AUGHENTED UT EXAHIHATIOH REQUIRED USING 45 DEG.REFRACTED LONGITUDINAL NAVE PER NRC I.N.90-30.<<<<B-SS-X-1.4-11-DCC
- 011300 1-PRZ-24 NOZZLE TO SAFE-END PRESS.DH 8 F 85.40 PT 1-UT 2 3.4 C C AUGHEHTED UT EXAHINAT IOH REQUIRED USING 45 DEG.REFRACTED LONGITUDINAL MAVE PER NRC I.N.90 30.**3378027 (4-SS-120-.430)*<<
011400 1-PRZ-25 NOZZLE TO SAFE-END CONT.PRT 8-F 85'0 PT 1C UT 2.3-4-AUGHEN'IED UT EXAHINATIOH REQUIRED USING 45 DEG.REFRACTED LONGITUDINAL NAVE PER HRC I.N~90.30.<<*3378032 (14-SS-160-1.CO)**
LOMER HEAD TO SUPPORT SKIRT MELD FIG NO A-4 011500 1-PRZ-26 VESSEL SUPPORT L.CONT.B-H 88.20 HT'I---C UT 2---C 3---X 4 EXAHINE 100X OF MELD LENGTH.**PL-1'-CS-78**PRESSURE RETAINIHG BOLTING 2" AND LESS FIG NO A-C 011800 1-PRZ-HB-1 THROUGH 16 HANMAY BOLTIHG PRESS.DH 8-0-2 87.20 VT-1 I-C HT 2C 3X 4 C C PERFORH HT IH ACCORDANCE
'MITN IE BULLETIN 82-02 IF BOLTING IS REHOVED.
DATE: 12/20/95 REVI S I OH: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 15 STEAN GENERATOR HO.11 SUHHARY EXAHI HAT IOH AREA HUH BE R IDENT I F I CAT ION INSPECTION INTERVAL I FIRST ASHE PER I CO SEC.XI I CATGY HDE I ITEN NO NETH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE-1 2 3 4 1 2 3 IHSTRUCTIOHS
- ~CALIBRATION BLOCK**CIRCUHFERENTIAL WELDS FIG NO A-6 011900 STH-11-01 LOWER HEAD TO TUBE SHEET CONI'.L1 8-8 82.40 UT 1C 2 C 3-4-C**HP-20-5-CSCL-47 DCC~*NOZZLE INSIDE RADIUS SECTIONS FIG NO A-6 012000 STH-11-I-IRS INLET NOZZLE INSIDE RADIUS SECTION BD UT 83.140 1 C 2C 3X 4-*~IR-CSCL-24.DCC*~
012100 STN-11-0-IRS OUTLET NOZZLE INSIDE RADIUS SECTION 8-D Ul'3.140 1 C 2 C 3X 4*~IR-CSCL-24-DCC**
NOZZLE TO ELBOW AND ELBOW TO NOZZLE WELDS FIG HO A-6 012200 STH-11.02 ELBOW TO INLET NOZZLE 8-F 85.70 PT 1C UT 2C 3 X 4**3378033 (HAIN RPV COOLANT)*012300 STN-11-03 OUTLET NOZZLE TO ELBOW 8-F 85.70 PT 1C UT 2C 3X 4~~3378033 (HAIN RPV COOLAHI')**
PRESSURE RETAINING BOLTIHG 2" AND LESS FIG NO A-6 012740 STH-11-IHB-1 THROUGH 16 INLET NANWAY BOLTING CONT.L1 8-G-2 VT-1 1 87.30 HT 2 C 3 X 4-C-PERFORH HT IN ACCORDANCE WITH C I.E.BULLETIN 82-02 IF BOLTING IS REHOVED.
DATE: 11/15/95 REV I SION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTIOH LONG TERM PLAN CLASS 1 ALL STATUS COMPOHEHTS PAGE: 16 STEAM GENERATOR HO.11
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION FIRST PER I CO INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE I ITEM NO METH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I-0 U T A G E------I 1 2 3 4 1 2 3 I INSTRUCTIONS
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 17 STEAM GENERATOR HO.12
SUMMARY
EXAMINATION AREA NUMBER IDENT IF I CAT I OH INSPECTION INTERVAL I ASME I SEC.XI CATGY HDE I ITEM NO METH I PLAN STATUS FIRST SECOND PERIOD PERIOD THIRD I PERIOD I-OUTAGE I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
NOZZLE INSIDE RADIUS SECTIONS FIG NO A-6 012900 STM-12-I-IRS INLET NOZZLE INSIDE RADIUS SECT ION CONT.L2 83'40 2-3-4 8-D UT 1 C C X**IR-CSCL-24-DCC**
013000 STM-12-0.IRS OUTLET NOZZLE INSIDE RADIUS SECTION CONT.L2 BD UT 1-'3.140 2-3-4<<*IR-CSCL-24-DCC**
NOZZLE TO ELBOW AND ELBOW TO NOZZLE WELDS FIG NO A-6 013100 STM-12-02 ELBOW TO INLET NOZZLE COH'T.L2 B-F PT 1 85.70 UT 2-3-4 C C X**3378033 (MAIN RPV COOLANT)**
013200 STM-12-03 OUTLET NOZZLE TO ELBOW CONT.L2 8-F 85.70 PT'1---C UI'---C 3-X 4-I.**3378033 (MAIN RPV COOLANT)i*
PRESSURE RETAINING BOLTING 2" AHD LESS FIG NO A-6 013400 STM-12-IMB-1 THROUGH 16 IHLET MANWAY BOLTIHG CONT.L2 8-G-2 VT-'I 1 87.30 MT 2 C 3-4-C------PERFORM MT IN ACCORDANCE
'WITH C I.E.BULLETIN 82-02 IF BOLTIHG X IS REMOVED.
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UHIT'I INSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 18 STEAM GENERATOR NO.12 SUMHARY EXAMINATION AREA NUHBER IDENTIFICATION IHSPECTION INTERVAL I FIRST ASME PER I 00 SEC.XI I CATGY HDE ITEM NO METH I 1 2 3 PLAN STATUS SECOND PERIOD OUTAGE-2 3 4 THIRD I PERIOD-I-----I 1 2 3 I INSTRUCTIONS
<<*CALIBRATION BLOCK**PRESSURE RETAINING BOLTING 2" AND LESS FIG NO A-6 013500 STH-12-OMB-1 THROUGH 16 OUTLET MANNAY BOLTING CONT.L2 8-G-2 87.30 VT-1 1-MT 2C 3-4-C C X PERFORM HT IN ACCORDANCE HITH I.E.BULLETIN 82-02 IF BOLTING IS REHOVED~
DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE IHSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPOHEHTS PAGE: 19 STEAN GENERATOR HO.13 SUHNARY EXAHI HAT ION AREA NUNBER IDENTIFICATION FIRST PER I OD INSPECTION INTERVAL I ASNE I SEC.XI I CATGY HDE I ITEN NO NETH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE---1 2 3 4 1 2 3 I I I INSTRUCTIONS
- >>CALIBRATIOH BLOCK>>*CIRCUNFERENTIAL WELDS FIG NO A-6 014000 STH-13-01 LOWER HEAD TO TUBE SHEET CONT.L3 B-B B2.40 UT 1-2-3-4-C**MP 20 5-CSCL-47-DCC**
NOZZLE INSIDE RADIUS SECTIONS FIG NO A-6 014100 STH-13-I-IRS INLET NOZZLE INSIDE RADIUS SECT ION CONT.L3 BD UT 83.140 1-2-3-4-X*>>IR-CSCL-24-DCC*>>
014200 STH.13-0.1RS OUTLET HOZZLE INSIDE RADIUS sEGT lou cour.1.3 B-D UT B3.140 1-2-3-4 X<<*IR-CSCL-24-DCC**
NOZZLE TO ELBOW AHD ELBOW TO NOZZLE WELDS FIG NO A-6 014300 STN-13-02 INLET NOZZLE TO ELBOW COHT~L3 B-F B5.70 3-4 X PT 1-C Ur 2-C<<*3378033 (HAIN RPV COOLANT)**
014350 STH-13-03 OUTLET NOZZLE TO ELBOW CONT.L3 8-F e5.70 PT 1 UT 2-3-4-C C X*>>3378033 (HAIN RPV COOLANT)<<>>
PRESSURE RETAINIHG BOLTIHG 2" AND LESS FIG NO A.6 014500 STH-13-IHB-1 THROUGH 16 INLET HANWAY BOLTIHG B-0-2 87.30 VT-1 1 C Hr 2c 3-4 C PERFORH HT IH ACCORDANCE WITH I.E.BULLETIN 82-02 IF BOLTING IS REHOVED.
DATE: 11/15/95 REVI SIGH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 20 STEAM GENERATOR NO.13 SUMHARY EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE I ITEM NO HETH I 1 PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD-OUTAGE-2 3 1 2 3 4 1 2 3 I I I I INSTRUCTIONS
- CALIBRATION BLOCK**PRESSURE RETAINING BOLTING 24 AND LESS FIG NO A-6 014600 STH 13-OMB-1 THROUGH 16 OUTLET MANNAY BOLTING 8-G-2 B7.30 VT-1 1 C HT 2C 3-4-C X PERFORH MT IN ACCORDANCE
'WITH I.E.BULLETIN 82-02 IF BOLTIHG IS REMOVED' DATE: 11/15/95 REVI SIGH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 21 STEAM GENERATOR NO.14
SUMMARY
EXAHINATI ON AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I ASHE I SEC~XI I CATGY NDE I ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD--0 U T A G E------1 2 3 1 2 3 4 1 2 3 I I I IHSTRUCT IONS I**CAL I BRAT ION BLOCK**CIRCUMFERENTIAL WELDS FIG NO A-6 014900 ST M-14-01 LOWER HEAD TO TUBE SHEET CONT.L4 B-B 82.40 UT 1 2-3.4-C C**MP-20-5-CSCL-47-DCC**
NOZZLE INSIDE RADIUS SECTIONS FIG NO A-6 015000 STH-14-I-IRS INLET NOZZLE INSIDE RADIUS SECTION CONT.L4 BD UT 1 83.140 2-3-4-C C*~IR-CSCL-24-DCC**
015100 STM-14-0 IRS OUTLET NOZZLE INSIDE RADIUS SECTION CONT.L4 B-D UT 1 B3.140 2-3-4 C C**IR-CSCL-24-DCC**
NOZZLE TO ELBOW AND ELBOW TO NOZZLE WELOS FIG NO A-6 015200 STM.14-02 ELBOW TO IHLET NOZZLE B-F B5.70 PT 1C Ur 2-C 3-4-**37-CCSS-X-3.0-9-DCC**
015300 STM-14-03 OUTLET NOZZLE TO ELBOW B-F 85.70 PT 1 UT 2-C 3-4 C**37-CCSS--X-3.0-9.DCC*~
PRESSURE RETAINING BOLTING 2" AND LESS FIG NO A-6 015800 STM-14-IHB-1 THROUGH 16 INLET MANWAY BOLTIHG B-G-2 B7.30 VT-1 1 MT 2C 3-4 C X C PERFORM MT IN ACCORDANCE WITH I~E.BULLETIN 82-02 IF BOLTING IS REMOVED.
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 22 STEAM GENERATOR NO.14 SUMHARY EXAMI HAT IOH AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I ASME I SEC.XI I CATGY HDE ITEM HO METH I FIRST PERIOD 1 2 3 PLAN STATUS SECOND THIRD I PERICO PERIOD OUTAGE------I 1 2 3 4 1 2 3 I INSTRUCTIONS
<<<<CALIBRATION BLOCK<<*PRESSURE RETAINIHG BOLTIHG 2" AND LESS FIG NO A-6 015900 STM-14.OMB.1 THROUGH 16 OUTLET MANIJAY BOLTING B G-2 87.30 VT-1 1-MT 2C 3-4-C X C PERFORM MT IN ACCORDANCE IJITH I.E.BULLETIN 82-02 IF BOLTIHG IS REMOVED.
DATE: 11/15/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS CONPOMEMTS PAGE: 23 REACTOR COOLANT SYSTEK
SUMMARY
EXAHIHATIOH AREA HUHBER IDENT IF I CATION PLAN STATUS FIRST SECOND PERIOD PERIOD IHSPECTIOH INTERVAL I ASHE I SEC~XI I CATGY MDE/----0 U T A G E ITEH NO NETH I 1 2 3 1 2 3 4 THIRD I PERIOD I-----I 1 2 3 I INSTRUCTIONS
~*CALIBRATIOH BLOCK~*LINE 1-RC-1 FIG MO A-7 020000 1-RC-1-01F SAFE-EHD TO PIPE 8-J 89.11 PT 1C AUT 2 C 3-4 C X**9-DCC/39-PCC**
020100 1-RC-1-01S PIPE TO PIPE 8-J 89.11 PT UT 2-3.4-**37-CCSS-X-3,0-9-DCC
- 020200 1-RC-1-01N 8-J 6-IN.NOZZLE (SET-ON BRANCH 89.31 CONNECTION)
PT 1 Ut 2-3-4-**BC-6/27.5-29-SS-42-DCC
- 020300 1-RC-1-02H 2-1/2IH.NOZZLE (BRANCH CONNECTION) 8-J 89.32 PT 1-2-3-4 020350 1-RC-1-OBF PIPE TO PIPE 8-J 89.21 PT 1-2-3-4 020400 1-RC-1-02S PIPE TO ELBWI 8-J 89.11 PT 1-UT 2-3-4-**37-CCSS-X-3.0 9-DCC**LINE 1-RC-1 FIG NO A-8 020600 1-RC-1-04F ELBON TO PIPE 8-J 89.11 PT 1 Ul'-3 4**37-CCSS-X-3.0-9.0CC~~
DATE: 11/15/95 REVI SION: 0 COOK HUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPONEHTS PAGE: 24 REACTOR COOLANT SYSTEN SUNHARY EXAHINATIOH AREA HUNBER IDENT IF I CATION INSPECTION INTERVAL I ASKE I SEC.XI I CATGY NDE I ITEN HO METH I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD------0 U T A 0 E------2 3 1 2 3 4 1 2 3 I I I INSTRUCTIONS
<<<<CALI BRATIOH BLOCK*IHE 1-RC-'I F G HO A-B 020700 1.RC-1-03S PIPE TO ELBOM 8-J 89.11 PT 1-UT 2 3-4<<<<37-CCSS X-3+0-9-DCC<<<<
020800 1-RC-1-04S ELBQJ TO PIPE 8-J 89.11 PT 1-UT 2-3-4-*<<37-CCSS-X-3.0-9.DCC
<<020900 1.RC.1-08H 3 IN.NOZZLE (BRANCH CONNECTION) 8-J 89.32 PT 1-2-3-4.021000 1-RC-1-09N 2-IH.HOZZLE (BRANCH CONNECTION) 8-J 89.32 PT 1-2-3-4-021100 1-RC-1-05S PIPE TO ELBOH 8-J 89.11 PT 1-UT 2-3-4-<<*37-CCSS-X-3.0.9.DCC
- 021200 1.RC-1-05SLD-I LONGITUDINAL SEAN 8-J 89.12 PT 1-UT 2-3.4-*<<37-CCSS-X-3.0-9 DCC*021300 1-RC-1-05SLD-0 LONGITUDINAL SEAN 8-J 89.12 PT 1-UT 2-3<<*37-CCSS-X-3.0-9-DCC*<<
DATE: 11/15/95 REVISION: 0 COOK HUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS CDHPOHEN'IS PAGE: 25 REACTOR COOLAHT SYSTEM
SUMMARY
EXAHINATIOH AREA NUNBER IDENT I F I CAT ION INSPECTION I HTERVAL I ASHE I SEC~XI I CATGY NDE ITEH NO NETH I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD---0 U T A G E------1 2 3 1 2 3 4 1 2 3 I I I INSTRUCTIONS
- CALIBRATIOH BLOCK**LINE 1-RC-1 FIG NO A-B 021400 1-RC-1-05FLU-I LONGITUDINAL SEAN 8-J 89.12 PT 1-UT 2-3-4*~37-CCSS-X-3.0.9.DCC
- 021500 1 RC-1.05FLU-O LONGITUDINAL SEAN 8-J 89.12 PT 1-UT 2-3-4-*~37-CCSS-X-3.0-9.DCC~*
021600'1-RC-1-05F ELBON TO PUMP 8-J 89.11 PT 1-UT 2-3 4-~*37-CCSS-X-3.0-9-DCC**
LIME 1-RC-1 FIG NO A-9 021700 1-RC-1-06F PUHP TO PIPE 8-J 89.11 PT 1-UT 2-3 4**37-CCSS-X-3.0-9-DCC**
021800 1 RC-1-10H 2-IH.NOZZLE (BRANCH CONHECTION) 8-J 89.32 PT 1-2C 3 X 4.021900 1-RC-1-11N 3-IN.NOZZLE (BRANCH CONNECTION) 8-J 89.32 PT 1 2-3-4-022000 1-RC-1-12N 2-1/2IH.NOZZLE (BRANCH CONHECTIOH) 8-J 89.32 PT 1C 2-3X 4 DATE: 11/15/95 REVI SIGH: 0 COOK NUCLEAR PLANT UMIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 26 REACTOR COOLANT SYSTEM
SUMMARY
EXAHI HAT I OH AREA HUHBER IDENT I F I CATION INSPECTION INTERVAL I FIRST ASME PERIOD SEC.XI I CATGY NDE I ITEM NO NETH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I OUTAGE-I 1 2 3 4 1 2 3 I INSTRUCT IONS**CALIBRATION BLOCK**L NE 1-RC-1 F G HO A-9 022050 1.RC-1-10F PIPE TO PIPE 8-J 89.21 PT 1 2-3-4-022100 1.RC.1-13H 10-IH.NOZZLE (SET-OM BRANCH CONNECT I ON)8 J 89.31 PT 1 UT 2-3-4-**BC 10/27.5-SS-43-DCC**
022200 1-RC-1.14H 1-1/2-IN~NOZZLE (BRANCH COHHECTION) 8 J 89.32 PT 1---C 2-3-4-022300 1-RC-1-06S PIPE TO PIPE 8-J 89.11 PT 1-UT 2-3-4<<<<37-CCSS-X-3.0-9-DCC**
022400 1-RC-1-078 PIPE TO ELBOM 8-J 89.11 PT 1-UT 2-3-4-<<<<37-CCSS-X-3.0-9-DCC<<<<
022500 1-RC-1-07F ELBOM TO SAFE-END 8 J 89.11 PT 1 UT 2-3-4.**9-DCC/39-DCC<<<<
LINE 1-RC-2 FIG NO A-10 022600 1-RC-2-DBF SAFE-END TO PIPE 8-J 89.11 PT 1-AUT 2-3-4**9-DCC/39.DCC**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS CDHPOHENTS PAGE: 27 REACTOR COOLANT SYSTEH SUHHARY EXAHINATIOH AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY HDE ITEN NO NETH I PLAN STATUS FIRST SECOND THIRD PERICO PERIOD PERIOD--OUTAGE---
1 2 3 1 2 3 4 1 2 3 INSTRUCTIONS
- CALI BRAT ION BLOCK*>>LINE 1-RC-2 FIG NO A-10 022700 1.RC.2.15H 6 IH.NOZZLE (SET-ON BRANCH CONNECTION) 8-J 89.31 PT 1-UT 2-3-4-*>>BC.6/27.5-29-SS-42-DCC
022900 1.RC-2-16N 2.1/2IH.NOZZLE (BRANCH COHNECT ION)8 J 89.32 PT 1-2-3-4-022950 1.RC-2.15F PIPE TO PIPE 8 J 89.21 PT 1-2-3-4 023000 1-RC-2.17H 14-IH.NOZZLE (SET-OH BRANCH CONNECTION)
CONT~L2 8 J 89.31 PT 1---C UT 2---C 3-X**BC-14/29-SS-44-DCC>>*
023100 1-RC-2.09S PIPE TO ELBOM 8-J 89.11 PT 1-UT 2-3-4<<*37-CCSS.X.3.0.9-DCC
- LINE 1-RC-2 FIG NO A-11 023400 1.RC-2-11F ELBON TO PIPE 8-J 89.11 PT 1 UT 2-3 4>>>>37 CCSS X 3.0 9.DCC>>
DATE: 11/15/95 REVISIOH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE IHSPECTIOH LONG TERN PLAN CLASS 1 ALL STATUS COHPOHEHTS PAGE 28 REACTOR COOLANT SYSTEH SUHNARY EXAHI HAT I ON AREA HUHBER IDENT I F I CAT IOH INSPECTION INTERVAL I FIRST ASHE PERIOD SEC.Xl I CATGY NDE ITEN NO NETH (1 2 3 PLAN STATUS SECOHD THIRD PERIOD PERIOD-OUTAGE 2 3 4 1 2 3 I I I INSTRUCT IOHS I<<*CAL I BRAT ION BLOCK**INE 1-RC-2 FIG HO A-11 023500 1-RC-2-10S PIPE TO ELBOW 8 J 89.11 PT 1C UT 2C 3X 4-*<<37-CCSS.X-3.0 9-DCC<<0?3600 1-RC2-11S ELBOW TO PIPE 8-J 89.11 PT 1-UT 2-3-<<*37-CCSS X-3 0-9-DCC<<*023700 1-RC-2-23N 2-IN.HOZZLE (BRANCH CONHECTION) 8-J 89.32 PT 1C 2 C 3X 023800 1-RC-2-24N 3-IN'OZZLE (BRANCH COHNECTION)
CONT.L2 8-J 89.32 PT 1.2-3-4-C C X 023900 1-RC.2-12S PIPE TO ELBOW CONT.L2 8-J 89.11 PT 1--.-C UT 2.--C 3-X 4*<<37-CCSS-X-3.0-9-DCC**
024000 1-RC.2-12SLD.I LOHGITUDIHAL SEAM CONT.L2 8-J 89.12 PT 1---C UT 2---C 3-X 4<<*37-CCSS-X-3.0-9-DCC
- 024100 1-RC-2-12SLD-0 LONGITUDINAL SEAN COHT.L2 8-J 89.12 PT 1---C UT 2---C 3-X 4*<<37-CCSS-X-3.0-9-DCC
<<
DATE: 11/15/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPONENTS PAGE: 29 REACTOR COOLANT SYST H SUHHARY EXAHINATIOH AREA HUHBER IDENT IF ICATION F IRST PERIOD IHSPECTIOH INTERVAL I ASHE I SEC.XI I CATGY NDE ITEN NO NETH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERICO-OUTAGE---
---I INSTRUCTIONS 1 2 3 4 1 2 3 I<<<<CALI BRAT ION BLOCK**LIHE 1-RC-2 FIG NO A-11 024200 1-RC-2-12FLU-I LONGITUDINAL SEAN CONT.L2 8-J 89.12 PT 1-UT 2-3-4-C C X*<<37-CCSS-X-3.0-9-DCC
- 024300 1-RC-2-12FLU.O LONGITUDINAL SEAN CONT~L2 8-J 89.'12 PT 1-UT 2-3-4 C C**37-CCSS-X-3.0-9.DCC**
024400 1-RC-2-12F ELBON TO PUHP CONT.L2 8 J 89.11 PT 1---C UT 2---C 3-4-X*<<37-CCSS-X-3.0-9 DCC**LIHE 1-RC-2 FIG NO A-12 024500 1-RC-2-13F PUHP TO PIPE 8-J 89.11 PT 1-UT 2-3-4**37-CCSS-X-3.0-9-DCC**
024600 1 RC-2-25H 2-IH.NOZZLE (BRANCH CONNECTION) 8-J 89.32 PT 1-2-3-4-024700 1-RC-2-26H 2-1/2IH.NOZZLE (BRANCH CONHECTION) 8-J 89.32 PT 1-2-3-4 024750 1-RC-2-17F PIPE TO PIPE 8-J 89.21 PT 1-2-3 DATE: 11/15/95 REVI S I OH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPONEHTS PAGE: 30 REACTOR COOLANT SYSTEH SUHHARY EXAHI NAY I OH AREA NUHBER IDENTIFICATION PLAN STATUS SECOND PERIOD INSPECTION INTERVAL I FIRST ASHE PERIOD SEC XI I CATGY HDE I------0 U T A G E-ITEH HO NETH I 1 2 3 1 2 3 4 THIRD I PERIOD-I-----I 2 3 IHSTRUCTIONS
<<*CALIBRATION BLOCK<<*LINE 1-RC-2 FIG HO A-12 024800 1-RC-2-27N 10-IN.NOZZLE (SET-OH BRANCH CONHECTION) 8-J 89.31 PT I.UT 2-3-C X<<*BC-10/27.5-SS-43.DCC<<>>
024900 1-RC-2-13S PIPE TO PIPE 8-J 89.11 PT 1-UT 2-3-4-<<<<37-CCSS-X.3.0-9-DCC**
025000 1-RC-2-28N 1-1/2 IN.NOZZLE (BRANCH CONNECTION) 8-J 89.32 PT 2-3-4-025100 1-RC-2-14S PIPE TO ELBOM 8-J 89.11 PT 1-UT 2-3-4-**37-CCSS-X-3.0 9-DCC*<<025200 1-RC-2-14F ELBOM TO SAFE-END 8-J 89.11 PT 1 AUT 2-3-4-<<*9-DCC/39.DCC*<<
LIHE 1-RC-3 FIG NO A-13 025300 1-RC-3-15F SAFE END TO PIPE 8-J 89.11 PT 1-----C AUT 2-3-4-**9-DCC/39 DCC*025400 1.RC.3-15S PIPE TO PIPE 8-J 89.11 PT 1-UT 2-3-4<<<<37-CCSS-X-3.0 9 DCC**
DATE: 11/15/95 REVI SION: 0 COOK NUCLEAR PLANT UHIT 1 IHSERVICE INSPECTION LONG TERM PLAH CLASS 1 ALL STATUS COHPOHEHTS PAGE: 31 REACTOR COOLANT SYSTEN SUNHARY EXAHI HAT ION AREA NUNBER IDENT I F I CAT ION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE ITEN NO NETH I PLAN STATUS F IRST SECOND THIRD PERIOD PER IOD PERIOD------OUTAGE--
I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
~025600 1-RC-3-33H 14-IH.NOZZLE (SET-ON BRANCH CONNECTION) 8-J 89.31 PT UT 2-3 4 C X**BC-14/29-SS-44-DCC~*
025700 1-RC-3-34N 2-1/2IN.NOZZLE (BRANCH CONNECTION) 8-J 89.32 PT 1-2-3-4-025750 1-RC-3-22F PIPE TO PIPE 8-J 89.21 PT 2-3-4 025800 1-RC-3-16S PIPE TO ELBSI 8-J 89.11 PT 1.UT 2-3-4~~37-CCSS-X-3.0-9-DCC**
LINE 1-C-3 G NO A-14 026100 1-RC-3-18F ELBOtl TO PIPE 8-J 89.11 PT 1-Ul'-3-4-**37-CCSS-X-3.0-9-DCC~*
026200 1-RC-3.17S PIPE TO ELBOM 8-J 89.11 PT 1-UT 2-3-4*~37-CCSS-X-3.0-9 DCC*
DATE: 11/15/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTIOH LONG TERN PLAN CLASS 1 ALL STATUS COHPOHEHTS PAGE: 32 REACTOR COOLANT SYSTEH SUHNARY EXAHINATION AREA HUNBER IDENTIFICATION PLAN STATUS SECOND PER IOO INSPECTION INTERVAL I F IRST ASHE PERIOD SEC.XI I CATGY NDE i------0 U T A G E-ITEN NO NETH I 1 2 3 1 2 3 4 THIRD I PER I OD I-----I 2 3 INSTRUCTIONS
<<*CAL I BRAT ION BLOCK**LIN'1-RC-3 FIG NO A-14 026300 1-RC-3-18S ELBOU TO PIPE 8-J 89.11 PT 1-UT 2-3-4-<<<<37-CCSS-X-3.0-9-DCC
- 026400 1-RC-3-38N 3-IH.NOZZLE (BRANCH COHHECTION) 8-J 89.32 PT 1-2-3-4-026500 1-RC-3-39N 2-IN.NOZZLE (BRANCH CONNECTIOH) 8-J 89.32 PT 1C 2 C 3X 4 026600 1-RC.3-19S PIPE TO ELBOll 8-J 89.11 PT 1-UT 2-3-4-<<*37-CCSS-X-3.0 9-DCC<<>>026700 1-RC-3-19SLD-0 LONGITUDINAL SEAN 8-J 89.12 PT 1-UT 2-3 4.*37-CCSS-X-3.0-9 DCC**026800 1-RC-3-19SLD-I LONGITUDINAL SEAN 8-J 89.12 PT 1-UT 2-3-4<<*37-CCSS.X.3.0.9.DCC<<*
026900 1-RC-3-19FLU-0 LONGITUDINAL SEAN 8-J 89.12 PT 1-UT 2-3-<<<<37-CCSS-X-3.0 9-DCC*
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR'LANT UNIT 1 INSERVICE INSPECTION LOHG TERN PLAN CLASS 1 ALL STATUS COHPONENTS PAGE: 33 REACTOR COOLANT SYSTEH SUNHARY EXAHINATION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I ASHE I SEC.Xl I CATGY NDE ITEN NO METH I PLAN STATUS FIRST SECOND PERICO PERIOD--OUTAGE-1 2 3 1 2 3 4 THIRD I PERIOD I-----I 1 2 3 I INSTRUCT IOHS<<*CAL I BRAT I OH BLOCK**LINE 1-RC 3 F G NO A-14 027000 1-RC-3-19FLU-I LONGITUDINAL SEAN 8-J 89.12 PT 1 UT 2-3-4-++37-CCSS-X-3.0-9-DCC**
027100 1-RC-3-19F ELBOM TO PUHP 8-J 89.11 PT 1.UT 2-3-4-**37-CCSS-X-3.0.9-DCC
~LINE 1-RC-3 FIG NO A-15 027200 1-RC-3-20F PUHP TO PIPE COHT.L3 8-J 89.11 PT 1-UT 2-3 4 C C X~*37-CCSS-X-3.0-9-DCC**
027300 1-RC-3-40N 2-IH.NOZZLE (BRANCH COHHECTIOH) 8-J 89.32 PT 1-2-3-4-027400 1-RC-3-41H 2-1/2IN.NOZZLE (BRAHCH CONNECTION)
'8 J'9.32 PT 1-2-3-4-027450 1-RC-3-24F PIPE TO PIPE 8-J 89.21 PT 1-2 C 3 X 4-~+37-CCSS-X-3.0 9 DCC*027500 1-RC-3-42H 10-IH.NOZZLE (SET-OH BRANCH CONNECTION) 8-J 89.31 PT 1-Ul'-3 4-**BC-10/27.5-SS-43-DCC
- DATE: 11/15/95 REVI SIGH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE IHSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COHPOHEHTS PAGE: 34 REACTOR COOLANT SYSTEM
SUMMARY
EXAHINATIOM AREA NUHBER IDENT I F I CATION INSPECTION IHTERVAL PLAN STATUS F IRST SECOND ASHE PERIOD PERIOD SEC.XI I-CATGY HDE)------0 U T A G E-ITEH NO NETH I 1 2 3 1 2 3 4 THIRD PERIOD 2 3 INSTRUCTIONS I**CALI BRAT ION BLOCK**LIKE 1-RC-3 FIG MO A 15 027600 1-RC-3-43M 4-IN.NOZZLE (SET-OH BRANCH COHNECTIOH)
CONT.L3 8-J 89.31 PT 1--.C UT 2---C X 4~~BC.4/27.5-SS-41.DCC
~027700 1-RC-3-20S PIPE TO PIPE CONT.L3 8-J 89.11 PT 1---C UT 2--C 3-X 4-*~37-CCSS-X-3.0.9.DCC
~027800 1.RC-3.44N
'1-1/2-IN.
NOZZLE (BRANCH CONNECTION) 8-J 89.32 PT 1-2-3-4 027900 1-RC-3-21S PIPE TO ELBOH 8-J 89.11 PT 1-UT 2-3-4-**37-CCSS-X-3.0-9 DCP>>028000 1-RC-3-21F ELBOH TO.SAFE-END 8-J 89.11 PT 1-C AUT 2 C 3 4 C X<<*9.DCC/39-DCC**
LINE 1-RC-4 FIG MO A-16 028100 1-RC-4-22F SAFE-END TO PIPE 8-J 89.11 PT 1-----C AUT 2-3-4-~~9.DCC/39-DCC~~
028200 1.RC-4.22S PIPE TO PIPE 8-J 89.11 PT 1-UT 2-3-**37 CCSS-X-3.0.9-DCC**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPOHENTS PAGE: 35 REACTOR COOLAHT SYSTEH SUHHARY EXANIHATIOH AREA HUHBER IDENT IF ICATION FIRST PER IOD INSPECTION INTERVAL I ASKE I SEC.XI I CATGY HDE I ITEN NO METH j 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD-0 U T A G E---I INSTRUCTIONS 1 2 3 4 1 2 3 (**CALI BRAT ION BLOCK**LINE 1-RC-4 FIG NO A-16 028300 1-RC-4-45H 6-IN.NOZZLE (SET-OH BRANCH COHNECTIOH) 8-J 89.31 PT 1 UT 2-3-<<<<BC-6/27.5-29-SS-42-DCC**
028400 1-RC-4-46N 2-1/2IH.NOZZLE (BRAHCH COHHECTIOH)
B-J 89.32 PT 1 2-3-4-028450 1-RC-4-29F PIPE TO PIPE 8 J 89.21 PT 1 2-3-4 028500 1-RC.4-23S PIPE TO ELBOW B-J 89.11 PT 1 AUT 2-3-4-*<<9-DCC/39-DCC**
LINE 1-RC-4 FIG HO A-17 028800 1-RC-4-25F ELBOW TO PIPE B-J'9.11 PT 1 UT 2---C 3-X 4**3378033 (HAIN RPV COOLANT)**
028900 1-RC-4-24S PIPE TO ELBOW B-J 89.11 PT 1 UT 2-3-4<<*37-CCSS-X-3.0-9 DCC**029000 1.RC-4-25S ELBOW TO PIPE CONT.L4 8-J 89.11 PT 1---C UT 2-3 4**37-CCSS-X-3.0-9 DCC**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPONEHTS PAGE: 36 REACTOR COOLANT SYSTEH SUHHARY EXAHINAT I ON AREA NUHBER IDENTIFICATION INSPECTION IHTERVAL I FIRST ASHE PERIOD SEC~XI I CATGY NDE I ITEH NO NETH i 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE-2 3 4 1 2 3 I I I I INSTRUCTIONS
- CALIBRATION BLOCK<<*LIHE 1-RC-4 FIG NO A-17 029100 1-RC-4-52H 3-IH.NOZZLE (BRANCH CONNECTIOH)
CONT+L4 8-J 89.32 PT 1---C 2-C 3-X 4 029200 1-RC-4-53N 3-IH.NOZZLE (BRANCH CONHECTION) 8-J 89.32 PT 1 2-3-4-029300 1.RC-4-26S PIPE TO ELBOM 8-J 89.11 PT 1C UT 2C 3X 4**37-CCSS-X-3.0-9 DCC**029400 1-RC-4-26SLD-I LONGITUDINAL SEAH 8-J 89.12 PT 1C UT 2C 3 X 4-<<*37-CCSS-X-3.0-9.DCC<<<<
029500 1-RC-4-26SLD-0 LONGITUDINAL SEAH 8-J 89.12 PT 1C UT 2C 3X 4-**37-CCSS-X-3.0-9-DCC**
029600 1-RC-4-26FLU-I LONGITUDIHAL SEAN 8-J 89.12 PT 1-UT 2-3-4<<*37-CCSS-X-3.0-9 DCC**029700 1-RC-4-26FLU.O LONGITUDINAL SEAN 8-J PT 89.12 UT 1 2-3-4<<<<37-CCSS-X-3o0 9-DCC<<<<
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 37 REACTOR COOLANT SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDEHT IF I CAT I ON INSPECTION INTERVAL I ASME I , SEC.XI I CATGY NDE I ITEM NO METH I PLAH STATUS FIRST SECOND PERIOD PERIOD THIRD I PERIOD I------OUTAGE------I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
+*CALI BRAT ION BLOCK**LINE 1-RC-4 FIG HO A-17 029800 1-RC-4-26F ELBOW TO PUMP 8-J 89.11 PT 1 UT 2-3-4-~~37-CCSS-X-3.0-9-DCC~~
LINE 1-RC-4 FIG NO A-18 029900 1-RC.4-27F PUMP TO PIPE 8-J 89.11 PT 1 UT 2-3-4-*~37-CCSS-X-3.0 9.DCC~030000'I-RC.4-54N 2-IN'OZZLE (BRANCH CONHECTION) 8-J 89.32 PT 1-2-3-4-030100 1-RC-4-55N 2.1/2IN.NOZZLE (BRANCH COHHECTION) 89.32 2-3-4 BJ PT 1-030150 1-RC-4-31F PIPE TO PIPE 8-J 89.21 PT 1 2-3-4-030200 1-RC-4-56H 3-IH.NOZZLE (BRANCH COHNECTIOH) 8 J 89.32 PT 1-2-3-4-030300 1-RC-4-57H 10-IN.NOZZLE (SET-OH BRAHCH CONNECTION) 8-J 89.31 PT 1C UT 2C 3 X 4**BC-10/27.5-SS-43.DCC**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE IHSPEC'IION LONG TERN PLAN CLASS 1 ALL STATUS COHPOHENTS PAGE: 38 REACTOR COOLANT SYSTEH SUHHARY EXAHIHATIOH AREA NUHBER IDENTIFICATION PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD INSPECTION INTERVAL I ASHE I SEC.XI I CATGY HDE i------0 U T A G E--ITEM NO NETH I 1 2 3 1 2 3 4 1 2 3 I I I I INSTRUCTIONS I**CALIBRATIOH BLOCK~~LINE 1-RC-4 FIG NO A-18 030400 1-RC-4-59H 4-IH.NOZZLE (SET-ON BRANCH CONNECTION)
B-J 89.31 PT 1 UT 2-3-4**BC-4/27.5-SS 41-DCC**030500 1-RC 4-60N 1-1/2-IH.NOZZLE (BRAHCH COHHECTIOH)
CONT.L4 8-J 89.32 PT 1 2-3-4-030600 1-RC-4-27S PIPE TO PIPE CONT.L4 8-J 89.11 PT 1-UT 2-3-4 C C X"*37-CCSS-X-3.0-9.DCC**
030700 1-RC 4-28S PIPE TO ELBSI 8-J 89.11 PT 1 UT 2-3-4-**37-CCSS-X-3
'-9-DCC**030800 1-RC.4-28F ELBSI TO SAFE-EHD 8-J 89.11 PT 1 AUT 2-3-4-**9-DCC/39-DCC**
LIHE 1-RC-5 FIG HO A-19 030900 1-RC-5.01F BRANCH COHHECTIOH TO PIPE CONT.L3 8-J 89.11 PT 1-.-C UT 2-.-C 3-X 4<<~3378032 (14-SS-160-1.40)**
031000 1-RC-5-02S PIPE TO PIPE 8-J 89.11 PT 1 UT 2-3-4-**3378032 (14-SS-160-1.40)~*
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPOHEHTS PAGE: 39 REACTOR COOLANT SYSTEH SUNMARY EXAHIHATIOH AREA HUHBER IDENT IF ICATION FIRST PERIOD INSPECTION INTERVAL I ASME I SEC.XI I CATGY HDE I ITEN HO NETH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD-OUTAGE-1 2 3 4 1 2 3 I I I INSTRUCTIONS
- CAL I BRAT ION BLOCK**LINE 1-RC-5 FIG NO A-19 031100 1-RC-5-03F PIPE TO PIPE 8-J 89.11 PT 1-UT 2-3-4-*~3378032 (14-SS-160-1
'0)**031200 1-RC-5-04F PIPE TO PIPE 8-J 89.11 PT 1-UT 2-3-4**3378032 (14-SS-160.1.40)**
031300 1-RC-5-DSF PIPE TO SAFE-EHD 8-J 89.11 PT 1C UT 2C 3 X 4-1~**3378032 (14.SS.160.1.40)*~
LINE 1-RC-6 FIG NO A-20 031400 1-RC-6 01F SAFE-END TO PIPE 8-J 89.11 PT 1C UI'C 3 X 4-*~3378028 (6.SS-160-.71)~*
03'1500 1-RC-6-02S PIPE TO ELBOW 8-J 89.11 PT 1 Ur 2-3-4*~3378028 (6-SS-160-.71)~*
031600 1-RC-6.03S ELBOW TO PIPE 8-J 89.11 PT 1 UT 2-3-**3378028 (6-SS-160-.71)**
031700 1-RC-6-05S PIPE TO ELBOW 8-J 89.11 PT 1 UT 2-3-4-<<*3378028 (6-SS-160-.71)*~
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPOHEHTS PAGE: 40 REACTOR COOLANT SYSTEM
SUMMARY
EXAMINATION AREA HUHBER IDENTIFICATION FIRST PERIOD INSPECTION INTERVAL I ASME I SEC.XI I CATGY HDE I ITEM NO METH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I I-OUTAGE------I 1 2 3 4 1 2 3 I INSTRUCTIONS
031900 1-RC-6-07S PIPE TO ELBOW PRESS.DH B J B9.11 Pl'--C UT 2---C 3-X 4-*~3378028 (6-SS-160-.71)**
032000 1-RC-6 08S ELBOW TO PIPE B-J 89.11 PT 1 UT 2-3-4-~*3378028 (6-SS-160-.71
)**LINE 1-RC-6 FIG NO A-21 032100 1-RC-6-09F PIPE TO ELBOW B J 89.11 UT 2-3-4**3378028 (6-SS-160..71)**
032200'-RC-6-11S ELBOW TO PIPE 8-J 89.11 PT 1-UT 2-3-4-~~3378028 (6-SS-160-.71)~*
032300 1-RC-6-12S 3-IN'OZZLE (BRANCH COHHECTIOH) 8-J 89.32 PT 2-3-4 032400 1.RC-6-12S-A BRANCH COHHECTIOH TO PIPE PRESS.DH B-J 89.21 PT 1-2-3 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONEHTS PAGE: 41 REACTOR COOLANT SYSTEM SUHMARY EXAMINATION AREA NUHBER IDENT IF I CAT ION INSPECTION IHTERVAL I ASME I SEC.XI I CATGY NDE I ITEM NO METH I PLAN STATUS FIRST SECOND PERIOD PERIOD------0 U T A G E-1 2 3 1 2 3 4 THIRD I PERIOD I-I-----I 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK*~LIHE 1-RC-6 FIG NO A-21 032500 1-RC-6-13S PIPE TO ELBOW 8-J 89.21 PT 1-2-3-4 032600 1-RC-6-14S ELBON TO PIPE 8-J 89.21 PT 1C 2-3-4 032700 1-RC-6-15F PIPE TO VALVE 8-J 89.21 PT 1 2-3-4.032800 1-RC-6-16F VALVE TO PIPE 8-J 89.21 PT 1 2-3-4-032900 1-RC-6-17F PIPE TO VALVE 8-J 89.21 PT 1 2 C 3 X 4-033100 1-RC-6-19S PIPE TO REDUCER 8-J 89.11 P'I 1 UI'-3-4**3378028 (6-SS-160-.71)~*
033200 1-RC.6-20S REDUCER TO PIPE PRESS.DH 8-J 89.11 Pj'---C UT 2---C 3-X 4~*3378027 (4-SS-120-.430)**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL S'IATUS COHPONENTS PAGE: 42 REACTOR COOLANT SYSTEM SUHHARY EXAHINATION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE I ITEH NO NETH PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I I OUTAGE I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
033400 1-RC-6.20S-B PIPE TO PIPE 8-J B9.'11 PT 1 UT 2-3-4**3378027 (4-SS-120.
~430)**033500 1-RC-6-21S PIPE TO TEE B-J 89.11 PT 1-UT 2-3-4-**3378027 (4-SS-120-
~430)**033600 1.RC-6-22F TEE TO PIPE PRESS.DH B-J 89.21 PT 1 2-3-4 C 033700 1-RC-6-23S TEE TO REDUCER B-J PT 1 89 11 UT 2-3-4-**3378027 (4-SS-120-.430)**
033800 1-RC-6-24F REDUCER TO PIPE PRESS.DH B-J B9.21 PT 1C 2-3-4 X 033900 1-RC-6-25S PIPE TO ELBOM B-J B9.21 PT 1 2-3-4 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTIOH LONG TERM PLAN CLASS 1 ALL STATUS COMPOHEHTS PAGE: 43 REACTOR COOLANT SYSTEH
SUMMARY
EXAMIHATIOH AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I FIRST ASME PERIOD SEC.XI I CAVu'DE ITEM HO METH I 1 2 3 PLAH STATUS SECOND THIRD I PERIOD PERIOD I OUTAGE I 1 2 3 4 1 2 3 I INSTRUCTIONS
~*CALIBRATION BLOCK~*LIHE 1-RC-6 FIG NO A-21 034000 1-RC-6-26S ELBOW TO PIPE 8-J 89.21 PT 1-2-3-4 034100 1-RC 6-27F PIPE TO VALVE 8-J 89.21 PT 1-2-3-4-034200 1-RC-6-28F VALVE TO PIPE 8-J 89.21 PT 1 2-3-4 034300 1-RC-6-29F PIPE TO VALVE 8-J 89.21 PT 1 2 C 3 X 4-LINE 1-RC-6 FIG NO A-22 034500 1-RC.6-31S PIPE TO ELBOW 8-J 89.21 PT 1 2-3-4 034600 1-RC-6.32S ELBOW TO PIPE 8-J 89.21 PT 1 2-3-4 034700 1-RC-6-33F PIPE TO VALVE 8-J 89.21 PT 1 2 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLAN'I UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 44 REACTOR COOLAHT SYSTEM SUHHARY EXAHI HAT I OH AREA NUHBER IDENTIFICATION INSPECTIOH INTERVAL I FIRST ASME PERIOD SEC.XI I CATGY NDE I ITEN HO METH[1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE--1 2 3 4 1 2 3 I INSTRUCT IOHS I**CALI BRAT ION BLOCK**LINE 1-RC-6 FIG NO A-22 034800 1-RC-6-34F VALVE TO PIPE PRESS.DH 8-J 89.2'I PT 2-3-4-034900 1-RC-6-35F PIPE TO VALVE 89.21 2-3-4 B-J PT 1 LINE 1-RC-7 FIG NO A-23 035100 1-RC 7-01F SAFE-END TO ELBOW 8-J 89.11 PT 1-UT 2-3-4~*3378028 (6.SS-160-.71)**
035200 1-RC-7-02S ELBOW TO PIPE 8-J 89.11 PT 1 UT 2-3-4**3378028 (6-SS-160-.71)+*
035300 1-RC-7-03S PIPE TO ELBOW PRESS'H 8-J 89.11 PT 1-UT 2-3-4 C C X**3378028 (6-SS-160-.71
)~~035400 1-RC-7-04S ELBOW TO PIPE 8-J 89.11 PT 1 UT 2-3-4-<<*3378028 (6-SS-160-.71
)**035500 1-RC-7-05S PIPE TO ELBOW 8-J 89.11 PT 1-UT 2-3-4-**3378028 (6.SS-160-.71)**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPONENTS PAGE: 45 REACTOR COOLANT SYSTEM SUHHARY EXAMINATION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE I ITEH NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD-OUTAGE--1 2 3 1 2 3 4 1 2 3 I INSTRUCTIOHS
- CALIBRATION BLOCK**LINE 1-RC.7 FIG NO A-23 035600 1-RC-7-06S ELBOW TO ELBOW B-J 89.11 P1'-UT 2-3-4**3378028 (6-SS-160-.71)**
035700 1-RC-7-08S ELBOW TO PIPE B-J 89.11 PT 1 UT 2-3-4-**3378028 (6.SS-160-.71)~*
035800 1.RC-7-09S PIPE TO FLANGE PRESS.DH B-J 89.11 PT 1-UT 2-3-4 C C X**3378028<6-SS-160-.71)**
035810 1-RC-7 09S FB FLANGE BOLTING B-0 2 B7.50 VT-1 1 2 C 3 X 4 LINE 1-RC-8 FIG NO A-24 036000 1-RC-8-01F SAFE-END TO ELBOW B-J 89.11 PT 1 UT 2-3 4~*3378028 (6-SS-160-.71)**
036100 1-RC-8-02S ELBOW TO PIPE PRESS.DH 8-J 89.11 PT 1 Ur 2-3-4 C C X+*3378028<6-SS-160-.7'I)**
036200 1-RC-8.03S PIPE TO ELBOW 8-J 89.11 PT UT 2-3-4**3378028 (6-SS.160-.71)*~
DATE: 11/15/95 REVISIOH: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 46 REACTOR COOLANT SYSTEN SUHHARY EXAHIHATIOH AREA HUHBER IDENTIFICATION INSPECTIOH INTERVAL I F IRST ASHE I PERIOD SEC.XI I CATGY NDE I ITEN HO METH/1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE 2 3 4'I 2 3 I I I I IHSTRUCTIONS I*~CALIBRATIOH BLOCK**LINE 1-RC-8 FIG HO A-24 036300 1-RC-8-04S ELBSI TO PIPE 8-J 89.11 PT 1-UT 2-3-4-C X<<*3378028 (6-SS.160-.71)**
036400 1-RC-8-05S PIPE TO ELBDM PRESS.DH 8-J 89.1'I PT 1 UT 2-3-4--~*3378028 (6.SS-160-.71)**
036500 1-RC-8-06S ELBOll TO ELBON 8-J 89.11 PT 1-UT 2-3-4**3378028 (6-SS-160-.71)**
036600 1.RC.8-08S ELBM TO PIPE 8-J 89.11 PT 1 UT 2-3-4-**3378028 (6-SS-160-.71)**
036700 1-RC-8-09S PIPE TO FLANGE 8-J 89.11 PT 1C UT 2C 3 X 4**3378028 (6-SS-160-.71)**
036800 1-RC-8.09S-FB FLANGE BOLTING 8-G-2 87.50 VT-1 1."2-C 3-X 4-LINE 1-RC-9 FIG NO A-25 036900 1-RC-9-01F SAFE-EHD TO ELBOM 8-J 89.11 PT 1C UT 2C 3X-~**3378028 (6-SS-160-.71)
~>>
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UHIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 47REACTOR COOLANT SYSTEM
SUMMARY
EXAHINATIOH AREA NUMBER IDENTIFICATIOH PLAN STATUS FIRST SECOND PERIOD PERIOD INSPECTION INTERVAL I ASME I SEC.Xl" CATGY NDE]------0 U T A G E ITEM NO METH I 1 2 3 1 2 3 4 THIRD I PERIOD I------I 1 2 3 I INSTRUCTIONS
- CALIBRATIOH BLOCK**I.INE 1-RC-9 FIG NO A-25 037000 1-RC-9.02S ELBSI TO PIPE 8-J 89.11 PT 1-UT 2-3-4**3378028 (6-SS-160-.71)~*
037100 1-RC-9.03S PIPE TO ELBSI 8-J B9.11 PT 1-Ur 2-3-4**3378028 (6-SS-160..71)~*
037200 1-RC-9-04S ELBSI TO PIPE PRESS.DH 8-J 89.11 PT 1---C UT 2---C 3-X 4**3378028 (6-SS-160-.71)**
037300 1-RC-9.05S PIPE TO ELBSI 8-J PT 1 89.11 UT 2-3-4**3378028 (6-SS-160-.71)**
037400 1 RC-9.06S ELBOH TO ELBOW PRESS.DH 8-J 89.11 PT 1 Ur 2-3-4 C X~*3378028 (6-SS-160-.71)~*
037500 1-RC.9-08S ELBOW TO PIPE PRESS.DH 8-J 89.11 PT 1-UT 2-3 4-C C X**3378028 (6-SS-160-.71)**
037600 1-RC.9.09S PIPE TO FLANGE 8-J 89.11 PT 1 UT 2-3 4**3378028 (6-SS-160-.71)**
DATE: 11/15/95 REVISION: 0 COOK HUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 48 REACTOR COOLANT SYSTEM
SUMMARY
EXAMINATION AREA NUHBER'DENTIFICATION INSPECTIOH INTERVAL I ASHE I SEC.XI I CATGY NDE ITEM HO METH I PLAN STATUS FIRST SECOND PERIOD PERIOD THIRD PER I OO--OUTAGE-1 2 3 1 2 3 4 1 2 3 I I I I INSTRUCT I ONS**CAL I BRAT I OH BLOCK~*LINE 1-RC-9 FIG NO A 25 037700 1-RC-9.09S-FB FLANGE BOLTING PRESS.DH B-G-2 B7.50 VT-1 1-2-3-4-C X LINE 1.RC.10 FIG HO A-26 037800 1-RC-10-01S REDUCER TO PIPE'-J 89.11 PT 1 UT 2-3-4-**3378027 (4-SS-120-.430)**
037900 1-RC-10.02H 2-IN.NOZZLE (BRANCH CONNECTION)
B9.32 2-3-4 B-J PT 1-038000 1-RC-10-03S PIPE TO ELBOW 8-J B9.11 PT 1 UT 2-3-4-IIELD INACCESSIBLE DUE TO RESTRAINT OBSTRUCTIOH.
- ~3378027 (4-SS-120-.430)**
038100 1-RC-10.04S ELBOW TO PIPE B-J 89.11 PT 1 UT 2-3-4*~3378027 (4-SS-120-.430)**
038200 1-RC-10.05S PIPE TO ELBOW B-J 89.11 PT 1 UT 2-3-4*~3378027 (4-SS-120-.430)**
038300 1-RC-10-06S ELBOW TO PIPE COHT.PRT B J 89.11 PT 1---C UT 2---C 3-X 4**3378027 (4-SS-120-.430)**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 49 REACTOR COOLANT SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT I F ICATION INSPECTION INTERVAL I ASME I SEC.Xl CATGY NDE I ITEM NO METH I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD-OUTAGE-1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- ~CALIBRATION BLOCK**LINE 1-RC-10 FIG HO A-26 038400 1-RC-10.07S PIPE TO TEE CONT.PRT B.J 89.11 UT 1 2 C C 3 X 4.C C**3378027 (4.SS.120.
430 038500 1-RC-10.08F TEE TO PIPE CONT.PRT 8-J 89.11 UT 1-2---C C--C C 3-X 4**3378027 (4-SS-120-.430)**
038600 1-RC-10.09F TEE TO PIPE CONT.PRT 8-J 89.11 UT 1 2 3-4-C C C X+*3378027 (4-SS-120-.430)+*
038700 1-RC-10-10S PIPE TO ELBOW COHT.PRT 8-J 89.11 UT 1-2-3X 4 C C C**3378027 (4-SS-120-.430)~*
038800 1-RC-10-11S ELBOW TO PIPE CONT.PRT 8-J 89.11 PT 1 UT 2-3-4 C C X*~3378027 (4-SS-120-.430)**
038900 1-RC-10-12S PIPE TO'LBOW 8-J PT 89.11 UT 2-3-4<<*3378027 (4-SS-120-.430)**
039000 1-RC-10.13S ELBOW TO PIPE 8-J 89.11 PT 1 UT 2-3-4-**3378027 (4-SS-120-.430)*4 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 50 REACTOR COOLANT SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT IF ICATION INSPECTION INTERVAL I ASME I SEC.XI I CATGY HDE ITEM HO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD-OUTAGE---
1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
~*CALIBRATIOH BLOCK~*LINE 1-RC-10 FIG NO A-26 039100 1-RC-10.14S PIPE TO ELBOW 8-J 89.11 PT 1-UT 2C 3X 4-**3378027 (4-SS-120-.430)**
039200 1-RC-10-15S ELBOW TO PIPE B-J PT 1 C 89.11 UT 2-3-4-*~3378027 (4-SS-120-.430)**
039300 1-RC-10-16S PIPE TO ELBOW B-J PT 1 89.11 UT 2-3-4**3378027 (4-SS-120-.430)**
039400 1-RC-10-17S ELBOW TO PIPE B J B9.11 PT 1 UT 2-3-4-**3378027 (4-SS-120-.430)**
039500 1-RC-10-18S PIPE TO ELBOW J B-J 89.11 PT 1-UT 2-3.4-**3378027 (4-SS-120-.430)**
039600 1-RC-10-19F ELBOW TO PIPE B-J 89.11 PT 1-UT 2-3-4-*~3378027 (4-SS-120-.430)**
LINE 1-RC-10 FIG NO A-27 040100 1-RC-10.20S PIPE TO ELBOW B-J 89.11 PT 1-UT 2-3-4<<~3378027 (4.SS-120-.430)**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE IHSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPONENTS PAGE 51 REACTOR COOLANT SYSTEH SUHHARY EXAHIHATIOH AREA NUHBER IDENT I F I CAT I OH FIRST PER I OO INSPECTION INTERVAL j ASME I SEC.XI I CATGY NDE I ITEN HO METH i 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD-OUTAGE--1 2 3 4'2 3 I I I I INSTRUCTIONS
040300 1-RC-10-22S PIPE TO ELBOM B-J 89.11 PT 1 UT 2-3-4**3378027 (4-SS-120..430)**
040400 1-RC-10-23S ELBOM TO PIPE B-J 89.11 PT 1 UT 2-3-4**3378027 (4-SS-120-.430)**
040500 1-RC-10-24F PIPE TO PIPE PRESS.DH 8-J 89.11 PT 1--C UT 2---C 3-X 4-**3378027 (4-SS-120-.430)**
040600 1-RC-10-24F-HL 1 THROUGH 4 HANGER LUG PRESS.DH'-K-1 PT 810.10 1-2-3-4-C C X 041400 1.RC-10-25S PIPE TO ELBOM B-J 89.11 PT 1 UT 2-3-4**3378027 (4-SS-120-.430)**
041500 1-RC-10-26S ELBOM TO PIPE B-J PT 1 89.11 UT 2-3-4**3378027 (4-SS-120-.430)*~
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLAHI'NIT 1 IHSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPOHEHTS PAGE: 52 REACTOR COOLANT S'YSTEH SUHHARY EXAMINATION AREA HUHBER IDENT I F ICATION IHSPECTIOH INTERVAL I FIRST ASME PERIOD SEC.XI I CATGY HDE ITEN NO NETH i 1 2 3 PLAH STATUS SECOND THIRD I PERIOD PERIOD I OUTAGE I 1 2 3 4 1 2 3 I IHSTRUCTIOHS
041700 1-RC-10-28S ELBOH TO PIPE B-J 89.11 PT 1 UT 2-3-4-*~3378027 (4-SS-120-.430)~*
041800 1-RC-10-29S PIPE TO ELBOM 8-J 89.1'I PT 1-UT 2-3-4*~3378027 (4-SS-120-.430)**
041900 1-RC-10-30S ELBOM TO PIPE PRESS.DH 8-J PT 1 89.11 UT 2-3-4-C C X**3378027 (4-SS-120-.430)**
042000 1-RC-10-31S PIPE TO ELBOM B-J 89.11 PT 1-UT 2-3-4-4*3378027 (4-SS-120-.430)**
042100 1-RC-10-32S ELBSI TO PIPE B-J PT 1 89.11 UT 2-3-4-**3378027 (4-SS-120-.430>**
042200 1-RC-10.33F PIPE TO PIPE 8-J 89.11 PT 1 UT 2-3-4-**3378027 (4-SS-120..430)**
DATE: '11/15/95 REVI S ION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 53 REACTOR COOLANT SYSTEM SUMHARY EXAHIHATI OH AREA HUMBER IDENT IF I CAT IOH INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE I ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD-OUTAGE-1 2 3 1 2 3 4 1 2 3 INSTRUCTIONS
- <<CALIBRATIOH BLOCK*<<LINE 1-RC-10 FIG NO A-27 042300 1-RC-10-34S PIPE TO ELBOW 8 J 89.11 PT 1 UT 2-3-4-*<<3378027 (4-SS-120-.430)**
042400 1.RC-10-35S ELBOW TO PIPE PRESS.DH 8-J 89.11 PT 1 UT 2-3-4 C C X*<<3378027 (4-SS-120-.430)**
042500 1.RC-10-36S PIPE TO ELBOW 8-J 89.11 PT 1-UT 2-3-4**3378027 (4-SS-120-.430)**
042600 1-RC-10-37S ELBOW TO PIPE 8-J 89.11 PT 1 UT 2-3-4**3378027 (4-SS.120..430)**
042700 1-RC-10-3BS PIPE TO ELBOW 8-J 89.11 PT 1 UI'C 3 X~4-**3378027 (4-SS-120-.430)**
042800 1-RC-10.39F ELBOW TO SAFE-EHD 8-J 89.11 PT 1-UT 2-3-4<<<<3378027 (4-SS-120-.430)**
LINE 1-RC-11 FIG NO A-28 042900 1-RC-11-01F BRANCH CONNECTION TO ELBOW 8-J 89.11 PT 1-UT 2-3 4<<<<3378027 (4.SS.120-.430)<<*
DATE: 1'I/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPONENTS PAGE: 54 REACTOR COOLANT SYSTEH SUHHARY EXAHINAT ION AREA NUHBER IDENT IF I CAT ION INSPECT ION INTERVAL I ASHE I SEC.XI CATGY NDE ITEN NO NETH i 1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I OUTAGE I 2 3 1 2 3 4 1 2 3 INSTRUCTIOHS
- CALIBRATION BLOCK**LINE 1-RC-11 FIG NO A-28 043000 1.RC-11-02S ELBOW TO PIPE 8-J 89.11 PT 1 Ul'-3-4-**3378027 (4-SS.120-.430)<<*
043100 1-RC-11-038 PIPE TO ELBOW 8-J PT 1 89.11 UT 2-3-4-<<<<3378027 (4-SS-120-.430)**
043200 1-RC-11-04S ELBOW TO PIPE 8-J 89.11 PT 1 UT 2-3-4**3378027 (4-SS-120-.430)**
043300 1-RC-11-05F PIPE TO ELBOW CONT.PRT 8-J 89.11 PT C UT C 3-X 4**3378027 (4-SS-120-.430)**
043400 1-RC-11-06S ELBOW TO PIPE 8-J 89.11 PT 1 UT 2-3-4**3378027 (4-SS-120-.430)*<<
043500 1-RC.11-07S PIPE TO ELBOW 8-J 89.11 PT 1 UT 2-3-4-**3378027 (4-SS-120-.430)<<*
043600 1-RC-11-08S ELBOW TO PIPE 8-J 89.11 PT 1C UT 2C 3 X 4*<<3378027 (4-SS-120-.430)**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UHIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 55 REACTOR COOLANT SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT I F ICATION PLAN STATUS FIRST SECOHD PERIOD PERIOD INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE I------0 U T A 0 E-ITEM NO METH I 1 2 3 1 2 3 4 THIRD I PERIOD I-----I 2 3 INSTRUCTIONS
- CALIBRATION BLOCK~*LINE 1-RC-11 FIG NO A-28 043700 1 RC-11-11S PIPE TO ELBOW 8-J 89.11 PT 1-UT 2-3-4-~~3378027 (4-SS-120-.430)**
043800 1-RC-11-12S ELBOW TO PIPE 8-J 89.11 PT 1 UT 2-3-4-**3378027 (4-SS-120-.430)**
043900 1-RC-11-'13S PIPE TO ELBOW 8-J 89.11 PT 1 UT 2-3-4**3378027 (4-SS-120-.430)**
044000 1-RC-11-14F ELBOW TO VALVE CONT.PRT 8-J 89.11 PT 1 UT 2-3-4 C C X**3378027 (4-SS.120-.430)*>>
044100 1-RC-11-15F VALVE TO PIPE 8-J 89.11 PT 1 UT 2-3-4**3378027 (4-SS-120-.430)**
044200 1 RC-11-16S PIPE TO ELBOW 8-J 89.11 PT UT 2-3-4**3378027 (4-SS-120-.430)~~
044300 1 RC.11-17S ELBOW TO PIPE CONT.PRT 8-J PT 1 89.11 UT 2-3-4-C C X*~3378027 (4-SS-120-
~430)~*
DATE: 11/15/95 REVI S ION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 56 REACTOR COOLANT SYSTEH
SUMMARY
EXAMINATIOH AREA NUHBER IDENT I F I CATION INSPECTION IHTERVAL I FIRST ASHE PERIOD SEC.XI I CATGY NDE I ITEH NO METH i'I 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD OUTAGE-.I 1 2 3 4 1 2 3 I INSTRUCTIONS
044600 1.RC-11.20S PIPE TO TEE 8-J 89.11 PT 1-UT 2-3-4.**3378027 (4-SS-120-.430)*>>
044700 1-RC-11-21S TEE TO PIPE 8-J 89.11 PT 1-UT 2-3-4**3378027 (4-SS-120-.430)**
044800 1-RC-11-22S PIPE TO ELBOW 8-J 89.'I1 PT 1-UT 2-3 4-**3378027.(4-SS-120-.430)>>>>
044900'I-RC-11-23S ELBOW TO PIPE CONT.PRT 8-J PT 89.11 UT 2-3-4-C C X**3378027 (4-SS-120-.430)**
LINE 1-RC-12 FIG NO A-29 045000 1-RC-12-01F NO?ZLE TO ELBOW 8-J PT 1 89.11 UT 2-3-4.**3378027 (4-SS-120..430)**
DATE: 11/'15/95 REVISION: 0 COOK NUCLEAR PLAHT UNIT 1 IHSERVICE IHSPECTIOH LONG TERH PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 57 REACTOR COOLANT SYSTEM
SUMMARY
EXAMI HAT I OH AREA NUMBER IDENT IF I CATION FIRST PERIOD INSPECTION INTERVAL I ASHE I , SEC.XI I CATGY HDE I ITEM HO METH i 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD-OUTAGE-1 2 3 4 1 2 3 I I I I INSTRUCTIONS
- CALIBRATIOH BLOCK~*LINE 1-RC-12 FIG NO A-29 045100 1-RC-12-02S
.ELBOW TO PIPE B-J 89.11 PT 1C UT 2C 3 X 4~*3378027 (4-SS-120-.430)*~
045200 1-RC-12-03S PIPE TO ELBOW 8-J PT 1 89.11 UT 2-3-4-~*3378027 (4-SS-120-.430)**
045300 1-RC-12-04S ELBOW TO PIPE 8-J 89.11 PT 1 UT 2-3 4-**3378027 (4-SS-120..430)**
045400'I-RC-12-05S PIPE TO ELBOW 8-J 89.11 PT 1 UT 2-3-4**3378027 (4-SS-120-.430)**
045500 1-RC-12-06S ELBOW TO PIPE 8-J 89.11 PT 1 ur 2-3 4-**3378027 (4-SS-120..430)**
045600 1-RC.12-07S PIPE TO ELBOW B-J 89.11 PT 1 UT 2-3-4-**3378027 (4-SS-120-.430)**
045700 1 RC-12-08F ELBOW TO PIPE CONT.PRT B-J 89.11 PT 1---C UT 2---C 3-X 4"*3378027 (4-SS-120-.430)**
DATE: 11/15/95 REVISIOH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPOHEHTS PAGE: 58 REACTOR COOLANT SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT IF I CAT I OH INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE I------0 U T A G E-ITEM NO METH i 1 2 3 1 2 3 4 THIRD I PERIOD I I-----I 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK~*LINE 1.RC-12 FIG NO A-29 045800 1-RC-12-09S PIPE TO ELBOW 8-J 89.11 PT 1-UT 2-3-4-4*3378027 (4-SS-120..430)**
045900 1-RC-12.10S ELBOW TO PIPE B-J 89.11 PT 1 UT 2-3-4+*3378027 (4-SS-120-.430)**
046000 1-RC-12-15S PIPE TO ELBOW COHT.PRT 8-J 89.11 PT UT 2-3-4-C C X**3378027 (4-SS-120-.430)~*
046100 1-RC-12-16S ELBOW TO PIPE 8-J 89.11 PT 1-UT 2-3-4**3378027 (4-SS-120-.430)**
046200 1-RC-12-17S PIPE TO ELBOW B-J 89.11 PT 1-UT 2-3 4-**3378027 (4-SS-120-.430)~>>
046300 1-RC-12-'18F ELBOW TO VALVE CONT.PRT 8-J 89.'11 PT 1---C UT 2---C 3-X 4~~3378027 (4-SS-120-.430)~~
046400 1-RC-12-19F VALVE TO PIPE B-J 89.11 PT UT 2-3-4**3378027 (4-SS-120..430)**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPOHENTS PAGE: 59 REACTOR COOLANT SYSTEH SUHHARY EXAHINAT I OH AREA NUHBER IDENT I F I CAT ION INSPECTION INTERVAL I ASHE I SEC~XI CATGY NDE ITEN NO HETH I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD-0 U T A G E------I INSTRUCTIONS 2 3 1 2 3 4 1 2 3 I**CALIBRATION BLOCK**LINE 1-RC-12 FIG NO A-29 046500 1-RC-12-20S PIPE TO ELBOW 8-J 89.11 PT 1 UT 2-3-4>>>>3378027 (4-SS-120-.430)<<>>
046600 1-RC-12-21S ELBOW TO PIPE 8-J 89.11 PT 1-UT 2-3-4-<<*3378027 (4-SS-120..430)**
046700 1.RC-12-22S PIPE TO ELBOW 8-J 89.11 PT 1C UI'C 3 X 4-**3378027 (4.SS-120-.430)**
046800'1-RC-12-23S ELBOW TO PIPE 8 J PT'1 89.11 UT 2-3-4**3378027 (4-SS-120-.430)**
046900 1-RC-12-24F PIPE TO TEE 8-J 89.11 PT 1 UT 2-3-4>>*3378027 (4-SS-120-
~430)*>>LINE 1-RC-13 FIG NO A-30 047000 1-RC-13.01S PIPE TO FLANGE 8-J 89.2'1 PT 1 2-3-4 047050 1-RC-13.01S-F 8 FLANGE BOLTIHG CONT.L1 8-G-2 87.50 VT-1 1 2-3 DATE: 11/15/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 60 REACTOR COOLANT SYSTEN SUNNARY EXANIHAT I ON AREA HUNGER IDENTIFICATION PLAN STATUS FIRST SECOND PERIOD PERIOD INSPECTION INTERVAL I ASHE I SEC~XI I CATGY NDE I------0 U T A G E-ITEH NO METH i 1 2 3 1 2 3 4 THIRD PERIOD I-----I 1 2 3 I IHSTRUCTIOHS
- CALIBRATION BLOCK**LINE 1-RC-13 FIG NO A-30 047100 1-RC-13-02S FLANGE TO PIPE 8-J 89.21 PT 1 2-3-4 C 047200 1-RC-13.03S PIPE TO ELBOW 8-J 89.21 PT 1-2 C 3-4-047300 1-RC-13.04S ELBOM TO PIPE 8-J 89.21 Pl'C 2-3.4-047400 1-RC-13-05S PIPE TO ELBOM 8-J 89.21 PT 1-2-3-4-047500 1-RC-13-06S ELBON TO PIPE 8-J 89.21 PT 1-2-3-4 047800 1-RC-13 26F PIPE TO PIPE 8-J 89.21 PT 1 2-3-4 C 047900 1-RC-13.07S PIPE TO ELBOW CONT.L1 8-J 89.21 PT 2-C 3-X 4 DATE: 11/15/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAH CLASS 1 ALL STATUS COHPOHEN'TS PAGE: 61 REACTOR COOLANT SYSTEN SUHHARY EXANI HAT IOH AREA HUHBER IDENTIFICATION INSPECTION INTERVAL I FIRST ASME PERIOD SEC.XI CATGY NDE ITEN NO NETH j 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I-0 U T A G E------I 1 2 3 4 1 2 3 I IHSTRUCTIOHS
- CALIBRATION BLOCK**-LINE 1-RC-13 FIG NO A-30 048000 1-RC-13-OBF ELBOll TO VALVE CONT.L1 8-J 89.21 PT 1 2-C 3.--X 4 048100 1-RC 13 09F VALVE TO ELBOM CONT.L1 8 J 89.21 PT 1 2-C 3-X 4 048200 1-RC-13-10S ELBOM TO PIPE CONT.L1 89.21 2-3-4 BJ PT 1 C X 048300 1-RC-13-11F PIPE TO PIPE 8-J 89.21 PT 1 2.3-4 048400 1-RC-13-12F PIPE TO BRANCH CONNECTION 8 J 89.21 PT 1C 2 C 3 X 4 LINE 1-RC-13 FIG NO A-31 048500 1-RC.13-13S REDUCER TO PIPE 89.21 2-3-4-8-J PT 1 048600 1-RC-13-14S PIPE TO ELBOW 8-J 89.21 PT 1 2-3-4 C DATE: 11/15/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 62 REACTOR COOLANT SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION FIRST PERIOD INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE I ITEM NO METH i 1 2 3 PLAN STATUS SECOND PERIOD THIRD PERIOD-OUTAGE-1 2 3 4 1 2 3 INSTRUCTIOHS I~*CALIBRATIOH BLOCK**LINE 1-RC-13 FIG NO A-31 048700 1.RC-13-15S ELBOW TO PIPE 8-J 89.21 PT 1 2-3-4 049100 1-RC-13-17F PIPE TO VALVE 8-J 89.21 PT 1 2-3-4 C 049200 1-RC-13-18F VALVE TO PIPE 8-J 89.21 PT 1 2-3-4 049300 1-RC-13-19S PIPE TO ELBOW 8-J 89.21 PT 1-2-3-4 049400 1-RC-13-20S ELBOW TO PIPE 8-J 89.21 PT 1-2-3-4 049500 1-RC-13-21S PIPE TO TEE 8-J 89.21 PT 1C 2 C 3 X 4 049600 1-RC-13-23S TEE TO PIPE 8-J 89.21 PT 1 2-3-4 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANI'NIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 63 REACTOR COOLANT SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I F IRST ASME PERIOD SEC.XI I CATGY HDE ITEM HO METH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE-1 2 3 4 1 2 3 I I I I INSTRUCTIONS
- CALIBRATIOH BLOCK**LINE 1-RC-13 FIG HO A-31 049700 1-RC-13-24S PIPE TO ELBOH 8-J 89.21 PT 1-2-3-4 049800 1-RC-13-25F ELBOiI TO PIPE 89.21 2-3-4 8-J PT 1 LINE 1-RC-14 FIG NO A-32 049900 1-RC-14-01S REDUCER TO PIPE 8-J 89.21 PT 1 2-3-4 050000 1-RC-14-02S PIPE TO ELBON 8-J 89.21 PT 1 2-3-4-C 050100 1-RC-14-03S ELBON TO PIPE 8-J 89.21 PT 2-3-4 050500 1-RC-14-05F PIPE TO VALVE 8-J 89.21 P'I 1-2-3-4-050600 1-RC-14-06F VALVE TO PIPE 8-J 89.21 PT 1C 2 C 3 X 4-DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLAHT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 64 REACTOR COOLANT SYSTEM SUSRY EXAMINATION AREA NUMBER IDENT I F I CAT I OH PLAN STATUS FIRST SECOND PERIOD PERIOD IHSPECTIOH INTERVAL I ASME I SEC.XI I CATGY NDE I-----0 U T A G E ITEM HO METH i 1 2 3 1 2 3 4 THIRD I PERIOD I---I 2 3 INSTRUCTIONS
- CALIBRATION BLOCK**LINE 1-RC-14 FIG HO A-32 050700 1-RC-14-07S PIPE TO ELBOW 8-J 89.21 PT 1 2 3.4 050800 1-RC-14-08S ELBOW TO PIPE 8-J 89.21 PT 1 2-3-4-050900 1-RC-14-31F PIPE TO PIPE 8-J 89.21 PT 1 2-3-4-051000 1-RC-14-09S PIPE TO TEE 89.21 2-3-4 8-J PT 1---C 051100 1-RC-14-10S TEE TO PIPE 8-J 89.21 PT 1 2-3-4-051200 1-RC-14-11F PIPE TO ELBOW 8-J 89.21 PT 1-2-3-4 L'INE 1 RC 14 FIG HO A-33 051300 1-RC-14-12S ELBOW TO PIPE 89.21 2-3-4 8-J PT 1-DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS'I ALL STATUS COMPOHENTS PAGE: 65 REACTOR COOLANT SYSTEM
SUMMARY
EXAMIHATIOH AREA HUNGER IDENTIFICATION INSPECTION INTERVAL I ASME I SEC~XI I CATGY NDE I ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD-OUTAGE-1 2 3" 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATIOH BLOCK~*LIHE 1-RC-14 FIG NO A-33 051400 1-RC-14-30F PIPE TO PIPE 8-J 89.21 PT 1 2-3-4-05'l500 1-RC-14-13S PIPE TO FLANGE CONT.L2 8-J 89.21 PT 1-2-3-4 C X 051550 1-RC-14-138-FB FLANGE BOLTING CONT.L2 B.G.2 87.50 VT-1 1-2-3-4-C X 051600 1-RC-14.16S FLANGE TO PIPE CONT.L2 8-J 89.21 PT 1-2-3-4.051900 1-RC-14-17S PIPE TO ELBOW CONT.L2 89.21 2-3-4 8-J PT 1 C 052000 1-RC-14-18S ELBOW TO PIPE CONT.I.2 8-J 89.21 PT 1 2-3 4-052200 1-RC-14-19S PIPE TO ELBOW 8-J 89.21 PT 1-2 C 3 X 4-DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE IHSPECTIOH LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 66 REACTOR COOLANT SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT I F I CAT ION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY HDE I ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD--OUTAGE--1 2 3 1 2 3 4 1 2 3 I I I I INSTRUCT IONS I**CALIBRATION BLOCK**LINE 1-RC-14 FIG NO A-33 052300 1-RC-14-20S ELBOW TO PIPE 8-J 89.21 PT 1C 2-3-4-052400 1-RC-14-24F PIPE TO VALVE 8 J 89.21 PT 1 2-3-4 052500 1-RC-14-25F VALVE TO PIPE 8-J 89.21 PT 1-2-3-4-052600 1-RC-14-26S PIPE TO ELBOW 8-J 89.21 PT 1 2.3-4 052700 1-RC-14.27S ELBOW TO PIPE 8-J 89.21 PT 1 2-3-4-C 052800 1.RC.14-28F PIPE TO PIPE 8-J 89.21 PT 1 2-3-4-052900 1.RC-14-29F PIPE TO BRANCH CONNECTION 8-J PT 89.21 1-2-3-4 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 67 REACTOR COOLANT SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT IF I CAT IOH FIRST PERIOD INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE ITEM No METH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD-0 U T A G E------(INSTRUCTIONS 1 2 3 4 1 2 3 I**CALIBRATION BLOCK**LINE 1 RC-15 FIG No A-34 053000 1.RC-15-01S REDUCER TO PIPE 8-J 89.21 Pr 1-2-3-4-C 053300 1-Rc-15-01S-A PIPE TO PIPE CONT.L3 89.21 2-3.4.8-J PT 1'C 053400 1 Rc-15-02S PIPE To ELBON CONT.L3 8-J 89.21 PT 1---C 2-3-4 053500 1.RC-15 03S ELBOU TO PIPE COHT.L3 8-J 89.21 PT 1---C 2-3-4.053900 1-Rc-15-05F PIPE TO VALVE cour.L3 8-J 89.21 PT 1 2-3-4 054000 1-Rc-15-06F VALVE TO PIPE coNr.I.3 89.21 2-3-4 8-J PT 1 C X 054100 1-RC-15-07S PIPE TO ELBSJ 8-J 89.21 PT 1-2-3-4 0 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPONENTS PAGE: 68 REACTOR COOLANT SYSTEH SUHHARY EXAHINATION AREA HUHBER IDENT IF I CATION INSPECTION INTERVAL I ASHE I SEC~Xl I CATGY NDE I ITEN NO HEIH I 1 PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERICO-OUTAGE------I 2 3 1 2 3 4 1 2 3 I IHSTRUCTIONS
- ~CALIBRATION BLOCK~*LINE 1-RC-15 FIG NO A-34 054200 1-RC-15-0BS ELBOW TO PIPE 8-J 89.21 PT 1-2 3-4 054300 1-RC-15-09S PIPE TO TEE 8-J 89.21 Pr 2 3.4-C 054400 1-RC-15-10S TEE TO PIPE 8-J 89.21 PT 1-2 3-4-054500 1 RC-15-11F PIPE TO ELBOW 8-J 89.21 PT 1 2-3-4 LINE 1-RC-15 FIG NO A-35 054600 1-RC-15-12S ELBOW TO PIPE 8-J 89.21 PT'-2-3-4 054700 1-RC-15-13S PIPE TO FLANGE 8-J 89.21 PT 1 2-3-4 054750 1-RC.15.13S.FB FLANGE BOLTING CONT~L3 8-G-2 87.50 VT-1 1 2-3-4 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 69 REACTOR COOLANT SYSTEH SUHHARY EXAHI HAT ION AREA NUHBER IDENT IF ICATION INSPECTION INTERVAL I ASHE ISEC.XI I CATGY NDE I ITEH NO METH I PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I-OUTAGE I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
<<*CALIBRATION BLOCK~*LINE 1-RC-15 FIG NO A-35 054800 1-RC-15-16S FLANGE TO PIPE 8-J 89.2'I PT 1---C 2-3-4.055000 1-RC-15-17S PIPE TO ELBOW 8-J 89.21 PT 1 2-3 4-055100 1-RC-15.18S ELBOW TO PIPE 8-J 89.21 PT 1-2-3-4.055300 1-RC-15-198 PIPE TO ELBOW 8-J 89.21 PT 1C 2 C 3X 4 055400 1-RC-15-20S ELBOW TO PIPE 8-J 89.21 PT 1 2-3-4-055500 1-RC-15-21F PIPE TO VALVE 8-J 89.21 PT 1 2-3-4 055600 1-RC-15-22F VALVE TO PIPE 8-J 89.21 PT 1 2-3-4 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 70 REACTOR COOLANT SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT IF ICATION IHSPECTIOH INTERVAL I ASME I SEC.XI I CATGY NDE ITEM NO METH I FIRST PERIOD PLAN STATUS SECOND THIRD PERIOD PERIOD I-OUTAGE------I 2 3 1 2 3 4 1 2 3 I IHSTRUCT IONS**CALIBRATIOH BLOCK**LINE 1-RC-15 FIG HO A-35 055700 1-RC-15-23S PIPE TO ELBOW 8-J 89.21 PT 2-3-4 055800 1-RC-15-248 ELBOW TO PIPE 8-J 89.21 PT 1C 2 C 3 X 4 055900 1-RC-15-24S-A PIPE TO PIPE 8-J 89.21 2 3-4-056000 1.RC-'15-25F PIPE TO BRANCH CONNECTION 8-J 89.21 PT 1 2-3.4-LIHE 1-RC-16 FIG HO A-36 056100 1-RC-16-01S REDUCER TO PIPE 8-J 89.21 PT 1C 2 C 3X 4-056200 1-RC-16-02S PIPE TO ELBOW 8-J 89.21 PT 2-3-4 056300 1-RC-16.03S ELBOW TO PIPE 89.21 2-3-4-8-J PT 1 DATE: 11/15/95 REVISION: 0 COOK HUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERN PLAN'CLASS 1 ALL STATUS COHPOHENTS PAGE: 71 REACTOR COOLANT SYSTEM SUHHARY EXAHI HAT I ON AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I FIRST ASHE PER I OO SEC.XI I CATGY HDE I ITEN NO METH i 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE------
1 2 3 4 1 2 3 I INSTRUCTIONS
~*CALIBRATION BLOCK**LINE 1-RC-'16 FIG NO A-36 056700 1-RC-16-05F PIPE TO VALVE 8-J 89.21 PT 1C 2 C 3 X 4 056800 1-RC-16-06F VALVE TO PIPE 8-J 89.21 PI'2-3-056900 1 RC-16-07S PIPE TO ELBOW 8-J 89.21 PT 1 2-3-4-057000 1-RC-16-0BS ELBOM TO PIPE 8-J 89.21 PT 1 2-3-4-057100 1-RC-16.09S PIPE TO TEE 8-J 89.21 PT 1 2-3-4 057200 1-RC-16-10S TEE TO PIPE 8-J 89.21 PT 1C 2-3-4-057300 1-RC-16-11F PIPE TO ELBOM 89.21 2 C 3 X 4 8-J PT 1 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPONEN'IS PAGE: 72 REACTOR COOLAH'I SYSTEH SUHHARY EXAHINATION AREA HUHBER IDENT IF I CAT IOH IHSPECI'ON INTERVAL I FIRST ASME PERIOD SEC.XI I CATGY HDE I ITEM HO NETH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERICO I OUTAGE------I 1 2 3 4 1 2 3 INSTRUCTIONS
- CAL I BRAT IOH BLOCK~*LINE 1-RC-16 FIG NO A-37 057400 1-RC-16-12S ELBOW TO PIPE 8-J B9.21 PT 1 2-3-4-057500 1 RC-16-13S PIPE TO FLANGE B-J 09.21 PT 2-3-4-057550 1-RC-16-13S-FB FLANGE BOLTIHG B-G-2 B7.50 Vr-1 2 C 3 X 4-057600 1-RC-16-16S FLANGE TO PIPE B-J B9.2'I PT 1---C 2-3-4 057700 1-RC-16-16S-PS PIPE SUPPORT B-K-1 PT 1 810.10 2-3-4-C 057800 1-RC-16-17S PIPE TO ELBOW B J B9.21 PT 1 2-3-4 057900 1-RC-16-18S ELBOW TO PIPE 8 J B9.21 PT 1-2-3-4 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 73 REACTOR COOLANT SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I ASME I SEC.XI CATGY NDE I ITEM NO METH I FIRST PERIOD PLAN STATUS SECOND THIRD PERIOD PERIOD---0 U T A G E------1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK*>>LINE 1-RC-16 FIG NO A-37 058000 1-RC-16-30F PIPE TO PIPE 8-J 89.21 PT 1 2-3-4-058200 1-RC-16-19S PIPE TO ELBOW 89.21 2-3-4-8-J PT 1-C 058300 1-RC-16-20S ELBOW TO PIPE B-J 89.21 PT 1-2-3-4 058400 1-RC-16-21F PIPE TO VALVE 8-J 89.21 PT 2-3-4 058500 1-RC-16-22F VALVE TO PIPE 8-J 89.21 PT 2-3-4 C 058600 1-RC-16-23S PIPE TO ELBOW 8-J PT 1 89.21 2-3-4 058700 1-RC-16.24S ELBOW TO PIPE CONT.L4 8-J 89.21 PT 1-2 3-4 C X DATE: 11/15/95 REVI SIGH: 0 COOK NUCLEAR PLAN'I UHIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE 74 REACTOR COOLANT SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATIOH FIRST PER IOD IHSPECTIOH INTERVAL I ASME I SEC.XI I CATGY NDE I ITEH HO METH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD-OUTAGE-1 2 3 4 1 2 3 I I I I INSTRUCTIONS
- CALIBRATION BLOCKi~LINE 1-RC-16 FIG HO A-37 058800 1-RC-16-25S PIPE TO ELBOW CONT.L4 8-J 89.21 PT 1-2-C 3---X 4-058900 1-RC-16-26S ELBOW TO PIPE CONT.L4 8 J 89.21 PT 1 2-3-4 C X 059000 1-RC-16-28F PIPE TO ELBOW CONT.L4 8-J 89.21 PT 1 2-3-4-C X P 059100 1-RC-16-29F ELBOW TO PIPE CONT.L4 8 J 89.21 PT 1 2-C 3-X 4 059200 1-RC-16.27F PIPE TO BRANCH CONHECTIOH 8-J 89.21 PT 1 2-3-4 LIHE 1-RC.501 FIG NO A-38 059300 1-RC-501-01S REDUCER TO TEE 89.40 2-3-4 8-J PT 1 059400 1-RC-501-02S TEE TO REDUCER 8-J 89.40 PT 1C 2-3-4 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE IHSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 75 REACTOR COOLANT SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT I F I CAT ION FIRST PERIOD INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE I ITEM HO METH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD-OUTAGE-1 2 3 4 1 2 3 I I I I INSTRUCTIONS
- ~CALIBRATIOH BLOCK**LINE 1-RC-501 FIG NO A-38 059500 1-RC-501 03S TEE TO PIPE 8-J 89.40 PT 1 2-3-4 060000 1-RC-501-04S PIPE TO ELBOW 8-J PT 1 89.40 2-3-4 060100 1-RC-501-05S ELBOW TO PIPE 8-J 89.40 Pl'2 C 3X 4 060200 1-RC.501-06S PIPE TO ELBOW CONT.PRT 89.40 2-3-4-8-J PT 1 C C X 060300'1-RC-501-07F ELBOW TO PIPE 8-J 89.40 PT 1 2-3-4-060400'I-RC-501-08S PIPE TO ELBOW 8-J 89.40 PT 1 2.3-4 060500 1-RC-501-09S ELBOW TO PIPE 8-J 89.40 PT 1 2-3 DATE: 11/15/95 REVI SION: 0 COOK HUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 76 REACTOR COOLAHT SYSTEM SUHMARY EXAMINATION AREA NUMBER IDEHTIFICATIOH PLAN STATUS F IRSI'ECOND THIRD PERIOD PERIOD PERIOD INSPECTION INTERVAL I ASME I SEC.XI I CATGY HDE I--0 U T A G E--ITEM HO METH I 1 2 3 1 2 3 4 1 2 3 I I I I INSTRUCTIONS
- CALIBRATION BLOCK*~LIHE 1-RC-501 FIG NO A-38 060600 1-RC-501-10S PIPE TO ELBOW 8-J 89.40 PT 1 2-3-4 060700 1-RC-501-11F ELBOW TO PIPE 8-J 89.40 PT 1 2-3.4 060800 1-RC-501-12F PIPE TO TEE CONT.PRT 8-J 89.40 PT 1 2-3-4-LINE 1.RC-504 FIG NO A-39 060900 1-RC-504-01S REDUCER TO ELBOW CONT.L1 8-J 89.40 PT 1 2---C 3-X 4-061000 1-RC-504-02S ELBOW TO PIPE CONT.L1 8-J 89.40 PT 1 2-C 3-X 4-061100 1-RC-504-03S PIPE TO CROSS 8-J PT 1 89.40 2 C 3 X 4 C 06'1200 1-RC-504-04S CROSS TO REDUCER CONT.L1 8-J 89.40 PT 1 2-C 3-X 4-DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLAHT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 77 REAC'IOR COOLANT SYSTEM
SUMMARY
EXAMIHATION AREA NUMBER IDEHT IF I CATION INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE I ITEM NO METH I PLAN STATUS FIRST SECOHD THIRD PERIOD PERIOD PERIOD 0 U T A G E I INSTRUCTIONS 2 3 1 2 3 4 1 2 3 (**CALIBRATION BLOCK~~LINE 1.RC 504 FIG HO A-39 061300 1-RC-504-05S CROSS TO REDUCER CONT.L1 8-J 89.40 PT 1-2-C 3-X 4-061400 1-RC-504-06S CROSS TO PIPE 8-J 89.40 PT 1-2-3-4-061500 1-RC-504-07S PIPE TO ELBOW 8-J 89.40 PT 1 2-3-4-C 061600 1-RC-504-DBF ELBSI TO PIPE 89.40 2-3-4-8-J PT 1 C 061700 1-RC-504-09S PIPE TO VALVE 8-J 89.40 PT 1 2-3-4 061800 1-RC-504-10S VALVE TO PIPE 8-J 89.40 PT 1 2-3'.4 061900 1-RC-504-11S PIPE TO VALVE 89.40 2-3-4 8-J PT 1 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 78 REACTOR COOLANT SYSTEH SUNHARY EXAHIHATION AREA NUNBER IDENTIFICATION INSPECTION IHTERVAL I ASHE I SEC~XI I CATGY HDE I ITEN NO NETH I PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I j OUTAGE I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK**LINE 1-RC-504 FIG NO A-39 062000 1.RC-504-12S VALVE TO PIPE 8-J 89.40 PT 1 2-3-4-C 062100 1.RC-504-13S PIPE TO ELBOW 8-J 89.40 PT 1 2 C 3X 4-062200 1-RC-504-14S ELBOW TO PIPE 8 J 89.40 PT 1 2-3-4-062300 1-RC-504-15S PIPE TO ELBOW 8-J 89.40 PT 1-2-3-4-062400 1-RC-504-16F ELBOW TO PIPE 8-J 89.40 PT 1 2-3-4 062500 1-RC-504-17S PIPE TO TEE 8-J 89.40 PT 1C 2-3-4 062600 1-RC-504-18S TEE TO PIPE 8-J 89.40 PT 1 2-3 DATE: 11/15/95 REVI S ION: 0 COOK HUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LOHG TERM PLAH CLASS 1 ALL STATUS COMPONEH'IS PAGE: 79 REACTOR COOLANT SYSTEM
SUMMARY
EXAMIHAT I ON AREA NUMBER IDENT I F I CATION FIRST PERIOD INSPECTION INTERVAL I ASME I SEC~XI I CATGY NDE ITEM NO METH i 1 2 3 PLAH STATUS SECOND THIRD PERIOD PERIOD-OUTAGE-1 2 3 4 1 2 3 I IHSTRUCTIOHS
- CALIBRATION BLOCK*~LINE 1.RC-504 FIG NO A-39 062700 1-RC-504-19S PIPE TO VALVE 8-J 89.40 PT 2-3-062800 1-RC-504-20S VALVE TO PIPE 8-J 89.40 PT 1 2-3-4-062900 1-RC-504-21S PIPE TO FLANGE 8-J 89.40 PT 1 2-3-4-062950 1-RC-504-21S-FB FLANGE BOLTIHG COHT.L1 8-G 2 87.50 VT-1 1 2-3-4-063000 1-RC-504-22S TEE TO PIPE 8-J 89.40 PT 1 2-3-4 063100 1-RC-504-23S PIPE TO MANIFOLD 89.40 2 C 3X 4 8-J Pi'C 063200 1-RC-504-24S MANIFOLD TO PIPE 8-J 89.40 PT 1 2-3-4 DATE: '11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPONENTS PAGE: 80 REACTOR COOLAN'I SYSTEH SUMHARY EXAHIHATIOH AREA NUHBER IDENT IF I CATION INSPECTIOH INTERVAL I ASME'SEC.XI I CATGY NDE I ITEN NO METH I 1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD-I-----OUTAGE------I 2 3 1 2 3 4 1 2 3 INSTRUCT IOHS**CALIBRATION BLOCK**LINE 1-RC-504 FIG HO A-39 063300 1-RC-504-25S PIPE TO ELBOW 8-J 89.40 PT 1-2-3-4 C 063400 1-RC-504-26S ELBOW TO PIPE 8 J 89.40 PT 2-3-4 063500 1-RC-504-27F PIPE TO REDUCER 8-J 89.21 PT 1-2-3.4-LINE 1-RC-505 FIG HO A-40 063600 1-RC-505-01F BRANCH CONNECTION TO PIPE 8-J 89.40 PT 1 2-3-4 063700 1-RC-505-02S PIPE TO ELBOW 8-J 89.40 PT 1-2 C 3X 4 063800 1-RC-505-03S ELBOW TO PIPE 89.40 2-3.4 8-J PT 1 C 063900 1 RC.505-04S PIPE TO ELBOW 8-J 89.40 PT 1 2-3 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE IHSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPONEHTS PAGE: 81 REACTOR COOLANT SYSTEN SUHHARY EXAMINATION AREA HUHBER IDENTIFICATION INSPECTION INTERVAL I FIRST ASIDE PERIOD SEC.XI I CATGY HDE ITEN HO NETH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD-I OUTAGE------
I 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK~~"'INE 1-RC-505 FIG NO A-40 064000 1-RC 505-05S ELBOW TO PIPE 8-J 89.40 PT 2 3-4-064100 1-RC-505-06S PIPE TO ELBOW 8-J 89.40 PT 1-2-3-4 064200 1-RC-505-07S ELBOW TO PIPE 8 J 89.40 PT 1 2-3-4-064300 1-RC-505-08S PIPE TO ELBOW 8-J 89.40 PT 1-2-3-4-064400 1-RC-505 09F ELBOW TO PIPE 89.40 2-3-4 8 J PT'064500 1-RC-505-10S PIPE TO ELBOW 89.40 2-3-4 8-J PT 1 C 064600 1-RC-505-11S ELBOW TO PIPE 89.40 2-3-4-8-J PT 1 DATE: 11/15/95 REVI 8 I OH: 0 COOK NUCLEAR PLAHT UHIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 82 REACTOR COOLANT SYSTEM
SUMMARY
EXAMI HAT I OH AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I FIRST ASME PERIOD SEC.XI I CATGY NDE I ITEM HO METH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I 0 U T A G E I 1 2 3 4 1 2 3 IHSTRUCTIONS
- CALIBRATIOH BLOCK~~LINE 1-RC-505 FIG NO A-40 064700 1-RC-505-12S PIPE TO VALVE 8-J 89.40 PT 1 2-3-4 064800 1-RC-505-13S VALVE TO PIPE 8-J 89.40 PT 1 2-3-4 064900 1-RC-505-14S PIPE TO VALVE 8-J 89.40 PT 1-2-3-4-065000 1-RC-505-15F VALVE TO PIPE 8-J 89.40 PT 1 2-3-4 065100 1-RC-505-16S PIPE TO TEE 8-J 89.40 PT 1 2-3-065200 1-RC-505-17S TEE TO REDUCER 8-J 89.40 PT 1 2-3-4 065300 1-RC-505-18S TEE TO PIPE 8-J 89.40 PT 2-3-4 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAH CLASS 1 ALL STATUS COMPONENTS PAGE: 83 REACTOR COOLANT STSTEM
SUMMARY
EXAHINATION AREA NUHBER IDENTIFICATIOH INSPECTION INTERVAL I FIRST ASME PERIOD SEC~XI j CATGT NOE ITEH NO METH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD OUTAGE-----I 1 2 3 4 1 2 3 I INSTRUCTIOHS
~~CALIBRATION BLOCK~*LINE 1-RC-505 FIG NO A-40 065400 1-RC-505-19S PIPE TO MANIFOLD 8-J 89.40 PT 1C 2 C 3X 4-065500 1-RC-505-20S HAHIFOLD TO PIPE 8-J 89.40 PT 1-2-3-4 065600 1-RC-505-21S PIPE TO ELBON 8-J 89.40 PT 1 2-3-4 065700 1.RC-505-22S'LBSI TO PIPE 8-J 89.40 PT 1 2-3-4 065800 1-RC.505-23F PIPE TO TEE 8-J 89.40 PT 1 2 3-4 065900 1-RC-505-24S TEE TO REDUCER 8-J 89.40 PT 1 2-3-4 C 066000 1-RC-505-25S TEE TO PIPE 8-J 89.40 PT 1 2-3 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAH CLASS 1 ALL STATUS COHPONENTS PAGE: 84 REACTOR COOLANT SYSTEM SUNNARY EXANIHATIOH AREA HUNGER IDENTIFICATION IHSPECTIOH INTERVAL I ASHE I SEC.Xl CATGY HDE I ITEN NO NETH I FIRST PER I OD PLAN STATUS SECOND PERIOD THIRD I PER IOO------I--0 U T A G E------I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
<<*CALI BRAT ION BLOCK**LIHE 1-RC-505 FIG NO A-40 066100 1-RC-505-26S PIPE TO FLANGE 8-J 89.40 PT 1 2-3-4 066150 1-RC-505-26S-FB FLAHGE BOLTING CONT.L1 8-G-2 87.50 VT-1 1 2-3-4-066200 1-RC-505-27S FLANGE TO PIPE 8-J 89.40 PT 1C 2 C 3 X 4 066600 1-RC-505-28S PIPE TO ELBOM 89.40 2-3-4 8-J PT 1 066700 1-RC-505-29S ELBOM TO PIPE 89.40 2-3-4-8-J PT 1-066800 1-RC-505-30S PIPE TO ELBOM CONT.L1 8-J 89.40 PT 1 2-C 3-4.066900 1-RC-505-31S ELBOM TO PIPE CONT.L1 8-J 89.40 PT 1 2-3-4 C X DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPOHEHTS PAGE: 85 REACTOR COOLANT SYSTEM
SUMMARY
EXAHIHATIOH AREA NUMBER IDEHTIFICATIOH INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE ITEM NO METH I PLAH STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD--OUTAGE-----1 2 3 1 2 3 4 1 2 3 I I I I IHSTRUCTIOHS I**CALIBRATIOH BLOCK**LINE 1-RC-505 FIG NO A-40 067000 1-RC-505-32S PIPE TO VALVE CONT.L1 8-J 89.40 PT 1-2-C 3-X 4 067100 1-RC-505-33S VALVE TO PIPE CONT.L1 8-J 89.40 PT 1---C 2-C 3---X 4 067200 1-RC-505-34F PIPE TO TEE CONT.L1 8-J 89.21 PT 2-C 3-X 4-LINE 1-RC 506 FIG NO A-41 067300 1.RC-506.01F BRANCH COHHECT ION TO PIPE 8-J 89.40 PT 1-2-3-4-067400 1-RC-506.02S PIPE TO ELBOW 8-J 89.40 PT 1 2.3-4 067500 1.RC-506-038 ELBOW TO PIPE 89.40 2-3-4-8-J PT 1 C 0 067600 1-RC-506.04S PIPE TO ELBOW 8-J 89.40 PI'2-3-4 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONEN'TS PAGE: 86 REACTOR COOLANT SYSTEM SUMHARY EXAMI HAT I ON AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE ITEM NO METH I PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I I--0 U T A G E------I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIOHS
- CALIBRATION BLOCK~~LINE 1-RC-506 FIG NO A-41 067700 1-RC-506-05S ELBOW TO PIPE 8-J 89.40 PT 1 2-3-4-067800 1-RC-506 06S PIPE TO ELBOW 8-J 89.40 PT 1-2-3-4 067900 1-RC-506.07S ELBOW TO PIPE 8-J 89.40 PT 1-2-3-4 068000 1-RC-506.08S PIPE TO ELBOW 8-J 89.40 PT 1-2-3-4-068100 1-RC-506.09S ELBOW TO PIPE 8-J 89.40 PT 1-2-3-4 068200 1-RC-506-10S PIPE TO VALVE 89.40 2-3-4-8-J PT 1 C 068300 1.RC-506-11S VALVE TO PIPE B.J B9.40 PT 1 2-=3-4 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALI.STATUS CONPOHEHTS PAGE: 87 REACTOR COOLANT SYSTEN SUNHARY EXAMINATION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I FIRST ASIDE PER IOO SEC.XI I CATGY NDE I ITEN HO NETH I 1 2 3 PLAN STATUS SECOND THIRD I PER I OO PERIOD I-OUTAGE--'
1 2 3 4 1 2 3 I INSTRUCTIONS
~~CALIBRATION BLOCK*~LIHE 1-RC-506 FIG NO A-41 068400 1-RC-506-'l2S PIPE TO VALVE 89.40 2-3-4-8-J PT 1 068500 1-RC-506-13S VALVE TO PIPE 89.40 2-3-4-8-J PT 1 C 068700 1-RC-506-14F PIPE TO ELBOW 8-J 89.40 PT 1 2-3-4 068800 1 RC-506-15S ELBOW TO PIPE 8-J 89.40 PT 1C 2 C 3 X 4 068900 1-RC-506-16S PIPE TO TEE CONT.L2 89.40 2-3-4-BJPT1 C X 069000 1-RC-506-17S TEE TO REDUCER CONI'.L2 89.40 2-3-4 BJ PT 1 C X 069100 1-RC-506-18S TEE TO PIPE CONT.L2 8-J 89.40 PT 1-2-3-4 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLAN'I UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 88 REACTOR COOLANT SYSTEM
SUMMARY
EXAMIHATIOH AREA NUMBER IDENT I F I CATION INSPECT IOH INTERVAL I ASME I SEC.XI I CATGY HDE ITEM HO METH I 1 FIRST PERIOD PLAN STATUS SECOND THIRD I PERIOD PERIOD 0 U T A G E------I 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
~*CALIBRATIOH BLOCK~*LINE 1-RC-506 FIG NO A-41 069200 1-RC-506-19S PIPE TO MANIFOLD CONT.L2 B-J B9.40 PT 1 2-3-4-069300 1-RC-506-20S MAHIFOLD TO PIPE CONT~L2 8-J B9.40 PT 2-3-4 C X 069400 1-RC-506-21S PIPE TO ELBOW CONT.L2 89.40 2-3-4 B-J PT 1 C C X 069500 1-RC-506.22S ELBOW TO PIPE CONT.L2 B9.40 2-3-4 B-J PT 1 C X 069600 1-RC-506-23F PIPE TO TEE B9.40 2-3-4 B-J PT 1-069700 1-RC-506-24S TEE TO REDUCER B-J B9.40 PT 1 2-3-4-C 069800 1-RC-506-25S TEE TO PIPE B.J 89.40 PT 2-3-4 DATE: 11/15/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL SI'ATUS COMPOHEH'IS PAGE: 89 REACTOR COOLANT SYSTEM SUHMARY EXAMINATION AREA HUMBER IDENTIFICATION PLAN STATUS FIRST SECOND PERIOD PERIOD INSPECTION INTERVAL I ASHE I SEC'I I CATGY HDE I------0 U T A G E-ITEM NO METH I 1 2 3 1 2 3 4 THIRD I PERIOD I-----I 1 2 3 I IHSTRUCTIOHS
- CALIBRATIOH BLOCK~~LINE 1-RC-506 FIG HO A-41 069900 1-RC-506-26S PIPE TO ELBOW 8-J 89.40 PT 1 2-3-4-070000 1-RC.506-27S ELBOW TO PIPE 89.40 2-3-4-8-J PT 1-~070100 1-RC-506-28S PIPE TO FLANGE 8-J 89.40 PT 1C 2 C 3X 4-070150 1-RC-506.28S-FB FLANGE BOLTIHG 8-0.2 87.50 VI'-1 1 2 C 3 X 4 070200 1-RC-506-29S FLANGE TO PIPE 8-J 89.40 PT 1-2-3-4-070600 1.RC-506.30S PIPE TO ELBOW 8-J 89.40 PT 1 2-3-4-070700 1-RC-506-31S ELBOW TO PIPE 8-J 89.40 PT 2-3-4.C DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECI'ION LONG TERH PLAN CLASS 1 ALL STATUS COHPONENTS PAGE: 90 REACTOR COOLANT SYSTEH
SUMMARY
EXAHINATION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE I ITEH NO METH I PLAN STATUS F IRST SECOND THIRD I PERIOD PERIOD PERIOD I OUTAGE I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK~*LINE 1-RC-506 FIG NO A-41 070800 1-RC-506-32S PIPE TO ELBQl 8-J 89.40 PT 1 2-3-4 070900 1-RC-506-33S ELBOU TO PIPE 8-J 89.40 PT 1 2-3-4 071000 1-RC-506.348 PIPE TO VALVE 8-J 89.40 PT 1-2-3-4-071100 1-RC.506-35S VALVE TO PIPE 8 J 89.40 PT 1C 2 C 3 X 4 071200 1-RC-506-36F PIPE TO TEE 8-J 89.21 PT 1 2-3-4-LINE 1-RC-507 FIG NO A-42 071300 1-RC-507-01S REDUCER TO ELBOU 8-J 89.40 PT 2-3-4-071400 1-RC-507-02S ELBSI TO PIPE 8-J 89.40 PT 1-2-3-4 DATE: 11/15/95 REVISIOH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAH CLASS'I ALL STATUS COMPONENTS PAGE: 91 REACTOR COOLANT SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION FIRST PERIOD IHSPEC'TIOH INTERVAL I ASME I SEC.XI I CATGY HDE I ITEM NO METH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I-I OUTAGE-1 2 3 4 1 2 3 I IHSTRUCTIOHS iiCAL I BRAT ION BLOCK**LIHE 1-RC-507 FIG HO A-42 071500 1.RC-507-03S PIPE TO CROSS 8-J 89.40 PT 1-2-3-4 071600 1-RC-507-048 CROSS TO REDUCER 8-J 89.40 PT 1C 2 C 3X 4 071700 1-RC-507-05S CROSS TO REDUCER 8-J 89.40 PT 1C 2 C 3 X 4 071800 1-RC-507.06S CROSS TO PIPE CONT.L2 8-J 89.40 PT 1 2-3-4 C X 071900 1-RC-507-07S PIPE TO ELBOM COHT.L2 8-J 89.40 PT 1-2 3-4-072000 1-RC-507-OBF ELBSI TO PIPE CONT.L2 8-J 89.40 PT 1 2-3-4 072100 1-RC.507-09S PIPE TO VALVE CONT.L2 8-J 89.40 PT 1 2-3.4 C X DATE: 11/15/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COHPONEHTS PAGE: 92 REACTOR COOLANT SYSTEM SUHHARY EXAMINATION AREA NUHBER IDENT IF ICATION INSPECTIOH INTERVAL I FIRST ASHE I PER IOD SEC.XI I CATGY HDE I ITEH NO HETN I 1 2 3 PLAH STATUS SECOND THIRD I PERIOD PERIOD I I OUTAGE-----t 1 2 3 4 1 2 3 I INSTRUCTIONS
~*CALIBRATIOH BLOCK**LINE 1-RC-507 FIG NO A-42 072200 1-RC-507-10S VALVE TO PIPE CONT.L2 8-J 89.40 PT 1-2-3-4 072300 1-RC-507-11S PIPE TO VALVE 8-J 89.40 PT 1 2-3-4 C 072400 1-RC.507-128 VALVE TO PIPE 8-J 89.40 PT 1-2-3-4 C 072500 1-RC-507-13S PIPE TO ELBOW 89.40 2-3-4-8-J PT 1 072600 1-RC-507-14S ELBOH TO PIPE 8-J 89.40 PT 1-2-3-4-072700 1-RC-507-14S-PS PIPE SUPPORT 8-K-1 PT 1 810.10 2-3.4 072800 1-RC-507-158 PIPE TO ELBOM 8-J 89.40 PT 1 2-3 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLAHI'NIT 1 IHSERVICE INSPECTION LOHG TERN PLAN CLASS 1 ALL STATUS CONPONEHTS PAGE: 93 REACTOR COOLANT SYSTEN SUNMARY EXAMINATION AREA NUNBER IDENI'I F ICATION INSPECTION INTERVAL I FIRST ASHE I PERIOD SEC.XI I CATGY HDE ITEN NO NETH I 1 2 3 PLAN 81'ATUS SECOND THIRD PERIOD PERIOD OUTAGE---I 1 2 3 4 1 2 3 I INSTRUCTIONS i*CALIBRATION BLOCK**LINE 1-RC-507 FIG NO A-42 072900 1-RC-507-16F ELBOM TO PIPE 8-J 89.40 PT 1 2-3-4 073000 1-RC-507-17S PIPE TO TEE 8-J 89.40 PT 1 2-3-4 073100 1-RC-507-18S TEE TO PIPE 8-J 89.40 PT 2 3-4-C 073200 1-RC-507-19S PIPE TO VALVE 8-J 89.40 PT 1-2-3-4-073300 1-RC-507-20S VALVE TO PIPE 8-J 89.40 PT 1 2-3-4-073400 1-RC-507-21S PIPE TO FLANGE 89.40 2-3-4-8-J PT 1 073450 1-RC-507-21S-FB FLANGE BOLTING CONT.L2 8-G-2 87.50 VT-1 1 2-3-4 X DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UHIT 1 IHSERVICE INSPECTION LOHG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 94 REACTOR COOLANT SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION PLAN STATUS SECOND PERIOD INSPECTION IHTERVAL I F IRST ASME PERIOD SEC.XI I CATGY NDE I 0 U T A G E ITEM NO METH I 1 2 3 1 2 3 4 THIRD I PERIOD-I I 1 2 3 I INSTRUCTIOHS
- ~CALIBRATION BLOCK**LINE 1-RC-507 FIG NO A-42 073500 1-RC-507-22S TEE TO PIPE 8-J 89.40 PT 1 2-3-4-C 073600 1-RC.507-23S PIPE TO MANIFOLD 8-J 89.40 PT 1 2-3-4 C 073700 1-RC-507-24S MAHIFOLD TO PIPE 8-J 89.40 PT 1 2-3-4 073800 1-RC-507-25S PIPE TO ELBON 8-J 89.40 PT 1 2-3-4 073900 1-RC-507-26S ELBON TO PIPE 8-J 89.40 PT 1-2-3-4 074000 1-RC-507-27F PIPE TO REDUCER 8-J 89.21 PT 2-3-4-LINE 1-RC-508 FIG NO A-43 074100 1-RC.508.01S REDUCER TO TEE 89.40 2-3.4-BJPT1 DATE: 11/15/95 REV I S I OH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 95 REACTOR COOLAHT SYSTEM
SUMMARY
EXAMIHATIOH AREA HUMBER IDENTIFICATION INSPECTION INTERVAL I ASME I SEC.XI I CATGY HDE ITEM NO METH I 1 PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD-0 U T A G E-----I 2 3 1 2 3 4 1 2 3 I IHSTRUC'I IONG~~CALIBRATIOH BLOCK~*LINE 1-RC-508 FIG HO A-43 074200 1-RC-508-02S REDUCER TO TEE 8-J 89.40 PT 1C 2 C 3 X 4 074300 1-RC-508-03S TEE TO PIPE 8 J 89.40 PT 1 2-3-4-074400 1-RC-508-04S PIPE TO TEE 8 J 89.40 PT 1 2-3-4-074500 1-RC-508-05S TEE TO REDUCER 8-J 89.40 PT 1-2-3-4-074600 1-RC-508 06S TEE TO PIPE 8 J B9.40 PT 1 2.3-4 C 074700 1-RC-508 07S PIPE TO ELBOM 8-J 89.40 PT 1 2-3-4.074800 1-RC-508-08S ELBml TO PIPE 8-J 89.40 PT 1 2.3-4 DATE: 11/15/95 REVISION: 0 COOK HUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 96 REACTOR COOLANT SYSTEM
SUMMARY
EXAHIHATIOM AREA NUMBER IDENT IF I CAT I OH INSPECTION INTERVAL I FIRST ASHE PERIOD SEC.XI I CATGY HDE I ITEN HO METH/1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD (I 0 U T A G E------I 1 2 3 4 1 2 3 I IHSTRUCTIOHS
- CALIBRATIOH BLOCK~~LIME 1-RC-508 FIG HO A-43 074900 1-RC-508-09S PIPE TO ELBOH 8 J 89.40 PT 1.2-3-4 075000 1-RC-508 10S ELBSI TO PIPE 8-J 89.40 PT 1C 2 C 3 X 4 075100 1-RC-508-11S PIPE TO ELBOH 8-J 89.40 PT 1 2-3-4 075200 1-RC-508-12S ELBOH TO PIPE 8-J 89.40 PT 1-2.3-4-075300 1-RC-508-13S PIPE TO VALVE 8-J 89.40 PT'I 2-3-4 075400 1.RC-508.14S VALVE TO PIPE 8-J 89.40 PT 1 2-3-4-075500 1-RC-508-15S PIPE TO VALVE 8-J 89.40 PT 1 2-3-4 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 97 REACTOR COOLANT SYSTEM
SUMMARY
EXAMI HAT IOH AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I FIRST ASME I PERIOD SEC.XI I CATGY NDE I ITEM NO METH I 1 2 3 PLAN STATUS SECOND THIRD I PERICO PERIOD-I OUTAGE-1 2 3 4 1 2 3 I INSTRUCTIONS
~*CALIBRATION BLOCK~*LINE 1-RC-508 FIG NO A-43 075600 1-RC-508-16S VALVE TO PIPE 8-J 89.40 PI'C 2 C 3 X 4 076400 1-RC-508-'l7S PIPE TO ELBOW CONT.L3 89.40 2-3-4-8-J PT 1 C X 076500 1-RC-508-18S ELBOW TO PIPE COHT.L3 8-J 89.40 PT 1 2-3 4-076600 1-RC-508-19S PIPE TO TEE COHT.L3 89.40 2-3-4--~8-J PT 1 C X 076700 1-RC-508-20S TEE TO PIPE 89.40 2 C 3X 4.8-J PT 1 C 076800 1-RC-508.21S PIPE TO ELBOW 89.40 2-3-4-8-J PT 1 076900 1-RC-508.22S ELBOW TO PIPE 8-J 89.40 PT 1 2-3-4 DATE: 11/15/95 REVI S ION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPOHEHTS PAGE: 98 REACTOR COOLANT SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT I F I CAT I OH IHSPECT ION INTERVAL I FIRST ASME PERIOD SEC.XI I CATGY HDE I ITEM HO METH i 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD-I OUTAGE------I 1 2 3 4 1 2 3 INSTRUCTIONS
- CALIBRATIOH BLOCK~*LINE 1-RC-508 FIG NO A-43 077000 1-RC-508-23S PIPE TO ELBOW 8-J 89.40 PT 1 2-3-4-077100 1-RC-508-24S ELBOW TO PIPE 8-J 89.40 PT 1-2-3-4-077200 1-RC-508-25S PIPE TO VALVE 8-J 89.40 PT 1 2-3-4-C 077300 1-RC-508-26S VALVE TO PIPE 8-J 89.40 PT 2-3-4 077400 1-RC-508-27S PIPE TO FLANGE 8-J 89.40 PT 1 2-3-4 077450 1.RC-508.27S-FB FLANGE BOLTING CONT.L3 8-G-2 87.50 VT-1 1 2-3-4 C X 077500 1-RC-508-28S TEE TO PIPE CONT.L3 8-J 89.40 PT 1-2-3-4 C C X DATE: 11/15/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPONENTS PAGE: 99 REACTOR COOLANT SYSTEH SUHMARY EXAHINATION AREA HUHBER IDENT I F ICATION IHSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE I ITEN NO NETH I 1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD OUTAGE I 2 3 1 2 3 4 1 2 3 I INSTRUCT IONS*~CALIBRATION BLOCK**LINE 1-RC-508 FIG NO A-43 077600 1-RC.508-29S PIPE TO HANIFOLD CONT.L3 8-J 89.40 PT 1 2-3-4-077700 1-RC-508-30S HANIFOLD TO PIPE 8-J PT 89.40 1-2-3-4-077800 1-RC.508-31S PIPE TO ELBOW 89.40 2-3-4 8-J PT 1 C 077810 1-RC-508-32S ELBOW TO PIPE 89.40 2-3-4-8-J PT 1 077820 1-RC-508-33S PIPE TO ELBOW 8-J 89.40 PT 1 2-3-4 077830 1-RC-508.34S ELBOW TO PIPE 89.40 2-3-4-8-J PT 1 077840 1-RC-508-35S PIPE TO ELBOW 89.40 2-3-4-8-J PT 1 DATE: 11/15/95 REVI S ION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LOHG TERM PLAN CLASS 1 ALL STATUS COMPOHENTS PAGE: 100 REACTOR COOLAHT SYSTEM
SUMMARY
EXAMI HAT I ON AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE I ITEM NO METH i 1 PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD-OUTAGE-2 3 1 2 3 4 1 2 3 I I I I INSTRUCTIONS I**CALIBRATIOH BLOCK**LIHE'I-RC.508 FIG HO A-43 077850 1-RC-508-36S ELBOW TO PIPE 8-J 89.40 PT 2-4-C 077860 1-RC.508.37F PIPE TO REDUCER 8-J 89.40 PT 1 2-3-4.LINE 1-RC-509 FIG NO A-44 077900 1-RC-509-01F BRANCH CONNECTION TO PIPE 8-J 89.40 PT 1 2-3-4-078000 1-RC-509-02S PIPE TO ELBOW 8-J 89.40 PT 1-2-3-4-078100 1-RC-509.03S ELBOW TO PIPE 8-J 89.40 PT 1 2-3-4 078200 1-RC-509-04S PIPE TO ELBOW 8-J 89.40 PT 2-3-C 078300 1-RC-509.05S ELBOW TO PIPE 89.40 2-3-4 B.J PT 1-DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLAHT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 101 REACTOR COOLANT SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION PLAN STATUS FIRST SECOND PERIOD PERIOD INSPECTION INTERVAL I ASHE I SEC~XI I CATGY NDE I 0 U T A G E ITEM NO METH i 1 2 3 1 2 3 4 THIRD I PERIOD I I-----I 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK~*LINE 1-RC-509 FIG NO A-44 078400 1-RC-509.06S PIPE TO ELBSI 8-J 89.40 PT 1 2-3-4 078500 1-RC-509.07S ELBON TO PIPE B-J 89.40 PT 1 2-3-4-078600 1-RC-509-08S PIPE TO ELBON B-J 89.40 PT 1 2-3-4 078700 1-RC-509.09S ELBOW TO PIPE 8-J 89.40 PT 1 2-3-4 C 078800 1-RC-509-10S PIPE TO VALVE 8-J 89.40 PT 1 2-3-4 078900 1-RC-509.11S VALVE TO PIPE 8-J B9.40 PT 1 2-3-4 079000 1-RC-509-12S PIPE TO VALVE 8-J 89.40 PT 1 2-3 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPOHENTS PAGE: '102 REACTOR COOLANT SYSTEM
SUMMARY
EXAMINATION AREA NUHBER IDENT I F ICATION IHSPEC'TIOH INTERVAL I ASME I SEC.Xi I CATGY HDE I ITEM NO METH i 1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD-I-0 U T A G E------I 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- CAL I BRAT ION BLOCK**LINE 1-RC-509 FIG NO A-44 079100 1-RC-509-13S, VALVE TO PIPE 8-J 89.40 PT 1-2-3-4 C 079200 1-RC-509.14F PIPE TO ELBOW 8-J 89.40 PT 1 2-3.4 079300 1-RC.509-15S ELBOW TO PIPE 8-J 89.40 PT 1.2-3-4 079400 1-RC-509-16S PIPE TO TEE 89.40 2 3-4-8-J PT 1 079500 1-RC-509-17S TEE TO REDUCER 8-J 89.40 PT 1 2-3-4-079600 1-RC-509-1BS TEE TO PIPE 8-J 89.40 PT 1 2-3-4 C 079900 1-RC-509-19S PIPE TO MANIFOLD 8-J 89.40 PT 1-2-3-4 DATE: 11/15/95 REVISION: 0 COOk NUCLEAR PLANT UHIT 1 IHSERVICE INSPECTION LONG TERM PLAH CLASS 1 ALL STATUS COMPONENTS PAGE: 103 REACTOR COOLANT SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL i ASME I SEC.XI I CATGY HDE I ITEM NO METH I PLAH STATUS FIRST SECOND PERIOD PERIOD-OUTAGE-1 2 3 1 2 3 4 THIRD I PERIOD I-----I 2 3 INSTRUCTIONS
- ~CALIBRATION BLOCK**LINE 1-RC-509 FIG NO A-44 080000 1-RC-509-20S MANIFOLD TO PIPE 8-J 89.40 PT 1 2-3-4 080100 1-RC.509-21S PIPE TO ELBSI 8-J 89.40 PT 1 2-3-4 C 080200 1-RC-509-22S ELBON TO PIPE 8-J 89.40 PT 1-2-3-4 080300 1-RC-509-23F PIPE TO TEE CONT.L3 8-J 89.40 PT 1 2 3-4-080400 1-RC-509-24S TEE TO REDUCER CONT.L3 8-J 89.40 PT 1 2-3-4-C 080500 1-RC-509-25S TEE TO PIPE COHI'.L3 8-J 89.40 PT 1---C 2-3-4 C X 080600 1-RC-509-26S PIPE TO ELBON CONT.L3 8 J 89.40 PT 1 2-3.4-C X BATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPOHENTS PAGE: 104 REACTOR COOLAHT SYSTEH SUHMARY EXAHI NATION AREA NUHBER IDENT IF ICATION INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE I ITEH NO NETH PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD OUTAGE I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- ~CALIBRATIOH BLOCK~~LINE 1-RC-509 FIG NO A-44 080700 1-RC-509-27S ELBOM TO PIPE CONT~L3 8-J 89.40 PT 1-2-3.4 080800 1-RC-509-28S PIPE TO FLANGE CONT.L3 B-J B9.40 PT 1-2-3-4 080850 1-RC-509-28S-FB FLANGE BOLTIHG CONT.L3 8-G-2 87.50 VT-1 1-2-3-4-C X 080900 1-RC-509-29S
~FLANGE TO PIPE 1 8-J 89.40 PT 1C 2 C 3 X 4-081000 1-RC-509.29S.A PIPE TO COUPLIHG 8-J 89.40 PT 1-2-3.4 081100 1-RC-509-29S-B COUPLIHG TO PIPE 8-J 89.40 PT 1C"-2 C 3 X 4-081500 1-RC-509-30S PIPE TO ELBOM B-J 89.40 PT 1 2-3-4 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPOHENTS PAGE: 105 REACTOR COOLANT SYSTEH SUHHARY EXAMINATIOH AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I F IRST ASHE I PERIOD SEC.XI I CATGY NDE I ITEN NO NETH J 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I I OUTAGE------I 1 2 3 4 1 2 3 INSTRUCTIOHS
- CALIBRATION BLOCK**LINE 1-RC-509 FIG NO A-44 081600 1-RC-509-31S ELBSI TO PIPE 8-J 89.40 PT 1 2-3-4-081700 1-RC-509.32S PIPE TO ELBOM 8-J 89.40 PT 2-3-4-081800 1-RC-509-33S ELBOU TO PIPE 8-J 89.40 PT 1 2-3-4-081900 1-RC-509-34S PIPE TO VALVE 8-J 89.40 PT 1 2-3-4-082000 1-RC-509-35S VALVE TO PIPE 8-J 89.40 PT 1 2-3-4 082100 1-RC-509-36F PIPE TO TEE 8-J PT 89.21 1 C 2 C 3X 4 LINE 1-RC-510 FIG NO A-45 082200 1-RC-510-01S REDUCER TO ELBOM 89.40 2-3-4 8-J PT 1 DATE: 11/15/95 REVISIOH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 106 REACTOR COOLANT SYSTEM
SUMMARY
EXAHI HAT I ON AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I ASHE I SEC.Xl CATGY HDE I ITEM NO METH I PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I I-0 U T A G E------I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS aiCALIBRATION BLOCKaa LIHE 1-RC-510 FIG NO A-45 082300 1-RC-510-02S ELBOW TO PIPE 8-J 89.40 PT 1 2-3-4-082400 1-RC.510.03S PIPE TO CROSS 8-J 89.40 PT 1C 2-3-4 082500 1-RC-510-04S CROSS TO REDUCER 8 J 89.40 PT 1C 2-3-4-082600 1-RC-510'5S CROSS TO REDUCER 8-J 89.40 PT 1 2-3-4 082700 1-RC-510-06S CROSS TO PIPE 8-J 89.40 PT 1-2-3-4 082800 1-RC-510.07S PIPE TO ELBOW 89.40 2-3-4-8 J P'I 1 082900 1-RC-510-OBF ELBOW TO PIPE 8 J 89.40 PT 1 2-3-4 DATE: 11/15/95 REVI SIOH: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTIOH LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 107 REACTOR COOLAHT SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT IF I CATION FIRST PERIOD INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE I ITEM NO METH (1 2 3 PLAN STATUS SECOND THIRD PERIOD PER I OD-OU T A G E-1 2 3 4 1 2 3 I I I I INSTRUCTIONS
~'CALIBRATION BLOCK*~LINE 1-RC-510 FIG HO A-45 083000 1-RC-510-09S PIPE TO VALVE 8-J 89.40 PT 1 2-3-4 083100 1-RC.510-10S VALVE TO PIPE 8-J 89.40 PT 1-2-3-4-C 083200 1-RC-510-11S PIPE TO VALVE 8-J 89.40 PT 1 2-3-4 083300 1-RC-510-12S VALVE TO PIPE 89.40 2-3-4-8-J PT 1-083400 1-RC-510-13S PIPE TO ELBOW 8-J 89.40 PT 1 2-3-4-083500 1.RC-510-14S ELBOW TO PIPE 8-J 89.40 PT 1 2-3-4-C 083700 1.RC-510-15S PIPE TO ELBOW 8-J 89.40 PT 1-2-3-4 C DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS CONPONEH'IS PAGE: 108 REACTOR COOLANT SYSTEH SUHNARY EXANIHATIOH AREA HUNBER IDENT IF ICATION INSPECTIOH INTERVAL I FIRST ASHE PER IOO SEC'I I CATGY NDE I ITEN NO METH i 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD-t OUTAGE I 1 2 3 4 1 2 3 I IHSTRUCTIOHS
- CALIBRATION BLOCK~~LINE 1-RC-510 FIG HO A-45 083800 1-RC-510-16F ELBOM TO PIPE 89.40 2-3-4-8-J PT 1 083900 1-RC-510-17S PIPE TO TEE 89.40 2-3-4-8-J PT 1 084000 1-RC-510.18S TEE TO PIPE CONT.L4 8-J 89.40 PT 1 2-C 3-X 4-084100 1-RC-510-19S PIPE TO VALVE CONT.L4 8-J 89.40 PT 1 2-C 3-X 4 084200 1-RC.510-20S VALVE TO PIPE CONT.L4 8-J 89.40 PT 1-2-C 3.X 4 084300 1-RC-510-21S PIPE TO FLANGE CONT.L4 8-J 89.40 PT 1---C 2-C 3-X 4 084350 1-RC-510-21S-FB FLANGE BOLTING CONT.L4 8-G-2 87.50 VT-1 1 2-3-4 DATE: 11/15/95 REVISION: 0 COOK HUCLEAR PLAN'I UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 109 REACTOR COOLANT SYS'EM
SUMMARY
EXAHI HAT I OH AREA NUMBER IDENT I F ICATION IHSPECTIOH INTERVAL I ASME I SEC.XI I CATGY HDE I ITEM NO METH PLAN STATUS FIRST SECOHD THIRD I PERIOD PERIOD PERIOD I-0 U T A G E------I 1 2 3 1 2 3 4 1 2 3 IHSTRUC'T IONG<<*CALIBRATIOH BLOCK~i LINE'1-RC-510 FIG NO A.45 084400 1-RC-510-22S TEE TO PIPE CONT.L4 89.40 2-3-4-8-J PT 1 C X 084500 1-RC-510-23S PIPE TO MAHIFOLD 8-J 89.40 PT 1-2-3-4-084600 1-RC-510.24S MANIFOLD TO PIPE 8-J 89.40 PT 1 2 C 3 X 4 084700 1-RC-510.25S PIPE TO ELBSl 8-J PT 1 89.40 2 C 3X 4-084800 1-RC-510.26S ELBOM TO PIPE 8-J 89.40 PT 1 2-3-4 084900 1-RC-510.27F PIPE TO REDUCER 89.21 2-3-4 BJ PT 1 C LINE 1-RC-511 FIG NO A-46 085000 1-RC-511-01F BRANCH CONNECTION TO PIPE 8-J 89.40 PT 1 2-3-4 C DATE: 11/15/95 REV I S I OH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPOHEHTS PAGE: 110 REACTOR COOLANT SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I FIRST ASME PER IOD SEC.XI I CATGY HDE I ITEM NO METH I 1 2 3 PLAN STATUS SECOHD THIRD PERIOD PERIOD I 0 U T A G E I 1 2 3 4 1 2 3 I INSTRUCTIOHS
~~CALIBRATIOH BLOCK**LINE 1 RC-511 FIG NO A-46 085100 1-RC-511-02S PIPE TO ELBOW 8-J 89.40 PT 1 2-3 4-085200 1-RC-511-03S ELBOW TO PIPE 8-J 89.40 PT 1 2-3-4 085300 1-RC-511-04S PIPE TO ELBOW 89.40 2-3-4 B-J PT 1 085400 1-RC-511-05S ELBOW TO PIPE 8-J 89.40 PT 1 2-3-4-C 085500 1-RC-511-06S PIPE TO ELBOW 8-J 89.40 PT 1-2-3-4-085600 1-RC-511-07S ELBOW TO PIPE 8-J B9.40 PT 1 2-3-4-085700 1-RC-511-OBF PIPE TO ELBOW CONT~L4 B.J 89.40 PT 1 2.C 3-X 4 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPONENTS PAGE: 111 REACTOR COOLANT SYSTEM SUHHARY EXAMINATION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I F IRST ASME PERIOD SEC.XI I CATGY NDE ITEH No HETM I 1 2 PLAN STATUS SECOND THIRD I PERIOD PERIOD I-I 0 U T A 0 E------I 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK**LINE 1-RC-511 FIG NO A-46 085800 1-Rc-511-09S ELBOW TO PIPE cour.L4 8-J 89.40 PT 1 2-3-4 C X 085900 1-RC.511-10S PIPE TO VALVE CONT.L4 8-J 89.40 Pr 1 2-C 3--.X 4-086000 1-Rc-511-11S VALVE TO PIPE CONT.L4 8-J 89.40 PT 1-2-C 3-X 4 C 086100 1-Rc-511-12S PIPE To VALVE CONT.L4 89.40 2-3-4 8-J PT 1 C X 086200 1-Rc-511-13S VALVE TO PIPE cour.1.4 8-J Pr 89.40 2-3-4 C X 086300 1-Rc-511-14S PIPE TO ELBOW 8-J 89.40 PT 2-3-4 086400 1-RC-511-15F ELBOW TO PIPE 89.40 2 C 3 X 4 8-J PT 1---C DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTIOH LONG TERN PLAN CLASS 1 ALL STATUS CONPOHEHTS PAGE: 112 REACTOR COOLANT SYSTEN SUNNARY EXANI HAT ION AREA NUNBER IDENT IF I CATION INSPECTION INTERVAL I FIRST ASNE PER I OD SEC.XI I CATGY HDE I ITEN HO NETH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I I 0 U T A G E-1 2 3 4 1 2 3 I INSTRUCTIOHS
- CALIBRATION BLOCK**LINE 1-RC-511 FIG HO A-46 086700 1-RC-511-16S PIPE TO TEE 8-J 89.40 PT 1C 2 C 3 X 4 086800 1-RC-511-17S TEE TO REDUCER 8-J 89.40 PT 1 2-3-4-086900 1 RC.5'11-18S TEE TO PIPE 8-J 89.40 PT 1-2-3-4 087000 1-RC-511-19S PIPE TO NAHIFOLO 8-J 89.40 PT 1 2-3.4 087100 1-RC-511-20S NAHIFOLD TO PIPE 89.40 2.3-4-8-J PT 1 087200 1-RC-511-21S PIPE TO ELBOW B-J,, 89.40 PT 1 2-3-4-C 087300 1-RC-51'1-22S ELBOW TO PIPE 8-J 89.40 PT 1 2-3-4 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONEH'IS PAGE: 113 REACTOR COOLANT SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT IF I CATION INSPECTION INTERVAL I FIRST ASHE I PERIOD SEC.Xl CATGY NDE ITEM NO METH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I OUTAGE------I 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK**LIHE 1-RC-511 FIG NO A-46 087400 1-RC-511-23F PIPE TO TEE 89.40 2-3-4-8-J PT 1 087500 1-RC-511-24S TEE TO REDUCER 8-J 89.40 PT 1-2-3-4-087600 1.RC.511-25S TEE TO PIPE 89.40 2-3.4-8-J PT 1 087700 1-RC.511-26S PIPE TO ELBOW 8-J 89.40 PT 1-2-3-4 C 087800 1-RC-511-27S ELBOW TO PIPE 8-J 89.40 PT 1 2-3-4 087900 1-RC-511-28S PIPE TO FLANGE 8-J 89.40 PI'2-3-4 087950 1-RC-511-28S-FB FLANGE BOLTING CON'T.L4 8-G-2 87.50 VT-1 1 2 3.4 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECT'IOH LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 114 REACTOR COOLANT SYSTEM~
SUMMARY
EXAMINATION AREA NUMBER IDEHT IF I CAT I OH INSPECTION INTERVAL I ASME I SEC~XI I CATGY NDE ITEM NO METH I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD--OUTAGE-1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK**LINE 1-RC-511 FIG NO A-46 088000 1-RC-511-29S FLANGE TO PIPE 8 J B9.40 PT 1 2-3-4 088100 1-RC-511-30S PIPE TO ELBOW B.J 89.40 PT 1-2-3-4 088200 1-RC-511-31S ELBOW TO PIPE 8 J 89.40 PT 1C 2-3.4 088300 1-RC-5'1'1-32S PIPE TO ELBOW 8-J PT 89.40 2-3-4-088400 1.RC-511-33S ELBOW TO PIPE 8'89.40 PT 1 2-3-4-088500 1-RC-511-34S PIPE TO VALVE 8-J 89.40 PT 1 2.3-4-088600 1-RC-511-35S VALVE TO PIPE 8-J 89.40 PT 1 2-3-4 DATE: 11/15/95 REVISIOM: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTIOH LONG TERH PLAN CLASS 1 ALL STATUS COMPONENTS PAGE 115 REAC'TOR COOLANT SYSTEH
SUMMARY
EXAHINAT I OH AREA NUHBER IDENT I F I CAT I OH IHSPEC'TION INTERVAL I ASHE I SEC.Xl CATGY NDE I ITEN NO METH/1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I 0 U T A G E I 2 3 1 2 3 4 1 2 3 INSTRUCTIONS
- CALIBRATION BLOCK**LIME 1-RC-511 FIG MO A-46 088700'I-RC-511-36F PIPE TO TEE B.J PT B9.21 1 C 2 C 3 X 4 DATE: 12/20/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERN PLAH CLASS 1 ALL STATUS COHPONEHTS PAGE: 116 SAFETY INJECTION SYSTEH SUHHARY EXAHINAT I OH AREA NUHBER IDENT IF I CATION INSPECTION INTERVAL I FIRST ASHE PER IOO SEC.XI I CATGY NDE ITEN NO NETH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERICO-OUTAGE-1 2 3 4 1 2 3 I I I INSTRUCT IOHS<<<<CALIBRATION BLOCK>>*LIHE 1-SI-21 F G HO A-47 088900 1-Sl-21-26F VALVE TO ELBOll 8-J 89.11 PT 1-UT 2-3-4-<<*3378029 (S-SS-140-.81)**
089200 1.SI-21-26F-HL 1 THROUGH 4 HANGER LUG 8-K-1 PT 810.10 1 C 2-C 3-X 4 089400 1-SI-21-27S ELBOll TO PIPE 8-J 89.11 PT 1 UT 2-3-4-**3378029 (B-SS-140-.81)<<>>
089500 1.SI.21.27S.HL 1 THROUGH 4 HANGER LUG BK1 PT 1-810~10 2-3-4 C 089900 1-SI-21-28S PIPE TO ELBOM 8-J 89.11 PT 1'-UT 2-3.4-<<*3378029 (S-SS-140-.81)**
090000 1-SI-21-29S ELBSJ TO PIPE 8-J 89.11 PT 1-UT 2-3-4**3378029 (S-SS-140-.81)*>>
090100 1.SI.21.30S PIPE TO ELBOW 8-J 89.11 PT 1 UT 2-3-4<<*3378029 (S-SS-140-.81)**
DATE: 11/'15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS CONPOHENTS PAGE: 117 SAFETY IHJECTION SYSTEH SUHHARY EXAHIHATION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I FIRST ASHE PERIOD SEC.XI I CATGY HDE I ITEM HO NETH[1 2 3 PLAN STATUS SECOHD THIRD PERIOD PERIOD-OUTAGE-----I 1 2 3 4 1 2 3 I INSTRUCT IOHS<<<<CALIBRATION BLOCK**LINE 1-SI-21 FIG NO A-47 090200 1-SI-21-31S ELBOM TO ELBOM 8-J 89.11 PT 1 UT 2-3-4-**3378029 (B-SS-140..81)<<*
090300 1-SI-21-32F ELBOM TO PIPE B-J 89.11 PT 1-Ur 2-3-4<<*3378029 (B-SS-140-.81)**
090400 1-SI-21-34S PIPE TO ELBSI 8-J B9.11 P'I 1 UT 2-3-4<<<<3378029 (B-SS-140-.81)**
090500 1-SI-21-35S ELBOM TO TEE ANNULUS B.J PT 1 89.11 UT 2.3-4-C C X**3378029 (B-SS-140-.81)<<<<
090600 1-SI-21-37S TEE TO REDUCER B-J 89.11 PT 1-UT 2-3 4-**3378029 (B-SS-140-.81)**
090700 1-$1-21-38S REDUCER TO PIPE B-J 89.11 PT 1 UT 2-3-4**3378028 (6-SS-160-.71)**
090800 1-SI-21-39S TEE TO REDUCER ANNULUS B-J B9.11 PT 1 UT 2-3-4 C C X**3378029 (B-SS-'l40-.81)**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAH CLASS 1 ALL STATUS COHPONENTS PAGE: 118 SAFETY INJECTION SYSTEM SUHMARY EXAMINATION AREA NUHBER IDENTIFICATION INSPECT IOH INTERVAL I F IRST ASHE I PERICO SEC.XI I CATGY NDE ITEM NO METH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERICO I-I 0 U T A G E------I 1 2 3 4 1 2 3 INSTRUCTIONS
091000 1-SI-21.41S PIPE TO ELBOW 8-J 89.11 PT 1 UI'-3-4<<*3378028<6-SS-160-.71)**
LINE 1-Sl-22 FIG NO A-48 091100 1-SI-22-01F ELBOW TO ELBOW 8-J 89.11 PT 1 UT 2-3-4-<<<<3378028 (6-SS-160-.71)<<<<
091200 1-SI-22-02S ELBOW TO PIPE 8-J 89.11 PT 1 UT 2-3-4<<<<3378028 (6-SS-160-.71)<<*
091300 1-SI.22.03S PIPE TO ELBOW CONT.L2 8-J 89.11 PT 1 UT 2-3-X 4-C C**3378028 (6-SS-160-.71)<<*
091400 1-SI-22-04S ELBOW TO PIPE 8-J 89.11 PT 1 UI'-3-4**3378028<6-SS-160-.71)**
091500 1-SI-22-OSF PIPE TO COLLAR 810.10 2-3-4 8-K-1 PT 1 WELD IHACCESSIBLE FOR EXAMIHATION DUE TO COLLAR CONFIGURATION.
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPOHEH'IS PAGE: 119 SAFETY INJECTION SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT I F I CAT IOH INSPECTION INTERVAL I ASME I SEC.XI I CATGY HDE ITEM HO METH I PLAN STATUS FIRST SECOND PERIOD PERIOD THIRD PERIOD----OUTAGE 1 2 3 1 2 3 4 1 2 3 I I I I INSTRUCTIONS I>>>>CAL I BRAT I OH BLOCK>>>>LINE 1 SI-22 FIG NO A-48 091600 1-SI-22-06F COLLAR TO PIPE B-K-1 PT 1 C 810.10 2 C 3 X 4 100K UT HOT FEASIBLE DUE TO WELD CONFIGURATION.
091700 1-S I-22-07F PIPE TO ELBOW 8 J 89.11 PT 1-ur 2-3-4-**3378028 (6-SS-160-.71)**
091800 1.81-22-08S ELBOW TO PIPE 8-J PT 1 B9.11 UT 2-3-4**3378028 (6-SS-160-.71)**
091900 1-81-22-09S PIPE TO ELBOW 8-J 89.11 PT 1-ur 2-3-4-**3378028 (6-SS-160-.71)*>>
092000 1-81-22-10S ELBOW TO PIPE B-J 89.11 P T 1-UT 2-3 4**3378028 (6-SS-160..71)**
092100 1-SI-22-11F PIPE TO ELBOW CONT.L2 8-J PT 1 89.11 UT 2-3-4 C C X**3378028 (6-SS-160-.71)**
092200 1-S I-22-12S ELBOW TO PIPE B-J PT 1 B9 11 UT 2-3-4>>>>3378028 (6-SS-160-.71)**
0 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPONENTS PAGE: 120 SAFETY INJECTION SYSTEH SUHHARY EXAHINATION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE I ITEH NO HETH PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I I 0 U T A G E I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- >>CALIBRATION BLOCK<<<<LINE 1-SI-22 FIG NO A-48 092300 1-SI-22-14S PIPE TO ELBOW B J 89.11 PT 1 Ul'-3-4.<<<<3378028 (6-SS-160-.71)**
092400 1-SI-22-15S ELBOW TO PIPE B.J PT 1 B9.11 UT 2.3-4-<<*3378028 (6-SS.160-.71
)**092500 1-SI-22-16F PIPE TO ELBOW B-J 89.11 PT 1-UT 2-3-4-<<>>3378028 (6-SS-160-.71)*>>
092600 1-SI-22-17S ELBOW TO PIPE CONT.L2 8-J 89.11 PT 1---C UT 2---C 3-X 4**3378028 (6-SS-160-.71)<<*
092700 1.SI-22-18F PIPE TO.VALVE BJ PT 89.11 UT 2-3-4<<*3378028 (6-SS-160-.71)"*
092800 1-SI-22-19F VALVE TO ELBOW 8-J 89.11 PT 1-UT 2-3-4-**3378028 (6-SS-160-.71)<<<<
092900 1-SI-22-20F ELBOW TO BRANCH CONNECTION 8-J 89.11 PT 1 UT 2-3-4-**3378028 (6-SS-160..71)**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 121 SAFETY INJECTION SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I FIRST ASME PERIOD SEC~Xl CATGY HDE I ITEM NO METH I 1 2 3 PLAN STATUS SECOHD TMIRD I PERIOD PERIOD I OUTAGE I 1 2 3 4 1 2 3 I INSTRUCTIONS
093100 1-S I-23-01F-A PIPE TO ELBOW 8-J 89.11 PT 1.UT 2-3-4-*~3378028 (6-SS-160-.71)**
093200 1-SI-23-02F ELBOW TO ELBOW ANNULUS 8-J 89.11 PT 1C UT 2-3-X 4 C.**3378028 (6-SS-160-.71)**
093300 1-SI.23-03S ELBOW TO PIPE B-J PT 1 89.11 UT 2-3-4<<*3378028 (6-SS.160-.71)**
093400 1-SI-23-04F PIPE TO COLLAR 810.10 2-3-4 8-K-1 PT 1 WELD INACCESSIBLE FOR EXAMIHATIOH DUE TO COLLAR CONFIGURATION.
093500 1-Sl-23-05F COLLAR TO PIPE CONT.L3 B-K-1 PT 1 B10.10 2-4 C 100K UT NOT FEASIBLE DUE TO WELD CONFIGURATION.
093600 1-SI-23-06F PIPE TO ELBOW 8-J 89.11 PT 1-UT 2-3-4-**3378028 (6-SS-160..71)*
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COMPOHENTS PAGE: 122 SAFETY IHJECTION SYSTEH SUNMARY EXANI HAT ION AREA NUNBER IDENT IF ICATION INSPECTION INTERVAL I ASNE.I SEC.XI I CATGY NDE I ITEN NO NETH FIRST PERIOD 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I OUTAGE I 1 2 3 4 1 2 3 I INSTRUCTIONS
093800 1-81-23-08S PIPE TO ELBOW 8-J 89.11 PT 1 UT 2-3-4>>*3378028 (6-SS-160-.71)**
093900'I-SI-23-09S ELBOW TO PIPE 8-J 89.11 PT 1-UT 2-3-4**3378028 (6-SS-160-.71)<<*
094000 1-81-23.10F PIPE TO ELBSI BJ PT 1 89.11 UT 2-3-4-**3378028 (6.SS-160..71)**
094100 1-81-23-11S ELBSI TO PIPE 8-J PT 1 89.11 UT 2 C 3X 4 C 3378028 (6-SS-160-.71)**
094200 1-81-23-13S PIPE TO ELBSI 8-J 89.11 PT UT 2-3-4-<<*3378028 (6-SS-160-.71)**
094300 1-81-23-14S ELBOW TO PIPE 8-J 89.11 PT 1 UT 2-3-4-**3378028 (6-SS-160-.71)>>>>
DATE: 11/15/95 REVISIOH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPOHEHTS PAGE: 123 SAFETY INJECTION SYSTEM
SUMMARY
EXAHIHAT I OH AREA NUMBER IDENT IF I CATION INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE I ITEM HO METH I PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I-0 U T A G E------I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
094500 1-SI-23.16S ELBOW TO PIPE CONT.L3 8-J 89.11 PT 1---C UT 2---C 3-X 4**3378028 (6-SS-160..71)**
094600 1-SI-23-17F PIPE TO VALVE 8-J 89.11 PT 1 UT 2-3-4**3378028 (6-SS-160-.71)**
094700 1-SI-23-18F VALVE TO ELBOW B-J 89.11 PT 1 UT 2-3-4-**3378028 (6-SS-160-.71)~*
094800 1-SI-23-19F ELBOW TO BRANCH COHNECTION 8-J B9.11 PT 1-UT 2-3-4**3378028 (6-SS-160-.71)**
LINE 1-SI-25 FIG NO A-50 095000 1-SI-25-22F VALVE TO ELBOW B-J B9.11 PT 1 UT 2-3-4-**3378029 (B-SS-140-.81)**
095100 1-SI-25-23S ELBOW TO PIPE B-J B9.11 PT 1 UT 2-3.4-**3378029 (8-SS-140-.81)**
DATE: '12/20/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE IHSPECTIOH LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 124 SAFETY INJECTION SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT I F I CAT I OH INSPECTION INTERVAL I ASHE I SEC~XI I CATGY NDE ITEM NO METH I 1 F IRST PERIOD 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD-I OUTAGE------I 1 2 3 4 1 2 3 I INSTRUCT I DMS~~CALI BRAT ION BLOCK~~LIHE 1-SI.25 FIG NO A-50" 095200 1-SI-25-23S HL'I THROUGH 4 HANGER LUG ANNULUS 8-K-1 PT 810.10 2-3-4-C C 095300 1-Sl-25-23S-HL 5 THROUGH 8 HANGER LUG ANNULUS B-K-1 PT 810.10 2-3-4-096000 1-SI-25-24F PIPE TO ELBOH B-J 89.11 PT UT 2-3-4-**3378029 (8 SS-140-.81)**
096100 1-SI-25-25S ELBOtl TO PIPE.8-J 89.11 PT UT 1 C 2 C 4-**3378029 (B.SS-140-.81)**
096200 1-SI-25.26S PIPE TO ELBOH 8 J 89.11 PT UT 2-3-4-~*3378029 (8-SS-140-.81)**
096300 1-SI-25-27S ELBSI TO PIPE B-J 89.11 PT UT 2-3-4-*~3378029 (B-SS-140-.81)*>>
096400 1.SI-25.28S PIPE TO ELBOH 8-J 89.11 PT Ul'.3-**3378029 (8-SS-140-.81)
~*
DATE: 11/15/95 REV I S ION: 0 COOK NUCLEAR PLAN'I UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPONENTS PAGE: 125 SAFETY INJECTION SYSTEH SUNHARY EXAHINATION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I FIRST ASHE I PERIOD SEC.XI I CATGY NDE I--.-0 U T A G E-.ITEH NO HETH (1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS I**CALIBRATION BLOCK<<<<LINE 1-SI-25 FIG NO A-50 096500 1-$1.25-29S ELBOU TO TEE 8-J 89.11 PT 1-UT 2-3 4**3378029 (8-SS-140-.81)<<*
096600 1-SI-25-31S TEE TO REDUCER ANNULUS 8-J 89.11 PT 1---C UT 2---C 3-X 4*<<3378029 (8.SS.140 81)**096700 1-SI.25-32S REDUCER TO PIPE B-J 89.11 PT 1 Ur 2-3-4-*<<3378028 (6-SS-160-.71)*>>
096800 1-SI-25-33S TEE TO REDUCER 8-J 89.11 PT 1 UT 2-3-4<<<<3378029 (8-SS-140-.81)*<<
096900 1-SI-25-34S REDUCER TO PIPE ANNULUS B-J 89.11 PT 1 UT 2-3 4 C C X**3378028 (6-SS-160-.71)**
097000 1-SI-25-35F PIPE TO ELBSI ANNULUS B-J B9.11 PT 1 Ur 2-3-4 C C X<<*3378028 (6.SS-160-.71)**
LINE 1-SI-26 FIG NO A-51 097100 1-SI-26-01F ELBON TO ELBOM B-J 89.11 PT 1 UT 2-3-**3378028 (6-SS-160-.71)>>*
DATE: 11/15/95 REVISIOH: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 126 SAFETY INJECTION SYSTEH SUHHARY EXAHIHATION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL j FIRST ASHE PERIOD SEC.XI I CATGY NDE ITEN HO NETH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I OUTAGE------I 1 2 3 4 1 2 3 I IHSTRUCTIOHS
~~CALIBRATIOH BLOCK**LINE 1-$1-26 FIG NO A.51 097200 1-Si-26-02F ELBOW TO PIPE B-J 89.11 PT 1-UT 2-3 4-<<*3378028 (6-SS-160-.71)**
097300 1-Sl-26-03F PIPE TO COLLAR B10.10 2-3-4 B-K-1 PT 1-WELD INACCESSIBLE FOR EXAHIHATION DUE TO COLLAR CONFIGURATIOH.
097400 1-SI-26.04F COLLAR TO PIPE B10.10 2-C 3-4-B-K-1 PT 1 100K UT NOT FEASIBLE DUE TO IIELD CONFIGURATION.
097500 1-SI-26-05S PIPE TO ELBOW B J B9.11 PT 1-UT 2-3.4-~~3378028 (6-SS-160-.71)**
097600 1-SI-26.06F ELBOW TO PIPE B-J PT 1 B9.11 UT 2 3-4-**3378028 (6-SS-160-.71)~*
097700 1-SI-26-07S PIPE TO ELBOW B-J B9.11 PT 1 UT 2-3-4**3378028 (6-SS-160-.71)**
097800 1.SI-26.08F ELBOW TO PIPE CONT.L1 B-J 89.11 Pl 1--.C UT 2---C 3-X 4**3378028 (6.SS-160-.71)~~
DATE: 11/15/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE IHSPECTIOH LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 127 SAFETY INJECTION SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT I F I CAT ION PLAN STATUS FIRST SECOND PERIOD PERIOD INSPECTION INTERVAL I ASME I SEC~XI I CATGY NDE I-----0 U T A G E-ITEMHOMETH I 1 2 3 1 2 3 4 THIRD I PERIOD I I 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK**LINE 1-SI-26 FIG NO A-51 097900 1-SI-26-10S PIPE TO ELBOW CONT.L1 8-J 89.11 PT 1-UT 2-3-4 C X**3378028 (6-SS-160-.71)
~~098000 1-SI.26-11S ELBOW TO PIPE 8-J 89.11 PT 1 UT 2-3-4*~3378028 (6-SS-160-.71)*~
098100 1-SI-26-12F PIPE TO ELBOW 8-J 89.11 PT 1-UT 2-3-4~*3378028 (6-SS-160-.71)*~
098200 1-Sl-26-13S ELBOW TO PIPE B-J PT 1 89.11 UT 2-3-4-**3378028 (6.SS.160-.71)~~
098300 1-SI-26.15F PIPE TO VALVE B-J 89.11 PT 1 UT 2-3-4**3378028 (6-Ss-160-.71)~*
098400 1-Sl-26-16F VALVE TO ELBOW B-J 89.11 PT UT 2.3 4-**3378028<6-SS-160-.71)~~
098500 1-SI-26-17F ELBOW TO BRANCH COHHECTIOH 8-J PT 1 C 89 11 UT 2 C 3 X 4**3378028<6-SS-160-.71
)**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPOHEHTS PAGE: 128 SAFETY IHJECTIOH SYSTEM
SUMMARY
EXAHIHATIOH AREA NUMBER IDENTIFICATIOH INSPECTION INTERVAL I ASME I SEC.Xl I CATGY HDE I ITEM HO METH I 1 FIRST PERIOD PLAN STATUS SECOND THIRD I PERIOD PERIOD-OUTAGE------I 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
<<*CALIBRATIOH BLOCK<<*LINE 1-SI.27 FIG NO A-52 098600 1-Sl-27-01F PIPE TO ELBOW B-J 89.11 PT 1-UT 2-3-4.*<<3378028 (6-SS-160-.71)**
098700 1-Sl-27-02F ELBOW TO ELBOW ANNULUS 8 J 89.11 PT 1.--C UT 2---C 3-X 4**3378028 (6.SS-160..71)**
098800 1-SI-27-03F ELBOW TO PIPE 8-J B9.11 PT 1 UT 2-3-4**3378028 (6-SS-160..71)**
098900 1-SI-27-04F PIPE TO COLLAR 8-K-1 PT 810.10 2-3-4 WELD INACCESSIBLE FOR EXAHIHATIOH DUE TO COLLAR COHFIGURATIOH.
099000 1-Sl-27-05F COLLAR TO PIPE CONT.L4 810.10 2-3 4 8-K-1 PT 1 100K UT NOT FEASIBLE DUE TO WELD CONFIGURATION.
099100 1-Sl-27-06F PIPE TO ELBOW CONT.L4 8-J 89.11 PI'-UT 2-3-4 C C X<<*3378028 (6-SS-160-.71)**
099200 1-SI-27.07S ELBOW TO PIPE 8-J 89.11 PT 1 UT 2-3-4-**3378028 (6-SS-160-.71)**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLAHT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPONENTS PAGE: 129 SAFETY INJECTION SYSTEH SUHHARY EXAHI HAT ION AREA NUHBER IDENTIFICATION FIRST PERIOD INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE I ITEH NO NETH i 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I I OUTAGE I 1 2 3 4 1 2 3 I INSTRUCTIONS
099400 1-Sl-27-09S ELBOW TO PIPE B-J 89.11 PI'Ur 2-3-4-*~3378028 (6-SS-160-.71)*~
099500 1-Sl-27-10F PIPE TO ELBOW 8-J 89.11 PT 1 UI'-3-4-**3378028 (6-SS-160..71)**
099600 1-SI-27-11S ELBOW TO PIPE 8-J 89.11 PT 1C UT 2C 3X 4**3378028 (6-SS-160-.71)**
099700 1-SI.27-13S PIPE TO ELBOW 8-J 89.11 UT 2.3-4 a*3378028 (6.SS 160.~71)a*099800 1-SI-27-14S ELBOW TO PIPE 8-J PT 89 11 UT 2-3-4**3378028 (6-SS-160-.71)**
099900 1-Sl-27-15F PIPE TO ELBOW B-J PT 1 89.11 UT 2-3-4*~3378028 (6-SS-160-.71)~~
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 130 SAFETY INJECTION SYSTEM SUMHARY EXAMINATION AREA NUMBER IDENT IF I CAT I OH INSPECTION INTERVAL I FIRST ASME PER IOD SEC.XI I CATGY NDE I ITEM HO METH i 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERICO OUTAGE-1 2 3 4 1 2 3 I I I I INSTRUCTIONS
100100 1-SI-27-17F PIPE TO VALVE 8 J 89.11 PT 1C UT 2-3-4-**3378028 (6-SS~160-.71)>>*
100200 1-S I-27-18F VALVE TO ELBOW B-J 89.11 PT 1 UT 2C 3 X 4*>>3378028 (6-SS-160-.71)"*
100300 1-SI-27-19F ELBOW TO BRANCH CONHECTIOH 8 J 89.11 PT 1-UT 2.3 4-**3378028 (6-SS-160-.71)**
LINE 1-SI-68 FIG NO A-53 100500 1-Sl-68-22F VALVE TO REDUCER 8-J PT 1 89.11 UT 2-3.4**3378028 (6-SS-160-.71)>>>>
LINE 1-SI-28 FIG NO A-53 100700 1-S I-28-05F VALVE TO PIPE ANNULUS 8 J B9.11 PT 1---C Ur 2---C 3-X 4**3378030 (10.SS-140-1.0)>>*
DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLAMT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPONEHTS PAGE: 131 SAFETY INJECTION SYSTEH SUHHARY EXAMINATION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY MDE I ITEH NO HETH I 1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I-I-----OUTAGE-2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
~~CALIBRATIOM BLOCK*~LINE 1-SI-29 FIG MO A-53 100800 1-S1-29.03S PIPE TO ELBOW 8-J 89.11 PT 1 UT 2-3-4-WELD IHACCESSIBLE (BOXED IH I-BEAH RESTRAINT).
~*3378030 (10-SS-140-1.0)**
100900 1-Sl-29-03S-ML HANGER LUG AHNULUS 810.10 2-3-4-8-K-'I PT 1-C X 101000 1-S I-29.04F ELBOW TO PIPE ANNULUS 8-J 89.11 PT 1---C UT 2---C 3-X 4-~*3378030 (10-SS-140-1.0)-
101100 1-Sl-29-05F PIPE TO COLLAR 8-K-1 PT 810~10 1-2-3-4-WELD INACCESSIBLE FOR EXAHIHATIOH DUE TO COLLAR CONFIGURATION.
101200 1-SI-29-06F COLLAR TO PIPE 8-K-1 PT'I-810.10 UT 2 C 3 X 4-101300 1-81-29-07S PIPE TO ELBOW CONT.L1 8-J 89.11 PT 1C UT 2---C 3-X 4**3378030 (10-SS-140-1.0)**
101400 1-81-29.08F ELBOW TO PIPE 8-J 89.11 PT 1-UT 2-3-4**3378030 (1O-SS-140-1.0)**
DATE: 11/15/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE IHSPECTIOH LONG TERH PLAN CLASS 1 ALL STATUS COHPONEHTS PAGE: 132 SAFETY INJECTION SYSTEM SUHMARY EXAMINATION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE I ITEM NO METH I 1 F IRS'I PERIOD PLAN STATUS SECOND PERIOD THIRD I PER I OD I 0 U T A G E------I 2 3 1 2 3 4 1 2 3 IHSTRUCTIOHS
<<*101700 1-SI-29-11S PIPE TO ELBOW CONT~L'I 8-J 89.11 PT 1---C UT 2-C 3-X 4**3378030 (10.SS.140.1 0)*<<101800 1-SI-29-12S ELBOW TO PIPE 8-J PT 89.11 UT 2-3-4-**3378030 (10-SS-140-1.0)**
101900 1-S I-29-13S PIPE TO ELBOW 8-J 89.'l1 PT 1 UT 2-3-4**3378030 (10.SS-140-1.0)**
102000 1-SI-29-14F ELBOW TO PIPE CONT.L1 8-J 89.11 PT 1 UT 2-.*3~4.C C X<<<<3378030 (10-SS-140-1.0)<<<<
102100 1-SI-29-16S PIPE TO ELBOW 8-J 89.11 PT 1-UT 2C 3 X 4<<<<3378030 (10-SS-140-1.0)**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE IHSPECTIOH LONG TERH PLAN CLASS 1 ALL STATUS COHPONENTS PAGE: 133 SAFETY INJECTION SYSTEH SUHHARY EXAHIHATIOH AREA NUHBER IDENT IF I CATION INSPECTION INTERVAL I FIRST ASHE I PERIOD , SEC.XI I CATGY HDE ITEN NO NETH i 1 2 3 PLAN STATUS SECOHD THIRD I PERIOD PERIOD 0 U T A G E-1 2 3 4 1 2 3 I INSTRUCTIONS
>>>>CALIBRATIOH BLOCK>>*LINE 1-SI-29 FIG NO A-53'102200 1.SI-29-17S ELBOM TO PIPE 8-J 89.11 PT 1C UT 2-3-4-**3378030 (10.SS-140.1.0)**
102300 1-SI-29-18S PIPE TO PIPE 8-J 89.11 PT 1-UT 2-3-4**3378030 (10-SS-140-1.0)**
102400 1-SI-29-19S PIPE TO TEE 8-J 89.1'I PT'I UT 2-3-4**3378030 (10.SS.140
~1.0)>>>>102500 1-SI-29-20S ELBOM TO TEE 8-J 89.11 PT 1-ur 2-3-4**3378030 ('IO-SS-140-1.0)**
102600 1-SI-29-21S REDUCER TO ELBOlJ 8-J 89.11 PT 1 UT 2-3-4**3378030 (10-SS-140-1.0)**
102700 1-SI-29-23S TEE TO PIPE COHT.L1 8-J 89.11 PT 1--.C UT 2---C 3-X 4>>*3378030 (IO-SS-140-1.0)*>>
102800 1.SI-29.24F PIPE TO VALVE BJPT1 89.11 UT 2-3-4.**3378030 (10-SS-140-'I.O)**
DATE: 11/15/95 REVI S ION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 134 SAFETY INJECTION SYSTEM
SUMMARY
EXAMIHATIOH AREA NUMBER IDENTIFICATIOH INSPECTION IHTERVAL I FIRST ASME I PERIOD SEC.XI I CATGY HDE I ITEH NO METH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I OUTAGE I 1 2 3 4 1 2 3 I INSTRUCTIONS
103000 1-SI-29-26F ELBOW TO BRANCH CONHECTIOH COHT~L1 B-J B9.11 PT 1 UT 2-3-4 C C X*~3378030 (IO-SS-140.'l.0)~*
LIHE 1 SI.69 FIG NO A-54 103100 1-SI-69-23F VALVE TO REDUCER B-J B9.11 PT 1 UT 2C 3X 4 LINE 1-SI-30 FIG NO A-54 103200 1-S I-30.06F VALVE TO PIPE B-J 89.11 PT 1 UT 2-3-4-**3378030 (10.SS-140-1.0)*~
LINE 1-SI.31 FIG NO A-54 103300 1-SI-31-01S PIPE TO TEE B J 89.11 PT 1-UT 2-3 4.**3378030 (10-SS-140-1.0)**
103400 1-SI-31-02S TEE TO ELBOW ANNULUS B-J 89.11 PT 1-UT 2-3 4 C C X**3378030 (10-SS-140-1.0)**
DATE: 12/20/95 REVI SIGH: 0 COOK NUCLEAR PLANT UHIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 135 SAFETY INJECTION SYSTEM
SUMMARY
EXAMINATIOH AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE ITEM NO METH I 1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD-I OUTAGE I 2 3 1 2 3 4 1 2 3 INSTRUCTIONS
<<<<CALIBRATION BLOCK<<<<LINE 1-SI-31 FIG NO A-54 103500 1-SI.31-02S.NL HANGER LUG ANNULUS 810.10 2-3.4 B-K-1 PT 1 C 103600 1-S I-31-03S ELBOH TO PIPE 8-J 89.11 PT 1 UT 2-3.4-**3378030 (10-SS-140-1
')*>>103700 1-SI-31-04S PIPE TO ELBOll BJ PT 1 89.11 UT 2-3-<<*3378030 (10-SS-140-1.0)**
103800 1.S I-31.05F ELBON TO PIPE 8-J 89.11 PT 1 UT 2-3-4-**3378030 (10-SS-140-1.0)**
103900'-S I-31-06F PIPE TO COLLAR B10.10 2-3-4 B-K-1 PT 1 IIELD INACCESSIBLE FOR EXAMINATION DUE TO COLLAR CONFIGURATION.
104000 1-SI-31-07F COLLAR TO PIPE B.K-1 PT 1-810~10 2.3-4-104100 1-Sl-31-08S PIPE TO ELBON 8 J 89.11 PT 1 UT 2-3-4-<<*3378030 (10-SS-140-1.0)**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPONENTS PAGE: 136 SAFETY INJECTION SYSTEH SUHHARY EXAMINATION AREA NUMBER IDENT IF ICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE I ITEM NO HETH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD-OUTAGE-2 3 1 2 3 4 1 2 3 I I INSTRUCTIONS I**CALIBRATION BLOCK**LINE 1-SI.31 FIG NO A-54 104200 1-SI-31-09F ELBOW TO PIPE B-J B9.11 PT 1C UT 2C 3 X 4*~3378030 (10 ASS.140.1.0)**
104300 1-SI-31-10S PIPE TO ELBOW 8 J PT'I B9.11 UT 2-3-4**3378030 (10.SS-140-1.0)**
104400 1-SI-31-11F ELBOW TO PIPE CONT.L2 B-J 89.11 PT 1 UT 2-3-4-**3378030 (1O-SS-140-1.0)~*
104500 1-SI-31-12S PIPE TO ELBOW B J 89.11 PT 1-UT 2-3-4.**3378030 (10.SS-140.1.0)"*104600 1-SI-31-13S ELBOW TO PIPE 8 J 89.11 PT 1 UT 2-3-4**3378030 (10-SS-140-1.0)**
104700 1.S I-31-14S PIPE TO ELBOW 8-J 89.11 PT 1 UT 2-3-4**3378030 (10-SS-140-1.0)*~
104800 1.SI.31-15S ELBOW TO PIPE CONT.L2 8-J 89.11 PT 1-.-C UT 2-.-C 3-X 4**3378030 (10-SS-140-1.0)**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPONEHTS PAGE: 137 SAFETY INJECTION SYSTEH SUHHARY EXAHINAT I OH AREA NUHBER IDENT IF I CAT ION INSPECTION INTERVAL I FIRST ASHE I PERIOD SEC.XI I CATGY HDE I ITEN HO NETH J 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I OUTAGE--I 1 2 3 4 1 2 3 INSTRUCTIONS
- <<CALIBRATIOH BLOCK**LINE 1-SI-31 FIG NO A-54 104900 1-S I-31-17S PIPE TO ELBOM 8-J 89.11 PT 1-UT 2-3-4-*<<3378030 (10-SS-140-1
')<<*105000 1-SI.31-18S ELBOM TO PIPE CONT.L2 8-J 89.11 PT'I.-.C UT 2---C 3---X 4-**3378030 (10-SS-140.1.0)<<<<
105100 1-SI.31.19S PIPE TO PIPE CONT.L2 8-J 89.11 PT 1-UT 2-4 C C X<<<<3378030 (10-SS-140-1.0)**
105200 1-SI-31-20S PIPE TO TEE B-J 89.11 PT UT 2-3-4-**3378030 (10.SS-140-1.0)**
105300 1-SI-31-21S ELBOM TO TEE B.J PT 1 B9.11 UT 2-3-4**3378030 (10-SS-140-1.0)**
105400 1-S I-31-22S REDUCER TO ELBDM B-J B9.11 PT UT 2-3-4**3378030 (10-SS-140.1.0)<<*
105600 1-SI-31-24S TEE TO PIPE 8-J PT 1 89.11 UT 2-3-4.**3378030 (10-SS-140-1.0)**
DATE: 11/15/95 REVISIOH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPONENTS PAGE: 138 SAFETY INJECTION SYSTEH SUHHARY EXAHIHATIOH AREA NUHBER IDENTIFICATION IHSPECTIDN INTERVAL I ASHE I SEC.XI I CATGY NDE ITEH NO NETH i 1 PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD-0 U T A G E-2 3 1 2 3 4 1 2 3 I I I INSTRUCTIONS
- CALIBRATION BLOCK~~LIN 1-SI-31 FIG NO A-54 105700 1-Sl-31-25F PIPE TO VALVE 8 J Pl'B9.11 UT 2.3-4**3378030 (10-SS-140-1.0)**
105800 1-SI-31.26F VALVE TO ELBOM 8-J 89.11 PT 1.UT 2-3-4-**3378030 (10-SS-140-1.0)**
105900 1-SI-31-27F ELBOU TO BRANCH CONNECTION 8-J PT 1 89.11 UT 2.3-4-**3378030 (10-SS-140-1.0)**
LINE 1-SI-70 FIG NO A-55 106100 1-SI-70-29F VALVE TO REDUCER 8-J PT 1 89.11 UT 2-3-4**3378028 (6-SS-160-.71)~*
LIHE 1-SI-32 FIG NO A-55 106200 1-SI-32.05F VALVE TO PIPE 8-J PT 89.11 UT 2-3-4**3378030 (10.SS-140-1.0)**
LINE 1-SI-33 FIG NO A.55 106300 1-SI-33.02S PIPE TO TEE 8 J B9.11 PT 1 UT 2-3-4-DIFFICULT TO ACCESS.~*3378030 (10-SS-140-1.0)**
DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS CONPONEHTS PAGE: 139 SAFETY INJECTION SYSTEN SUNNARY EXANIHATION AREA HUNBER IDENT I F I CAT ION INSPECTION INTERVAL I ASHE I SEC~XI I CATGY NDE ITEN NO NETH I PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I-OUTAGE I 1 2 3 1 2 3 4 1 2 3 I IHSI'RUCTIONS
- GAL I BRAT I OH BLOCK<<*LINE'I-SI-33 FIG NO A-55 106400 1-SI-33-03S PIPE TO TEE 8-J 89.11 PT 1-UT 2-3-4*<<3378029 (B-SS-140-.81)**
106500 1-SI-33-04S ELBOM TO PIPE 8-J 89.11 PT 1-Ul'-3-**3378029 (B.SS-140-.81)**
106600 1-SI-33-05S PIPE TO ELBOM 8-J 89.11 PT 1-UT 2-3-4-*<<3378029 (B.SS-140-.81)<<<<
106700 1-SI-33.06S TEE TO ELBOM 8-J 89.11 PT 1-UT 2-3-4-*<<3378030 (10.SS-140-1~0)**106800 1-Sl-33-06S-RL RESTRAINT LUG 8-K-1 PT'-810.10 2-3-4-106900 1-SI-33-07F ELBOM TO PIPE 8-J 89.11 PT 1 UT 2-3-4-**3378030 (10.SS-140-1.0)<<*
107100 1-Sl-33-08F PIPE TO COLLAR 8-K-1 PT 810.10'I-2-3-4 MELD INACCESSIBLE FOR EXANIHATIOH DUE TO COLLAR CONFIGURATION.
DATE: 12/20/95 REVISION: 0 QSK NUCLEAR PLANT UHIT 1 INSERVICE INSPECTIOH LONG TERN PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 140 SAFETY INJECTION SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE I ITEN NO NETH I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD-----OUTAGE--1 2 3 1 2 3 4 1 2 3 INSTRUCTIONS I<<<<CALIBRATIOM BLOCK<<*IME 1-SI-33 FIG MO A-55 107200 1-SI-33-09F COLLAR TO PIPE 8-K-1 PT 1 810.10 2-3-4-107300 1-S I-33-10S PIPE TO ELBON 8-J 89.11 PT 1-UT 2-3-**3378030 (10-SS-140-1.0)
<<*107400 1-S I-33-11F ELBOU TO PIPE 8-J 89.1'1 PT 1---C UT 2C 3 X 4**3378030 (10-SS-140-1.0)**
107500 1-SI.33.12S PIPE TO ELBOM 8-J 89.11 PT 1C UT 2-3-4<<*3378030 (1O-SS-140-1.0)*.
107600 1-SI-33-138 ELBON TO PIPE 8-J 89.11 PT 1-UT 2C 3X 4-<<<<3378030 (10-SS-140-1.0)**
107700 1-SI-33-14S PIPE TO ELBON CONT.L3 8 J 89.11 PT 1.UT 2.3-4.C C X**3378030 (10-SS-140-1.0)**
E 107800 1.SI-33.15S ELBOH TO PIPE CONT.L3 8-J 89.11 PT 1-UT 2..-C 3-X 4<<<<3378030 (10-SS-140-1.0)<<*
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 141 SAFETY INJECTION SYSTEM
SUMMARY
EXAMIHATIOH AREA NUMBER IDENT I F I CAT ION INSPECTION INTERVAL I FIRST ASME PERIOD SEC.XI I CATGY HDE I ITEM NO METH i 1 2 3 PLAN STATUS SECOHD THIRD PERIOD , PERIOD OUTAGE-1 2 3 4 1 2 3 I INSTRUCTIONS
108000 1-SI-33-17F ELBOW TO PIPE CONT~L3 8-J PT 89.11 Ur 2-3-4 C C X~~3378030 (10-SS-140.1.0)**
'108100 1-SI-33.19S PIPE TO ELBOW 8-J 89.11 PT 1.UT 2-3-4-*~3378030 (10-SS-140-1.0)"*
108200 1-SI-33-20S ELBOW TO PIPE CONT.L3 8-J PT 1 B9.11 UT 2-3-4 C X**3378030 (10-SS-140-1.
0)**108300 1-S I-33-21S PIPE TO PIPE 8-J PT 1 89.11 UT 2-3-4**3378030 (10-SS-140.1.0)**
108400 1-SI-33.22S PIPE TO TEE 8-J 89.11 PT 1 UT 2 I 3 4~*3378030 (10-SS-140-1.0)*>>
108500 1-SI-33-23S TEE TO PIPE CONT.L3 B-J 89.11 PT 1.--C UT 2---C 3-X 4-**3378030 (10-SS-140-1.0)**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE IHSPECI'ION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 142 SAFETY INJECTION SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION F IRST PERIOD INSPECTION INTERVAL I ASME I SEC.XI I CATGY HDE ITEM HO METH i 1 2 3 PLAN STATUS SECOND THIRD PER I OD PER I OO-OUTAGE-1 2 3 4 1 2 3 I I I I INSTRUCTIONS I<<*CALIBRATION BLOCK**L I NE 1.S I-33 F I 0 NO A.55 108600 1-SI-33-24F PIPE TO VALVE 8-J 89.11 PT 1-UT 2-3-4-**3378030 (10..SS-140
'.0)~~108700'I-SI-33-25F VALVE TO ELBOW 8-J PT 1 89.11 Ul'-3-4-**3378030 (10.SS-140-1.0)**
108800 1-Sl-33-26F ELBOW TO BRANCH CONNECTION 8-J 89.11 PT 1C UT 2C 3X 4-**3378030 (10.88-140.1.0)*~
108900 1-SI-33-27S ELBOW TO TEE 8-J 89.11 PT 1-UT 2-3-4~3378030 (10.SS-140-1.0)**
109000 1-SI-33-28S REDUCER TO ELBOW CONT.L3 8-J PT 1 89.11 UT 2-3-4 C C X**3378030 (10.SS-'140.1.0)**
LINE 1-SI-34 FIG NO A-56 109400 1-SI-34-06F VALVE TO PIPE 8 J 89.11 PT 1 UT 2.3 4**3378030 (10-SS-140.1.0)**
LINE 1.SI-35 FIG NO A-56 109500 1-SI-35-02S PIPE TO ELBOW 8-J 89.11 PT 1 UT 2.3-4**3378030 (10-SS-140-1.0)**
DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPONENTS PAGE: 143 SAFETY INJECTION SYSTEH SUHHARY EXAHI HAT ION AREA HUHBER IDENT I F I CAT I OH INSPECTION INTERVAL I ASME I SEC.Xl CATGY HDE I ITEH HO NETH I PLAN STATUS FIRSI'ECOND THIRD PERIOD PERIOD PERIOD----0 U T A G E-----1 2 3 1 2 3 4'I 2 3 I INSTRUCTIONS I**CALIBRATIOH BLOCK+*LINE 1-81-35 FIG NO A-56 109600 1-Sl-35-02S-HL HANGER LUG AHNULUS 810.10 2-3-4-8-K-1 PT 1 109700 1.81-35-03F ELBDM TO PIPE 8-J 89.11 PT 1 UT 2-3-4~*3378030 (10-SS-140-1.0)i~
109800 1-Sr-35-04F PIPE TO COLLAR 810.10 2-3-4 8K1 PT 1-MELD INACCESSIBLE FOR EXAHINATIOH DUE TO COLLAR CONFIGURATIONS 109900 1-Sl-35-05F COLLAR TO PIPE 8-K-1 PT 1-810.10 2-3-4.100X UT HOT FEASIBLE DUE TO'IELD COHF I GURAT I OH~110000 1-81-35-06S PIPE TO ELBOH COHT~L4 8-J 89.11 PT 1---C UT 2---C 3-X 4*~3378030<10-SS-140-1
~0)**110100 1-SI-35-07F ELBOU TO PIPE CONT.L4 8-J 89.11 PT 1---C UT 2---C 3-X 4*i3378030 (10-88-140-1.0)~i 110200 1-SI-35-07F-A PIPE TO PIPE 8-J 89.1'I PT 1 UT 2-3-4**3378030<10-SS-140-1.0)~*
DATE: 11/15/95 REVI S ION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 144 SAFETY INJECTION SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT I F ICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE I ITEM NO METH J 1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD-I-OUTAGE------I 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
<<*CALIBRATION BLOCK**LINE 1-SI-35 FIG NO A-56 110300 1-SI-35.08S PIPE TO ELBOW COHT.L4 B-J 89.1'I PT 1 Ui'-3-4-C.C X<<*3378030 (10.SS-140-1.0)
<<<<110400 1-SI-35-09S ELBOW TO PIPE 8-J B9.11 PT 1 UT 2-3-4-**3378030 (10-SS-140-1.0)**
110500 1-SI-35-09S-A PIPE TO PIPE 8-J 89.11 PT 1 UT 2-3-4**3378030 (10.SS-140-1.0)<<*
110600 1-SI-35-10S PIPE TO ELBOW 8 J 89.11 PT 1C UT 2C 3X 4-<<*3378030 (10-SS-140.1
')**110700'I-SI-35-11S ELBOW TO PIPE 8'PT 1 89.11 UT 2.3-4-*<<3378030 (10-SS-140.1.0)**
110800 1-SI-35-12F PIPE TO ELBOW 8-J PT B9.11 UT 2.3-4<<*3378030 (10.SS-140-'I.O)**
110900 1.SI.35-13S ELBOW TO PIPE 8-J 89.11 PT 1 UT 2-3-4-**3378030 (10-SS-140-1.0)**
DATE: 11/15/95 REVISION: 0 COOK HUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAH CLASS 1 ALL STATUS COMPONENTS PAGE: 145 SAFETY INJECTION SYSTEM SUHHARY EXAHINATION AREA NUHBER IDENTIFICATION PLAN STATUS SECOND PERIOD INSPECTION INTERVAL I FIRST ASHE PERIOD SEC.XI I CATGY NDE I-----0 U T A G E-ITEM NO METH I 1 2 3 1 2 3 4 THIRD I PERIOD-I-----I 1 2 3 I INSTRUCT'ONS**CALIBRATION BLOCK**LINE 1-Sl-35 FIG NO A-56 111000 1-Sl-35-13S-A PIPE TO PIPE 8-J 89.11 PT 1 Ur 2-3-4-H**3378030 (10.SS-140-1.0)**
111100 1.81-35-13S.A1 PIPE TO PIPE 8-J PT 1 89.11 UT 2-3-4**3378030 (10.SS-140-1.0)**
'111200 1-81-35-15S PIPE TO ELBOW 8-J 89.11 PT 1C UT 2C-~3 X 4<<<<3378030 (10-SS-140-1.0)**
111300 1-81.35-16S ELBOW TO PIPE 8-J 89.11 PT'1 UT 2.3 4-**3378030 (10.SS-140-1.0)**
111400 1-81-35-17S PIPE TO PIPE 8-J 89.11 PT 1.UT 2-3 4**3378030 ('IO.SS-140-1.0)<<*
111500 1-81-35-18S PIPE TO TEE 8-J 89.11 PT 1 UT 2-3-4-**3378030 (10-SS-140.1.0)**
1'11600 1-81-35-19S TEE TO PIPE 8-J 89.11 PT 1 UT 2-3-4**3378030 (10-SS-140-1.0)*<<
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPONENTS PAGE: 146 SAFETY INJECTION SYSTEH SUHHARY EXAHIHAT ION AREA HUHBER IDENTIFICATION INSPECTION IN'TERVAL I ASHE I SEC.XI I CATGY HDE ITEM NO NETH I 1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I-I-0 U T A G E------I 2 3 1 2 3 4 1 2 3 I IHSTRUCTIOHS
- CALIBRATION BLOCK**LIHE 1-SI-35 FIG HO A-56 111700 1-SI-35-20F PIPE TO VALVE B-J B9.11 PI'C Ur 2C 3X 4**3378030 (10-SS-140-1.0)**
111800 1-81.35-21F VALVE TO ELBOW B-J 89.11 PT 1 UT 2-3-4**3378030 (10-SS-140-1.0)*<<
111900 1-SI-35-22F ELBOW TO BRANCH CONNECTION B-J 89.11 PT 1 Ur 2-3-4**3378030 (10-SS-140-1
')**112000 1.SI.35-23S REDUCER TO TEE CONT.L4 8-J 89.11 PT 1 UT 2-3 4 C C X**3378030 (10-SS~140-1.0)**
112100 1.SI-35-24S ELBOW TO REDUCER B-J PT 1 B9.11 UT 2.3-4-*<<3378028 (6-SS-160-.71)<<*
112200 1-SI-35-25S PIPE TO ELBOW 8-J 89.11 PT 1 UT 2.3 4**3378O28 (6-SS-T60-.71)<<<<
112300 1-SI-35-26S ELBOW TO PIPE CONT.L4 8'PT 1 B9.11 UT 2-3-4~C C X<<<<3378028 (6-SS-160..71)<<*
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 147 SAFETY INJECTION SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT IF ICATION PLAN STATUS SECOND PERIOD IHSPECTIOH INTERVAL I FIRST ASME PERIOD SEC.XI I-CATGY NDE I 0 U T A G E ITEM NO METH i 1 2 3 1 2 3 4 THIRD I PERIOD-I I 2 3 INSTRUCTIONS
- CALIBRATIOH BLOCK**LINE 1-SI-35 FIG NO A 56 112400 1-SI-35-27F VALVE TO ELBmI B-J 89.11 PT 1-UT 2-3-4-<<*3378028 (6-SS-160-.71)**
LINE 1-SI-39 FIG HO A-57 112402 1.SI.39.01F PENETRATIOH
¹44 TO PIPE 8-J 89.21 PT 1 2-3-X 4 112404 1-SI-39.02S PIPE TO ELBM B9.21 2-3.4 8-J PT 1 112406 1-S I-39-03S ELBOH TO PIPE 89.21 2-3-4.8-J PT 1 112408 1-SI-39-04F PIPE TO TEE 8-J 89.21 PT 1-2-3.4.112410'I-SI-39.05S TEE TO REDUCER 8-J 89.21 PT 1 2-3-4-X 112412 1-SI-39.06S REDUCER TO PIPE 89.21 2-3.4-8-J PT 1 X DATE: 11/15/95 REVI 8 I OH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTIOH LOHG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 148 SAFETY INJECTION SYSTEM SUHMARY EXAMINATION AREA NUHBER IDENTIFICATION INSPECTION IHTERVAL I FIRST ASME PER IOO SEC~XI I CATGY NDE I ITEH NO METH i 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I I OUTAGE------I 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK**LIHE 1-SI-39 FIG NO A-57 112414 1-S I-39.07 PIPE TO ELBOW 8-J 89.21 PT 1 2-3-4-112416 1-SI-39-08S TEE TO REDUCER 8-J 89.21 PT 1 2-3-112418 1-SI-39.09S REDUCER TO PIPE 8-J PT 1 89.21 2-3-4 112420 1-SI-39-10S PIPE TO ELBOW 8-J 89.21 PT 1 2-3-4 112422'I-SI-39-11S ELBOW TO PIPE 89.21 2-3-4 8-J PT 1 112424 1-S I-39-12S PIPE TO ELBOW 8 J 89.21 PT 1-2-3-4-112426 1-S I-39-13S ELBOW TO PIPE 8-J 89.21 PT 1 2-3-4.
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT'I INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 149 SAFETY INJECTION SYSTEM SUHMARY EXAMINATION AREA NUMBER IDENTIFICATION FIRST PERIOD INSPECTION IHTERVAL I ASME I SEC.XI I CATGY NDE I ITEM NO HETH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD-OUTAGE--1 2 3 4 1 2 3 I I I IHSTRUCTIOHS
- CALIBRATION BLOCK~~LINE 1-SI-39 FIG NO A-57 112428 1-SI-39-14S PIPE TO ELBOW 8-J 89.21 PT 1 2-3-4 112430 1-SI-39-15S ELBOW TO PIPE 8 J 89.21 PT 2-3-4-112432 1.SI-39-16S PIPE TO ELBOW 89.21 2-3-4-8-J PT 1--~112434 1-SI-39-17F ELBOW TO PIPE 89.21 2-3-4 8-J PT 1 112436 1-SI-39-18S PIPE TO REDUCER 89.21 2-3-4-8-J PT 1 X LINE 1-S'I-40 FIG NO A-58 112438 1-SI-40-01 F ELBOW TO PIPE 89.21 2-3-X 4-8-J PT 1 112440 1-SI-40-02S PIPE TO ELBOW 8-J 89.21 PT 1 2-3-X 4-DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLAHT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COHPONENTS PAGE: 150 SAFETY INJECTION SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT IF I CAT I OH INSPECTION INTERVAL I ASHE I SEC.XI I CATGY HDE I ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD--OUTAGE--
1 2 3 1 2 3 4 1 2 3 INSTRUCTIONS I**CALIBRATION BLOCK~~LINE 1-81-40 FIG NO A-58 112442 1-SI-40-03S ELBOW TO PIPE 8-J 89.21 PT 1.2 3-X 4-112444 1-SI-40.04S PIPE TO ELBOW 89.21 2-3-4 8-J PT 1-112446 1-SI-40.05S ELBOW TO PIPE 8-J 89.21 PT 1-2-3.4 112448 1-SI.40'68 PIPE TO ELBOW 8-J 89.21 PT 2-3-4-112450 1-SI-40-07S ELBOW TO PIPE 8-J 89.21 PT 1 2-3-4-112452 1-81-40.0BS PIPE TO ELBOW 89.21 2-3-4 8-J PT 1 112454 1.SI-40-09S ELBOW TO PIPE 8 J 89.21 PT 1 2-3.4-DATE: 11/15/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE IHSPECT ION LONG TERN PLAN CLASS 1 ALL STATUS COHPONEHTS PAGE: 151 SAFETY INJECTION SYSTEM SUHHARY EXAHINATIOH AREA NUHBER IDENTIFICATIOH PLAN STATUS FIRST SECOND PERIOD PERIOD INSPECTION INTERVAL I ASME I'SEC.XI I CATGY NDE I------0 U T A G E-ITEH HO NETH I 1 2 3 1 2 3 4 THIRD I PERIOD (I-----I 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK~*LINE 1-SI-40 FIG NO A-58 112456 1-Sl-40-10F PIPE TO ELBOW 8-J 89.21 PT 1 2-3-4 112458 1-SI-40-11S ELBOW TO PIPE 8 J 89.21 PT 1 2-3-4 112460 1-SI-40-12S PIPE TO ELBOW 8 J 89.21 PT 1 2-3-4-112462 1-S I-40.13S ELBOW TO PIPE 89.21 2-3-4-8-J PT 1 112464 1-SI-40.14S PIPE TO ELBOW 8-J 89.21 PT 1 2-3-4 X 112466 1-SI-40-15S ELBOW TO PIPE 8-J 89.21 PT 1 2-3-4-X 112468 1-Sl-40-16F PIPE TO ELBOW 8-J 89.21 PT 1 2-3-4 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLAN'I UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPONENTS PAGE: 152 SAFETY INJECTION SYSTEH SUHHARY EXAHIHAT ION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE I ITEN HO NETH i 1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD-I-OUTAGE------I 2 3 1 2 3 4 1 2 3 INSTRUCTIOHS
<<*CALIBRATIOH BLOCK*~0'INE 1-SI-40 FIG NO A-58 112470 1.SI.40.17S ELBOW TO PIPE 89.21 2-3-4 8-J PT 1-112472 1-SI-40.18S PIPE TO ELBOW 8-J 89.21 PT 2-3-4 112474 1-SI-40.19S ELBOW TO PIPE 8 J 89.21 PT 1 2-3-112476 1-SI-40-20S PIPE TO ELBOW B-J B9.21 PT 1 2-3-4-112478 1-Sl-40-21S ELBOW TO PIPE I 89.21 2-3-4-8-J PT 1 112480 1-S I-40-22S PIPE TO ELBOW 8-J 89.21 PT 2-3-4 112482 1-SI-40.23S ELBOW TO PIPE 89.21 2-3-4-BJPT1 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE IHSPECTIOH LONG TERM PLAN CLASS 1 ALL STATUS COMPOHENTS PAGE: 153 SAFETY INJECTION SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT IF I CATION INSPECTION INTERVAL I FIRST ASME PER I OD SEC.XI I CATGY NDE I ITEM NO METH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD-I-0 U T A G E-I 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK**LINE 1-SI-40 FIG NO A-58 112484 1-Sl-40-24S PIPE TO ELBOW 8-J 89.21 PT 1 2-3-4-112486 1.SI-40-25S ELBOW TO PIPE 89.21 2-3-4-8-J PT 1 112488'I-SI-40-26S PIPE TO REDUCER 8-J 89.21 PT 1 2-3-4 X LINE 1-Sl-51 FIG HO A-59 112528 1-SI-51-20F VALVE TO REDUCER 89.21 2-3-4 8-J PT 1 X 112530 1-S I-51-21F REDUCER TO ELBOW 8-J 89.21 PT 1-2-3-4-X 112532 1-SI-51-22F ELBOW TO TEE 8-J 89.21 PT 1 2-3-4 112534 1-S I-51-23S TEE TO REDUCER 8-J 89.2'I PT 1 2.3-4 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE IHSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPOHEHTS PAGE: 154 SAFETY INJECTION SYSTEH SUHHARY EXANINATIOH AREA HUHBER IDENT I FI CAT I OH INSPECTION INTERVAL I ASNE I SEC.Xl CATGY NDE I ITEH NO METH I 1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD--I 0 U T A G E I 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- "CALIBRATION BLOCK~~LIHE 1-SI-51 FIG NO A-59'112536 1-SI-51-24F REDUCER TO VALVE 8-J 89.21 PT 1 2-3-112538 1-SI-51-27F TEE TO PIPE 8 J 89.21 PT 1 2-3-4-112540 1-SI-51-28S PIPE TO ELBSI 8 J 89.21 PT 1 2-3-4 112542 1.SI.51-29S ELBOM TO PIPE 8-J 89.21 PT 1 2-3-4-112544 1-SI-51-30F PIPE TO PENETRATIOH
¹44 89.21 2.3-4 B.J PT 1 LINE 1-Sl-545 FIG HO A-60 112605 1-SI-545-09F REDUCER TO BEND 8 J 89.40 PT 1 2-3 X 4-1126'IO 1-Sl-545-10F BEND TO PIPE 8-J 89.40 PT 1 2-3-4 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 155 SAFETY IMJECTION SYSTEM
SUMMARY
EXAHINATIOH AREA NUMBER IDENT I F I CAT ION IHSPECTION INTERVAL I ASNE I SEC.XI I CATGY NDE I ITEN NO METH)1 PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD-I-OUTAGE------I 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
~*CALIBRATIOM BLOCK~~LIME 1-SI-545 FIG HO A-60 112615 1-SI-545-11S PIPE TO ELBOW 8-J 89.40 PT 1-2-3-4-112620 1-81-545-12S ELBOW TO PIPE 8 J 89.40 PT 1 2 3-4.112625 1-SI-545-13S PIPE TO ELBOW 89.40 2-3.4-BJ PT 1 112630 1-SI-545-14S ELBOW TO PIPE 89.40 2-3-4-8-J PT 1 112635 1-SI.545.158 PIPE TO ELBOW 8-J 89.40 PT 1-2-3-4-112640 1-SI.545-16S ELBOW TO PIPE 89.40 2-3-4-B.J PT 1 112645 1-SI-545-178 PIPE TO ELBOW 8-J 89.40 PT 1 2-3 OATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 156 SAFETY INJECTION SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I FIRST ASME PER IOO SEC.XI I CATGY NDE I----0 U T A G E-ITEM NO METH I 1 2 3 1 2 3 4 1 2 3 I I I I INSTRUCTIONS
~CALIBRATIOH BLOCK**LINE 1-Sl-545 FIG NO A-60 112650 1-SI-545-18S ELBOW TO PIPE 8-J 89.40 PT 1 2-3-4-112655 1.SI.545-19S PIPE TO TEE 8-J 89.40 PT 1 2-3-4-112660 1.SI-545.20S TEE TO PIPE 89.40 2.3-4-BJ PT 1 X 112665 1-SI-545-21S PIPE TO TEE 8-J 89.40 PT 2-3-4-X 112670 1-SI.545-22S TEE TO PIPE 8-J 89.40 PT 1 2-3-4 112675 1-SI-545-23F ELBOW TO PIPE 8 J 89.40 PT 1 2-3-4-112680 1-SI-545.24S PIPE TO ELBOW 89.40 2-3-4 BJ PT 1 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 157 SAFETY INJECTION SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT IF I CAT IOH PLAN STATUS SECOHD PER I OO INSPECTION INTERVAL I FIRST ASME PERIOD SEC.XI I CATGY NDE I------0 U T A G E-ITEM HO METH I 1 2 3 1 2 3 4 THIRD I PERIOD I-----I 1 2 3 I INSTRUCTIONS
- ~CALIBRATION BLOCK~*LINE 1-SI-545 FIG HO A-60 112685 1-S I-545-25S ELBOW TO PIPE 8-J 89.40 PT 1 2-3-4 112690 1-SI.545-26F PIPE TO VALVE 8-J 89.40 PT 1.2.3-4 LINE 1-SI-545 FIG NO A-61 112700 1-SI-545-27F VALVE TO PIPE 8 J 89.40 PT 1 2.3-4 112800 1-Sl-545-28S PIPE TO VALVE ANNULUS 89.40 2-3-4 8-J PT 1 C C X 112900 1-SI-545-29S VALVE TO PIPE 89.40 2-3-4-8-J PT 1~113000 1-SI-545-30F PIPE TO ELBOW 89.40 2 C 3 X 4 8 J P'I 1 113100 1-SI-545-31S ELBOW TO PIPE 89.40 2-3-4 B.J PT 1 C DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE IHSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COMPOHEHTS PAGE: 158 SAFETY INJECTION SYSTEH SUHHARY EXAMINATION AREA HUHBER IDENT I F I CAT IOH INSPECT IOH INTERVAL I F IRST ASHE PERIOD SEC~XI I CATGY NDE I ITEM NO NETH i 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD OUTAGE------I 1 2 3 4 1 2 3 IHSTRUCTIONS
- CALIBRATION BLOCK**LINE 1-SI 545 FIG NO A-61 113200 1-SI-545.32S PIPE TO ELBOW 89.40 2-3-4-8-J PT 1 113300 1-$1-545-33S ELBOW TO PIPE 8-J 89.40 PT 1.2-3-4 113400 1.SI-545-34S PIPE TO ELBOW ANNULUS 8-J 89.40 PT 1-2-3-4-C C X 113500 1.S I-545-35F ELBOW TO PIPE AHNULUS 8-J 89.40 PT 1-2-C 3-X 4 113600 1-SI-545-36S PIPE TO COLLAR 8-K-1 PT 1 810.10 2-3.4 WELD IHACCESSIBLE FOR EXAHIHATION DUE TO COLLAR CONFIGURATION.
113700 1-SI-545-37S COLLAR TO PIPE B.K-1 PT 1 810.10 2-3-4-C LINE 1-SI-545 FIG NO A-62 113800 1-SI-545-38F PIPE TO ELBOW 89.40 2-3-4 BJ PT 1 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 159 SAFETY INJECTION SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDEHT IF ICATION INSPECTION INTERVAL I F IRST ASME PERIOD SEC.XI I CATGY HDE I ITEM NO METH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD-OUTAGE-1 2 3 4 1 2 3 I I I INSTRUCTIONS
- >>CALIBRATIOH'BLOCK>>>>
LINE 1-Sl-545 FIG HO A-62 113900 1-SI-545.39S ELBOW TO PIPE 8-J 89.40 PT 1-2-3-4 114000 1-SI-545 40S PIPE TO ELBOW 8-J 89.40 PT 1-2-3-4 114100 1-SI-545.41S ELBOW TO PIPE 8-J PT 89.40 1 C 2 C 3X 4 114200 1-S I-545-42F PIPE TO ELBOW 8-J 89.40 PT 1 2-3.4-114300 1-SI.545-43S ELBOW TO PIPE 89.40 2-3-4 BJ PT 1 114400 1-SI-545-44S PIPE TO ELBOW CONT.L3 8 J 89.40 PT 1 2-3-4.C C X 114500 1-SI-545-45S ELBOW TO PIPE 89.40 2-3-4-BJ P'I 1 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANI'NIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 160 SAFETY INJECTION SYSTEM SUHMARY EXAMINATION AREA NUHBER IDENT IF ICATIOH INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE I ITEM HO METH I PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I-I-OUTAGE------I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIOHS
- ~CALIBRATION BLOCK~~LINE 1-SI-545 FIG NO A-62 114600 1-Sl-545-46S PIPE TO ELBOW B.J 89.40 PT 2-3-4.114700 1.SI-545-47S ELBOW TO PIPE 8-J 89.40 PT 1 2-3.4-114800 1-Sl-545-4BS PIPE TO ELBOW 8-J 89.40 PT 1 2-3-4-114900 1-SI-545-49S ELBOW TO PIPE COHT.L3 8-J 89.40 PT 1.--C 2-C 3-X 4 115000 1-$1.545.50S PIPE TO ELBOW 89.40 2-3-4 8-J PT 1 115100 1-SI-545.51S ELBOW TO PIPE 8-J 89.40 PT 1-2-3-4 115200 1-SI-545-52S PIPE TO ELBOW 8-J 89.40 PT 1 2-3 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAH CLASS 1 ALL STATUS COHPONENTS PAGE: 161 SAFETY IHJECTION SYSTEH SUHHARY EXAHINAT ION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I FIRST ASHE PERIOD SEC.XI I CA'IGY NDE ITEN NO METH (1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD I I 0 U T A G E------I 1 2 3 4 1 2 3 I INSTRUCTIONS
<<~CALIBRATIOH BLOCK~*LINE 1-SI-545 FIG NO A-62 115300 1-Sl-545-53F ELBSI TO PIPE 8-J 89.40 PT 1C 2 C 3 X 4-115400 1-81-545.54S PIPE TO ELBSI 8-J 89.40 PT 1 2-3-4 115500 1-SI-545-55S ELBOM TO PIPE 89.40 2-3-4 BJ PT 1 115600 1-81-545-56S PIPE TO VALVE 8-J 89.40 PT 2-3-4-115700 1-SI-545-57S VALVE TO PIPE CONj'.L3 8-J 89.40 PT 1 2-3-4-'I15800 1-SI-545-58S PIPE TO ELBOM 8-J 89.40 PT 1 2-3-4-115900 1-S I-545.59S ELBOH TO PIPE 8 J 89.40 PT 1 2-3-4 DATE: 12/20/95 REVI SION: 0 COOK NUCLEAR PLANT UHIT 1 IHSERVICE IHSPECTIOH LONG TERN PLAH CLASS 1 ALL STATUS COHPOHENTS PAGE: 162 SAFETY IHJECTIOH SYSTE SUPJIARY EXAHI NAT ION AREA NUNBER IDENTIFICATION INSPECTIOH INTERVAL I FIRST ASNE PERIOD SEC.XI I-CATGY NDE ITEN NO NETH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I I 0 U T A G E------I 1 2 3 4 1 2 3 I INSTRUCTIONS
~~CALIBRATIOH BLOCK~~LINE 1-SI-545 FIG HO A 62 116000 1-SI-545.60F PIPE TO BRANCH CONNECTION CONT.L3 8-J 89.40 2-3-4 C X PT 1--C LINE 1-S1-546 FIG HO A-63 116060 1.SI.545.06S REDUCER TO TEE 8-J 89.40 PT 1-2-3-4 116080 1-SI-546-07F TEE TO ELBOM 8-J 89.40 PT 1 2-3-4-116090 1-SI-546-DBS ELBDM TO TEE 8-J 89.40 Pl'-2-3-4 116100 1-SI-546-09S TEE TO PIPE 8-J 89.40 PT 1-2-3-4 116110 1-SI-546-10S PIPE TO TEE 8-J 89.40 PT 1-2-3-4 116'120 1-$1.546-11S TEE TO PIPE 8-J 89.40 PT 2-3 DATE: 12/20/95 REVI SIGH: 0 COOK NUCLEAR PLANT UHIT 1 IHSERVICE IHSPECTIOH LONG TERH PLAN CLASS 1 ALL STATUS COHPONENTS PAGE: 163 SAFETY INJECTION SYSTEH SUHHARY EXAHIHATION AREA NUHBER IDEHT IF I CATION FIRST PERIOD INSPECTION INTERVAL ASHE I SEC.Xl I CATGY NDE I ITEH HO METH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERICO-0 U T A G E------1 2 3 4 1 2 3 INSTRUCTIONS I*iCALISRATIOH BLOCK**LINE 1-81-546 FIG HO A-63'16130'I-S I-546-12S PIPE TO ELBSI B.J 89.40 PT 1.2-3-4.116140 1-81-546-13S ELBSI TO PIPE 8-J 89.40 PT 1-2-3-4 116150 1-81-546-14S PIPE TO ELBSI 8-J 89.40 Pl'-2-3-4 116160 1-81-546-158 ELBSI TO PIPE 8-J 89.40 PT 2-3-4-116170 1-Sl-546-16F PIPE TO ELBSI 8-J S9.40 PT 1-2-3-4-116180 1-81-546-17S ELBOII TO PIPE B.J 89.40 PT 2-3-4 116190 1.81-546-18F PIPE TO VALVE 8-J 89.40 PT 1 2-3 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLAMT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPOMENTS PAGE: 164 SAFETY INJECTION SYSTEH SUHHARY EXAHI MAT I ON AREA NUHBER IDENT IF ICATION INSPECTION INTERVAL I FIRST ASHE PER IOD SEC.XI I CATGY NDE ITEH NO HETH I 1 2 3 PLAN SI'ATUS SECOND THIRD I PERIOD PERIOD I OUTAGE-I 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK~~L NE 1 S-546 F G MO A-64 116200 1-SI-546-19F VALVE TO PIPE 8-J 89.40 PT 1 2-3.4-116300 1-Sl-546-20S PIPE TO VALVE 8-J 89.40 PT 1-2-3-4-116400 1.SI.546.21S VALVE TO PIPE ANNULUS 8 J 89.40 2-3-C X PT 1--C 116500 1.SI-546-228 PIPE TO ELBOM 8-J 89.40 PT I-2-3-4 116600 1.SI.546.23S ELBOll TO PIPE 8-J 89.40 PT 1-2-3-4-116700 1-SI-546-24F PIPE TO ELBON ANNULUS 8-J 89.40 PT 1-2-3-4 C C X 116800 1.SI.546.25S ELBOU TO PIPE 8-J 89.40 PT 1.2-3 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE IHSPECTIOH LONG TERN PLAN CLASS 1 ALL STATUS CCHPONENTS PAGE: 165 SAFETY IHJECTION SYSTEH SUNHARY EXAHIHATIOH AREA NUNBER IDENTIFICATION IHSPECTIOH IHTERVAL I FIRST ASNE PER I CO SEC.XI I CATGY NDE ITEN HO NETH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD)I OUTAGE I 1 2 3 4 1 2 3 I INSTRUCTIOHS
- CALIBRATIOH BLOCK~LINE 1-SI-546 F G HO A-64 116900 1-8 I-546-26S PIPE TO ELBOM 8-J 89.40 PT 1-2-3-4-'117000 1-SI-546-27F ELBOM TO PIPE ANNULUS 8-J 89.40 2-3-4-C X PT 1---C 117025 1-8 I-546.27F-A PIPE TO COUPLIHG B.J 89.40 PT 1-2-3-4-117050 1-SI 546-27F-8 COUPLING TO PIPE 8-J 89.40 PT 1 2-4 117100.1.SI.546-28S PIPE.TO ELBOM 8-J PT 89.40 2-3-4-117200 1-SI-546 28S A ELBOM TO PIPE 8-J 89.40 PT 1-2-3-4 117300 1-SI-546-28S-B PIPE TO ELBOM 8-J 89.40 PT 1-2-3-4 DATE: 12/20/95 REVISIOH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS CONPONENTS PAGE: 166 SAFET INJECTION SYSTE SUNNARY EXAHI HAT I ON AREA HUNGER IDENTIFICATION INSPECTION INTERVAL I ASHE SEC.Xl I CATGY NDE ITEN NO NETH I 1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD-I----0 U T A G E------I 2 3 1 2 3 4 I 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK L NE 1-S-46 FIG NO A-65 117400 1-Sl-546-29F ELBQI TO PIPE ANNULUS 8 J 89.40 PT 2 3-4 C C X 117500 1.$1-546.30S PIPE TO COLLAR 8-K-1 PT 810.10 1-2-3-4-WELD INACCESSIBLE FOR EXANINATION DUE TO COLLAR CONF I CURAT ION.117600 1-8 I-546-318 COLLAR TO PIPE COHT.L2 B.K.1 PT 810.10 2.3-4-C X 117700 1-SI-546-328 PIPE TO ELBOW 8 J 89.40 PT 2-3.4 X 117800 1.SI-546-33F ELBOW TO PIPE 8 J 89.40 PT 1 C 2 C 3X 4-117900 1.SI~546-34S PIPE TO ELBQI 8-J 89.40 PT 2-3X 4 118000 1-SI.546-35S ELBOW TO PIPE 8-J 89.40 PT 2-3 DATE: 12/20/95 REVISIOI: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE IHSPECTIOM LONG TERM PLAH CLASS 1 ALL STATUS COMPONENTS PAGE: 167 SAF TY N 0
SUMMARY
EXAHI HAT ION AREA NUMBER I DENT IF I CAT I OH INSPECTION INTERVAL I F IRST ASHE I PERIOD SEC.XI I CATGY NDE ITEM MO METH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I I OUTAGE------I 1 2 3 4 1 2 3 I INSTRUCTIONS
~~CAL I BRAT IOH BLOCK*~LINE 1-S1-546 FIG NO A-65 118100 1-S1-546.36S PIPE TO ELBOM 8-J 89.40 PT 1 2 3-4-118200 1-Sl-546-37S ELBDM TO PIPE 8-J 89.40 PT 1-2-3-4 118300 1-S1.546-38F PIPE TO ELBON 8-J 89 40 PT 1C 2 C 3 X 4-118400 1-SI-546-39S ELBON TO PIPE CONT~L2 8-J 89.40 PT 1 2-3-4-118500 1-81-546-40S PIPE TO ELBOI B-J 89.40 PT*1 2-3-4-X 118600 1-S I-546-41F ELBOH TO PIPE 8-J 89.40 PT 1 2-3-4-118900 1-81-546-42S PIPE TO ELBOll 8-J 89.40 PT 1-2-3-4 DATE: 12/20/95 REVI SIGH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 168 SAFETY INJECT OM SYSTEM
SUMMARY
EXAM I MAT I OH AREA NUMBER IDENT IF I CAT I OH INSPECTION INTERVAL I ASME I SEC.XI I CATGY MDE ITEN MO HETK/1 FIRST PER I CO 2 3 PLAN STATUS SECOND PER IOO THIRD I PERIOD 0 U T A G E------I 1 2 3 4 1 2 3 I INSTRUCTIOHS
~~CALIBRATIOM BLOCK**NE 1-SI-46 F G NO A-65 119000 1-SI-546.43S ELBOU TO PIPE 8-J 89.40 PT 2-3-4 119100 1.SI.546.448 PIPE TO VALVE 8-J 89.40 PT 2 C 3X 119200 1-SI-546 45S VALVE TO PIPE 8 J 89.40 PT 2-3-119300 1.SI-546-46S PIPE TO ELBDU 8-J 89.40 PT 2-3-4 119400 1-81-546-478 ELBOU TO PIPE COHT~L2 8-J 89.40 PT 2-3-4 C C X 119500 1-S I-546-48F PIPE TO BRANCH CONNECTION 8-J 89.40 PT 2-3.4.NE 1-S 548 F G MO A.66 119535 1.SI.548.04S TEE TO PIPE 8-J 89.40 PT 2-3 DATE: 12/20/95 REVISIOH: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE IHSPECTIOH LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 169 SAFETY IHJECTIOH SYSTEH SUHMARY EXAMI HAT ION AREA NUMBER IDENT I F I CAT IOH INSPECTION INTERVAL I FIRST ASHE I PERIOD SEC.XI CATGY NDE ITEM NO METH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I 0 U T A G E------I 1 2 3 4 1 2 3 I IN STRUC'f I ONS*~CALIBRATIOH BLOCK*LINE 1 SI-548 FIG HO A-66 119540 1-SI-548-05S ELBOH TO PIPE 8-J 89.40 PT 1-2-3-4-119545 1-SI-548.06S PIPE TO ELBOW 8-J 89.40 PT 1 2-3-4-119550 1-SI-548-07S ELBOH TO PIPE 8-J 89.40 PT 1 2-3-4-119555 1.SI-548-08S PIPE TO ELBSI 8-J PT 89.40 2-3-4 119560 1.SI-548.09S ELBWI TO PIPE 8-J 89.40 PT 1 2-3-4 119565 1-SI-548-10S PIPE TO TEE 8-J 89.40 PT 1 2-3-4-119570 1.SI-548.1'IS TEE TO PIPE 8-J 89.40 PT 1 2-3 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPOHEHTS PAGE: 170 SAFETY INJECTION SYSTEM
SUMMARY
EXAMI HAT I OH AREA NUMBER IDENT I F ICATION INSPECTION INTERVAL I ASME I SEC XI I CATGY NDE I ITEM HO METH PLAN STATUS FIRST SECOND THIRD PERICO PERIOD PERIOD-I------OUTAGE------I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
<<~CALIBRAT ION BLOCK i NE'I-S-48 F G HO A-66 119575 1-SI-548-12S PIPE TO TEE 8-J 89.40 PT 1-2-3-4 119580 1-S I-548-13S TEE TO PIPE 8-J B9.40 PT 1-2-3-4-119590 1-SI-548-14S PIPE TO ELBON 8-J 89.40 PT 1.2-3-4-119600 1.SI.548-15S ELBOH TO PIPE 8-J 89.40 PT 1-2-3-4-'I 19610 1.S I.548-16S PIPE TO ELBOH 8-J 89.40 PT 1-2-3-4-119620 1-SI-548-17S ELBOH TO PIPE 8-J 89.40 PT 2-4-119630 1-Sl-548-18S PIPE TO ELBOH 8-J 89.40 PT 1 2-3-4 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LOHG TERN PLAN CLASS 1 ALL STATUS CONPOHENTS PAGE: 171 SAFETY INJECT OM SYSTEM
SUMMARY
EXANIHATIOH AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I ASHE I SEC~XI I CATGY HDE ITEN NO NETH I 1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERICO I-I-0 U T A G E----I 2 3 1 2 3 4 1 2 3 I INSTRUCT I OH S**CALIBRATION BLOCK**LIME 1 S1-548 FIG NO A-66 119640 1-Sl-548-19S ELBON TO PIPE 8-J 89.40 PT 1-2-3-4-119650 1.SI-548-20S PIPE TO ELBON 8-J 89.40 PT 1 2-3-4-119660 1-SI-548.21F ELBON TO PIPE 8-J 89.40 PT 1 2-3.4 119670 1-SI-548-22S PIPE TO ELBON 8-J 89.40 PT 1 2-3-4-'119680'I-SI-548.23S ELBON TO BEND 8-J 89.40 PT 1-2-3-4 119690 1-Sl-548-24F BEND TO VALVE 8-J 89.40 PT 1-2-3-4-LINE 1-SI-548 FIG NO A-67 119700 1-S I-548-25F VALVE TO PIPE 8-J 89.40 PT 1-2-3 DATE: 12/20/95 REVISION: 0 COOK NUCI.EAR PLAHT UNIT 1 IHSERVICE INSPECTION LOHG TERH PLAN CLASS 1 ALL STATUS CDHPONEN'TS PAGE: 172 SAFETY INJECTION SYSTEH SUHHARY EXAHI HAT I OH AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE ITEH NO NETH I PLAN STATUS FIRST SECOND PERIOD PERIOD THIRD I PER I CO---0 U T A G E------I 1 2 3 1 2 3 4 1 2 3 I INSTRUCT IOHS**CALIBRATION BLOCK~~L N 1 S 548 FIG HO A 67 119800 1-S I-548-26S PIPE TO VALVE 89.40 2-3-4-8-J PT 1 119900 1-$1-548-27S VALVE TO PIPE B J 89.40 PT 1-2-3 4-120000 1-S I-548-28S PIPE TO ELBOW 8-J B9.40 PT 1-2.3.4 120100 1-SI.548.29F ELBOW TO PIPE 8-J 89.40 PT 1C 2C 3X 4-120300 1-S I-548-30S PIPE TO ELBOW ANNULUS 8 J 89.40 PT 1---C 2-C 3-X 4-120400 1-SI-548-31S ELBOW TO PIPE B-J 89.40 PT 1 2-3.4-120500 1-SI-548-32S PIPE TO ELBOW B-J 89.40 PT 1 2-3 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 173 SAFETY IMJECTIOH SYSTEM SMEARY EXAMINATION AREA NUMBER IDENT IF ICATION INSPECTIOH INTERVAL I ASHE I SEC.XI I CATGY MDE ITEN MO METR FIRST PERIOD PLAN STATUS SECOHD THIRD PERIOD PERICO------OUTAGE
-I 1 2 3 1 2 3 4 1 2 3 I 1HSTRUCTIONS
~~CALIBRATION BLOCK~~LIHE 1-SI-548 FIG HO A-67 120600'I-SI-548.33F ELBOU TO PIPE 8-J 89.40 PT 1-2-3-120700 1-SI-548-33F-A PIPE TO ELBSI 8-J 89.40 PT 1C 2 C 3X 4-120800 1-81 548-33F-8 ELBDH TO PIPE 8 J 89.40 PT 1 2-3-4 120900 1-SI-548-33F-C PIPE TO ELBOll 8-J 89.40 PT 1 2-3-4*E.121000 1-SI-548.33F-D ELBOM TO PIPE 8-J 89.40 PT 1-2-3.4.X 121100 1-SI-548.34S PIPE TO ELBOM AHHULUS 8-J 89.40 2.3-4 C X PT 1---C LIME 1-SI-548 FIG NO A-68 121200 1-SI-548-35F ELBDN TO PIPE ANHULUS 8-J 89.40 PT 1-2.3.C C X DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UHIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 174 SAFETY INJECT OM SYSTEM
SUMMARY
EXAHIHATI OH AREA NUMBER IDENI'IF I CATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE I ITEN NO NETH I 1 PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD-I 0 U T A G E I 2 3 1 2 3 4 1 2 3 I INSTRUCT I OH S*~CAL I BRAT ION BLOCK**L E 1-S-548 IG HO.68 121300 1-$1-548.36S PIPE TO COLLAR 810.10 2-3-4-8-K-1 PT 1-llELD INACCESSIBLE FOR EXAHINATIOM DUE TO COLLAR COHF I GURAT I OH.121400 1-S I-548-37S COLLAR TO PIPE 8-K-1 PT 1-810.10 2-3-4-121500 1.S1.548.38F PIPE TO COUPLIHG B.J 89.40 PT 1 2-3-4-121600 1-SI-548-39S COUPLING TO PIPE 8-J 89.40 PT 1-2-3-4-121700 1-SI-548-40S PIPE TO ELBOM B-J B9.40 PT 1-2-3-121800 1-SI-548-41F ELBOM TO PIPE CONT.L1 8-J 89.40 PT 1-2 3 4 C C X 121900 1-SI-548-42S PIPE TO ELBOH 8 J 89.40 PT 1-2-3 DATE: 12/20/95 REVI SIGH: 0 COOK NUCLEAR PLANT UNIT 1-IHSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE 175 SAFETY IHJECTIOH SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT IF ICATlOH INSPECTION INTERVAL I ASME I SEC.XI CATGY NDE ITEM NO METH I 1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD-I OUTAGE I 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
<<*CALIBRATION BLOCK*~LIHE 1-SI-548 FIG NO A-68 122000 1-SI-548-4'3S ELBSI TO PIPE 8-J 89.40 PT 1-2-3-4-122100 1-SI-548.44S PIPE TO VALVE 8-J 89.40 PT 1-2-3-4-122200 1-SI-548-45S VALVE TO PIPE 8-J 89.40 PT 1 2-3-122300 1-SI-548.46S PIPE TO ELBSI 8-J 89.40 PT 1 2-3-4 122400'1-81-548.47S ELBOM TO PIPE 8-J 89.40 PT 1C 2 C 3 X 4-122500 1-SI-548.48F PIPE TO BRANCH CONNECTION 8-J 89.40 PT 1 2-3 X 4-LINE 1-SI 549 FIG HO A-69 123240 1-SI-549-11F REDUCER TO PIPE 8-J 89.40 PT 1 2-3X 4-DATE: 12/20/95 REVISIOH: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LOHG TERN PLAN CLASS 1 ALL STATUS COHPOHEHTS PAGE: 176 SAFETY INJECTION SYSTEN SUNMARY EXANIHATIOH AREA HUHBER IDENTIFICATIOH PLAN STATUS SECOND THIRD PERIOD PERIOD INSPECTION INTERVAL j FIRST ASNE i PER IOD SEC.XI-I CATGY NDE)------0 U T A G E------ITEH HO NETH I 1 2 3 1 2 3 4 1 2 3 I I I I INSTRUCTIONS I~*CALI BRAT I OH BLOCK~L NE 1-SI-549 FIG HO A.69 123250 1-SI-549-128 PIPE TO ELNN B.J 89.40 PT 1-2-3X 4-123260 1-Sl-549-13F ELBON TO PIPE 8-J 89.40 PT 1-2-3-4-123270 1.SI.549-14S PIPE TO ELBQI 8 J 89.40 PT 1-2-4-123280 1-Sl-549-15S ELBOll TO PIPE 8-J 89.40 PT 1-2-3-4-123290 1-SI-549-16S PIPE TO ELBON 8-J 89.40 PT 1-2-3-=4-123300 1-Sl-549-17S ELBOM TO PIPE 8-J 89.40 PT 1 2-3X 4-123310 1-SI-549.18S PIPE TO ELBON 8 J 89.40 PT 1-2-3 DATE 12/20/95 REVI SICH: 0 COOK NUCLEAR PLAN'I UHIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPOHEHTS PAGE: 177 SAFETY INJ CTIOM SYST
SUMMARY
EXAMIMATION AREA NUMBER IDENTIF ICATIOM INSPECTION INTERVAL I ASME I SEC.Xl I CATGY NDE I ITEM NO METH I PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I I-----OUTAGE-----I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
~iCAL I BRAT I OH BLOCK**LIME 1 SI-549 FIG NO A.69 123320 1-SI-549-19S ELBSI TO PIPE 8-J 89.40 PT 1-2-3-123330 1-SI-549-20F PIPE TO ELBOM 8-J 89.40 PT 1 2-3-4 LINE'I-SI-549 FIG MO A-70 123340 1.SI-549-21S ELBOM TO PIPE 8-J 89.40 PT 1-2 3-4 X 123350 1-S I-549.22S PIPE TO ELBOW 8-J 89.40 PT 1 2-3.4 X 123360 1-SI.549-23S ELBOM TO PIPE 8-J 89.40 PT'I-2-3-4-123370 1-SI-549-24S PIPE TO PIPE 8 J 89.40 PT 1-2-3-4 123380 1-SI-549-25S PIPE TO PIPE 8-J 89.40 PT 1-2-3 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPONEHTS PAGE: 178 SAF TY HJ T ON S STEH SUHHARY EXAHI HAT I ON AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I FIRST ASHE I PER IOO SEC~XI I CATGY NDE I ITEH HO HETH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERICO I I OUTAGE---I 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK**LINE 1-S-49 FIG NO A-70 123390 1-SI-549-26S PIPE TO TEE 8-J 89.40 PT 1-2-3-4-123400 1-SI-549-27S TEE TO PIPE B.J 89.40 PT 1-2-3-4-123410 1-SI-549-28S PIPE TO TEE 8-J 89.40 PT 1-2-3 4-123420 1-Sl-549-29S TEE TO PIPE 8-J 89.40 PT 1-2-3-4-123430 1-SI-549-30F PIPE TO ELBDM 8-J 89.40 PT 1 2 3-4-L NE 1-S.549 FIG NO A-71 123440 1.SI-549.31S ELBOlJ TO PIPE 8-J ,89.40 PT 1-2-3.4-123450 1-S I-549.32S PIPE TO ELBOI 8-J 89.40 PT 1-2.3-4 DATE: 12/20/95 REVI S I OH: 0 COOK HUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 179 SAFETY INJECT OH SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT IF I CATION IHSPECTIOH INTERVAL I ASHE I SEC.XI CATGY NDE ITEM NO METH I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD I I OUTAGE I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- ~CALIBRATIOH BLOCK**LINE'1-SI-549 FIG NO A-71 123460 1.SI-549.33S ELBSI TO PIPE 8-J 89.40 PT 1-2-3-4-123470 1-SI-549-34S PIPE TO ELBON 8-J 89.40 PT 1-2.3.4-123480 1-SI-549.35S ELBON TO PIPE 8-J 89.40 PT 1 2-3-4-123490 1-SI-549.36F PIPE TO VALVE 8-J PT 1 89.40 2-3.4 X LIHE 1-SI-549 FIG NO A-72 123500 1-Sl-549-37F VALVE TO PIPE 8-J 89.40 PT 1 2-3.4 123600 1-SI-549-38S PIPE TO VALVE 8-J 89.40 PT 1 2-3-4 123700 1.SI-549-39S VALVE TO PIPE 8-J 89.40 PT 1 2-3-4 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPOHENTS PAGE: 180 SAFETY INJECTION SYSTE SUHHARY EXAHI HAT I ON AREA NUNBER IDENT I F ICATION IHSPECT10N INTERVAL I'SHE I SEC.XI I CATGY NDE ITEN NO NETH I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD------0 U T A G E------1 2 3 1 2 3 4 1 2 3 IHSTRUCT IOHS<<~CALIBRATION BLOCK*NE 1 Sl-49 FIG NO A-72 123800 1-SI-549-40S PIPE TO ELBOM 8-J 89.40 PT 1C 2 C 3X 4-123900 1-SI-549-41S ELBOM TO PIPE 8-J 89.40 PT 2-3-4-124000 1-SI-549-42S PIPE TO ELBOM 8-J 89.40 PT 1-2 3.4 124100 1-Sl-549-43F ELBOM TO PIPE AHHULUS 8-J 89.40 2-3-4 C X PT 1---C 124200 1-SI-549-44S PIPE TO ELBOM 8-J 89.40 PT 1'-2-3-4-124300 1-SI-549-45S ELBOM TO PIPE 8-J 89.40 PT 1 2-3-4-124400 1-SI-549-46S PIPE TO ELBOM 8-J 89.40 PT 1-2 3-e 4 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UHIT 1 IHSERVICE INSPECTION LOHG TERM PLAN CLASS 1 ALL STATUS CONPOHENTS PAGE: 181 SAFETY INJECT OH SYSTEN SUNHARY EXAHINATIOH AREA NUHBER IDEN I IF I CATION INSPECT IOH INTERVAL I ASHE I SEC~XI I CATGY NDE I ITEN NO NETH I 1 F IRST PERIOD PLAN STATUS SECOND THIRD I PERIOD PERIOD-----OUTAGE I 23 1234 123I INSTRUCTIONS
~~CALIBRATION BLOCK~LINE 1-SI-549 FIG NO A-72 124500 1-SI-549.47F ELBSI TO PIPE 8-J 89.40 PT 1-2 3-4 124600 1-SI-549.48S PIPE TO ELBOM 8-J 89.40 PT 1-2-3-4-LINE 1-Sl-549 FIG NO A 73 124700 1-SI-549.49F ELBOM TO PIPE 8-J 89.40 PT 2 C 3 X 4-124800 1-SI-549-50S PIPE TO COLLAR 810.10 2-3-4 8-K 1 PT 1-HELD INACCESSIBLE FOR EXAHIHATIOH DUE TO COLLAR CONF I GURAT I OH~124900 1-SI.549-51S COLLAR TO PIPE CONT.L4 810.10 2-3-4 8-K-1 PT 1 C 100K UT NOT FEASIBLE DUE TO IIELD CONFIGURATION.
125000 1-SI-549-52F PIPE TO COUPLIHG 8-J 89.40 PT 2-3-4 125100 1-SI.549-53S COUPLIHG TO PIPE COHT~L4 8 J 89.40 2-3-C X PT 1---C DATE: 12/20/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPONENTS PAGE: 182 SA ETY INJECT ON SYST H SUHHARY EXAHI HAT ION AREA NUHBER IDENT IF ICATION INSPECTION INTERVAL I FIRST ASHE PERIOD SEC.Xl CATGY NDE ITEH NO HETH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I I OUTAGE...---I 1 2 3.4 1 2 3 I INSTRUCTIONS
~ICAL I BRAT ION BLOCK~~LINE 1-SI-549 F G NO A-73 125200 1-SI-549-53S.A PIPE TO ELBOM 8-J 89.40 PT 2-3-4-125300 1-81-549-53S.B ELBSJ TO ELBOW 8-J 89.40 PT 1-2.3-4-125400 1-SI-549-53S-C ELBOM TO PIPE 8-J 89.40 PT 1-2 3-4 125500 1-SI-549-53S-D ,PIPE TO ELBON CONT~L4 8-J 89.40 PT 1.2-3-4-125600 1-SI-549.53S.E ELBOM TO ELBOtl'-J 89.40 PT 1-2-3-4 125700 1-SI-549-53S.F ELBOM TO PIPE 8 J 89.40 PT 1 2-3-4-125800 1-SI-549.54S PIPE TO ELBOM 8-J 89.40 PT 1-2-3 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLAHT UHIT 1 IHSEPVICE INSPECTIOH LONG TERH PLAN CLASS 1 ALL STATUS COHPONENTS PAGE: 183 SAFETY INJECTION SYSTEH SUHHARY EXAHINATIOH AREA NUHBER IDENT IF I CATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE ITEN HO NETH PLAN STATUS F IRST SECOND THIRD PERIOD PERIOD PER I CO I OUTAGE I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
~*CALIBRATIOH BLOCK*i LINE 1-SI 549 FIG NO A-73 125900 1.$1.549.55F ELBOW TO PIPE 8-J 89.40 PT 1-2-3-126000 I-SI-549-56S PIPE TO ELBOM 8-J 89.40 PT 1-2-3-4-126100 1.SI.549-57S ELBDM TO PIPE 8-J 89.40 PT 1-2.3-4 126200 1-SI-549.58S PIPE TO VALVE CONT.L4 8-J 89.40 PT 1.2-3-4-C C X 126300 1-SI-549-59S VALVE TO PIPE 8-J 89.40 PT 2-3-4-126400 1-SI-549.60S PIPE TO ELBDM CONT.L4 8-J 89.40 PT 1 2-3-4-C C X 126500 1-SI-549-61S ELBOH TO PIPE 8-J 89.40 PT 1-2-3-4 DATE: '12/20/95 REVI SIGH: 0 COON NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 184 SAFETY INJECTION SYSTEM
SUMMARY
EXAHIHATIOM AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I ASKE I SEC.XI I CATGY NDE ITEN NO KETH I 1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I-----OUTAGE--
I 2 3 1 2 3 4 1 2 3 INSTRUCTIONS
++CALIBRATION BLOCKaeL NE1.S 4 F GNOA-126600 1-SI-549.62F PIPE TO BRANCH CONHECTIOM 8-J B9.40 PT 1-2-3 DATE: 12/20/95 REVISIOH: 0 COOK NUCLEAR PLANT UHIT 1 IHSERVICE IHSPECTION LOHG TERM PLAN CLASS 1 ALL STATUS COMPOHENTS PAGE: 185
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION IN'IERVAL CHEMICAL AND VOLUME CONTROL SYSTEM I ASME I SEC.XI I CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND THIRD PER I OD PERIOD PERIOD I I OUTAGE----
-I 1 2 3 1 2 3 4 1 2 3 I IHSTRUCTIOHS
~*CALIBRATION BLOCK~~LIHE 1-CS-92 FIG HO A-74 126800 1-CS-92-22F VALVE TO PIPE 8-J 89.21 PT 1-2-3-4-127100 1.CS-92-23F PIPE TO VALVE CONT.L4 8 J 89.21 PT'I-2.3-4-C C X 127200 1-CS-92-24F VALVE TO PIPE 8-J 89.21 PT 1-2-3-4 127300 1-CS-92.25S PIPE TO ELBSI 8 J 89.21 PT 1-2.3-4-127400'-CS-92-26S ELBOLI TO ELBOI 8-J 89.21 PT 1-2-3-4 127500 1-CS-92-27S ELBOH TO PIPE 8-J 89.21 PT 1 2-3-4-127600 1-CS-92-28S PIPE TO ELBOM 8-J 89.21 PT 1.2-3 DATE: 12/20/95 REVI SION: 0 COOK NUCLEAR PLANT UMIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 186 CHEH CA AMD V UH C TRO SYSTE SUHHARY EXAHI NATION AREA NUHBER IDENT I F ICATION INSPECTION INTERVAL I ASHE SEC~XI I CATG'Y NDE ITEH NO METH J 1 PLAN STATUS FIRST SECOND PERIOD PERIOD THIRD I PERIOD--I-0 U T A G E------I 23 1234 123 INSTRUCTIONS
- ~CALIBRATION BLOCK~~LIME 1-CS-92 FIG MO A-74 127700 1.CS-92-29S ELBOM TO ELBSI B-J 89.21 PT 1-2-3-4-127800 1-CS-92-30S ELBOM TO PIPE 8-J 89.21 PT 1-2-3-4 127900 1-CS-92-31F PIPE TO BRANCH CONNECTION 8 J 89.21 PT 1 2-3-4-IM 1-CS-9 F G 0 A-128100'I-CS-96-48F VALVE TO PIPE B-J B9.21 PT 1-2-3-4-128200 1.CS-96-49F PIPE TO VALVE 8-J 89.21 PT 1 2-3-4-128300 1.CS-96-50F VALVE TO PIPE 8-J 89.21 PT 2-3-4 128400 1-CS.96-51F PIPE TO ELBSI CONT.L1 8-J 89.21 PT 1---C 2...C 3-X 4-DATE: 12/20/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPOHEHTS PAGE: 187 SUNDRY EXAHINATIOH AREA NUHBER IDENT I F I CATION INSPECTION INTERVAL CHEHICAL AND VOLUHE CONTROL SYSTEH I ASHE I SEC.XI I CATGY NDE ITEN HO NETH PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I I-0 U T A G E------I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
~eCALIBRATION BLOCK**IH 1-CS-96 G NO A-75 128500 1-CS-96-52S ELBOU TO PIPE 89.21 2-3-4 BJ PT 1 128600 1-CS-96.53S PIPE TO ELBOM 8-J 89.21 PT 1C 2 C 3 X 4-128700 1-CS-96-54S ELBOLI TO PIPE 89.21 2.3-4-B.J PT 1-128800 1.CS-96-55S PIPE TO ELBOM 8-J 89.21 PT 1 2-3-4-128900 1.CS.96-56S ELBDM TO PIPE 8-J 89.21 PT 1-2-3-4 129000 1-CS-96.57S PIPE TO ELBOM B-J 89.21 PT 1 2-3-4-129100 1-CS-96-58S ELBON TO PIPE 8-J 89.21 PT 1-2-3-4 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LOHG TERH PLAN CLASS 1 ALL STATUS COHPOHENTS PAGE: 188 CHEHICA AND VO SUHHARY EXAHI NATION AREA HUHBER IDEN'I IF ICATION INSPECTION INTERVAL T 0 SYSTEH I FIRST ASHE PERIOD SEC.XI I CATGY NDE I ITEH NO METH i 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I I-0 U T A 0 E------I 1 2'3 4 1 2 3 INSTRUCTIONS
~*CALIBRATIOH BLOCK~~IHE 1.CS 6 F G NO A-75'129200 1.CS.96-59S PIPE TO ELBOM CONT.L1 8-J'9.21 PT 1-UT 2-C 3-X 4**3378026 (3-SS.160-.430)
~*129300 1-CS-96-60F ELBSI TO BRANCH CONNECTION 8-J 89.21 PT 1-2-"3-4-LINE 1-CS-99 F G HO A 76 129400 1-CS-99-01F REDUCER TO TEE BJ PT 1C 89.21 2 C 3.4 129500 1-CS-99.02S PIPE TO TEE COHT.L4 8-J 89.21 PT 1-2-3-4-C C X 129600 1-CS-99.03F PIPE TO PIPE COHT.L4 8-J 89.21 PT 1-2-3-4 C C X 129700 1-CS-99.04F BRANCH CONNECTION TO PIPE 8-J 89.21 PT 1 2-3-4-129800 1-CS.99-05S TEE TO PIPE 8-J 89.21 PT 1C 2 C 3 X 4-DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 189
SUMMARY
EXAMIHATIOH AREA NUMBER IDENTIFICATION INSPECTION INTERVAL CHEMICAL AHD VOLUME CONTROL SYSTEM I ASME I SEC.XI I CATGY NDE I ITEM NO METH FIRST PER ICO PLAH STATUS SECOND PER ICO THIRD PERIOD I OUTAGE I 1 2 3 1 2 3 4 1 2 3 I IHSTRUCTIONS
~~CALIBRATION BLOCK~*LIME 1-CS-99 FIG NO A-76 129900 1-CS-99-06F PIPE TO VALVE 8-J 89.21 PT 1-2-3-4-130000 1-CS.99-07F VALVE TO PIPE CONT.L4 8 J 89.21 Pl'--C 2-3-4 X 130100 1-CS-99-09F
-PIPE TO ELBSI 8-J 89.21 PT 1-2-3-4 130200 1-CS-99-10F ELBOH TO PIPE 8-J 89.21 PT 1 2-3-4-130300 1-CS-99-1'IF PIPE TO ELBOM 8 J 89.21 PT 1-2-3-4 130400 1-CS-99-12F ELBSI TO PIPE 8-J 89.21 PT 1-2-3-4-130500 1-CS-99.12F-A PIPE TO PIPE 8-J 89.21 PT'I-2-3 DATE: 12/20/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LOHG TERN PLAN CLASS 1 ALL STATUS COHPONEHTS PAGE: 190 CHEMICA AND VOLIN SUHHARY EXAHI HAT I OH AREA HUHBER IDENT I F I CAT ION IHSPECTIOH INTERVAL TROL S'YST H I ASHE I SEC.XI I CATGY NDE I ITEN NO NETH I 1 PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD--0 U T A G E-----2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
+~CALIBRATIOH BLOCK~~LIHE 1-CS-99 FIG NO A-76 130600 1-CS-99.13F PIPE TO ELBOM 8-J 89.21 PT 1-2-3-4-130700 1-CS-99-'14S ELBOM TO PIPE 8 J 89.21 PT 1C 2 C 3X 4-131200 1-CS-99-15S PIPE TO ELBOM CONT.PRT 8-J 89.21 PT 1---C 2---C 3--.X 4-131300'I-CS-99-16S ELBOM TO PIPE 8-J 89.21 PT 1 2-3-131400 1-CS-99-17S PIPE TO ELBOM 8-J 89.21 PT 1 2-3-4-131500 1-CS-99-18S ELBOM TO ELBOM 8-J 89.21 PT 1-2-3-4 131600 1.CS.99-19S ELBOM TO PIPE 8-J 89.21 PT 1-2C 3X 4 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPOHENTS PAGE: 191 SUNNARY EXANI HAT ION AREA HUNBER IDENTIFICATION INSPECTION INTERVAL CKENICAL AND VOLUHE CONTROL SYSTEH I ASNE I SEC XI'CATGY HDE ITEN HO NETH I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD I OUTAGE I 1 2 3 1 2 3 4 I 2 3 I INSTRUCT I OHS eeCAL I BRAT I OH BLOCK**INE 1-CS.99 FIG NO A-76 131700 1-CS.99-19S-A PIPE TO REDUCER 8-J 89.21 PT 1C 2-3-4-131800 1-CS-99-20F REDUCER TO VALVE 8-J 89.21 PT 1-2-3-4-131900 1-CS.99-21F VALVE TO PIPE B.J 89.21 PT 1-2-3-4-132000 1 CS99-22F PIPE TO VALVE 8-J 89.21 PT 1-2-3-4-MELD PARTIALLY COVERED (50X)BY PERHANEHT PIPE RESTRAINT AND IS LOCATED IN HIGH RAD I AT IOH AREA.HE 1-CS-780 FIG NO A-77 140080 1-CS-780.01F BRANCH COHHECTIOH TO PIPE 8-J 89.40 PT 1 2-3-4 140100 1-CS-780-02F PIPE TO VALVE 8-J B9.40, PT 1-2-3-4-140200 1.CS-780.03F VALVE TO PIPE 8-J 89.40 PT 1 2-3 DATE: 12/20/95 REVI SIGH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS CCHPOHENTS PAGE: 192 SUNNARY EXAHI HAT IOH AREA NUHBER IDENT I F ICATION INSPECTION INTERVAL CHEN CAL AND VOLUHE CONT OL SYSTEM I ASHE I SEC.XI I-CATGY NDE ITEN NO NETH I 1 PLAN STATUS FIRST SECOND THIRD I PERICO PERIOD PERIOD I I OUTAGE--.-2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK~~LINE 1-CS 780 FIG ND A-77 140300 1-CS-780-04S PIPE TO ELBOW B-J 89.40 PT 2-4-140400 1-CS-780-05S ELBOM TO PIPE 8-J 89.40 PT 1-2-3-4 140500 1-CS-780-06S PIPE TO ELBOll REGEH HXRN 8-J 89.40 PT 1-2-3 4 C C X 140600 1-CS-780-07S ELBOH TO PIPE 8-J 89.40 PT 1-2-3-4-140700 1-CS-780-08S PIPE TO ELBOM'8-J B9.40 PT 1-2-3-4 140800 1-CS-780.09S ELBDM TO PIPE 8-J 89.40 PT 1 2-3-4 140900 1-CS-780-10S PIPE TO ELBOM B-J 89.40 PT 1-2-3-4.
DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COMPOHENTS PAGE: 193 SUHHARY EXAHIHATIOH AREA NUMBER IDENTIFICATION INSPECTION INTERVAL CHEHICAL AHD VOLUHE CON'TROL SYSTEH I ASHE I SEC.Xl CATGY NDE ITEN NO NETH I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERICO-I-OUTAGE----I 1 2 3 1 2 3 4 1 2 3 I INSTRUCT IOHS*~CALIBRATION BLOCK*~LIHE 1-CS-780 FIG NO A-78 141000 1-CS-780-11F ELBDU TO PIPE REGEH HXRH 8-J 89.40 PT 1-2-3 4 C C X 141100 1.CS.780-11F-A PIPE TO PIPE 8 J 89.40 PT 1-2-3-4-141200 1.CS-780.11F-B PIPE TO PIPE 8 J 89.40 PT 1-2.3-4 PT NOT FEASIBLE DUE TO I NACESS I 8 IL I T Y.141700 1-CS-780-12S PIPE TO ELBOU CONT.L4 8-J 89.40 PT 1.2-3-4 C 141800 1-CS-780-13S ELBON TO PIPE 8-J 89.40 PT'C 2 C 3X 4-141900 1-CS-780-14F PIPE TO ELBOM 8-J 89.40 PT 1 2-3.4 142000 1-CS-780-15S ELBON TO PIPE CONT.L4 8-J 89.40 PT 1---C 2--.C 3-X 4 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LOHG TERN PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 194 CHEHICA A D VO UH SUHHARY EXAHI NATION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL H 0 SYSTEH I ASHE I SEC.XI I CATGY NDE ITEN NO NETH I 1 PLAN STATUS FIRST SECOND.THIRD PERIOD PERIOD PERIOD 0 U T A G E I INSTRUCTIONS 2 3 1 2 3 4 1 2 3]**CAL I BRAT ION BLOCK~~LINE 1 CS-780 FIG NO A 78 142100 1-CS-780-15S-A PIPE TO ELBON 8-J 89.40 PT 1-2 3-4 142200 1-CS-780-15S-B ELBOM TO PIPE B J 89.40 PT 2-3-4 142600 1-CS-780-16S PIPE TO VALVE B-J 89.40 PT 1-2-3-4 C X 142700 1.CS-780-17S VALVE TO PIPE B-J 89.40 PT 1-2-3-4 142800 1-CS-780-17S-A PIPE TO COUPLING 8-J 89.40 PT 1-2-3-4 142900 1.CS-780-17S-B COUPLIHG TO PIPE 8-J.PT 89.40 2-3-4-143000 1.CS-780-18F PIPE TO REDUCER 8-J PT 1 C 89.21 2C 3X 4 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UHIT 1 INSERVICE INSPECTION LOHG TERN PLAN CLASS 1 ALL STATUS COHPONENTS PAGE: 195 RESIDUAL HEAT RENOVAL SYSTEM SUHMARY EXANINATIOH AREA HUHBER IDENTIFICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE I ITEN NO NETH PLAN STATUS FIRST SECOND PERIOD PERIOD------OUTAGE 1 2 3 1 2 3 4 THIRD I PERIOD-I---I 1 2 3 I INSTRUCTIONS
- <<CALIBRATION BLOCK**L NE 1-RH-7 FIG NO A-79 143200 1-RH-27-10F VALVE TO PIPE 8-J 89.1'I PT 1-UT 2.3-4.<<<<3378029 (B-SS-140..81)<<>>
143300 1-RH.27-11S PIPE TO ELBOW 8-J 89.11 PT 1 UT 2-3-4*<<3378029 (B-SS-140-.81)<<*
143400 1.RH-27-12S ELBNI TO PIPE 8 J 89.11 PT 1 UT 2-3-4-<<*3378029 (8-SS-140..81)*>>
143500 1-RH-27-13F PIPE TO TEE ANNULUS 8 J 89.11 PT UT 2-4 C C X<<<<3378029 (B-SS-140-.81)*>>
LINE 1-RH.28 FIG NO A-80 143600 1-RH-28-01S PIPE TO ELBOW CONT.L2 8-J 89.11 PT 1---C UT 2---C 3-X 4-**3378032 (14-SS-160-1.40)**
143700 1-RH-28-01S-HL HANGER LUG CONT.L2 8'10.10 2-3-4 BK-1 PT 1C C X 143800 1.RH-28.02S ELBOW TO ELBOW 8-J 89.11 PT 1-UT 2-3-4-<<*3378032 (14-SS-160-1.40)**
DATE: 12/20/95 REVI SI OH: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPONENTS PAGE: 196 RESIDUAL HEAT REHOVAL SYSTEH SUNHART EXAHINATION AREA NUHBER IDENTIFICATION PLAN STATUS SECOND PERIOD INSPECTIOH IHTERVAL I FIRST ASNE[PERIOD SEC.XI I CATGY NDE i-----0 U T A G E ITEH NO NETH I 1 2 3 1 2 3 4 THIRD I PER I CO I------I 1 2 3 I INSTRUCTIONS
<<*CALIBRATIOH BLOCK<<LINE 1-RH-28 FIG HO A-80 143900 1-RN-28 03S ELBOM TO PIPE 8-J 89.11 PT 1-UT 2 3-4-<<<<3378032 (14-SS-160-1.40)
<<*144000 1-RH 28 04F PIPE TO PIPE BEND 8 J 89.11 PT 1-UT 2-3-4<<<<3378032 (14.SS 160 1 40)<<*144100 1-RH-28-17F PIPE BEND TO PIPE 8-J 89.11 PT 1-UT 2-3-4-<<<<3378032 (14-SS 160-1 40)<<<<144200 1-RH-28-05F PIPE TO PIPE CONT.L2 8-J 89.11 PT 1---C UT 2---C 3-X 4*<<3378032 (14.SS.160.1.40)<<<<
144300 1-RH-28-06S PIPE TO ELBOM 8-J 89.11 PT 1-UT 2.3-4-3378032 (14.SS 160.1 40)<<<<144400 1-RH-28 07F ELBOU TO PIPE 8-J 89.11 PT 1-UI'.3-4-*<<3378032 (14-SS-160-1.40)<<*
144500'I-RH-28 08F PIPE TO COLLAR COHT.L2 8-K-1 PT 1-810~10 2-3-4 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAM CLASS 1 ALL STATUS COMPONENTS PAGE: 197 RESIDUAL HEAT REMOVAL SYSTEH
SUMMARY
EXAHIHATIOll AREA HUHBER IDENT IF I CAT ION INSPECTION INTERVAL I FIRST ASHE (PE RICO SEC.Xl CATGY NDE ITEH MO NETH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD-I OUTAGE---I 1 2 3 4 1 2 3 I INSTRUCTIONS
~~CALIBRATION BLOCK~*N'I.RH-8 F 0 MO A-80 144600 1-RH-28-09F COLLAR TO PIPE 810.10 2-3-4 8-K-1 PT 1-THIS llELD INACCESSIBLE FOR EXAHIHATION DUE TO COLLAR COHFIGURATION.
144700 1-RH-28.10S PIPE TO ELBOU 8-J 89.11 PT 1C UT 2C 3 X 4**3378032 (14-SS-160-1.40)*~
144800 1-RH-28-10S-HL HANGER LUG 8-K-1 PT 810.10 1-2-C 3-4-144900 1.RH-28-11F ELBDU TO PIPE 8-J 89.11 PT 1 UT 2-3-4~~3378032 (14-SS-160-1.40)**
145000 1-RH-28.12S PIPE TO ELBON 8-J PT 1-89.11 , UT 2-3-4<<*3378032 (14-SS-160-1.40)**
145100 1-RH-28-13S ELBOH TO PIPE ANNULUS 8-J 89.11 PT 1 UT 2-3-4-C C X~*3378032 (14-SS-160-1.40)
~~145200 1-RH-28-15F PIPE TO VALVE 8-J 89.11 PT'I-UT 2-3 4-**3378032 (14-SS-160-1.40)~*
DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COHPOMENTS PAGE: 198 RESIDUA HEAT REMOVAL SYSTEM
SUMMARY
EXAHI MAT ION AREA NUMBER IDENT IF ICATION INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE I------0 U T A G E-!TEN NO NETH I 1 2 3 1 2 3 4 THIRD I PER I CO I I-----I 1 2 3 I INSTRUCTIONS
145500 1-RH-29-03S PIPE TO ELBOH 8-J 89.11 PT 1 UT 2.3.<<*3378032 (14-SS-160-1.40)~*
145600 1-RH-29-04F ELBOI TO VALVE 8-J 89.11 PT 1-UT 2.3-4-~*3378032 (14-SS-160-1.40)**
145700 1-RH-29-05F VALVE TO PIPE 8-J 89.11 PT 1 UT 2-3-4-~~3378032 (14-SS-160-1.40)**
LIHE 1-RH-30 FIG MO A-55 145900 1-RH-30.07F VALVE TO PIPE 8-J 89.11 PT UT 2.3-**3378029 (8.SS-140-.81)~*
DATE: 12/20/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPONEHTS PAGE: 199 HASTE DISPOSAL SYSTEH SUHHARY EXAHIHATIOH AREA NUHBER IDENTIF ICATION INSPECTION INTERVAL I FIRST ASHE PERIOD SEC.XI CATGY NDE ITEH NO NETH/1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD-I OUTAGE--1 2 3 4 1 2 3 I INSTRUCT I OHS**CALIBRATION BLOCK*LIHE 1-UD-640 FIG NO A-82 146000 1-ND.640.01F BRANCH CONNECTION TO PIPE 8 J 89.40 PT 1-2-3-,4 146100 1-QD.640-02S PIPE TO VALVE CONT.L1 8 J 89.40 PT 1-2-3-4.C C X 146200 1-lJD-640.03S VALVE TO PIPE 8-J 89.40 PT 1 2-3-4-146300 1-ND-640.04S PIPE TO VALVE 8-J 89.40 PT 1-2-3.4 LINE 1-N-642 FIG NO A-83'146500 1-le-642.01F BRANCH CONNECTION TO PIPE 8-J 89.40 PT 1-2-3-4-146600 1-l$-642-02S PIPE TO VALVE 8-J 89.40 PT 1-2-3-4 146700 1-ND-642.03S VALVE TO PIPE CONT.L2 8-J 89.40 2-3-4-C X PT 1---C DATE: 12/20/95 REVISIOH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE IHSPECTION LONG TERN PLAN CLASS 1 ALL STATUS CONPONENTS PAGE: 200 WASTE DISPOSAL SYSTE SUHMARY EXANINATION AREA HUNBER IDENTIFICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY HDE ITEN NO NETH I 1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PER100 I I----0 U T A G E----2 3 1 2 3 4 1 2 3 INSTRUCT I OHS*ICAL I BRAT ION BLOCK~*LINE 1-WD-642 FIG HO A-83 146800 1-WD-642.04S PIPE TO VALVE 8-J 89.40 PT 2-3.4-LINE 1-WD-644 FIG NO A-84 147000 1-WD.644 01F BRAHCH COHHECTIOH TO PIPE CONT.L3 8-J 89.40 PT 2-3-4-C C X 147100 1.N.644.02S PIPE TO ELBOW 8-J 89.40 PT 2-147200 1-WD-644-03S ELBOW TO PIPE 8-J 89.40 PT 2-3-4-147300 I-le-644-048 PIPE TO VALVE CONT.L3 8-J 89.40 PT 2-3.4.C C X 147400 1-WD-644-05S VALVE TO PIPE 8 J 89.40 PT 2-3-4 147500 1-WD-644-06S PIPE TO TEE 8-J 89.40 PT 2 C 3X 4 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS CDHPOHEHTS PAGE: 201 PASTE DISPOSAL SYSTEH SUHNARY EXANINATION AREA NUNBER IDENTIFICATION INSPECTION IHTERVAL I ASHE I SEC.XI I CATGY NDE ITEN NO NETH I PLAN STATUS F IRST SECOND THIRD PERIOD PERIOD PERIOD-OUTAGE-1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS I*~CALIBRATION BLOCK~~IHE 1-UD-644 FIG HO A-84 147600 I-ND.644.07S TEE TO REDUCER 8-J 89.40 PT 1-2-3-4-147700 1-ND.644-08S TEE TO PIPE 8-J 89.40 PT 1-2-3 4-147800 1-40.644.09S PIPE TO VALVE CONT.L3 8-J 89.40 2-3-4-C X PT 1---C HE 1-ND 651 FIG NO A-85 147910 1.1$-651-01F REDUCER TO PIPE 8-J 89.40 PT 1 2-3-4-147920 I-l8-651.02S PIPE TO VALVE CONT.L4 8-J 89.40 PT 1-2 3-4 C C X 147930 1-ND-651-03S VALVE TO PIPE 8-J 89.40 PT 1-2-3-4-147940 I-ND-651-04S PIPE TO VALVE 8-J 89.40 PT 1-2-3-4 DATE: 12/20/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL S'fATUS COHPONENTS PAGE: 202 REACTOR COOLANT PUHP NO.11 SUHHARY EXAHI HAT I ON AREA NUHBER IDEHT IF I CATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE ITEH HO HETH I PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I------OUTAGE---
I 1 2 3 1 2 3 4 1 2 3 I INSTRUC'TIONS
- CAL I BRAT ION BLOCK*i PRESSURE RETAIHING BOLTIHG GREATER THAM 24 FIG NO A-86'148000 PUHP BOLTS, 1 THROUGH 24 B-G-1 UT 1 C 86.180 2-3.4-**3378042 (PUHP STUD)i*148075 PUHP BOLTS LONER SEAL HOUS!NG (2")8-G-2 87.60 VT-I 1-2-3-4 12 BOLTS TO BE EXAHINED MHEN REHOVED.SUPPORT COMPONENTS 148100 SUPPORT LUG NO.8-K 1 P'I 810.20 2 3-4-C UT OF MELD NOT FEASIBLE DUE TO ATTENUATIVE PROPERTIES OF PINP CASING HATERIAL.148200 SUPPORT LUG NO.2 810.20 2-3-4-8-K 1 PT 1-C UT OF MELD NOT FEASIBLE DUE TO ATTEHUATIVE PROPERTIES OF PUHP CASING HATERIAL.148300 SUPPORT LUG HO.3 810.20 2-3-4 8-K-1 PT 1 C UT OF MELD NOT FEASIBLE DUE TO ATTENUATIVE PROPERTIES OF PUHP CASING HATERIAL.CIRCUHFEREHTIAL MELDS 148400 PUHP CASING MELD 812.10 2-3-4-B.L.1 VT-1 1-EXAHINATION TO BE PERFORHED IH ACCORDANCE MITH CC N 481.
DATE: 12/20/95 REVISIOM: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COMPONENTS PAGE$203 REACTOR COOLANT PUMP NO'11
SUMMARY
EXAHI NAT IOH AREA NUMBER IDENT I F ICATION INSPECTION INTERVAL I ASHE J SEC.XI I CATGY MDE ITEH NO METH I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD-I OUTAGE I 1 2 3 1 2 3 4 1 2 3 INSTRUCTIONS
~~CALIBRATION BLOCK~~PUMP CASING F G NO A-86 148500 PUMP CASING IHTERMAL SURFACE B.L-2 VT.3 1-812.20 2-3-4 EXAHIHATION TO BE PERFORHED IN ACCORDANCE Hl TH CC-N-481.148510 PUHP FLANGE SURFACE 86.190 2.3-4-B.G-1 VT.1 1.EXAHINATIOH TO BE PERFORMED IN ACCORDANCE MITH CC.M.481.~PtMP FLYIIIIE L 148600 FLYNMEEL (IN PLACE)CONT.Ll Ul'C RG1.14 2 C 3 X 4-C C C X UT OF BORE 8 KEYNAY.**RC-FLYNHEEL-CS-31-DCC**
148700 FLYHMEEL (MHEN REHOVED)U.CONT.PT 1 RG1~14 HT 2-UT 4-C C X PT OF THE BORE AHD HT OF ALL REHAINING ACCESSIBLE SURFACES.*~RC.FLYHNEEL-CS-31-DCC~*
DATE: 12/20j93 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 204 REACTOR COOLANT PUMP NO.12
SUMMARY
EXAHINATIOH AREA HUHBER IDENT IF I CATION INSPECTION INTERVAL I FIRST ASHE PERIOD SEC.XI I CATGT NDE ITEH MO METH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I I 0 U T A G E------I 1 2 3 4 1 2 3 INSTRUCTIONS
~~CALIBRATION BLOCK~~PRESSURE RET H NG BO TING GREATER THAM 2" F G NO A-86 148800 PUHP BOLTS, 1 THROUGH 24 8-0-1 UT 1 86.180 2-3-4**3378042 (PUHP STUD)~~148875 PUMP BOLTS LONER SEAL NDUSIHG (2")8 G-2 87.60 VT-1 1-2 3.4.12 BOLTS TO BE EXAHINED MNEM REHOVED.SUPPORT COMPONENTS 148900 SUPPORT LUG NO.1 810.20 2-3.BK1 PT 1 C UT OF MELD NOT FEASIBLE DUE TO ATTENUATIVE PROPERTIES OF PUMP CASING HATER IAL.149000 SUPPORT LUG NO.2 810.20 2-3-4 8-K-1 PT 1.C C UT OF MELD HOT FEASIBLE DUE TO ATTENUATIVE PROPERTIES OF PUMP CASING HATERIAL.149100 SUPPORT LUG NO.3 8-K-1 PT 810.20 1-2-3-4.C UT OF IIELD MOT FEASIBLE DUE TO ATTENUATIVE PROPERTIES OF PUMP CASING HATER IAL.CIRCUMFERENTIAL TELOS 149200 PUMP CASING IIELD 812.10 2 3-4 8-L-1 RT 1-EXAHIHATION TO BE PERFORHED IN ACCORDANCE Hl TH CC-N-481.
DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 205 REACTOR COO AMT PUMP MO 12
SUMMARY
EXAHI NAT IOH AREA NUMBER IDENTIFICATION PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD INSPECTION INTERVAL I I ASHE I I SEC.XI I I CATGY NDE/--0 U T A G E ITEH MO METH.i 1 2 3 1 2 3 4 1 2 3 IHSTRUCTIONS
~*CAL I BRAT I OH BLOCK~" PUMP CASIHG F G NO A-86 149300 PUMP CASING INTERNAL SURFACE 8-L-2 VT-3 1---------EXAMINATION TO BE PERFORHED IN 812.20 2-ACCORDANCE WITH CC-N-481.3 4 149310 PUHP FLANGE SURFACE B6.'190 2-3-4-B-G.1 VT.1 1.EXAMINATION TO BE PERFORHED IN ACCORDANCE WITH CC H-481.PUMP FLYNN EL 149400 FLYWHEEL (IH PLACE)CONT~L2 RG1.14 UT 1-2 C 3X 4-C C X UT OF BORE 8 KEYWAYS.*~RC-FLYWHEEL CS-31-DCC~*
149500 FLYWHEEL (WMEN REHOVEO)U.COHT.PT 1 RG1.14 HT 2-UT 3*-4 C C X PT OF THE BORE AND HT OF ALL REHAIHIMG ACCESSIBLE SURFACES.**RC FLYWHEEL-CS-31-DCC*>>
DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UHIT 1 IHSERVICE IHSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPONENTS PAGE: 206 REACTOR COOLANT PUMP NO 13
SUMMARY
EXAHI HAT ION AREA NUMBER IDENT IF I CAT IOH INSPECT IOH INTERVAL I F IRST ASHE I PERIOD SEC~XI I CATGY MDE ITEH NO HETH i 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD-"-I OUTAGE I 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATIOH BLOCK~RESSURE R TA NING BOLTING GREATER THAN 2" FIG NO A 86 149600 PUMP BOLTS, 1 THROUGH 24 8-G-1 UT 86.180 1 C 2 P 3X 4**3378042 (PUMP STUD)~~149675 PUMP BOLTS LOWER SEAL HOUSING (2")8-G-2 87.60 VT-1 1 2-3-12 BOLTS TO BE EXAHINED WHEN REMOVED.SUPPORT COHPOHEHTS 149700 SUPPORT LUG HO.1 CONT.L3 810.20 2-3-4-8-K-1 PT 1 C C C X UT OF WELD MOT FEASIBLE DUE TO ATTENUATIVE PROPERTIES OF PIWP CASING HATERIAL.149800 SUPPORT LUG NO.2 CONT.L3 810.20 2-3-4-8-K-1 PT 1-UT OF WELD NOT FEASIBLE DUE TO ATTENUATIVE PROPERTIES OF PUHP CASING HATERIAL~149900 SUPPORT LUG NO.3 CONT.L3 B.K-1 PT 1 810.20 2-3-4 C C X UT OF WELD NOT FEASIBLE DUE TO ATTEHUATIVE PROPERTIES OF PUHP CASING HATERIAL.CIRCUMFERENTIAL WELDS 150000 PUHP CASING WELD CONT.L3 8-L-1 VT-1 1-812.10 2-3-4-C EXAHINATION TO BE PERFORMED IN C ACCORDANCE WITH CC-N-481.
DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPONENTS PAGE: 207 REACTOR COOLANT PUNP HO.13 SUHHARY EXAHIHAT ION AREA HUHBER IDEHT I F I CAT I OH PLAN STATUS FIRST SECOND PERIOD PERIOD IHSPECTIOH INTERVAL I ASHE I SEC.XI I CATGY NDE I-----0 U T A G E-ITEH NO NETH I'1 2 3 1 2 3 4 THIRD I PERIOD I-----I 1 2 3 I INSTRUCTIONS
- CALIBRATIOH BLOCK*~PUNP CAS NG F G NO A-86 150100 PUHP CASING INTERNAL SURFACE 8-L-2 VT-3 1-812.20 2-3-4-X EXAHINATION TO BE PERFORHED IN ACCORDANCE MITH CC-N-481'50110 PUHP FLANGE SURFACE COHT.L3 86.190 2-3-4 8-G-1 VT-1 1-X EXAHINATIOH TO BE PERFORHED IH ACCORDANCE MITH CC-H-481.PUHP FLYMHE L FIG NO A-86 150200 FLYMKEEL (IH PLACE)CONT~L3 RG1.14 UT 1-2-3-4-C X C C X UT OF EXPOSED SURFACES.~*RC-FLYMHEEL-CS-31 DCC*~150300 FLYMHEEL (MNEH REHOVED)PT 1-RG1.14 HT 2 C UT 3X 4-C PT OF THE BORE AND HT OF ALL REHAINING ACCESSIBLE SURFACES.<<*RC-FLYMHEEL-CS-31-DCC*~
DATE: 12/20/95 REVISION: 0 COOK HUCLEAR PLANT UNIT 1 INSERVICE IMSPECTIOM LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 208 REACTOR COOLANT PUMP NO.14 SUHHARY EXAHI MAT I ON AREA MUHBER IDENT IF I CATION INSPECT I OM IN'TERVAL I FIRST ASHE PERIOD SEC.XI I CATGY MDE ITEH MO HETH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I I OUTAGE----I 1 2 3 4 1 2 3 I INSTRUCTIONS
- iCALIBRATION BLOCK*i R SSUR R T HING BOLTI G AT T AN 4 G M A-86 150400 PUMP BOLTS, 1 THROUGH 24 BG1 UT 1 C 86.180 2-C 3-4-*+3378042 (PUMP STUD)ae 150475 PUMP BOLTS LOWER SEAL HOUSING (2")8G2 87.60 VT-1 1-2.3-4-12 BOLTS TO BE EXAHIMED WHEN REMOVED.SUP COMPONENTS 150500 SUPPORT LUG NO.B-K 1 PT 1-B10.20 2-3-4 C UT OF WELD MOT FEASIBLE DUE TO ATTEHUATIVE PROPERTIES OF PUHP CASING MATERIAL.150600 SUPPORT LUG NO.2 8-K-1 PT 1 810.20, 2-3-4-UT OF WELD NOT FEASIBLE DUE TO ATTENUATIVE PROPERTIES OF PUMP CASING MATERIAL+150700 SUPPORT LUG HO.3 B-K-1 PT 1-810.20 2-3-C UT OF WELD NOT FEASIBLE DUE TO ATTENUATIVE PROPERTIES OF PUHP CASING MATERIAL.CIRCUHFEREHTIAL WELDS 150800 PUMP CASIHG WELD B-L.1 VT-1 1.EXAHINATION TO BE PERFORMED IN 812.10 2-3-4-ACCORDANCE WITH CC-N-481.
DATE: 12/20/95 REVI SION: 0 COOK NUCLEAR PLANt UNIT 1 INSERVICE IHSPECTIOH LOHG TERN PLAN CLASS 1 ALL STATUS COMPONENTS PACE: 209 REACTOR COOLAMT PUMP NO.14
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INtERVAL I F IRSI'SHE PERIOD SEC.XI I CATGY NDE ITEH NO NETH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD-I OUTAGE---I 1 2 3 4 1 2 3 I INSTRUCTIONS
- ICAL I BRAT ION BLOCK+*PUMP CASING FIG MO A-86 150900 PUMP CASING INTERNAL SURFACE B L 2 VT-3 1--------EXAHINATIOH TO BE PERFORHED IN 812.20 2-ACCORDANCE lllTH CC H-481~3 4'150910 PUMP FLANGE SURFACE B6.190 2-3-4-B.G-1 VT-1 1-EXAMINATION TO BE PERFORMED IM ACCORDAHCE IIITH CC-N-481.UHP FLYMHE L FIG MO A-86 151000 F LYIIHEEL (IN PLACE)COHT~L4 Ut 1-RG1.14 2 C 3X C C X**RC-FLYMHEEL-CS-31.DCC
- 151100 FLYMHEEL (MHEM REMOVED)U.COHT.PT 1-RG1.14 Ht 2-UT 3-4 C C X PT OF THE BORE AND HT OF ALL REHAINING ACCESSIBLE SURFACES.*eRC.FLYMHEEL CS.31-DCC*~
DATE: 12/20/95 REVISION: 0'COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPOHENTS PAGE: 210
SUMMARY
EXAlll MAT I OH AREA NUMBER IDENT I F I CAT ION INSPECTION INTERVAL VALVE PRESSURE RETAIN NG BOLTIMG 2" AMD LESS I FIRST ASHE I PERIOD SEC.XI I-CATGY'NDE I ITEN HO NETH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERICO I.I OUTAGE I 2 3 4 1 2 3 I INSTRUCT I OHS*~CALI BRAT ION BLOCK~~LINE 1-RC-7 FIG MO A-23 224000 SV-45-C FLANGE BOLTING 8-6-2 87.70 VT-1 1 2 C 3-4 L ME 1-RC 8 FIG MO A-24 224100 SV.45.8 FLANGE BOLTIHG 8-0.2 87.70 VT-1 1-2.C 3-4 L ME 1-RC-9 FIG MO A-25 224200 SV-45.A FLAHGE BOLTIHG PRESS.DH 8-G 2 87.?0 VT-1 1-2-3-4-IHE 1-S-F G MO A-47 224300 IHO.325 FLANGE BOLTING 8-G-2 87.70 VT-'I 1-2 C 3-X 4-N 1-S-7 FIG HO A-52 224600 S I-158-L4 FLANGE BOLTING CONT.L4 8-G-2 VT-1 1-87.70 2-3-4-C INE 1-SI-23 FIG NO A.49 224700 Sl-158-L3 FLANGE BOLTING COHT.L3 8-G-2 87.70 VT-1 1-2-3-4 DATE: 12/20/95 REVI 8 I OH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LOHG TERN PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 211 LVE PRES U
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL H G OLT NG" AMD SS ASHE I SEC~XI I CATGY MDE ITEN NO NETH I 1 PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD I 0 U T A G E I 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- iCALIBRATIOM BLOCK**LINE 1-SI 25 FIG NO A-50 224800 I HO-315 FLAHGE BOLTING AHNULUS B.G-2 87.70 VT-1 1-2-3-4-C LIME 1-SI-26 FIG NO A-51 224900 SI-158-L1 FLANGE BOLT IHG 8-G-2 87.70 VT-1 1-2-C 3-X 4-LINE 1 S-F G MO A-48 225000 SI.158.L2 FLANGE BOLTING CONT.L2 8-G 2 87.70 VT-1 1 2-3-4 C LINE 1-Sl-29 FIG NO A-53 225100'l-170-L1 FLANGE BOLTING COHT.L1 8-0-2 87.70 VT-1 1 2-3-4 C LIHE 1-Sl-30 FIG MO A-54 225200 SI-166.L2 FLANGE BOLTING ANNULUS BG2 87.70 VT-1 1-2-3-4 X LIHE 1.SI-1 FIG NO A-54 225300 SI-170.L2 FLANGE BOLTIHG CONT~L2 8-G-2 87.70 VT-1 1 2-3-4-X DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE IHSPECTIOH LOHG TERH PLAN CLASS 1 ALL STATUS COHPOHEN'TS PAGE: 212 INSPECTION INTERVAL VALVE PRESSURE RETAIN HG BOLTING 2" AND LESS ASHE I SEC.XI I CATGY NDE ITEN NO NETH I PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I I------OUTAGE--
--I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALI BRAT ION BLOCK~LIN 1-S-32 FIG HO A-55 225400 S I-166-L3 FLANGE BOLTING 8-G-2 87.70 VT-1 1-2C 3.4 IHE 1 SI 3 F G NO A-55 225500 SI.170-L3 FLANGE BOLTING 8-G 2 87.70 VT1 1.~-2-C 3.LINE 1-SI-34 FIG NO A.56 225600 SI-166-L4 FLANGE BOLTING ANHULUS B-G-2 87.70 VT-1 1 2-3-4 LINE 1-SI-35 FIG NO A-56 225700 SI-170-L4 FLANGE BOLTING CONT.L4 B.G-2 87.70 VT-1 1-2-3-4-C IH 1-S-68 F G HOA-3 225750 SI-161-Ll FLANGE BOLTIHG CONT.L1 B-G-2 87.70 VT-1 1-2-3-C 225800 Sl-166-L1 FLANGE BOLTING ANNULUS 8-G-2 87.70 VT-1 1-2 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE IHSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPOHENTS PAGE: 213 INSPECTION INTERVAL VALVE PRESSURE RET N HG BOLTING 24 AND LESS ASHE I SEC.XI I CATGY NDE ITEN NO NETH I PLAN STATUS FIRSl'ECOND THIRD PERIOD PERIOD PERIOD I-I------OUTAGE-1 2 3 1 2 3 4 1 2 3 I INSTRUCT IOHS*iCAL I BRAT IOH BLOCK~LINE 1-Sl-69 FIG NO A-54 225900 SI-161-L2 FLAHGE BOLTING 8-G-2 87.70 VT-1 1-2C 3X 4 LIHE 1 Sl-70 F G NO A-55 226000 SI-161-L3 FLANGE BOLTIHG B G-2 B7.70 VT-1 1-2-C 3-4-H 1-S-7 F G NO A-6 226100 S I-161-L4 FLANGE BOLTING CONT.L4 8-G-2 B7.70 VT-1 1-2-3-4 LIHE 1-RH-27 FIG HO A-79 226200 RH-133 FLANGE BOLTING ANNULUS B G-2 87.70 VT-1 1-2-3-4-C LINE 1-RH 30 FIG HO A-55 226300 RH-134 FLANGE BOLTIHG ANHULUS B G-2 B7.70 VT-1 1 2-3-4-C X DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 214 LOYCO SUING CHECK VALVES
SUMMARY
EXAMINATION AREA HUMBER IDENT I F I CATION INSPECTION INTERVAL I F IRST ASME PERIOD SEC~XI I CATGY NDE I ITEN NO NETH i 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I 0 U T A G E--.---I 1 2 3 4 1 2 3 I INSTRUCT IOHS*~CALIBRATIOH BLOCK*i LINE 1-S-6 G NO A-51 231300 S1-158-L1 VALVE BODY IHTERHAL SURFACE B.H-2 VT-3 1.-812.50 2-3 4.C ONE ALOYCO SHING CHECK VALVE TO BE EXAMINED BY l&N PERSONNEL DURING THE INTERVAL.THE CHOICE DEPENDS OH MAINTENANCE REQUIREMENTS.
IN 1.S.7 F G HO-52 231400 S1-158-L4 VALVE BODY INTERNAL SURFACE 8-N-2 VT-3 812.50 2 C 3 X 4-C IN 1 S F GNOA-49 231500 S1-158 L3 VALVE BODY INTERNAL SURFACE B.N-2 VT-3 1-812.50 2-3-4 C LIHE 1.SI-22 FIG MO A-48 231600 S1-158-L2 VALVE BODY INTERNAL SURFACE B.N-2 Vt-3 1-812.50 2 C 3X 4-C LINE 1-SI-68 FIG MO A-53 231700 S1-161-L1 VALVE BODY INTERMAL SURFACE 8-H-2 VT-3 1-812.50 2-3 DATE: 12/20/95 REVISIOH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTIOH LOHG TERN PLAN CLASS 1 ALL STATUS COMPOHEHTS PAGE: 215 LOYCO SUING CHECK VALVES SUNHARY EXANINATION AREA NUNBER IDENT IF I CATION INSPECTION INTERVAL t FIRST ASNE PER I 00 SEC.XI I CATGY NDE ITEN NO NETH I 1 2 3 PLAN STATUS SECOHD THIRD PERIOD PERIOD-I OUTAGE------1 2 3 4 1 2 3 I INSTRUCTIONS
~~CALIBRATIOH BLOCK~~LINE 1 SI-69 FIG NO A-54 231800 S1.161.L2 VALVE BODY INTERNAL SURFACE 812~50 2-3-4 B-N.2 VT-3 1-LINE 1 SI 70 FIG NO A-55 231900 S1.161-L3 VALVE BODY INTERNAL SURFACE 812.50 2-3.4 8-N-2 VT-3 1-LIHE 1-SI.71 FIG NO A-56 232000 S1-161-L4 VALVE BODY INTERNAL SURFACE 8-N 2 VT-3 1-812.50 2-3 DATEs 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 216 ARLING SWING CHECK VALVES
SUMMARY
EXAHIHATIOH AREA HUHBER IDENTIFICATION INSPECTION INTERVAL I ASHE SEC.XI I CATGY NDE I ITEH NO KETH I 1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERICO I--OUTAGE----I 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK~*LINE 1-RH-30 IG NO A-5 232100 RH-133 VALVE BODY INTERNAL SURFACE AHNULUS B.H.2 VT-3 1.812.50 2-3-4-ONE EIGHT INCH DARLING SWING CHECK VALVE TO BE EXAHIHEO BY IQI PERSONNEL DURING THE INTERVAL.THE CHOICE DEPENDS OH HAINTEMANCE REQUIREMENTS'32200 RH-134 VALVE BODY INTERNAL SURFACE ANNULUS B.H-2 VT.3 1-812.50 2 3-OHE EIGHT INCH DARLING SWING CHECK VALVE TO BE EXAHIHED SY IQI PERSOHHEDL DURING THE INTERVALED TNE CHOICE DEPENDS OH HAIHTENANCE REQUIREHEHTS.
LIME 1-SI-68 FIG MO A-53 232300 Sl-166-L1 VALVE BODY INTERNAL SURFACE 8'12.50 2-3.4-8-H-2 VT-3 1-L I HE 1-SI 30 F IG NO A.54 232400 SI-166-L2 VALVE BODY INTERNAL SURFACE 812.50 2 C 3-4 B.H.2 VI'-3 1-X ONE TEN INCH DARLING SWING CHECK VALVE TO BE EXAHINED BY ISH PERSONNEL DURING THE INTERVAL.THE CHOICE DEPENDS ON HAINTEHANCE REQUIREMENTS.
LIME 1-81-32 FIG NO A-55 233200 SI-166-L3 VALVE BODY INTERNAL SURFACE 812.50 2-3-4-,8-H-2 VT-3 1-DATE: 12/20/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LOHG TERN PLAN CLASS 1 ALL STATUS COHPOHEHTS PAGE: 217 DARLING SWING CHECK VALVES
SUMMARY
EXAMINATION AREA HUHBER IDEH'I I F I CAT ION INSPECTION IHTERVAL I FIRST ASHE PERIOD SEC XI I CATGY MDE ITEN NO NETH i~1 2 3 PLAN STATUS SECOND THIRD J PERIOD PERIOD I OUTAGE I 1 2 3 4'2 3 I INSTRUCTIONS
~*CALIBRATIOH BLOCK~*LINE 1 SI-34 FIG NO A-56 233300 SI-166-L4 VALVE BODY IHTERHAL SURFACE 812.50 2-3-4-8-H-2 VT-3 1-LINE 1-81-29 FIG MO A-53 233400 SI.170-L1 VALVE BODY INTERNAL SURFACE B.H.2 VT-3 1-812.50 2-3-4-LINE 1-SI-31 FIG MO A-54 233500 SI-170.L2 VALVE BCOY INTERNAL SURFACE B.H-2 VT-3 1 812.50 2-3-4-LINE 1-SI-33 F G MO A-55 233600 SI-170.L3 VALVE BODY IHTERHAL SURFACE 8-H-2 VT-3 1 812.50 2-3-4-C LIHE 1-SI-35 FIG NO A.56 233700 SI-170.L4 VALVE BODY IHTERHAL SURFACE B-H.2 VT-3 1-812.50 2-3.4.
DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLAHT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 218 CROSBY SAFETY VALVES
SUMMARY
EXAlll MAT I OH AREA NUMBER IDENT IF I CAT ION INSPECT ION INTERVAL I FIRST ASME I PERIOD SEC.XI I CATGY NDE ITEN MO NETH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE----I 2 3 4 1 2 3 INSTRUCTIONS
- ~CAL I BRAT ION BLOCK~*M 1-C-F G MO A-3 234000 SV-45-C VALVE BODY INTERNAL SURFACE PRESS.DH B-N.2 VT-3 1-812.50 2-3-4 OHE CROSBY SAFETY VALVE TO BE EXAMINED BY I&M PERSONNEL DURING THE INTERVAL.THE CHOICE DEPENDS OM MAINTENANCE REGUIREHEHTS.
IH 1-RC-8 F G NO A-24 234100 SV-45-8 VALVE BODY INTERNAL SURFACE PRESS.DH B-H.2 VT-3 1-812.50 2-3-4 OHE CROSBY SAFETY VALVE TO BE EXAMINED BY I&M PERSONNEL DURING THE IHTERVAL.THE CHOICE DEPENDS ON HAINTEMANCE REQUIREHEHTS.
INE 1-RC-F G NO A-25 234200 SV-45-A VALVE BODY INI'ERNAL SURFACE PRESS.DH 8-K-2 VT-3 812.50 2-3-4-ONE CROSBY SAFETY VALVE TO BE EXAlllNED BY I&M PERSONHED DURING THE INTERVAL.THE CHOICE DEPENDS OH MAINTEHANCE REOUIREHENTS.
DATE: 12/20/95 REVI SION: 0 LUHKENMEIKER GATE VALVES
SUMMARY
EXAHINAT IOH AREA NUMBER IDENT IF I CAT IOH COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTIOH LONG TERN PLAN CLASS 1 ALL STATUS COMPONENTS INSPECTION INTERVAL I ASKE I SEC.Xl I CATGY NDE ITEH MO METH I FIRST PER I 00 PLAN STATUS SECOND THIRD I PERIOD PERIOD-OUTAGE------
I 1 2 3 1 2 3 4 1 2 3 I PAGE: 219 INSTRUCTIONS
- CALI BRAT I OH BLOCK~*LINE 1-S-21 FIG MO A-47 234300 IN0.325 B.H.2 VT-3 1-VALVE BODY INTERHAL SURFACE 812.50 2-ANMULUS 3.4-X OME LUNKENHEINER GATE VALVE TO BE EXAllIMED BY IQI PERSOHHEL DURING THE INTERVAL.THE CHOICE DEPENDS OH MAINTENANCE REQUIREMENTS.
LIME 1-SI-25 FIG NO A-50 234400 IH0.315 VALVE BODY IHTERHAL SURFACE ANNULUS B-N-2 VT-3 812.50 1-2-3-4 OHE LUNKENHEIHER GATE VALVE TO BE EXAHINED BY IQI PERSONNEL DURING THE IHTERVAL~THE CHOICE DEPENDS ON MAINTENANCE REOUIREKEHTS.
DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLAHI'NIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 220 COPES WLCAN GLOBE VALVES
SUMMARY
EXAM INAT I OH AREA NUMBER'IDENTIFICATION INSPECTION INTERVAL I FIRST ASHE PERIOD SEC.XI I CATGY NDE ITEN NO NETH I 1 2 3 PLAN STATUS SECOHD THIRD I PERIOD PERl(8-I OUTAGE I 1 2 3 4 1 2 3 I INSTRUCTIONS teCALIBRAT ION BLOCK*LIHE 1-RH-29 G MO A-B 234500 Ile-128 VALVE BODY INTERNAL SURFACE CONT.L2 B-N-2 VT-3 1-812.50 2-3-4-X C OHE COPES WLCAN GLOBE VALVE TO BE EXAIIINED BY l&H PERSOHHEL DURING THE INTERVAL.THE CHOICE DEPENDS ON MAINTENANCE REOUIREHENTS
~LINE 1-RH'28 F G NO A-80 234600 I CH-129 VALVE BODY INTERNAL SURFACE AHHULUS B H-2 VT-3 1-B12.50 2-3-4-C OHE COPES WLCAN GLOBE VALVE TO BE EXAMINED BY l&H PERSOHHEL DURING THE INTERVAL.THE CHOICE DEPENDS OH MAINTENANCE REOUIREHENTS.
DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAH CLASS 2 ALL STATUS COHPOHEHTS PAGE: 1 STEAH GENERATOR MO.11 SUHHARY EXAHI HAT I OH AREA NUMBER IDENT IF ICATION INSPECTION INTERVAL I ASHE I SEC.Xl CATGY MDE ITEH NO HETH PLAN STATUS F IRST SECOND PERIOD PERIOD THIRD PERIOD--...-OUTAGE------
2 3 1 2 3 4 1 2 3 I I I INSTRUCTIONS
>>*CALIBRATIOH BLOCK>>*CIRCUMFERENTIAL MELDS FIG MO 8-1 300000 STH-11.04 TUBE SHEET TO STUB BARREL CONT.L1 C A C1.30 UT 1 2 C 3 X 4-C C**PL-3.0.CS-22 DCC*>>300010 STH-11-05 STUB BARREL TO SHELL C A C1.10 UT 1----C 2-3X 4>>*PL-3.0 CS-22 DCC>>>>'300020 STH-11-06 SHELL TO SHELL C-A C1~10 SEE 1 INST 2-3-4 MO EXAHIHATIOH REQUIRED FOR IIELDS IIITH IDENTICAL SHELL COURSE THICKHESSES AMD IIITH NO GROSS STRUCTURAL DISCONTINUITY.
>>>>PL-3o0-CS-22-DCC>>>>
300030 STH-11-07 SHELL TO TRANSITION COME C-A C1.10 UT 1 2-3-4*>>PL-3.0-CS-22-DCC**
300040 STH-11-08 TRANSITION COHE TO SHELL C-A C1.10 UT 1 2-3-4**PL-3.0 CS-22-DCC*300050 STH.11-09 SHELL TO SHELL C-A C1.10 SEE 1 INST 2-3-4 HO EXAHIHATIOH REQUIRED FOR IIELDS IIITH IDENTICAL SHELL COURSE THICKNESSES AND IIITH NO GROSS STRUCTURAL DISCONTINUITY.
- PL-3.0.CS-22-DCC**
DATE: 11/15/95 REVISIOH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 2 STEAM GENERATOR NO.11
SUMMARY
EXAMINAT IOH AREA HUMBER IDENT I F ICATION PLAN STATUS FIRST SECOND PERIOD PERIOD INSPECTION INTERVAL I ASME I SEC.XI CATGY HDE I------0 U T A G E-ITEM NO METH I 1 2 3 1 2 3 4 THIRD I PERIOD I-----I 1 2 3 I INSTRUCTIONS
~*CALIBRATION BLOCK~*CIRCUMFERENTIAL TELOS FIG NO 8.1 300060 STM-11-10 SHELL TO HEAD C-A UT C1.20 1-2-3-4-**CAL.BLK.TO BE DETERMINED**
NOZZLE TO SHELL AND SHELL TO NOZZLE NELDS FIG NO 8-1 300070 STM 11-FIIH NOZZLE TO SHELL C-B C2.21 MT 1-UT 2-3-4**PL-3.0 CS-22-DCC**
300080 STM-11-MSN SHELL TO NOZZLE C-B C2.21 MT 1 UT 2-3-4-C~*PL-3.0.CS-22-DCC**
NOZZLE INSIDE RADIUS SECTIONS FIG NO 8-1 300090 STM-11-FUN-IRS INSIDE RADIUS SECTION C-B C2.22 UT 1-2-3-4-~*IR-CS-33-DCC*~
300100 STM 11 MSH-IRS IHSIDE RADIUS SECTION C-B C2.22 UT 2-3-4-**IR-CS-33 OCC**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 3 STEAM GENERATOR NO.12
SUMMARY
EXAMINATIOH AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD-OUTAGE-1 2 3 1 2 3 4 1 2 3 I I I I INSTRUCTIONS
300120 STM-12.05 STUB BARREL TO SHELL COHT~L2 C-A C1.10 UT 1-2-3.4-C SUPPLEMENI'AL 35 DEGREE ANGLE BEAM EXAMINATION FOR ADDITIOHAL COVERAGE DUE TO RESTRICTED ACCESS'~PL-3.0-CS-22 DCC~*300130 ST M-12-06 SHELL TO SHELL C-A SEE 1 C1.10 INST 2-3.4 NO EXAHINAT ION REQUIRED FOR WELDS WITH IDENTICAL SHELL COURSE THICKNESSES AND WITH NO GROSS STRUCTURAL DISCONTINUITY.
~~PL-3.0-CS-22-DCC**
300140 STH.12 07 SHELL TO TRANSITION CONE C-A C1.10 UT 1 2-3-4**PL-3.0-CS-22-DCC~~
300150 STH-12-08 TRAHSITIOH CONE TO SHELL C-A C1.10 UT 1 2-3-4**PL 3.0 CS 22 DCC**300160 STM-12.09 SHELL TO SHELL C-A SEE 1 C1.10 INST 2-3-4 HO EXAHINATION REQUIRED FOR'WELDS'WITH IDENTICAL SHELL COURSE THICKHESSES AND WITH NO GROSS STRUCTURAL DISCONTINUITY.
- PL 3.0-CS-22-DCC~~
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAH CLASS 2 ALL STATUS COMPONENTS PAGE: 4 STEAM GENERATOR NO.12
SUMMARY
EXAMINATI OH AREA NUMBER IDENTIFICATION INSPECTION IHTERVAL I ASME I SEC.XI I CATGY HDE I ITEM NO METH i 1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I OUTAGE I 2 3 1 2 3 4 1 2 3 I INSTRUCTIOHS
~*CALIBRATION BLOCK~*CIRCUMFEREHTIAL TELOS FIG NO B-2 300170 STM-12-10 SHELL TO HEAD C-A UT C1.20 1-2-3-4-**CAL~BLK.TO BE DETERMINED*~
NOZZLE TO SHELL AND SHELL TO NOZZLE UELDS FIG NO B.2 300180 STM-12-FWN NOZZLE TO SHELL C B C2.21 MT ur 2-3-4**PL-3.0 CS-22-DCC**
300190 STM-12-MSN SHELL TO NOZZLE CONT.L2 C B C2.21 MT 1 UT 2-3 4 C X"*PL-3.0-CS-22-DCC**
NOZZLE INSIDE RADIUS SECTIONS FIG NO 8-2 300200 STM.12-F'NH-IRS IHSIDE RADIUS SECTION C-B C2.22 UT 1-2-3-4-**IR-CS-33 DCC**300210 STM-12-MSN-IRS INSIDE RADIUS SECTION CONT.L2 C-B C2.22 UT 1 2-C 3 4 X**IR.CS-33.DCC**
DATE: 12/20/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE 5 STEAM GENERATOR NO.13
SUMMARY
EXAHI HAT I OH AREA NUHBER IDENT I F I CAT ION INSPECTION INTERVAL I FIRST ASHE PER I CO SEC.XI I CATGY HDE ITEH NO METH I 1 2 3 PLAN STATUS SECOND PERIOD THIRD I PERIOD I 0 U T A G E------I 1 2 3 4 1 2 3 I INSTRUCT IOHS**CALI BRAT ION BLOCK~~CIRCUMFERENTIAL IIELDS FIG NO 8-3 300220 STH-13-04 TUBE SHEET TO STUB BARREL C-A C1.30 UT 1-2.3.4**PL-3.0 CS-22 DCC*~300230 STH-13-05 STUB BARREL TO SHELL C-A C1.10 UT 1-2-3-4-**PL-3.0-CS-22-DCC~*
300240 STM-13-06 SHELL TO SHELL C A C1.10 SEE 1.INST 2-3-4-NO EXAHIHATIOH REQUIRED FOR MELDS llITH IDEHTICAL SHELL COURSE THICKHESSES AND QITH NO GROSS STRUCTURAL D I SCOHT I NUI 7 Y.**PL-3.0-CS-22-DCC**
300250 STH-13-07 SHELL TO TRAHSITIOH CONE C A C1.10 UT 1 2-3-**PL-3.0-CS-22-DCC**
300260 STH-13-08 TRANSITION CONE TO SHELL CONT.L3 C.A C1.10 UT 1 2-3-4-C X C SUPPLEHEHTAL 35 DEGREE ANGLE BEAM EXAMINATION FOR ADDITIONAL COVERAGE DUE TO RESTRICTED ACCESS.*~PL-3'CS-22.DCC**
300270 STM-13-S SHELL TO SHELL C-A C1.10 SEE 1 INST 2-3-4-NO EXAHINATIOH REDUIRED FOR TELOS HITH IDENTICAL SHELL COURSE THICKNESSES AND HITH NO GROSS STRUCTURAL DISCONTINUITY.
- PL-3.0 CS-22-DCC**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 6 STEAM GEHERATOR NO.13
SUMMARY
EXAMI HAT ION AREA NUMBER IDENT'IF I CATION INSPECTIOH INTERVAL I ASME I SEC.XI CATGY HDE I ITEM NO METH I 1 PLAN STATUS FIRST SECOND PERIOD PERIOD THIRD I PERIOD I--0 U T A G E------I 2 3 1 2 3 4 1 2 3 INSTRUCTIONS
NOZZLE TO SHELL AHD SHELL TO NOZZLE WELDS FIG HO B-3 300290 STM-13-FWN NOZZLE TO SHELL C B C2.21 MT 1-Ur 2-3-4~~PL-3.0-CS-22-DCC**
300300 STM-13-MSN SHELL TO NOZZLE C-B C2~21 MT 1 UT 2-3-**PL-3.0-CS-22-DCC**
NOZZLE INSIDE RADIUS SECTIONS FIG NO B.3 300310 STM-13-FWN-IRS
" INSIDE RADIUS SECTION C-B C2.22 UT 2-3-4-**IR-CS-33-DCC~*
300320 STM-13-MSH-IRS INSIDE RADIUS SECTION C-B C2.22 UT 1 2-3-4**IR-CS-33 DCC**
0>>DATE: 11/15/95 REVISION: 0 STEAM GENERATOR NO.14
SUMMARY
EXAMINATIOH AREA NUMBER IDENT I F I CAT ION INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE I ITEM NO METH I 1 2 3 FIRST PERIOD PLAN STATUS SECOND THIRD PERIOD PERIOD-OUTAGE--1,2 3 4 1 2 3 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LOHG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 'I INSTRUCTIONS
300340 STM-14-05 STUB BARREL TO SHELL C-A C1.10 UT 1-2-3-4**PL-3.0-CS-22-DCC**
300350 STM.14-06 SHELL TO SHELL C-A C1.10 SEE 1 INST 2-3-4-NO EXAMINATION REOUIRED FOR WELDS WITH IDENTICAL SHELL COURSE THICKNESSES AND WITH NO GROSS STRUCTURAL D I SCOHT INUI T Y.**PL-3.0-CS-22-DCC**
300360 STM-14-07 SHELL TO TRAHSITION COHE CONT.L4 C-A C1~10 UT 1 2-3-4-C X*~PL-3.0-CS-22-DCC**
300370 STM-14-08 TRANSITION CONE TO SHELL C-A UT 1 C1.10 2-3-4-**PL-3.0 CS-22-DCC**
300300 STM.14-09 SHELL TO SHELL C-A C1.10 SEE 1 INST 2-3-4 NO EXAMINATION REOUIRED FOR WELDS WITH IDENTICAL SHELL COURSE THICKNESSES AND WITH NO GROSS STRUCTURAL D I SCONT I NUI T Y.<<~PL-3.0-CS-22-DCC**
DATE: '12/20/95 REVISIOH: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LOHG TERM PLAN CLASS 2 ALL STATUS COHPONENTS PAGE%8 STEAN GEN RATOR NO 14 SUHHARY EXAHINATION AREA NUHBER IDENT IF I CATION INSPECTION INTERVAL I FIRST ASHE I PERIOD SEC.XI I CATGY NDE ITEN NO NETH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I OUTAGE------I 1 2 3 4 1 2 3 INSTRUCTIONS
- <<CALIBRATION BLOCK<<*CIRCUHFEREHTIAL IIELDS FIG NO 8-4 300390 STN.14.10 SHELL TO HEAD CONT.L4 C-A C1.20 UT 1 2-3-4-C X**CAL.BLK.TO BE DETERNINED**
HOZZ E 0 S E AND SHELL TO NO E HELDS F G NO 8.4 300400 STH-14-FNH NOZZLE TO SHELL CONT.L4 C-B C2.21 Hl'-UT 2.P 3---X 4-C<<*PL-3.0-CS-22-DCC
<<300410 STH-14-NSN SHELL TO NOZZLE C 8 C2.21 HT 1-UT 2-3-4<<<<PL-3.0.CS-22 DCC*NOZZLE INSIDE RAD US SECTIONS FIG NO B-4 300420 STM.14-FNH-IRS INSIDE RADIUS SECTION C-B C2.22 UT 1 2 C 3X 4.**IR-CS-33-DCC**
300430 STH-14.HSH-IRS INSIDE RADIUS SECTION C-B C2.22 UT 1-2 3 4**IR CS 33-DCC**
DATE: 11/15/95 REVI S ION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COMPONENTS PAGE 9 REGEHERATIVE HEAT EXCHANGER SUHMARY EXAHINATIOH AREA NUHBER IDEHTIFICATIOH INSPECTION INTERVAL PLAN STATUS I FIRST SECOND ASHE PERIOD PERIOD SEC.XI I CATGY NDE I 0 U T A 0 E ITEM NO METH I 1 2 3 1 2 3 4 THIRD I PERIOD-I-----I 1 2 3 I INSTRUCTIONS
- >>CALIBRATION BLOCK<<>>CIRCUMFERENTIAL TELOS FIG NO 8-5 300440 RHE-1-01 CAP TO SHELL REGEH HXRH C-A UT C1.20 1-2-3-4 C X**9.625-CCSS-X-1.0-2-DCC>>>>
300450 RHE-1-05 SHELL TO TUBE SHEET REGEH HXRM C-A C1.30 UT 1-2-C 3-X 4**9.625 CCSS X-1.0-2-DCC
- 300460 RHE-1-06 TUBE SHEET TO SHELL REGEH HXRM C-A C1.30 UT 1 2--.C 3-X 4-**9.625-CCSS-X-1.0-2-0CC
>>300470 RHE-1-08 SHELL TO CAP REGEN HXRM C-A C1.20 UT 1-2-C 3-X 4**9.625 CCSS-X-1.0-2 DCC**300480 RHE-1-13 CAP TO SHELL REGEH HXRH C-A C1.20 UT 1 2-3-4-C X>><<9.625-CCSS-X-1.0-2-DCC>>>>
300490 RHE-1-16 SHELL TO TUBE SHEET REGEH HXRM C-A C1.30 UT 1 2-3-4 C<<*9.625-CCSS-X-1.0-2-DCC*>>
300500 RHE-1-17 TUBE SHEET TO SHELL C A C1.30 UT 1 2 C 3-4 C>>*9.625-CCSS-X-1.0-2.DCC
>>
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 10 REGENERATIVE HEAT EXCHANGER SUHMARY EXAHIHATIOH AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I ASME I SEC.XI CATGY NDE I ITEH NO METH I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERICO-OUTAGE-1 2 3 1 2 3 4 1 2 3 I I I INSTRUCTIONS
~*CALIBRATION BLOCK**CIRCUMFERENTIAL llELDS FIG NO B-5 300510 RHE-1-20 SkELL TO CAP C-A C1.20 UT 1 2 C 3-4.*~9.625-CCSS-X-1.0-2-DCC**
300520 RHE.1-26 CAP TO SHELL REGEN HXRH C A C1.20 UT 1 2-3X 4 C**9.625-CCSS-X.1.0-2-DCC**
300530 RHE-1-28 TUBE SHEET TO SHELL REGEH HXRM C-A C1.30 UT 1-C 2-3 X 4-C C**9.625-CCSS-X-1.0.2.DCC*>>
300540 RHE-1-29 SHELL TO TUBE SHEET REGEH HXRM C-A C1.30 UT 1 2 3X 4.C**9.625-CCSS-X-1.0-2-DCC**
300550 RHE-1-32 SHELL TO CAP REGEH HXRM C-A C1~20 UT 1-C 2-3 X 4-C C**9.625-CCSS-X-1.0-2.DCC**
DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 11 CHENICAL AND VOLUHE CONTROL TAN SUHHARY EXAHI HAT ION AREA NUHBER IDENTIFICATION PLAN STATUS SECOND PERIOD INSPECTION INTERVAL I FIRST ASHE I PERIOD SEC.XI I CATGY HDE I---0 U T A G E-ITEH NO NETH I'I 2 3 1 2 3 4 THIRD I PERIOD-I I 2 3 IHSTRUCTIOHS
<<>>CALI BRAT IOH BLOCK<<>>CIRCUHFERENTIAL WELDS FIG'O B-6 300680 1-CVCT-1 UPPER HEAD TO SHELL C-A C1.20 UT 1-2C 3-C X**PL-.312-SS-23R-DCC**
300690 1~CVCT.2 SHELL TO LOWER HEAD VCI'H C-A C1.20 UT 1-2-3-4 X>>*PL-.312-SS 23R.DCC*>>INTEGRALLY WELDED VESSEL SUPPORTS FIG NO B-6 300700 1-CVCT-2VS-1, 2i&3 C-C C3.10 PT 1.2 C 3X 4-300710 1-CVCT.2VS-4, 5,&6 VCT RH C-C C3.10 PT 2-C 3-X 4-300720 1.CVCT-2VS-7, 8,&9 VCT RH C-C PT C3.10 2-3-4 C X 300730 1-CVCT-2VS-10, 11,&12 VCT RH C-C C3.10 PT 1 2-3 DATE: 11/15/95 REVI SION: 0 COOK NUCLEAR PLANt UHIT 1 INSERVICE INSPECTION LOHG TERM PLAN CLASS 2 ALL StATUS COMPONEHTS PAGE: 12 CTS HEAT EXCHANGER EAST
SUMMARY
EXAMINATIOH AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE ITEM NO METH I PLAN STATUS FIRST SECOND PERIOD PERIOD THIRD PERIOD---0 U T A G E------1 2 3 1 2 3 4 1 2 3 I I I INSTRUCTIONS I**CALIBRATION BLOCK**CIRCUMFERENTIAL IJELDS FIG NO B 7 300731 E-CTSHEX-1 TUBE SHEET TO SHELL E CTS HXRM C A C1.30 UT 1 2 C 3X 4 C EXAHINATION FROM THE TUBESHEET SIDE TO BE PERFORHED IH THE SECOND PERIOD.**SS-27-DCC/CS-37-DCC**
300732 E-CTSHEX.2 SHELL TO FLANGE C-A O'1.10 Ut 1 2-3-4~*PL-1 F 000-SS-27-DCC**
NOZZLE TO SHELL AND SHELL TO NOZZLE LIELDS FIG NO B-7 300733 E-CtSHEX-IN NOZZLE TO SHELL E CTS HXRM C 8 C2.11 PT 1-2 3.4 C X 300734 E-CTSHEX OUT SHELL TO NOZZLE C-B C2.11 PT 1 2-3 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UHIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS CONPONENTS PAGE: 13 CTS HEAT EXCHANGER WEST SUNNARY EXAHI HAT ION AREA NUHBER IDENT IF I CATION INSPECT IOH INTERVAL I ASNE I SEC.XI I CATGY NDE I ITEN NO NETH I F IRST PERIOD PLAN STATUS SECOHD THIRD PERIOD PERIOD-OUTAGE-1 2 3 4 1 2 3 I I I I INSTRUCTIONS a*CALIBRATIOH BLOCK+a CIRCUNFERENTIAL WELDS FIG NO B-8 300739 W.CTSHEX-1 TUBE SHEET TO SHELL C-A C1.30 UT 1 2-3-4-**SS.27 DCC/CS 37 DCC*e 300740 W.CTSHEX-2 SHELL TO FLANGE W CTS HXRN C-A C1.10 UT 1 2-C 3-X**PL-'1.000 SS-27-DCC**
NOZZLE TO SHELL AND SHELL TO NOZZLE WELDS FIG NO B.B 300741 W-CTSHEX-IN NOZZLE TO SHELL C 8 C2.11 PT 1-2 3-4.300742 W.C'ISNEX-OUT SHELL TO NOZZLE W CTS HXRM C-B C2.11 PT 1 2-3 4 X X DATE: 11/15/95 REVISIOH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COMPOHENTS PAGE: 14 RHR HEAT EXCHANGER EAST SUHMARY EXANI HAT ION AREA NUHBER IDEN'I IF ICATION INSPECTION INTERVAL I FIRST ASHE I PERIOD SEC'I I CATGY NDE I ITEN NO NETH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I OUTAGE I 1 2 3 4 1 2 3 I INSTRUCTIONS
<<*CALIBRATION BLOCK**CIRCUNFERENTIAL UELDS FIG NO B-300749 E-RHRHEX-1 FLANGE TO SHELL C-A C1.10 UT 1-2C 3,X 4 C**PL.SS-1.0-27-DCCii 300750 E-RHRHEX-2 SHELL TO HEAD C A C1~20 UT 1 2-3-4~*PL-SS-1.0-27-DCC
- NOZZLE TO SHELL AND SHELL TO NOZZLE NELDS FIG NO 8-9 300760 E-RHRHEX-IN NOZZLE TO SHELL C-B C2.21 PT 1-UT 2C 3X 4-**PL-SS-1.0-27-DCC*i 300770 E-RHRHEX-OUT SHELL TO NOZZLE C-B C2~21 PT 1 UT 2-3-4*APL SS.1 0.27.DCC**
NOZZLE INSIDE RADIUS SECTIONS FIG NO 8-9 300780 E-RHRHEX-IH-IRS INSIDE RADIUS SECTION C B C2.22 UT 1 2 3-4 UT NOT FEASIBLE DUE TO CONFIGURATION.
RELIEF REQUESTED.
300790 E-RHRHEX-OUT-IRS INSIDE RADIUS SECTION C-B C2.22 UT 1 2-3-4-UT NOT FEASIBLE DUE TO CONFIGURATION.
RELIEF REQUESTED' DATE: 11/15/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENI'S PAGE: 15 RHR HEAT EXCHANGER EAST SUMHARY EXAMINATION AREA NUHBER IDENT IF I CATION INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE I------0 U T A G E ITEM NO METH I 1 2 3 1 2 3 4 THIRD I PER IOO I-.---I 1 2 3 I INSTRUCTIONS
- ~CALIBRATIOH BLOCKii INTEGRALLY WELDED VESSEL SUPPORTS FIG NO 8-9 300800 E-RHRHEX-1VS VESSEL SUPPORT C-C PT 1 C3.10 2 C 3X 4-300810 E-RHRHEX-2VS VESSEL SUPPORT C-C C3.10 PT 1-2-3-4 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANI'NIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENI'S PAGE: 16 RNR HEAT EXCHANGER WEST SUHHARY EXAMI HAT ION AREA NUHBER IDENT IF I CATION INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE ITEM NO METH I 1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I-I--0 U T A G E------I 2 3 1 2 3 4 1 2 3 J INSTRUCTIOHS
NOZZLE TO SHELL AHD SkELL TO NOZZLE WELDS FIG NO B-10 300840 W RHRHEX-IN NOZZLE TO SHELL C B C2.21 PT 1 UT 2-3-4-*>>PL SS 1.0-27-0CC>>>>
300850 W.RHRHEX-DUT SHELL TO NOZZLE W RHR HXRH C-B C2.21 PT 1 UT 2---C 3-X 4>>*PL-SS-1.0-27-DCC**
NOZZLE INSIDE RADIUS SECTIONS FIG NO B-10 300853 W.RHRHEX-IN-IRS INSIDE RADIUS SECTION C-B C2.22 UT 1-2-3-4-UT NOT FEASIBLE DUE TO CONFIGURATIOH.
RELIEF REQUESTED.
300857'W RHRHEX-DUT-IRS INSIDE RADiUS SECTION C-B C2.22 UT 1 2-3-4 UT NOT FEASIBLE DUE TO CONFIGURATION.
RELIEF REQUESTED' DATE: 11/15/95 REVI S I OH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTIOH LONG TERM PLAN CLASS 2 ALL STATUS COHPONEHTS PAGE: 17 RHR HEAT EXCHANGER HEST SUMHARY EXAMINATION AREA NUHBER IDENT I F I CAT ION INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE ITEH NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERICO-0 U T A G E------I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS s*CALIBRATIOH BLOCK@a INTEGRALLY NELDED VESSEL SUPPORTS FIG NO B-10 300860 H.RHRHEX-1VS VESSEL SUPPORT C-C PT 1 C3~10 2-3-4-300870 W.RHRHEX-2VS VESSEL SUPPORT H RHR HXRH C-C C3.10 PT 2-3-4 C X DATE: 11/15/95 REVI SIGH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTIOH LONG TERH PLAH CLASS 2 ALL STATUS COMPONENTS PAGE: 18 BORON INJECTION TAH SUMHARY EXAMINATION AREA NUMBER IDENT I F I CAT ION PLAN STATUS FIRST SECOND PERIOD PER I OO IHSPECTIOH INTERVAL I ASHE I SEC.XI I CATGY HDE I------0 U T A G E-ITEH HO HETH (1 2 3 1 2 3 4 TNIRD I PERIOD I-----I 1 2 3 I INSTRUCTIONS
<<*CALIBRATIOH BLOCK<<*CIRCUHFEREHTIAL WELDS FIG NO 8'11 300880 1-8 I T-A SHELL TO LOWER HEAD BIT RM C-A C1.20 UT 1 2-C 3-X 4-<<<<TO BE DETERHIHED<<<<
300890 1-BIT-8 SHELL TO UPPER HEAD BIT RH C-A C1.20 UT 1-2 3-C X**PL-3.0.CSCL-4-DCC**
NOZZLE TO SHELL AHD SHELL TO NOZZLE l}ELDS FIG NO 8 11 300900 1-BIT-INS INLET NOZZLE TO SHELL C-B C2.21 HT 1 UT 2-3-4-NO EXAHINATIOH REQUIRED PER TABLE ll}C-2500, CATEGORY C 8~NOTE 2.300910 1-8IT.OHS OUTLET NOZZLE TO SHELL C-B C2.21 Hl'UT 2-3-4-HO EXAHINATIOH REQUIRED PER TABLE INC 2500'ATEGORY C Bg NOTE 2.NOZZLE INSIDE RADIUS SECTIONS FIG NO 8-11 300913 1-BIT-IHS-IRS INSIDE RADIUS SECTION C-B C2.22 UT 1 2.3-4 NO EXAHINATIOH REQUIRED PER FIGURE IWC-2500-4.
300917'I.BIT-OHS-IRS INSIDE RADIUS SECTION C-B C2.22 UT 1 2-3-4-NO EXAHINATION REQUIRED PER FIGURE IWC-2500.4.
DATE: 11/15/95 REVISIOH: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPOHENTS PAGE: 19 BORON INJECTION TANK
SUMMARY
EXAHIHATI OH AREA NUMBER IDENT IF I CATION INSPECTION INTERVAL I FIRST ASME PER 1 00 SEC~XI I CATGY NDE I ITEH NO METH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PER100 I I I 0 U T A G E------I INSTRUCTIONS 1 2 3 4 1 2 3 I**CAL I BRAT ION BLOCK**INTEGRALLY WELDED VESSEL SUPPORTS FIG NO B-11 300920 1-BIT-VS.1 C-C HT 1 C3.10 2 C 3X 4 C 300930 1-BIT-VS-2 BIT RH C-C C3.10 HT 1-2-C 3-X 4-300940 1 BIT-VS-3 BIT RH C C C3.10 HT 1-2-3-4-300950 1 BIT-VS-4 BIT RH C-C C3.10 HT 1 2-3.4 X DATE: 11/15/95 REVI S ION: 0 COOK NUCLEAR PLANT UMIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 20 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT IF I CATION PLAN STATUS FIRST SECOND PERIOD PERIOD INSPECTIOH INTERVAL I ASHE I SEC.XI I CATGY MDE i--0 U T A G E-ITEH NO HETH (1 2 3 1 2 3 4 THIRD I PERIOD I-----I 1 2 3 I INSTRUCTIONS
- CALIBRATIOH BLOCK*>>LINE 1-SI-2 FIG NO 8-12 300960 1-Sl-2-01F VALVE TO PIPE C.F-1 C5~11 PT 1-UT 2-3-4.EXAMINATION TO BE PERFORHED IN ACCORDANCE WITH CC-N-524'*18$$40 562 32 DCC>>*300965 1.SI-2-02S-LU PIPE LONGITUDINAL WELD VESTIBULE C-F-1 C5.12 PT 1 UT 2---C 3-X 4-EXAMINATION TO BE PERFORHED IH ACCORDANCE WITH CC-N-524.>>>>18-SS-40-.562-32-DCC*>>
300970 1.SI.2.02S PIPE TO ELBOW VESTIBULE C.F.1 C5.11 PT 1.UT 2.3.4 C X**18-SS-40-.562 32-DCC*300971 1-Sl-2-02S-LDI PIPE LONGITUDINAL WELD VESTIBULE C F-1 C5.12 Pl'UT 2-3-4-C X EXAHINATION TO BE PERFORMED IN ACCORDAHCE WITH CC-N-524.**18-SS-40-.562-32.DCC**
300972 1-S1-2-02S.LDO PIPE LOHGITUDIHAL WELD VESI'IBULE C.F-1 C5.12 PT 1.UT 2----C 3-X 4 EXAHINATIOH TO BE PERFORMED IH ACCORDANCE WITH CC-H-524.**18.SS-40-.562-32-DCC**
300980'I-SI-2-03S ELBOW TO PIPE C-F-1 C5.11 PT 1-UT 2 3.4-**18-SS-40-.
562-32-D CC*>>300990 1-SI-2-04S PIPE TO ELBOW C-F-1 PT 1.C5.11 UT 2-3-4*>>18-SS-40-.562-32-DCC**
DATE: 12/20/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE IHSPECTIOH LOHG TERN PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 21 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDEHI'IF I CATION INSPECTION INTERVAL I F IRSI'SME PERIOD SEC.XI I CATGY NDE ITEM NO METH I 1 2 3 PLAN STATUS SECOND PER IOD THIRD I PERIOD-I 0 U T A G E------I 1 2 3 4 1 2 3 I INSTRUCTIONS
- <<CALIBRATION BLOCK**LINE 1-SI-2 FIG NO B-12 301000 1-SI-2.05S ELBOH TO TEE C F-1 C5.11 PT 1-UT 2-3-4**18-SS-40-.562-32-DCC**
301010 1-S I-2-06S TEE TO REDUCER C-F-1 C5.11 PT 1-UT 2C 3-4-X**18.SS 40-.562-32.DCC*<<
301020 1-SI-2-07F TEE TO ELBOH C.F-1 C5.11 PT 1-UT 2-3-4**14-SS-40-.438-30-DCC**
301030 1-SI-2-08S ELBOtl TO PIPE C-F-1 C5.11 PT 1 UT 2-3-**14$$-40,438 30 PCC**301040 1-SI-2-09S PIPE.TO ELBSI C-F-1 C5~11 PT 1-UT 2-3-4.<<*14.SS-40-.438-30-0CC**
301050 1-SI-2-10S ELBOH TO PIPE C-F-1 C5.11 PT 1 UT 2-3-4**14.SS.40..438-30.DCC
<<301070 1-SI-2.11S PIPE TO ELBOH C-F-1 C5.11 PT 1 UT 2-3-4-<<<<14-SS-40-.438.30-DCC<<<<
DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL SI'ATUS COMPONENTS PAGEL 22 EHERGEHCY CORE COOL NG SYSTEM SUHHARY EXAHI MAT10N AREA NUMBER IDENT IF ICATION INSPECTIOH INTERVAL I ASHE I SEC'I I CATGY MDE ITEH NO HETH I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD------0 U T A G E----1 2 3 1 2 3 4 1 2 3 I I I INSTRUCTIONS
<<<<CALIBRATION BLOCK*>>LINE 1-SI-2 FIG MO B-12 301080 1-SI-2-12F ELBON TO PIPE C-F-1 C5.11 PT 1 UT 2-3-4-<<>>14-SS-40..438-30-DCC<<>>
301090 1-SI-2-13S PIPE TO ELBOI C-F-1 C5.11 PT 1-UT 2.3.4-**14-SS-40-.438.30.DCC*>>
301100 1-SI-2-14S ELBOU TO PIPE 1I RHR PPRH C-F 1 C5~11 PT 1-UT 2-3-4 X<<*14-SS-40-.438-30-0CC**
301110 1-SI-2-15S PIPE TO ELBSI C-F-1 P'I 1 C5.11 UT 2-3-4.**14-SS-40-.438-30-DCC**
301140 1-SI-2-16F ELBOU TO VALVE'C-F-1 C5.11 PT 1.UT 2.3-4->>>>14-SS-40..438.30.DCC**
301150 1-SI-2-17F VALVE TO ELBOM C-F-1, PT 1 C5.11 UT 2-3-4-**14.SS-40-.438.30.DCC<<*
301160 1-SI-2.18S ELBON TO PIPE 1I RHR PPRH C-F-1 C5.11 PT 1-UT 2-C 3-4 X**14.SS-40-.438-30.DCC*>>
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTIOH LONG TERM PLAN CLASS 2 ALL SI'ATUS COMPONENTS PAGE: 23 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT IF ICATION PLAN STATUS SECOND PER I OD INSPECTION INTERVAL I FIRST ASME PERIOD SEC.XI I CATGY NDE i------0 U T A 0 E-ITEM HO METH I 1 2 3 1 2 3 4 THIRD I PER I CO I I-----I 1 2 3 I INSTRUCTIONS
301180 1-SI-2-20S PIPE TO TEE C-F-1 C5.11 PT 1-UT 2-3-4-**14-SS-40-,438 30-PCC**301210 1-S I-2-21F VALVE TO PIPE C-F-1 C5.11 PT 1 UT 2.3.4**14-SS-40-.438-30 DCC*+301220 1-SI-2.22F TEE TO TEE C-F-1 CS~11 PT 1.UT 2-3-4<<*14-SS-40-.438-30.DCC~*
301230 1-SI-2-23S TEE TO FLANGE C-F-1 Pr 1-C5 11 UT 2-3.4~*14 SS-40-.438-30-DCC**
301260 1-SI-2-24F TEE TO PIPE C-F-1 C5.11 PT 1-UT 2-3-4-**14-SS-40-.438-30.OCCAM~
301270 1-SI-2-25S PIPE TO PUMP C-F-1 C5~11 PT 1 UT 2-3-4**14-SS-40-.438-30-DCC
- DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LOHG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 24 EMERGENCY CORE COOLING SYSTEM SUMHARY EXAMINATION AREA NUHBER IDENT IF ICATION INSPECTION INTERVAL I FIRST ASHE I PER IOO SEC.XI I CATGY NDE I ITEM NO METN i 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I 0 U T A G E------I 1 2 3 4 1 2 3 I INSTRUCT IOHS>>>>CALIBRATION BLOCK>>>>LINE 1 SI-2 FIG NO B-12 301280 1-SI-2-26F REDUCER TO ELBOW C-F-1 C5.11 PT 1 UT 2-3-4-**12-SS-40-.406-29-DCC**
301290 1-SI-2-27S ELBOW TO PIPE CF'I C5.11 PT 1-UT 2-3-4-**12-SS-40-.406-29-DCC
>>301300 1-SI-2.28S PIPE TO ELBOW C-F-'1 C5.11 PT 1-UT 2-3-4-*>>12-SS-40-.406-29-DCC**
301310 1-SI-2-29F ELBOW TO PIPE C-F-1 C5.11 PT 1-UT 2-3-4**12-SS-40-.406-29.DCC**
301320 1-SI-2-30S PIPE TO ELBOW C-F.1 PT 1-C5.11 UT 2-3->>>>12-SS-40-.406.29.DCC>>>>
301350 1.SI.2.31S ELBOW TO PIPE W CTS PPRM C-F-1 C5.11 PT 1-UT 2.3 4 C X*>>12-SS-40-.406.29.DCC**
301360'1-SI-2-32S PIPE TO ELBOW C-F-1 C5~11 PT 1.UT 2.3 4*12-SS-40-.406 29 DCC**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LOHG TERM PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 25 EHERGENCY CORE COOLING SYSTEH SUHHARY EXAMINATIOH AREA NUMBER IDENT IF I CATION INSPECTION INTERVAL I F IRS'I ASHE PERICO SEC.XI I CATGY HDE ITEH NO METH I 1 2 3 PLAN STATUS SECOND PERIOD OUTAGE 1 2 3 4 THIRD PERIOD 1 2 3 I INSTRUCTIONS
<<*CALIBRATION BLOCK**LINE 1-Sl-2 FIG NO B-12 301370 1-Sl-2-32S-PS PIPE SUPPORT C-C C3.20 PT 1 2-3-4-~EXAHIHAT IOH NOT REQUIRED.SUPPORT THICKNESS 0.322".301390 1-SI-2.33F ELBOH TO VALVE C-F-1 C5.11 PT 1-UT 2-3-4<<*12-SS.40-.406-29-DCC**
301400 1-SI-2-34F VALVE TO ELBOM C-F-1 C5.11 PT UT 2-3 4-**12-SS-40-.406.29.DCC<<<<
3014'10 1-SI-2-35S ELBOM TO PIPE C-F-1 C5.11 PT 1 UT 2-3-4*<<12-SS-40-.406.29 DCC<<*301420 1-SI-2-36S PIPE TO TEE C-F-1 PT 1-C5.11 UT 2-3-4-**12-SS.40..406-29-DCC*<<
301450 1-S I-2-37F VALVE TO TEE C-F-1 C5.11 PT 1-UT 2-3-4-**12-SS-40-.406-29-OCC
DATE: 'l1/'15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAH CLASS 2 ALL STATUS COMPONENTS PAGE: 26 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION F IRST PERIOD INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE ITEM NO METH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I I OUTAGE------2 3 4 1 2 3 I INSTRUCTIONS
>>301480 1-S I-2-40F PIPE TO PIPE C-F-1 C5.1'I PT 1-UT 2-3-4*>>12-SS.40..406-29-DCC*>>
301490 1-SI-2-41F PIPE TO PIPE C-F-1 C5.11 PT 1-UT 2-3.4<<*12-SS-40-.406-29-DCC>>*
301500 1-SI-2-42S PIPE TO PUMP C F-1 C5.11 PT 1 UT 2.3-X 4*>>12.SS-40-.406-29-DCC**
LINE 1-SI-3 FIG NO B-13 301520 1-SI-3-01F VALVE TO PIPE C-F-1 C5.11 PT 1-UT 2-3 4-<<*18-SS.40-.562-32.DCC*>>
301530 1-.SI-3-02S PIPE TO ELBSI C F-1 C5.11 PT 1-UT 2-3-4**18-SS-40-.562-32-DCC
- 301540 1-S I-3-03S ELBOH TO PIPE C-F-1 CS~11 PT 1-UT 2-3 4*>>18-SS.40-.562-32-DCC
<<
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECI'ION LONG TERM PLAN CLASS 2 ALL STATUS COMPONEHTS PAGE 27 EMERGENCY CORE COOLING SYSTEM SUMHARY EXAMINATION AREA NUMBER IDEHT IF ICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE I ITEM NO METH I PLAN STATUS FIRST SECOND THIRD PERICO PERIOD PERIOD-OUTAGE---1 2 3 1 2 3 4 1 2 3 I t I INSTRUCTIONS
>>>>CALIBRATIOH BLOCK>>>>LINE 1-SI-3 FIG NO B-13 301545 1-SI-3-04S-LU PIPE LONGITUDINAL WELD VESTIBULE C-F-1 C5.12 PT 1 UT 2-3-4 C X EXAMINATION TO BE PERFORMED IH ACCORDANCE WITH CC-H 524.**18-SS-40..562-32-DCC
- 301550 1-S I-3.04S PIPE TO ELBOW VESTIBULE C F-1 C5.11 PT 1-Ur 2----C 3-X 4**18-SS-40-.562-32-DCC**
301551 1-SI-3.04S-LDI PIPE LONGITUDINAL WELD VESTIBULE C F-1 C5.12 PT 1 UT 2----C 3-X 4-EXAMINATION TO BE PERFORHED IN ACCORDAHCE
'WITH CC-H-524.**18-SS 40-~562 32-DCC>>>>301552 1-SI-3-04S.LOO PIPE LONGITUDIHAL WELD VESTIBULE C-F-1 C5~12 PT 1-ur 2----C 3-X 4 EXAMINATION TO BE PERFORMED IN ACCORDANCE WITH CC-N-524'*18-SS-40-.562.32-DCC>>>>
301560 1-SI-3"05S ELBOW TO TEE C-F-1 C5.'11 PT 1 UT 2-3.4.<<*18-SS-40-.562-32-DCC>>>>
301570 1-SI-3-06S TEE TO REDUCER C-F-1 C5.11 PT 1-UT 2-3-4**18-SS-40.
~562-32-DCC*>>
301580 1-SI-3-07F TEE TO ELBOW C-F-1 C5.11 PT 1-UT 2-3.4-X>>*12-SS-40-.406-29-DCC**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLAHI'NIT 1 IHSERVICE INSPECTION LONG TERH PLAH CLASS 2 ALL STATUS COHPONENTS PAGE: 28 EMERGENCY CORE COOLING SYSTEM SUHHARY EXAMI HAT ION AREA NUMBER IDENT I F ICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY HDE ITEM HO HETH I 1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD-I-OUTAGE-----I 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- >>CALIBRATIOH BLOCK>>>>LINE 1-SI-3 FIG NO 8-13 301590 1-SI-3-08S ELBOW TO PIPE CF1 C5.11 PT 1-UT 2-3-4->>>>12-SS-40-.406-29.DCC>>>>
301600 1-SI-3-09S PIPE TO ELBOW C-F-1 C5.11 PT 1-UT 2-3 4-X C**12-SS 40-.406-29 DCC*301610 1-SI-3.10S ELBOW TO PIPE C-F-1 C5.11 PT 1-UT 2-3-4**12-SS-40..406-29.DCC>>>>
301670 1-SI-3-11S PIPE TO ELBOW C-F-1 C5.11 PT 1-UT 2-3-4**12-SS-40-.406-29 DCC*>>301680 1-SI-3-12F ELBOW TO PIPE C F-'I C5.11 PT UT 2C 3X 4>>*12-SS-40-.406-29.DCC**
301690 1.S I-3-13S PIPE TO ELBOW C-F-1 C5.11 PT 1-UT 2.3-**12-SS-40..406-29.DCC>>*
301720 1-SI-3-14S ELBOW TO PIPE C-F-1 C5.11 PT UT 2-3-4-**12-SS-40-.406.29-DCC*>>
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 29 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT IF I CATION INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE ITEM NO METH I PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD-t------OUTAGE------I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
<<*CALI BRAT ION BLOCK**LINE 1-SI-3 FIG NO 8-13 301730 1.SI.3-15S PIPE TO ELBOW C-F-1 C5.'11 PT 1-UT 2-3-4**12-SS-40-.406-29.DCC*<<
301760 1-SI-3-16F ELBOW TO VALVE C-F-1 C5.11 PT 1-UT 2.3-4-<<*12-SS-40-,406-29-DCC*>>
301770 1-SI-3-17F VALVE TO ELBOW C-F.1 C5.11 PT 1-UT 2-3-4<<<<12-SS-40-.406-29.DCC**
301780 1.SI-3-18S ELBOW TO PIPE C-F-1 C5.11 PT 1 UI'-3-4**12-SS-40-.406-29.DCC**
301790 1-SI-3-19S PIPE TO TEE C.F-1 C5.11 PT 1 UT 2-3-4.**12-SS-40-.406-29.DCC**
301820 1-SI-3-20F VALVE TO TEE C-F.1 C5.11 PT 1 UT 2-3-4**12-SS-40-.406-29.DCC**
301830 1-SI-3-21F VALVE TO VALVE C-F-1 C5.11 PT 1 UT 2-3-4**12-SS-40-.406-29.DCC**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 30 MERGENCY CORE COO IHG SYSTEM
SUMMARY
EXAMIHATIOH AREA NUMBER'IDENTIFICATION PLAN STATUS SECOND PER I OD INSPECTION INTERVAL I FIRST ASME I PERIOD SEC.XI CATGY NDE (------0 U T A G E-ITEM NO METH I 1 2 3 1 2 3 4 THIRD I PERIOD I-----I 1 2 3 I INSTRUCTIONS
301850 1-SI-3-23F PIPE TO PIPE C-F-1 C5.11 PT 1 UT 2-3-4-**12-SS-40-.406-29.DCC**
301860 1-SI-3-25F PIPE TO PUMP C-F-1 C5~11 P'I 1 UT 2-3-4**12-SS.40-.406-29-DCC*>>
301870 1.SI-3-26S REDUCER TO ELBOW VESTIBULE C F1 C5.11 PT 1 UT 2---C 3-X 4-**14-SS-40-.438-30.DCC>>>>
301890 1-SI-3-28F ELBOW TO PIPE C-F-1 C5.11 PT, 1-Ur 2-3.4-**14-SS-40-.438.30-DCC**
301930 1-SI-3-29F PIPE TO ELBOW C-F-1 C5.11 PT 1-UT 2-3-4**14-SS ~438-30-DCC>>>>
301960 1-S I-3-30S ELBOW TO PIPE C-F-1 CS~11 PT 1 Ul 2-3 4**14-SS-40-.438-30.DCC>>>>
DATE: 11/15/95 REVISIOH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE IHSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 31 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION IN'IERVAL I FIRST ASME PERIOD SEC.Xl I CATGY NDE I ITEM NO METH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE--1 2 3 4 1 2 3 I I I INSTRUCTIONS
>>*CALIBRATION BLOCK>>>>LINE 1-SI-3 FIG NO B-13 301970 1-SI-3-31S PIPE TO ELBSI C-F-1 C5.11.PT 1 UT 2C 3 X 4-*>>14-SS-40-.438-30-OCC>>*
302000 1-SI-3-32F ELBSI TO VALVE C-F-1 C5.11 PT 1-UT 2-3 4>>>>14-SS-40
.438-30.DCC**
302010 1-SI-3-33F VALVE TO ELBOM C-F-1 C5~11 PT 1-UT 2-3-4>>*14-SS-40-.438-30.DCC**
302020 1-SI-3-34S ELBSI TO PIPE C-F-1 C5.11 PT 1-UT 2-3-4**14-SS-40-.438.30.DCC**
302030 1-SI-3-35S PIPE TO TEE C.F-1 C5.11 PT 1-UT 2-3.4-**14-SS-40-.438-30.DCC
>>302060 1-SI-3-36S PIPE TO TEE C-F-1 C5.11 PT 1-UT 2-3 4**14-SS-40-.438 30 DCC*302070 1-SI-3.37S VALVE TO PIPE C-F-1 C5.11 PT 1-UT 2-3-4-'*14-SS-40-.438-3O-DCC**
DATE: 11/15/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONEHTS PAGE: 32 EHERGEHCY CORE COOLING SYSTEM SUNHARY EXAHINATIOH AREA HUNBER IDENT IF ICATION INSPECTION INTERVAL I FIRST ASHE PERIOD SEC.Xl CATGY HDE]------0 U T A 0 E----ITEN NO NETH I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS I<<*CALIBRATIOH BLOCK*<<LINE 1-SI-3 FIG NO B-13 302080 1-SI-3-38F TEE TO TEE W CTS PPRN C-F-1 C5.11 PT 1-UT 2-3-4-C X<<<<14-SS-40-.438-30-OCC<<<<
302090 1-SI-3-39S TEE TO FLANGE C-F-1 C5.11 PT 1 UT 2-3-4-<<<<14-SS-40-.438-30.DCC**
302100 1-SI-3-40S TEE TO PIPE C-F-1 C5.11 PT 1-UT 2-3-4<<*'14.SS-40-.438-30.DCC<<*
302120 1-SI-3-4'1F PIPE TO PUHP C-F-1 C5~11 O'I 1 UT 2-3-4**14-SS-40-.438-30.DCC
<<LINE 1-Sl-4 FIG NO B-14 302130 1-SI-4-01F PEHETRATIOH TO PIPE C-F-1 C5.11 PT 1-UT 2-3-4-C<<*14-SS-40-.438-30-DCC
- 302140 1-SI-4-02S PIPE TO ELBOW C-F-1 C5.11 PT 1-UT 2C 3 X 4**14-SS-40-.438-30.
D CC<<*302150 1-SI-4-03S ELBOW TO PIPE C-F-1 C5~11 PT 1 UT 2-3-4**14-SS-40-.438-30.DCC
<<
DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPOHEHTS PAGE: 33 EHERGENCY CORE COOLING SYSTEM
SUMMARY
EXAHINATIOH AREA NUMBER IDENTIFICATION IHSPECTIOH INTERVAL FIRST ASHE I PERIOD SEC.XI I CATGY NDE ITEH NO METH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERICO-I OUTAGE------I 1 2 3 4 1 2 3 I INSTRUCTIONS
- >>CAL I BRAT ION BLOCK*>>LINE 1-SI-4 FIG NO B 14 302160 1-Sl-4-04F PIPE TO ELBSI C-F-1 C5.11 PT 1.UT 2-3-4->>>>14-SS-40..438-30.DCC**
302170 1-SI-4-05S ELBSI TO PIPE C-F-1 C5.11 PT 1-UT 2-3-4-*>>14-SS-40-.438-3O-DCC<<*
302180 1-SI-4-05S-PL 1 THROUGH 4 PIPE LUG C-C C3.20 PT'I 2 C 3X 4-BASE MATERIAL 1.5".302190 1-SI-4-06S PIPE TO TEE C-F-1 C5.11 PT 1 UT 2-3-4-**14 SS-40-.438-30-DCC<<<<
302210 1-Sl-4-07F VALVE TO TEE C-F 1 C5.11 PT" 1 Ul 2-3-4**12-SS.40..406-29.DCC<<*
302220 1-SI-4-OBF VALVE TO VALVE VESTIBULE C-F-1 C5.11 PT 1 UT 2-3-4-X<<*12-SS-40-.406-29-DCC<<*
302230 1-SI-4.09S TEE TO PIPE C-F-1 C5.11 PT 1-UT 2-3-4<<*14-SS-40-.438-30.DCC*>>
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPOHENTS PAGE: 34 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT IF I CATION INSPECTION INTERVAL I ASME I SEC.Xl CATGY HDE ITEM NO METH I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD-OUTAGE---1 2 3 1 2 3 4 1 2 3 I I I INSTRUCTIONS
<<<<CALIBRATIOH BLOCK*<<LINE 1-SI-4 FIG NO B-14 302240 1-SI-4-10S PIPE TO ELBOW C-F-1 C5~11 PT 1-UT 2-3-4-**14-SS-40-.438.30.DCC<<<<
302250 1-S I-4-11F ELBOW TO PIPE VESTIBULE C-F-1 C5.11 Pj'-UT 2---C 3-X 4*<<14-SS-40-.438-30.
D CC**302270 1-SI.4-12S PIPE TO TEE CF1 C5.11 PT 1 UT 2-3-4-<<<<14-SS-40-.438-30.DCC*<<
302280 1-SI-4-13F TEE TO ELBOW C-F-1 C5~11 PT 1-UT 2-3-4-**14-SS-40-.438-30.DCC**
302290 1-SI-4-14S ELBOW TO PIPE C-F-1 C5.11 PT 1-UI'-3-4 C**14-SS-40-.438-30.DCC**
302300 1-SI-4-15S PIPE TO ELBOW VESTIBULE C-F-1 C5.11 PT 1 UT 2-3-4-C**14-SS-40-.438-30-OCC<<*
302310 1-SI-4.16F ELBOW TO PIPE C F-1 C5.11 PT 1 UT 2-3-4-<<<<14-SS-40-.438-30-DCC
- DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL S'TATUS COMPONENTS PAGE: 35 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAHINATIOH AREA NUMBER IDENT I F I CATION FIRST PERIOD INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE I ITEH NO METH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I I-OUTAGE-I 234 123 I IHSTRUCTIOHS
302330 1.SI-4-18F TEE TO PIPE C-F-1 C5~11 PT 1.UT 2-3 4*>>14.SS-40-.438-30.DCC**
302340 1-SI-4.19S PIPE TO ELBOU C-F-1 C5.11 PT 1-UT 2-3 4**14-SS-40-.438-3P-DCC**
302350 1-SI-4.20S ELBSI TO PIPE VESTIBULE C-F-1 C5.11 PT 1 UT 2-3-4 C**14-SS-40..438-30.DCC>>*
302360 1-SI-4-21F PIPE TO ELBCM C-F-1 C5.11 PT 1-UT 2-C 3-X 4*>>14-SS-40-.438-30-DCC**
302370'I-SI-4-22S ELBSI TO PIPE C-F-1 C5~11 PT 1 Ul'-3-4<<>>14-SS.40-.
438-30-D CC*>>302380 1-SI-4-23F PIPE TO VALVE C-F-1 C5.11 PT 1-Ul'-3-4 C**14-SS ~438-30-DCC>>>>
DATE: 11/15/95 REVISIOH: 0 COOK HUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LOHG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 36 EMERGENCY CORE COOLING SYSTEM SUHMARY EXAMINATION AREA NUHBER ,IDEHTIFICATIOH FIRST PERIOD INSPECTION INTERVAL I ASHE I SEC.Xl CATGY NDE ITEH NO METH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD I-0 U T A G E------I 1 2 3 4 1 2 3 I INSTRUCTIONS
~*CALIBRATION BLOCK**LINE 1-SI-20 F G NO B-15 302390 1-SI-20.01F PENETRATION TO ELBOW C-F-1 C5.11 PT 1-UT 2.3-4**3378029 (8-SS-140-.81)i*
302400 1 SI 20 02F ELBOW TO VALVE C-F-1 C5.11 PT 1-UT 2-3-4-**3378029 (8-SS.140-.81)i*
302410 1-SI-20-03F VALVE TO PIPE C-F-1 C5.11 PT 1 UT 2.3-X 4**3378029 (8-SS-140-.81)**
302420 1-SI-20-04S PIPE TO ELBOW C-F-1 C5.11 PT 1.UT 2-3.4**3378029 (8-SS-140-.81)**
302430 1-SI-20.05S ELBOW TO PIPE CF1 C5.11 PT 1-UT 2-3-4**3378029 (8.SS-140-.81)"*
302440 1-SI-20.06F PIPE TO PIPE C-F-1 C5.11 PT 1-UT 2-3-4.**3378029 (B-SS-140-.81)**
302450 1-SI-20.06F-NL 1 AND 2 HANGER LUG U.CONT.C-C C3.20 PT 1-2-C 3-X 4 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPOHEHTS PAGE: 37 EMERGENCY CORE COOLING SYSTEH SUNNARY EXANINATION AREA NUNBER IDENTIFICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY HDE I ITEN NO NETH I PLAN STATUS FIRST SECOND PERIOD PERIOD--OUTAGE-2 3 1 2 3 4 THIRD I PERIOD I--.--I 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK**LINE 1-SI-20 FIG NO B-15 302480 1-SI-20-07S PIPE TO ELBOM C-F-1 C5.11 PT 1-UT 2-C 3.4 X*<<3378029 (B-SS-140-.81)**
302490 1-Sl-20-OBF ELBOM TO PIPE C-F-'I C5.11 PT 1 UT 2-3-4<<*3378029 (B-SS-140-.81)**
302510 1-SI-20-09F PIPE TO PIPE C.F-1 C5.11 PT 1-UT 2-3-4-**3378029 (8-SS-140-.81)
<<*LINE 1-SI-21 FIG HO B-16 302520 1-S I-21-01S PIPE TO ELBOM C-F-1 C5.11 PT 1-UT 2-3-<<*3378029 (B-SS-140-.81)**
302530 1-SI-21-02S ELBOM TO PIPE ANNULUS C-F-1 C5.11 PT 1 UT 2-3-4 C X<<*3378029 (8-SS-140-.81)<<*
302540 1-Sl-21-03F PIPE TO ELBOM C F-1 C5.11 PT 1 UT 2-3 4-**3378029 (B-SS.140..81)<<*
302550 1-SI-21-04S ELBOM TO PIPE C-F-1 C5.11 PT 1 UT 2-3**3378029 (8-SS-140-.81)**
DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS CGMPONENTS PAGE!38 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAHIMATIOH AREA NUMBER IDENT IF I CAT I OH INSPECT IOH INTERVAL I F IRST ASME I PERIOD SEC~Xl I CATGY MDE ITEM HO METH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PER100 I OUTAGE------I 1 2 3 4 1 2 3 I INSTRUCTIONS
- >>CALIBRATIOH BLOCK>>*L HE 1.S1-21 F 0 MO B-16 302560 1-SI-21-05F PIPE TO PIPE C-F'I C5.11 PT 1-UT 2-3-4-*>>3378029 (8-SS-140-.81)<<*
302570 1-SI-21-06F PIPE TO PIPE C.F.1 C5.11 PT UT 2-3-4-*>>3378029 (8.SS.140..81)**
302580 1-Sl-21-07F PIPE TO PIPE C.F.1 C5.11 PT 1-UT 2-3-4<<<<3378029 (8-SS-140-.81)
<<>>302590 1-SI-21-08S PIPE TO ELBOH C-F-1 C5.11 PT 1-UT 2-3-4-<<*3378029 (8-SS-140-.81)**
302600 1-81-21-09S ELBOM TO PIPE C.F.'I C5.11 PT 1-UT 2-3-4-C X*>>3378029 (B-SS-140-.81)>>>>
302610 1-SI-2'I-10F PIPE TO ELBSI C-F-1 C5.11 PT 1 UT 2-3-4>>*3378029 (8-SS-140-.81)**
302620 1-SI-21-11S ELBOll TO PIPE C-F-1 C5.11 PT UT 2-3 4-<<*3378029 (8-SS-140-.81)**
DATE: 11/15/95 REV I SION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPOHENTS PAGE: 39 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDEHT IF I CAT ION INSPECTION INTERVAL I FIRST ASME PERIOD SEC.XI I CATGY NDE I ITEM NO METH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I I OUTAGE------1 2 3 4 1 2 3 I INSTRUCTIONS
302640 1-SI-21-13S ELBOW TO PIPE ANNULUS C F-1 C5.11 PT 1-UT 2-3-4-C X**3378029 (B-SS.140-.81)~~
302645 1-SI.21-13S.HL 1 THROUGH 4 HANGER LUG ANNULUS C-C C3.20 PT 1 2-C 3-X 4-BASE MATERIAL'l.0".302650 1.SI-21-14S PIPE TO TEE C-F-1 C5.11 PT 1-UT 2-3-4**3378029 (B-SS-140-.81)**
302660 1-Sl-21-15F TEE TO PIPE C-F-1 PT C5.11 UT 1-2-3-4.*~3378029 (B-SS-140-.81)**
302670 1-SI-21-16S PIPE TO ELBOW C-F-1 C5.11 PT 1 UT 2-3 4 i*3378029 (8.SS-140-.81)**
302675 1-Sl-21-16S-HL 1 THROUGH 4 HANGER LUG ANNULUS C-C C3.20 PT 1 2-3-4 C DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 40 EMERGENCY CORE COOLING SYSTEH SUHHARY EXAHI HAT I ON AREA NUHBER IDENT IF I CATION PLAN STATUS SECOND PERIOD INSPECTION INTERVAL I FIRST ASHE I PERIOD SEC~Xl I CATGY HOE i------0 U T A G E-ITEH HO NETH i 1 2 3 1 2 3 4 THIRD PER IOD IHSTRUCTIOHS 1 2 3 (**CALIBRATION BLOCK**LINE 1-SI.21 FIG HO B-16 302680 1-S1.21-17S ELBOW TO PIPE C-F-1 C5.11 PT UT 2-3-4-*<<3378029 (S-SS-140-.
S1)**302690 1.$1-21.18S PIPE TO ELBOW C-F 1 C5.11 PT 1 Ul'-3-4-<<<<3378029 (S-SS-140-.81)**
302700 1-SI-21-19F ELBOW TO VALVE C-F-1 C5.11 PT 1 UT 2-3-4**3378029 (S-SS-140-.81)**
302710 1-81-21-20S TEE TO PIPE C-F-1 C5.11 PT 1 UT 2-3-4-<<<<3378029 (S-SS-140-.81)**
302720 1-SI.21.21S PIPE TO ELBOW C-F-1 C5.11 PT 1 UT 2-3-4-<<*3378029 (8-SS-140-.81)
<<*302730 1-SI-21-22F ELBOW TO VALVE ANNULUS C-F-1 C5.11 PT 1 UT 2-3-X 4 C**3378029 (S-SS-140-.81)**
LINE 1-SI-24 FIG NO B-17 302740 1-SI-24-01F PEHETRATIOH TO ELBOW C-F-1 C5.11 PT 1-UT 2-3-4-<<*3378029 (S-SS-140-.81)**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 41 EHERGENCY CORE COOLING SYSTEH SUHHARY EXAHINATION AREA NUHBER IDENTIFICATION INSPECTION IHTERVAL I FIRST ASHE PERIOD SEC.XI I CATGY NDE I ITEH NO METH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD 0 U T A G E-----I INSTRUCTIONS 1 2 3 4 1 2 3 J**CALIBRATION BLOCK*~LINE 1-SI 24 FIG NO B-17 302750 1.SI-24.02F ELBOW TO ELBOW C.F-1 C5.11 Pl'-UT 2-3-4-~~3378029 (8-SS-140-.81)**
302760 1-SI-24-03F ELBOW TO VALVE U.CON'T.C-F-1 CS~11 PT 1-UT 2-3-4-C X**3378029 (8-SS-140-.81)
~*302770 1-Sl-24-04F VALVE TO ELBOW C-F-1 C5.'I1 PT 1-UT 2-3-4<<*3378029 (8-SS-140-.81)**
302780 1-SI-24-05S ELBOW TO PIPE C-F-1 CS~11 PT 1-UT 2-3 4-**3378029 (8-SS-140-.81)~>>
302820 1-SI-24-06F PIPE TO TEE C-F-1 C5.11 PT 1 UI'-C 3-X 4**3378029 (8-SS-140-.81)**
302830 1-SI-24-07F TEE TO PIPE C-F-1 C5.'I'I PT 1-UT 2-3.4-**3378029 (B-SS-140-.81)**
302840 1-SI-24-08S PIPE TO ELBOW C-F-1 C5~11 PT 1-UT 2-3-4-C**3378029 (B-SS-140-.81)**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAH CLASS 2 ALL STATUS COHPOHENTS PAGE: 42 EHERGENCY CORE COOLING SYSTEN SUHMARY EXAMINATION AREA NUHBER IDENTIFICATION PLAN STATUS FIRST SECOND PERIOD PERIOD INSPECTION INTERVAL I ASME I SEC.XI CATGY NDE i------OUTAGE-ITEH HO NETH I 1 2 3 1 2 3 4 THIRD I PER I DO I I I 1 2 3 I INSTRUCTIONS
- CALIBRATIOH BLOCK~~LINE 1-SI-24 FIG NO B-17 302850 1-SI-24-09S ELBOW TO PIPE C-F-1 C5.11 PT 1-UT 2-3-4**3378029 (B-SS-140-.81)~~
302860 1 S I-24-10F PIPE TO ELBOW C-F-1 C5.11 PT 1-UT 2-3-4-**3378029 (8-SS-140-.81)**
LINE 1-SI-25 FIG NO B 18 302870 1-SI-25-01F ELBOW TO PIPE C-F-1 C5.11 PT 1 UT 2-3-4 C**3378029 (8-SS-140-.81)~*
302890 1.SI-25.02S PIPE TO ELBOW C-F-1 C5.11 PT 1-UT 2.3-4 3378029 (B-SS-140-.81)
h 302920 1-Sl-25-04F PIPE TO ELBOW C F-1 C5.11 PT 1-UT 2-3-4-**3378029 (B-SS-140-.81)**
302930 1.SI-25-05S ELBOW TO PIPE C F-1 C5.11 PT" 1-UT 2-3-4**3378029 (8 SS-140-.81)~~
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 43 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAMINATION AREA NUMBER I DENT IF I CATION INSPECT ION INTERVAL I ASME I SEC.XI CATGY NDE I ITEM NO METH I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD------0 U T A G E-----i INSTRUCTIONS 1 2 3 1 2 3 4 1 2 3 (**CALIBRATIOH BLOCK**LIHE 1-SI-25 FIG HO B-18 302950 1.SI-25-06S PIPE TO ELBOM C-F-1 C5.11 PT 1 UT 2-3-4>>>>3378029 (8-SS-140..81)**
302960 1.SI-25-07F ELBOH TO PIPE C F-1 C5.11 PT 1-UT 2-3-4-**3378029 (8-SS.140..81)>>>>
302980'I-SI-25-08S PIPE TO PIPE C-F.1 C5.11 PT 1.UT 2-3-4">>*3378029 (8-SS-140-.81)*>>
302990 1-SI-25-09S PIPE TO PIPE C-F-1 C5.11 PT 1 UT 2-3-4**3378029 (B-SS-140-.81)**
303000 1-SI-25-10S PIPE TO PIPE C-F-1 C5.11 PT 1 UT 2-3 4-**3378029 (8-SS-140-.81)>>>>
303010 1-SI-25-11S PIPE TO PIPE C-F-1 C5.11 PT ur 2-3-4**3378029 (B-SS-140..81)>>*
303030 1-SI-25-12S PIPE TO PIPE C-F 1 C5.11 PT UT 2-3-4**3378029 (8-SS-140-.81)**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPOHEHTS PAGE: 44 EMERGEHCY CORE COOLING SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT I F ICATION INSPECTION INTERVAL I FIRST ASHE , t PERIOD SEC.Xl CATGY HDE I ITEM NO METH I 1?PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE 1 2 3 4 1 2 3 I I I INSTRUCT I OHS>>>>CALIBRATION BLOCK*>>LINE 1-SI-25 FIG HO B-18 303040 1-SI-25-13S PIPE TO ELBOW C-F-1 C5.11 PT 1 UT 2-3-4**3378029 (8-SS.140..81)*>>
303050 1-SI-25-14F ELBOW TO PIPE C F-1 C5.11 Pr Ul'-3-4-**3378029 (8-SS-140..81)
<<>>303070 1.SI-25-15F PIPE TO PIPE C-F-1 C5~11 PT 1 UT 2-3-4**3378029 (B-SS-140-.81)**
303090 1-S I-25-16S PIPE TO ELBOW C.F-1 C5.'11 PT 1-UT 2-3-4-**3378029 (8-SS-140-.81)**
303100 1-SI-25-17S ELBOW TO PIPE C-F-1 CS~11 PT 1 UT 2-3-4**3378029 (B-SS-140-.81)**
303110 1-SI-25-18F PIPE TO ELBOW ANNULUS C-F-1 C5.11 PT 1 UT 2-3 4 C X>>>>3378029 (B-SS-140..81)*>>
303120 1-SI-25-19S ELBOW TO PIPE C-F-1 C5.11 PT 1-UT 2-3-4**3378029 (8-SS-140-.81)**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTIOH LONG TERH PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 45 EHERGENCY CORE COOLING SYSTEM SUHHARY EXAHI HAT ION AREA NUHBER IDENT IF ICATIOH INSPECTION INTERVAL I FIRST ASHE PERIOD SEC.XI I CATGY NDE I ITEH NO METH I 1 2 3 PLAN STATUS SECOND PERIOD THIRD I PER IOD I-OUTAGE-----I 1 2 3 4 1 2 3 I IHSTRUCTIONS
<<*CALIBRATION BLOCK**LIHE 1-SI-25 FIG NO B 18 303130 1-S I-25-20S PIPE TO ELBOW C-F-1 C5.11 PT 1 ur 2-3-4-<<<<3378029 (8-SS-140-.81)*>>
303140 1-SI-25.21S ELBOW TO TEE C-F-1 C5.11 PT 1 UT 2-3-4<<<<3378029 (8-SS-140-.81)*'03150 1-SI-25-22S TEE TO PIPE C.F-1 C5.11 PT 1-UT 2-3 4----------'*3378029 (8-SS-140-.81)**
303160 1-SI-25.22S.HL 1 THROUGH 4 HANGER LUG C3.20 2 C 3-4-C.C PT 1-303180 1-SI-25-23F PIPE TO ELBOW C-F-1 C5.11 PT 1 UT 2C 3 X 4**3378029 (B-SS-140-.81)*<<
303190 1-SI-25-24F ELBOW TO VALVE C-F-'I C5.11 PT 1 UT 2-3X 4<<*3378029 (8-SS-140-.81)*<<
LINE 1-SI-28 FIG NO B-19 303200 1-S I-28-01F HOZZLE TO PIPE C F-1 SEE 1 INST 2-3-4-EXAHINATI ON NOT REGUIRED.PIPE THICKNESS LESS THAN~3 75~
DATE: 11/15/95 REVISiON: 0 COOK NUCLEAR PLAN'I UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPONEHTS PAGE: 46 EMERGENCY CORE COOLING SYSTEM SUHHARY EXAMIHATIOH AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I FIRST ASHE I PERIOD SEC.XI I CATGY NDE ITEN NO NETH I 1 2 3 PLAN Sl'ATUS SECOND THIRD PERIOD PERIOD-OUTAGE-1 2 3 4 1 2 3 I I I I INSTRUCTIONS
~*CALIBRATION BLOCK~+LINE 1-Sl-28 FIG NO 8-19 303210 1-81-28-02S PIPE TO ELBON C-F-1 SEE 1 INST 2-3-4 EXAHIHRT ION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".303220 1.81-28.03S ELBOU TO PIPE C-F-1 SEE 1 INST 2-3-4-C EXAHI HAT I OH HOT REQUIRED~PIPE THICKNESS LESS THAN.375".303230 1-SI-28-04S PIPE TO ELBOM C-F-1 SEE 1 INST 2-3-4 EXAHIHATIOH NOT REQUIRED.PIPE THICKNESS LESS THAN.375".303240 1.SI.28-05S ELBOU TO PIPE C-F-1 SEE 1 INST 2-3-4-EXAHIHATIOH NOT REQUIRED.PIPE THICKNESS LESS THAN.375".303250 1-SI-28-06S PlPE TO ELBOU C-F-1 SEE 1-INST 2-3-4~EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN~375~303280 1.SI.28-07S ELBOU TO PIPE C-F-1 SEE 1 INST 2-3-4 EXAHIHATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".303290 1-sl-2e-08F PIPE TO VALVE C-F-1 SEE 1-INST 2-3-4 EXAHI HAT ION HOT REQUIRED.PIPE THICKNESS LESS THAN.3754.
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPOHENTS PAGE: 47 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAMINATION AREA MUHBER IDENT IF ICATIOM INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE I ITEN HO HETH I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD-0 U T A G E---1 2 3 1 2 3 4 1 2 I I I INSTRUCTIONS
- CALIBRATION BLOCK*~LIME 1-SI-28 FIG MO B-19 303300 1-SI-28-09F VALVE TO ELBDH C-F-1 C5.11 PT 1-Ur 2-3-4~~3378030 (10-SS-140-1.0)~*
303310 1-SI.28.10F ELBOH TO VALVE C-F-1 C5.11 PT 1-UT 2-3-4**3378030 (10-SS-140-1.0)
+~LINE 1-SI-30 FIG NO B.20 303320 1-SI-30.01F NOZZLE TO PIPE ANNULUS C F-1 SEE 1-INST 2-3-4-C EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAH.375".303330 1-S I-30.02S PIPE TO ELBOM C-F-1 SEE'I-INST 2-3-4-EXAHINAT ION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".303340 1-SI-30.03S ELBOH TO PIPE C-F-1 SEE 1-INST 2-3-4 EXAHI HAT ION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".303350 1-SI-30.04S PIPE TO ELBOM C-F-1 SEE 1-INST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS TNAH.375".303360 1-SI-30-05S ELBOM TO PIPE C-F-1 SEE 1 INST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE IHSPECTIOH LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 48 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAMINATION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY HDE ITEH NO METH I 1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I-OUTAGE---I 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
<<<<CALIBRATION BLOCK<<*LINE 1-SI-30 FIG NO B-20 303370 1-SI-30-06F PIPE TO ELBOW C-F-1 SEE 1 INST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".303400 1-SI.30.07F ELBOW TO VALVE C-F-1 SEE 1-INST 2-3.4 EXAMI HAT ION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".303410 1.SI-30.08F VALVE TO PIPE C-F-1 C5.11 PT 1-UT 2-3-X 4<<*3378030 (10-SS-140-1.0)**
303420 1-SI-30-09S PIPE TO ELBOW C-F-1 C5.11 PT 1-UT 2-3-4-<<*3378030 (10-SS-140-1.0)**
303430 1.SI-30.10F ELBOW TO VALVE C-F-1 C5.11 PT 1-UT 2 3-4-<<<<3378030 (10.SS.140-1~0)**LINE 1-SI-32 FIG NO B 21 303440 1-SI-32.01F NOZZLE TO PIPE C-F 1 SEE 1 INST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN~375~303450 1-SI-32-02S PIPE TO ELBOW ANNULUS C-F-1 SEE 1 INST 2-3-4-C EXAMIHATIOH NOT REQUIRED.PIPE THICKNESS LESS THAN~375".
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 49 EHERGEHCY CORE COOLING SYSTEM SUHMARY EXAMINATION AREA NUMBER IDENT!F ICATION INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE I ITEM NO METH PLAN STATUS FIRSI'ECOND THIRD PERIOD PERIOD PERIOD 0 U T A G E I INSTRUCTIONS 1 2 3 1 2 3 4 1 2 3 J~*CALIBRATION BLOCK~*LIHE 1-SI-32 FIG NO B-21 303460 1-SI-32-03S ELBSI TO PIPE C F-1 SEE INST 2-3-4.EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375"~303470 1-SI-32-04S PIPE TO ELBSI C-F-1 SEE 1 INST 2-3-4 EXAHIHATION NOT REQUIRED, PIPE THICKNESS LESS THAN~3 75~303480 1.SI-32.05S ELBOH TO PIPE C-F-1 SEE 1 INST 2-3-4-EXAHINATIOH NOT REQUIRED.PIPE THICKNESS LESS THAN.375".303490 1-SI.32-06S PIPE TO PIPE C-F-1 SEE 1 INS'I 2-3-4-EXAMI HAT ION HOT REQUIRED.PIPE THICKNESS LESS THAN.3754.303500 1-SI-32-07F PIPE TO ELBOH C F-1 SEE 1 INST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.3754.303530 1-SI-32-08S ELBOW TO PIPE C-F-1 SEE 1-INST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".303560 1-Sl-32-09F PIPE TO VALVE C-F-1 SEE 1 INST 2-3-4-EXAMIHATIOH NOT REQUIRED.PIPE THICKNESS LESS THAN~375".
DATE: 1'I/15/95 REVISIOII:
0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 50 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAHINATION AREA NUMBER ,IDENTIFICATIOH FIRST PERIOD INSPECTIOH INTERVAL I ASME I SEC.XI I CATGY NDE J ITEM NO METH J 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD-OUTAGE-----1 2 3 4 1 2 3 I I I I INSTRUCTIONS
')~~303580 1-SI-32-11F ELBSI TO VALVE C-F-1 C5~11 Pl'-UT 2-3-4**3378030 (10-SS-140-1.0)**
LINE 1-SI-34 FIG NO 8-22 303590 1-S I-34-01F NOZZLE TO PIPE C-F-1 SEE 1-INST 2-3-4-EXAMIHATION NOT REQUIRED.PIPE THICKNESS LESS THAN~3754.303600 1-SI-34-02S PIPE TO ELBSI C F-'1 SEE 1-INST 2-3-4-EXAMINATION HOT REQUIRED.PIPE THICKNESS LESS THAN.3754.303610 1-SI-34-03S ELBOM TO PIPE C-F-1 SEE 1-INST 2-3-4-C EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN~375".303620 1.$1-34.04S PIPE TO ELBOW C-F-1 SEE 1 INST 2-3-4 EXAMINATION NOT REQUIRED.PIPE THICKHESS LESS THAN.375".303630 1-Sl-34-05F ELBON TO PIPE C F 1 SEE 1-INST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKHESS LESS THAN.375".
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPOHENTS PAGE: 51 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION FIRST PERIOD INSPECTION INTERVAL I ASME I SEC.XI I CATGY HDE I ITEM NO METH I 1 2 3 PLAN S'TATUS SECOND TMIRD PERIOD PERIOD-0 U T A G E------2 3 4 1 2 3 I I I INSTRUCTIOHS
- CALIBRATION BLOCK**LINE 1.SI-34 FIG NO B-22 303640 1-SI-34-06F PIPE TO PIPE C-F-1 SEE 1-INST 2-3-4-EXAHINATIOH NOT REQUIRED.PIPE THICKHESS LESS TNAH.375<<.303650 1-SI-34-07S PIPE TO ELBOW C-F-1 SEE 1 INST 2-3-4-EXAHIHATI ON NOT REQUIRED.PIPE THICKHESS LESS THAN~375~303680 1-Sl-34-OBF ELBOW TO VALVE C F 1 SEE 1 INST 2-3-4 EXAHIHATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".303690 1-SI-34-09F VALVE TO PIPE C-F 1 C5.11 PT 1 UT 2~3-4-<<*3378030 (10-SS-140-1.0)**
303700 1-SI-34-10S PIPE TO ELBOW C-F-1 C5.11 PT 1-UT 2-3-4**3378030 (10-SS-140-1.0)**
303710 1-SI-34-11F ELBOW TO VALVE C-F-1 C5.11 PT 1 UT 2-3-X 4-<<<<3378030 (10.SS-140.1.0)**
LINE 1-SI-68 FIG NO 8-23 303720 1-Sl-68-01F REDUCER TO ELBOW C-F-1 C5.11 PT 1-UT 2-3-4**3378028 (6-SS-160-.71)*<<
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLAHT UNIT 1 IHSERVICE IHSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 52 EMERGEHCY CORE COOLING SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT I F ICATION PLAN STATUS SECOND PERIOD INSPECTION INTERVAL FIRST ASME I ERIOD SEC.XI I CATGY HDE i------0 U T A G E-ITEM HO METH J 1 2 3 1 2 3 4 TNIRD I PERIOD I-----I 1 2 3 I IHSTRUCTIOHS
>>*CALIBRATIOH BLOCK>>*LINE 1-S1-68 FIG NO B-23 303730 1-SI-68-02S ELBOW TO ELBOW C F-1 C5.11 PT 1-UT 2-3-4-**3378028 (6-SS.160-.71) 303740 1.SI-68-03S ELBOW TO PIPE C-F-1 C5.11 PT'I UT 2-3-4-**3378028 (6-SS-160-.71)**
303750 1-Sl-68-04S PIPE TO ELBOW C-F-1 C5.11 PT 1 UT 2.3-4>>*3378028 (6-SS-160-.71)>>*
303760 1-S I-68-05S ELBOW TO PIPE C-F-1 C5.11 PT 1-UT 2-3-4-**3378028 (6-SS-160-.71)>>>>
303790'I-SI-68.06S PIPE TO ELBOW C-F-'I C5.11 Pr 1-UT 2.3 4**3378028 (6-SS-160-.71)>>>>
303800 1-Sl-68-07S ELBOW TO PIPE C-F-1 C5~11 PT UT 2-C 3-X 4-*>>3378028 (6-SS-160-.71)**
303810 1-S I-68.08S PIPE TO ELBOW C-F-1 C5.11 PT 1-UT 2.3-4-**3378028 (6-SS-160-.71)>>*
DATE: 11/15/95 REVI SION: 0 COOK NUCLEAR PLAN'I UNIT 1 IHSERVICE IHSPECTIOH LOHG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 53 EMERGENCY CORE COOLING SYSTEM SUHMARY EXAMIHATIOH AREA NUMBER IDENT I F I CAT ION IHSPECTIOH INTERVAL I ASME I SEC.XI I CATGY HDE I ITEM NO METH I PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD-.----OUTAGE----I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- <<CALIBRATIOH BLOCK**LINE 1-SI-68 FIG NO 8-23 303820 1-SI.68-09S ELBOW TO ELBOW C-F-1 C5.11 PT 1-UT 2-3-4-**3378028 (6-SS.160-.71)<<<<
303830 1-Sl-68-10F ELBOW TO PIPE C F-1 C5.11 PT 1-UT 2-3-4-C**3378028 (6-SS-160..71)<<*
303840 1-Sl-68-11F PIPE TO FLANGE C-F-1 C5.11 PT 1 UT 2-3-4<<<<3378028 (6-SS-160..71)*<<
303850 1-Sl-68-12F FLANGE TO PIPE C-F-1 C5.11 PT 1-Ul'-3-4-~<<*3378028 (6-SS-160-.71)**
303860 1-Sl-68-13F PIPE TO ELBOW C-F-1 C5.11 PT'I UT 2-3-4<<<<3378028 (6-SS-160-.71)**
303870 1-SI.68-14S ELBOW TO PIPE C-F-1 C5.11 PT 1 UT 2-3-4-**3378028 (6-SS-160-.7'I)**
303880 1-Sl-68-15F PIPE TO ELBOW CONT.L1 C-F-1 C5.11 PT 1 UT 2-3-4 C X**3378028 (6-SS-160-.71)**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL Sl'ATUS COMPONENTS PAGE: 54 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I FIRST ASME PER I CO SEC.Xl I CATGY NDE ITEM HO METH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD-I OUTAGE I 1 2 3 4 1 2 3 I INSTRUCTIONS CALIBRATIOH BLOCK>>>>LINE 1-SI-68 FIG HO B-23 303890 1-SI-68-16S ELBOW TO PIPE C F-1 C5.11 PT 1 UT 2-3-4-**3378028 (6.SS.160-.71)>>*
303910 1-S I.68.17F PIPE TO ELBOW C-F-1 C5.11 PT 1-UT 2 3-4-**3378028 (6-SS-160-.71)**
303920'I-S I-68-18S ELBOW TO PIPE C-F-1 C5.11 PT 1-UT 2-3-4->>*3378028 (6-SS-160-.71)*>>
303930 1-SI-68.'l9S PIPE TO ELBOW C-F-1 C5.11 PT UT 2-3-4**3378028 (6-SS-160-.71)>>>>
303940'I-S I-68-20S ELBOW TO ELBOW C-F-1 C5.11 PT UT 2-3-4**3378O28 (6-SS-160-.71)>>>>
303950 1-S I-68-21S ELBOW TO PIPE C-F-1 C5.11 PT 1 UT 2-3-4**3378028 (6-SS-160-.71)**
, 303970 1-SI-68-22F PIPE TO VALVE CONT.L1 C-F-1 C5.11 PT 1-UT 2 3-4 C X**3378028 (6-SS-160-.71
)**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 55 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAMIHAT ION AREA NUMBER IDEHT IF I CATION INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE ITEM NO METH I PLAN STATUS FIRST'ECOND THIRD I PERIOD PERIOD PERIOD I I--0 U T A G E-----I 1 2 3 1 2 3 4 1 2 3 I IHSTRUC'TIONS
)**304000 1-SI.69.02F PIPE TO PIPE C-F-1 C5.11 PT 1 UT 2-3-4-**3378028 (6-SS-160-.71)~*
304010 1-S I-69-03S PIPE TO ELB(XI C-F-1 C5.11 PT 1 UT 2.3-4-~~3378028 (6-SS-160-.71)~~
304020 1-SI-69.04S ELBSI TO PIPE AHNULUS C-F-'I C5.11 PT 1 UT 2-3.4-C X*~3378028 (6-SS-160-.71)**
304030 1-SI-69.05S PIPE TO ELB(XJ C-F-1 C5.11 PT 1 UT 2-3-4**3378028 (6-SS.160-.71)~~
304040 1-SI-69-06S ELBOH TO PIPE C-F-1 C5.11 PT 1-Ur 2-3-4**3378028 (6-SS-160-.71
)**304050 1-SI-69-07S PIPE TO ELBOM C-F-1 C5.11 PT 1.ur 2-3-4-~*3378028 (6-SS-160-.71)~*
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLAN'I UHIT 1 IHSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS CONPONEHTS PAGE: 56 HERGENCY CORE COOLING SYSTEH SUHHARY EXANI HAT ION AREA HUHBER IDENT I F I CATION INSPECTION INTERVAL I FIRST ASHE PERIOD SEC.XI I CATGY NDE ITEN NO NETH I I 2 3 PLAN STATUS SECOND THIRD I PERIOD'ERIOD I OUTAGE-----I 1 2 3 4 1 2 3 I INSTRUCTIONS
>>>>CALIBRATIOH BLOCK**LINE 1 SI.69 F G NO B-24 304060 1-SI-69.08F ELBOW TO PIPE C-F-1 C5.11 PT 1-UT 2.3.4-*>>3378028 (6.SS-160..71
)**304070 1-SI-69-09F PIPE TO FLANGE C-F-1 C5.11 PT 1 UT 2.3.4**3378028 (6-SS-160-.71)*>>
304080 1-SI-69-10F FLANGE TO PIPE C-F-1 C5.11 PT 1 UT 2-3-4**3378028 (6-SS-160-.71)**
304090 1.SI-69-11F PIPE TO ELBOW C-F 1 C5.11 PT 1.UT 2-3-4->>*3378028 (6-SS-160-.71)**
304100 1-SI-69-12S ELBOW TO PIPE C-F-1 C5.11 PT 1-UT 2C 3 X 4.*>>3378028 (6-SS-160..71)*>>
304110 1-SI-69-13F PIPE TO ELBOW C F-1 C5.11 PT 1-UT 2.3-4-<<*3378028 (6-SS-160-.71)**
304120 1-Sl-69-14F ELBOW TO PIPE C-F-1 C5.11 PT 1.UT 2-3-4*>>3378028 (6-SS-160-.71)**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 57 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAMIHATIOH AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I FIRST ASME PERIOD SEC.XI I CATGY HDE ITEM NO METH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE-1 2 3 4 1 2 3 I I I INSTRUCTIONS
~*CALIBRATION BLOCK~*LINE 1-SI-69 FIG NO B 24 304140 1-SI-69-'15F PIPE TO ELBOW C-F-1 C5.11 PT 1-UT 2-3-4*~3378028 (6-SS-160-.71)**
304150 1-SI-69-16S ELBOW TO PIPE C-F-1 C5.'11 PT 1-UT 2-3-4-*'3378028 (6-SS-160-.71)**
304180 1-S I-69-17F PIPE TO VALVE C-F-1 C5~11 PT 1-UT 2-3-X C**3378028 (6-SS-160-.71)~~
LINE 1-SI-70 FIG NO B-25 304190 1.S I-70.01F VALVE TO ELBOW C-F-1 C5.11 PT 1 UT 2-3-4-**3378029 (8-SS-140-.81)" 304200 1-SI-70'2S ELBOW TO PIPE C-F'-1 C5.11 PT 1 UT 2-3-4-**3378029 (8-SS.140-.81
)~~304205 1-SI-70.02S-PL 1 THROUGH 4 PIPE LUG ANNULUS C-C C3.20 P'I 1 2-3-4-304210 1-S I-70.03S PIPE TO ELBOW C-F-1 PT 1-C5.11 UT 2-3 4**3378029 (8.SS.140-.81)~*
DATE: 11/15/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 58 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT IF I CAT IOH PLAN STATUS FIRST SECOND PERIOD PERIOD INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE I----0 U T A G E-ITEM HO METH (1 2 3 1 2 3 4 THIRD I PERIOD I-----I 1 2 3 I INSTRUCTIONS
304240 1-S I-70.06S TEE TO REDUCER C-F-1 C5.11 PT UT 2-3-4-**3378029 (8-SS-140..81)
<<*304250 1-SI-70-07S REDUCER TO PIPE C-F-'I C5.11 PT 1 Ul'-3-4**3378028 (6.SS-160-.71)**
304260'I-SI.70-08S PIPE TO ELBOW C-F-1 PT 1 C5.11 UI'-3-4**3378028 (6-SS.160..71
)<<<<304270 1-SI-70-09S ELBOW TO PIPE C-F-1 C5.11 PT 1 UT 2-3-4-**3378028 (6-SS-160-.71)**
304280 1-SI-70-10S PIPE TO ELBOW C-F-'I C5.11 PT 1 UT 2C 3 X 4<<*3378028 (6-SS.160..71)**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 59 EMERGEHCY CORE COOLING SYSTEM
SUMMARY
EXAHINATION AREA NUMBER IDENTIFICATION INSPECT ION INTERVAL I ASME I SEC.XI CATGY NDE I ITEM NO METH I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD--OUTAGE------1 2 3 1 2 3 4 1 2 3 I I I INSTRUCTIONS a*CALIBRATION BLOCK*LINE 1-SI-70 FIG HO B-25 304290 1-SI-70-11F ELBOW TO PIPE C-F-1 C5.11 PT 1 UT 2-3.4 X C**3378028 (6-SS-160-.71)~~
304300 1-SI-70-12F PIPE TO FLANGE C-F-1 C5.11 PT UT 2-3-4-**3378028 (6-SS-160-.71)~
304310 1-SI-70-13F FLANGE TO PIPE C F-1 C5.11 PI'T 2-3-4-**3378028 (6.SS-160-.71)*
304320 1-SI-70-14F PIPE TO ELBOW C-F-1 C5.11 PT 1-UT 2-3.4**3378028 (6.SS-160-.71
)*~304330 1-SI-70-15S ELBOW TO PIPE C-F-1 C5.11 PT 1 UT 2-3.4-**3378028 (6-SS-160-.71)~*
304340 1-SI-70-16F PIPE TO ELBOW C-F-1 C5.11 PT 1 UT 2-3-4*~3378028 (6-SS-160-.71)~*
304350 1.SI-70-17S ELBOW TO PIPE C-F-1 C5.11 PT 1 UT 2-3-4**3378028 (6-SS-160-.71)*~
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UHIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPOHENTS PAGE: 60 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAHINAT ION AREA NUMBER IDENTIFICATION INSPECTION IN'IERVAL FIRST ASME PERIOD SEC.Xl CATGY NDE I ITEM NO METH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE-1 2 3 4 1 2 3 I I j I IHSTRUCTIOHS
~~CALIBRATION BLOCK~+LIHE 1-SI-70 FIG NO B-25 304370 1-SI-70-18F PIPE TO ELBOH CONT.L3 C-F-1 C5.11 PT 1-UT 2-3-4-C X**3378028 (6-SS.160-.71)
~*304380 1.SI-70-19S ELBOH TO PIPE C-F-1 C5~11 PT 1-UT 2-3 4-~*3378028 (6-SS.160..7'l)~*
304400 1-SI-70-20F PIPE TO VALVE C-F-1 C5.11 PT 1-UT 2-3-4-+*3378028 (6-SS-160-.71)++
LINE 1-SI-71 FIG NO B 26 304410 1-SI-71-01S TEE TO ELBSJ AHHULUS C-F-I C5.11 PT 1 Ul'----C 3-X 4-<<~3378029 (8-SS-140-.81)~*
304420 1.SI-71.02S ELBSI TO PIPE C.F.1 C5.11 PT 1-UT 2-3-4-**3378029 (B-SS-140-.81)**
304430 1-SI.71-02S-HL
'I THROUGH 4 HANGER LUG C-C C3.20 2 C 3 X 4-304440 1-SI-71-03S PIPE TO ELBOM C-F-1 PT 1 C5.11 UT 2-3.4-**3378029 (B-SS-140-.81)**
DATE: 11/15/95 REVISIOH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAH CLASS 2 ALL STATUS COMPOHENI'S PAGE: 61 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDEHT IF I CATION INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE I ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD-OUTAGE-1 2 3 1 2 3 4 1 2 3 INSTRUCTIONS
- 'CALIBRATIOH BLOCK**LINE 1-SI-71 FIG NO B-26 304450 1-SI.71.04F ELBOW TO VALVE C-F-1 C5.11 PT 1-UT 2-3.4<<*3378029 (B.SS-140-.81)**
304460 1-SI-71-05F VALVE TO ELBOW C.F-1 C5.11 PT 1-UT 2-3-4-C<<*3378029 (8-SS-140-.81)
<<*304470 1-SI.71.06S ELBOW TO PIPE ANHULUS C-F-1 C5.11 PT 1-UT 2-3-4**3378029 (B-SS.140-.81)**
304490 1-SI-71-07S PIPE TO TEE C-F-1 C5~11 PT 1 UT 2-3-4-<<<<3378029 (8-SS-140-.81)**
304500 1-SI-71-08S TEE TO REDUCER C-F-1 C5.11 PT 1-UI'-3-4-<<<<3378029 (8-SS-140-.81)*<<
304510 1-SI-71-10S TEE TO REDUCER C-F-1 C5.11 PT 1 UT 2-3-4**3378029 (8-SS-140-.81)**
304520 1-SI-71-11S REDUCER TO PIPE ANNULUS C-F 1 C5.11 PT 1-ur 2---c 3-X 4-**3378028 (6-SS-160-.71)<<*
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLAN'I UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS CONPOHENTS PAGE: 62 ENERGENCY CORE COOLING SYSTEN SUHNARY EXANI HAT I OH AREA HUNBER IDENTIFICATION IHSPECTION INTERVAL I ASME I SEC.Xl CATGY HDE I ITEN HO NETH I 1 PLAN STATUS FIRST SECOND THIRD I PERICO PERIOD PERIOD I--OUTAGE------I 2 3 1 2 3 4 1 2 3 I IHSTRUCTIONS
304560 1-S I-71-14S PIPE TO ELBOW C-F-1 C5.11 PT 1-Ul'-3.4*+3378028 (6 SS 160 71)ae 304570 1-SI-71.15S ELBOM TO PIPE C F1 C5.11 PT 1.UT 2-3-4**3378028 (6-SS.160-.71)*>>
304580 1-S I-71-16S PIPE TO ELBOW C-F-1 C5.11 PT'I-UT 2.3-4**3378028 (6-SS.160..71)
~*304590 1-SI-71.17S ELBOM TO ELBOM C-F-1 C5.11 PT 1 UT 2-3-4**3378028 (6.SS-160-.71)**
304600 1-S I-71-18F ELBOW TO PIPE C-F-1 C5.11 PT 1-UT 2-3-4**3378028 (6-SS-160-.71)~*
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 63 EMERGENCY CORE COOLIHG SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT IF I CAT I OH INSPECTION INTERVAL I FIRST ASME PERIOD SEC.XI I CATGY NDE I ITEM NO METH I PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE-1 2 3 4 1 2 3 I I I IHSTRUCTIOHS
304620 1-Sl-71-20F FLANGE TO PIPE C-F-1 C5.11 PT 1-UT 2-3-4-+*3378028 (6-SS-160-.71)**
304630 1-SI-71-21F PIPE TO ELBOW C-F-1 C5.11 PT 1-UT 2-3-4**3378028 (6-SS-160-.71)~*
304640 1-Sl-71-22S ELBOW TO PIPE C-F-1 C5.11 PT 1 Ul'-3-4<<*3378028 (6-SS-160-.71)**
304650 1-SI.71-23F PIPE TO ELBOW C-F-1 C5.11 PT 1-UT 2-3-~*3378028 (6-SS-160-.71
)**304660 1-SI-71-24S ELBOW TO PIPE C-F-1 C5.11 PT 1 Ul'-3-4.+*3378028 (6-SS-160-.71)
+*304680 1-SI-71-25F PIPE TO ELBOW C-F-1 C5.11 PT 1 UT 2-3-4-**3378028 (6-SS-160-.71)**
DATE: 11/15/95 REVI SIGH: 0 COOK HUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPOHENTS PAGE: 64 EHERGENCY CORE COOLING SYSTEH SUHHARY EXAHINATION AREA NUHBER IDEHT IF I CATION INSPECTION INTERVAL I F IRST ASHE PERIOD SEC.XI I CATGY NDE ITEN NO METH i 1 2 3 PLAN STATUS SECOND THIRD I PERICO PERIOD 0 U T A G E------I 1 2.3 4 1 2 3 I IHSTRUCTIOHS
<<~CALIBRATION BLOCK*~LIHE 1-Sl-71 FIG NO B-26 304690 1-SI-71-26S ELBOW TO PIPE C-F-1 C5~11 PT 1 UT 2-3-4~~3378028 (6-SS-160-.71)**
304710 1-SI-71-27F PIPE TO VALVE C-F 1 C5.11 PT 1-UT 2.3-4-C**3378028 (6.SS-160..71
)*>>LIHE 1-RH-1 FIG NO B-27 304720 1-RH-1-01F PUHP TO VALVE C-F-1 SEE 1 INST 2-3.4 EXAHI HAT ION NOT REQUIRED.PIPE THICKNESS LESS THAN~375~304730 1-RH-1-02F VALVE TO PIPE C-F-1 SEE 1 INST 2-3-4 EXAHINAT ION NOT REQUIRED.PIPE THICKNESS LESS THAN.375"~304740 1-RH-1-03S PIPE TO ELBOW E RHR PPRH C-F-1 SEE 1 INST 2-3-4 C EXAHINAT ION NOT REQUIRED.PIPE THICKNESS LESS THAN~375~304770 1.RH-1-04S ELBOW TO VALVE C-F-1 SEE 1-INST 2-3-4-EXAHINAT ION NOT REQUIRED.PIPE THICKHESS LESS THAH.375".304780 1-RH-1-05S VALVE TO ELBOW C-F 1 SEE 1.IHST 2-3.4 EXAHIHAT IOH HOT REQUIRED.PIPE THICKNESS LESS THAN 375n DATE: 11/15/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL SI'ATUS COMPONENTS PAGE 65 EMERGENCY CORE COOLIHG SYSTEM SUMHARY EXAMINAT IOH AREA NUMBER IDEHT IF I CAT ION FIRST PERIOD INSPECTIOH INTERVAL I ASME I SEC.XI I CATGY NDE I ITEM NO METH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I OUTAGE I 1 2 3 4 1 2 3 I INSTRUCTIONS
~*CALIBRATIOH BLOCK~~LINE 1-RM-1 FIG NO B-27 304790 1-RH-1-06S ELBOW TO PIPE C-F-1 SEE INST 2-3-4-C EXAHIHATION NOT REQUIRED.PIPE THICKHESS LESS THAN~375'04820 1-RH-1-07S PIPE TO ELBOW C F-1 SEE 1-IHST 2-3-4 EXAHIHATIOH NOT REQUIRED+PIPE THICKNESS LESS THAN.375".304830 1-RH-1-08S ELBOW TO ELBOW C-F-1 SEE 1 INST 2-3-4 EXAMINATION NOI'EQUIRED.
PIPE THICKNESS LESS THAN.375".304840 1-RH-1 09F ELBOW TO PIPE C.F-1 SEE 1-INST 2-3-4-EXAHIHATION NOT REQUIRED.PIPE THICKNESS LESS TNAN.375"~304860 1-RH-1-10S PIPE TO ELBOW C-F-1 SEE 1-INST 2-3-4-EXAHINATION NOT REQUIRED.PIPE THICKNESS LESS THAH.375".304870 1.RH-1.11S ELBOW TO PIPE E RHR PPRM C-F-1 SEE 1-INST 2-3-4 C EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.3754.304880 1-RH-1-12S PIPE TO ELBOW C-F-1 SEE 1 INST 2-3-EXAHI HAT ION NOT REQUIRED.PIPE THICKNESS LESS THAN 375 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 66 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT I F ICATION INSPECTION INTERVAL I ASME I SEC.XI I CATGY HDE ITEM NO METH I 1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD-I OUTAGE I 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
~~CALIBRATIOH BLOCK*~LINE 1-RH-1 FIG NO B-27 304890 1-RH-1-13S ELBOW TO PIPE C-F-1 SEE 1-INST 2-3-4 EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375" 304910'I.RH.1.14S PIPE TO ELBOW E RHR PPRM C-F-1 SEE 1-INST 2-3.4 C X EXAMINATION NOT REOUI RED.PIPE THICKNESS LESS THAN.3754.304920 1-RH-1-15F ELBOW TO PIPE C-F-1 SEE 1-IHST 2-3-4 EXAMINATION NOT REOUIREO.PIPE THICKNESS LESS THAN.375".304940 1-RH-1-16F PIPE TO PIPE C-F-1 SEE 1 INST 2-3-4 EXAHIHATION NOT REOUIREDo PIPE THICKNESS LESS THAN.375".304945 1-RH-1-16F-PS PIPE SUPPORT E CHG PPRM C-C C3.20 PT 1.2 3-4 C BASE MATERIAL 1.0>>.304950 1-RH-1-17S PIPE TO ELBOW C.F-1 SEE 1-INST 2 3-4 EXAMINATION NOT REOUIRED.PIPE THICKNESS LESS THAN~375~304960 1-RH-1-1BS ELBOW TO PIPE C-F-1 SEE 1-INST 2-3-4-EXAHI HAT I ON HOT REOUI RED~PIPE THICKNESS LESS THAN~375~
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UHIT 1 INSERVICE INSPECTION LOHG TERM PLAN CLASS 2 ALL STATUS COMPOHENTS PAGE: 67 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAMIHATIOH AREA NUHBER IDENT IF I CAT I OH INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE ITEH NO METH I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD---0 U T A G E-----I INSTRUCTIONS 1 2 3 1 2 3 4 1 2 3 (~*CALIBRATIOH BLOCK~~LINE 1-RH-'I FIG NO B-27 304970 1-RK-1-19S PIPE TO ELBOM C-F-1 SEE 1 INST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS TNAH.3754.304980 1.RH-1.20S ELBON TO TEE C-F-1 SEE 1 INST 2 3-4-EXAHINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.3754.304990 1.RH-1.21F TEE TO VALVE C-F-1 SEE 1-INST 2-3-4 EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".305000 1-RH-1-22F TEE TO VALVE C-F 1 SEE INST 2-3-4 EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.3754.305010 1-RH-1-23F VALVE TO ELBOM C-F-1 SEE 1 IHST 2-3-4 EXAMINAT10N NOT REQUIRED.PIPE THICKNESS LESS THAN~375".305020 1-RH-1-24S ELBOW TO PIPE C-F-1 SEE 1-INST 2-3-4-EXAHI HAT ION NOT REQUIRED.PIPE THICKNESS LESS THAN.375"~305030 1-RH-1-25S PIPE TO ELBOW C-F-1 SEE 1-INST 2-3.4 EXAMINATION NOT REQUIRED.PIPE THICKHESS LESS THAN.3754.
DATE: 11/15/95 REVISION: 0 COOK HUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPOHEHTS PAGE: 68 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT IF ICATION PLAN STATUS SECOHD PERIOD INSPECTION INTERVAL I FIRST ASME PERIOD SEC.XI I CATGY NDE i-----OUTAGE-ITEM HO METH I 1 2 3 1 2 3 4 THIRD I PERIOD I-----I 1 2 3 I INSTRUCTIONS
~*CALIBRATIOH BLOCK**LINE 1-RH-1 FIG NO B 27 305040 1-RH 1 26S ELBOW TO PIPE C-F-1 SEE 1 INST 2-3-4 EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN~375~305050 1-RH 1-27S PIPE TO ELBOW C-F-1 SEE 1-INST 2-3-4 EXAMIHAT ION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".305060 1-RH-1-28S ELBOW TO REDUCER C-F-1 SEE 1-IHST 2 3-4 EXAMINATION NOT REQUIRED.PIPE THICKHESS LESS THAN.375".305070 1.RH-1-29S REDUCER TO ELBOW C.F.1 C5.11 PT 1 UT 2 3-4-X~*14-SS-40-.438-30-DCV*
305080 1-RH.1-30F ELBOW TO NOZ2LE C-F-1 C5~11 PT 1-UT 2-3-4.**14-SS-40-.438-30.DCC**
LINE 1-RH.2 FIG NO B.28 305090 1-RH 2 01F PUMP TO VALVE C-F-1 SEE 1-INST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".305'IOD 1-RH-2-02F VALVE TO PIPE C-F-1 SEE 1 INST 2-3-4 C EXAMIHAT ION NOT REQUIRED~PIPE THICKNESS LESS THAN.375".
DATE: 11/15/95 REVISIOH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE 69 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAMIHATION AREA NUMBER IDENT I F ICATION INSPECTION INTERVAL I ASHE I'EC.Xl CATGY NDE ITEM NO METH)1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD-I OUTAGE---I 2 3 1 2 3 4 1 2 3 IHSTRUCTIONS
~*GAL I BRAT ION BLOCK**LINE 1-RH-2 FIG HO B-28 305110 1-RH-2-03S PIPE TO ELBOW C-F-1 SEE 1-INST 2-3.4~EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN~375~305120 1-RH-2-04F ELBOW TO VALVE C F-1 SEE 1-INST 2 3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.3754.305130 1-RH-2-05F VALVE TO ELBOW C-F-1 SEE 1 INST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN~375 305140 1-RH.2.06S ELBOW TO PIPE C F-1 SEE 1 INST 2-3-4-EXAMINATION NOT REQUIRED+PIPE THICKNESS LESS THAN.3754.305170 1.RH-2-07S PIPE TO ELBOW W RHR PPRM C-F-1 SEE 1 INST 2-3-4 C EXAHI HAT ION NOT REQUIRED.PIPE THICKNESS LESS THAN~375 305180 1-RH-2-OBF ELBOW TO PIPE C-F-1 SEE 1-INST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".305200 1-RH.2.09S PIPE TO ELBOW C-F-1 SEE 1 INST 2-3-4 EXAHINAT I ON NOT REQUIRED.PIPE THICKNESS LESS THAN.375".
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 70 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAHI HAT ION AREA NUMBER IDENT IF ICATION PLAN STATUS SECOND PERIOD INSPECTION INTERVAL I FIRST ASME PERIOD SEC~Xl CATGY NDE I---0 U T A G E ITEM NO HETH I 1 2 3 1 2 3 4 THIRD I PERIOD I--I 1 2 3 INSTRUCTIOHS
- iCALIBRATION BLOCK>>*LINE 1-RH-2 FIG NO 8-28 305210 1-RH-2-10S ELBON TO PIPE C-F-1 SEE 1 INST 2-3-4-C EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375>>.305220 1.RH-2-11S PIPE TO ELBOM C-F-1 SEE 1 INST 2-3.4 EXAHINATION NOT REQUIRED.PIPE THICKHESS LESS THAN.375>>.305230 1-RH.2-12S ELBOU TO PIPE C.F-1 SEE 1 INST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375>>.305250 1-RH-2-13F PIPE TO ELBON C-F-1 SEE 1 INST 2-3.4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN~375~305260 1-RH-2-14S ELBON TO PIPE C F 1 SEE 1 INST 2 3-4-EXAMI HAT I ON HOT REQUIRED.PIPE THICKHESS LESS THAN 375>>305270 1-RH-2-15F PIPE TO PIPE C-F-1 SEE 1 INST 2-3-4 EXAHINATI ON NOT REQUIRED.PIPE THICKHESS I.ESS THAN.375>>.305275 1-RH-2-15F-PS PIPE SUPPORT N CHG PPRM C-C C3.20 PT'1 2.3-4-BASE MATERIAL 1.0>>.
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPOHEHTS PAGE: 71 EMERGENCY CORE COOLING SYSTEH SUHHARY EXAHINATIOH AREA NUHBER IDENT IF ICATION INSPECTION INTERVAL I FIRST ASHE I PERIOD SEC.XI I CATGY HDE I ITEN NO NETH (1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I-I-OUTAGE------I 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATIOH BLOCK**LINE 1-RH-2 FIG NO 8-28 305280 1-RH.2-16S PIPE TO ELBOW C-F-1 SEE 1 INST 2-3-4-EXAHIHAT ION HOT REQUIRED.PIPE THICKNESS LESS THAN.375".305290 1-RH-2-17S ELBOW TO PIPE C-F-1 SEE 1 INSI'-3-4-EXAHINATIOH NOT REQUIRED.PIPE THICKHESS LESS THAN 375n, 305300 1-RH-2-1BS PIPE TO ELBOW C-F-1 SEE 1-INSI'-3-4 EXAHINATI OH NOT REQUIRED.PIPE THICKNESS LESS THAN.375".305310 1.RH-2-19S ELBOW TO TEE W RHR HXRM C-F-1 SEE 1-INST 2-3-4 EXAHI HAT ION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".305320 1-RH-2-20F TEE TO VALVE C-F-1 SEE 1-INST 2-3-4 EXAHIHATI OH NOT REQUIRED.PIPE THICKHESS LESS TNAH.375".305330 1-RH-2-21F TEE TO VALVE C-F-1 SEE 1 INST 2-3-4-EXAHINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".305340 1-RH-2-22F VALVE TO PIPE C-F-1 SEE 1 INST 2-3-4-EXAHINAT ION NOT REQUIRED.PIPE THICKNESS LESS THAN~3754.
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COHPOHENTS PAGE: 72 EMERGENCY CORE COOLING SYSTEM SUMHARY EXAMINATION AREA NUMBER IDENTIFICATION FIRST PERIOD INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE I ITEM NO METH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD-OUTAG'E-1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK**LINE 1-RH-2 FIG NO B-28 305350 1-RH-2-23S PIPE TO ELBOW C-F-1 SEE 1 INST 2-~3-4-EXAHINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".305360 1-RH-2-24S ELBOW TO PIPE C-F-1 SEE 1-INST 2-3-4 EXAMI HAT ION NOT REQUIRED.PIPE THICKNESS LESS THAN.3754.305370 1-RH-2-25S PIPE TO REDUCER C-F-'I SEE 1 INST 2-3-4.EXAHINATIOH NOT REQUIRED.PIPE THICKNESS LESS THAN.375".305380 1-RH-2-26S REDUCER TO ELBOW C-F-1 C5.11 PT 1-UT 2-3-4-<<*14-SS-40-.438-30.DCC*>>
305390 1-RH-2-27F ELBOW TO H02ZLE C-F-1 C5.11 PT 1-UT 2-3.*~14 SS-40-.438-30-DCC*~
LINE 1-RH-3 FIG NO B-29 305400 1-RH-3 01F VALVE TO PIPE C-F-1 SEE 1 INST 2-3-4 EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.3754.305410 1-RH-3-02S PIPE TO ELBOW C-F-1 SEE 1-INST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".
DATE: 11/15/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE IHSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONEHTS PAGE: 73 EMERGENCY CORE COOLING SYSTEM SUMHARY EXAHI HAT ION AREA NUMBER IDENT IF ICATION INSPECTION INTERVAL I ASME I SEC.XI I CATGY HDE ITEM NO METH I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD--OUTAGE----I INSTRUCTIONS 1 2 3 1 2 3 4 1 2 3[**CALIBRATION BLOCK*~LIHE 1-Rk-3 FIG NO 8-29 305420 1.RH-3-03S ELBOW TO TEE C F 1 SEE 1 INST 2-3-4 EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS TNAN.3754.305430 1.RH-3.04F TEE TO PIPE E RHR HXRM C-F-1 SEE 1-INST 2-3-4 EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN~375".305440 1-RH-3.05S PIPE TO ELBOW C-F-1 SEE 1-INST 2-3-4 EXAMINATION HOT REQUIRED~PIPE THICKNESS LESS THAN.375".305450 1.RH.3.06S ELBOW TO PIPE C-F-1 SEE 1 INST 2.3-4-EXAMINATION HOT REQUIRED.PIPE THICKNESS LESS THAN~375~305460 1-RH-3.07S PIPE TO ELBOW C-F-1 SEE 1 INST 2 C 3-4 EXAMINATION HOT REQUIRED.PIPE THICKNESS LESS THAN.375".305470 1-RH-3.08F ELBOW TO VALVE C-F-1 SEE INST 2-3-4-C EXAMINATION NOT REQUIRED.PIPE THICKHESS LESS THAH~375".305480 1-RH-3-09S TEE TO PIPE C-F-1 SEE 1 INST 2-3-4 EXAMIHAT I OH HOT REQUIRED.PIPE THICKHESS LESS THAN~375~
DATE: 11/15/95 REVISIOH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LOHG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 74 EHERGENCY CORE COOLING SYSTEM
SUMMARY
EXAHINAT ION AREA HUHBER IDENT IF I CAT ION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE ITEH NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD----0 U T A 0 E-1 2 3 1 2'3 4 1 2 3 I I I I INSTRUCTIONS
- ~CALIBRATION BLOCK~*LINE'1-RH 3 FIG NO B-29 305490 1-RH-3-10F PIPE TO VALVE C-F-'1 SEE 1 INST 2-C 3-4-EXAM I HAT ION NOT REQUIRED.PIPE THICKNESS LESS THAH.3754.305500 1-RH-3-1'IF VALVE TO ELBOM C-F-1 SEE 1 INST 2-3-4-EXAHINATION NOT REQUIRED.PIPE THICKNESS LESS THAN~3 75~305510 1.RH.3-12S ELBOM TO VALVE C-F'1 SEE 1-INST 2 3-4 EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAM.375".305520 1-RH-3-13S VALVE TO PIPE C-F 1 SEE 1-INST 2-3-4-C EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN 375u 305530 1-RH-3-14S PIPE TO ELBSI E RHR HXRM C-F-1 SEE 1 INST 2-3-4-C EXAMI HAT I ON NOT REQUIRED.PIPE THICKHESS LESS THAN.3754.305540 1-RH-3-15S ELBOW TO PIPE C-F-1 SEE 1 INST 2-3-4-EXAMINAT IOH NOT REQUIRED.PIPE THICKNESS LESS THAN 375u 305550 1.RH.3-16S PIPE TO REDUCER C-F-1 SEE 1 INST 2-3-4 EXAHINATIOH HOT REQUIRED.PIPE THICKNESS LESS THAN~3754.
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UHIT 1 INSERVICE INSPECTIOH LONG TERM PLAN CLASS 2 ALL STATUS COMPONEHTS PAGE: 75 EMERGENCY CORE COOLIHG S'STEM
SUMMARY
EXAMINATION AREA NUHBER IDENT I F I CATION INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE ITEM NO METH I PLAN STATUS FIRST SECOND THIRD PERIOD PERICO PERIOD-0 U T A G E------I INSTRUCTIONS 1 2 3 1 2 3 4 1 2 3)**CALIBRATIOH BLOCK**LINE 1-RH-3 FIG NO B-29 305560 1-RH-3-17S REDUCER TO TEE E RHR HXRM C-F-1 C5.11 3.4 X PT 1-UT 2-C**12-SS-40..406-29.DCC**
305570 1-RH-3-18F TEE TO VALVE C-F-1 SEE 1 INST 2-3-4 EXAMIHATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".305580 1-RH-3-'19S TEE TO TEE C.F-1 C5.11 PT 1-UT 2-3-4**12-SS-40-.406-29.DCC**
305590 1-RH-3-20S TEE TO ELBOM C-F-1 C5.11 PT 1-UT 2-3-4-**12-SS-40-.406-29-DCC**
305600 1-RH-3-21S TEE TO PIPE E RHR HXRH C-F-1 SEE 1 INST 2-3-4 EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".305610 1.RH.3-22S PIPE TO ELBOM C-F-1 SEE 1-INST 2-3.4-C EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAM.375"~305620 1-RH-3-23F ELBDM TO PIPE C F-1 SEE 1 INST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375"~
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLAHT UHIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 76 MERGENCY CORE COOLING SYSTEH SUHHARY EXAHINAT I ON'AREA NUHBER.IDENT I F I CAT I ON PLAN STATUS SECOND PERIOD INSPECTION INTERVAL I F IRST ASHE I PERIOD SEC.XI I CATGY NDE I 0 U T A G E ITEM NO METH I 1 2 3 1 2 3 4 THIRD I PERIOD I-I 1 2 3 I INSTRUCTIONS
- CALIBRATIOH BLOCK<<<<LINE 1-RH-3 FIG NO B-29 305630 1-RH-3-24S PIPE TO ELBOM C-F-1 SEE 1 INST 2-3-4-EXAHINAT ION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".305640'I-RH-3.25S ELBNI TO VALVE C-F-'I'SEE 1 INST 2 C 3-4-EXAMIHAT ION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".LINE 1-RH-4 FIG NO 8-30 305650 1-RH-4-01F ELBOM TO PIPE C-F 1 C5.11 PT 1-UT 2.3-4<<*12-SS-40-.406-29.DCC
<<305660 1-RH-4-02S PIPE TO TEE C-F-1 C5.11 PT 1 UT 2-3.4.<<<<12-SS-40-.406-29.DCC**
305670 1-RH.4.03F TEE TO ELBOM C-F-1 C5.11 PT 1 UT 2-3-4-<<*12-SS-40-.406-29.DCC**
305680 1-RH-4-04S ELBOll TO PIPE C-F-1 C5.11 PT 1 UT 2-3.4**12-SS-40-.406-29-DCC<<*
305690 1.RH-4-05S PIPE TO ELBOM C-F-1 C5.11 PT 1 UT 2-3 4-<<*12-SS-40-e406-29-DCC<<*
DATE: 11/15/95 REVISION: 0 COOK HUCLEAR PLANT UHIT 1 INSERVICE INSPECTION LOHG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 77 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAMI HAT I OH AREA NUHBER IDEHI'IF ICATION INSPECTION INTERVAL I FIRST ASHE PERIOD SEC.XI I CATGY NDE ITEM NO METH i 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE------
1 2 3 4 1 2 3 I I I INSTRUCTIONS
<<<<CALIBRATIOH BLOCK<<*LIHE 1-RH-4 FIG NO B-'30 305700 1-RH-4-06F ELBOW TO PIPE C-F-1 C5.11 PT 1 U T 2-3-<<*12-SS-40..406-29.DCC<<>>
305710 1-RH-4-07S PIPE TO ELBOW C-F-1 C5.11 PT 1 UT 2-3-4-<<*12-SS-40-.406-29.DCC*>>
305720 1-RH.4.08S ELBOW TO PIPE C-F-1 C5~11 PT 1 UT 2-C 3-4**12 SS 40.406 29 DCC>>*305750 1-RH.4-09F PIPE TO ELBOW C-F-1 C5.11 PT 1.Ur 2-.-3-4-**12-SS.40-.406-29.DCC**
305760 1-RH-4-10S ELBOW TO PIPE VESTIBULE C-F-1 C5.11 PT 1.O'I 2-3-4->>*12-SS-40-.406-29-OCC**
305780 1-RH-4-11S PIPE TO ELBOW C-F-1 C5.11 PT 1 UT 2-3-4-<<*12-SS ~406-29-OCC*>>
305790 1.RH-4.12F ELBOW TO PIPE C-F-1 C5.11 PT 1 UT 2-3-4**12-SS-40-.406-29-DCC**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTIOM LONG TERM PLAN CLASS 2 ALL STATUS COHPOMENI'S PAGE: 78 EMERGENCY CORE COOLING SYSTEM SUHHARY EXAMINATIOH AREA NUMBER IDENT IF I CAT ION INSPECTION INTERVAL I FIRST ASME PERIOD SEC.XI I CATGY NDE I ITEM NO METH J 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I OUTAGE-----I 1 2 3 4 1 2 3 INSTRUCTIOHS
- CALIBRATIOH BLOCK**LINE 1-RH-4 FIG NO B-30 305820 1-RH-4-13S PIPE TO ELBOW C.F-1 C5~11 PT 1-UT 2-3-4 C>>*12.SS-40-.406-29.DCC>>*
305830 1-RH-4'l4S ELBOW TO PIPE VESTIBULE C F-1 C5.11 PT 1-UT 2-.--C 3-X 4<<>>12-SS-40-.406-29.DCC
>>305840 1-RH-4-15F PIPE TO REDUCER C-F-1 C5.11 PT 1-UT 2C 3 X 4<<*12-SS-40-.406-29.DCC**
305850 1-RH-4-16S REDUCER TO PEHETRATIOM C-F-1 C5.11 PT UT 2-3-4**12-SS-40-.406-29 DCC*>>LINE 1-RH-5 FIG MO 8-31 305860 1-RH-5-01F NOZZLE TO REDUCER C-F-1 SEE 1 INST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".305870 1.RH 5 02S REDUCER TO PIPE W RHR HXRH C-F-1 SEE 1 INST 2-3-4-C EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN~3 75~305880 1-RH-5-03S PIPE TO TEE C-F-1 SEE 1-INST 2-3-4-EXAMINATION HOT REQUIRED.PIPE THICKNESS LESS THAN.375>>.
DATE: 11/15/95 REV I SION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 79 EHERGENCY CORE COOLING SYSTEH SUHMARY EXAHINAT ION AREA NUHBER IDENT I F ICATION INSPECTION INTERVAL I ASME I SEC.XI I CATGY HDE ITEH NO NETH I PLAN STATUS FIRST SECOND PERIOD PERICO-OUTAGE-1 2 3 1 2 3 4 THIRD I PERIOD I I-----I 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK>>>>LINE 1-RH-5 FIG NO B-31 305890 1-RH-5.04S TEE TO PIPE II RHR HXRM C F.1 SEE 1-INST 2-3-4-C~EXAHIHATI OH HOT REQUIRED.PIPE THICKNESS LESS THAN.375".305900 1-RH-5-05S PIPE TO ELBSI C-F-1 SEE 1-INST 2-3-4-EXAHIHATI OH NOT REQUIRED.PIPE TNICKHESS LESS THAN.375".305910 1.RH-5.06S ELBON TO PIPE C.F.1 SEE 1-INST 2-3-4 EXAHI HAT I OH NOT REQUIRED.PIPE THICKNESS LESS THAN~375~305920 1-RH-5-07S PIPE TO TEE C-F-1 SEE 1-INST 2-3-4 C EXAHI HAT ION NOT REQUIRED.PIPE THICKNESS LESS THAN~375~305930 1-RH-5-08S TEE TO PIPE C-F-1 SEE 1-INST 2-3-4 EXAHI HAT ION NOT REQUIRED.PIPE THICKHESS LESS THAN.375"~305940 1-RH.5-09S PIPE TO VALVE C-F-1 SEE 1 INST 2-3-4-EXAHINATI OH NOT REQUIRED~PIPE THICKHESS LESS THAN~375m 305950 1-RH-5-10F TEE TO PIPE C-F-1 SEE 1 INST 2-3-4 EXAHIHATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".
DATE: 11/15/95 REVISION: 0 COOK HUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPOHEHTS PAGE: 80 EMERGENCY CORE COOL NG SYSTEM
SUMMARY
EXAMIHATION AREA NUMBER IDENT I F I CATION INSPECTION INTERVAL I FIRST ASME PERIOD SEC.XI j CATGY NDE ITEM HO METH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERICO 0 U T A G E I IHSTRUCTIOHS 1 2" 3 4 1 2 3 (<<*CALIBRATION BLOCK**LINE 1-RH-5 FIG NO B-31 305970 1-RH-5-11S PIPE TO ELBOW C-F-1 SEE 1 INST 2-3-4-EXAMINATION HOT REQUIRED.PIPE THICKNESS LESS THAN~375~305980 1-RH-5 12S ELBOW TO PIPE C-F-1 SEE 1 INST 2 3-4 EXAMINATION HOT REQUIRED.PIPE TMICKHESS LESS THAN.375".306010 1 RH-5-13S PIPE TO ELBOW C-F-1 SEE 1 EXAMI HAT I ON NOT REQUIRED.INST 2-PIPE THICKNESS LESS THAN 3-.3754.4 306020 1-RH-5-14S ELBOW TO PIPE C-F-1 SEE 1 INST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375>>.306030'I-RH-5-15S PIPE TO ELBOW C-F-1 SEE 1 INST 2-3-4 EXAMINATION HOT REQUIRED.PIPE THICKNESS LESS THAN.375".306040 1-RH-5-16F ELBOW TO PIPE C.F.1 SEE 1~INST 2-3-4-EXAMINATION HOT REQUIRED.PIPE THICKNESS LESS THAN~375~306060 1-RH-5-17F PIPE TO VALVE C-F-1 SEE 1-INST 2-3-4 C EXAMINATION HOT REQUIRED.PIPE THICKNESS LESS THAN.3754.
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANI'NIT 1 INSERVICE INSPECTION LOHG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 81 EMERGENCY CORE COOLING SYSTEM SUMHARY EXAHINATION AREA NUHBER IDENTIFICATION IHSPECTIOH IH'IERVAL I FIRST ASHE PER I OO SEC~XI I CATGY NDE ITEM NO METH J 1 2 3 PLAN STATUS SECOHD THIRD PERIOD PERIOD OUTAGE-1 2 3 4 1 2 3 I I I I INSTRUCTIONS
- CALIBRATIOH BLOCK~*LINE 1.RH-5 FIG NO B-31 306070 1-RH-5-18F VALVE TO PIPE C-F-1 SEE 1-INST 2-3-4-PIPE SCHEDULE CHANGE.EXAHINAT ION NOT REQUIRED.PIPE THICKNESS LESS THAH.3754.306080 1-RH-5-'19S PIPE TO ELBOW C-F-1 SEE 1 INST 2.3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN~375".306090 1-RH-5-20S ELBOW TO ELBOW C-F-1 SEE 1-INST 2-3.4.C EXAMI HAT I OH NOT REQUIRED.PIPE THICKNESS LESS THAN.375".306100 1-RH 5-21S ELBOW TO PIPE C-F-1 SEE 1 INST 2-3-4-EXAHI HAT ION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".306110 1-RH-5-22F PIPE TO ELBOW C-F-1 SEE 1 INST 2-3-4 EXAMINATION NOT'EQUIRED
~PIPE THICKNESS LESS THAN~375".306120 1-RH.5-23S ELBOW TO PIPE C-F-1 SEE 1 IHST 2-3-4-EXAMINATION HOT REQUIRED~PIPE THICKNESS LESS THAN.375".306150 1-RH-5-24S PIPE TO ELBOW C-F-1 SEE 1-INST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN~3 75~
DATE: 11/'I5/95 REVISIOH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LOHG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 82 EMERGENCY CORE COOL NG SYSTEM SUHHARY EXAHIHATIOH AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE I ITEN NO NETH i 1 PLAN STATUS FIRST SECOND PERIOD PERIOD--OUTAGE-2 3 1 2 3 4 THIRD I PERIOD-I-----I 1 2 3 I INSTRUCTIONS
~~CALIBRATION BLOCK~*LINE 1-RH.5 F'IG NO B-31 306160 1-RH-5-25S ELBDH TO PIPE C-F-1 SEE INST 2-3-4 EXAHIHATIOH NOT REQUIRED.PIPE THICKHESS LESS THAN.375".306170 1-RH-5-26F PIPE TO ELBSI C-F.1 SEE INST 2 3-EXAHINATIOH NOT REQUIRED'IPE THICKHESS LESS THAN.375".306180 1.RH.5.27S ELBOM TO PIPE C-F-1 SEE INST 2.3-4 EXAHINATIOH NOT REQUIRED.PIPE THICKNESS LESS THAN.375".306190 1.RH~5.27S.A PIPE TO PIPE C-F-1 SEE INST 2-3-4 EXAHIHATIOH HOT REQUIRED.PIPE THICKNESS LESS THAN~375~306220 1-RH-5-28S PIPE TO ELBON C F-1 SEE INST 2-3-4-EXAHINATIOH HOT REQUIRED'IPE THICKNESS LESS TNAH.3754.306230 1-RH-5-29F ELBSJ TO PIPE C-F-1 SEE INST 1-2.3-4-EXAHI HAT ION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".306250 1.RH.5-30S PIPE TO ELBDH C.F-'I SEE INST 1-2-3-4-EXAHI HAT ION NOT REQUIRED.PIPE THICKHESS LESS THAN.375".
DATE: 11/15/95 REVI S ION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECI'ION LONG TERM PLAN CLASS 2 ALL STATUS COMPOHENTS PAGE: 83 EMERGENCY CORE COOLING SYSTEM SUHMARY EXAHI HAT ION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE ITEM NO METH I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD------0 U T A G E-----I INSTRUCTIONS 1 2 3 1 2 3 4 1 2 3 (**CALIBRATION BLOCK**LINE 1-RH-5 FIG NO B-31 306260 1-RH-5.31F ELBOM TO PIPE C-F 1 SEE 1 INST 2.3-4 EXAHINATION NOT REQUIRED.PIPE THICKNESS LESS THAN~375~306270 1-RH-5-32S PIPE TO ELBOH C-F-1 SEE 1-INST 2-3-4-EXAMINATI OH NOT REQUIRED.PIPE THICKNESS LESS THAN~3 75~306280 1-RH-5-33F ELBOH TO PIPE C-F-1 SEE 1 INST 2-3-4-EXAMIHATIOH NOT REQUIRED.PIPE THICKNESS LESS THAN.375".306290 1-RH-5-34F PIPE TO PENETRATION VESTIBULE C-F-1 SEE INST 2.3-4 EXAMINATION NOT REQUIRED~PIPE THICKNESS LESS THAN.375".LINE 1-RH-6 FIG NO B-32 306300 1-RH-6-01F HEAT EXCHANGER TO REDUCER C-F-1 SEE 1-INST 2-3.4 EXAMINATION NOT REQUIRED.PIPE THICKHESS LESS THAN~375"~3063'IO 1-RH-6.02S REDUCER TO PIPE C-F-1 SEE 1 INST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".306320 1-RH.6-03S PIPE TO ELBOM C-F-1 SEE 1 INST 2-3-4 EXAHINATION NOT REQUIRED.PIPE THICKNESS LESS THAN 375u DATE: 11/15/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 84 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAMINATION AREA NUHBER IDENT I F I CAT ION FIRST PERIOD INSPECTION IHTERVAL I ASME I SEC.Xl I CATGY HDE I ITEH NO METH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD-0 U T A G E--.---I INSTRUCTIONS 1 2 3 4 1 2 3 J**CALIBRATIOH BLOCK*LINE 1-RH-6 FIG NO 8-32 306330 1-RH-6-04S ELBOIJ TO PIPE C-F-1 SEE 1 INST 2-3-4 EXAMINATION NOT REQUIRED.I IPE THICKNESS LESS THAN.375".306340 1-RH-6.05F PIPE TO TEE C-F-1 SEE 1-INST 2-3-4 EXAMINATION HOT REQUIRED.PIPE THICKNESS LESS THAN.375".306350 1-RH-6-06F TEE TO PIPE C-F-1 SEE 1-INST 2-C 3-4-EXAMINATION NOT REQUIRED+PIPE THICKNESS LESS THAN.3754~306360 1-RH-6.07S PIPE TO TEE C-F-1 SEE 1 INST 2-3-EXAMINATION NOT REQUIRED~PIPE THICKNESS LESS THAH.375".306370 1-RH-6.0BS TEE TO PIPE C-F-1 SEE 1.INST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS TNAH 375u 306380 1-RH-6.09S PIPE TO ELBOU C-F-1 SEE 1 INST 2-3-4-EXAMI HAT I OH HOT REQUIRED.PIPE THICKNESS LESS THAN.375W.306390 1.RH.6-10S ELBOU TO PIPE C-F-1 SEE 1-INS'I 2-3-4.EXAHIHATIOH HOT REQUIRED.PIPE THICKNESS LESS THAN.375".
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE IHSPECTION LONG TERH PLAH CLASS 2 ALL STATUS COMPONENTS PAGE: 85 EMERGENCY CORE COOLING SYSTEM SUMHARY EXAHIHATION AREA HUMBER IDENT I F I CATION PLAN STATUS SECOND THIRD PERIOD PERIOD INSPECTION INTERVAL I FIRST ASME PERIOD SEC.XI I CATGY NDE I------0 U T A G E-ITEM NO METH i 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS I<<*CALIBRATION BLOCK**LINE 1-RH-6 FIG NO B-32 306400 1-RH-6-11S PIPE TO TEE C-F-1 SEE 1-INST 2-3 4 EXAHINATION HOT REQUIRED.PIPE THICKNESS LESS THAN~375~306410 1.RH.6-12S TEE TO PIPE C-F-1 SEE 1-INST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".306420 1.RH.6-13S PIPE TO VALVE C-F-1 SEE 1.INST 2-3-4-EXAMIHATIOH NOT REQUIRED.PIPE THICKNESS LESS THAN.375".306430 1-RH-6.14F TEE TO PIPE C-F-1 SEE 1 INST 2 3-4-C EXAHINATIOH NOT REQUIRED.PIPE THICKNESS LESS THAN~375 4~306460 1-RH-6-15S PIPE TO ELBOW E RHR HXRM C-F-1 SEE 1 INST 2-3-4 C EXAMINATION NOT REQUIRED.PIPE THICKHESS LESS THAN.3754.306470 1-RH.6-16S ELBOW TO PIPE C-F-1 SEE 1 INST 2-3-4-EXAMINAT IOH NOT REQUIRED.PIPE THICKNESS LESS THAN 375 306480 1-RH-6-17S PIPE TO ELBOW C-F-1 SEE 1 IHST 2-3-4 EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS CONPOHEHTS PAGE: 86 ENERGENCY CORE COOL NG SYSTEN SUNHARY EXAMINATION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I F IRST ASHE PERIOD SEC'I I CATGY NDE ITEN NO HETN I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD I I OUTAGE I 1 2 3 4 1 2 3 I INSTRUCT IONS++CALIBRATION BLOCK**LINE 1-RH-6 FIG NO 8-32 306490 1-RH-6-1BS ELBOW TO PIPE C-F 1 SEE 1 INST 2-3-4-EXAHINATION NOT REQUIRED.PIPE THICKNESS LESS THAN~375~306500 1-RH-6-19S PIPE TO ELBOW C-F-1 SEE 1-INST 2-3-4-EXAHINAT ION NOT REQUIRED.PIPE THICKNESS LESS THAN+375".306510 1 RH.6-20F ELBOW TO PIPE C-F-1 SEE 1 INST 2-3-4 EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.3754.306530 1.RH.6-21F PIPE TO VALVE C F 1 SEE 1-INST 2-3.4-EXAHINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".306540 1-RH-6-22F VALVE TO.PIPE C-F-1 SEE 1 INST 2-3-4-PIPE SCHEDULE CHANGE.EXANINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375'06550 1-RH-6-23S PIPE TO ELBOW C.F.1 SEE 1-INST 2 C 3-4 EXAHI HAT ION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".306560 1-RH;6;24S ELBOW TO ELBOW C F-1 SEE 1 INST 2.3-C EXAHI HAT ION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECT IOH LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 87 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION PLAN STATUS FIRST SECOND PERIOD PERIOD INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE I------0 U T A G E-ITEM NO HETH I 1 2 3 1 2 3 4 THIRD I PERIOD-I-----I 1 2 3 I INSTRUCTIONS
- +CALIBRATION BLOCK+a LINE 1-RH-6 FIG HO B-32 306570 1-RH.6-25S ELBOW TO PIPE C-F-1 SEE INST 2-3-4 EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.3754.306580 1-RH-6-26F PIPE TO ELBOW C-F 1 SEE 1 INST 2-3-4-EXAMINATION HOT REQUIRED.PIPE THICKHESS LESS THAN.375".306590 1 RH-6-27F ELBOW TO PIPE C-F-1 SEE 1 INST 2-3-4 EXAMIHATIOH NOT REQUIRED.PIPE TNICKHESS LESS THAN.3754.306620 1.RH-6-28F PIPE TO PIPE C-F-1 SEE 1 INST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".306630 1-RH.6-29F PIPE TO PIPE C-F-1 SEE 1 INST 2-3-4 EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN 375u 306670 1-RH-6.30S PIPE TO ELBOW C-F 1 SEE 1 INST 2 C 3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAH~3754.306680 1-RH.6-31F ELBOW TO PIPE C-F-1 SEE 1-INST 2-3-4-EXAMINATION HOT REQUIRED.PIPE THICKHESS LESS THAN 375 DATE: 11/15/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGES 88 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAHI HAT I ON AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I F IRST ASHE PERIOD SEC.Xl CATGY HDE I'ITEN NO HETM I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I OUTAGE------I 1 2 3 4 1 2 3 I INSTRUCT IDHS~*CALIBRATION BLOCK**LINE'1.RH.6 F G NO B-32 306690 1-RH-6-32S PIPE TO ELBOW C-F-1 SEE 1 INST 2-3-4-EXAHINATIOH NOT REQUIRED.PIPE THICKNESS LESS THAN.375".306700 1-RH-6-33F ELBOW TO PIPE C-F-1 SEE 1-INST 2-3-4-EXAHINAT ION NOT REQUIRED.PIPE THICKHESS LESS THAN.375".306710 1-RH-6-34S PIPE TO ELBOW VESTIBULE C-F-1 SEE 1 INST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN~375~306720 1-RH-6-35F ELBOW TO PIPE C-F-1 SEE 1 INST 2-3-EXAMINATION HOT REQUIRED.PIPE THICKNESS LESS THAN~375~306730 1-RH.6-36F PIPE TO PENETRATIOM C-F-1 SEE 1 INST 2-3-4-EXAHINATIOM HOT REQUIRED~PIPE THICKNESS LESS THAN.375"~LINE 1-RH-7 FIG NO 8-33 306740 1-RH-7-01F VALVE TO ELBOW C-F-1 SEE 1-INST 2-3-4 EXAHIMATIOM HOT REQUIRED.PIPE THICKNESS LESS THAN.3754.306750 1-RH 7-02S ELBOW TO PIPE C-F-1 SEE 1 INST 2-3-4 EXAHIHATIOM NOT REQUIRED.PIPE THICKNESS LESS THAM.375".
DATE: 11/15/95 REV I S ION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 89 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAMIHATION AREA NUMBER IDEHT IF ICATION INSPECTION INTERVAL I ASME I SEC.Xl I CATGY NDE ITEM NO METH I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD------0 U T A 0 E-----i INSTRUCTIONS 1 2 3 1 2 3 4'I 2 3)*~CALIBRATION BLOCK**LINE 1-RH-7 FIG NO 8-33 306770 1.RH.7-03S PIPE TO ELBSI C-F-1 SEE 1-INST 2-3-4'XAHIHAT ION HOT REQUIRED.PIPE THICKHESS LESS THAN.3754.306780 1-RH-7.04S ELBSI TO PIPE C-F-1 SEE 1 INST 2-3.4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375"~306790 1-RH-7-05S PIPE TO ELBSI C-F-1 SEE 1-INST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".306800 1-RH-7-05F-A ELBSI TO PIPE C-F-1 SEE 1 INST 2-3-4-C EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.3754.306810 1-RH-7-06S ELBSI TO TEE C-F-1 SEE 1 INST 2 3-4 EXAHIHAT ION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".306820 1-RH-7-07S TEE TO VALVE C-F-1 SEE 1 INST 2-3-4 EXAHINATIOH NOT REQUIRED.PIPE THICKNESS LESS THAN.375".306830 1-RH-7-OBF TEE TO PIPE C-F-1 SEE 1 INST 2-3-4 EXAMINATION NOT REQUIRED.PIPE THICKHESS LESS THAN.375".0 DATE: 11/15/95 REVI SIGH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LOHG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 90 EMERGENCY CORE COOLING SYSTEM SUHMARY EXAMINATION AREA"'UMBER IDENTIFICATION INSPECTIOH INTERVAL I ASME I SEC'I I CATGY NDE I-----0 U T A G E.ITEHNOME'IH i 1 2 3 1 2 3 4 THIRD I pERroo I I 1 2 3 I INSTRUCTIONS
~~CALIBRATION BLOCK**LINE 1-RH-7 FIG NO B-33 306860 1-RH-7-09S PIPE TO FLANGE C-F-1 SEE 1 INST 2-3-4 EXAHINATION NOT REOUIREO.PIPE THICKHESS LESS THAN.375".306870 1-RH-7-10S FLANGE TO PIPE C-F-1 SEE 1-rusT 2-3-4 EXAMINATION NOT REOUIRED.PIPE THICKNESS LESS THAN.375".306MO 1.RH-7-11S PIPE TO ELBOW C-F-1 SEE 1 INST 2-3-4 EXAMINATION NOT REGUI RED~PIPE THICKNESS LESS THAN.375".306890 1-RH-7-12S ELBOW TO PIPE C-F-1 SEE 1 russ 2-3-4 EXAMIHATI ON NOT REQUIRED.PIPE THICKHESS LESS THAN~3754 306900 1.RH-7-13F PIPE TO VALVE E RHR HXRM C-F-1 SEE 1-INST 2-EXAMINATION NOT REOUIRED.PIPE THICKNESS LESS THAN 3-375" 306910 1-RH-7-14F VALVE TO PIPE C F-1 C5.11 PT 1 UT 2-3-4 PIPE SCHEDULE CHANGERS**3378029 (8-SS-140-.81)**
306920 1-RH-7-15S PIPE TO ELBOW C-F-1 C5.1'I PT 1 UT 2-3-4**3378029<B-ss-140-.81
)+>>
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 91 EMERGENCY CORE COOLING SYSTEH
SUMMARY
EXAHIHATIOH AREA NUMBER IDENTIFICATION PLAN STATUS FIRST SECOND PERIOD PERIOD INSPECT ION INTERVAL I ASHE I SEC.XI I CATGY NDE I 0 U T A G E ITEM NO METH I 1 2 3 1 2 3 4 THIRD I PERIOD I-----I 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK**LINE 1.RH-7 FIG NO B-33 306930 1-RH-7-16S ELBOW TO PIPE C-F-1 C5.11 PT 1-UT 2C 3 X 4-**3378029 (8-SS-140-.81)~*
306940 1-RH-7-16S-HL 1 THROUGH 4 HANGER LUG E RHR HXRH C-C C3.20 PT 1-2 3-4-C BASE MATERIAL LESS THAN 0.754~306960 1'H-7 17S PIPE TO ELBOW C-F-1 C5.11 PT 1-UI'-3.4**3378029 (8-SS-140..81)
~~306970 1-RH-7-18S ELBOW TO PIPE C-F-1 C5.11 PT 1 UT 2-3-4**3378029 (8-SS-140-.81)**
306980'I.RH-7-19F PIPE TO ELBOW C F-1 C5.11 PT 1-UT 2-3-4~~3378029 (8-SS-140-.81)**
306990 1-RH-7-20S ELBOW TO PIPE C-F-1 C5~11 PT 1-UT 2-3-4**3378029 (B-SS-140-.81)**
307000 1-RH-7-21F PIPE TO PIPE C-F-1 C5.11 PT 1 UT 2-3-4**3378029 (B-SS-140-.81)~*
DATE: 11/15/95 REVISIOH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 92 ENERGENCY CORE COOLING SYSTEH SUMHARY EXAHI HAT ION AREA NUHBER IDENT IF I CATION INSPECTION INTERVAL I ASME I SEC.XI I CATGY HDE ITEN NO KETH I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD-OUTAGE-1 2 3 1 2 3 4 1 2 3 I IHSTRUCTIOHS
- CALIBRATION BLOCK**LINE 1-RH-7 FIG NO B-33 307030 1-RH-7-22F PIPE TO PIPE C-F-1 C5.11 PT 1-UT 2-3-4-~~3378029 (B-SS-140-.81)~~
307050 1-RH.7.23F PIPE TO PIPE C-F.1 C5.11 PT 1-UT 2.3-4~~3378029 (B-SS-140..81)**
307070 1-RH-7-24F PIPE TO PIPE C-F-1 C5.11 PT 1 UT 2-3-4-**3378029 (B-SS-140-.81)**
307090 1-RH-7-25F PIPE TO ELBSI VESTIBULE C-F-1 C5.11 PT 1-UT 2-3-4-C X~*3378029 (8-SS-140..81)**
307100 1-RH-7-26S ELBDM TO PIPE CF1 C5.11 PT 1-Ul'-3-4**3378029 (8-SS.140-.81
)~*307110 1-RH-7-27F PIPE TO REDUCER C-F 1 C5~11 PT 1-UT 2C 3X 4*3378029 (B-SS-140-.81)**
307120 1-RH-7-28S REDUCER TO PENETRATIOH C-F-1 C5.11 PT 1-UT 2-3.4-**3378031 (12-SS.160-1.31)*>>
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 93 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION FIRST PERIOD INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE I ITEM NO HETH I 1 2 3 PLAH STATUS SECOND THIRD I PERIOD PERIOD I I OUTAGE I 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATIOH BLOCK~*LINE 1 RH-8 FIG NO B-34 307130 1.RH-8.01F VALVE TO PIPE W RHR HXRM C F-1 SEE 1 INST 2-3-4 EXAMIHATIOH HOT REQUIRED.PIPE THICKNESS LESS THAN.375".307140 1-RH-8.02S PIPE TO ELBSI C-F-1 SEE 1 IHST 2-3.4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".307150 1-RH-8.03S ELBSI TO ELBSI C.F-1 SEE 1-INST 2 C 3-4 EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".307160 1-RH-8-04S ELBOU TO PIPE C.F-1 SEE 1-INST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN~375".307170 1-RH-8.05S PIPE TO TEE C-F-1 SEE 1-INST 2-3-4-EXAMINATIOH NOT REQUIRED.PIPE THICKNESS LESS THAN.375".307180 1-RH-8-06S TEE TO VALVE U RHR MXRH C-F-1 SEE 1 IHST 2 3.4 C EXAMINATION NOT REQUIRED~PIPE THICKNESS LESS THAN.375".307190 1-RH-8.07F TEE TO PIPE C-F-1 SEE 1 INST 2 3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375N.
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPOHENTS PAGE: 94 EMERGENCY CORE COOLING SYSTEM SUMHARY EXAMIHAT I ON AREA NUHBER IDENT IF I CAT I OH FIRST PERIOD INSPECTIOH INTERVAL I ASME I SEC.Xl I CATGY NDE I ITEM NO METH I 1 2 3 PLAN STATUS SECOHD THIRD PERIOD PERIOD 0 U T A G E j INSTRUCTIONS 1 2 3 4 1 2 3 (**CALIBRATION BLOCK>><<LINE 1-RH-8 FIG NO 8-34 307200 1-RH-8-08S PIPE TO PIPE C-F-1 SEE INST 2 3 4 EXAMINATION NOT REQUIRED.PIPE TNICKHESS LESS THAN.375".307210 1-RH-8.09S PIPE TO FLANGE C-F 1 SEE 1 INST 2-3.4 EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".307220 1-RH-8-10S FLANGE TO PIPE C-F-1 C5.'I'I PT 1 UT 2-3-4**3378029 (B-SS-140-.81)**
307230 1-RH.8-11S PIPE TO ELBOW C-F 1 C5.11 Pt 1-Ut 2-3-4<<*3378029<8-SS-140-.81)<<*
307240 1-RH.8.12F ELBOW TO VALVE C-F-1 C5.11 PT 1 UT 2-3-4.<<*3378029 (8-SS-140..81)*>>
307250 1-RH.8-13F VALVE TO ELBOW W RHR HXRM C-F-1 C5.11 3-4-X PT 1 UT 2-C<<<<3378029 (8-SS.140-.81)**
307260 1-RH-8-14S ELBOW TO PIPE C-F-1 C5.11 PT 1-UT 2-3-4-**3378029<8-SS-140..81)**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLAN'T UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS CCMPOHENTS PAGE: 95 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAHINAT ION AREA NUMBER IDENT I F I CAT I ON INSPECTION INTERVAL I FIRST ASME PERIOD SEC~XI I CATGY NDE ITEM NO METH i 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD-OU T A G E---I INSTRUCTIONS 1 2 3 4 1 2 3 J<<*CALIBRATION BLOCY<<<<LIHE 1-RH.B FIG NO B-34 307270 1-RH-8-15S PIPE TO ELBOW C-F-1 C5.11 PT 1 UT 2.3.4-<<<<3378029 (8.SS-140-.81)
<<<<307280 1-RH-8-16S ELBOW TO PIPE C-F-1 C5.11 PT 1 UT 2-3-4-**3378029 (B-SS-140-.81)<<*
307310 1-RH.8-17S PIPE TO ELBOW C-F-1 C5~11 PT 1 UT 2-3.4<<*3378029 (8-SS-140-.81)**
307320 1.RH.8-18F ELBOW TO PIPE C-F-1 CS~11 PT 1 UT 2-3-4 C X**3378029 (B-SS-140-.81)**
307330 1-RH-8-'19S PIPE TO PIPE C-F-1 C5.11 PT 1 Ur 2-3-4**3378029 (8-SS-140..81)*<<
307340 1-RH-8-20S PIPE TO ELBOW C-F-1 C5.11 PT 1 UT 2.3.4*<<3378029 (B-SS-140-.81)**
307350 1-RH-8-21F ELBOW TO PIPE C-F-1 C5.11 PT 1 UT 2-3-4**3378029 (8-SS-140-.81)**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 96 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAHI HAT I OH AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE ITEH NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD I I OUTAGE 1 2 3 1 2 3 4 1 2 3 INSTRUCTIOHS
- CALIBRATION BLOCK~~LINE 1 RH-8 FIG NO B-34 307380 1-RH-8-22F PIPE TO PIPE C-F-1 C5.11 PT 1-UT 2-3 4**3378029 (8-SS-140-.81)++
307400 1-RH-8.23F PIPE TO PIPE C-F-1 C5.11 PT 1-UT 2-3-4**3378029 (8-SS-140..81)
~*307430 1-RH.8-24S PIPE TO ELBOW C-F-1 C5.11 PT 1-UT 2-3-4**3378029 (8.SS-140-.81)
~*307440 1-RH.8-25S ELBOW TO PIPE C-F-1 C5.11 PT 1 UT 2-3-**3378029 (8-SS-140-.81)**
307460 1-RH-8-26S PIPE TO ELBOW C-F-1 C5.11 PT 1 UT 2-3-~4-**3378029 (8-SS-140..81) ea 307470 1-RH-8-27F ELBOW TO PIPE CF1 C5.11 PT 1 UT 2-3-4-**3378029 (8.SS-140-.81)~~
307480 1-RH-8-28S PIPE TO PIPE C-F-1 C5.11 PT 1-UT 2-3 4**3378029 (B-SS-140..81)**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANl'NIT 1 INSERVICE INSPECTION LOHG TERM PLAH CLASS 2 ALL STATUS COMPONENTS PAGE: 97 EMERGENCY CORE COOLING SYSTEM SUMHARY EXAMINATION AREA NUMBER IDENT IF I CAT I OH INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE ITEM HO METH I 1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD-l-OUTAGE---I 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
307500 1-RH-8-30S ELBOW TO PIPE C F-1 C5.11 PT 1 UT 2-3-4-**3378029 (8.SS.140-.81)
<<<<307510 1.RH.8.31F PIPE TO PENETRATIOH C-F-1 C5.11 PT 1 UT 2-3-4*<<3378029 (B-SS-140-.81)**
LIHE 1-RH-9 FIG NO B-35 307520 1 RH-9.01F TEE TO PIPE C-F-1 SEE 1 INST 2-3-4.C EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".307530 1-RH-9-02S PIPE TO ELBOW C-F-1 SEE 1-INS'I 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375"~307540 1.RH-9.03S ELBOW TO PIPE C-F 1 SEE 1 INST 2-C 3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN~375".307550 1-RH-9-04S PIPE TO ELBOW C-F-1 SEE 1 INST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375"~
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 98 EMERGEHCY CORE COOLING SYSTEM
SUMMARY
EXAMIHATIOH AREA HUHBER IDENT IF ICATION INSPECTION INTERVAL I FIRST ASME PERIOD SEC.XI I CATGY NDE I ITEH HO METH I 1 2 3 PLAH STATUS SECOND THIRD PERIOD PERIOD-OUTAGE-1 2 3 4 1 2 3 I INSTRUCTIONS I~~CALIBRATIOH BLOCK**LIHE 1-RH-9 FIG HO B 35 307560 1-RH-9.05S ELBOW TO PIPE C-F-1 SEE 1 INST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375"~307570 1-RH-9-06S PIPE TO ELBOW C-F-1 SEE 1-IHST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN 375>'307590 1-RH-9-07F ELBOW TO VALVE C-F-1 SEE 1 INST 2-3-4-EXAHIHATION HOT REQUIRED~PIPE THICKNESS LESS THAN.3754.307600 1-RH-9-DBF VALVE TO ELBOW C F-1 SEE 1-INST 2-3-4.PIPE SCHEDULE CHANGE.EXAHINATION NOT REQUIRED.PIPE THICKHESS LESS THAN.375".307610 1-RH-9-09S ELBOW TO PIPE C-F-1 SEE 1-INST 2-3.4.EXAMINATION HOT REQUIRED.PIPE THICKNESS LESS THAN.375".307620 1-RH-9-10F PIPE TO PIPE C-F-1 SEE 1.INST 2-3-4.EXAMINATIOH HOT REQUIRED.PIPE THICKNESS LESS THAN~375~307630 1-RH-9-11F PIPE'O ELBOW C-F-1 SEE 1-INST 2-3-4.EXAHI HAT IOH NOT REQUIRED.PIPE THICKNESS LESS THAH.3754.
DATE: 11/15/95 REVISION: 0 COOK HUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL S'IATUS COMPOHENTS PAGE: 99 EMERGENCY CORE COOLING SYSTEH
SUMMARY
EXAHINATION AREA NUHBER IDENT IF ICATION FIRST PERIOD INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE I ITEH NO METH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD-0 U T A G E-1 2 3 4 1 2 3 I I I I INSTRUCTIONS
++CALIBRATION BLOCK**LINE 1-RH-9 FIG NO B-35 307640 1.RH-9-12F ELBOW TO PIPE C-F-1 SEE 1 INST 2-3-4-EXAHINATI ON NOT REQUIRED.PIPE THICKNESS LESS THAN.375".307660 1.RH.9-13F PIPE TO PIPE C-F-1 SEE 1-INST 2-3-4-EXAHIHAT ION NOT REQUIRED.PIPE THICKNESS LESS THAN.375"~307680 1-RH.9-14F PIPE TO PIPE C-F 1 SEE 1 INST 2-3-4 EXAHIHAT ION NOT REQUIRED.PIPE THICKHESS LESS THAN.3754.307690 1-RH-9-15S PIPE TO ELBOW C-F-1 SEE INST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".307700 1-RH-9-16S ELBOW TO PIPE C-F-1 SEE 1 INST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKHESS LESS THAN.375".307710'I-RH-9.17F PIPE TO ELBOW C-F-1 SEE 1 INST 2-3-4-EXAMINATI OH NOT REQUIRED.PIPE THICKNESS LESS THAH~375".307720 1-RH.9.18S ELBOW TO PIPE C-F-1 SEE 1 INST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375' DATE: 11/15/95 REVISION: 0 COOK HUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 100 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I FIRST ASME PERIOD SEC~XI I CATGY HDE ITEM NO METH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD-I-OUTAGE-----.I 1 2 3 4 1 2 3 INSTRUCTIONS
- CALIBRATION BLOCK*~LINE 1-RH-9 FIG NO B 35 307730 1-RH-9-19F PIPE TO PIPE C-F-1 SEE 1 INST 2-3-4.EXAMINATION NOT REQUIRED'IPE THICKHESS LESS THAN ,3754.307740 1-RH-9-20S PIPE TO ELBOW C-F-1 SEE 1.INST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKHESS LESS THAN.375"~307750 1-RH-9-21S ELBOW TO PIPE SI PPRM C F-1 SEE 1-INST 2 3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".307760 1-RH-9.22F PIPE TO PIPE SI PPRM C-F-1 SEE 1-INST 2-3-4-C EXAMINATION HOT REQUIRED~PIPE THICKHESS LESS THAN~3 75~307770 1-RH-9-23F PIPE TO TEE C-F-1 SEE 1 INST 2-3-4-C EXAMINATION NOT REQUIRED.PIPE THICKHESS LESS THAH 375 II LINE 1-RH-10 FIG NO 8-36 307780 1-RH-'10.01F TEE TO ELBOW C-F-1 SEE 1 INST 2-3-4-EXAMINATION NOT REQUIRED~PIPE THICKNESS LESS THAN~375"~307790 1.RH-10.02S ELBOW TO PIPE C-F-1 SEE 1-INST 2-3-4 C EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 101 EMERGEHCY CORE COOLING SYSTEM
SUMMARY
EXAHINAT ION AREA NUMBER IDENT IF ICATION PLAN STATUS FIRST SECOND PERIOD PERIOD INSPECTION INTERVAL I ASME I SEC~XI I CATGY NDE I------0 U T A G E-ITEM NO METH f 1 2 3 1 2 3 4 THIRD I PERIOD I I-----I 1 2 3 I IHSTRUCT IONS**CALIBRATION BLOCK~~LINE 1-RH-10 FIG NO B-36 307810 1-RH-10-03S PIPE TO ELBOW C-F-1 SEE 1 INST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.3754.307820 1-RH-10.04S ELBOW TO PIPE C-F-1 SEE 1.INST 2-C 3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375'07850 1-RH-10.05S PIPE TO ELBOW C-F-1 SEE 1 IHST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN..3754.307860 1-RH-10.06F ELBOW TO VALVE C-F 1 SEE 1 INST 2-3-4 EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAH'375".
307870 1-RH-10.07F VALVE TO ELBOW C-F-1 SEE 1-EXAMINATION NOT REQUIRED~INST 2-PIPE THICKNESS LESS THAN 3-.375" 4 307880 1-RH-10-08S ELBOW TO PIPE C.F.1 SEE 1 INST 2-3-4-EXAMIHATION NOT REQUIRED.PIPE THICKHESS LESS THAN.375".307890 1-RH-10.09S PIPE TO ELBOW C-F-1 SEE 1 INST 2-3-4-EXAMI HAT I OH HOT REQUIRED.PIPE THICKNESS LESS THAN.375".
DATE: 11/15/95 REVISIOll:
0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 102 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAMINATIOH AREA NUHBER IDENT IF I CAT I OH FIRST PERIOD INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE I ITEM NO METH I 1 2 3 PLAN STATUS SECOHD THIRD PERIOD PERIOD 0 U T A G E I IHSTRUCT IONG 1 2 3 4 1 2 3 I a~CALIBRATION BLOCK**LINE 1-RH-10 FIG NO B-36 307900 1-RH-'10-10S ELBOW TO PIPE C-F-1 SEE 1 INST 2-3-4 EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".307910 1-RH-10-11S PIPE TO ELBOW C-F-1 SEE 1 INST 2-3-4.EXAHINATI OH HOT REQUIRED.PIPE THICKNESS LESS THAN.375".307920 1-RH-10-12S ELBOW TO PIPE C-F-1 SEE 1 INST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN 375>'.307940 1-RH-10-13F PIPE TO TEE C-F 1 SEE 1 INST 2-3-4 EXAMINATION HOT REQUIRED.PIPE THICKNESS LESS THAN~375~307950'I-RH-10-14S TEE TO PIPE C-F-1 SEE 1-INST 2-3-4.EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".307960 1-RH-10-15S PIPE TO ELBOW W CHG PPRM C-F-'I SEE 1 INST 2-3-4-C EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN~375~307970'I-RH-10.16S ELBOW TO PIPE C-F 1 SEE 1-INST 2-3-4 EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN~375".
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LOHG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 103 EMERGENCY CORE COOLING SYSTEM SUHMARY EXAMINATION AREA NUMBER IDENTIFICATION INSPECT IOH INTERVAL I F IRST ASME I PERIOD SEC.XI CATGY NDE I ITEH NO HETH f 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD (I OUTAGE---I 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK**LINE 1 RH-10 FIG NO B-36 307990'I-RH-10-17F PIPE TO TEE C-F-1 SEE 1 INST 2-3-4 EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".LINE'I-RH.11 FIG NO B 37 308000 1-RH-11-01F TEE TO PIPE C-F-1 SEE 1 INST 2-3-4-EXAMINATION HOT REQUIRED.PIPE THICKHESS LESS THAN.375".308010 1-RH-11-02S PIPE TO ELBOM C-F-1 SEE 1-INST 2-3-4 EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.3754.308020 1-RH-11-03F ELBON TO PIPE C-F-1 SEE 1 INST 2-3-4 EXAMINATION HOT REQUIRED.PIPE THICKNESS LESS THAN.375"~308030 1-RH-11-04F PIPE TO VALVE E RHR HXRM C-F-1 SEE 1-INST 2-3-4 EXAMIHATIOH HOT REQUIRED.PIPE THICKNESS LESS THAN.375"~308040 1.RH-11-05F VALVE TO PIPE C-F-1 SEE INST 2-3-4 EXAHI HAT I ON NOT REQUIRED.PIPE THICKNESS LESS THAH.375".308050 1-RH-11-06S PIPE TO ELBSI C-F-1 SEE 1 INST 2-3-4-EXAMINATION HOT REQUIRED.PIPE THICKNESS LESS THAN~3 75~
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECT IOH LONG TERH PLAN CLASS 2 ALL STATUS COMPONEHTS PAGE: 104 EMERGENCY CORE COOLIHG SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT IF ICATION PLAN STATUS FIRST SECOND PERIOD PERIOD INSPECTION INTERVAL I ASME I SEC.XI I CATGY HDE I 0 U T A G E ITEH HO METH I 1 2 3 1 2 3 4 THIRD I PERIOD I I-----I 1 2 3 I IHSTRUCTIONS
- CALIBRATION BLOCK~>>LINE 1-RH-11 FIG NO 8-37 308060 1-RH-11-07S ELBOW TO PIPE C-F-1 SEE 1-INST 2-3-4 C EXAHINATION HOT REQUIRED'IPE THICKNESS LESS TNAN.3754.308080 1-RH-11-07S-HL 1 THROUGH 4 HANGER LUG C F-1 SEE 1 INST 2-C 3-4-308100 1-RH-11-08S PIPE TO ELBOW VESTIBULE C-F-1 SEE 1 INST 2-3-4-C EXAMIHATIOH NOT REQUIRED.PIPE THICKNESS LESS THAN.375"~308110 1-RH-11-09S ELBOW TO PIPE C-F-1 SEE 1 INST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKHESS LESS THAN.375".308120 1-RH-11-10S PIPE TO ELBOW C-F-1 SEE 1 INST 2-3-EXAHI HAT ION HOT REQUIRED.PIPE THICKNESS LESS THAN~375~308130 1-RH-11-11S ELBOW TO PIPE C-F-1 SEE 1.IHST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".308140 1-RH-11 12F PIPE TO TEE C-F-1 SEE 1-INST 2 C 3-4.EXAMINATION NOT REQUIRED~PIPE THICKNESS LESS THAN.375".
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS CONPOHENTS PAGE: 105 ENERGENCY CORE COOLING SYSTEN SUHHARY EXAHI HAT ION AREA NUNBER IDENT IF I CAT I OH INSPECTION INTERVAL I ASNE I SEC.Xl CATGY NDE I ITEN HO NETH I PLAN STATUS FIRS'I SECOHD THIRD PERIOD PERIOD PERIOD-OUTAGE--1 2 3 1 2 3 4 1 2 3 I I I I IHSTRUCTIOHS
~~CALIBRATIOH BLOCK~~LIHE 1-RH-27 FIG NO 8-38 308150 1-RH-27.01F PEHETRATION TO REDUCER C-F-1 C5.11 PT UT 2-3-4-*a12-SS-40-.406.29-DCC a 308160 1-RH-27-02S REDUCER TO PIPE C-F-1 C5.11 PT 1 UT 2-3-4 C**12-SS-40-.406 29 DCC~308170 1-RH-27-03F PIPE TO ELBOW C-F-1 C5~11 PT 1-UT 2-3-4-**12-SS 40-.406-29-DCC**
308180 1-RH-27-04S ELBOW TO PIPE C-F-1 C5.11 PT 1-UT 2-3-4**12.SS.40-.406-29.DCC**
308190 1-RH-27-05S PIPE TO ELBOW C-F-1 C5~11 PT 1 UT 2-C 3-X 4-<<*12-SS-40-.406-29.0CC*>>
308200 1-RH.27-06F ELBOW TO PIPE C-F-1 C5.11 PT 1 UT 2-3-4-**12-SS-40-.406-29.DCC**
308210 1-RH-27-07F PIPE TO ELBOW C-F.1 C5.11 PT 1 UT 2-3-4*12-SS.40-.406-29.DCC**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 106 EMERGEHCY CORE COOLIHG SYSTEH
SUMMARY
EXAHIHATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE I ITEH NO METH I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD-OUTAGE-1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS I<<*CALIBRATION BLOCK*<<LINE 1-RH-27 FIG NO B-38 308220 1-RH-27-OBF ELBSI TO VALVE ANNULUS C-F-1 C5.11 PT 1 UT 2 C 3-X 4-<<*12-SS-40-.406-29.DCC**
308230 1-RH-27-09F VALVE TO PIPE C-F-1 C5.11 PT 1 UT 2-3-4-PIPE SCHEDULE CHANGE.*<<3378031 (12-SS-160-1.31)<<*
308240 1-RH-27-10F PIPE TO PIPE C-F-1 C5.11 PT 1-UT 2-3-4-**3378031 (12-SS-160-1.31)**
308250 1-RH-27-11S PIPE TO TEE C.F-1 PT C5.11 UT 2-3-4-**3378031 (12-SS-160-1.31)<<<<
308260 1-RH-27-12S TEE TO REDUCER C.F.1 C5.11 PT 1-UT 2-3-4-<<<<3378031 (12-SS-160-1.3'I)**
308270 1-RH-27-13F TEE TO PIPE C-F-1 C5.11 PT 1-UT 2-3-4**3378029 (8-SS-140-.81)<<*
308280 1-RH-27-14S PIPE TO ELBOM C-F-1 C5.11 PT 1-UT 2-3-4<<*3378029 (8-SS-140..81)*>>
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 107 EMERGENCY CORE COOLING SYSTEH SUHMARY EXAHINAT I ON AREA NUHBER IDENTIFICATION PLAN STATUS FIRST SECOND PERIOD PERIOD INSPECTION IHTERVAL I ASHE I SEC.XI I CATGY NDE I------0 U T A G E-ITEH NO METH I 1 2 3 1 2 3 4 THIRD I PERIOD I-----I 1 2 3 I INSTRUCTIONS
- >>CALIBRATION BLOCK*>>LINE 1-RH-27 FIG NO B-38 308290 1-RH-27-15F ELBOW TO VALVE C-F-1 CS~11 PT 1 UT 2-3-4-**3378029 (B-SS-140-.81)<<<<
LIHE 1-RH-28 FIG NO B-39 308300 1-RH-28-01F VALVE TO ELBOW C-F-1 C5.11 PT UT 2-3-4-*>>14.SS.40-.438-30.0CC>>>>
308310 1-RH-28.02S ELBOW TO PIPE C-F-1 C5.11 PT 1 UT 2-3-4.C**14-SS-40-.438-30-DCC**
308320 1-RH-28.03F PIPE TO ELBOW C-F-1 C5.11 PT 1-UT 2-3-4-**14-SS-40-.438-30 Dcc<<*308330 1-RH.28.04S ELBOW TO PIPE C-F-'1 C5.11 PT 1 UT 2-3-4.<<*14-SS-40-.438-30-OCC*>>
308340 1-RH.28.05F PIPE TO PEHETRATION C-F-1 C5.11 PI'ur 2-C 3-X 4-**14-SS-40-.438-30-D CC**LINE 1.RH-30 FIG NO B-40 308350 1.RH-30-01F REDUCER TO PIPE C-F-1 PI'--~C5.11 UT 2-3-4*<<337e029<e-SS-140-.81
><<>>
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLAN'I UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 108 EHERGEHCY CORE COOLING S'STEM SUMHARY EXAHINATIOH AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I FIRST ASHE I PERIOD SEC.XI I CATGY NDE I------0 U T A G E-ITEM NO METH t 1 2 3 1 2 3 4 THIRD J PERIOD)I-----I 1 2 3 I INSTRUCTIONS
308370 1-RH-30-03F PIPE TO PIPE C-F-1 C5.11 PT 1-UT 2.3-4-<<*3378029 (B-SS-140..81)>>>>
308380 1-RH-30.04F PIPE TO PIPE C-F-1 C5.'I1 PT 1-UT 2-3-4-<<>>3378029 (B-SS.140..81)**
308390 1.RH-30.05S PIPE TO ELBSJ C-F-1 C5.'l1 PT 1 UT 2-3-<<*3378029 (8-SS-140-.81)**
308400 1-RH-30.06F ELBOll TO VALVE C-F-1 C5.11 PT 1 UT 2-3-4-X C<<*3378029 (8-SS-140-.81)>>*
DATE: 1'I/15/95 REV I S ION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAH CLASS 2 ALL STATUS COMPONENTS PAGE: 109 INSPECTION INTERVAL CHEMICAL AND VOLUME CONTROL SYSTEM I ASME I SEC.XI I CATGY NDE ITEM NO METH I PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I-I.-----OUTAGE--
I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK**LINE 1-CS-33 FIG NO B-41 308410 1-CS.33-06F VALVE TO ELBOW C-F-1 SEE 1 INST 2-3.4~EXAMINATION NOT REQUIRED.PIPE THICKHESS LESS THAN.375".308420 1-CS-33-07S ELBOW TO PIPE C-F-1 SEE 1-INST 2-3-4 EXAMIHATIOH NOT REQUIRED.PIPE THICKNESS LESS THAN.375".308430 1-CS-33-OBF PIPE TO TEE C-F-1 SEE 1 INST 2-3-4 EXAMI HAT I ON NOT REQUIRED.PIPE THICKNESS LESS THAN.375".308440 1-CS-33-12F VALVE TO PIPE C-F-1 SEE 1 INST 2-3-4-EXAHI HAT ION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".308450 1-CS-33-13S PIPE TO TEE C-F-1 SEE 1 INST 2-3-4 EXAHINAT I ON NOT REQUIRED.PIPE THICKNESS LESS THAN.375".308460 1.CS-33-14S TEE TO ELBOW C-F-1 SEE 1 INST 2-3-4 EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN~3754.308470 1-CS-33-15F ELBOW TO PIPE E CHG PPRM C-F-1 SEE 1 INST 2-3-4-C EXAHINATIOH HOT REQUIRED.PIPE THICKNESS LESS THAM.375".
DATE: 11/15/95 REVISIOH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE IHSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 110
SUMMARY
EXAMI HAT I ON AREA NUMBER IDENT IF ICATION INSPECTION INTERVAL CHEMICAL AHD VOLUME CONTROL SYSTEM I ASME I SEC.XI I CATGY NDE I ITEM NO METH i 1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I 0 U T A G E------I 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
~~CALIBRATIOH BLOCK**LINE 1-CS-33 FIG NO B-41 308480 I-CS-33-16S PIPE TO ELBOlI C-F-1 SEE 1-INST 2-3-4 EXAMINATION NOT REQUIRED~PIPE THICKNESS LESS THAN~375~308490 1-CS-33.17S ELBOU TO ELBOU C F 1 SEE 1-INST 2-3-4 EXAMINATION HOT REQUIRED.PIPE THICKNESS LESS THAN~375~308500 1-CS-33-18S ELBOH TO PIPE C-F 1 SEE 1 INST 2 C 3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN 375n 308510 1-CS-33-'l9F PIPE TO VALVE C-F'I SEE 1 INST 2-3-4 EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.3754.308520 1-CS-33.20F VALVE TO TEE C-F-1 SEE 1 INST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".308530 1.CS-33.21F TEE TO TEE C F-1 SEE 1-INST 2-3-4-EXAMI HAT IOH NOT REQUIRED.PIPE THICKNESS LESS THAN 375u 308540 1-CS-33-22F TEE TO PIPE C-F-1 SEE 1 INST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375"~
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPOHENTS PAGE: 111 SUHHARY EXAMINATION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL CHEMICAL AND VOLUME COHTRO SYSTEM I ASME I SEC.Xl CATGY NDE ITEH NO METH I 1 PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD I I I 0 U T A G E I INSTRUCTIONS 2 3 1 2 3 4 1 2 3)<<~CALIBRATION BLOCK**LINE 1-CS-33 FIG NO 0-41 308550 1-CS-33-23S TEE TO ELBOW C-F-1 SEE 1-INST 2-3-4 EXAHINATIOH NOT REQUIRED.PIPE THICKHESS LESS THAN.375".308560 1-CS-33-24S ELBOW TO PIPE E CHG PPRH C-F-1 SEE 1-INST 2-3-4 EXAMINATION HOT REQUIRED.PIPE THICKNESS LESS THAN.375".308570 1-CS-33-25S PIPE TO ELBOW C-F-1 SEE 1 INST 2-3-4-EXAHINATIOH NOT REQUIRED~PIPE THICKNESS LESS THAN.375".308580 1-CS-33-26S ELBOW TO PIPE C-F-1 SEE 1 INST 2-3-4-EXAMIHATIOH HOT REQUIRED.PIPE THICKNESS LESS THAH.375".308590 1.CS-33.27F PIPE TO VALVE C-F.1 SEE 1 IHST 2 C 3.4-EXAHINATION HOT REQUIRED.PIPE THICKNESS LESS THAN.3754.308600 1.CS-33-28F VALVE TO ELBOW C-F-1 SEE 1-INST 2-3-4 EXAMINATION HOT REQUIRED.PIPE TNICKNESS LESS THAN.3754.308610 1-CS-33-29S ELBOW TO PIPE C-F-1 SEE 1-INST 2-3-4a-EXAHINAT ION NOT REQUIRED.PIPE THICKNESS LESS THAH~375".
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 112
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL CHEMICAL'ND VOLUME CONTROL SYSTEM I ASHE I SEC'I I CATGY NDE I ITEM HO METH I 1 PLAN STATUS FIRST SECOHD THIRD I PERIOD PERIOD PERIOD-I-0 U T A G E------I 2 3 1 2 3 4 1 2 3 I INSTRUCTIOHS
~*CALIBRATIOH BLOCK**I 1-CS-33 FIG NO B-41 308620 1-CS-33-30F PIPE TO STRAINER C-F-1 SEE 1 INST 2-3-4-EXAMINATION HOT REQUIRED.PIPE THICKNESS LESS THAN~375'08630 1-CS-33-31F S'IRAINER TO ELBON C-F-1 SEE 1 INST 2-3-4 EXAHINAT ION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".308640 1-CS-33.32S ELBON TO FLANGE C-F-1 SEE 1 INST 2-3-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.3754.308650 1-CS-33-33S TEE TO REDUCER C-F-1 SEE 1 INST 2-C 3-4-EXAHIHATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".LINE 1-CS-35 FIG NO B-42 4 308660'I-CS-35-17S REDUCER TO TEE N CHG PPRM C F-1 SEE INST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.3754.308670 1-CS-35.18S TEE TO PIPE C F-1 SEE 1 INST 2-3-4 EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".308680 1-CS-35-19S PIPE TO ELBOH INST 2-3-4-PIPE THICKNESS LESS THAN.375".C-F-1 SEE 1 EXAMINATION NOT REQUIRED.
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAH CLASS 2 ALL STATUS COMPONEN'IS PAGE: 113
SUMMARY
EXAHI HAT IOH AREA NUMBER IDENTIFICATION INSPECTIOH INTERVAL CHEMICAL AND VOLUME CONTROL SYSTEM I ASME I SEC.XI CATGY NDE I ITEM HO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD-OUTAGE-1 2 3 1 2 3 4 1 2 3 I I I I INSTRUCTIOHS
- CALIBRATIOH BLOCK**LINE 1-CS-35 FIG NO B-42 308690 1-CS-35-20F ELBOW TO ELBOW C-F-1 SEE 1 INST 2-3-4 EXAMINATION NOT REQUIRED.PIPE THICKHESS LESS THAN~3 75~308700 1-CS-35-21S ELBOW TO PIPE W CHG PPRM C-F 1 SEE 1-INST 2-3-4-C EXAMINATION NOT REQUIRED;PIPE THICKNESS LESS THAN.375>>.308710 1-CS-35-22S PIPE TO REDUCER C-F-1 SEE 1 IHST 2-3-4.EXAMI HAT IOH NOT REQUIRED.PIPE THICKNESS LESS THAN.375>>.308720 1.CS-35-23S REDUCER TO TEE C-F-1 SEE 1 INST 2-3-4-EXAHINATION NOT REQUIRED.PIPE THICKHESS LESS THAN~375>>.308730 1-CS-35-24S TEE TO PIPE C-F-1 SEE 1 INST 2-3-4 C EXAHIHATION HOT REQUIRED.PIPE THICKNESS LESS THAN.375>>.308740 1-CS-35-25S TEE TO PIPE C-F-1 SEE 1 INST 2-3-4 EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN~375>>.308750 1-CS-35-26F PIPE TO VALVE W CHG PPRM C-F 1 SEE 1 INST 2-3-4 C EXAMIHATIOH NOT REQUIRED.PIPE THICKNESS LESS THAN.375".
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 114
SUMMARY
EXAMINATIOH AREA NUHBER IDENT IF ICATION INSPECTION INTERVAL CHEMICAL AND VOLUME CONTROL SYSTEM I ASME I SEC.XI CATGY NDE ITEM NO METH I 1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I-OUTAGE------I 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
~~CALIBRATIOH BLOCK~*LINE 1-CS-35 FIG NO B-42 308760 1-CS-35-27F VALVE TO ELBOW C-F-1 SEE 1 INST 2-3-4-EXAHIHATIOH NOT REQUIRED.PIPE THICKHESS LESS THAN~375~308770 1-CS.35.28S ELBOW TO PIPE C F-1 SEE 1-INST 2-3-4 EXAHINATI OH NOT REQUIRED.PIPE THICKNESS LESS THAN.3754.308780 1-CS-35-29F PIPE TO STRAINER C-F-1 SEE 1 INST 2-3-4 EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".308790 1-CS-35.30F STRAINER TO ELBOW C-F-1 SEE 1 INST 2 C 3-EXAHI HAT IOH NOT REQUIRED.PIPE THICKNESS LESS THAN~375".308800 1-CS-35-31S ELBOW TO FLANGE C-F-1 SEE 1 INST 2-3.4-EXAMINATION NOT REQUIRED~PIPE THICKNESS LESS THAH.375".
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE IHSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 115 CONTAINMENT SPRAY PIPING SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I ASHE I SEC.XI I CA'TGY NDE ITEH NO METH I PLAN STATUS FIRST SECOND PERIOD PERIOD-.OUTAGE 2 3 1 2 3 4 TMIRD I PERIOD-I------I 2 3 INSTRUCTIONS
~*CALIBRATION BLOCK~*LINE 1-CTS-1 FIG NO B-43 308810 1-CTS-1-01F PUMP TO REDUCER W CTS PPRH C F-1 SEE 1-INST 2-3-4 C EXAHINAT I ON NOT REQUIRED~PIPE THICKHESS LESS THAH.375".308820 1-CTS-1-02S REDUCER TO ELBOW C-F-1 SEE 1 INST 2-3-4 EXAHINAT ION NOT REQUIRED.PIPE THICKNESS LESS THAN.375"~308830 1-CTS-1.03S ELBOW TO PIPE C-F-1 SEE 1 INST 2-3-4 EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.3754.308840 1-CTS-1-35F PIPE TO VALVE C-F-1 SEE 1-INST 2-3-4 EXAHIHATI ON NOT REQUIRED.PIPE THICKNESS LESS THAN.375"~308850 1.CTS-1-04F VALVE TO PIPE'W CTS PPRH C-F-1 C5.11 PT 1 ur 2-3-4 C X EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".7.5X AUGMENTED UT REQUIREMENT.
- 10 SS-40-.365-26 DCC**308860 1-CTS-1.05F PIPE TO ELBOW C-F-1 SEE INST 2-3-4 EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375"~308870 1-CTS-1-06S ELBOW TO PIPE C-F-1 SEE 1 INST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS TNAN.375"~
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 116 CONTAINMENT SPRAY PIPING SYSTEM SUMHARY EXAHIHAT I ON AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I FIRST ASME PERIOD SEC.XI I CATGY NDE I ITEH NO METH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I OUTAGE I 1 2 3 4 1 2 3 I INSTRUCTIONS
~~CALIBRATIOH BLOCK~~LINE 1-C'TS-1 FIG NO B 43 308880 1-CTS-1-07S PIPE TO TEE C-F-1 SEE 1-INST 2 C 3-4 EXAMINATION HOT REQUIRED.PIPE THICKHESS LESS THAN.375".308890 1.CTS-1-08S TEE TO ELBOW C-F-1 SEE 1-INST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN~375".308900 1-CIS-1-09S ELBOW TO PIPE C-F-1 SEE 1 INST 2-3.4-EXAMINATION HOT REQUIRED.PIPE THICKNESS LESS THAN.375".308910 1-CTS-1-10F PIPE TO VALVE C-F-1 SEE 1 INST 2.3.4 EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".308920 1-CTS-1-11F VALVE TO ELBOW C F-1 SEE 1 INST 2-3.4.EXAMINATIOH NOT REQUIRED.PIPE THICKNESS LESS THAN.375".308930 1-CTS-1-12S ELBOW TO TEE C-F-1 SEE 1----------'XAHINATION HOT REQUIRED~IHST 2-PIPE THICKNESS LESS THAN 3-375" 4 308940 1-CTS-1-13S TEE TO PIPE C-F-1 SEE 1 P INST 2-3-4 EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".
DATE: 11/15/95 REVI S I OH: 0 COOK HUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 117 CONTAINMENT SPRAY PIPING SYSTEM SUMHARY EXAMINATION AREA HUMBER IDENT I F ICATION INSPECTION INTERVAL I FIRST ASME PERIOD SEC.XI I CATGY NDE I ITEM NO METH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE-1 2 3 4 1 2 3 I I I I INSTRUCTIONS
- CALIBRATION BLOCK*~LINE 1-CTS-1 FIG NO B-43 308950 1-CTS-1-14F PIPE TO VALVE C-F-1 SEE 1-INST 2 3-4 EXAHINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.3754.308960 1-CTS-1-15F VALVE TO TEE C-F-1 SEE 1-INST 2-3-4-EXAHIHATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".308970 1-CTS-1-16S TEE TO ELBSI U CTS PPRM C-F-1 SEE 1-INST 2.3-4 C EXAHI HAT ION NOT REQUIRED.PIPE THICKNESS LESS THAN.3754.308980 1-CTS.1-17S ELBOM TO PIPE U CTS PPRH C-F-1 C5.11 PT 1 UT 2-3-4-C X EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".7.5X AUGMENTED UT REQUIREMENT.
- 10-SS-40-.365-26 DCC**308990 1-CTS.1-18S PIPE TO ELBml C-F-1 SEE 1 INST 2-3-4 EXAMINAT IOH HOT REQUIRED~PIPE THICKHESS LESS THAN.375"~309000 1-CTS-1-19S ELBOU TO PIPE C-F-1 SEE 1 INST 2-3-4 EXAMI HAT ION NOT REQUIRED.PIPE THICKNESS LESS THAN~3 75~309010 1-CTS-1-20F PIPE TO PIPE C-F-1 SEE 1-INST'-3-4-EXAHINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 118 CONTAINMENT SPRAY PIPING SYSTEM
SUMMARY
EXAHINATIOH AREA NUHBER IDENT I F I CAT I OH INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE ITEM NO METH I PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I I------0 U T A G E------I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK~*LIHE 1-CTS-1 FIG NO B-43 309030 1-CTS-1-21F PIPE TO PIPE C-F-1 SEE 1 INST 2-3-4 EXAHI HAT I OH NOT REQUIRED~PIPE THICKNESS LESS THAN.3754.309040 1-CTS.1.22S PIPE TO ELBOW C-F-1 SEE 1 INST 2-3-4-EXAHINATI ON NOT REQUIRED.PIPE THICKNESS LESS THAN.375".309050 1-CTS-1-23S ELBOW TO PIPE C-F-1 SEE 1 INST 2-3-4 EXAMIHATIOH HOT REQUIRED.PIPE THICKNESS LESS THAN 375n 309060 1-CTS-1-24S PIPE TO ELBOW C-F-1 SEE 1-IHST 2.3-4-EXAMI HAT ION NOT REQUIRED.PIPE THICKHESS LESS THAN.3754.309070 1-CTS~'I-25F ELBOW TO VALVE C-F 1 SEE 1 INST 2.3-4-EXAMINATION HOT REQUIRED~PIPE TMICKHESS LESS THAN.375".309080 1-CTS-1-26F VALVE TO ELBOW C-F-1 SEE 1 INST 2-3.4 EXAMI HAT ION NOT REQUIRED~PIPE THICKNESS LESS THAN~375".309090 1.CTS-1.27S ELBOW TO PIPE W CTS HXRM C-F-1 SEE 1 INST 2-3-4 EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE IHSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONEHTS PAGE: 119 CONTAINMENT SPRAY PIPING SYSTEM
SUMMARY
EXAHINATION AREA NUMBER IDENT IF ICATION INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE ITEM HO METH PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I--0 U T A G E------I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
>>>>CALIBRATIOH BLOCK>>>>LINE 1-CTS-1 FIG NO B.43 309100 1.CTS-1-28S PIPE TO ELBOW C-F-1 SEE 1 INST 2-3-4-~EXAHIHATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".309110 1.CTS-1-29S ELBOW TO PIPE C-F-1 SEE 1-INST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".309120 1-CTS.1-30S PIPE TO ELBOW C-F 1 SEE 1 INST 2-3-4 C EXAMINATION HOT REQUIRED.PIPE THICKHESS LESS THAN.375>>.309140 1-CTS-1-32S ELBOW TO ELBOW W CTS HXRM C-F-1 SEE 1 INST 2-3-4-EXAMINATIOH NOT REQUIRED+PIPE THICKNESS LESS THAN.375".309160 1-CTS-1-33S ELBOW TO PIPE C-F-1 C5.11 PT 1-~UT 2..-C 3-X 4 EXAMINATION HOT REQUIRED.PIPE THICKHESS LESS THAN.375".7.5X AUGMENTED UT REQUIREMENI'.
- 10-$$-40-.365-26-PCC**
309170 1-CTS-1-34F PIPE TO HEAT EXCHAHGER C-F-1 SEE 1 INST 2-3-4 EXAMINATION NOT REQUIRED.PIPE TNICKNESS LESS THAN.375".LINE 1-CTS-2 FIG NO B-44 309180'I-CTS-2-01F HEAT EXCHANGER TO REDUCER C F-1 SEE 1 INST 2-3-EXAMINATION HOT REQUIRED.PIPE THICKNESS LESS THAN.375".
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 120 COHTAINMENT SPRAY PIPING SYSTEM SUHMARY EXAHIHATI OH AREA NUHBER IDENT IF ICATION INSPECTION INTERVAL FIRST ASHE IERIOD SEC.XI I CATGY NDE ITEM NO METH I 1 2 3 PLAN STATUS SECOND TNIRD I PERIOD PERIOD I I 0 U T A G E------I 2 3 4 1 2 3 I INSTRUCTIONS
- ~CALIBRATION BLOCK~*LINE 1-CTS-2 FIG NO B-44 309190 1-CTS-2-02S REDUCER TO ELBOW C-F-1 SEE 1 INST 2-3.4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS TNAN.375".309200 1-CTS-2.03F ELBOW TO VALVE CF-1 SEE 1-IHST 2-3 4 EXAMIHATION NOT REQUIRED.PIPE THICKNESS LESS THAH.375".309210 1-CTS-2-04F VALVE TO TEE C-F-1 SEE 1 INST 2-3-4 EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN~375~309220 1-CTS-2-05S TEE.TO ELBOW C-F-1 C5.11 PT 1 UT 2-C 3-X 4-EXAMI HAT ION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".7.5X AUGMENTED UT REQUIREMEN'I
- 10-SS-40-.365-26-DCC~*
309230 1-CTS-2-06S ELBOW TO REDUCER C.F-1 SEE 1-INST 2-3-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".309240 1-CTS-2-07S REDUCER TO PIPE W CTS HXRM C-F-1 C5.11 3-4 X PT 1-UT 2-C EXAMINATION NOl'EQUIRED.
PIPE THICKNESS LESS THAN.375".7.5X AUGMENTED UT REQUIREMENT.
- 6-SS-40..280-28-DCC*>>
309250 1.CTS-2-08F PIPE TO VALVE C-F-1 SEE 1 INST 2-3-4-EXAHI HAT I ON NOT REQUIRED.PIPE THICKNESS LESS THAN.375".
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE IHSPECTION LONG TERM PLAH CLASS 2 ALL STATUS COMPONENTS PAGE: 121 CONTAINMENT SPRAY PIPING SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDEHTIF ICATION INSPECTION INTERVAL I F IRST ASME I PERIOD SEC.XI I CATGY NDE ITEM HO METH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE-1 2 3 4 1 2 3 I I I J INSTRUCTIONS
~*CALIBRATIOH BLOCK**LIHE 1-CTS-2 FIG NO B-44 309260 1-CTS-2.09F
, VALVE TO TEE W CTS HXRM C-F-1 SEE 1 INST 2-3.4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375'09270 1-CTS.2-10S TEE TO PIPE C-F-1 SEE 1-INST 2-3-4 EXAMINATION NOT REQUIRED;PIPE THICKNESS LESS THAN.375".309290 1-CTS-2-11S PIPE TO ELBOW C-F-1 SEE 1-INST 2-3-4 EXAMINATION NOT REQUIRED;PIPE THICKHESS LESS THAN.3754.309300 1-CTS-2-12S ELBOW TO PIPE C-F 1 SEE 1 INST 2 3-4 EXAMINATION NOT REQUIRED.PIPE THICKHESS LESS THAN.375".309310 1-CTS-2-13S PIPE TO ELBOW C-F-1 PT 1-C5.11 UT 2---C 3-X 4-EXAMINATION HOT REQUIRED.PIPE THICKNESS LESS THAN.375".7.5'UGMENTED UT REQUIREMENT.
- 6-SS-40-.280-28-DCC**
309320 1-CTS-2-14S ELBOW TO FLANGE C.F-1 SEE 1-INST 2-3-4 EXAMINAT IOH NOT REQUIRED.PIPE THICKNESS LESS THAN.375u.309330 1-CTS-2-15S FLANGE TO PIPE C-F-1 SEE 1 INST 2-3-4\EXAMINATION NOT REQUIRED.PIPE THICKHESS LESS THAN.375".
DATE: 11/15/95 RE V I SIGH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE IHSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 122 CONTAINMENT SPRAY PIPIHG SYSTEM SUHMARY EXAHINATION AREA NUHBER IDENT IF ICATION INSPECTION INTERVAL I FIRST ASHE I PER100 SEC~XI I CATGY HDE I ITEH NO MEIN I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PER100 0 U T A G E I INSTRUCTIONS 1 2 3 4 1 2 3 i~*CALIBRATION BLOCK~*LINE 1-CTS-2 FIG NO 8-44 309340 1-CTS-2-16F PIPE TO PIPE C-F-1 SEE 1 INST 2-3-4 EXAHINAT ION NOT REQUIRED.PIPE THICKNESS LESS THAN 375 309350 1-CTS-2-17F PIPE TO FLANGE C-F-1 SEE 1-INST 2-3-4 EXAMI HAT ION HOT REQUIRED.PIPE THICKNESS LESS THAN.375".309360 1-CTS-2-18F FLANGE TO PIPE U CTS HXRM C-F-1 C5~11 PT 1 UT 2-3-X 4 C EXAHI HAT I OH NOT REQUIRED.PIPE THICKNESS LESS THAN~375".7.5X AUGHENTED UT REQUIREMEN'f.
"*6 SS-40-.280-28-DCC
- 309370 1-CTS-2-30F PIPE TO PIPE C-F-1 SEE 1-INST 2-3-4 EXAHIHAT ION NOT REQUIRED.PIPE THICKNESS LESS THAN~375".309380 1-CTS-2-'19F PIPE TO ELBOH C-F-1 SEE 1 INST 2-3-4 EXAMIHATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".309390 1-CTS-2-20S ELBOM TO ELBOU C-F-1 SEE 1-INST 2 C 3-4 EXAMINATION NOT REQUIRED PIPE THICKNESS LESS THAN 375m, 309400 1-CTS-2-31S ELBDH TO PIPE VESTIBULE C-F-1 SEE IHST 2-3-4 C EXAMI HAT I ON NOT REQUIRED.PIPE THICKNESS LESS THAN.375"~
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLAHT UNIT 1 INSERVICE INSPECTION LONG TERM PLAH CLASS 2 ALL STATUS COMPONENTS PAGE: 123 CONTAINMENT SPRAY PIPING SYSTEM SUHMARY EXAMI HAT ION AREA NUMBER IDENT I F I CAT ION IHSPECT I OH INTERVAL I ASME I SEC XI I CATGY NDE I ITEM NO METH I PLAN STATUS FIRST SECOHD THIRD I PERIOD PERIOD PERIOD-I------0 U T A G E--1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK~~LINE 1-CTS-2 FIG NO B-44 309410 1-CTS-2-21F PIPE TO PIPE C-F-1 SEE 1 INST 2-3-4 EXAMIHATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".309450 1-CTS-2-22S PIPE TO ELBOW C-F-1 SEE 1-INST 2-3-4 EXAHINATIOH NOT REQUIRED.PIPE THICKNESS LESS THAN.375".309460 1.CTS.2.23F ELBOW TO PIPE C-F-1 SEE 1 INST 2-3-4 EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN 375u 309480 1.CTS-2-24S PIPE TO ELBOW C-F-1 PT 1 C5.11 UT 2 C 3 X 4 EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN~375".7.5X AUGHEHTED UT REQUIREMENT.
- 6-SS-10S..134-21.DCC*~
309490 1.CTS-2-25F ELBOW TO PIPE C-F-1 SEE 1 INST 2-3-4 EXAMINATION HOT REQUIRED.PIPE THICKNESS LESS THAN~375"~309500 1-CTS-2-26S PIPE TO ELBOW C-F-1 SEE 1 INS'T 2-3-4 EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".309510 1-CTS-2-27F ELBOW TO PIPE C-F-1 SEE 1 INST 2-3.4 EXAMI HAT IOH HOT REQUIRED.PIPE THICKNESS LESS THAN.375".
DATE: 11/15/95 REVI S ION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 124 CONTAINMEHT SPRAY PIPING SYSTEM SUHMARY EXAHI HAT ION AREA NUHBER IDENT IF I CATION PLAN STATUS FIRST SECOND PERIOD PERIOD INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE i------0 U T A G E.ITEH NO METH/1 2 3 1 2 3 4 THIRD I PERIOD I I I 1 2 3 I INSTRUCTIONS
- ~CALIBRATIOH BLOCK~~LINE 1-CTS-2 FIG NO B-44 309520 1.CTS.2.28S PIPE TO REDUCER C-F-1 SEE 1 INST 2-C 3-4 EXAHIHATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".309530 1.CTS-2-29F REDUCER TO PENETRATION C-F-1 SEE 1 IHST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375N.LINE 1-CTS-3 FIG NO B.45 309540 1.CTS-3-01F TEE TO PIPE C-F.1 SEE 1-INST 2-3-4-EXAHIHATI OH NOT REQUIRED.PIPE THICKNESS LESS THAN~3754.309550 1-CTS-3-02F PIPE TO VALVE N CTS HXRM C-F-1 C5.11 PT 1-UT 2-3-4 C X EXAHINATION HOT REQUIRED.PIPE THICKNESS LESS THAN.375".7.5X AUGMENTED UT REQUIREMENT.
~~B-SS-40-.322-17-DCC**
309560 1-CTS-3.03F VALVE TO TEE C F 1 SEE 1 INST 2-'-3-4-EXAMINATIOH NOT REQUIRED.PIPE THICKNESS LESS THAN.375"~309570 1-CTS-3-04S TEE TO PIPE C F-1 SEE 1 INST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.3754.
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 125 CONTAIHMEHT SPRAY PIPING SYS'EM
SUMMARY
EXAMI HAT I OH AREA NUMBER IDENT IF ICATION FIRST PERIOD INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE ITEM NO METH/1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD-OUTAGE----I INSTRUCTIONS 1 2 3 4 1 2 3 I~*GAL I BRAT ION BLOCK*~LINE 1-CTS-3 FIG NO 8-45 309590 1-CTS-3-OSS PIPE TO ELBOH C-F-1 SEE 1 INST 2-3.4 EXAHINATI ON HOT REQUIRED.PIPE THICKNESS LESS THAN~3754.309600 1-CTS-3-06S ELBOH TO PIPE C-F-,1 SEE 1 INST 2-3-4 EXAHINATION NOT REQUIRED.PIPE THICKHESS LESS THAN~375~309610 1.CTS.3.07S PIPE TO ELBSI C-F-1 SEE 1 INST 2 C 3-4-EXAHINATION NOT REQUIRED.PIPE THICKHESS LESS THAN.3754.309620 1-CTS-3-08S ELBOU TO PIPE II CTS HXRH C-F-1 PT 1 C5.11 Ur 2-3-4 C X EXAMINATION NOT REQUIRED PIPE THICKNESS LESS THAN.375".7.5X AUGMENTED UT REQUIREHEHT.
- B-SS.40-.322.17.DCC~~
309630 1-CTS-3-09S PIPE TO FLANGE C-F'I SEE 1 INST 2-3-4 C EXAHINATION NOT REQUIRED.PIPE THICKNESS LESS THAH.3754.309640 1-CTS-3-10S FLANGE TO PIPE C-F-1 SEE 1 INSI'-3.4-EXAMINATION NOT REQUIRED~PIPE THICKNESS LESS THAN 375" 309650 1-CTS-3-11F PIPE TO ELBOM C-F-1 SEE 1 INST 2-3-4 PIPE SCHEDULE CHANGE.EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN~375".
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 126 CONTAINMENT SPRAY PIPING SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE ITEM NO METH I 1 PLAN STATUS FIRST SECOND THIRD I PERICO PERIOD PERIOD I-I-OUTAGE------I 2 3 1 2 3 4 1 2 3 INSTRUCTIONS
- ~CALIBRATIOH BLOCK**LINE 1-CTS-3 FIG NO B-45 309660 1-CTS-3-12S ELBOW TO ELBOW C-F-1 SEE 1-INST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAM.3754.309670 1.CTS-3.13S ELBOW TO PIPE C-F-1 SEE 1 INST 2-3-4 EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".309710 1-CTS-3-14F PIPE TO ELBOW C-F-1 SEE 1 INST 2-C 3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".309720 1-CTS-3-15S ELBOW TO PIPE C-F-1 SEE 1 INST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".309740 1-CTS-3-16F PIPE TO ELBOW C-F-1 SEE 1 INST 2-3-4-EXAHINATI OH NOT REQUIRED.PIPE THICKNESS LESS TNAH.375".309750 1-CTS-3-17S ELBOW TO PIPE C-F-1 SEE 1 INST 2.3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAH.375".309760 1-CTS.3-18F PIPE TO ELBOW C-F-1 SEE 1 INST 2-3-4 EXAMINATIOH HOT REQUIRED~PIPE THICKNESS LESS THAN.375".
DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE IHSPECTIOH LONG TERH PLAN CLASS 2 ALL STATUS COHPONEHTS PAGE: 127 CONTAINMENT SPRAY PIPING S'YSTEH
SUMMARY
EXAHI HAT ION AREA NUHBER IDENT IF ICATION FIRST PERIOD INSPECT I OH INTERVAL I ASHE SEC.XI I CATGY NDE ITEM HO NETH]1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD-OUTAGE-1 2 3 4 1 2 3 INSTRUCTIOHS
- CALIBRATION BLOCK**LIME 1-CTS-3 FIG NO B-45 309770 1-CTS-3-19F ELBDH TO PIPE C-F 1 SEE 1 INST 2-3-4-EXAHINAT ION NOT REQUIRED.PIPE THICKNESS LESS THAN.3754.309780 1-CTS-3-20F PIPE TO PENETRATION C-F-1 SEE 1-INST 2-3-4-EXAMINATION HOT REQUIRED'IPE THICKNESS LESS THAN.375".INE 1-CTS-4 FIG NO B-46 309790 1-CTS-4-01F PUHP TO REDUCER C-F-'I C5~11 PT 1 2-3.4.EXAHINAT IOH NOT REQUIRED.PIPE THICKHESS LESS THAM.375".309800 1-CTS.4-02S REDUCER TO PIPE C-F-1 C5.11 PT 1-2-3-4 EXAHIHATION HOT REQUIRED~PIPE THICKHESS LESS THAM.3754.309810 1-CTS-4-03F PIPE TO VALVE C5.11 2-3-4-C-F41'T 1-EXAHIHAT IOH HOT REQUIRED.PIPE THICKNESS LESS THAM.3754.309820 1.CTS-4-04F VALVE TO TEE C-F-1 C5.11 PT 1-2-3-4 EXAHINAT ION MOT REQUIRED~PIPE THICKNESS LESS THAN.375".309830 1-CTS-4-05S TEE TO ELBOH E CTS PPRH C-F-1 C5.11 PT 1 UT 2-3-4-EXAHI MAT ION HOT REQUIRED.PIPE THICKNESS LESS THAM~375~7o5X AUGHENTED UT REQUIREHENI'.
- 10-SS.40-.365-26.0CC~*
DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAH CLASS 2 ALL STATUS COHPOHEHTS PAGE: 128 COHTAIHHENT SPRAY PIPING SYSTEH SUHHARY EXAHIHATION AREA HUHBER IDENT I F I CAT ION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE I ITEH HO METH I PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD-I-----OUTAGE---
I 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
~~CAL IBRATIOH BLOCK**LINE 1-CTS-4 FIG NO B-46 309840 1-CTS-4-06F ELBON TO VALVE C-F-1 C5.11 PT EXAHINAT ION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".309850 1.CTS.4.07F VALVE TO PIPE C-F-1 C5.11 PT EXAHIHATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".309860 1-CTS-4-08S PIPE TO ELBOM C-F-1 C5.11 PT EXAHIHATI OH NOT REQUIRED.PIPE THICKNESS LESS THAN.3754.309870 1.CTS-4-09S ELBOM TO TEE C-F-1 C5.11 PT EXAHI HAT I OH NOT REQUIRED.PIPE THICKNESS LESS THAN~375".309880 1-CTS-4-10S TEE TO PIPE E CTS PPRH C-F 1 C5.11 PT C EXAHI HAT ION NOT REQUIRED.PIPE THICKNESS LESS THAN.3754.309890 1-CTS-4-11F PIPE TO VALVE C-F-1 C5.11 PT EXAHINATION NOT REQUIRED.PIPE THICKNESS LESS THAN 375)'.309900 1-CTS-4-12F VALVE TO TEE C-F-1 C5~11 PT EXAHINATIOli NOT REQUIRED.PIPE THICKNESS LESS THAN~375~
DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE:-129 CONTAINMENT SPRAY PIP NG SYSTEH
SUMMARY
EXAHINATI ON AREA NUMBER IDEHT I F I CAT I OH INSPECTION INTERVAL I FIRST ASHE I PERIOD SEC.XI I CATGY MDE ITEH HO HETH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD-I OUTAGE------
I 1 2 3 4 1 2 3 INSTRUCTIONS a*CALIBRATIOH BLOCK+a LIHE 1-CTS-4 FIG NO B-46 309930 1-CTS-4-13S TEE TO ELBOH E CTS PPRH C-F-1 C5.11 PT 1-UT 2-.-C 3-X 4 EXAHI HAT IOH MOT REQUIRED.PIPE THICKNESS LESS THAN.375".7.5X AUGMENTED UT REQUIREHEHT.
~~10"SS.40-.365-26.DCC**
309940 1-CTS-4-14S ELBOH TO PIPE C-F-1 C5.11 PT 1-2-3-4 EXAHINATIOM NOT REQUIRED~PIPE THICKNESS LESS THAM 375 309950 1-CTS-4-15S PIPE TO ELBSI C-F-1 C5.11 PT 1 2-3-4-EXAHIHATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".309960 1-CTS-4-16S ELBOH TO PIPE C-F-1 C5.11 PT 1-2-3-4-EXAHI HAT I ON NOT REQUIRED.PIPE THICKNESS LESS THAN.375".309970 1-CTS.4-17F PIPE TO PIPE C-F-1 CS~11 PT 1-2-3-4-EXAHINATIOH NOT REQUIRED.PIPE THICKNESS LESS THAN.375"~309980 1-CTS.4-18S PIPE TO ELBON E CTS PPRH C-F-1 C5.11 PT 1-2-3-C EXAHINAT ION MOT REQUIRED.PIPE THICKNESS LESS THAN 375 309990 1-CTS-4-19S ELBSI TO PIPE C-F-1 C5.11 Pl'-2-3-4-EXAHIHAT ION MOT REQUIRED.PIPE THICKNESS LESS THAM.375".
DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 LHSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 130 COMTAIMHEMT SPRAY PIPING SYSTEH
SUMMARY
EXAHIHATIOH AREA NUHBER I DENT IF I CATION PLAN STATUS FIRST SECOND PERIOD PERIOD INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE i--0 U T A G E-LTEH HO HETH)1 2 3 1 2 3 4 THIRD I PERIOD I--.--I 2 3 INSTRUCTIONS
~aCALLBRATLOH BLOCK+*LIME 1 CTS-4 FIG NO B-46 310000 1-CTS-4-20F PIPE TO PIPE C-F-1 C5.11 PT'I 2-3-4-EXAHI NATION NOT REQUIRED.PIPE THICKNESS LESS THAM~375~310010 1-CTS-4.21S PIPE TO ELBOM C-F.1 C5.11 PT 1-2-3-EXAMINATION NOT REQUIRED+PIPE THICKNESS LESS THAN.375".3'10020'1-CTS-4-22S ELBOM TO PIPE C-F-1 C5.11 PT 1 2-3-4-EXAHIHATIOH NOT REQUIRED.PIPE THICKNESS LESS THAN.375".310030 1.CTS-4.23S PIPE TO ELBON C-F-1 C5.'ll PT 1-2-3.4-EXAHLHATIOH NOT REQUIRED.PIPE THICKNESS LESS THAH.375".310040 1-CTS-4-24F ELBOM TO VALVE C-F-1 C5.11 PT 1-2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".310050 1-CTS-4.25F VALVE TO ELBNI C-F-1 C5.11 PT 1-2-3-4-EXAHI HAT I OH HOT REQUIRED.PIPE THICKNESS LESS THAH.375".310060 1-CTS-4-26S ELBOLI TO PIPE C-F-1 C5.11 PT 1-2-3-4-EXAHIHAT ION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".
DATE: 12/20/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LOHG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 131 COHTAINHENT SPRAY PIPING SYSTEM
SUMMARY
EXAHINATIOH AREA NUMBER IDENTIFICATION IHSPECTIOH INTERVAL I FIRST ASHE PERIOD SEC.Xl CATGY MDE ITEH NO NETH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD 0 U T A G E I INSTRUCTIOHS
~1 2 3 4 1 2 3 J~*CALI BRAT ION BLOCK~~LINE 1-CTS-4 FIG MO B-46 310070 1-CTS.4.27S PIPE TO ELBSI C-F-1 C5.11 PT 1-2-3-4-EXAHINATIOH HOT REQUIRED.PIPE THICKNESS LESS THAN.375".310080 1-CTS-4-28S ELBOI TO PIPE C-F-1 C5.11 PT 1-2-3-4-EXAHINATIOH NOT REQUIRED.PIPE THICKHESS LESS THAN.375".310090 1-CTS-4-29S PIPE TO ELBOW C-F-1 C5.11 PT 1-2-3-4 EXAMINATION NOT REQUIRED~PIPE THICKHESS LESS THAN.375".310100 1-CTS-4-30S ELBON TO ELBON C-F-1 C5.11 PT 1-2-3-4 EXAMINATION NOT REQUIRED.PIPE THICKHESS LESS THAN 375 310120'-CTS-4-31F ELBON TO HEAT EXCHANGER C-F-1 C5.11 PT 1-2 C 3-4 EXAHI MAT ION NOT REQUIRED.PIPE THICKHESS LESS THAN.375".LINE 1 CTS-5 FIG HO 8-47 310130 1-CTS-5-01F HEAT EXCHANGER TO REDUCER C-F-1 SEE 1 INST 2 C 3-4 EXAHIMATIOH NOT REQUIRED.PIPE THICKHESS LESS THAN.375".310140 1-CTS.5-02S REDUCER TO PIPE C-F-1 SEE 1 INST 2-3.4-EXAHI MAT IOH HOT REQUIRED.PIPE THICKNESS LESS THAM.375".
DATE: 11/15/95 REVI SIGH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE IHSPECTION LONG TERM PLAN CLASS 2 ALL S'IATUS COMPONENTS PAGE: 132 CONTAINMENT SPRAY PIPING SYSTEM SUHMARY EXAHINATION AREA NUHBER IDENTIFICATION INSPECj'ION INTERVAL I FIRST ASME PERIOD SEC~XI I-CATGY NDE I ITEM NO METH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I 0 U T A G E------I 1 2 3 4 1 2 3 J INSTRUCTIONS
- 10-SS-40-.365 26-DCC*~310160 1-CTS-5-04F ELBOW TO VALVE C-F-1 SEE 1 EXAHI HAT I OH NOT REQUIRED.INST 2---------'IPE THICKNESS LESS THAN 3-375" 4 310170 1-CTS-5-05F VALVE TO TEE C-F-1 SEE 1 INST 2-3-4 EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".310180 1-CTS.5.06S TEE TO ELBOW E CTS KXRM C-F-1 SEE 1 INSI'-3-4 EXAMINATION NOT REQUIRED.C PIPE THICKHESS LESS THAN~375".310190 1-CTS-5-07S ELBOW TO REDUCER C-F-1 SEE 1--~INST 2-3-4-EXAMIHATION NOT REQUIRED'IPE THICKNESS LESS THAN.3754.310200 1-CTS-5-OBS REDUCER TO PIPE C.F-1 SEE 1-INST 2-3-4 EXAMINATION NOT REQUIRED.PIPE THICKHESS LESS THAN~3754 310210 1-CTS-5.09F PIPE TO VALVE C-F-1 SEE INST 2-3.4 EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN~3 75~
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPOHEHTS PAGE: 133 CONTAINMEHT SPRAY PIPING SYSTEM
SUMMARY
EXAMINATIOH AREA NUMBER IDENT IF ICATION PLAN STATUS FIRST SECOND PERIOD PERIOD INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE I------0 U T A G E ITEM NO MEI'H i 1 2 3 1 2 3 4 THIRD I PERIOD I I 1 2 3 IHSTRUCTIDHS
- CALIBRATION BLOCK**LINE 1-CTS-5 FIG NO B-47 310220 1.CTS-5-10F VALVE TO TEE C-F-1 SEE 1-INST 2.3-4 EXAHIHATION HOT REQUIRED.PIPE THICKNESS LESS THAN.375'10230 1-CTS-5-11S TEE TO PIPE C-F-1 SEE 1-EXAMINATION NOT REQUIRED.INST-2-PIPE THICKNESS LESS THAN 3-.375".4 310250 1-CTS-5-12S PIPE TO ELBOW E CTS HXRH C-F-1 SEE 1 INST 2-3-4-EXAHI HAT IOH NOT REQUIRED.PIPE THICKNESS LESS THAN 3754.310260 1-CTS-5.13S ELBOW TO PIPE C-F-1 SEE 1 INST 2-3-4-C EXAMI HAT ION NOT REQUIRED.PIPE THICKHESS LESS THAN.375".310270 1-CTS-5-14S PIPE TO ELBOW C-F-1 SEE 1 INST 2-3-4 EXAMIHATION NOT REQUIRED'IPE THICKNESS LESS THAN.375".310280 1-CTS-5-15S ELBOW TO FLANGE C-F-1 SEE 1 INST 2-3-4 EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.3754~310290 1-CTS-5-16S FLAHGE TO PIPE E CTS HXRH C-F-1 SEE 1 INST 2-3-4-C EXAMINATION HOT REQUIRED~PIPE THICKHESS LESS TNAH.375".
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLAN'I UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 134 CONTAIHMENT SPRAY PIPING SYSTEM SUMHARY EXAMINATION AREA HUHBER IDENTIFICATION INSPECT I OH INTERVAL I FIRST ASHE PERIOD SEC.XI I CATGY NDE I ITEH NO METH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I I OUTAGE-----
I 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK**LINE 1-CTS.5 FIG NO B-47 310300 1-CTS-5-17F PIPE TO PIPE C-F-1 SEE 1 INST 2-3-4 EXAHI HAT ION NOT REQUIRED.PIPE THICKNESS LESS TNAN.375".310310 1-CTS.5.18S PIPE TO FLANGE C-F-1 SEE 1 INST 2 3-4 EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN 375'10320 1-CTS-5-19S FLANGE TO PIPE C-F-1 SEE 1 INST 2-3-4-C EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN~3754.310330 1-CTS-5-20F PIPE TO PIPE C-F-1 SEE 1 IHST 2-3-4-EXAHINATION HOT REQUIRED~PIPE THICKNESS LESS THAN.375".310340 1-CTS-5-21F PIPE TO ELBON C-F-1 SEE 1 INST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAH.3754.310350 1-CTS-5-22S ELBOU TO ELBOU C-F-'I SEE 1 INST 2-3.4 EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAH.375".310360 1-CTS-5-23S ELBOH TO PIPE C F-1 SEE 1 INST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKHESS LESS THAN.375".
DATE: 11/15/95 REVISIOH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 135 COHTAINHENT SPRAY PIPING SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I FIRST ASME PERIOD SEC.XI I CATGY NDE I ITEM NO METH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE------
1 2 3 4 1 2 3 I I I IHSTRUCTIOHS
~*CALIBRATIOH BLOCK~~LINE 1.CTS-5 FIG NO B-47 310370 1-CTS-5-24F PIPE TO PIPE C-F 1 SEE 1 INST 2-3-4-PIPE SCHEDULE CHANGE.EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".310420 1-CTS-5-25F PIPE TO ELBSI C-F-1 SEE 1-INST 2-3-4 EXAMINATION NOT REQUIRED.PIPE THICKHESS LESS THAN.3754.310430 1-CTS-5-26F ELBSI TO PIPE C-F-1 SEE 1 IHST 2-3.4 EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".310440 1-CTS-5-27S PIPE TO REDUCER C-F-1 SEE 1 INST 2-3-4 EXAMI HAT IOH NOT REQUIRED.PIPE THICKNESS LESS THAN.3754.310450 1-CTS.5-28F REDUCER TO PENETRATION C-F-1 SEE 1 INST 2-3-4-EXAHINATI ON NOT REQUIRED.PIPE TNICKHESS LESS THAH 375'INE 1-CTS-6 FIG NO B.48 310460 1-CTS.6-01F TEE TO PIPE C-F-1 SEE 1.INST 2-3-4-EXAMIHATIOH NOT REQUIRED'IPE THICKNESS LESS THAN~375~310470 1-CTS-6-02F PIPE TO VALVE E CTS HXRM C-F-1 SEE 1 INST 2-3-4-C EXAMINATION NOT REQUIRED.PIPE THICKHESS LESS THAN~375".
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UHIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 136 CONTAINMEHT SPRAY PIPING SYSTEM SUMHARY EXAMINATION AREA NUHBER IDENT IF I CAT IOH INSPECTION INTERVAL I FIRST ASME PERIOD SEC.XI I CATO Y NDE I ITEM HO METH t 1 2 3 PLAN STATUS S COND THIRD I PERIOD PERIOD I-I OUTAGE------I 1 2 3 4 1 2 3 I INSTRUCTIONS
~~CALIBRATION BLOCK*~LIHE 1-O'IS-6 FIG NO 8-48 310480 1-CTS-6-03F VALVE TO PIPE C-F-1 SEE 1 INST 2-3-4 EXAHI HAT ION NOT REQUIRED.PIPE THICKHESS LESS THAN.3754.310500 1.CTS-6.04S PIPE TO ELBOW C-F-1 SEE 1 INST 2 C 3-4.EXAHI HAT I OH HOT REQUIRED.PIPE THICKNESS LESS THAN~375".310510 1-CTS-6-05S ELBSI TO PIPE C-F-1 SEE 1 IHSI'.3-4 EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".310520 1-CTS.6-06S PIPE TO ELBOW C-F-1 SEE 1 INST 2-3-4 EXAHIHATION HOT REQUIRED.PIPE THICKNESS LESS THAN.375".310530 1-CTS-6.07S ELBON TO PIPE C-F-1 C5.11 PT 1 UT 2C 3 X 4 EXAMI HAT I OH NOT REQUIRED.PIPE THICKNESS LESS THAN.3754.7.5X AUGMENTED UT REQUIREHEHT.
- 8-SS-40..322-17-DCC*~
310540 1-CTS-6-08S PIPE TO FLANGE E CTS HXRM C-F-1 SEE 1 INST 2.3-4 C EXAHI HAT ION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".310550 1-CTS.6.09S FLANGE TO PIPE C-F-1 SEE 1 INST 2-3-4.EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.3754~
DATE: 11/15/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 137 CONTAINMENT SPRAY PIPING SYSTEM
SUMMARY
EXAHI HAT I ON AREA NUMBER IDENTIFICATION IHSPECTION INTERVAL I FIRST ASME I PERIOD SEC.XI I CATGY NDE I ITEH NO METH (1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE--1 2 3 4 1 2 3 I I I I INSTRUCTIONS
~*CALIBRATION BLOCK~~LINE 1 CTS-6 FIG HO B.48 310560 1-CTS.6-10F PIPE TO ELBOM C-F-1 SEE INST 2.3-4 EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".310570 1-CTS-6.11S ELBOU TO ELBOU C-F 1 SEE 1 INST 2-3.4-EXAHINATIOH NOT REQUIRED.PIPE THICKNESS LESS THAN.375".310580 1-CTS-6-12S ELBON TO PIPE C-F 1 SEE 1-INST 2-3-4-EXAHINAT ION NOT REQUIRED.PIPE THICKHESS LESS THAN~3 75~310600 1-CTS.6-13F PIPE TO PIPE C-F-1 SEE 1~INST 2-4-EXAMINATION NOT REQUIRED.PIPE THICKHESS LESS THAN.375".310640 1-CTS-6-14F PIPE TO PIPE C-F-1 SEE 1 INST 2-3-4-EXAMINATION HOT REQUIRED.PIPE THICKHESS LESS THAN 375 310650 1-CTS-6-15F PIPE TO ELBQJ C-F-1 SEE 1 INST 2-3-4 EXAHI HAT ION NOT REQUIRED~PIPE THICKNESS LESS THAN.375"~310660 1-CTS-6 16S ELBOH TO PIPE C-F-1 SEE 1-INST 2-3-4-EXAMINATION NOT REQUIRED.PIPE THICKNESS LESS THAN.375".
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 138 CONTAINMENT SPRAY PIP NG SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT IF I CATION INSPECTIOH INTERVAL I FIRST ASME PERIOD SEC'I I CATGY NDE ITEM HO METH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I I 0 U T A G E------I 1 2 3 4 1 2 3 I INSTRUCTIONS
- ~CALIBRATIOH BLOCK**LINE 1-CTS-6 FIG NO B.48 310670 1-CTS-6-17S PIPE TO ELBOH C-F-1 SEE 1-INST 2-3-4-EXAHINATI ON HOT REQUIRED.PIPE THICKNESS LESS THAN.375".310680 1.CTS.6-18F ELBSl TO PIPE C-F-1 SEE 1 INST 2-3-4 EXAMIHATIOH NOT REQUIRED.PIPE THICKHESS LESS THAN~3754.310690 1-CTS-6-19S PIPE TO ELBSI C-F 1 SEE 1-INST 2-3-4 EXAHIHATIOH HOT REQUIRED.PIPE THICKHESS LESS THAN.3754.310700 1-CTS-6-20S ELB(N TO PIPE C F-1 SEE 1 INST 2 C 3-4-EXAHIHAT ION HOT REQUIRED.PIPE THICKNESS LESS THAN.375".310710 1-CTS.6.21F PIPE TO PEHETRATIOH C-F-1 SEE 1 INST 2-3-4-EXAMINATION NOT REQUIRED+PIPE THICKNESS LESS THAN~375"~
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 139 FEEDWATER SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT IF ICATION FIRST PERIOD INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE I ITEM HO METH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD-0 U T A G E---1 2 3 4 1 2 3 I I I I INSTRUCTIONS
<<<<CALIBRATION BLOCK**INE 1-F'W-'10 F G NO B-49 310720 1-FII.10.01F VALVE TO PIPE C-F-2 C5.51 MT 1 UT 2-3.4<<<<14-CS-80-.750.12-0CC**
310730 1-FW.10.02S PIPE TO ELBOW C-F-2 C5.51 MT 1 UT 2-3-4-**14-CS-80-.750-12-DCC*<<
310750 1-FW-10.03S ELBOW TO PIPE C.F-2 C5.51 MT 1 UT 2-3-4<<*14-CS-80-.750-12.DCC**
310760 1-FW-10.04S PIPE TO ELBOW C-F.2 C5.51 MT 1 UT 2.3-4-cv v**14-CS-80-.750-12-DCC**
310770 1-FW.10-05F ELBOW TO PIPE C-F-2 C5 F 51 MT 1 Ul'-3-4**14-CS-80-.750-12-DCC*<<
310780 1-FW-10.06S PIPE TO ELBOW C.F-2 MT 1 C5.51 UT 2-3-4-<<*14-CS-80-.750 12 DCC**310790 1-FW-10-07S ELBOW TO PIPE MS ACC C-F-2 C5.51 MT 1 UT 2---C 3-X 4-<<<<14-CS-80-.750-12-OCC<<*
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 140 FEEDWATER SYSTEH
SUMMARY
'XAHI MAT I ON AREA NUHBER IDENT I F ICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE I ITEH NO HETN PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD I-I-OUTAGE-----I 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- ~CALIBRATION BLOCK*~LINE 1.FW.10 FIG NO B-49 310800 1-F'W-10-OBF PIPE TO PIPE C-F-2 C5.51 Hl'UT 2-3.4*~14-CS.BO.
~750.12.DCCaa 310810 1-FW-10-09F PIPE TO PIPE C-F-2 C5.51 HT 1 UT 2-3-4-**14-CS-80-.750-12-OCC**
310820 1-FW-10-10S PIPE TO ELBOW C-F-2 C5.51 HT 1 2-3-4-BASE HATERIAL'1.0"~**14-CS-80-.750-12-DCC~*
310830 1-FW-10-11F ELBOW TO ELBOW C-F-2 C5.51 HT 1 UT 2-3-4-<<*14-CS-80-.750.12-DCC~~
310840 1-FW-10-12S ELBOW TO PIPE C-F-2 C5.51 MT 1 UT 2-3.4-**14-CS-80-.750.'l2.DCC~>>
310850 1-FW-10-12S.PL 1 AND 2 PIPE LUG C-C C3.20 Hl'2 C 3 X 4-BASE MATERIAL 1.0"~310860 1.FW.10-13F PIPE TO PIPE C-F-2 C5.51 HT 1 UT 2-3 4**14-CS-80-.750-12-DCC'~
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UHIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 141 FEEDWATER SYSTEM
SUMMARY
EXAHI HAT I ON AREA NUHBER IDENTIFICATION PLAN STATUS FIRST SECOND PERIOD PERIOD INSPECTION IHTERVAL I ASHE SEC.XI I CATGY HDE I---0 U T A G E-ITEM NO METH i 1 2 3 1 2 3 4 THIRD I PERIOD I----I 1 2 3 I INSTRUCTIOHS
- CALIBRATION BLOCK~*LINE 1-FW-10 FIG NO B-49 310870 1-FW.10.13F-A-PL PIPE LUG MS ACC C-C C3.20 MT 1-2-C 3---X 4 BASE HATERIAL 1.04.310874 1-FW 10-13F-B-PL 1 AND 2 PIPE LUG MS ACC C-C C3.20 HT 1 2-3-4-BASE HATER IAL 1 0~310880 1.FW-10-14S PIPE TO ELBOW C.F-2 C5~51 HT 1-UT 2-3-4-**14-CS.80-.750-12-DCC**
310910 1-FW.10-15F ELBOW TO PIPE C-F-2 C5.51 MT 1 UT 2-3-4**14-CS-80-.750-12-DCC**
310920 1-FW-10-16S PIPE TO ELBOW C-F-2 C5.51 HT 1 UT 2-3-4-**14-CS-80-.750-12-DCC*~
310930 1-FW-10-17S ELBOW TO PIPE W HS ENC C-F-2 C5.51 HT 1 UT 2---C 3 4-X~~14-CS.80-.750-12-DCC**
310935 1-FW-10-17S-PS PIPE SUPPORT C-C C3.20 MT 1 2-3-4 INACCESSIBLE DUE TO WELDED INSULATION ATTACHMENT.
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UHIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 142 EED'WATER SYSTEM SUHMARY EXAHINATIOH AREA NUMBER IDENT IF ICATION F IRST PERIOD INSPECTION INTERVAL I ASME I SEC~XI I CATGY NDE I ITEH NO METN i 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD-OUTAGE--1 2 3 4 1 2 3 (INSTRUCTIONS
- CALIBRATION BLOCK**LINE 1-F'W-10 FIG NO B-49 310940 1.FW-10-18F PIPE TO PIPE C-F-2 C5.51 H'I 1 UT 2-3-4->>>>14 CS-80-.750-12-DCC*>>
310950 1-FW-10-'19F PIPE TO VALVE C F-2 C5.51 HT 1 UT 2-3-4**14-CS-80-.750 12-DCC**310960 1-FW-10-20F VALVE TO PIPE C-F-2 C5.51 HT 1 UT 2-3-4-<<*14-CS-80-.750-12 DCC>>>>310970 1-FW-10.21F PIPE TO PENETRATION C-F-2 C5.51 HT 1 UT 2-3-4 WELD IS PARTIALLY INACCESSIBLE FOR EXAHI HAT ION.SUMHARY NO.310930 WILL BE UTILI2IED AS A SUBST I TUT I OH.<<>>14.CS-80-.750.12.DCC*>>
310980 1-FW-10-22S-PS C-C HT 1 PIPE TO PENETRATION SEAL WELD C3.20 2-'W MS ENC 3-4 C 311000 1-FW-10.44 BRANCH CONNECTION TO PIPE C-F C5.80 MT 1 2-3-4 311010 1-FW-10-45 SADDLE TO PIPE C-F-2 C5.51 MI'2-3-4 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLAHT UNIT 1 IHSERVICE IHSPECTION LOHG TERM PLAN CLASS 2 ALL STATUS COHPONEHTS PAGE: 143 FEEDWATER SYSTEM
SUMMARY
EXAHI HAT I OH AREA NUHBER IDENT I F I CAT IOH INSPECTION IHTERVAL I ASHE I SEC.Xl I CATGY NDE I ITEM NO METH I PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I I-OUTAGE--I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
SEE BASIS FOR PREPARATION, SECTION 3.5.LINE 1-FW.11 FIG NO B-50 311030 1-FW-1'1-01S PIPE TO FLUED HEAD C-F-2 C5.51 MT UT 2-3-4 WELD INACCESSIBLE FOR EXAMINATION.
SEE BASIS FOR PREPARATION, SECTION 3.5.CODE RELIEF GRANTED FROM EXAHI NAT I OH.311040 1-FW.11-02S-PS C-F-2 HT PEHETRATION SUPPORT WELD C5.51 2-ANHULUS 3-4 311050 1-FW-11-03F FLUED HEAD TO PIPE ANNULUS C-F-2 C5.51 MT 1 U1'---C 3-X 4**14-CS-80-.750-12-DCC**
311060 1.FW.11-04S PIPE TO ELBOW C-F-2 C5.51 MT 1 UI'-3-4**14-CS-80-.750-12-DCC**
311070 1-FW.11-05S ELBOW TO PIPE C-F-2 CS~51 MT 1 UT 2-3-4-~*14-CS-80-.750-12-DCC~~
DATE: 11/15/95 REVI SION: 0 COOK NUCLEAR PLANT WHIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COHPOHENTS PAGE: 144 FEEDWATER SYSTEM SUHHARY EXAMI HAT I OH AREA NUMBER IDENT I F I CATION INSPECTION INTERVAL I ASHE I SEC.XI CATGY HDE I ITEH HO METH I 1 PLAN STATUS FIRST SECOHD THIRD I PERICO PERIOD PERIOD OUTAGE I 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATIOH BLOCK>>>>LINE 1-FW-11 FIG HO B-50 311080 1-FW-11-06F PIPE TO ELBOW CF2 C5.51 HT 1 UT 2-3-4>>>>14-CS-80..750-12.DCC*>>
311090 1-FW-11-07S ELBOW TO PIPE C-F.2 C5.51 MT 1-UT 2-3-4**14.CS.80..750-12.DCC**
311100 1-FW-11-OBF PIPE TO ELBOW C-F-2 C5.51 HT 1 UT 2.3-4-**14-CS-80-.750.12.DCC**
311110 1-FW.11-09S ELBOW TO PIPE C-F-2 C5.51 HT 1 C UT 2-3-~4>>>>14-CS-SO-.750-12-OCC>>>>
311140 1-FW-11-10S PIPE TO ELBOW C-F-2 C5.51 HT 1 UT 2-3-4 C**14-CS-80-.750-12.DCC>>>>
311150 1-FW-11-11F ELBOW TO PIPE C-F-2 C5.51 Hl'C Ul'-3 4>>>>14-CS-80-.750-12-DCC**
311160 1-FW-11-12F PIPE TO REDUCER C-F-2 C5.51 HT 1 UT 2-3-4.C**14-CS-80-.750-12-DCC
- DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 145 FEEDWATER SYSTEH SUHHARY EXAHINATION AREA NUMBER IDENT IF ICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE ITEM NO METH I 1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD-I OUTAGE I 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
<<<<CALIBRATION BLOCK<<*LINE 1-FW-11 FIG NO B-50 311170 1-FW-11-13S REDUCER TO ELBOW C-F-2 CS~51 HT 1 UI'-3 4-C X<<<<FW 16-CS-80-.844-45-DCC
<<311180 1-FW-11-14F ELBOW TO NOZZLE C-F-2 C5.51 HT 1 C UT 2-3-4.**FW-16-CS-80-.844-C5 DCC*LINE 1.FW-12 FIG NO B-51 311190 1-FW-12.01F VALVE TO PIPE C-F-2 C5.51 H'I 1 UT 2-3-4<<<<14-CS-80..750-12.DCC*<<
311200 1-FW-12-02S PIPE TO ELBOW C-F-2 C5.51 HT 1 UT 2.3-4-C**14-CS-80-.750-12.DCC*<<
311220 1-FW-12-03S ELBOW TO PIPE C-F-2 C5.51 HT 1 UT 2-3-4**14-CS.80-.750-12.DCC**
311230 1-FW-12-04S PIPE TO ELBOW C-F-2 C5.51 HT 1 UT 2-3-4-*<<14-CS-80-.750-12.DCC**
311240 1-FW.12-05S ELBOW TO PIPE HS ACC C-F-2 C5.51 HT 1 UT 2-3-4 C X**1C-CS-80-.750-12-DCC**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 146 FEEDWATER SYSTEM SUHMARY EXAHINATION AREA NUMBER IDENTIFICATION PLAN STATUS FIRST SECOHD PERIOD PERIOD INSPECTION INTERVAL I ASHE I SEC.XI I CATGY HDE J-----0 U T A G E-ITEH NO METH I 1 2 3 1 2 3 4 THIRD I PERIOD I-----I 1 2 3 I IHSTRUCTIOHS
- CALIBRATION BLOCK*<<LINE 1-FW-12 FIG HO B-51 311250 1-FW-12-06S PIPE TO ELBOW C-F-2 C5.51 HT 1 UI 2-3-4-<<<<14-CS-80-.750-12.DCC<<<<
311260 1-FW-12-07F ELBOW TO PIPE C F-2 C5.51 HT 1-UT 2-3-4-**14-CS-80-.750-12.DCC**
311280 1-FW-12-07F PL 1 AND 2 PIPE LUG HS ACC C-C C3.20 HT 1 2-3-4-C 311290 1.FW-12-08F PIPE TO PIPE C-F-2 CS~51 HT 1 UT 2-3-4*<<14-CS-80-.750-12.DCC**
311300 1-FW-12-09F PIPE TO PIPE C-F-2 C5~51 HT 1 UT 2-3-4 l}ELD REMOVED AHD REPLACED BY 1-FW.12.09F-A UNDER PH-1305'*14-CS-80-.750-12-DCC*'11310 1-FW-12-09F-PL 1 AHD 2 PIPE LUG C-C C3.20 HT 1 2 C 3-4~311330 1.FW-12-10F PIPE TO ELBOW C-F-2 C5.51 HT 1 UT 2-3-4**14-CS-80-.750-12.DCC*<<
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UHIT 1 IHSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPOHENTS PAGE: 147 FEEDWATER SYSTEH SUHHARY EXAHI HAT I ON AREA NUHBER IDENT IF I CAT ION IHSPECTION INTERVAL I FIRST ASHE I PERIOD SEC.XI I CATGY NDE I ITEM NO METH i 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE----1 2 3 4 1 2 3 IHSTRUCTIOHS
<<<<CALIBRATION BLOCK<<*LINE 1-FW-12 FIG HO B-51 311340 1-FW.12-11S ELBOW TO PIPE C-F-2 C5.51 HT 1 UT 2-3-4-**14-CS-80-.750-12-DCC**
311360 1-FW.12-12S PIPE TO ELBOW C-F-2 C5.51 HT 1 UT 2-3-4**14-CS-80-.750-12-OCC'>>
311370 1-F'W-12-13F ELBOW TO PIPE C-F-2 C5.51 HT 1 ur 2-3-4-**14-CS-80..750-12-DCC**
311380 1-FW.12-14S PIPE TO ELBOW C-F-2 C5.51 MT 1 Ur 2-3-4.**14-CS-80..750-12-DCC*>>
311390 1-FW-12-15F ELBOW TO PIPE C.F-2 C5.51 HT 1 UT 2-3.4.<<*14-CS-80-.750-12-OCC
<<311395 1-FW.12-15F-PS PIPE SUPPORT C3.20 2 3.4-C C M'I 1 INACCESSIBLE DUE TO WELDED INSULATION ATTACHHENT.
311400 1-FW-12-16F PIPE TO VALVE C-F-2 C5.51 HT 1 UT 2-3-4-<<*14-CS-80-.750-12-DCC*>>
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 148 FEEDWATER SYSTEM
SUMMARY
EXAHIHATION AREA HUHBER IDENT IF I CAT I OH INSPECTION INTERVAL I FIRST ASME PERIOD SEC.XI I CATGY NDE I ITEH NO HETH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PER I CO I I OUTAGE------I 2 3 4 1 2 3 I INSTRUCTIONS
~~CALIBRATION BLOCK**LINE 1-FW-12 FIG NO 8-51 311410 I-FW.12-17F VALVE TO PIPE C-F-2 C5~51 MT"I UT 2.3-4-14.CS-80..750-12-DCC**
311420 1-FW-12-18F PIPE TO PIPE C F2 C5~51 HT Ul'-3-4**14.CS.80-.750-12-DCC*~
311430 1-FW-12-19S-PS C-F-2 PIPE TO PENETRATION SEAL WELD C5.51 HT 1 2 3.4-*~14.CS-80-.750-12.DCC**
311450 1-FW-12-39 BRANCH CONHECTIOH TO PIPE C-F-2 C5.51 H'I 1 2-3.4 311460 1-FW-12-40 SADDLE TO PIPE C-F-2 C5.51 MT 1 2.3-4-311470 1-FW-12-41 SADDLE TO BRANCH CONNECTION C-F-2 C5.51 HT 1 2-3-4-CODE RELIEF WAS GRAN'IED FIRST INTERVAL FROH VOLUMETRIC EXAHINATION
~SEE BASIS FOR PREPARATION, SECl'ION 3.5.LINE 1-FW-13 FIG NO B-52 311480 1-FW.13-01S PIPE TO FLUED HEAD C-F-2 C5.51 MT 1 UT 2-3-4-WELD INACCESSIBLE FOR EXAHINATIOH.
SEE BASIS FOR PREPARATION, SECTIOH 3.5.CODE RELIEF GRANTED FRDH EXAHIHATION.
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECT'ION LONG TERM PLAN CLASS 2 ALL STATUS COMPOHENTS PAGE: 149 FEEDWATER SYSTEM SUHHARY EXAHINAT ION AREA NUMBER IDENTIFICATION INSPECTIOH INTERVAL I ASME I SEC.XI I CATGY NDE I ITEH NO METH I 1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD-I-----0 U T A G E--I 2 3 1 2 3 4 1 2 3 INSTRUCTIONS
- ~CALIBRATION BLOCK~~LINE 1-F'W-13 FIG NO B-52 311490 1-FW-13-02S-PS PENETRATIOH SUPPORT WELD C-C C3.20 MT 1 2-3-4 311500 1-FW-13-03F FLUED HEAD TO PIPE C-F-2 C5.51 MT 1.UT 2-3-4**14-CS-80
.750-12 DCC**311510 1-FW.13-04S PIPE TO ELBOW C-F-2 C5.51 MT 1 UT 2-3-4-**14-CS.80-.750-12-DCC*~
311520 1-FW-'13-05S ELBOW TO PIPE C-F-2 C5.51 MT 1 Ur 2-3 4-**14-CS-80-.750-12-DCC**
311530 1-FW-13-06F PIPE TO ELBOW C-F-2 C5.51 MT 1 UT 2-3-4**14-CS.BO-.
750-12.DOC**311540 1-FW.13-07S ELBOW TO PIPE C-F-2 C5.51 MT 1 UT 2-3-4**14-CS 80.750 12 DCC**311550 1-FW.13-08F PIPE TO ELBOW C-F-2 C5.51 MT 1 UT 2-3-4-**14-CS-80-.750-12-OCC~~
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 150 FEEDWATER SYSTEH SUHHARY EXAHINAT I ON AREA NUMBER IDENTIFICATION PLAN STATUS SECOND PERIOD INSPECTION INTERVAL I FIRST ASHE I PERIOD SEC.XI I CATGY NDE I------0 U T A G E-ITEM NO HETH I 1 2 3 1 2 3 4 THIRD I PERIOD I-I-----I 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK**LINE 1.F'W-13 FIG NO B-52 311560 1-F W-13-09S ELBOW TO PIPE C-F-2 C5~51 HT 1 C UT 2-3-X 4*>>14-CS-80-.750-12-DCC.
311580 1-FW-13-10S PIPE TO ELBOW C-F-2 C5.51 HT 1 UT 2-3--~4 C**14-CS-80-.750-12-P CC>>*311590 1-FW.13-'11F ELBOW TO PIPE CONT~L2 C-F-2 C5.51 3-4 X HT 1-C UT 2---C**14-CS-80..750-12-DCC>>>>
311600 1-FW.13-12F PIPE TO REDUCER C-F-2 C5.51 H'I'I C UT 2-3*>>14-CS-80-.750-12-DCC**
311610 1-FW-13-13S REDUCER TO ELBOW C-F-2 C5.51 HT 1 UT.2-3-4-C>>*FW-16.CS-80-.844-45 DCC**311620 1-FW-13-14F ELBOW TO NOZZLE C-F-2 C5.51 HT 1 C UT 2-3-4-**FW-16-CS-80..844-45-DCC*>>
LINE 1.FW.15 FIG NO B-53 311630 1-FW-15-01F VALVE TO PIPE C-F-2 C5.51 HI'UT 2-3-4-<<*14-CS-80-.750-12-DCC*>>
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECT'ION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 151 FEEDWATER SYSTEM SUMHARY EXAHINATI ON AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I FIRST ASHE PERIOD SEC.XI I CATGY NDE ITEH NO HETH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE 1 2 3 4'I 2 3 I INSTRUCTIONS I**CALIBRATION BLOCK**LINE 1-FW-15 FIG NO B-53 311640 1-F'W-15-02S PIPE TO ELBOW C-F-2 C5.51 MT 1 UT 2-3-4**14-CS-80-.750-12.DCC>>*
311660 1-FW-15-03S ELBOW TO PIPE C-F-2 C5~51 HT 1-UT 2-3-4-~**14-CS-80-.750-12-DCC**
311670 1-FW-15.04S PIPE TO ELBOW C-F-2 C5.51 MT 1 UT 2-3-4 C**14-CS.80..750 12-DCC*>>311680 1-FW-15-OSF ELBOW TO PIPE C-F-2 C5.51 Ml'-UT 2-3-4>>*14-CS-80-.750-12.DCC*>>
311690 1-FW-15-06F PIPE TO PIPE C-F-2 C5.51 HT 1-UT 2-3-4 14-CS-80-.750-'12.DCC>>>>
311700 1-FW-15-07F PIPE TO PIPE C-F-2 C5.51 HT 1 UI'-3 4-**14-CS.80-.750-12.DCC**
311710 1-FW-15-08F PIPE TO PIPE C-F-2 C5.51 MT 1 UT 2-3-4 WELD REHOVED AND REPLACED BY 1-FW-15-BF-A UNDER PH 1305.<<>>14-CS-80-.750-12 DCC*>>
DATE: 11/15/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 152 FEEDWATER SYSTEM SUMHARY EXAMINATION AREA NUMBER IDENT I F I CATION INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE ITEH NO METH)1 PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD-OUTAGE-2 3 1 2 3 4 1 2 3 INSTRUC'IIONS
- CALIBRATION BLOCK*>>LINE 1-FW-15 FIG NO B-53 311720 1-FW-15-09S PIPE TO ELBOW C F-2 C5.51 HT i1 UT 2 3.4**14.CS-80-.750-12.DCC**
311730'1.F'W-15-10F ELBOW TO PIPE C-F-2 C5.51 Ml'UT 2-3-4**14.CS.80-.750-12.DCC**
311735 1-FW-15-10F-PS PIPE SUPPORT C-F-2 C5.51 HT 2-3-4 INACCESSIBLE DUE TO'WELDED INSULATION ATTACHMENTo 311740 1-F'W-15-11F PIPE TO VALVE C-F-2 C5.51 HT 1 UT 2-3-4**14.CS-80-.750-12.DCC>>*
311750 1-FW-15-12F VALVE TO PIPE C-F-2 C5.51 HT 1 UT 2-3-4**14-CS-80-.750-12-OCC**
311760 1-FW-15-13F PIPE TO PIPE C-F-2 C5.51 HT UT 2C 3X 4-<<*14-CS ~750-12-DCC*>>
311770 1-FW-15-14S-PS C-C PIPE TO PENETRATION SEAL WELD C3~20 MT 1 2.3-4 C DATE: 11/15/95 REVI S I OM: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECI'IOM LONG TERH PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 153 FEED'WATER SYSTEH
SUMMARY
EXAHINATION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE ITEH NO HETH I 1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD-I-----OUTAGE-----I 2 3 1 2 3 4'I 2 3 INSTRUCTIONS
<<*CALIBRATIOM BLOCK<<<<LINE 1-FW-15 FIG NO B-53 311790 1-FW-15-39S BRANCH CONNECTION TO PIPE C-F C5.21 HT 1-2-3-311800 1-FW-15.40 SADDLE TO PIPE C-F-2 C5.51 HT 1 2-3.4 C 311810 1-FW.15-41 SADDLE TO BRANCH CONNECTION C.F-2 C5.51 HT 1-2-3-4 CODE RELIEF WAS GRANTED FIRST INTERVAL FROM VOLUHETRIC EXAHINATION
~SEE BASIS FOR PREPARATION, SECTION 3.5.311820 1-FW-15-42 PIPE TO PIPE C-F-2 C5.51 HT 1 2-3-4-LINE 1-FW-16 FIG MO 8-54 311830 1-FW.16-01S PIPE TO FLUED HEAD'-F-2 C5.51 HT 1 UT 2-3-4 IIELD INACCESSIBLE FOR EXAHIMATION.
SEE BASIS FOR PREPARATION, SECTION 3.5.CODE RELIEF GRANTED FROH EXAHI MAT ION.311840 1-F'W-16-02S-PS PENETRATION SUPPORT WELD C-F-2 C5.51 HT 1 2-3-4 DATE: 11/15/95 REVI S ION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECI'ION LONG TERH PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 154 FEEDWATER SYSTEH SUHHARY EXAHINATIOH AREA NUHBER IDENT I F I CATION INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE ITEM NO METH I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD-OUTAGE------2 3 1 2 3 4 1 2 3 I I I INSTRUCTIONS
<<<<CALI BRAT ION BLOCK**LINE 1-FW-16 FIG NO 8-54 311850 1-FW.16-03F FLUED HEAD TO PIPE C-F-2 C5.51 HT UT 2-3-4 C**14.CS.80-.750-12.DCC**
311860 1-FW-16 04S PIPE TO ELBOW C-F-2 C5.51 HT 1 Ur 2-3-4<<<<14-CS-80-.750-12-OCC<<<<
311870 1-FW-16.05S ELBOW TO PIPE C.F-2 C5.51 H'I 1 UT 2-3-4**14-CS.80..750-12.DCC<<<<
311880 1-FW-16-06F PIPE TO ELBOW C-F-2 C5.51 HT 1-UT 2-3-4<<<<14-CS-80-.750-12.DCC*<<
311890 1-FW-16.07S ELBOW TO PIPE C-F-2 C5.51 HT 1 UT 2-3-4-**14-CS-80-.750-12-DCC<<<<
311900 1-FW.16-08F PIPE TO ELBOW C-F-2 C5.51 HT 1-UT 2-3-4*<<14-CS-80-.750-12-OCC**
311910 1.FW-16-09S ELBOW TO PIPE C-F-2 MT 1 C5.51 UT 2-3-4**14-CS-BO 750-12-DCC**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE IHSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 155 FEEDWATER SYSTEM SUMHARY EXAHINAT ION AREA NUMBER IDENT I F ICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE ITEM NO MEtH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD I------0 U T A G E---1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
311960 1-FW-16-12F PIPE TO REDUCER C-F-2 C5.51 HT C UT 2-3-4**14.CS-80-.750-12-DCC**
311970 1-FW.16-13S REDUCER TO ELBOW C-F-2 C5.51 MT 1 C Ul'-3-4**FW.16-CS-80-.844-45-DCC~~
311980 1-FW-16-14F ELBOW TO NOZZLE C-F-2 C5.51 HT 1 UT 2-3-4 C C**FW-'16-CS-80-.844-45-DCC**
LINE 1-FW.17 FIG NO B 55 311990 1-FW 17-01F VALVE TO PIPE C F-2 C5.51 Mt 1 UT 2-3-4-**14-CS-80-.750-12-OCC**
312000 1-FW.17-02S PIPE TO ELBOW C-F-2 C5.51 MT 1 UT 2-3-4**14-CS.80-.750-12-DCC*~
DATE: 11/15/95 REVI S ION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL S'IATUS COMPONEN1'S PAGE: 156 FEEDWATER SYSTEM SUHMARY EXAHIHATIOH AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I FIRST ASME PERIOD SEC.XI I CATGY NDE I ITEM NO METH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD-0 U T A G E-----I INSTRUCTIONS 1 2 3 4 1 2 3)**CALIBRATIOH BLOCK**LINE 1-FW.17 FIG HO B-55 312020 1-FW-17-03S ELBOW TO PIPE C-F-2 C5.51 HT 1 UT 2.3-4-<<<<14-CS-80-.750-12-DCC<<<<
312030 1-FW-17-04F PIPE TO ELBOW C-F-2 C5.51 HT 1 UT 2-3-4-**14-CS-80-.750.12-DCC*<<
312040 1-F'W-17-05S ELBOW TO PIPE C-F-2 C5~51 HT 1 UT 2-3 4-<<*14-CS-80-.750
'2-DCC**312050 1-FW-17-06S PIPE TO ELBOW C-F-2 C5.51 HT 1 UT 2-3-4**14-CS-80-.750-12-DCC
- 312060 1-FW-17-07S ELBOW TO PIPE E MS EHC C-F-2 C5.51 HT UT 2---C 3-4 X**14-CS-80-.750-12 DCC*<<312070 1.FW-17-08F PIPE TO PIPE C-F-2 C5.51 HT 1 UT 2-3-4-*'14-CS-80-.750-12-DCC**
312080 1-FW.17-09F PIPE TO PIPE C-F-2 C5.51 HT 1 UT 2-3-4-WELD REMOVED AND REPLACED BY 1-FW-17-09F-A UNDER PH.1305.**14.CS-80-.750-12-DCC**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 157 FEEDWATER SYSTEM
SUMMARY
EXAHINAT IOH AREA NUMBER IDENT I F I CAT ION INSPECTION INTERVAL I FIRST ASME I PERIOD SEC.XI I CATGY NDE I ITEH NO METH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD-I-0 U T A G E------I 1 2 3 4 1 2 3 INSTRUCTIONS
~~CALIBRATION BLOCK*~LINE 1-FW-17 FIG NO B-55 312086 1-FW-17-17S PIPE TO TEE C-F-2 C5~51 MT.1 UT 2-3-4-**14-CS-80-.750-12.DCC**
312087 1-FW.17-18S TEE TO FLANGE C-F-2 C5.51 HT 1-UT 2-3-4~*14-CS-80-.750-12.DCC~~
312088'I-FW-17-19F PIPE TO ELBOW.C-F-2 C5.51 HT 1 UT 2.3-4**14-CS.BD-.750-12-DCC**
312090 1-FW.17-10F PIPE TO PIPE C-F-2 C5.51 MI'UT 2-3-4-**14-CS-80-.750-12-DCC~*
312100 1-FW-17.11S PIPE TO ELBOW C-F-2 C5.51 MT 1-UT 2-3-<<~14-CS-80-.750 12-DCC**312110 1-FW.17-12F ELBOW TO PIPE C-F-2 C5.51 Ml'UI'-3-4**14-CS.80-.750-12-DCC**
312115 1.FW.17-12F-PS PIPE SUPPORT C3.20 2-3-4.CC MT 1 INACCESSIBLE DUE TO WELDED INSULATION ATTACNHENT.
DATE: 11/15/95 REVI SION: 0 COOK NUCLEAR PLAN'I UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONEN'TS PAGE: 158 FEEDWATER SYSTEM
SUMMARY
EXAHINATION AREA HUMBER IDENTIFICATIOH INSPECTION INTERVAL I F IRST ASHE I PERIOD SEC.XI I CATGY NDE I ITEH NO METH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE------
1 2 3 4 1 2 3 I I I INSTRUCTIONS
- <<CALIBRATION BLOCK<<*LINE 1-FW-17 FIG NO B-55 312120 1-FW-17-13F PIPE TO VALVE C-F-2 C5~51 Mr UT 2-3-4-*<<14-CS-80-.750-12-DCC**
312130 1-FW.17-14F VALVE TO PIPE C.F-2 C5.51 M'I 1 UT 2-3-4**14-CS-80-.750-12 DCC**312140 1-FW-17-15F PIPE TO PIPE C-F-2 C5.51 MT 1 UT 2-3-4<<<<14-CS-80-.750-12-0CC*<<
312150 1-FW-17-16S.PS C.C H'I 1 PIPE TO PEHETRATION SEAL WELD C3.20 2-3 4-*<<14-CS-80-.750-12.DCC**
312170 1-FW-17-44 BRANCH COHNECTION TO PIPE C-F-2 C5.51 HT 1 2-3.4-312180'I-FW.17.45 SADDLE TO PIPE C5.51 2-3-4-C-F-2 MI 1 312190 1-FW-17-46 C.F-2 SADDLE TO BRANCH CONNECTION C5.51 HT 1 UT 2-3-4 CODE RELIEF WAS GRANTED FIRST INTERVAL FROH VOLUHETRIC EXAMINATION.
SEE BASIS FOR PREPARATIOH, SECTION 3.5.e DATE: 1'I/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPOHEHTS PAGE: 159 FEEDWATER SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDEHTIFICATIOH PLAN STATUS SECOND THIRD PERIOD PERIOD INSPECTION INTERVAL I FIRST ASME PER I OD SEC.XI I CATGY NDE i------0 U T A G E-ITEM NO METH I 1 2 3 1 2 3 4 1 2 3 I I I I INSTRUCTIONS I**CALIBRATION BLOCK**LINE 1-FW.18 FIG NO 8-56 312200 1-FW.18-01S PIPE TO FLUED HEAD C-F-2 C5.51 MT 1 Ul'-3-4-WELD INACCESSIBLE FOR EXAMINATION.
SEE BASIS FOR PREPARATION, SECTIOH 3.5.CODE RELIEF GRANTED FROM EXAM I HAT I OH.312210 1-FW-18.02S-PS PENETRATION SUPPORT WELD C-C C3.20 MT 1 2-3-4-312220 1-FW-18-03F FLUED HEAD TO PIPE C-F-2 C5.51 MT 1-UT 2-3-4-**14-CS-80-.750-12-DCC" 312230 1-FW.18.04S PIPE TO ELBOW C-F-2 C5.51 MT 1 UT 2-3-4<<'14-CS-80-.750-12-DCC**
312240 1-FW-18.05S ELBOW TO PIPE C-F-2 C5.'51 MT 1 UT 2-3-4-*~14-CS-80-.750-12.DCC**
312250 1-FW-18.06F PIPE TO ELBOW C-F-2 C5.51 MT 1 UT 2-3-4-~~14-CS-80-.750-12-DCC**
312260 1-FW-18-07S ELBOW TO PIPE C-F-2 C5.51 MT 1 UT 2-3-4**14.CS-80-.750-12 DCC*~
DATE: 11/15/95 REVI SIGH: 0 COOK NUCLEAR PLANT UNIT 1 IN SERV I CE I H S PE CT ION LOH G TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 160 FEEDWATER SYSTEM SUHMARY EXAMIHAT ION AREA NUMBER IDENT IF I CATION INSPECTION INTERVAL I ASME I SEC~XI I CATGY NDE I ITEM HO METH I PLAH STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD----OUTAGE-1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
"*CALIBRATIOH BLOCK**LINE 1-FW-18 FIG NO B-56 312270 1-FW-18.08F PIPE TO ELBOW C-F 2 C5.51 MT 1 ur 2-3-4**14-CS.80-.750-12.DCC*>>
312280 1.FW-18.09S ELBOW TO PIPE C-F-2 C5.51 MT 1-UT 2-3-4 C**14-CS-80-.750-12-0CC*~
312310 1-FW-18.10S PIPE TO ELBOW C-F-2 C5.51 MT 1 UT 2-3-4-C**14-CS-80-.750-12.DCC**
312320 1.FW.18.11F ELBOW TO PIPE C-F-2 C5.51 MT 1 UT 2-3-4-C**14-CS-80-.750-12.DCC**
312330 1-FW-18 12F PIPE TO REDUCER C-F 2 C5.51 MT 1----C UT 2-3 4-**14-CS-80-.750-12-DCC~*
312340 1-F'W.18.13S REDUCER TO ELBOW C-F-2 C5.51 MT 1----C UT 2-3 4*~FW-16.CS-80-.844-45-DCC**
312350 1-FW-18.14F ELBOW TO NOZZLE C-F-2 C5.51 MT 1 C UT 2.3-4**FW.16.CS-80-.844-45.DCC**
DATE: 11/15/95 REVI SIGH: 0 COOK NUCLEAR PLANI'NIT 1 INSERVICE INSPECTION LOHG TERM PLAN CLASS 2 ALL STATUS COMPONEH'TS PAGE: 161 FEEDWATER SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT IF I CAT IOH INSPECTION INTERVAL i ASME I SEC.XI I CATGY HDE I ITEM HO METH I PLAN STATUS FIRST SECOND TNIRD I PERIOD PERIOD PERIOD I------OUTAGE I 1 2 3 1 2 3 4 1 2 3I IHSTRUCTIOHS
312370 1-FW-26-02S TEE TO PIPE C-F-2 C5.51 MT 1-UT 2-3-4*~6-CS-80..432.13-0CC~~
312390 1-F'W-26.03S PIPE TO TEE C-F-2 C5.51 MT 1 UT 2-3-4-**6-CS-80-.432-13-DCC*>>
312400 1-FW-26.04S TEE TO PIPE C-F-2 C5.51 MT 1 UT 2-3-4**6-CS-80-.432-13.0CC**
312420 1-FII.26-05S PIPE TO ELBOW 596'LAT C-F-2 C5.51 MT 1 UT 2-3-4-C X**6-CS-80-.432-13-OCC~*
312430 1-FW-26.06F ELBOW TO PIPE C-F-2 C5.51 MT 1 UT 2-3-4-~~6-CS-80-.432-13.0CC**
312435 1.FW-26-22 PIPE TO PIPE C-F-2 C5.51 MT 1 UT 2-3-4*~6-CS-80-.432-13-OCC~*
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT'NIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 162 FEEDWATER SYSTEM SUMHARY EXAHINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL F IRST ASME PER I CO SEC.XI I CATGY NDE ITEH NO HETM (1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE--1 2 3 4 1 2 3 I I I I INSTRUCTIONS
<<*CALIBRATION BLOCK>>>>LINE 1-FW-26 FIG NO B-57 312440 1-FW-26-07S PIPE TO ELBOW C F-2 C5.51 HT 1 UT 2-3-4-**6-CS-80-.432-13.DCC>>*
312450 1.FW-26-08F ELBOW TO PIPE C-F-2 C5.51 HT 1 UT 2-3-4**6-CS-80-.432-13-DCC*>>
312480 1-F'W-26-09S PIPE TO ELBOW C-F-2 C5.51 HT 1 UT 2-3-<<*6-CS-80-.432-13-DCC<<*
312490 1-FW.26.10F ELBOW TO PIPE C-F-2 C5.51 MT 1 ur 2-3-4-<<>>6-CS-80-.432-13.DCC**
312500 1-FW.26.11S PIPE TO ELBOW C-F-2 C5.51 HT 1 UT 2-3-4*<<6-CS-80..432-13.DCC<<*
312510 1-FW-26-12S ELBOW TO PIPE C-F-2 C5~51 HT 1 UT 2-3-4-**6 CS 80-.432-13-DCC**
312515 1-FW-26.23 PIPE TO PIPE C-F-2 C5.51 HT 1 UT 2-3-4**6-CS 80.432-13-DCC**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLAN'I UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 163 FEEDWATER SYSTEM SUHHARY EXAHINATION AREA NUMBER IDENTIFICATION FIRST PERIOD INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE ITEM NO HETH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD-OUTAGE-1 2 3 4 1 2 3 I I I I INSTRUCTIONS
312518 1-FW-26-25 FLANGE TO PIPE C-F.2 C5.51 HT 1-UT 2-3-4.**6-CS.80-.432-13.DCC**
312520 1-FW.26-13S PIPE TO ELBOW C-F-2 C5.51 HT 1 UT 2-3-4~~6-CS-80-.432-13.DCC~~
312530 1-FW-26-14S ELBOW TO PIPE C-F-2 C5.51 MT UT 2-3-4-**6-CS-80-.432-13-DCC**
3'I2540 1-FW.26-15F PIPE TO PIPE C-F-2 C5.51 HT 1-UT 2-3-4-*'6-CS-80-.432-13-DCC**
LINE 1-F'W-27 FIG NO B-58 312590 1-FW-27-01S CAP TO TEE C-F-2 C5.51 Hl 1 UT 2-3.4**6.CS-80..432-13-DCC**
312600 1-FW-27-02S TEE TO PIPE C-F-2 C5.51 MT 1 UT 2-3 4-**6.CS-80..432-13.DCC**
DATE: 11/15/95 REVISIOH: 0 COOK HUCLEAR PLAN'I UNIT 1 IHSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS CONPOHENTS PAGE: 164 FEEDWATER SYSTEH SUHHARY EXANI NATION AREA NUHBER IDENT I F I CAT ION INSPECTION INTERVAL I ASNE I SEC.XI I CATGY HDE ITEM NO NETH I F IRST PLAN STATUS SECOHD THIRD PERICO PERIOD PERIOD-OUTAGE-1 2 3 1 2 3 4 1 2 3 I I INSTRUCTIONS I*~CALIBRATIOH BLOCK**LINE 1-FW-27 FIG NO B-58 312620 1-FM-27-03S PIPE TO TEE 596'LAT C-F-2 C5.51 HT 1-UT 2-3.4-C X**6.CS-80-.432-13.DCC*~
312630 1-FW-27-04S TEE TO PIPE C.F.2 CS~51 NT 1 UT 2-3-4**6.CS-80-.432-13-DCC**
312640 1-FW-27-05S PIPE TO ELBOM C-F-2 C5.51 HT 1 UT 2-3 4**6.CS.80-.432-13.0CC~~
312650 1-FW.27-06S ELBOM TO PIPE C-F 2 C5.51 HT 1 UT 2 3-4<<*6.CS-80-.432-13-DCC*>>
312660 1-FW.27-07F PIPE TO ELBOM C.F.2 C5.51 HT 1 UT 2-3-6-CS-80.432-13-DCC**
312670 1-FW.27.08S ELBOW TO PIPE C-F-2 C5.51 HT 1 UT 2-3.4~*6-CS-80-.432-13-DCC~*
312675 1-FW-27-20 PIPE TO PIPE C-F-2 C5.51 HT 1 UT 2-3 4-**6-CS-80-.432-13-DCC*~
je DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPONEN'IS PAGE: 165 FEEDWATER SYSTEM SUHMARY EXAMINATION AREA NUMBER IDENT I F I CAT ION INSPECTION INTERVAL I ASHE I SEC.XI[CATGY NDE I ITEH NO HETN PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD-I-OUTAGE---I 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK>>>>LINE 1-FW-27 FIG NO B-58 312690 1-FW-27-09F PIPE TO ELBOW C-F-2 C5.51 HT UT 2-3-4-**6-CS-80-.432-13.DCC>>>>
312700 1-FW.27-10S ELBOW TO PIPE C-F-2 C5.51 HT 1-UT 2-3-4**6.CS-80-.432-13.DCC**
312710 1.FW-27.11S PIPE TO ELBOW C-F-2 C5.51 HT'I-UT 2-3-4**6.CS-80-.432-13.DCC**
312720 1-FW-27-12S ELBOW TO PIPE C-F-2 C5.51 HT 1 UT 2-3-4**6.CS-80-.432-13 DCC*>>3'12722 1-FW-27-21 PIPE TO PIPE C-F-2 C5.51 HT 1 UT 2-3-4**6.CS-80-.432-13.DCC**
312724 1-FW-27.22 PIPE TO FLANGE C-F-2 HT 1 C5.51 UT 2-3-4<<*6-CS-80-.432-13.DCC**
312728 1-FW-27-23 FLANGE TO PIPE C-F-2 C5.51 HT UT 2-3-4*>>6-CS-80-.432-13.DCC*>>
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 166 FEEDWATER SYSTEM SUHHARY EXAHI HAT ION AREA NUHBER IDENT IF ICATION INSPECTION INTERVAL I F IRST ASHE PERIOD SEC.XI I CATGY NDE ITEH NO METH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD 0 U T A 0 E------I INSTRUCTIONS 1 2 3" 4 1 2 3 I*>>CALIBRATION BLOCK**LINE 1-FW.27 FIG NO B-58 312730 1-FW-27-13S PIPE TO ELBOW C-F-2 C5.51 HT 1 UT 2-3-4-**6-CS-80-.432-13-0CC>>*
312740 1.FW-27-14S ELBOW TO PIPE C.F-2 C5.51 HT 1 UT 2-3-4-*>>6-CS-80..432-13-DCC>>>>
312750 1-FW.27-15F PIPE TO PIPE C-F.2 C5.5'I HT 1.UT 2-3-X 4**6-CS-80-.432-13 DCC>>>>LINE 1-FW-30 FIG NO B-59 312800 1-FW.30.01S CAP TO TEE C-F-2 C5.51 HT 1 UT 2-3 X 4-**6.CS-80-.432-13-DCC**
312810 1-FW-30.02S TEE TO PIPE C-F-2 C5~51 MT 1 UT 2-3.4-**6-CS-80..432.13.DCC>>>>
312820 1-FW-30-03S PIPE TO TEE C-F-2 C5.51 HT 1 UT 2-3-4->>*6-CS-80-.432-13-DCC**
312830 1.FW-30.04S TEE TO PIPE C-F-2 C5.51 HT 1 UT 2-3-4**6-CS-80-.432-13-DCC*>>
DAZE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 167 FEEDWATER SYSTEH
SUMMARY
EXAHINATION AREA NUMBER IDENTIFICATION INSPECTION IN'ZERVAL I ASME I SEC.XI I CATGY NDE I ITEH NO HETH I FIRST PER I OD PLAN STATUS SECOND PERIOD THIRD I PERIOD I 0 U T A G E------I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
<<<<CALIBRATION BLOCK*<<LINE 1-FW-30 FIG NO B-59 312840 1-FW.30-05S PIPE TO ELBOW C-F-2 C5.51 HT 1 UT 2.3-4**6-CS-80-.432-13.DCC**
312850 1-FW-30.06S ELBOW TO PIPE C-F-2 C5.51 HT 1-ur 2-3-4-<<*6-CS-80-.432-13-DCC<<<<
312860 1-FW.30.07F PIPE TO PIPE C-F-2 C5.51 MT 1 UZ 2-3-4-<<*6-CS-80-.432-13-DCC<<*
312870 1.FW.30-08S PIPE TO ELBOW C-F-2 C5~51 HT 1 UT 2-3-4-**6.CS-80-.432-13.0CC<<<<
312880 1-FW-30-09S ELBOW TO PIPE C-F-2 C5.51 HT 1 Ui'.3 4**6.CS-80-.432-13-DCC**
312900 1.FW.30-10F PIPE TO ELBOW C.F-2 C5.51 HT 1 UT 2-3-4**6-CS.80-.432-13-DCC<<*
312910 1-F'W.30-11S ELBOW TO PIPE C-F-2 C5.51 Hl'UI'-3-4**6-CS.80..432-13.DCC**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UHIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 168 FEED'WATER SYSTEM
SUMMARY
EXAMINAT I OH AREA NUMBER IDENT I F I CAT ION FIRST PERIOD INSPECTION INTERVAL I ASME I SEC.XI I CATGY HDE ITEM NO METH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD-OUTAGE-1 2 3 4 1 2 3 I I I I INSTRUCTIONS
312930 1-F'W-30.13S ELBOW TO PIPE C.F.2 C5.51 MT 1 UT 2-3-4-**6-CS 80-.432-13-DCC
- 312933 1.FW.30-26 PIPE TO FLANGE C-F-2 C5~51 MT 1-UT 2-3-4-**6 CS-80-.432-13-DCC 312935 1-FW-30-27 FLANGE TO PIPE C-F-2 C5.51 MT 1-UT 2-3-4-<<*6.CS.80-.432-13-DCC*>>
312940 1.FW-30-14S PIPE TO ELBOW C-F-2 C5.51 MT 1 UT 2.3-4-**6-CS-80-.432-13-DCC**
312950 1-FW-30-15S ELBOW TO PIPE C-F-2 C5.51 MT 1 UT 2-3-4-<<*6 CS-80-.432-'I3 OCC**312960 1-FW.30-16S PIPE TO ELBOW C-F-2 C5.51 MT 1 UT 2-3-4**6-CS ~432-13-DCC**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 169 FEEDWATER SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION FIRST PERIOD INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE ITEM NO METH i 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD-OUTAGE-1 2 3 4 1 2 3 I I I I INSTRUCTIONS
- CALIBRATION BLOCK**LINE 1-FW-30 FIG NO B-59 312970 1-FW.30-17F ELBOW TO PIPE C F2 C5.51 MT 1 UT 2-3-4-*'6-CS-80-.432-13-Dec*'INE 1-FW.31 FIG NO B-60 313000 1-FW-31-01S CAP TO TEE C-F-2 C5.51 HT 1-UT 2-3-X 4 C**6-CS-80-.432-13 DCC>>>>313010 1-F'W-31-02S TEE TO PIPE C-F-2 CS~51 Ml'UT 2-3-4**6-CS-80-.432-13-DCC*>>
313020 1-FW-31-03S PIPE TO TEE C-F-2 C5~5'I MT 1 UT 2-3-4**6-CS-80-.432-13.DCC>>*
313030 1-FW-31-04S TEE TO PIPE C-F-2 C5.51 MT 1 O'I 2.3 4**6 CS-80-.432-13 DCC*313040 1-FW-31.04S-A PIPE TO ELBOW C-F-2 C5.51 HT 1 UT 2-3-4**6.CS-80-.432-13-DCC**
313050 1-FW-31-04S-B ELBOW TO PIPE C.F-2 C5.51 M'I 1 UT 2-3-4**6-CS-80-.432-13 DCC*>>
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 170 FEEOWATER SYSTEM
SUMMARY
EXAHINATION AREA NUHBER IDENTIFICATION PLAN STATUS FIRST SECOND PERIOD PERIOD INSPECTION INTERVAL I ASHE I SEC~XI I CATGY NDE I 0 U T A G E ITEM NO HETN I 1 2 3 1 2 3 4 THIRD I PERIOD I I 1 2 3 I INSTRUCTIONS
~~CALIBRATION BLOCK**LINE 1-FW-31 FIG NO 8-60 313060 1-FW-31-05F PIPE TO PIPE C-F-2 C5.51 HT 1 UT 2-3-4-**6 CS 80~432 13 DCC~~313070'.FW-31-06S PIPE TO ELBOW C-F-2 C5.51 HT 1 UT 2-3 X 4-C**6-CS.80-.432-13.DCC**
313080'I-FW.31-07S ELBOW TO PIPE C-F-2 C5~51 HT 1 UT 2-3-4<<~6-CS-80-.432-13-DCC**
313100 1-FW-31-OBF PIPE TO ELBOW C-F-2 C5.51 HT 1 UT 2-3-4*~6 CS 80..432-13-DCC**
313110 1-FW-31-09S ELBOW TO PIPE C-F-2 C5.51 MT 1 UT 2-3-4-**6.CS-80-.432-13.DCC**
313120 1.FW.31-10S PIPE TO ELBOW C-F-2 C5.51 HT 1 UT 2-3 4**6-CS-80..432 13.DCC**313130 1-FW-31-11S ELBOW TO PIPE C-F-2 C5~51 HT 1 UT 2-3-4**6 CS-80-.432-13 DCC**
DATE: 11/15/95 REV I SION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 171 FEED'MATER SYSTEM SUHHARY EXAHIHATIOH AREA HUHBER IDENTIFICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE ITEN HO METH i FIRST PER IOD 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD 0 U T A G E------I INSTRUCTIONS 1 2 3 4 1 2 3[**CALIBRATION BLOCK~~LINE 1-FM 31 FIG HO B-60 313132 1-FM-31.23 PIPE TO FLANGE C-F-2 C5.51 HT 1-UT 2-3-4-~*6.CS-80-.432 13-DCC**313136 1-FM.31-24 FLANGE TO PIPE C-F-2 C5.51 HT 1-UT 2.3-~*6.CS.80..432.13.DCCaa 313140 1-FM.31-12S PIPE TO ELBOM C-F-2 C5~51 HT 1 UT 2-3-4**6-CS-80..432.13-0CC~~
313150 1-FM-31-13S ELBOM TO PIPE C-F-2 C5.51 HT 1 UT 2-3-4**6 CS-80-.432-13-0CC**
313160 1-FM.31-14F PIPE TO PIPE C-F-2 C5.51 HT 1 UT 2-3-4-**6-CS-80-.432-13-0CC~*
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 172 MAIN STEAM SYSTEH SUMHARY EXAHINAT ION AREA NUHBER IDENTIFICATION PLAN STATUS FIRST SECOND PERIOD PERIOD INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE i-----0 U T A G E-ITEH NO METH I 1 2 3 1 2 3 4 TNIRD I PERIOD I-I 1 2 3 I INSTRUCTIONS
~*CALIBRATION BLOCK**LINE 1-MS-1 FIG NO B-61 313190 1-HS-1-01F NOZZLE TO ELBOW C-F-2 C5.51 HT 1 UT 2-3-4*~30-CS-X-1.00-38-DCC**
313200 1-HS-1-02S ELBOW TO PIPE C.F-2 C5.51 HT 1 UT 2-3-4-*~30.CS-X-1.00-38.DCC*~
313210 1-HS-1-03S PIPE TO ELBOW C-F-2 C5.51 HT 1 UT 2-3-4**30 CS-X-1.00-38-DCC**
313220 1-HS-1-04S ELBOW TO REDUCER C.F-2 C5.51 HT 1 UT 2-3-4-**30.CS-X-1.00-38-DCC*~
313230 1.HS-1-05F REDUCER TO PIPE C-F-2 C5.51 MT 1 UI'-3.4-~~30-CS-X-1.00-38.0CC~*
313240 1.HS-1-06F PIPE TO PIPE C-F-2 C5.51 HT 1 UI'.3.4**30-CS-X-1.00-38-DCC
~313250 1.MS-1-07S PIPE TO ELBOW C-F-2 Ml'C5.51 UT 2-3-4**30-CS X-1~00-38-DCC**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 173 MAIN STEAM SYSTEM
SUMMARY
EXAHINAT ION AREA NUMBER IDENT I F I CAT ION INSPECTION INTERVAL I F IRST ASHE I PERiOD SEC.XI I CATGY NDE I ITEH NO HETH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I I OUTAGE I I 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK~~LINE 1.MS-1 FIG NO B-61 313260 1-MS-1-08S ELBSI TO ELBOW C-F-2 C5~51 HT 1 UT 2-3.4<<*30-CS X F 00.38.DCC~~
313270 1-MS-1-09F ELBOW TO PIPE C-F 2 C5.51 HT 1 UT 2C 3X 4**30-CS X-1.00-38-DCC**
313310 1-MS-1-10F PIPE TO FLUED HEAD C-F-2 C5.51 HT I-UT 2-3-4 WELD INACCESSIBLE FOR EXAHINATION.
SEE BASIS FOR PREPARATION, SECTION 3.5~CCOE RELIEF GRANTED FROM EXAM I NAY ION o**30-CS-X-1.00-3B DCC**313320 1-HS-1-11S-PS PENETRATION SUPPORT MELD ANNULUS C-C C3.20 HT 1 2-3-4 C X 313330 1-MS-1-12F FLUED HEAD TO PIPE C-F-2 C5.51 HT 1-UT 2-3 4-MELD IHACCESSIBLE FOR EXAHINATION.
SEE BASIS FOR PREPARATION, SECTION 3.5.CODE RELIEF GRANTEO FROM EXAMINATION.
LINE 1-MS-2 FIG NO B-62 313340 1-HS-2-01S-PS C-C PIPE TO PENETRATION SEAL MELD C3.20 E MS ENC HT 1 2-3-4-C X DATE: 11/15/95 REV I SION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL Sl'ATUS COHPONEN'IS PAGE: 174 HAIN STEAH SYSTEM SUHHARY EXAHINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I FIRST ASHE PERIOD SEC.XI I CATGY NDE ITEM NO HETN i 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE-2 3 4 1 2 3 I I I I INSTRUCTIONS
<<<<CALIBRATION BLOCK<<*LINE 1-HS-2 FIG NO B-62 313350 1-HS.2-02F PIPE TO TEE C-F-2 C5.51 MT 1 UT 2C 3 X 4-**30-CS-X-1.00-38-OCC**
313360 1-MS.2-03F TEE TO VALVE C.F.2 C5.51 HT 1 UT 2-3-4-<<*30.CS-X-1.00-38-DCC**
313370 1.HS.2-04F TEE TO PIPE C-F-2 C5.51 Hl'UT 2-3-4-*<<30.CS-X-1.00-38.DCC**
313380 1-MS-2.05S PIPE TO TEE C-F-2 C5.5'I HT 1 UT 2-3-4**30-CS-X-1.00-38-OCC**
313390 1-MS-2-06S TEE TO PIPE C-F-2 C5.51 HT UT 2-3-4**30 CS X-1.00-38-DCC**
313400 1.MS-2.07S PIPE TO CAP C-F-2 C5.51 MT 1 UT 2.3-4<<<<30-CS-X-1.00-38 DCC**313410 1-HS-2-08S TEE TO PIPE C-F-2 C5.51 HT 1 UT 2-3-4**30-CS-X-1.00-38.DCC*<<
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPONENI'S PAGE: 175 HAIN STEAH SYSTEH I SUMHARY EXAHINATI ON AREA NUHBER IDENT IF ICATION PLAN STATUS SECOND PERIOD INSPECTION INTERVAL I FIRST ASHE I PERIOD SEC.XI I CATGY NDE I------0 U T A G E-ITEH NO HETH i 1 2 3 1 2 3 4 THIRD I PERIOD I--I 1 2 3 I INSTRUCTIONS
313430 1-HS-2-10F PIPE TO ELBSI C-F-2 C5.51 HT 1 UT 2-3-4**6-CS-80-.432-13-DCC**
313440 1-MS-2-11S PIPE TO FLANGE C-F-2 C5.51 MT 1-UT 2-3-4**6-CS-80-.432-13-DCC**
313450 1-HS.2-12S PIPE TO FLANGE C-F-2 C5.51 HT 1 UT 2-3-4-**6.CS-BD-
~432-13 DCC**313460 1.HS-2-13S PIPE TO FLANGE C-F-2 C5.51 HT 1 UT 2-3-4-**6.CS-80-.432-13-DCC**
313470 1-MS-2-14S PIPE TO FLANGE C F-2 C5.51 HT 1 UT 2-3-4**6-CS ~432-13-DCC**
313480 1-HS-2-15S PIPE TO FLANGE C-F-2 C5.51 HT 1 UT 2-3-4-<<*6.CS-80-.432-13.DCC*>>
DATE: 11/15/95 REVI SIGH: 0 COOK NUCLEAR PLANI'HIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 176 MAIN STEAM SYSTEM
SUMMARY
EXAHINATIOH AREA NUHBER IDENT I F ICATION INSPECTION INTERVAL I FIRST ASHE PER IOO SEC.XI I CATGY NDE ITEM NO METH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD-I OUTAGE------I 1 2 3 4 I 2 3 I INSTRUCTIOHS
~*CALIBRATION BLOCK~>>LINE 1.MS-2 FIG NO B-62 313490 1-MS-2.23 SADDLE TO BRANCH CONNECTION C-F-2 CS~51 MT 1-UT 2-3-4 CODE RELIEF WAS GRANTED FIRST INTERVAL FROM VOLUHETRIC EXAMINATION.
SEE BASIS FOR PREPARATION, SECTION 3.5.313500 1-MS-2.24 SADDLE TO PIPE C-F-2 C5.51 HT 1 2-3-4-C 313510 1-MS-2.25 BRANCH CONHECTION TO PIPE C-F-2 C5.51 HT 1 2-3-4 313520 1-MS.2-26 SADDLE TO BRANCH CONNECTION C-F-2 C5.51 HT 1 UT 2-3-4 CODE RELIEF WAS GRANTED FIRST INTERVAL FROM VOLUHETRIC EXAHINAT ION SEE BASIS FOR PREPARATION, SECTION 3.5.313530 1-MS-2-27 SADDLE TO PIPE C-F-2 C5.51 MT 2-3-4 C 313540 1-MS-2-28 C-F-2 BRANCH CONHECI'ION TO PIPE C5.51 MT 1-2-3-4-313550 1.MS-2-29 SADDLE TO BRANCH CONHECTION C-F-2 C5.51 MT 1 UT 2-3-4.CODE RELIEF WAS GRANTED FIRST INTERVAL FROH VOLUMETRIC EXAHINATION.
SEE BASIS FOR PREPARATION, SECTION 3.5.
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 177 MAIN STEAM SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL FIRST.ASME PERIOD SEC XI I CATGY NDE I ITEH NO METH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE-----)INSTRUCTIONS 1 2 3 4 1 2 3 J**CALIBRATION BLOCK**LINE 1.MS-2 FIG NO B-62 313560 1-MS-2-30 SADDLE TO PIPE C-F-2 C5.51 MT 1 2-3-4 313570 1.HS-2-31 BRANCH CONNECTION TO PiPE C-F-2 C5.51 MT 1 2-3-4 313580 1-MS.2.32 SADDLE TO BRANCH CONNECTION C-F-2 C5.51 HT 1 UT 2-3-4-CODE RELIEF llAS GRANTED FIRST IN'TERVAL FROM VOLUMETRIC EXAHINATION.
SEE BASIS FOR PREPARATION, SECTION 3.5.313590 1-MS-2-33 SADDLE TO PIPE C-F-2 C5.51 MT 1 2-3-4 313600 1-MS-2-34 BRANCH CONNECTION TO PIPE C-F-2 C5.51 HT 1 2-3.4.313610 1-MS-2-35 SADDLE TO BRANCH CONNECTION C-F-2 C5.51 MT 1 U'I 2-3-4-CODE RELIEF HAS GRANTED FIRST INTERVAL FROM VOLUMETRIC EXAHIHATIOH.
SEE BASIS FOR PREPARATION, SECTION 3.5.313620 1-MS-2-36 SADDLE TO PIPE C-F-2 C5.51 MT 1 2-3-4 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 178 MAIN STEAM SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT IF ICATION INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE I ITEH NO METH I PLAN STATUS FIRST SECOND THIRD I PERIOD PERICO PERIOD--------I-OUTAGE-----I 1 2 3 1 2 3 4 1 2 3 INSTRUCTIONS
SEE BASIS FOR PREPARATION, SECTION 3.5.313650 1-MS-2-39 SADDLE TO PIPE C-F-2 C5.51 MT 1 2-3-4-313660 1-HS-2.40 BRANCH CONNECTION TO PIPE C-F-2 C5 F 51 HT 1 2.3-4 LINE 1-MS-6 FIG NO B-63 313670 1.MS-6-01F NOZZLE TO PIPE C-F-2 C5.51 HT 1 UT 2-3-4-<<*30 CS-X-1~00-38.DCC**
313680 1.MS-6-02S PIPE TO ELBOW C-F-2 C5.51 HI 1 UT 2-3-4**30-CS-X-1.00.38.DCC**
313690 1-MS-6.03S ELBOW TO PIPE C-F-2 C5~51 MT 1 UT 2-3.4-**30-CS-X-'l.00-38.DCC~~
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 179 HAIN STEAM SYSTEM SUHHARY EXAHINATION AREA NUHBER IDENTIFICATION PLAN STATUS FIRST SECOND PERIOD PERIOD INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE I 0 U T A G E ITEM NO HETN I 1 2 3 1 2 3 4 THIRD I PERIOD-I-----I 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK**LINE 1-MS-6 FIG NO B-63 313700 1-MS-6-04S PIPE TO ELBSI C-F-2 C5.51 MT 1 Ul'-3-4~*30 CS-X-1.00-38 DCC**313710 1-HS.6-05S ELBON TO REDUCER C.F-2 C5.51 HT 1-UT 2C 3-X 4-**30.CS-X-1.00-38-DCC~*
313720 1.HS-6-06F REDUCER TO PIPE C-F 2 C5.51 MT 1 UT 2-3-4-**30-CS-X-1.00-38.DCC~~
313730 1-MS-6.07F PIPE TO PIPE C-F-2 C5.51 HT 1 UT 2-3-4-C**30 CS-X-1.00-38 DCC**313740 1-HS.6-08S PIPE TO PIPE C-F-2 C5.51 Hl'UT 2-3-4**30-CS-X-1.00-38.DCC**
313760 1.HS-6-09F PIPE TO PIPE C-F-2 C5.51 SEE 1 INST 2-3.4~EXAHINAT I ON NOT REQUIRED."30-CS-X-1.00-38-DCC**
313770 1-HS-6-09F-PL-1 PIPE LUG C-C C3.20 Hl'2-3-4 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE IHSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONEHTS PAGE: 180
SUMMARY
EXAHI HAT ION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE I ITEH NO METH/1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I-I-OUTAGE--I 2 3 1 2 3 4 1 2 3 INSTRUCTIONS
SEE BASIS FOR PREPARATION, SECTION 3.5.CODE RELIEF GRANTED FROM EXAHINATION.
<<<<30.CS-X-1.00-38-DCC<<<<
313800 1-HS-6-11S-PS PENETRATION SUPPORT WELD ANNULUS C-C C3~20 HT 1-2-3-4 X 313810 1.MS-6-12F FLUED HEAD TO PIPE C-F 2 C5.51 HT 1 UT 2-3-4-WELD INACCESSIBLE FOR EXAHINATION
~SEE BASIS FOR PREPARATION, SECTION 3.5.CODE RELIEF GRANTED FROM EXAM INAT I OH.L'INE 1.MS-7 FIG NO 8-64 313820 1-MS-7-01S-PS C-C PIPE TO PENETRATION SEAL WELD C3.20 HT 1 2-3-4 313830 1-HS-7-02F PIPE TO PIPE C-F-2 C5.51 MT UT 2-3-4**30-CS-X-1.00-38.DCC<<*
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 181 MAIN STEAH SYSTEM
SUMMARY
EXAHI HAT ION AREA NUMBER IDENTIFICATION FIRST PERIOD INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE I ITEM NO METH 1 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE-1 2 3 4 1 2 3 I INSTRUCTIONS I<<<<CALIBRATION BLOCK**LINE 1.MS-7 FIG NO B.64 313840 1-MS-7-03S PIPE TO TEE C-F.2 C5.51 HT 1 UT 2 3-4-C**30-CS-X-1.00-38-DCC**
313850 1-MS-7-04F TEE TO VALVE C-F-2 C5.51 HT 1 UT 2-3-4 C**30.CS.X-1.00-38.DCC*>>
313860 1-HS-7-05F TEE TO PIPE C-F-2 C5.51 HT 1 UT 2-3.4.C*<<3O-CS-X-1.00-38-OCC*<<
313870 1.HS-7-06S PIPE TO TEE C-F-2 C5.51 Hl'UT 2-3-4<<*30-CS-X-1.00-38-OCC**
313880 1-HS-7-07S TEE TO PIPE CD F-2 C5.51 HT 1 UT 2-3-4**30 CS-X-1.00-38.DCC*
313890 1.HS-7-08S PIPE TO CAP C-F-2 C5.51 HT 1 UT 2.3-4-<<*30-CS-X-1.00-38-DCC**
313900 1-HS-7-09S TEE TO PIPE C.F-2 C5~51 HT 1 UT 2-3-4**30-CS.X-1.00-38.DCC<<<<
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 182 HAIN STEAM SYSTEH
SUMMARY
EXAHINATION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I F IRST ASHE PERIOD SEC.XI I CATGY NDE I ITEH NO HETN i 1 2 3 PLAN STATUS SECOND PERIOD THIRD I PERIOD I OUTAGE------
I 2 3 4 1 2 3 I INSTRUCTIONS
313920 1-MS-7.11S PIPE TO FLANGE C-F-2 C5.51 HT 1 UT 2-3-X 4**6-CS.80-.432-13.DCC**
313930 1-HS-7-12S PIPE TO FLANGE C-F-2 C5.51 HT 1 UT 2-3-4~~6-CS-80-.432-13-0CC~*
313940 1-HS-7-13S PIPE TO FLANGE C-F.2 C5.51 MI'UT 2-3-4-*i6-CS-80..432-13-0CC**
313950 1-HS.7-14S PIPE TO FLANGE C-F-2 C5.51 HT 1 UT 2-3-4-*i6-CS-80-.432.13-OCCAM*
313960 1-HS-7-15S PIPE TO FLANGE C-F-2 C5.51 Hl'UT 2-3-4-<<*6.CS-80-.432-13.DCC**
313970 1-HS-7-22F SADDLE TO BRANCH CONNECTION C-F-2 C5.51 HT 1 UT 2-3-4-CODE RELIEF IJAS GRANTED FIRST INTERVAL FROH VOLUHETRIC EXAHINATION.
SEE BASIS FOR PREPARATION, SECTION 3.5.
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE IHSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 183 MAIN STEAM SYSTEM SUMHARY EXAHIHATI OH AREA NUMBER IDENTIFICATION FIRST PERIOD INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE I ITEH HO METH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD-0 U T A G E------I INSTRUCTIONS 1 2 3 4 1 2 3[**CALIBRATION BLOCK**LINE 1-MS-7 FIG HO 0 64 3'13980 1-MS-7-23 SADDLE TO PIPE W MS ENC C-F-2 C5.51 MT 1 2-C 3---X 4-313990 1.MS-7-25 SADDLE TO BRANCH CONNECTION C.F-2 C5.51 MT 1 UT 2-3-4 CODE RELIEF IJAS GRANTED FIRST INTERVAL FROM VOLUMETRIC EXAMINATION.
SEE BASIS FOR PREPARATIOH, SECTION 3.5.314000 1-MS-7-26 SADDLE TO PIPE C-F-2 C5.51 MT 1 2 C 3 X 4 314010 1-MS-7-27 BRANCH CONHECTION TO PIPE C-F-2 C5.51 MT 1 2-3-4 314020 1-MS-7-28 SADDLE TO BRANCH CONNECTION C-F-2 C5.51 MT 1 UT 2-3-4 C CODE RELIEF'HAS GRANTEO FIRST INTERVAL FROM VOLUHETRIC EXAHINATION.
SEE BASIS FOR PREPARATION, SECTION 3.5.314030 1-MS-7-29 SADDLE TO PIPE C.F-2 C5.51 MT 1 2-~-3-4-314040 1-MS-7-30 BRANCH COHHECTION TO PIPE C-F-2 C5.51 MT 1 2 DATE: 11/15/95 REVI SIGH: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPOHEH'IS PAGE: 184 MAIN S'TEAM SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I FIRST ASME PERIOD SEC.XI I CATGY NDE I ITEM NO METH i 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD I OU'TAGE------
J 1 2 3 4 1 2 3 I INSTRUCTIONS
~*CALIBRATIOH BLOCK**LlHE 1-MS-7 FIG NO B-64 314050 1-MS-7-31 SADDLE TO BRANCH CONNECTION C-F-2 C5.51 MT 1-UT 2-3-4-CODE RELIEF'WAS GRAHTED FIRST INTERVAL FROM VOLUMETRIC EXAMINATION.
SEE BASIS FOR PREPARATION, SECTION 3.5.314060 1.MS-7-32 SADDLE TO PIPE C-F 2 C5.51 MT 1 2-3-314070 1.MS-7.33 C-F-2 MT BRANCH CONNECTION TO PIPE C5.51 1-2-3-4-314080 1.MS.7.34 SADDLE TO BRANCH CONNECTION C-F-2 C5.51 MT 1 UT 2-3-4-CODE RELIEF WAS GRANTED FIRST INTERVAL FROM VOLUMETRIC EXAMINATION.
SEE BASIS FOR PREPARATION, SECTION 3.5~314090 1-MS-7-35 SADDLE TO PIPE C-F-2 C5.51 MT 1 2-3-4 314100 1-MS-7-36 BRANCH CONNECTION TO PIPE C-F-2 C5.51 MT 1 2-3-4-314110 1-MS-7-37 SADDLE TO BRANCH CONNECTION C-F-2 C5.51 M'I 1 UT 2-3-4 CODE RELIEF WAS GRANTED FIRST INTERVAL FROM VOLUHETRIC EXAMINATIONS SEE BASIS FOR PREPARATION, SECTION 3.5.
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 185 MAIN STEAH SYSTEM
SUMMARY
EXAHINAT ION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE I ITEH NO METH I 1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I-0 U T A G E------I 2 3 1 2 3 4, 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK~~LINE 1-MS-7 FIG NO B-64 314120 1.MS-7-38 SADDLE TO PIPE C-F-2 C5.51 MT 1 2-3-4 314130'I.MS.7-39 BRANCH CONNECTION TO PIPE C-F.2 C5.51 MT 1 2-3-4-314140 1.HS-7-40 BRANCH COHNEC'IION TO PIPE C-F-2 C5.51 MT 1 2-3.4-LINE 1-MS-10 FIG NO B-65 314150 1-MS.10-01F NOZZLE TO ELBOW C-F-2 C5.51 MT 1 UT 2-3-4-<<~30-CS-X-T.OD 38-DCC**314160 1.HS-10-02S ELBOW TO PIPE C-F-2 C5.51 HT 1 UT 2-3-4-**30.CS-X-1.00-38-DCC**
314170 1-MS-10.03S PIPE TO PIPE C-F-2 C5.51 MT 1 UT 2-3-4-**30 CS-X-1.00-38.DCC**
314180 1.HS-10.04S PIPE TO REDUCER C-F-2 C5.51 MT 1 UT 2.3.4**30-CS-X-1.00-38-0CC*>>
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE IHSPEcj'ION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 186 MAIN STEAM SYSTEM SUNDRY EXAMINATION AREA NUMBER IDENT I F ICATION INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE I ITEM HO METH i 1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I I-OUTAGE--2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
314200 1-MS-10.06F PIPE TO PIPE C-F-2 MT 1 C5.51.UT 2-3-4*>>30-CS-X.1.00-38 Dcc>>>>3142'I 0 1.MS-10.07S PIPE TO ELBOW C-F-2 C5.51 MT 1 UT 2-3-X 4 C**30-CS-X.1.00.38.DCC**
314230 1.MS.10.07'L PIPE LUG C C C3.20 MT 2-3-4 BASE MATERIAL 0.5".314240 1.MS-10.08F ELBOW TO PIPE C-F-2 C5.51 Ml'UT 2-3-4-**3O-CS.X-T.OO-38.OCC**
314250 1.MS-10-08F-PL 1 THROUGH 3 C.C MT 1 BASE MATERIAL 0.5"~PIPE LUG C3.20 2-3-4-314260 1-MS-10-09F PIPE TO FLUED HEAD CF2 MT 1 C5.51 UT 2-3-4 WELD INACCESSIBLE FOR EXAMINATION.
SEE BASIS FOR PREPARATION, SECTION 3.5.CODE RELIEF GRANTED FROM EXAMINATION.
- 30.CS.X-1.00-38.DCC>>*
DATE: 1'I/15/95 REVISION: 0 COOK NUCLEAR PLANI'NIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 187 MAIN STEAM SYSTEM
SUMMARY
EXAHINATION AREA NUMBER IDEHT IF ICATION INSPECTION INTERVAL I ,ASME I SEC.XI I CATGY NDE I ITEM NO METH I 1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD-I OUTAGE I 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
SEE BASIS FOR PREPARATION, SECTION 3.5.CODE RELIEF GRANTED FROM EXAHI HAT I OH.LINE 1.MS-11 FIG NO B-66 314290 1-HS-11-01S C-C MT 1-PIPE TO PENETRATION SEAL WELD C3.20 2-3-4 314300 1-MS-11-02F PIPE TO PIPE C-F-2 C5.51 HT'I UT 2-3-4**30-CS-X-1.00-38-DCC~*
314310 1.HS-11-03S PIPE TO TEE C-F-2 C5.51 MT 1 UT 2-3-4*~30-CS-X-1.00-38-OCC**
314320 1-HS-11-04F PIPE TO VALVE C.F-2 C5.51 HT 1 UT 2-3-4-**30-CS-X-1.00-38-OCC~*
DATE: 11/15/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 188 MAIN STEAH SYSTEH
SUMMARY
EXAHINATION AREA NUMBER IDEN'TIFICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE I ITEH NO METH I 1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD-I-OUTAGE------I 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
~~CALIBRATION BLOCK~*LINE 1-HS-11 FIG NO B.66 314330 1-MS-11-05F TEE TO PIPE C-F-2 C5.51 HT 1 UT 2-3.4-**30.CS-X-1.00-38.DCC~*
314340 1-HS-11-06S PIPE TO TEE C-F.2 C5.51 HT 1 UT 2-3-4~*30.CS-X-1.00-38 DCC*314350 1-HS-11-07S TEE TO PIPE C-F 2 C5.51 HT 1-UT 2-3-4-**30-CS.X-'1.00.38.DCC*~
314360 1-HS.11.08S PIPE TO CAP W MS EHC C-F-2 C5.51 HT 1-UT 2-3 4--~C X**30-CS-X-1.00-38 DCC**314370 1-HS-11-09S TEE TO PIPE C-F-2 C5.51 HT 1 UT 2-3-4**30-CS-X-1.00-38.DCC~>>
314380 1-HS-11-10S PIPE TO CAP C.F-2 C5.51 HT 1 UT 2-3-4-**30-CS-X-1.00-38.DCC"*
314390 1.HS-11-11S PIPE TO FLANGE C-F-2 HT 1-C5.51 UT 2-3-4**6.CS-80-.432.13.DCC~~
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 189 MAIN STEAH SYSTEM
SUMMARY
EXAHINATION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE I ITEH NO METH I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD------OUTAGE 1 2 3 1 2 3 4 1 2 3 I I I I INSTRUCTIONS
)<<<<CALIBRATION BLOCK**LINE 1-HS-11 FIG NO B-66 314400 1.HS-11-12S PIPE TO FLANGE C-F-2 C5.51 HT 1-UT 2-3-4-**6-CS-80..432-13.DCC**
314410 1-HS-11-13S PIPE TO FLANGE C-F-2 C5.51 MT 1 UT 2-3 4 C X**6-CS-80-.432-13-DCC<<<<
314420 1-MS-11-14S PIPE TO FLANGE C.F-2 C5.51 HT 1-2 3-4<<*6-CS-80-.432 13 DCC**314430 1-HS-11-15S PIPE TO FLANGE C-F-2 C5~51 HT 1 UT 2-3-**6.CS-80.
432-13-DCC<<<<
314440 1-MS.11-23 SADDLE TO BRANCH CONNECTION C-F-2 C5.51 HT 1 UT 2-3-4 CODE RELIEF HAS GRANTED FIRST INTERVAL FROH VOLUHETRIC EXAMINATION.
SEE BASIS FOR PREPARATION, SECTION 3.5.314450 1-HS-11-24 SADDLE TO PIPE C F-2 C5.51 HT 1 2-3-4 314460 1-HS-11-25 BRANCH CONNECTION TO PIPE C-F-2 C5.51 Hl'2-3 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 190 MAIN STEAM SYSTEM
SUMMARY
EXAMINATI OH AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY HDE I ITEM NO METH I PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I OUTAGE I 1 2 3 1 2 3 4 1 2 3 I IHSTRUCTIOHS
SEE BASIS FOR PREPARATION, SECTION 3.5.314490 1-MS-11-28 SADDLE TO PIPE C-F-2 C5~51 HI'2-3-4-314495 1-MS.11-41 BRANCH CONHECI'ION TO PIPE C-F-2 C5.51 HT 1 2-3-4-314500 1-MS-11-29 C.F.2 HT SADDLE TO BRANCH CONNECTION
, C5.51 W HS ENC 1 2-3-4 C X CODE RELIEF WAS GRANTED FIRST INTERVAL FROH VOLUHETRIC EXAHI HAT ION.SEE BASIS FOR PREPARATIOH, SECTION 3.5.314510 1.HS.11-30 SADDLE TO PIPE C-F-2 C5.51 HT 1 2-3-4 314520 1.HS-11-31 BRANCH CONNECTION TO PIPE C-F-2 C5.51 HT 2-3-4 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 191 MAIN STEAM SYSTEM
SUMMARY
EXAMINATION AREA NUHBER IDENTIFICATION INSPECTIOH INTERVAL (I FIRST ASME PERIOD SEC'I I CATGY NDE I ITEH NO HETH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD 0 U T A G E------I INSTRUCTIONS 1 2 3 4 1 2 3[**CALIBRATION BLOCK>>>>LINE 1-MS-11 FIG NO B-66 314530 1.HS-11.32 SADDLE TO BRANCH CONNECTION C-F-2 C5.51 MT 1 UT 2-3-4-CODE RELIEF HAS GRAHTED FIRST INTERVAL FROM VOLUHETRIC EXAHINATION.
SEE BASIS FOR PREPARATION, SEC'TION 3.5.314540 1-MS.11.33 SADDLE TO PIPE C-F.2 C5.51 MT 1 2-3-4-314550 1-HS-11-34 BRANCH CONNECTION TO PIPE C-F.2 C5.51 MT 1-2-3.4-314560 1.MS-11-35 SADDLE TO BRANCH CONNECTION C-F.2 C5.51 M'I 1 2-3-4 CODE RELIEF WAS GRANTED FIRST INTERVAL FROM VOLUMETRIC EXAHINATION.
SEE BASIS FOR PREPARATION, SECTION 3.5.314570 1-HS-11-36 SADDLE TO PIPE C-F-2 C5.51 MT 1 2-3-4-CODE RELIEF IJAS GRANTED FIRST INTERVAL FROM VOLUHETRIC EXAHINATION.
SEE BASIS FOR PREPARATION, SECTION 3.5.314580 1-MS-11-37 BRANCH CONNECTION TO PIPE C-F-2 C5.51 HT 1 2-3-4-~314590 1-HS.11.38 SADDLE TO BRANCH CONNECTION C-F-2 C5.51 MT 1 UT 2-3-4 CODE RELIEF HAS GRANTED FIRST INTERVAL FROM VOLUMETRIC EXAHINATIOH.
SEE BASIS FOR PREPARATION, SECTION 3.5~
DATE: 11/'15/95 REVISION: 0 COOK NUCLEAR PLAHT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 192 MAIN STEAM SYSTEM
SUMMARY
EXAHI NAY I ON AREA NUMBER IDENTIFICATION PLAN STATUS FIRST SECOND PERICO PERIOD INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE J---0 U T A G E-ITEM NO METH I 1 2 3 1 2 3 4 THIRD I PERIOD I-----I 2 3 INSTRUCTIONS
<<*CALIBRATION BLOCK**LINE 1 MS 11 FIG NO B-66 314600 1-MS-11-39 SADDLE TO PIPE C-F-2 C5.51 MT 1 2-3-4-314610 1-MS-11-40 BRANCH CONHECTION TO PIPE C-F-2 C5.51 HT 1 2-3-4-LINE 1.MS 14 FIG NO B-67 314630 1-MS-14-01F N02ZLE TO ELBOH C-F-2 C5.51 HT 1 UT 2-3-4**30 CS-X-1.00-38-DCC**
314640 1.MS-14-02S ELBSI TO PIPE C-F-2 C5.51 HT 1 UT 2.3-4-**30-CS-X-1.00-38.DCC**
314650 1.HS-14-03S PIPE TO ELBOW C-F-2 C5.51 HT 1 UT 2-3-4**30-CS-X-1.00-38.DCC**
314660 1-MS-14-04S ELB(N TO REDUCER C-F-2 C5.51 MT 1-UT 2.~3-4**30-CS-X-1.00-38-DCC**
314670 1-MS-14-05F REDUCER TO PIPE C F-2 MT'I-C5.51 UT 2-3-4**30-CS-X-1.00.38.DCC~~
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAH CLASS 2 ALL STATUS COMPONENTS PAGE: 193 MAIN STEAM SYSTEM
SUMMARY
EXAHINAT I ON AREA NUMBER IDENT IF ICATION PLAN STATUS FIRST SECOND PERIOD PERIOD iNSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE I 0 U T A G E ITEH NO HETH I 1 2 3 1 2 3 4 THIRD I PER I OD I-----I 1 2 3 I INSTRUCTIONS
>><<CALIBRATION BLOCK**LINE 1-MS-14 FIG NO B.67 314680 1-HS-14-06F PIPE TO PIPE C-F-2 C5~51 MT 1 UT 2-3-4**30-CS-X-1.00-38 DCC*>>314690 1-HS-14-07S PIPE TO ELBOW C-F.2 C5~51 MT 1-O'I 2-3-4-<<*30.CS-X.1.00-38.DCC**
314710 1-MS-14-OBF ELBOW TO PIPE C-F-2 C5.51 Ml'-UT 2-3-4**30-CS-X-F 00-38-OCC*>>
314740 1.MS.14-09F PIPE TO FLUED HEAD C-F-2 C5.51 HT 1 UT 2-3-4-'WELD INACCESSIBLE FOR EXAHINATION.
SEE BASIS FOR PREPARATIOH, SECTION 3.5.CODE RELIEF GRANTED FROM EXAHIHATION.
- 30.CS-X-1.00-38-DCC**
314750 1-MS.14-10S.PS PENETRATION SUPPORT WELD C-C C3.20 HT 1 2-3-4 314760 1-MS-14-11F FLUED HEAD TO PIPE C-F-2 C5.51 HT 1 UT 2-3-4-THIS WELD INACCESSIBLE FOR EXAHINAT ION.SEE BASIS FOR PREPARATION, SECTION 3.5.CODE RELIEF GRANTED FROH EXAMINATION.
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: " 194 MAIN STEAM SYSTEM SUHHARY EXAHINATION AREA NUHBER IDENTIFICATION PLAN STATUS SECOND PERIOD INSPECTION INTERVAL I FIRST ASME PERIOD SEC.XI I CATGY NDE I------0 U T A G E-ITEH NO HETN I 1 2 3 1 2 3 4 THIRD PERIOD I-----I 1 2 3 I INSTRUCTIONS
314800 1 MS-15 04F TEE TO VALVE C F-2 C5.51 HT 1 UT 2-3-4*>>30.CS-X-1.00-38.DCC*>>
314810 1 HS-15-05F TEE TO PIPE C-F-2 C5.51 HT 1 UT 2-3-4**30 CS-X-1~00 38 DCC>>>>314820 1-HS-15-06S PIPE TO TEE C-F-2 C5.51 MT 1 UT 2-3 4->>*30.CS-X-1.00-38-DCC*>>
314830 1-HS-15-07S TEE TO PIPE C-F-2 C5.51 HT 1 UT 2-3-4-**30 CS-X'1.00-38-DCC>>*
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 195 HAIN STEAM SYSTEM SUHHARY EXAHINAT I ON AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE I-ITEH NO HETN i 1 PLAN STATUS FIRS'I SECOND THIRD I PERIOD PERIOD PERICO-I-OUTAGE------I 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
314860 1-HS-15.10S PIPE TO CAP C-F-2 C5.51 HT UT 2-3-4-**30.CS.X-1.00 38.0CC~*314870 1-MS-15-11S PIPE TO FLANGE C-F-2 C5~51 HT 1 UT 2-3-4-**6-CS ~432-13-DCC**
314880 1-MS-15-12S PIPE TO FLANGE C-F-2 C5.51 HT 1 UT 2-3-4-~~6-CS.80-.432.13-DCC*~
314890 1-HS-15-13S PIPE TO FLANGE C-F-2 C5.5'I HT 1 UT 2-3-4-<<*6-CS-80-.432-13-DCC**
314900 1.MS-15-14S PIPE TO FLANGE C F-2 C5.51 HT 1 UT 2-3-4-**6-CS-80-.432-13-DCC**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 196 MA'Ik STEAM SYSTEM
SUMMARY
EXAHINATION AREA NUMBER IDEHT IF ICATION PLAN STATUS FIRST SECOND PERIOD PERIOD INSPECl'ION INTERVAL I ASHE I SEC~XI I CATGY NDE I------0 U T A G E-ITEH NO METH i 1 2 3 1 2 3 4 THIRD I PERIOD I-I 2 3 INSTRUCTIONS
314920 1-MS.15.23 PIPE TO PIPE C-F-2 C5~51 HT 1 UT 2-3-4~*6-CS-80-.432.13.DCC i 314930 1-MS-15-24 SADDLE TO BRANCH CONNECTION C-F-2 C5.51 HI'UT 2-3-4 CODE RELIEF MAS GRANTED FIRST INTERVAL FROH VOLUHETRIC EXAMI HAT IOH.SEE BASIS FOR PREPARATION, SECTION 3.5.314940 1-MS-15-25 SADDLE TO PIPE C-F 2 C5.51 MT 1 2-3-4 314950 1-MS-15-26 BRANCH CONNECTION TO PIPE C-F-2 C5.51 MT 1 2-3-4-314960 1-MS-15-27 SADDLE TO BRANCH CONNECTION C-F-2 C5.51 HT 1 UT 2.3-4 CODE RELIEF WAS GRANTED FIRST INTERVAL FROM VOLUHETRIC EXAHI NATION.SEE BASIS FOR PREPARATION, SECTION 3.5.314970 1-MS-15.28 SADDLE TO PIPE C-F C5.11 MT 1 2-3 DATE: 11/'l5/95 REVI S ION: 0 COOK NUCLEAR PLANT UNIT'I INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 197 MAIN STEAM SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT IF ICATION INSPECTION INTERVAL I FIRST ASHE I PERIOD SEC.XI I CATGY NDE I ITEM NO METH i 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I l 0 U T A G E------I 1 2 3 4 1 2 3 I INSTRUCTIONS
~~CALIBRATION BLOCK*~LINE 1-MS-15 FIG NO B-6B 314980 1-MS-15-29 BRANCH CONNECTION TO PIPE C-F-2 C5.51 MT 1 2-3.4-314990 1-HS-15-30 SADDLE TO BRANCH CONNECTION C-F-2 C5.51 HT 1 UT 2-3-4 CCOE RELIEF HAS GRANTED FIRST INTERVAL FROM VOLUMETRIC EXAMINATIONS SEE BASIS FOR PREPARATION, SECTION 3.5.315000 1-MS-15-31 SADDLE TO PIPE C-F-2 C5.51 MT 1 2 C 3 X 4 315010 1-MS-15-32 BRANCH CONNECTION TO PIPE C-F-2 C5~51 MT 1 2-3-4-315020 1.HS-15-33 SADDLE TO BRANCH CONNECTION C F-2 MT 1 C5.51 UT 2.3-4-CODE RELIEF HAS GRAHTED FIRST INTERVAL FROM VOLUMETRIC EXAMINATION.
SEE BASIS FOR PREPARATION, SECTION 3.5.315030 1-MS.15-34 SADDLE TO PIPE C-F-2 C5.51 MT 1 2-3-4 315040 1-MS-15.35 BRANCH CONNECTION TO PIPE C F-2 C5.51 MT 1 2-3-4 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTIOH LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 198 MAIN STEAM SYSTEH
SUMMARY
EXAHINATION AREA NUMBER IDENT IF ICATION INSPECTION INTERVAL I FIRST ASHE PERIOD SEC.Xl I CATGY NDE I ITEH NO METH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD 0 U T A G E------I INSTRUCTIOHS 1 2 3 4 1 2 3 I~~CALIBRATION BLOCK*~LINE 1-MS-15 FIG NO B-68 315050 1.MS-15-36 SADDLE TO BRANCH CONHECTION C-F-2 C5.51 MT 1 UT 2-3-4 1 CODE RELIEF WAS GRANTED FIRST INTERVAL FROH VOLUMETRIC EXAHINATION.
SEE BASIS FOR PREPARATION, SECTION 3.5.315060'I.MS-15-37 SADDLE TO PIPE C-F 2 C5.51 MT 1 2-3-4 315070 1.MS-15-38 C-F-2 BRANCH CONNECTION TO PIPE C5~51 MT 1 2-3-4.315080 1-MS-15-39 SADDLE TO BRANCH CONNECTION C-F.2 C5~51 HT 1-2-3-4-CODE RELIEF'MAS GRANTED FIRST INTERVAL FROH VOLUHETRIC EXAMINATION.
SEE BASIS FOR PREPARATION, SECTION 3.5.315090 1-MS-15.40 SADDLE TO PIPE C-F-2 C5.51 MT 1 2-3-4.315100 1.MS.15.41 BRANCH CONNECTION TO PIPE C-F.2 C5.51 HT 1 2-3-4 LINE 1-MS-189 FIG NO B.69 315110 1-MS-189-01S ELBSI TO PIPE C-F-2 C5.51 MT UT 2-3-4**6.CS-80-.432-13-DCC**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 199 MAIN STEAH SYSTEH SUHHARY EXAHINAT ION AREA NUMBER IDEN'll F I CAT ION INSPECI'ON INTERVAL I FIRST ASME PERIOD SEC.XI CATGY NDE I ITEM NO HETN i 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD-OUTAGE----I INSTRUCTIONS 1 2 3 4 1 2 3[**CALIBRATION BLOCK~*LINE 1.HS-189 FIG NO B-69 315120 1-HS-189.02S PIPE TO ELBOW C-F-2 C5.51 HT 1-UT 2-3-4**6-CS.80-.432-13-DCC**
315130 1-MS-189.03S ELBOW TO PIPE C-F-2 C5.51 HT 1 UT 2-3-4**6-CS.80-.432-13-DCC**
315140 1-HS-189.04F PIPE TO ELBOW C-F-2 C5.51 MT 1 Ur 2-3-4**6-CS.80-.432-13-DCC**
315150 1-HS-189-05S ELBOW TO PIPE C-F-2 C5.51 MT'I UT 2-3-4-**6-CS-80-.432-13.
D CC**315160 1-HS-189-06S PIPE TO ELBOW C-F-2 C5~51 MT'ur 2C 3 X 4**6 CS-80-.432-13-DCC*
315170 1-HS-189.07S ELBOW TO PIPE C-F-2 C5.51 HT 1 UT 2-3-4-**6.CS-80-.432-13.DCC*>>
315180 1-HS-189-OBS PIPE TO ELBOW C-F-2 C5.51 HT 1 UT 2-3-4**6-CS-80..432-13.DCC**
DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 200 HAIN STEAN SYSTEH SUHHARY EXAHINATIOH AREA NUHBER IDENT IF I CAT I OH INSPECTION INTERVAL I FIRST ASHE I PERIOD SEC XI I CATGY NDE ITEH NO HETN I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I OUTAGE------I 1 2 3 4 1 2 3 I INSTRUCTIONS
- 315210 1-HS-189.10F VALVE TO PIPE C-F-2 C5.51 HT 1-UT 2-3-*~6.CS.M-.432-13-DCC
- 315220 1-HS-'189-11F PIPE TO VALVE C-F-2 C5.51 HT 1 UT 2-3-4-<<*6-CS-80-.432-13-0CC
~LINE 1-HS-190 FIG NO B-70 315230 1-HS-190 O'IF PIPE TO PIPE C-F-2 C5.51 HT 1 UT 2-3-~*6-CS-80-.432-13.DCC
- 315250 1-HS-190.03S ELBOJ TO PIPE C-F-2 C5.51 HT 1.UT 2-3-4*~6.CS-80-.432-13-DCC*>>
315260 1-HS-190-04F PIPE TO ELBSI C F-2 C5.51 HT 1-UT 2-3-**6-CS-80-.432-13-DC~~
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 201 MAIN STEAM SYSTEM
SUMMARY
EXAHINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL FIRST ASME PERIOD SEC.XI I CATGY NDE ITEH NO HETM)1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I I OUTAGE-----I 1 2 3 4 1 2 3 I INSTRUCTIONS
<<*CALIBRATION BLOCK**LINE 1-MS-190 FIG NO B 70 315270 1-MS-190-05S ELBOW TO PIPE C-F-2 C5.51 HI'UT 2-3-4-**6-CS-80-.432-13-DCC*<<
315290 1-HS-190.06S PIPE TO ELBOW C.F-2 C5.51 HT 1 UT 2-3-4-<<*6-CS-80-.432-13-OCC'*
315310 1.MS-190-07S ELBOW TO PIPE C-F-2 C5.51 HT 1 UT 2-3.4**6.CS.80-.432-13.DCC**
315320 1.MS-190.08S PIPE TO ELBOW C-F-2 C5.51 HT 1 UT 2.3-4<<*6.CS-80-.432-13-DCC**
315330 1-MS-190.09S ELBOW TO PIPE C-F-2 C5.51 HT'I UT 2-3-4-**6-CS-80..432-13.DCC**
315340 1-MS-190.10F PIPE TO VALVE C-F.2 C5.51 HT 1 UT 2.3-4-<<*6-CS-80-.432-13.DCC<<>>
315350 1-HS-190-11F VALVE TO PIPE C-F-2 HT 1 C5.51 UT 2-3.4**6-CS-80..432-13-DCC**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 202 HAIN STEAM SYSTEM SUHMARY EXAHI HAT I OH AREA NUMBER IDENT IF ICATION INSPECTION INTERVAI.I F IRST ASHE PERIOD SEC.Xl CATGY NDE I ITEH HO METH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD-I OUTAGE.-----(1 2 3 4 1 2 3 I INSTRUCTIONS
~~CALIBRATIOH BLOCK~~LINE'1 HS 190 FIG NO B-70 315360 1-HS-190-12F PIPE TO VALVE C-F-2 C5.51 HI'UT 2.3-4-+*6-CS-80-.432-13-DCC+~
LIME 1-HS.1 1 FIG NO B-71 315370 1-HS-'191-01F PIPE TO PIPE C-F-2 CS~51 HI'-UT 2-3-4~*6-CS-80-.432 13.DCC**315380 1-HS-191.02S PIPE TO ELBOW C-F-2 C5.51 HT 1 UT 2.3-4-**6-CS-80-.432-13-DCC**
315390 1.HS-191-03S ELBOW TO PIPE C-F-2 C5.51 HT 1-UT 2-3-4~~6-CS-80..432.13-DCC**
315400 1.HS-191-04F PIPE TO ELBOW C.F-2 C5.51 HT 1 Ur 2-3.4-**6.CS-80..432-13-DCC~~
315410 1.HS-191-05S ELBOW TO PIPE C-F-2 C5.51 HT 1.UT 2-3 4-*~6-CS 80.432-13 DCC**315430 1.HS-191-06S PIPE TO ELBOW C-F-2 C5.51 HT 1 UT 2-3-4-**6-CS-80..432-13.DCC**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 203 MAIN STEAH SYSTEM
SUMMARY
EXAHI MAT I ON AREA NUMBER IDENT IF ICATION PLAN STATUS SECOND PERIOD INSPECTION INTERVAL I FIRST ASHE PERIOD SEC.XI I CATGY NDE I 0 U T A G E ITEH NO HETN I 1 2 3 1 2 3 4 THIRD I PERIOD I-----I 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK>>>>LINE 1-HS-19'I FIG NO B-71 315450'I-MS-191-07S ELBOW TO PIPE C-F-2 C5.51 HT'I-UT 2-3-4-<<*6-CS-80-.432-13-DCC<<*
315460 1-MS-191-08S PIPE TO ELBOW C.F-2 C5.51 HT 1-UT 2-3-4-<<*6-CS-80-,432-13.DCC<<*
315470 1.HS-191-09S ELBOW TO PIPE C-F-2 C5.51 MT 1 UT 2-3-4**6-CS-80-.432-13-DCC*<<
315480 1.HS-191-10F PIPE TO VALVE C-F-2 C5.51 MT 1 UT 2.3-4**6-CS-80-.432-13.DCC**
315490 1-HS-191-11F VALVE TO PIPE C-F-2 C5.51 HT 1 UT 2.3-**6-CS-80-.432-13-DCC**
315500 1-HS-191-12F PIPE TO VALVE C-F-2 C5.51 HT 1 UT 2-3-4<<*6.CS-80-.432-13.DCC**
LINE 1-HS-192 FIG NO B-72 , 315510 1-HS-192-01F PIPE TO ELBOW C-F-2 C5.51 HT 1 UT 2-3-4**6-CS-80-.432-13-DCC*>>
DATE: 11/15/95 REVI S ION: 0 COOK HUCLEAR PLANT UHIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 204 MAIN STEAM SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT I F I CAT IOH INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE I ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD 0 U T A G E I INSTRUCTIONS 1 2 3 1 2 3 4 1 2 3 I<<<<CALIBRATIOH BLOCK<<*LINE 1-MS-192 FIG NO B-72 315520 1-MS-192-02S ELBOW TO PIPE C-F-2 C5.51 MT 1 UT 2-3-4<<*6.CS-80-.432-13.DCC**
315530 1-MS-192-03S PIPE TO ELBOW C-F.2 C5.51 MT 1 UT 2.3-4-**6-CS-80-.432.13.DCC**
315540 1-MS-192-04S ELBOW TO PIPE C-F-2 C5.51 Ml'T 2-3-4-**6.CS-80-.432-13-DCC**
315550 1.MS-192-05F PIPE TO ELBOW E MS ENC C-F-2 C5.51 MT 1 UT 2-3-4 C X*<<6-CS ~432.13.DCC<<>>
315560 1.MS.192-06S ELBOW TO PIPE C-F-2 C5.51 MT 1 UT 2-3-4.<<<<6-CS-80-.432-13-DCC**
315570 1-MS-192-07S PIPE TO ELBOW C-F-2 C5.51 MT 1 UT 2-3-4*<<6-CS-80-.432-13.DCC<<*
315580 1-MS-192-08S ELBOW TO PIPE C.F-2 C5.51 MT 1-UT 2-3-4**6-CS-80-.432-13-DCC**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1'NSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 205 MAIN STEAM SYSTEH
SUMMARY
EXAMIHAT ION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I FIRST ASME PER I CO SEC.XI CATGY NDE I ITEM NO METH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD-I 0 U T A G E------I 1 2 3 4 1 2 3 I INSTRUCTIONS
<<*CALIBRATION BLOCK**LINE 1-MS-192 FIG NO B-72 315590 1-MS-192-09S PIPE TO ELBSI C-F-2 C5~51 MT 1 UT 2-3-4~*6-CS.80..432-13-DCC~~
315610 1-MS.192.10F ELBOtl TO VALVE C-F-2 C5.51 M1'-UT 2-3-4*~6-CS-80-.432-13-DCC~~
315620 1.MS.192-11F VALVE TO PIPE C-F-2 C5.51 MT 1 ur 2-3-4-'~6-CS-80-.432-13-DCC**
315630 1-HS.192-12F PIPE TO VALVE C-F-2 C5.51 MT 1 UT 2-3-4-**6-CS-80-.432-13-DCC**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UHIT 1 INSERVICE INSPECTION LONG TERH PLAH CLASS 2 ALL STATUS COMPOHEH'IS PAGE: 206
SUMMARY
EXAMINATION AREA NUMBER IDENT IF ICATION INSPECTION INTERVAL MAIN STEAM ISOLATION VALVE-LINE 1-MS-2 I FIRST ASME PER IOO SEC.XI I CATGY NDE ITEM NO METH i 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I OUTAGE I 1 2 3 4 1 2 3 I INSTRUCTIONS
- ~CALIBRATION BLOCK**VALVE BODY TELOS FIG HO B-75 8-76 317060 MSIV.MRV-210.1 CYLINDER HELD C G C6.20 MT 1.2 C 3X 4 INTEGRALLY MELDED SUPPO TS FIG HO B 75 B-76 317070 MSIV.MRV-210.S1 C C C3.40 MT 1 2-3-4 317080 MSIV-MRV-2'IO-S2 C-C C3.40 MT 1 2-3-4 PRESSURE RETAIHIHG BOLTIHG>2" FIG NO B-75 B-76 317090 MS I V-MRV-210 FLANGE BOLTING E MS EHC C 0 C4.40 UT 2-3-4**2.75-S-B CS-40 DCC**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPOHENTS PAGE: 207 INSPECTION INTERVAL MAIN STEAM ISOLATION VALVE-LINE 1-MS-7 I ASME I SEC.XI I CATGY HDE I ITEM HO METH'(PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I-0 U T A G E------I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATIOH BLOCK**VALVE BODY WELDS FIG HO B-75 B-76 317110 MS I V-MRV-220-1 CYLINDER WELD C-G C6.20 MT 1 2-3-4 INTEGRALLY WELDED SUPPORTS FIG NO B-75 B-76 317120 MS I V-MRV-220-S1 C-C C3.40 MT 1 2-3.4-317130 MSIV-HRV-220-S2 C-C C3.40 MT 1 2-3-4 PRESSURE RETAIHIHG BOLTING>2" FIG HO B-75 B-76 317140 MSIV-MRV-220 FLANGE BOLTING CD UT 1 C4.40 2-3-4**2.75-S-B-CS 40-DCC**
DATE: 11/15/95 REVISIOH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COHPONEHTS PAGE: 208 INSPECTION INTERVAL MAIN STEAM ISOLATION VALVE-LINE 1-MS-11 I ASME I SEC.XI I CATGY NDE I ITEM NO METH I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD-I OUTAGE------I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
~*CALIBRATIOH BLOCK*~VALVE BODY WELDS FIG NO B-75 B-76 317160 MSIV.HRV-230-1 CYLINDER WELD C G C6.20 HT 1 2-3-4-INTEGRALLY WELDED SUPPORTS FIG NO B-75 B-76 317170 MSIV-MRV-230-81 C-C C3.40 MT 1 2 C 3X 4 317180 MSI V-HRV-230-S2
'W MS ENC C-C Mr C3.40 2-3-4-C X PRESSURE RETAINING BOLTING>2" FIG NO B-75 8-76 317190 MSIV-MRV-230 FLANGE BOLTIHG C D C4.40 UT 1 2-3 4*~2.75-8-8 CS-40 DCC*>>
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPOHENTS P/GE: 209 INSPECTION INTERVAL MAIN STEAM ISOLATION VALVE-LINE 1-MS-15 I ASME I SEC.XI I CATGY HDE I ITEM HO METN PLAN S1'ATUS FIRST SECOHD THIRD PERIOD PERIOD PERIOD I-I 0 O'T A G E------I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS iiCALIBRATION BLOCKii VALVE BODY WELDS FIG NO B-75 B-76 3172'l0 MS I V.MRV-240-1 CYLINDER WELD C-G MT 1-C6.20 2-3-4 INTEGRALLY WELDED SUPPORTS FIG NO B-75 B-76 317220 MS I V-MRV-240-S1 C-C C3.40 MT 1 2-3-4-317230 MSIV-MRV-240-S2 C-C C3.40 MT 1 2-3-4 PRESSURE RETAIHIHG BOLTING>2" FIG NO B-75 B-76 317240 MSIV-MRV-240 FLANGE BOLTING C-D C4.40 UT 1 2-3-4<<*2.75-A 8 CS-40 DCC**
DATE: 11/15/95 REVISIOH: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL S'IATUS COMPONENTS PAGE: 210 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAHIHATION AREA NUMBER IDENT IF ICATION INSPECT I OH INTERVAL I ASME I SEC.XI I CATGY NDE ITEM NO METH I 1 PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERICO I-I-OUTAGE------I 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
323010 1-$1.5-02F VALVE TO TEE C-F-1 PT C5.11H UT 2-3-4-*<<8.SS.10-.148-16.DCC**
323020 1-SI-5-03S TEE TO PIPE C-F-1 PT 1 C5.11H UT 2-3-4**B-SS-10-.148-16-OCC**
323030 1.S 1.5.04S PIPE TO TEE C-F-1 PT C5.11H UT 2-3 X 4-<<<<8.SS-10-.148-16-DCC<<<<
323040 1-SI-5-05S TEE TO CAP A C-F-1 PT 1-C5~11H UT 2.3~4-**B-SS-10-.148-16-DCC**
323050 1-SI-5-06S TEE TO REDUCER C-F-1 PT 1-C5.11H UT 2 3-4**B-SS.10..148-16.DCC
<<323060 1-SI-5-07S TEE TO REDUCER C-F-1 PT 1-C5~11H UT 2-3.4*8-SS 10.148-16 DCC**
DATE: 11/'15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTIOH LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 211 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAHIHATION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I FIRST ASHE PER IOO SEC.XI I CATGY NDE ITEM NO METH m 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD 0 U T A G E------i INSTRUCTIONS 1 2 3 4 1 2 3 J<<*CALIBRATION BLOCK~*LINE 1.SI-5 FIG NO B-77 323070 1-SI-5.08S REDUCER TO PIPE C-F-1 PT 1 C5.11H UT 2-3-4**6-SS-40-.280.28.DCC**
323080 1-$1-5-09S PIPE TO TEE C-F-1 PT 1 C5.11H UT 2-3 X 4-~i6 SS 40-.280-28.DCC~~
323090 1-SI-5-10S TEE TO CAP C-F-1 PT 1 C5.11H UT 2-3-4~*4-SS-10S-.120 21 DCC**323100 1-SI-5-11S TEE TO PIPE C-F-1 PT 1 C5.11H UT 2-3-4-'~6-SS-40-.280-28.DCC**
323110 1-SI-5-12S PIPE TO ELBON C-F-1 PT 1 C5.11H UT 2-3-4**6.SS-40-.280.28.DCC~>>
323120 1-SI-5-13S ELBOW TO PIPE CF1 PT 1-C5.11H UT 2-3.4**6-SS-40-.280-28.DCC*~
323130 1-SI-5-14F PIPE TO VALVE C-F-1 PT 1 C5~11H UT 2-3-4**6.SS-40-.280-28-DCC**
DATE: 11/15/95 REV I S ION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 212 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAHINATIOH AREA NUHBER IDENTIFICATION PLAN STATUS FIRST SECOND PERIOD PERIOD INSPECTION IHTERVAL I ASHE I SEC.XI I CATGY NDE I---0 U T A G E-ITEH No METN i 1 2 3 1 2 3 4 THIRD I PERIOD I----I 1 2 3 I INSTRUCTIONS
323150 1-SI-5-16S REDUCER TO TEE C.F-1 PT 1-C5.11H UT 2-3-**6-SS-40-.280-28.DCC~*
323160 1-SI-5.17F TEE TO PIPE C-F-1 PT 1-C5.11H UT 2-3-4-**6-SS-4O-.2eO-28-OCC
323180 1-SI-5-19F REDUCER TO TEE C-F-'I PT 1-C5.1'IH UT 2-3-4-**6-SS-4O-.2eO-28-0CC
323200 1-SI-5-21F TEE TO PIPE C-F-1 PT 1 C5.11H UT 2.3-4.X**6-SS ~280-28.DCC*>>
DATE: 11/15/95 REVISION: 0 COOk NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPONENT'S PAGE: 213 EMERGENCY CORE COOLING SYSTEM SUHHARY EXAHI HAT I ON AREA NUHBER IDENTIFICATION PLAN STATUS FIRST SECOND PER I OO PER I 00 INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE I----0 U T A 0 E-ITEH HO NETH I 1 2 3 1 2 3 4 THIRD I PERIOD I-----I 1 2 3 I INSTRUCTIONS
~~CALIBRATION BLOCK~*LINE 1-SI-5 FIG NO B-77 323210 1-SI-5-22S PIPE TO ELBOW C-F-1 PT 1 CS~11H UT 2-3-4-**6-SS-40.280-28.DCC~~
323220 1-SI-5-23S ELBOW TO REDUCER CF1 PT 1 C5.11H UT 2-3-4"*6-SS-40.280.28-0CC**
323230 1-SI-5.24S REDUCER TO FLANGE C-F-1 PT 1-C5.11N UT 2-3.4~*4-SS.TOS-
~120.21-0CC~*
323240 1-SI-5-25S REDUCER TO PIPE C-F-1 PT 1 C5.11H UT 2-3-4**6-SS 40.280-28 DCC*>>323250 1-SI-5-26S PIPE TO ELBOW C-F-1 PT 1-C5.11H UT 2-3.4**6-SS-40..280-28-DCC**
323260 1-SI.5.27S ELBOW TO PIPE CF1 PT 1-C5.11H UT 2-3-4**6-SS-40-.280-28-0CC~*
323270 1-SI-5-28F PIPE TO VALVE C-F-1 PT C5.11H UT 1 2-3-4-**6-SS.40-.280-28.DCC**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 214 EHERGENCY CORE COOLING SYSTEM SUHHARY EXAHINATI ON AREA NUHBER IDEHT IF ICATION IHSPECTION INTERVAL I FIRST'SHE PERIOD SEC.XI I CATGY NDE I ITEH NO NETH i 1 2 3 PLAN STATUS SECOND PERIOD THIRD I PERIOD I-OUTAGE-----I 1 2 3 4 1 2 3 I INSTRUCTIONS
323290 1-SI-5-30F TEE TO TEE C F-1 PT C5.11H UT 2-3-4<<*6-SS-40-.280-28.DCC**
323300 1-SI-5-31S TEE TO FLANGE C F-1 PT 1 C5.11H UT 2-3-4-**6-SS-40-.280-28-DCC>>
323310 1-S I-5-32F TEE TO PIPE C-F-1 PT 1-C5.11H UT 2-3-4**6-SS-40-.280-28-DCC**
323320 1.SI-5-33S PIPE TO ELBON C F-1 PT 1 C5.11H UT 2-3-4-**6-SS-40..280 28 DCC**323330 1-SI-5-34S ELBOM TO REDUCER C-F-1 PT 1 C5.11H UT 2-3-4**6-SS-40-.280 28-DCC**323340 1-SI-5-35S REDUCER TO FLANGE CF1 PT 1 C5~11H UT 2-3-4**4-SS-10S-.120-21-DCC**
DATE: 11/15/95 REVI S I OH: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LOHG TERM PLAN CLASS 2 ALL S'TATUS COMPONENTS PAGE: 215 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT IF I CATION INSPECTION INTERVAL FIRST ASHE PERIOD SEC.XI I CATGY NDE ITEM NO METH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE-1 2 3 4 1 2 3 I I I IHSTRUCTIONS I~*CALIBRATION BLOCK**LINE 1-SI-5 FIG NO 8-78 323350 1-SI-5-36S TEE TO PIPE C-F.1 PT 1 C5.20H UT 2-3-4-**4-SS.10S-.120.21-0CC
~323360 1-SI-5-37S PIPE TO ELBOW C-F-1 PT 1 C5.20H UT 2-3-4-**4-SS-10$
-.120-21-DCC~~
323370 1-SI.5-38S ELBOW TO PIPE CF'I PT 1 C5.20H UT 2-3-4**4-SS.10S..120.21.0CC*~
323380 1-SI-5-39S PIPE TO TEE C-F-1 PT 1 C5.20H UT 2-3-4**4-SS.10S-
~120-21-DCC**
323390 1-SI-5.40S TEE TO ELBOW C-F-1 PT C5.20H UT 1 2.3-4"*4-SS-10S-.120-21-DCC*>>
323400 1-SI-5-41S ELBOW TO VALVE C-F-1 PT 1 C5.20H UT 2-3-4*4-SS-10S-.120 21-DCC**3234'10 1-SI-5-42S TEE TO PIPE C-F-1 PT 1-C5.20H UT 2-3-4.~*4-SS-10S-.120-21-DCC*~
DATE: 11/15/95 REVISIOH: 0 COOK HUCLEAR PLAHT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 216 EMERGEHCY CORE COOLING SYSTEM SIBLEY EXAMINATION AREA HUHBER IDEHT IF I CATION PLAN STATUS SECOND PERIOD INSPECTION IHTERVAL I FIRST ASME PERIOD SEC.XI CATGY NDE)-----0 U T A G E-ITEM HO METH I 1 2 3 1 2 3 4 THIRD J PERIOD-I-----I 2 3 I INSTRUCTIONS
LINE 1-SI-11A FIG NO B-79 325000 1-SI-11A-01S FLANGE TO ELBOW C-F-1 PT 1 C5.21H UT 2-3-X 4**2.5-SS-40-.203-15-DCC>>*
325010 1-SI-11A.02S ELBOW TO PIPE C-F-1 PT C5.21H UT 1-2-3X 4.<<*4.SS'80-.337-20 DCC**325020 1-SI-11A-03S
'PIPE TO TEE C-F-1 PT 1 C5.21H UT 2-3-4-<<>>4-SS-80-.337.20.DCC*>>
325030 1-SI.11A.04S TEE TO PIPE C-F-1 PT 1 C5.21H UT 2-3-4**4.SS.80-.337-20.DCC<<>>
325040 1-SI-11A-05F PIPE TO VALVE CF1 PT C5.21H.UT 1-2-3-4-**4-SS-80-.337.20.DCC**
325050 1.S I.11A.OSF VALVE TO VALVE C-F-1 PT 1 C5.21H UT 2-3-X 4 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL S'TATUS COMPONENTS PAGE: 217 EMERGENCY CORE COOLING SYSTEM SUHHARY EXAMINATION AREA NUHBER IDENTIFICATION PLAN STATUS FIRST SECOND PERIOD PERIOD INSPECTION IHTERVAL I ASHE I SEC.XI I CATGY NDE I-----0 U T A G E-ITEM NO METH I 1 2 3 1 2 3 4 THIRD I PERIOD I-I 2 3 INSTRUCTIONS
325070 1 Sl 11A-OBF ELBSl TO TEE C-F-1 PT C5.21H UT 1-2-3-4**4-SS-80-.337-20-DCC**
325080 1-SI-11A-09F TEE TO PIPE C-F-1 PT 1 C5.21H UT 2-3-4-**4-SS 80-.337 20 DCC*>>325090 1-SI-11A-10S PIPE TO ELBOM C-F-1 PT 1-C5.21H UT 2-3-4 X<<*4-SS-80-.337-20.DCC**
325100 1-SI-11A-11F ELBSI TO PIPE CF1 PT 1-C5.21H UT 2-3-4<<*4-SS-80-.337-20-DCC*<<
325110 1-SI-11A-12F PIPE TO ELBOM C-F-1 PT 1 C5.2'IH UT 2-3-4-**4-SS-80-.337-20 DCC<<*325120 1.SI-11A-13S ELBON TO PIPE C-F-1 PT 1 C5.21H UT 2-3-4<<*4-SS-80-.337-20.DCC
- DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 218 EMERGEHCY CORE COOLING SYSTEM SUHMARY EXAHIHATION AREA HUNGER IDENT IF ICATION INSPECTIOH INTERVAL I ASHE I SEC.XI CATGY NDE ITEM NO METH I PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I-OUTAGE----I 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
325140 1-SI-11A-15F ELBOW TO PIPE C-F-1 PT C5.21H UT 2-3.4-<<*4 SS 80-.337-20-DCC**
325150 1-SI-11A-16S PIPE TO FLANGE C-F-1 PT 1-C5.21H UT 2-3.325'l60 1-SI-11A-17S FLANGE'TO PIPE C-F-1 PT 1 C5.21H UT 2-3-4**4-SS-80..337-20.DCC**
325'170'1.SI-11A.18F PIPE TO ELBOW C-F-1 PT 1-C5.21H UT 2.3-4-**4-SS-80-.337-20.DCC**
LINE 1-SI-11 FIG NO 8-79 325500 1-SI-11-01S FLANGE TO ELBOW CF1 PT 1-C5.21H UT 2-3-X 4**2.5-SS-40-.203-15-0CC**
325510 1-SI-11-02S ELBOW TO PIPE C-F-1 PT C5.21H UT 2-3-4<<*4-SS-80-.337-20.DCC**
DATE: 11/15/95 REVISION: 0 COOK HUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 219 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAHINATIOH AREA NUHBER IDENT I F I CAT I ON PLAN STATUS SECOND PERIOD INSPECTION INTERVAL I F IRST ASHE I PERIOD SEC.Xl I CATGY NDE I------0 U T A G E ITEM NO METH I 1 2 3'I 2 3 4 THIRD I PER I OD I I 1 2 3 I INSTRUCTIONS
~**CALIBRATIOH BLOCK**LINE 1-S1-11 FIG ND B-79 325520 1-81-11-03S PIPE TO TEE C-F-1 PT C5.21H UT 1 2-3-4-<<*4-SS.80-.337-20.DCC**
325530 1-81-11-04S TEE TO PIPE C-F-1 PT 1 C5.21H UT 2-3-4<<<<4-SS-80-.337-20.0CC
>>325540 1-SI-11-05F PIPE TO VALVE C-F-1 PT C5.21H UT 2 3.X 4**4.SS.80-.337-20.DCC>>*
325550 1-SI-11-06F VALVE TO VALVE C-F-1 PT 1 C5.21H UT 2-3-4**4-SS-BD.337-20 DCC**325560 1.SI.11.07F VALVE TO PIPE C-F-1 PT 1 C5.21H UT 2-3-4-**4-SS-80-.337-20.DCC<<*
325570 1-SI-11-OBF PIPE TO ELBOW C-F-1 PT 1 C5.21H Ur 2-3-4**4-SS-80-.337-20-0CC'>>
325580 1-SI-11-09S ELBOW TO PIPE C-F-1 PT C5.21H UT 2-3-4-**4-SS-80-.337-20-PCC**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE IHSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 220 EHERGENCY CORE COOLIHG SYSTEH
SUMMARY
EXAMIHATION AREA HUHBER IDENTIFICATION PLAH STATUS SECOND PERIOD INSPECTION INTERVAL I FIRST ASHE PERIOD SEC.XI I CATGY NDE i------0 U T A 0 E-ITEH NO METH I 1 2 3 1 2 3 4 THIRD I PERIOD I-----I 1 2 3 I INSTRUCTIONS
- <<CALIBRATION BLOCK<<<<LINE 1-S1-11 FIG NO B-79 325590 1-SI-11-'IOF PIPE TO PIPE C F-1 PT 1 C5.21H UT 2-3-4**4-SS ~337-20-DCC**
325600 1.SI-11-11F PIPE TO ELBml C-F 1 PT 1 C5.21H UT 2 3-4-**4-SS-80-.337-20.DCC**
LIHE 1-SI-11 FIG NO B-BO 325610 1-SI-11-12S ELBOM TO PIPE C-F-1 PT C5.21H UT 2-3-4 X**4-SS-80-.337-20-DCC*<<
325620 1-SI-11-13S PIPE TO TEE C-F-1 PT C5.21H UT 1-2-3-4-<<*4-SS-80..337.20.DCC<<>>
325630 1-S I-11-14S TEE TO PIPE C-F-1 PT 1 C5.21H U'I 2.3-4**4-$$-80-.337-20-DCC**
325640 1-SI-11-15S PIPE TO ELBSl C-F-1 PT 1 C5.21H UT 2-3-4-<<<<4-SS-80-.337-20.DCC**
325650 1-SI-11.16S ELBON TO PIPE C-F-1 PT C5.21H UT 2-3-4 DATE: 11/15/95 REV I SION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPOHENTS PAGE: 221 EMERGENCY CORE COOLING SYSTEH
SUMMARY
EXAHIHAT ION AREA NUHBER IDENTIFICATION PLAN STATUS FIRST SECOND PERIOD PERIOD INSPECTIOH INTERVAL I ASME I SEC.XI I CATGY NDE)0 U T A G E ITEM NO METH I 1 2 3 1 2 3 4 THIRD I PERIOD I-----I 1 2 3 I INSTRUCTIOHS
325670 1-SI-11.18S ELBSJ TO PIPE C-F-1 PT C5.21H UT 1-2-3-4-**4 SS-80-.337-20.OCC*>>
325680 1-SI-11-19S PIPE TO FLANGE C-F-1 PT 1-C5.21H UT 2-3-4-X**4-SS-80..337-20-DCC**
325690 1-SI-11-20S FLANGE TO PIPE C-F-1 PT C5.21H UT 2-3-4**4-SS-80-.337-20.DCC*>>
325700 1-SI-11-21S PIPE TO ELBOlJ C-F-1 PT 1 C5.21H Ur 2-3-4**4-SS-80-.337-20-OCC**
325710 1.SI-11-22S ELBSI TO PIPE C-F-1 PT 1 C5.21H UT 2-3-4-**4-SS-80-.337-20-OCC**
325720 1-S I-11-23S PIPE TO ELB(N C-F 1 PT CS~21H UT 1 2-3-4->>>>4-SS-80-.337-20-PCC>>>>
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UHIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 222 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAHINATIOH AREA NUHBER IDENT IF ICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE I------0 U T A G E-ITEM HO METH I 1 2 3 1 2 3 4 THIRD I PERIOD I-----I 1 2 3 I INSTRUC'LIONS
.337-20-DCC**
325740'I.SI-11-25F PIPE TO VALVE C-F-1 PT C5.21H UT 2-3-4<<*4-SS-80.337-20-OCC**
325750 1-S I-11-26S VALVE TO PIPE CF1 PT C5.21H UT 2-3.4**3378027 (4-SS-120-.430)<<<<
325760 1-SI-11-27S PIPE TO ELBOW CF1 PT 1-C5.21H UT 2.3.4**3378027 (4-SS-120-.430)*<<
325770 1-SI-11-28S ELBOW TO.PIPE C-F-1 PT 1 C5.21H UT 2-3-4**3378027 (4-SS-120-.430)**
325780 1-SI-11-29S PIPE TO ELBOW C-F-1 PT C5.21H UT 2-3-4**3378027 (4-SS-120..430)<<<<
325790 1-SI-11-30S ELBOW TO PIPE C-F-1 PT 1-C5.21H UT 2-3-4<<*3378027 (4.SS.120-.430)<<>>
DATE: 11/15/95 REVI S ION: 0 COOK NUCLEAR PLAN'I UNIT 1 INSERVICE INSPECTION LOHG TERM PLAN CLASS 2 ALL STATUS COMPOHENTS PAGE: 223 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I ASHE I SEC.Xl CATGY NDE I ITEM NO HE'IH i 1 PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD-I-0 U T A G E------I 23 1234 123 INSTRUCTIONS
325820 1.SI-11-33S PIPE TO ELBOW C F-1 PT C5.21H UT 1-2-3-4-*~3378027 (4-SS.120-.430)~*
325830 1-SI-11-34F ELBOW TO PIPE C-F-1 PT 1 C5.21H UT 2-3-4-**3378027 (4-SS-120-.430)*~
325840'I-SI-11-35S PIPE TO ELBOW CF1 PT 1-C5.21H UT 2-3-4-<<*3378027 (4-SS-120-.430)*~
325850 1-SI-11-36S ELBOW TO PIPE C-F-1 PT 1 C5.21H UT 2-3.4**3378027 (4-SS-120-.430)**
325860 1-Sl-11-37S PIPE TO ELBOW C-F-1 PT 1 C5.21H UT 2-3-4**3378027 (4-SS-120-.430)~*
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 224 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAHINATIOH AREA NUHBER IDENT IF ICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE I ITEM NO METH I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD-OUTAGE 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS I**CALIBRATION BLOCK**LINE 1-SI-11 FIG NO B 80 325870 1-SI-11-38S ELBOW TO PIPE C-F-1 PT 1-C5.21H UT 2-3-4**3378027 (4-SS-120..430)a~
325880 1-Sl-11-39F PIPE TO ELBOW C-F-1 PT 1 C5.21H UT 2-3-4*~3378027 (4-SS-120-.430)**
325890'1.$1-11.40S ELBOW TO PIPE CF1 PT 1 C5.21H UT 2-3-4-~*3378027 (4-SS-120-
~430)~~325900 1-SI-11.41S PIPE TO ELBOW CF1 PT 1-C5.21H UT 2-3-4**3378027 (4-SS-120-.430)~>>
325910 1-SI-11-42S ELBOW TO PIPE C-F.1 PT 1.C5~21H UT 2-3-~~3378027 (4-SS-120-.430)**
325920 1-SI-11-43S PIPE TO ELBOW C-F-1 PT 1 C5.21H UT 2-3-4**3378027 (4-SS-120-.430)~~
325930 1-SI-11-44S ELBOW TO PIPE C-F-1 PT 1 C5.21H UT 2-3-4**3378027 (4-SS-120..430)~*
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UHIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 225 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAHINATIOH AREA NUMBER IDENTIFICATION FIRST PERIOD INSPECTION INTERVAL I ASME I'EC.XI I CATGY NDE I ITEM NO METH I 1 2 3 PLAN STATUS SECOHD THIRD PERIOD PERIOD-OUTAGE-1 2 3 4 1 2 3 I I I I IHSTRUCT IONS"'CALIBRATION BLOCK*<<LINE 1-Sl-11 FIG NO B-BO 325940 1-SI-11-45F PIPE TO PIPE C-F-1 PT 1-C5.21H UT 2-3-4**3378027 (4-SS-120..430)**
325950 1-SI-11-46S PIPE TO ELBOW C-F-1 PT 1.C5.21H UT 2-3**3378027 (4-SS-120..430)**
325960 1-SI-11-47S ELBOW TO PIPE C-F-1 PT 1 C5.21H UT 2-3-4**3378027 (4-SS-120-.430)**
325970 1-SI-11-48F PIPE TO ELBOW C-F-1 PI'5.21H UT 1 2-3-4<<<<3378027 (4-SS-120-.430)<<*
325980 1-SI-11-49S ELBOW TO PIPE C-F-1 PT 1 C5.21H UT 2-4**3378027 (4-SS-120-.430)<<*
325990 1.SI-11-50S PIPE TO ELBOW C-F-1 PT'5.21H UT 2-3-4-**3378027 (4-SS-120-.430)**
326000 1-SI-11-51S ELBOW TO PIPE C-F-1 P'I C5.21H UT 1 2-3-4<<<<3378027 (4-SS-120-.430)**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 AI.L STATUS COMPONENTS PAGE: 226 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT IF ICATION INSPECTIOH INTERVAL I FIRST ASHE PERIOD SEC.XI I CATGY NDE I ITEH MO NETH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD-0 U T A G E------1 2 3 4 1 2 3 I I I I IMSTRUCTIOHS
+*CALIBRATION BLOCKaa LIHE 1-SI-11 FIG HO B-BO 326010 1-S I-'11.52S PIPE TO ELBOW C-F-1 PT 1-C5.21H UT 2-3-4**3378027 (4-SS-120-.430)**
326020 1-SI-11-53S ELBOW TO PIPE C-F-1 PT 1-C5~21H UT 2-3.4-~*3378027 (4-SS-120-.430)*~
326030 1-Sl-11-54F PIPE TO PENETRATION
¹68 C-F-1 PT 1 C5.21H UT 2-3-4**3378027 (4-SS-120-.430)~~
LINE 1-SI-11 FIG NO B-81 326100 1-SI-11-55F TEE TO PIPE C-F-1 PT 1 C5.21H UT 2-3-4**4-SS-80-.337.20.OCC**
326110 1-SI-11-56S PIPE TO ELBOW C-F-1 Pr 1-C5.21M UT 2-3-*~4.SS-80-.337-20.DCC**
326120 1-SI-11-57S ELBOW TO PIPE C.F-1 PT 1-C5.21H UT 2-3-4.**4-SS-80-.337.20.DCC~~
326130 1-S I-11-58S PIPE TO ELBOW C-F-1 PT 1 C5.21H ur 2-3-4-"*4-SS-80-.337-20.DCC~~
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 227 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAHIHATION AREA NUMBER IDENT IF ICATION INSPECTION INTERVAL I FIRST ASHE PERIOD SEC.Xl I CATGY NDE I ITEH NO METH I 1 2 PLAN STATUS SECOND THIRD I PERIOD PERIOD I I OUTAGE I 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK**LINE 1-Sl-11 FIG NO B-81 326140 1.SI-11-59S ELBOW TO PIPE C-F-1 P'T C5.2'IH UT 1-2-3-4-**4-SS-80-.337-20-0CC**
326150 1-S I-11-60S PIPE TO ELBOW C-F-1 PT C5.21H UT 1-2-3-4-**4-SS-80-.337-20 DCC**326160 1-SI-11-61S ELBOW TO PIPE C-F-1 PT 1-C5.21H UT 2-3-4~~4.SS-80-.337-20.0CC**
326170 1-SI-11-61F PIPE TO PIPE C-F-1 PT 1 C5.2'IH UT 2-3.4-**4-SS.80..337-20.DCC**
326180 1-SI-11-62S PIPE TO VALVE C-F-1 PT C5.21H UT 2-3-4**4-SS-80-.337-20-0CC**
326190 1-SI-'11-63S VALVE TO PIPE C-F.1 PT 1 C5.21H UT 2-3.4-*~4-SS-80-.337-20-OCC~~
326200 1-S I-11-64S PIPE TO ELBOW C.F-1 PT 1 C5.21H Ul'-3-4**4-SS-80-.337-20.0CC~*
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 228 ENERGENCY CORE COOLING SYSTEH SUHMARY EXAHINATIOH AREA NUHBER IDENTIFICATION PLAN STATUS SECOND PERIOD INSPECTION INTERVAL I FIRST ASHE PERIOD SEC.XI I CATGY NDE I 0 U T A G E ITEH NO HETH I 1 2 3 1 2 3 4 THIRD I PERIOD I-I 2 3 INSTRUCTIONS
~*CALIBRATION BLOCK*~LINE 1-SI-11 FIG NO B-81 326210 1-SI-11.65S ELBOW TO PIPE C-F-1 PT 1 C5~21H UT 2-3-4+*4-$$-80-.337 20 DCC*+326220 1-SI-11.66F PIPE TO ELBOW C-F-1 PT C5.21H UT 2.3-4-~*4-SS-80-.337-20.DCC**
326230 1-SI-11-67S ELBOW TO PIPE C F-1 PT 1 C5.21H UT 2-3.4-**4-SS-80-.337-20 DCC**326240 1-SI-11-68S PIPE TO ELBOW C-F-1 PT 1-C5.21H UT 2-3-4-*~4.SS-80-.337-20.DCC~*
326250 1-SI-11.69F ELBWO TO PIPE C-F-1 PT 1 C5.21H UT 2-3-4-X**4-SS-80-.337-20-DCC~*
326260 1-SI-11-70F PIPE TO PIPE C-F-1 PT 1 CS.21H UT 2 3-4-"*4-SS-80-.337-20.DCC*~
326270 1.$1-11-71F PIPE TO ELBOW CF1 PT 1-C5.21H UT 2-3-4-<<~4-SS.80-.337-20-DCC**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE IHSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 229 EMERGENCY CORE COOLING SYSTEM SUMHARY EXAMINATION AREA NUMBER IDENT IF I CAT ION INSPECTION INTERVAL I FIRST ASME PERIOD SEC.XI I CATGY NDE ITEM NO METH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I I 0 U T A G E------I 1 2 3 4 1 2 3 I INSTRUCTIONS
326290 1-S I-11-73S PIPE TO ELBOW C F-1 PT C5.21H UT 1-2-3.4-**4-SS.80..337-20.DCC<<*
326300 1-SI-11-74S ELBOW TO PIPE CF1 PT 1-C5.21H UT 2 3-4-**4-SS-80-.337-20-OCC*>>
326310 1.SI-11.75S PIPE TO ELBOW C-F.1 PT 1-C5.21H UT 2-3-4<<<<4-SS.80-.337-20.DCC**
326320 1-SI-11-76S ELBOW TO PIPE C-F-1 PT 1 C5.21H UT 2-3-**4-SS-80..337-20.OCC**
326330 1-SI-11-77F PIPE TO PIPE C-F-1 PT 1 C5.21H UT 2-3-4**4-SS-80-.337-20.DCC**
326340 1-SI.11.78F PIPE TO VALVE C-F-1 PT CS~21H UT 2-3-4<<*4-SS.80-.337-20.DCC**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 230 EMERGENCY CORE COOLING SYSTEH
SUMMARY
EXAMI HAT IOH AREA NUHBER IDENT IF I CAT I OH INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE ITEM NO METH I PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I-I--0 U T A G E-----I 2 3 1 2 3 4 1 2 3 I INSTRUCT I OH S**CALIBRATION BLOCK**LINE 1-Sl-11 FIG HO B-81 326350 1-Sl-11-79F VALVE TO ELBOW C-F-1 PT 1-C5.21H UT 2-3-4-<<*4-SS-80-.337-20-DCC<<>>
326360 1-SI.11.80S ELBOW TO PIPE C-F-1 Pl'5.21H UT 2-3-4-**4-SS-80-.337-20 DCC**326370 1.SI-11-81S PIPE TO ELBOW C-F-1 PT 1 C5.21N UT 2-3-4*>>4.SS-80..337.20.DCC<<>>
326380 1-SI-11.82S ELBOW TO PIPE C-F 1 C5.21H UT 2-3-4**4-SS-80..337.20.DCC*>>
326390 1.S I-11-83S PIPE TO ELBOW C-F-1 PT 1 C5.21H UT 2-3-4**4-SS-80-.337-20-DCC*>>
326400 1-SI-11-84S ELBOW TO PIPE C-F-1 PT 1-C5.21H UT 2-3-4-*>>4-SS ~337-20.DCC**
326410 1.SI-11-85F PIPE TO TEE CF1 PI'C5.21H UT 2-3-4**4-SS.80-.337-20.DCC**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UHIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 231 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAMI HAT ION AREA NUMBER IDENT IF I CATION IHSPECT ION INTERVAL I FIRST ASME (PERIOD SEC.XI I CATGY NDE ITEM NO METH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD 0 U T A G E------(INSTRUCI'IOHS 1 2 3 4 1 2 3 (**CALIBRATIOH BLOCK~>>LINE 1-SI-12 FIG NO 8-82 327000 1-SI.12-01S ELBOW TO PIPE C-F-1 PT 1 C5.21H UT 2-3-X**4-SS-80-.337-20.DCC~~
327010 1.SI-12-02S PIPE TO ELBOW C-F-1 PT 1-C5.21H UT 2-3-4-**4.SS-80-.337-20.DCC**
327020 1-SI-12-03S ELBOW TO PIPE C-F-1 PT 1 C5.21H UI'-3-4**4-SS-80-.337-20-DCC**
327030 1.SI-12-04S PIPE TO ELBOW C-F-1 PT 1-C5.21H UT 2-3-4<<~4-SS-80-.337-20.DCC**
327040 1.SI-12-05S ELBOW TO PIPE CF1 PT 1 C5.21H UT 2.3-4-*~4.SS-80-.337-20.DCC**
327050 1-SI-12-06S PIPE TO ELBOW C-F-1 PT C5.21H UT 2-3-4*~4-SS-80-.337-20-0CC**
327060 1-SI-12-07S ELBOW TO PIPE C-F-1 PT 1 C5.21H UT 2-3.4~*4-SS-80-.337-20.DCC**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANl'NIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 232 EMeRGENCY CORE COOLING SYSTEM
SUMMARY
EXAHI NATION AREA NUMBER IDENT IF ICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE ITEM NO HETH I PLAN STATUS FIRST SECOND PERIOD PERIOD--OUTAGE-1 2 3 1 2 3 4 THIRD I PERIOD-I-----I 1 2 3 I INSTRUCTIONS
<<<<CALIBRATION BLOCK<<>>LINE 1-SI-12 FIG NO B-82 327070 1-SI-12-08F PIPE TO PIPE C.F-1 PT 1-C5.21H UT 2-3-4**4 SS-80-.337 20-DCC**327080 1-SI-12.09F PIPE TO VALVE C-F-1 PT 1 C5.21H UT 2-3-4**3378027 (4-SS-120-.430)**
327090 1-Sl-12-10F VALVE TO PIPE C-F-1 PT 1 C5.21H UT 2-3-4**3378027 (4-SS-120-.430)**
327100 1-SI-12-11F PIPE TO PIPE C-F 1 PT 1-C5.21H UT 2-3-4**3378027 (4-SS-120-.430)**
327110 1-Sl-12-12F PIPE TO ELBSI C-F-1 PT 1 C5.21H UT 2-3-4**3378027 (4-SS-120-.430)<<*
327120 1-SI-12-13S ELBOtl TO PIPE C-F-1 PT 1 C5.21H UT 2-3-4**3378027 (4-SS-120-.430)**
327130 1-SI-12-14S PIPE TO ELBON CF1 PT 1-C5.21H UT 2-3-4-**3378027 (4-SS-120-.430)*>>
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 233 EHERGENCY CORE COOLING SYSTEM
SUMMARY
EXAHI HAT ION AREA NUHBER IDENTIFICATION PLAN STATUS SECOHD PERIOD INSPECTION INTERVAL J I F IRST ASME PERIOD SEC.XI I CA'TGY NDE I------0 U T A G E-ITEH NO METH I 1 2 3 1 2 3 4 THIRD I PERIOD I-----I 2 3 INSTRUCTIONS
- >>CALIBRATION BLOCK>>>>LINE 1-Sl-12 FIG NO 8-82 327140 1-SI-12-15S ELBOW TO PIPE C-F-1 PT 1-C5.21H UT 2 3-4-**3378027 (4-SS-120-.430)*>>
327150 1-81-12-16S PIPE TO ELBOW C-F-1 PT 1 C5.21H UT 2-3-4**3378027 (4-SS-120-.430)>>>>
327160 1-81-12-17S ELBOW TO PIPE C.F-1 PT 1 C5.2'IH UT 2-3~4**3378027 (4-SS-120..430)**
327170 1-SI-12-18F PIPE TO ELBOW C-F-1 PT C5.21H UT 1 2-3-4*>>3378027 (4-SS-120-.430)*>>
327180 1-81-12-19S ELBOW TO PIPE C-F-1 PT 1 C5.21M UT 2-3-4**3378027 (4-SS-120-.430)>>*
327190 1-SI-12-20F PIPE TO ELBOW C-F-1 PT 1 C5.21M UT 2-3-**3378027 (4-SS-120..430)>>>>
327200 1-SI-12.21F ELBOW TO PIPE C-F-1 PT 1 C5.21H UT 2-3-4**3378027 (4-SS-120..430)**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPOHENTS PAGE: 234 EHERGENCY CORE COOLING SYSTEM SUHHARY EXAHINATI ON AREA NUHBER IDENT IF I CATION PLAN STATUS SECOND PERIOD INSPECTIOH INTERVAL I FIRST ASHE.i PERIOD SEC~XI I CATGY NDE I------0 U T A G E-ITEH NO KETH I 1 2 3 1 2 3 4 THIRD I PERIOD I I-----I 1 2 3 IHSTRUCTIOHS
<<<<CALIBRATIOH BLOCK**LINE 1 SI 12 FIG NO B-82 327210 1-SI-12-22F PIPE TO ELBDM C-F-1 PT 1 C5.21H Ui'-3.4**3378027 (4.SS-120-.430)*<<
327220 1-SI-12-23S ELBOM TO PIPE C-F 1 PT C5.21H UT 2-3-**3378027 (4-SS-120..430)*<<
327230 1.SI-12-24S PIPE TO ELBOM C-F-'I PT 1 C5.21H UT 2-3-4-<<<<3378027 (4-SS-120-.430)**
327240 1-SI-12-25S ELBOM TO PIPE C-F-1 PT 1 C5.21H UT 2-3-4-**3378027 (4-SS-120-.430)<<<<
327250 1-SI-12-26F PIPE TO PEHETRATION
¹43 C-F-1 PT 1-C5.21H UT 2-3-4 X<<<<3378027 (4-SS-120-.430)<<<<
LINE 1-SI-19 FIG NO B.83 327500 1-SI-19-01F PENETRATIOH
¹43 TO PIPE C F-1 PT C5.21H UT 1-2-3-X 4**3378027 (4-SS-120-.430)**
327510 1 S I-19.02S PIPE TO ELBSI CF1 PT 1-C5.21H UT 2-3-4**3378027 (4.SS-120..430)**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 235 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAMINATIOH AREA NUMBER IDENT IF I CATION PLAN STATUS FIRST SECOND PERIOD PERIOD IHSPECT ION INTERVAL I ASME J SEC.XI I CATGY NDE I------0 U T A G E-ITEM NO METH I 1 2 3 1 2 3 4 THIRD I PERIOD I-----I 2 3 I INSTRUCTIOHS
327530 1-SI-19.04S TEE TO CAP C-F-1 PT 1 C5.21H UT 2-3-4++3378027 (4-SS-120-.430)*~
327540 1-SI-19-05S TEE TO PIPE C-F-1 PT 1-C5.21H UT 2-3-4**3378027 (4-SS-120-.430)+*
327550 1-SI-19.06S PIPE TO REDUCER C-F-1 PT 1 C5~21H UT 2-3-4-~~3378027 (4-SS-120-.430)**
327560 1-SI-19.07F REDUCER TO PIPE C-F-1 PT 1 C5.21H UT 2-3.4-**2-SS-160-.344-6-DCC**
327570 1-Sl-19-08F PIPE TO VALVE C-F-1 PT 1 C5.21H UT 2-3-4-**2-SS-160-.344-6.DCC
~327580 1-SI-19.09F VALVE TO PIPE C-F-'I PT 1 C5.21H UT 2-3-~*2-SS-160-.344-6.DCC**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1-INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 236 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTIOH INTERVAL I FIRST ASHE PERIOD SEC.XI I CATGY NDE , i-----0 U T A G E-ITEH NO METH i 1 2 3 1 2 3 4 THIRD PERIOD I-----I 1 2 3 I IHSTRUCTIOHS
- CALIBRATION BLOCK**LINE 1-SI-19 FIG NO B.83 327590 1-Sl-19-10F PIPE TO REDUCER C-F-1 PT 1-C5.21H UT-2-3-4<<<<2-SS-160-.344.6.DCC<<<<
327600 1-SI-19-11F REDUCER TO PIPE C.F-1 PT 1.C5.21H UT 2.3-4.*<<3378027 (4-SS.120..430)<<*
LINE 1-SI-50 FIG NO B-84 329000 1-SI.50-01S TEE TO PIPE C F-1 PT 1 C5.21H UT 2-3-4-X<<<<3378027 (4;SS-120-.430)**
329010 1-SI-50.02S
'PIPE TO ELBSI C-F-1 PT C5~21H UT 1-2-3.4-**3378027 (4-SS.120-.430)*<<
329020 1-SI-50-03S ELBOW TO ELBSI C F-1 P'I 1 C5.21H Ul'-3-4**3378027 (4-SS-120..430)**
329030 1-SI-50.04F ELBOU TO PIPE C-F-1 PT C5.21H UT 2-3.4**3378027 (4-SS-120-.430)<<*
329040 1-SI-50.05S PIPE TO ELBSI C-F-1 PT 1 C5.21H UT 2-3-4-**3378027 (4-SS 120-.430)<<<<
DATE: 11/15/95 REVI SIGH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 237 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAHIHAT ION AREA NUMBER IDEN'I IF I CAT ION INSPECTION INTERVAL I ASME I SEC.XI I CATGY HDE I ITEM NO METH i 1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD-I----0 U T A G E------I 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
~*CALIBRATION BLOCK**LIHE 1-SI-50 FIG HO B-84 329050 1.SI-50-06S ELBOW TO PIPE C F-1 PT C5.21H UT 1 2-3-4-**3378027 (4-SS.120..430)**
329060 1.SI-50-07S PIPE TO ELBOW C-F-1 PT 1-C5.21H UT 2-3-~~3378027 (4-SS.120-.430)**
329070 1-SI-50.08F ELBOW TO PIPE C-F-1 PT 1 C5.21H Ur 2-3-4-"*3378027 (4-SS-120-.430)**
329080 1-SI-50.09S PIPE TO ELBOW CF1 PT 1-C5.21H UT 2-3-4-**3378027 (4-SS-120..430)**
329090 1.SI.50.10S ELBOW TO PIPE C-F-1 PT 1 C5.21H UT 2-3-**3378027 (4-SS-120..430)~*
329100 1-SI-50-11S PIPE TO ELBOW C-F-1 PT 1 C5~21H UT 2-3-4<<*3378027 (4-SS-T20-.430)~~
329'I 10 1-SI-50.12F ELBOW TO PIPE C F-1 PT 1 C5.21H UT 2-3-4-~~3378027 (4-SS-120'430)**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UHIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 238 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAHIHAT ION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE i------0 U T A G E-ITEM NO METH (1 2 3 1 2 3 4 THIRD I PERIOD I I-I 1 2 3 I INSTRUCTIONS
>>*CALIBRATIOH BLOCK**LINE 1-SI-50 FIG NO B-84 329120 1-SI-50-13S PIPE TO ELBOW C-F-'I PT 1 C5.21H UT 2-3-4**3378027 (4-SS-120-.430)*>>
329130 1-SI-50-14S ELBOW TO ELBOW C-F-1 PT 1 C5.21H UT 2-3-4-**3378027 (4-SS.120-.430)*>>
329140 1-SI-50-15S ELBOW TO TEE CF1 PT 1-C5.21H UT 2.3-4.*<<3378027 (4-SS-120-.430)**
329150 1-S I-50-16F TEE TO VALVE C.F-1 PI'C5~21H UT 2-3-4-<<*3378027 (4-SS-120-.430)**
329160 1-SI-50-17F VALVE TO PIPE C.F-1 Pj'5.21H UT 2.3-4**3378027 (4-SS-120-.430)*>>
329170 1-SI-50-'IBS PIPE TO TEE C.F-1 PT 1 CS~21H UT 2-3-4*>>3378027 (4-SS-120-.430)>>>>
329180 1.SI-50-19S TEE TO PIPE C.F-1 PT 1-C5.21H UT 2-3-4-**3378027 (4.SS-120-.430)**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 239 EMERGENCY CORE COOLING SYSTEH
SUMMARY
EXAMINATION AREA HUMBER IDENTIFICATION INSPECTION INTERVAL J FIRST'SME PERIOD SEC.XI I CATGY NDE ITEH NO METH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD-0 U T A G E------1 2 3 4 1 2 3 I INSTRUCTIONS
329200 1-SI-50-21S ELBOW TO PIPE C-F-1 PT 1-C5.21H UT 2-3-4-**3378027 (4-SS-120-.430)**
329210 1-SI-50.22S PIPE TO BEND C-F-1 PT 1 C5.2'IH UT 2-3.4-**3378027 (4-SS-120-.430)>>>>
329220 1-SI-50.23F BEHD TO VALVE C-F-1 PT 1 C5.21H UT 2-3-4-**3378027 (4-SS-120..430)**
329230 1.SI-50.24F VALVE TO PIPE C F1 PT 1 C5.21H UT 2.3-4>>*3378027 (4-SS-120..430)*>>
329240 1-SI-50.25S PIPE TO TEE C-F-1 PT 1 C5.2'IH UT 2 3-4**3378027 (4-SS-120-.430)**
329250 1-$1-50-26S TEE TO ELBOW CF1 PT 1~C5.21H O'I 2-3-4**3378027 (4-SS-120-.430)>>*
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UHIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 240 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I F IRST ASHE i PERIOD SEC~XI I-CATGY NDE I ITEM NO METH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I I OUTAGE I 1 2 3 4 1 2 3 INSTRUCTIONS
329270 1-Sl-50-28F PIPE TO TEE C-F 1 PT 1-C5.21H UT 2.3-4~*3378027 (4-SS-120-.430)~>>
329280 1-SI-50.29F TEE TO PIPE C-F-1 PT 1 C5~21H UT 2-3.4-**3378027 (4.SS.120-.430)*~
329290 1-SI-50-30S PIPE TO REDUCING ELBOW C-F-1 PT 1 C5.21H UT 2-3-4**3378027 (4-SS-120-.430)**
329300 1-SI-50.31F REDUCING ELBOW TO NOZZLE C-F-1 PT 1 C5.21H UT 2-3-4-X~~3378028 (6-SS-160-.71)**
LINE 1-SI-51 FIG NO B.85 330000 1-S I-51-01F NOZZLE TO REDUCING ELBOW C-F-1 PT 1 C5.21H UT 2-3-4-X~*3378028 (6-SS-160-.71)**
330010 1-SI-51-02S REDUCING ELBOW TO PIPEOW C-F-'I PT 1 C5.21H UT 2-3-4-**3378027 (4-SS-120-.430)**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPOHENTS PAGE: 241 EMERGENCY CORE COOLING SYSTEM SUMHARY EXAHINAI'ION AREA NUHBER IDENTIFICATION FIRST PERIOD INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE ITEM NO METH i 1 2 3 PLAN STATUS SECOHD THIRD PERIOD PERIOD I-I-OUTAGE---
--I 1 2 3 4 1 2 3 INSTRUCTIONS
<<*CALIBRATION BLOCK**LINE 1.SI 51 FIG NO B-BS 330020 1-SI-51-03S PIPE TO ELBOW C.F.1 PT 1-C5.21H UT 2-3.4>>*3378027 (4-SS-120-.430)*>>
330030 1-Sl-51-04F ELBOW TO PIPE C-F-1 PT C5.21H UI'.2-3-4-**3378027 (4.SS-120..430)*>>
330040 1-SI.51'5S PIPE TO ELBOW C-F-1 PT C5.21H UT 1-2-3-4-**3378027 (4-SS-120-.430)*>>
330050 1-SI-51-06F ELBOW TO PIPE C-F-1 PT C5.21H UT 2-3-4.**3378027 (4-SS-120-.430)**
330060 1-SI-51-07S PIPE TO ELBOW C-F-1 PT 1-C5.21H UT 2-3-<<*3378027 (4-SS-120-.430)**
330070 1-SI~51.08S ELBOW TO PIPE C-F-1 PT 1 C5.21N UT 2-3-4-**3378027 (4-SS-120..430)**
330080 1.SI-51-09F PIPE TO PIPE C-F-1 PT 1 C5.21H UT 2-3-4>>*3378027 (4-SS-120-.430)*>>
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 242 EHERGENCY CORE COOLING SYSTEH SUHHARY EXAHI HAT I OH AREA NUHBER IDENT I F I CAT IOH INSPECT I OH INTERVAL I F IRST ASHE PERIOD SEC.XI I CATGY NDE ITEM NO NETH J 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE 1 2 3 4 1 2 3 I I I IHSTRUCTIOHS
<<*CALIBRATION BLOCK*<<LINE 1-SI-51 FIG NO 8.85 330090 1-SI-51-10S PIPE TO ELBOW C-F-1 PT 1 C5.21H UT 2-3-4**3378027 (4-SS-120..430)<<<<
330100 1-Sl-51-11F ELBOW TO PIPE C-F-1 PT 1 C5.21H UT 2-3-4<<*3378027 (4-SS-120..430)**
LINE 1-SI-51 FIG NO B-86 330200 1-SI 51 12S PIPE TO ELBOW C-F-1 PT 1-C5.21H UT 2-3-4.**3378027 (4-SS.120-.430)**
330210 1-SI-51-13S.ELBOW TO BEND C-F-1 PT 1 C5.21H UT 2-3-4-**3378027 (4-SS-120-.430)<<<<
330220 1-SI-51-14S BEND TO TEE C-F-1 PT 1 C5.21H UT 2-3.4-*<<3378027 (4.SS.120-.430)**
330230 1-SI-51-15F TEE TO PIPE C-F-1 PT 1 C5.21H UT 2-3-4**3378027 (4-SS-120-.430)**
330240 1-SI-51 16S PIPE TO ELBOW CF1 PT 1-C5.21H UT 2.3.4-<<*3378027 (4.SS.120-.430)**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPOHENTS PAGE: 243 EMERGENCY CORE COOLING SYSTEM SUMHARY EXAMINATION AREA NUMBER IDENT I F ICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE I ITEH NO METH i 1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I-0 U T A G E------I 2 3 1 2 3 4 1 2 3 I IHSTRUCTIOHS
330270 1-SI-51-19F BEND TO VALVE C-F-1 PT 1-C5.21H UT 2-3.4-X~~3378027 (4-SS-120-.430)**
330330'I-SI-51.25F VALVE TO PIPE C-F-1 PT 1 C5.21H UT 2-3-4-**3378027 (4-SS-120-.430)**
330340 1-S I-51-26S PIPE TO TEE C-F-1 PT 1 C5.21H UT 2-3-4-**3378027 (4-SS-120-.430)**
L'INE 1-SI-74 FIG HO B-87 330500 1-SI-74-01F PENETRATION 068 TO ELBOW C-F-1 PT C5.21H UT 1-2-3-X 4-~*3378027 (4-SS-120-.430)~~
330510 1-SI-74.02S ELBOW TO ELBOW C-F-1 PT 1 C5.21H UT 2-3-4**3378027 (4-SS-120-.430)**
DATE: 11/15/95 REVI S ION:.0 COOK NUCI.EAR PLANT UNIT'I INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 244 EMERGENCY CORE COOLING SYSTEH
SUMMARY
EXAHINAT I OH AREA NUMBER IDENT I F I CAT IOH INSPECTION IHTERVAL I FIRST ASHE PERIOD SEC.XI I CATGY NDE ITEM NO METH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD I 0 U T A G E------I INSTRUCTIONS 1 2 3 4 I 2 3 I*~CALI BRAT ION BLOCK**LINE 1 SI 74 FIG HO B-87 330520 1-SI-74-03S ELBOW TO PIPE C-F-1 PT 1-C5.21H UT 2.3-~*3378027 (4-SS-120-.430)**
330530 1-SI-74-04S PIPE TO ELBOW C-F 1 PT C5~21H UT 2-3.4~~3378027 (4-SS-120-.430)~*
330540 1.SI.74-05S ELBOW TO PIPE C-F-1 PT 1-C5.21H UT 2-3-4-**3378027 (4-SS-120-.430)**
330550 1-SI-74-06S PIPE TO ELBOW CF1 PT 1-C5.21H UT 2-3-4-~~3378027 (4-SS-120-.430)**
330560 1-SI-74-07S ELBOW TO PIPE C-F-1 PT 1-C5.21H UT 2.3-4**3378027 (4.SS-120-.430)~>>
330570 1-SI-74-08S PIPE TO ELBOW C-F-1 PT C5.21H UT 2-3-4-**3378027 (4.SS.120..430)**
330580 1-SI-74-09S ELBOW TO PIPE C-F-1 PT 1 C5.21H UT 2-3-4**3378027 (4.SS-120-.430)*~
DATE: 11/15/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LOHG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 245 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAHINATI OH AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I FIRST ASHE I PERIOD SEC.XI I CATGY NDE I ITEM NO METH I 1 2 3 PLAN STATUS SECOHD PERIOD THIRD I PERIOD I-t OUTAGE------I 1 2 3 4 1 2 3 I INSTRUCTIONS
330600 1-S I-74-11F REDUCER TO PIPE C-F-1 PT C5.21H UT 2-3-4-*>>2.SS.160-.344-6-DCC
<<330610 1-SI-74-12F PIPE TO VALVE C-F-1 PT 1 C5.21H UT 2-3-4-<<*2-SS-160-.344-6-OCC**
330620 1-SI-74-13F VALVE TO PIPE C-F-1 PT 1 C5.21H UT 2-3-4**2-SS-160-.344-6-DCC**
330630 1-SI 74-14F PIPE TO REDUCER CF1 PT 1-C5.21H UT 2-3-4**2-SS-160-.344-6-OCC**
330640 1-Sl-74-15F REDUCER TO VALVE C-F-1 PT 1 C5.21H UT 2-3-4**3378027 (4-SS-120-.430)*>>
330650 1-SI-74-16F VALVE TO PIPE C-F-1 PT C5.21H UT 1-2-3-4<<*3378027 (4-SS-120-.430)**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPOHEHTS PAGE: 246 EMERGENCY CORE COOLING SYSTEM SUMHARY EXAMINAT I OH AREA NUHBER IDEHT I F I CAT IOH INSPECT I OH IHTERVAL I FIRST ASME PERIOD SEC.XI I CATGY HDE I ITEM NO METH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE-1 2 3 4 1 2 3 I I INSTRUCTIONS I<<*CALIBRATION BLOCK**LINE 1-SI-74 FIG HO B-87 330660'I-SI-74-17S PIPE TO ELBOW C-F-1 PT 1 C5.21H UT 2-3-**3378027 (4-SS-120-.430)**
330670 1-SI-74-18S ELBOW TO PIPE C-F-1 PT 1-C5.21H UT 2-3-**3378027 (4 SS 120.430)<<<<330680 1-SI-74-19S PIPE TO ELBOW C-F-1 PT 1-C5.21H UT 2-3-4<<*3378027 (4-SS-120-.430)**
330690 1-SI-74-20S ELBOW TO PIPE C-F-1 PT 1 C5.21H UT 2-3-4**3378027 (4-SS-120-.430)<<<<
330700 1-SI-74-21F PIPE TO BRANCH COHNECTION C-F-1 PT C5.21H UT 2-3-4<<*3378027 (4-SS-120-.430)**
LINE 1-Sl-80 FIG NO B.88 331000 1.SI-80.01F
.TEE TO VALVE C-F 1 PT CS~21H UT 2-3-4 X*<<3378027 (4-SS-120-.430)**
331010 1-SI-80.02F VALVE TO PIPE C-F-1 PT 1.C5~21H UT 2-3-**3378027 (4-SS-120-.430)*<<
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 247 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAHI HAT I ON AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE I ITEM NO METH I 1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I-I-..--0 U T A G E------I 2 3 1 2 3 4 1 2 3 I INSTRUCT'IONS
331030 1-SI-80-04S ELBOW TO PIPE C-F.1 PT 1.C5.21H UT 2-3-**3378027 (4-SS-120-.430)**
331040 1-SI-80.05S PIPE TO ELBOW C-F-1 PT 1.C5.21H UT 2-3-4**3378027 (4-SS-120-.430)**
331050 1-SI.80.06S ELBOW TO PIPE C-F-1 PT 1-C5.21H UT 2-3-4-+*3378027 (4-SS-120-.430)**
331060 1-SI-80-07S PIPE TO ELBOW C-F-1 PT 1 C5.21H UT 2-3.4-**3378027 (4-SS-120-.430)**
331070 1-SI-80.08S ELBOW TO PIPE C F1 Pl'C5.21H UT 2.3-4+*3378027 (4-SS-120-.430)**
331080 1-SI-80-09S PIPE TO ELBOW C-F-1 PT C5.21H UT 2.3-4**3378027 (4-SS-120-.430)**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 248 EMERGENCY CORE COOLING SYSTEH SUHHARY EXAHI HAT I ON AREA NUHBER IDENTIFICATIOH INSPECTION INTERVAL I FIRST ASME PERIOD SEC.XI I CATGY NDE ITEH NO NETH i 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I OUTAGE------I 1 2 3 4 1 2 3 I INSTRUCT IONS~ICAL I BRAT ION BLOCK**LINE 1.SI-BO FIG NO 8-88 331090 1-SI-80-10S ELBON TO PIPE C F-1 PT 1 C5.21H UT 2-3.4**3378027 (4-SS.120.430)*~331100 1-SI-80-11S PIPE TO ELBDM C-F-'I PT 1 C5.21H UT 2-3-4-**3378027 (4-SS.120..430)**
331110 1-SI-80-12S ELBOM TO PIPE C-F-1 Pr C5~21H UT 2-3-4**3378027 (4-SS-120..430)~~
331120 1.SI-80.13S PIPE TO ELBOM C-F-1 PT 1-C5.21H UT 2-3-4**3378027 (4-SS-120-.430)~~
331130 1.SI.80-14S ELBOM TO.PIPE CF1 PT 1-C5.21H UT 2-3-4**3378027 (4-SS-120-.430)**
331140 1-S I-80-15S PIPE TO ELBOW C-F-1 PT'I C5~2'IH UT 2-3-4-**3378027 (4-SS.120-.430)*~
331150 1.SI.80.16S ELBOM TO PIPE C.F-1 PT 1-C5.21H UT 2-3.4**3378027 (4-SS-120..430)~*
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 249 EMERGENCY CORE COO!.ING SYSTEM
SUMMARY
EXAMIHAT I OH AREA NUMBER IDENT I F ICATION INSPECTION INTERVAL I FIRST ASME PERIOD SEC.XI I CATGY NDE I ITEM NO METH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD 0 U T A G E------I INSTRUCTIONS 1 2 3 4 1 2 3 J**CALIBRATION BLOCK**LINE 1-Sl-80 FIG NO B-88 331160 1-SI.80.17S PIPE TO ELBOW C-F-1 PT 1-C5.21H UT 2-3-4**3378027 (4-SS-120-.430)**
331170 1-SI-80-18S ELBOW TO PIPE C-F-1 PT 1 C5.21H UT 2-3~4**3378027 (4-SS-120-.430)**
331180'I.SI-80.'19S PIPE TO ELBOW CF1 PT 1 C5.21H UT 2-3-4*~3378027 (4-SS-120-.430)*~
331190 1-SI-80-20S ELBOW TO PIPE C-F-1 PT 1 C5.21H UT 2-3-4-**3378027 (4-SS-120-.430)**
331200 1-SI-80-21S PIPE TO ELBOW C F-1 PT 1 C5.21H UT 2-3-4-**3378027 (4.SS-120-.430)**
331210 1-$1-80.22S ELBOW TO PIPE C-F-1 PT 1 C5.21H UT 2-3-4**3378027 (4.SS.120..430)14 331220 1-SI-80-23S PIPE TO ELBOW CF1 PT 1 C5.21H UT 2-3-4-**3378027 (4-SS-120..430)**
DATE: 1'I/15/95 REVISIOH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPONEHTS PAGE: 250 EHERGENCY CORE COOLING SYSTEH SUHHARY EXAHIHATI OH AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE I ITEN HO NETH PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I I OUTAGE I 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
331240 1.SI-80-25S PIPE TO ELBOW C-F-1" PT 1-C5.21H UT 2-3-4-<<>>3378027 (4-SS-120-.430)*>>
331250 1-SI-80-26S ELBOW TO PIPE C-F-1 PT 1 C5.21H UT 2-3-4**3378027 (4-SS-120..430)**
331260 1-SI-80-27S PIPE TO ELBOM C-F-1 PT 1 C5.21H UT 2-3-4<<*3378027 (4-SS.120..430)**
331270 1-SI-80-28S ELBOM TO ELBOW C-F-'I PT 1-C5.21H UT 2-3-4->><<3378027 (4-SS-120..430)>>>>
331280 1-SI-80-29S ELBOM TO VALVE C-F-1 PT 1 C5.21H UT 2-3-4 X<<<<3378027 (4-SS-120-.430)**
331290 1-$1-80-30S VALVE TO PIPE CF1 PT 1 C5.21H UT 2-3-4-*<<3378027 (4-SS-120..430)**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 251 EMERGENCY CORE COOLING SYSTEH SUHHARY EXAMI HAT IOH AREA NUHBER IDENT I F ICATION INSPECTION INTERVAL I ASME I SEC.XI[CATGY NDE I ITEH NO METH I FIRST PERIOD PLAN STATUS SECOND PERIOD-OUTAGE-1 2 3 1 2 3 4 THIRD I PERIOD I I 2 3 I INSTRUCT'IONS
~~CALIBRATION BLOCK~~LINE 1-S!-80 FIG NO B-88 331300 1-SI-80.31S PIPE TO ELBmI C-F-1 PT 1-C5.21H UT 2-3.4**3378027 (4-SS-120-.430)**
331310 1-S I-80.32S ELBOM TO PIPE C-F-1 PT 1 C5.21H UT 2-3.4**3378027 (4-SS-120..430)*~
331320 1-SI-80-33F PIPE TO TEE C-F-1 PT C5.21H UT 1-2-3-X**3378027 (4.SS-120-.430)**
DATE: '11/15/95 REVISION: 0 COOK NUCLEAR PLANT UHIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 252 SUMHARY EXAMINATION AREA NUHBER IDENT IF I CATION INSPECTION INTERVAL CHEMICAL AND VOLUME CONTROL SYSTEM I FIRST ASHE I PERIOD SEC.XI I CATGY NDE I ITEH NO METH/1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD-OUTAGE---1 2 3 4 1 2 3 I I I I INSTRUCTIONS
- +CALIBRATION BLOCK*a LINE 1-CS-32 FIG NO B-89 332000 1-CS-32.01F REDUCER TO PIPE C-F-1 PT 1 C5.21H UT 2-3-4<<~3378026 (3-SS-160-.430)**
332010 1-CS-32-02F PIPE TO PIPE C-F.1 PT 1-C5.21H UT 2-3-4 X*~3378026 (3-SS 160-.430)~~
332020 1-CS-32-03S PIPE TO ELBOM C-F-1 PT 1-C5.21H UT 2-3-4**3378026 (3.SS-160-.430)**
332030 1-CS-32.04S ELBOM TO PIPE CF1 PT 1-C5.21H UT 2-3-4-~~3378026 (3-SS-160-.430)~*
332040 1-CS-32-05S PIPE TO ELBSI C-F-1 PT 1 C5.21H UT 2-3-4-~~3378026 (3-SS.160-.430)**
332050 1-CS-32-06S ELBSI TO PIPE C-F.1 PT 1 C5.21H UT 2-3-4**3378026 (3-SS-160-
~430)**332060 1-CS-32-07S PIPE TO ELBSI C-F.1 PT 1.C5.21H UT 2.3.4**3378026 (3-SS-160-.430)*~
DATE: 11/15/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 253
SUMMARY
EXAHIHAT I OH AREA NUMBER IDENTIFICATION IHSPECTION INTERVA'HEMICAL AND VOLUME CONTROL SYSTEM I ASHE I SEC.XI I CATGY NDE I ITEM NO METH FIRST PLAH STATUS SECOND PERIOD PERIOD--OUTAGE 1 2 3 1 2 3 4 THIRD PERIOD 1 2 3 I I I I INSTRUCTIONS I~~CALIBRATION BLOCK~~LINE 1-CS-32 FIG NO 8-89 332070 1-CS-32-08S ELB(XI TO PIPE C-F-1 PT 1-C5.21H ur 2-3-4-~~3378026 (3-SS-160-.430)~~
332080 1-CS.32-09S PIPE TO VALVE C-F-1 PT 1 C5.21H UT 2-3.4.**3378026 (3-SS-160-.430)**
332090 1-CS-32-10S VALVE TO PIPE C-F-1 PT 1 C5.21H UT 2.3-4-**3378026 (3-SS-160-.430)**
332100 1-CS.32-11S PIPE TO ELBSI C-F-1 PT C5.21H UT 2-3-4**3378026 (3-SS-160-.430)**
332110 1-CS.32-12S ELBOM TO PIPE C-F-1 PT 1 C5.21H UT 2-3-X 4.**3378026 (3-SS-160-.430)**
332120 1-CS.32-13S PIPE TO VALVE C-F-1 PT 1 C5.21H UT 2-3-4-**3378026 (3-SS-160..430)**
332130 1.CS-32-14S VALVE TO PIPE C-F-1 PT 1 C5.21H UT 2-3-4**3378026 (3-SS-160-.430)*>>
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLAN'I UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 254
SUMMARY
EXAMINATION AREA NUHBER IDENT I F I CATION INSPECT ION INTERVAL CHEMICAL AND VOLUME CONTROL SYSTEM I ASME I SEC~XI CATGT HDE J ITEM-HO METH/1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD J-0 U T A G E------I 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
332150 1.CS-32-16S ELBOll TO PIPE C-F-1 PT 1 C5.21H UT 2-3.4>>*3378026 (3-SS-160..430)**
332'I60 1.CS-32-17S PIPE TO VALVE CF1 PT 1-C5.21H UT 2.3.-~4>>>>3378026 (3-SS-160-.430)**
332170 1.CS-32.18S VALVE TO PIPE C-F-1 PT 1 C5.21H UT 2-3-**3378026 (3-SS-160-.430)**
332180 1-CS-32-19S PIPE TO ELBOU C-F-1 PT 1-C5.21H UT 2-3-4.*>>3378026 (3-SS.160-.430)**
332190 I-CS-32-20S ELBSI TO PIPE C-F-1 PT 1 C5.21H UT 2-3-4**3378026 (3-SS-160-.430)>>*
332200 1-CS-32-21S PIPE TO TEE C-F-1 PT 1 C5.21H UT 2.3-4**3378026 (3-SS-160-.430)**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 255
SUMMARY
EXAMINATION AREA NUMBER IDENT IF ICATION INSPECTION INTERVAL CHEMICAL AND VOLUME CONTROL SYSTEM I ASME I SEC.XI I CATGY NDE I ITEM NO METH I PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I OUTAGE I 1 2 3 1 2 3 4 1.2 3 I INSTRUCTIONS
332220 1-CS-32-23S PIPE TO ELBSI CF1 PT 1-C5.21H UT 2.3-4-**3378026 (3-SS-160..430)**
332230 1-CS-32-24S ELBON TO VALVE C.F-1 PT 1-C5.21H UT 2.3-4**3378026 (3-SS.160..430)*>>
332240 1.CS-32-25S VALVE TO PIPE C-F-1 PT'C5.21H UT 2-3-4**3378026 (3-SS-160-.430)**
332250 1-CS-32-26S PIPE TO VALVE C-F-1 PT 1 C5.21H UT 2-3-4**3378026 (3-SS.160-.430)**
332260 1.CS-32-27S VALVE TO ELBOU C-F-1 PT C5.21H UT 2-3-4**3378026 (3-SS-160-.430)**
332270 1-CS-32-28S ELBOU TO PIPE C-F-1 PT 1-C5.21H UT 2-3--4**3378026 (3-SS-160-.430)>>>>
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTIOH LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 256
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL CHEMICAL AND VOLUME CONTROL SYSTEM I ASME I SEC.Xl CATGY NDE I ITEM NO METH I PLAN STATUS FIRST-SECOND THIRD PERIOD PERIOD PERIOD-OUTAGE-1 2 3 1 2 3 4 1 2 3 I I I I INSTRUCTIONS
332290 PCS-32-30S ELBOW TO PIPE C-F-1 PT C5.21H UT 2-3-4~~3378026<3-SS-160-.430)**
332300 1-CS-32-31S PIPE TO TEE C-F-1 PT 1-C5.21H UT 2-3 X 4-**3378026 (3-SS-160..430)*~
332310 1.CS.32-32S TEE TO PIPE C-F-1 PT 1-C5.21H UT 2-3-**3378026<3-SS-160-.430)**
332320 1-CS-32-33S PIPE TO FLANGE C-F-1 PT 1 C5.21H UT 2-3-4.**3378026<3-SS-160-.430)~*
332330 1.CS-32-34S FLAHGE TO PIPE C-F-1 PT 1 C5.21H UT 2-3-4~~3378026 (3-SS-160-.430)**
332340 1-CS-32-35S PIPE TO ELBOW C-F-1 PT C5.21H UT 1-2-3-4**3378026 (3-SS.160-.430)~>>
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLAHT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 257 SUHMARY EXAHIHATIOH AREA NUHBER IDENT IF I CAT ION INSPECTION INTERVAL CHEHICAL AND VOLUME CONTROL SYSTE t ASME I SEC.XI I CATGY HDE ITEM HO METH I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD-OUTAGE-1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
332360 1-CS-32-37S PIPE TO TEE CF1 PT 1-C5.21H UT 2-3-4**3378026 (3-SS-160-.430)
332380 1.CS-32-39S PIPE TO ELBOW C-F-1 PT C5.21H UT 2-3-4-**3378026 (3-SS-160-430)**332390 1-CS-32.40S ELBOW TO PIPE C-F-1 PT 1 C5.21H UT 2-3-4**3378026 (3.SS-'160..430)~~
332400 1-CS-32-41S PIPE TO ELBOW C-F-1 PT 1 C5.21H UT 2-3-4-**3378026 (3-SS-160-.430)~*
332410 1-CS-32.42S ELBOW TO PIPE C-F-1 PT 1 C5.21H UT 2-3-4**3378026 (3-SS.160-.430)**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 258 SUHHARY EXAHI HAT ION AREA NUHBER IDENT IF ICATION INSPECTIOH INTERVAL CHEHICAL AND VOLUHE CONTROL SYSTEH I ASHE I SEC.XI I CATGY NDE ITEH HO HETH I PLAN STATUS FIRST SECOND PERIOD PERIOD---OUTAGE-1 2 3 1 2 3 4 THIRD PERIOD 1 2 3 I I I I INSTRUCTIONS
LINE 1-CS-34 FIG NO B-90 333000 1-CS-34-01F FLANGE TO PIPE C-F-1 PT 1-C5.21H UT 2-3-4**3378027 (4-SS-120..430)<<*
333010 1-CS-34-02F PIPE TO ELBOlI C-F-1 PT 1 C5.21H UI'-3-4**3378027 (4-SS-120-.430)<<*
333020 1-CS-34-03S ELBNI TO ELBNI C-F-1 PT 1 C5.21H UT 2-3.4<<<<3378027 (4-SS-120-.430)<<*
333030 1.CS-34.04S ELBNI TO PIPE C-F-1 PT 1 C5.21H UT 2-3-4-X*<<3378027 (4-SS-120-.430)*<<
333040 1-CS-34-05S PIPE TO ELBDM C-F-1 PT 1 C5.21H UT 2-3.4*<<3378027 (4.SS-120-.430)**
333050 1-CS-34-06S ELBOU TO TEE C-F-1 PT 1 C5.21H UT 2-3-4-*<<3378027 (4-SS.'120-.430)**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONEHTS PAGE: 259 SUHMARY EXAHIHAT I ON AREA NUMBER IDENT IF I CAT I OH INSPECTION INTERVAL CHEMICAL AND VOLUME CONTROL SYSTEM I 1 ASME I SEC.XI I CATGY NDE ITEM HO METH I PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I I------OUTAGE--
I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
333070 1-CS-34-OBF ELBOW TO VALVE CF1 PT 1 C5.21H UT 2-3-4-**3378027 (4-SS-120..430)**
333080 1.CS.34-09F VALVE TO TEE C-F-1 PT 1 C5.21H UT 2-3.4**3378027 (4-SS-120-.430)**
333090 1-CS-34-10S TEE TO PIPE C-F-1 Pr 1-C5.21H UT 2-3-4**3378027 (4-SS-120-.430)**
333100 1-CS.34-11F PIPE TO VALVE C-F-1 PT 1 C5.21H U1'-3-4.**3378027 (4-SS-120-.430)**
333110 1-CS-34-12S TEE TO PIPE CF1 PT 1 C5.21H UT 2.3.4-~~3378027 (4-SS-120-.430)**
333120 1-CS-34-13F PIPE TO VALVE C-F-1 PT 1 C5.21H UT 2.3-4**3378027 (4-SS-'I20-.430)**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 260
SUMMARY
EXAHI HAT I OH AREA NUMBER IDENT IF ICATION INSPECTION INTERVAL CHEMICAL AND VOLUME CONTROL SYSTEM FIRST ASME PERIOD SEC.XI I CATGY NDE ITEH NO METH/1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE I 1 2 3 4 1 2 3 I INSTRUCTIONS
- >>CALIBRATION BLOCK*>>LINE 1-CS-34 FIG NO B-90 333130 1-CS-34-14F VALVE TO PIPE C-F-1 PT C5.21H UT 1 2 3-4-<<*3378027 (4-SS.120..430)>>>>
333140 1-CS-34-15S ELBOW TO PIPE C-F-1 PT 1-C5.21H UT 2-3-4-**3378027 (4 SS 120.430)>>>>333150 1-CS-34-16F PIPE TO TEE C-F-1 Pi'-C5.21H Ui'-3-4.*>>3378027 (4-SS-120-.430)>>>>
333160 1-CS.34-17F TEE TO ELBOW C-F-1 PT 1 C5.21H UT 2-3.X 4-**3378027 (4-SS.120..430)**
333170 1-CS-34-18S ELBOW TO PIPE C-F-1 PT 1 C5.21H UT 2-3-**3378027 (4-SS-120-.430)**
333180 1-CS-34-19S PIPE TO ELBOW CF1 PT 1-C5.21H UT 2-3-4>>>>3378027 (4-SS-120-.430)>>>>
333190 1-CS-34-20S ELBOW TO PIPE C-F-1 PT 1 C5.21H UT 2 3.4**3378027 (4-SS-120-.430)>>>>
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LOHG TERM PLAN CLASS 2 ALL S'TATUS COMPONENTS PAGE: 261 SUHMARY EXAMIHATIOH AREA NUMBER IDENTIFICATION INSPECTION INTERVAL CHEMICAL AND VOLUME CONTROL SYSTEH I FIRST ASME PERIOD SEC.Xl I-CATGY NDE I ITEM NO METH i 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PER!OD (-l-0 U T A G E------I 1 2 3 4 1 2 3 I IHSTRUCTIONS
333210 1.CS-34-22S FLANGE TO PIPE C-F-1 PT C5.21H UT 1-2-3-4**3378027 (4-SS-120-.430)**
333220 1-CS-34-23S ELBSl TO PIPE C-F-1 PT 1 C5.21H UT 2-3.4**3378027 (4-SS.120..430)~*
333230 1-CS-34-24S ELBNI TO ELBOW C-F-1 PT 1-C5.21H UT 2-3-4**3378027 (4-SS-120-.430)**
333240 1-CS-34-25S ELBOM TO PIPE C.F-1 PT 1-C5.21H UT 2-3-4**3378027 (4-SS-120..430)**
333250 1-CS-34-26S PIPE TO ELBNI C-F-1 PT 1 C5.21H Ur 2-3-**3378027 (4-SS-120-.430)**
333260 1-CS-34.27S ELBOLI TO PIPE C-F 1 PT 1 C5~21H UT 2-3.4*~3378027 (4-SS-120-.430)~*
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 262
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL CHEMICAL AND VOLUME CONTROL SYSTEM I ASME I SEC.XI I CATGY NDE I ITEM NO METH I PLAN STATUS FIRST SECOHD THIRD PERIOD PERIOD PERIOD I------OUTAGE----
I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- ~CALIBRATION BLOCK~~LIHE 1-CS-34 FIG NO B-90 333270 1-CS-34-28S PIPE TO ELBOM C-F-1 PT 1 C5.21H UT 2-3-4-**3378027 (4-SS.120..430)~~
333280 1-CS-34-29F ELBOM TO VALVE C-F-1 PT 1 C5.21H UT 2-3-4**3378027 (4-SS-120..430)**
333290 1.CS-34-30F VALVE TO TEE C.F.1 PT 1.C5.21H UT 2-3-4-**3378027 (4-SS-120-.430)**
333300 1-CS-34-31S TEE TO PIPE C-F-1 Pl'C5.21H UT 2-3.4*~3378027 (4-SS-120-.430)**
333310 1-CS-34.32F PIPE TO VALVE C-F-1 PT 1-C5~21H Ul'-3.4-~~3378027 (4-SS-120-.430)**
333320 1-CS-34.33F TEE TO PIPE C-F-1 PT 1 C5.2'IH UT 2-3-4-**3378027 (4-SS-120-.430)*~
333330 1-CS-34-34F PIPE TO VALVE C-F-1 PT 1 C5.21H UT 2-3-4-**3378027 (4-SS-120..430)**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTIOH LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 263
SUMMARY
EXAMINATION AREA NUHBER IDENT IF I CAT I OH INSPECTION INTERVAL CHEHICAL AND VOLUME CONTROL SYSTEM I ASME I SEC.XI I CATGY NDE I ITEH NO METH I F IRST PERIOD PLAN STATUS SECOND THIRD PERIOD PERIOD------OUTAGE-I 1 2 3 1 2 3 4 1 2 3 INSTRUCTIONS
- <<CALIBRATION BLOCK<<<<LINE 1-CS-34 FIG NO B-90 333340 1.CS-34-35F VALVE TO ELBOW C-F-1 PT C5.21H UT 2-3-4-<<*3378027 (4.SS-120-.430)*<<
333350 1-CS-34.36S ELBOW TO PIPE C-F-1 PT 1 C5.21H UT 2-3-4-<<*3378027 (4.SS-120-.430)<<*
333360 1-CS-34.37S PIPE TO ELBOW C-F-1 PT C5~21H UT 1-2-3-4**3378027 (4-SS-120-.430)**
333370 1-CS-34-38S ELBOW TO PIPE C-F-1 PT 1-C5.21H UT 2-3 X 4-**3378027 (4-SS-120..430)**
333380 1-CS-34.39S PIPE TO ELBOW C-F-1 PT 1 C5.21H UT 2-3.4<<<<3378027 (4-SS-120-.430)**
333390 1-CS-34-40S ELBOW TO PIPE C-F-1 PT 1 C5.21H UT 2-3-4-**3378027 (4-SS-120..430)**
333400 1-CS.34-41F PIPE TO TEE C-F-1 PT 1 C5.21H UT 2-3-4-**3378027 (4-SS-120-.430)**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 264 SUHHARY EXAMINATION AREA NUMBER IDENT I F I CAT ION'NSPECTIOH INTERVAL CHEMICAL AND VOLUME CONTROL SYSTEM I ASME I SEC.XI I CATGY NDE I ITEM HO METH J PLAN STATUS FIRST SECOHD THIRD PERIOD PERIOD PERIOD-OUTAGE-1 2 3 1 2 3 4 1 2 3 I I I INSTRUCTIONS I**CALIBRATION BLOCK**LINE 1-CS-34 FIG NO B-90 333410 1.CS.34-42S TEE TO REDUCER C-F-1 PT 1 C5.21H UT 2-3-4-**3378027 (4-SS.120-.430)
<<<<333420 1.CS.34-43S TEE TO PIPE C-F-1 PT 1-C5.21H UT 2.3-4-<<*3378027 (4-SS-120..430)<<*
333430 1.CS.34-44S PIPE TO TEE C-F-1 PT 1 C5.21H UT 2 3.4-<<<<3378027 (4-SS-120-.430)**
333440 1-CS-34-45F VALVE TO ELBOH CF1 PT 1 C5.21H UT 2-3-4 X**3378026 (3-SS-160-.430)**
333450 1-CS-34-46S ELBOM TO PIPE C-F-1 PT 1 C5.21H UT 2-3-4.**3378026 (3-SS-160..430)<<<<
333460 1-CS-34-47F PIPE TO TEE C-F-1 PT 1-C5.21H UT 2-3-4*<<3378026 (3-SS-160-.430)**
333470'I-CS-34-48F TEE TO VALVE C F-1 PT C5.21H UT 1-2-3-4**3378026 (3.SS-160-.430)<<*
DATE: 11/15/95 REVISIOH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE IHSPECTIOH LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 265
SUMMARY
EXAHINAT I ON AREA NUMBER IDENTIFICATION INSPECTION INTERVAL CHEMICAL AND VOLUME CONTROL SYSTEM I ASME I SEC.Xl CATGY NDE I ITEM NO METH I 1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD-I---OUTAGE-
--I 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK**LINE 1-CS-34 FIG NO B.90 333480 1-CS-34.49F TEE TO TEE C-F-1 PT 1 C5.21N Ul'-3-4-**3378026 (3-SS-160.
~430)**333490 1-CS-34.50F TEE TO ELBOW C-F-1 PT C5.21H=UT 1-2-3-4<<*3378026 (3-SS-160-.430)>>>>
333500 1-CS-34.51S ELBOW TO PIPE C-F-1 PT'1-C5.21H UT 2-3-4**3378026 (3-SS-160-.430)**
333510 1-CS-34-52S PIPE TO ELBOW C-F-1 PT 1 CS~21H UT 2-3-4**3378026 (3-SS-160-.430)**
333520 1-CS-34-53S ELBOW TO PIPE C-F-1 PT C5~21H UT 2-3-4-**3378026 (3.SS-160-.430)<<>>
333530 1.CS.34-54S PIPE TO ELBOW C-F-1 PT 1 C5.21H UT 2-3-4-<<*3378026 (3-SS-160..430)**
333540 1-CS-34-55S ELBOW TO PIPE C-F-1 PT 1 C5.21H UT 2-3-4<<>>3378026 (3-SS-160-.430)<<<<
OATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPOHENTS PAGE: 266
SUMMARY
EXAMINATION AREA NUHBER IDENT IF I CAT I OH'NSPECTION INTERVAL CHEMICAL AND VOLUME CONTROL SYSTEH I ASHE I SEC.XI I CATGY NDE I ITEH NO METH I 1 PLAN STATUS FIRST SECOND THIR0 PERICO PERIOO PERIOO-I-----OUTAGE------
I 2 3 1 2 3 4'2 3 I INSTRUCTIONS
- <<CALIBRATIOH BLOCK<<<<INE 1-CS-34 FIG NO B-90 333550 1-CS.34.56S PIPE TO PIPE C-F-1 PT 1 C5.21H UT 2-3-4-**3378026 (3-SS-160-.430)<<<<
333560 1.CS-34-57S PIPE TO ELBSI C-F-1 PT 1-C5.21H UT 2-3-4**3378026 (3-SS-160..430)**
333570 1-CS-34-58F ELBOU TO PIPE C-F-1 PT 1 C5.21H UT 2-3-4-<<*3378026 (3-SS-160-.430)<<*
LINE 1-CS-34 FIG NO B-91 333580 1-CS.34-59S PIPE TO ELBCM C-F-'I PT 1 C5.21H UT 2.3-4-<<*3378026 (3-SS-160-.430)**
333590 1.CS-34-60S ELBOM TO PIPE C-F-1 PT 1 C5.21H UT 2.3-4-**3378026 (3-SS-160-.430)**
333600 1-CS-34-61S PIPE TO TEE C-F-1 PT 1 C5.21H UT 2-3-4<<*3378026 (3-SS-160-.430)<<<<
LIHE 1 CS-36 FIG NO B.91 334000 1-CS-36 01S TEE TO PIPE C-F-1 PT 1 C5.21H UT 2-3 X 4-<<*3378026 (3-SS-160-.430)**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 267
SUMMARY
EXAMINATION AREA NUMBER IDENT I F I CAT I OH INSPECTION INTERVAL CHEMICAL AND VOLUME CONTROL SYSTEM I ASHE I SEC.XI I CATGY NDE I ITEM HO METH I PLAN STATUS FIRST SECOND PERICO PERIOD THIRD I PERIOD---"-I---0 U T A G E------I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
334020 1-CS-36.03S ELBOW TO PIPE C-F-1 PT C5.21H UT 2-3-4-**3378026 (3-SS-160-.430)" 334030 1-CS-36-04S PIPE TO ELBOW C.F-1 PT 1-C5.21H UT 2-3-4-~*3378026 (3-SS.160..430)**
334040'I-CS-36-05S ELBOW TO PIPE C-F-1 PT 1-C5.21H UT 2-3-4-**3378026 (3-SS.160'430)**334050 1-CS-36.06S PIPE TO TEE C-F-1 PT 1-C5.21H UT 2-3-4-**3378026 (3-SS-160-.430)>>" 334060 1.CS-36.07S TEE TO PIPE C-F-1 PT 1 C5.21H UT 2-3-4-**3378026 (3-SS-160..430)**
334070 1-CS-36-OBS PIPE TO ELBOW C-F-1 PT 1-C5.21H UT 2-3-4**3378026 (3-SS.160-.430)**
DATE: 11/15/95 REV I S ION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAH CLASS 2 ALL STATUS COHPOHEN'IS PAGE: 268 SUHHARY EXAHINATI OH AREA NUHBER IDENTIFICATION INSPECTION INTERVAL CHEHICAL AND VOLUHE CONTROL SYSTEH l ASHE I SEC.XI I CATGY NDE I ITEH NO NETH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD--OUTAGE--
1 2 3 1 2 3 4 1 2 3 I INSTRUCT IOHS**CALI BRAT ION BLOCK**LINE 1-CS-36 FIG HO B-91 334080 1-CS-36-09S ELBOIJ TO PIPE C-F-1 PT 1 C5~21H Ur 2-3-4<<<<3378026 (3-SS-160-
~430)**334090 1-CS-36-10F PIPE TO ELBOll C-F-1 PT 1 C5.21H UT 2-3-4-**3378026 (3-SS-160-.430)<<<<
334100 1-CS-36-11S ELBOM TO PIPE C-F-1 PT 1-C5.21H UT 2-3-4<<*3378026 (3-SS-160-.430)**
334110 1-CS-36-12S ELBOW TO PIPE C-F-'I PT 1 C5.21H UT 2-3-4**3378026 (3-SS-160-.430)<<*
334120 1-CS-36-13S ELBSl TO PIPE C-F-1 PT 1 C5.21H UT 2-3.4**3378026 (3-SS-160..430)<<<<
334130 1-CS-36-14S PIPE TO ELBOW C F-1 PT 1 C5.21H UT 2-3-4<<*3378026 (3-SS-160-.430)**
334140 1-CS-36-15S ELBOH TO PIPE C-F-1 PT 1-C5.21H UT 2-3-4**3378026 (3.SS-160-.430)**
DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 269
SUMMARY
EXAMINATION AREA NUMBER IDENT IF ICATION INSPECI'ION INTERVAL CHEMICAL AND VOLUME CONTROL SYSTEM I , ASME I SEC.XI I CATGY NDE I ITEM NO METH I 1 PLAH STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD-I-0 U T A G E------I 2 3 1 2 3 4 1 2 3 INSTRUCTIONS
~*CALIBRATIOH BLOCK**LINE 1-CS-36 FIG NO B-91 334150 1-CS-36-16S PIPE TO ELBSI C-F-1 Pr 1-C5.21H UT 2.3-4**3378026 (3-SS-160..430)*~
334160 1-CS-36.17S ELBSI TO PIPE C-F-1 PT 1 C5.21H UT 2-3-4~3378026 (3-SS-160-.430) 334170'I-CS-36-18S PIPE TO ELBOH C-F-1 PT 1 C5.21H UT 2-3-4**3378026 (3-SS-160-.430)**
334180 1-CS-36-19S ELBSI TO PIPE C-F-1 PT 1 C5.21H UT 2-3-4.**3378026 (3-SS-160-.430)~>>
334190 1-CS-36-20F PIPE TO TEE C F-1 PT 1 C5.21H UT 2-3 4<<*3378026 (3-SS-160..430)~~
LINE 1-CS-41 FIG NO B-92 335000 1-CS.41-01S TEE TO REDUCER C-F 1 PT 1 C5.21H UT 2-3-4**3378026 (3-SS-160-.430)~~
335010 1-CS-41-02S TEE TO PIPE C-F-1 PT 1 C5.21H UT 2-3-4-**3378026 (3-SS-160-.430)**
DATE: 11/15/95 REVI SIGH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 270 SUHHARY EXAHI HAT ION AREA NUHBER IDENT I F I CAT ION INSPECTION INTERVAL CNEHICAL AND VOLUHE CONTROL SYSTEM ASME I SEC'I I CATGY NDE I ITEH NO NETH)1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD-OUTAGE----
-I 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
<<*CALIBRATION BLOCK*<<LINE 1-CS.41 FIG NO B-92 335020 1-CS-41.03S PIPE TO TEE CF1 PT 1-C5.21H UT 2-3 4-X<<*3378026 (3-SS-160-.430)*>>
335030 1-CS.41.04S TEE TO REDUCER C-F-1 P'I C5.21H UT 2-3-4<<>>3378026 (3-SS-160-.430)*>>
335040 1-CS.41-05S TEE TO ELBOW C.F-1 PT 1-C5.21H UT 2-3-4**3378026 (3-SS-160-.430)**
335050 1-CS-41-06F ELBOW TO VALVE C-F-1 PT C5.21H UT 2-3 X 4-<<<<3378026 (3-SS-160-.430)<<<<
LINE 12-CS-131 FIG NO B-93 336000 12-CS-131-01F VALVE TO PIPE C-F-1 PT 1 C5.21H UT 2-3-4<<*3378027 (4-SS-120-.430)**
336010 12.CS-131-02S PIPE TO ELBOW CF1 PT 1-C5.21H UT 2-3-4-**3378027 (4-SS-120-.430)**
336020 12-CS-131-03S ELBOW TO PIPE C-F-1 PT 1-C5.21H UT 2-3-4-**3378027 (4-SS-120-.430)*>>
DATE: 11/15/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 271
SUMMARY
EXAMINATIOH AREA NUMBER IDENTIFICATION INSPECTIOH INTERVAL CHEMICAL AND VOLUME CONTROL SYSTEM I ASME I SEC.Xl CATGY HDE ITEH HO METH PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I-I------OUTAGE----
I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
L'INE 1-CS-132 FIG NO 8-94 337000 1-CS-132-01F VALVE TO PIPE C-F-1 PI'C5.21H UT 2-3-4**3378026 (3-SS.160-.430)*~
337010 1-CS-132-02F PIPE TO TEE C-F-1 PT 1-C5.21H UT 2-3-4-~~3378026 (3-SS-160-.430)~>>
LINE 1-CS-747 FIG NO B-95 338000 1.CS-747.01F TEE TO PIPE C-F-1 PT 1 C5.30H UT 2-3-4-338010 1-CS-747-02S PIPE TO ELBOW C-F-1 PT 1 C5.30H 2-3-4-338020 1-CS-747-03S ELBON TO PIPE C-F-1 PT C5.30H 1 2-3 DATE: 11/15/95 REVI SIGH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 272 FIRST PERIOD SUHMARY EXAHINAT ION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL CHEMICAL AND VOLUME CONTROL SYSTEM I ASHE I SEC.XI I CATGY NDE I ITEH NO METH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD-0 U I A G E------I 1 2 3 4 1 2 3 I INSTRUCTIONS
~~CALIBRATION BLOCK*~LINE 1-CS-747 FIG NO B 95 338030 1-CS-747.04S PIPE TO VALVE C5.30H 2-3-4-C-F-'1 PT 1 338040 1-CS-747.05S VALVE TO PIPE C5.30H 2-3-4 C-F-1 PT 1-338050 1-CS-747-06S PIPE TO REDUCER C-F-1 PT 1 C5.30H 2-3-4-338060 1-CS-747-07S REDUCER TO PIPE C-F-1 PT 1 C5.30H 2-3-4-338070 1-CS-747-08S PIPE TO ELBOW C5.30H 2-3 X 4 C-F-1 PT 1 338080 1.CS-747.09S ELBOW TO PIPE CF1 PT 1 C5.30H 2-3-4 338090 1-CS-747-10S PIPE TO ELBOW C-F-1 PT 1 C5.30H 2-3-4 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPEC'IION LONG TERH PLAN CLASS 2 ALL STATUS COHPONEHTS PAGE: 273 SUHHARY EXAHINAT ION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL CHEHICAL AND VOLUHE CONTROL SYSTEH I ASHE I SEC.XI I CATGY NDE (ITEH NO NETH FIRST PERIOD PLAN STATUS SECOND THIRD PERIOD PERIOD-0 U T A G E------I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK~*LINE 1.CS.747 FIG NO B-95 338100 1-CS-747-11S ELBOW TO PIPE C-F.1 PT 1-C5.30H 2-3-4-338110 1-CS-747-12S PIPE TO ELBOW C5.30H 2-3-4-C-F-1 PT'I 338120 1.CS.747.13S ELBOW TO PIPE C5.30H 2-3-4 C F-1 PT 1 338130 1-CS-747-14S PIPE TO ELBOW C-F-1 PT 1 C5.30H 2-3-4 338140 1-CS-747-15S ELBOW TO PIPE C-F-1 PT 1 C5.30H 2-3-4 338150 1-CS-747-16S PIPE TO ELBOW C-F-1 PT 1 C5.30H 2-3-4-338160 1-CS-747-17S ELBOW TO PIPE C5.30H 2-3-4 C-.F-1 PT 1-DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONEN'IS PAGE: 274 SUHMARY EXAMINATION AREA NUHBER IDEHT IF ICATION IHSPECTION INTERVAL CHEMICAL AND VOLUME CONTROL SYSTEM I ASME I SEC.Xi I CATGY NDE I ITEM NO METH (1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I-OUTAGE---
--I 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- ~CALIBRATION BLOCK~*LIHE 1-CS-747 FIG NO B-95 338170 1-CS-747-18S PIPE TO TEE C F-1 PT 1 C5.30H 2-3-4-338180'1.CS.747-19S TEE TO PIPE C F-1 PT 1 C5.30H 2-3-4-338190 1-CS-747-20S TEE TO PIPE C5.30H 2-3-4-C-F-1 PT1-338200 1.CS.747-21S PIPE TO ELBOM CF1 PT 1-C5.30H 2-3-338210 1.CS-747-22S ELBOW TO.PIPE C-F-1 PT 1-C5.30H 2.3-4 338220 1-CS-747-23F PIPE TO VALVE C F-1 PT C5.30H 2-3-4 LINE 1-CS-748 FIG NO B-96 339000 1.CS-748-01F TEE TO PIPE C5.30H 2-3-4.CF1 PT 1 DATE: 11/15/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAH CLASS 2 ALL STATUS COMPOHEHTS PAGE: 275 SUHMARY EXAMINATION AREA NUMBER IDENT'IFICATIOH IHSPECT ION INTERVAL CHEMICAL AND VOLUME CONTROL SYSTEM I ASME I SEC.XI I CATGY NDE I ITEM NO METH I PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD-I--0 U T A G E------I 1 2 3 1 2 3 4.1 2 3 I INSTRUCTIONS
- ~CALIBRATION BLOCK~~LIHE 1-CS-748 FIG NO B-96 339010 1-CS-748-02S PIPE TO ELBOW C5.30H 2-3-4 C-F-1 PT 1-339020 1-CS-748-03S ELBOW TO PIPE C5.30H 2-3-4 C-F-1 PT 1-339030 1-CS-748-04S PIPE TO VALVE C-F-1 PT 1.C5.30H 2.3-4 339040 1-CS-748.05S VALVE TO PIPE C-F-1 PT 1 C5~30H 2-3-4-339050 1-CS-748.06S PIPE TO REDUCER C5.30H 2-3.4-C-F-1 PT 1 339060 1-CS-748.07S REDUCER TO PIPE C-F-1 PT 1 C5.30H 2-3-4 339070 1.CS-748.08S PIPE TO PIPE C5.30H 2-3-4 C-F-1 PT 1 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPOHENTS PAGE: 276 SUMHARY EXAHI HAT I ON AREA NUHBER IDENTIFICATION INSPECTION INTERVAL CHEMICAL AND VOLUME CONTROL SYSTEM I ASHE I SEC.Xl)CATGY NDE I ITEH NO METH I 1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD-I OUTAGE I 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
~*CALIBRATION BLOCK~~LINE 1-CS-748 FIG NO B-96 339080 1-CS-748-09S PIPE TO PIPE C-F-1 PT 1 C5.30H 2-3-4-339090 1-CS-748-10S PIPE TO ELBOW C5.30H 2-3-4 CF1 PT 1-339100 1-CS-748.11S ELBOW TO PIPE CF1 PT 1-C5.30H 2-3-4-339110 1-CS-748-12F PIPE TO ELBOW C-F-1 PT 1 C5.30H 2-3-4-339120 1-CS-748-13S ELBOW TO PIPE C5.30H 2-3-4 C-F-1 PT 1 339130 1-CS-748-14S PIPE TO ELBOW C-F-'I PT 1 C5.30H 2-3-4 339140 1-CS-748-15S ELBOW TO PIPE CF1 PT 1 C5.30H 2-3 DATE: '11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTIOH LONG TERM PLAN CLASS 2 ALL STATUS COMPOHEHTS PAGE: 277
SUMMARY
EXAMINATION AREA NUMBER IDENT IF ICATION INSPECTION INTERVAL CHEMICAL AND VOLUME CONTROL SYSTEM I ASME I SEC.XI I CATGY NDE I ITEM NO METH PLAH STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I OUTAGE I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIOHS
- ~CALIBRATIOH BLOCK~*LIHE 1-CS-748 FIG NO 8-96 339150 1-CS-748-16F PIPE TO ELBOW C5.30H 2-3-4-C-F-1 PT 1-LINE 1-CS-747A FIG NO 8-97 340000 1-CS-747A-01S ELBOW TO PIPE C-F-1 PT C5.30H 2-3-4-340010 1-CS-747A.02S PIPE TO PIPE C-F-1 PT 1 C5.30H 2-3-4-340020 1-CS-747A-03S PIPE TO PIPE C-F-1 PT C5.30H 1-2-3-4-340030 1-CS-747A-04S PIPE TO ELBOW C-F-1 PT 1 C5.30H 2-3-4 340040 1-CS-747A-05F ELBOW TO PIPE C-F-1 PT C5.30H 1-2-3-4-e 340050 1-CS-747A-06F PIPE TO VALVE C5.30H 2-3-4-C-F-1 PT 1 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL Sl'ATUS COHPONENTS PAGEt 278 SUMHARY EXAHI HAT I ON AREA NUMBER IDENTIFICATION IHSPECTION INTERVAL CHEMICAL AND VOLUME CONTROL SYSTEH I FIRST ASHE I PERIOD SEC.XI I CATGY NDE ITEH NO HETH i 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD-I-0 U T A G E------I 1 2 3 4 1 2 3 I INSTRUCTIONS
<<~CALIBRATION BLOCK*~LINE 1.CS-753 FIG HO B-98 341000 1-CS-753-0'IS VALVE TO PIPE C5.30H 2-3-4-C-F.1 PT 1 341010 1-CS-753-02S PIPE TO ELBOW C5.30H 2-3-4 C-F-1 PT 1-341020 1-CS-753-03S ELBOW TO PIPE C5.30H 2-3-4-C-F-'I PT 1 341030 1-CS-753-04S PIPE TO ELBOW C-F.1 PT 1-C5.30H 2-3-4 341040 1-CS-753-05S ELBOW TO PIPE C-F 1 PT 1-C5.30H 2-3-4 341050 1-CS-753-06S PIPE TO ELBOW CF1 PT 1 C5.30H 2.3-4-341060 1.CS-753.07F ELBOW TO PIPE C-F-1 PT 1 C5.30H 2.3-4 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANI'NIT 1 INSERVICE INSPEC'TION LONG TERM PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 279 INSPECTION INTERVAL CHEHICAL AND VOLUHE CONTROL SYSTEH I ASME I SEC.XI CATGY NDE ITEN NO NETH I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD I--OUTAGE I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
<<*CALIBRATIOH BLOCK**LINE 1-CS 753 FIG NO 8-98 341070 1-CS-753-08S PIPE TO ELBOW C-F-1 PT C5.30H 1.2-3-4-341080 1-CS-753-09S ELBOW TO PIPE C-F-1 PT 1-C5.30H 2-3-4 341090 1-CS-753-10S PIPE TO ELBOW C-F-1 PT 1 C5.3OH 2 3-4 341100 1-CS-753-11S ELBOW TO PIPE C5.30H 2-3-4-C-F-1 PT 1 X 341110 1-CS-753-12F PIPE TO REDUCER C-F-1 PT 1 C5.30H 2-3-4-LINE 1-CS-754 FIG NO B-99 342000 1-CS-754.01S REDUCER TO PIPE C5.30H 2-3-4-C-F-1 PT 1 342010 1-CS-754-02S PIPE TO ELBOW C-F-1 P'T C5.30H 2-3 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS SUHMARY EXAHINAT I ON AREA NUHBER'DENTIF ICATIOH PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I-OUTAGE-1 2 3 1 2 3 4 1 2 3 INSPECTION INTERVAL CHEMICAL AND VOLUME CONTROL SYSTEM I ASME I SEC.XI I CATGY NDE I ITEH NO METH I PAGE: 280INSTRUCTIONS
- CALIBRATION BLOCK**.LINE'I-CS-754 FIG NO 8-99 342020 1-CS-754-03S ELBOW TO PIPE C.F-1 PT 1 C5.30H 2 3-4 342030 1-CS-754-04S PIPE TO ELBOW C.F.1 PT 1-C5.30H 2-3-4-342040 1-CS-754.05S ELBOW TO PIPE CF1 PT 1 C5.30H 2-3-4 342050 I.CS.754.06S PIPE TO VALVE CF1 PT 1 C5.30H 2-3-4 DATE: 11/15/95 REVI S I OH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 3 ALL STATUS COMPOHEHTS PAGE 1 AUXILIARY FEEDUATER SYSTEM
SUMMARY
EXAMINATIOH AREA NUMBER IDENTIFICATION PLAN STATUS FIRST SECOND PERIOD PERIOD INSPECTION INTERVAL I ASME I SEC'I I CATGY NDE I------0 U T A G E-ITEM NO HETH I 1 2 3 1 2 3 4 THIRD I PERIOD I-I 1 2 3 I INSTRUCTIONS
<<<<CALIBRATION BLOCK<<<<SEE AEP DUG.NO.1 C-32 500000 PRESSURE RETAINING COMPONENTS D-B D2~10 VT-2 1-2-3.4 500100 INTEGRAL ATTACHMENTS D-B D2.20 VT-3 1-2-3-4-SEE AEP D'LIG.NO.1.C-59 SH.1 OF 2 500200 PRESSURE RETAINING COMPONEHTS D-8 D2.10 VI'-2 1 2-3-4 500300 INTEGRAL ATTACHMENTS D-B VT-3 1 D2.20 2-3-4-SEE AEP DNG.NO.1 C 59 SN.2 OF 2 500400 PRESSURE RETAINING COMPONEN'TS D-8 D2.10 VT-2 1 2 3-4-500500 INTEGRAL ATTACNHEHTS D.B VT-3 1-02.20 2-3-4 DATE: 11/'15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 3 ALL STATUS COMPOHENTS PAGE: 2 AUXILIARY FEEDWATER SYSTEM SUHHARY EXAMI HAT ION AREA NUHBER IDENT IF ICATION INSPECTION INTERVAL I ASHE I'EC.Xl CATGY NDE I ITEH NO METH I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD-OUTAGE------
I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
~~CALIBRATION BLOCK**SEE AEP DWG.NO.1-C.65 SH 1 OF 2 500600 PRESSURE RETAINING COMPONENTS D-8 D2.10 VT-2 2-3-4-500700 INTEGRAL ATTACNHENTS D.B VT-3 1 D2.20 2-3-4 SEE AEP DWG.NO.1-C-65 SH.2 OF 2 500800 PRESSURE RETAINING COMPOHEHTS D-8 D2.10 VT-2 1-2-3-4 500900 INTEGRAL ATTACHMENTS D-8 D2.20 VT-3 1-2-3-4 SEE AEP DWG.NO.1-C-67 SH.1 OF 2 501000 PRESSURE RETAINING COMPOHENTS D-8 D2.10 VT-2 1-2-3-4-501100 INTEGRAL AT'TACHHEHTS D-8 D2.20 VT-3 2-3-4.
DATE: 11/15/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS PAGE: 3 AUXIL'IARY FEEDNATER SYSTEM
SUMMARY
EXAMIHATIOH AREA NUMBER IDENT IF ICATION PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD INSPECTION INTERVAL I ASME I SEC.XI CATGY NDE I----OUTAGE-ITEMNOMETH I 1 2 3 1 2 3 4 1 2 3)INSTRUCTIONS
- ~CALIBRATIOH BLOCK~~SEE AEP DHG.NO.1-C-67 SH.2 OF 2 501200 PRESSURE RETAINING COMPONENTS D-B D2.10 VT-2 1-2-3.4-50'I300 IHTEGRAL ATTACHMENTS D B 02.20 VT-3 1-2-3-SEE AEP DWG.NO.1-C-68 SH.1 OF 2 501400 PRESSURE RETAINIHG COMPONENTS D-B D2.10 VT-2 1 2-3-4-501500 INTEGRAL ATTACHMENTS D B D2.20 Vl'-3 1 2-3-4-501600 PRESSURE RETAINIHG COMPOHEHTS D.B 02.10 VT-2 1 2-3.4 501700 INTEGRAL ATTACHMENTS 0-B D2.20 VT-3 1-2-3-4 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COHPONENTS PAGE: 4 AUXILIARY FEEDWATER SYSTEH SUHMARY EXAHI HAT I OH AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I F IRST ASHE I PERIOD SEC~XI I Cate NDE ITEM NO METH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE------I 1 2 3 4 1 2 3 I INSTRUCTIOHS
~*CALIBRATIOH BLOCK~~501800 PRESSURE RETAINING COMPONENTS D-B 02.10 VT-2 1 2-3-4-501900 INTEGRAL ATTACHMENTS D-B D2.20 VT.3 1.2-3-4-502000 PRESSURE RETAINING COMPONENTS D-B 02.10 VT.2 1-2-3-4 502100 IN'IEGRAL ATTACNHEHTS 0 B 02.20 VT-3 1-2-3-4 SEE AEP DUG.NO.1-C-63 502200 PRESSURE RETAINING COMPONENTS D-8 D2.10 VT-2 1 2-3-4-502300 INTEGRAL ATTACHHENTS D-B D2.20 VT-3 1 2-3-4-SEE AEP DUG.NO.1-C-74 SN.1 OF 2 502310 PRESSURE RETAINING COMPOHENTS 0-B D2.10 VT-2 1-2.3 DATE: 11/15/95 REVISIOH: 0 COOK HUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS PAGE: 5 AUXILIARY FEEDWATER SYSTEH
SUMMARY
EXAMINATION AREA NUMBER IDEHT IF ICATIOH IHSPECTIOH INTERVAL I F IRST ASME I PERIOD SEC.Xl CATGY NDE I ITEM NO METH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD 0 U T A G E------(INSTRUCTIONS 1 2 3 4 1 2 3]**CALIBRATIOH BLOCK**SEE AEP DWG.NO.1-C-74 SH.1 OF 2 502315 INTEGRAL ATTACHMENTS D-B D2.20 VT-3 1-2-3-4 SEE AEP DWG.NO.1-C-74 SH.2 OF 2 502320 PRESSURE RETAINING COMPONENTS D-8 VT-2 1 02.10 2-3 4 502325 INTEGRAL ATTACHMENTS D-B D2.20 VT-3 1-2-3-4-SEE AEP DWG.NO.'1-C-157 502330 PRESSURE RETAINING COMPONENTS D-8 VT-2 1-D2.10 2-3 4 502335 INTEGRAL ATTACHMENTS D B VT-3 1 F2.20 2-3-4 SEE AEP DWG.NO.1-C-159 502340 PRESSURE RETAINING COMPONENTS D 8 D2.10 VT-2 1 2-3-4 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS COHPOHENTS PAGE: 6 AUXILIARY FEEDNATER SYSTEH SUHHARY EXAHIHATION AREA NUHBER IDENT IF I CATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE I ITEN NO NETH I 1 PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD-OUTAGE-2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK**SEE AEP DMG.NO.1-C-159 502345 INTEGRAL ATTACHHENTS D-B F2'0 VT-3 1-2 3-4 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 3 ALL STATUS COMPOHENTS PAGE: 7 COMPONENT COOLING WATER SYSTEM SUMHARY EXAMINATION AREA HUHBER IDENTIFICATION INSPECTION INTERVAL I ASME I SEC~Xi I CATGY NDE I ITEM NO METH I PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD-I------OUTAGE-
-I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- ~CALIBRATION BLOCK**SEE AEP DWG.NO.12-CCW.50 502400 PRESSURE RETAINING COMPOHEHTS D-8 D2.10 VT-2 1-2.3-4 502500 INTEGRAL ATTACHMENTS D-8 D2.20 VT-3 1 2-3-4.SEE AEP DWG.NO.12-CCW~58 502600 PRESSURE RETAIHIHG COMPONENTS D-8 02.10 VT-2 1-2-3-4.502700 INTEGRAL ATTACHMENTS 0-8 VT-3 1 D2.20 2-3-4-SEE AEP DWG.NO.1-CCW-1 502800 PRESSURE RETAIHIHG COMPONENTS D.B 02.10 VT-2 1 2.3-4 502900 INTEGRAL ATTACHMENTS D 8 D2.20 VT-3 1-2-3-4 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT WHIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS PAGE: 8 COMPONENT COOLING WATER SYSTEM SUHHARY EXAMINATION AREA NUMBER IDENT IF I CATION PLAN STATUS SECOND PERIOD INSPECTION INTERVAL I F IRST ASHE I PERIOD SEC.Xl CATGY NDE I------0 U T A G E-ITEM HO METH (1 2 3 1 2 3 4 THIRD I PER I OD I I-----I 1 2 3 I INSTRUCTIONS
- ~CALIBRATION BLOCK~~SEE AEP DWG.NO.1-CCW 2 503000 PRESSURE RETAINING COMPOHEHTS D-B VT 2 D2.10 2-3-4-503100 INTEGRAL ATTACHHENTS D 8 02.20 VT.3 1 2-3-4-SEE AEP DWG.NO.1-CCW 6 503200 PRESSURE RETAINING COMPONENTS D-B VT-2 1 D2.10 2-3 4 503300 INTEGRAL ATTACHMENTS D-B D2.20 VT-3 1 2-3-4-SEE AEP DWG.NO.1-CCW-7 503400 PRESSURE RETAINING COMPOHENTS D-B D2.10 VT-2 1 2-3-4-503500 INTEGRAL ATTACHMENTS D-B D2.20 VT-3 1 2-3-4 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAH CLASS 3 ALL STATUS COHPONENTS PAGE: 9 COHPONENT COOLING WATER SYSTEH SUHHARY EXAHIHAT I ON AREA NUHBER IDENTIFICATIOH INSPECTION INTERVAL I F IRST ASHE PERIOD SEC.XI I CATGY NDE ITEH NO HETH[1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE-1 2 3 4 1 2 3 I I I IHSTRUCTIONS
- CALIBRATION BLOCK**SEE AEP DWG.NO.1-CCW 8 503600 PRESSURE RETAINING COHPONENTS 0-8 D2.10 VT-2 1 2-3-4 503700 INTEGRAL ATTACNHENTS D-B D2.20 VT-3 1-2-3-4 SEE AEP DWG.NO.1 CCW-35 503800 PRESSURE RETAINING COHPONENTS D 8 D2.10 VT-2 1-2-3-4-503900 INTEGRAL ATTACHMENTS D 8 02.20 VT-3 1 2-3-4-SEE AEP DWG.NO.1-CCW.36 504000 PRESSURE RETA IN IHG COHPOHENTS D-8 VT-2 1 D2.10 2-3-4-504100 INTEGRAL ATTACHMEN'TS D-8 D2.20 VT-3 1-2-3-4 DATE: 11/15/95 REVISIOH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONEHTS PAGE: 10 C(HPONENT COOLING WATER SYSTEM
SUMMARY
EXAMINAT IOH AREA NUMBER IDENTIFICATION INSPECT I OH INTERVAL I FIRST ASME PERIOD SEC.XI I CATGY HDE ITEM HO METH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD I 0 U T A G E------I 1 2 3 4 1 2 3 I IHSTRUCTIOHS
~~CALIBRATIOH BLOCK**SEE AEP DWG.NO.1-CCW-37 504200 PRESSURE RETAINIHG COMPONENTS D.B D2.'10 VT-2 1 2-3-4-504300 INTEGRAL ATTACHMENTS D.B VT-3 1-D2.20 2-3-4 SEE AEP DWG.NO.1-CCW.40 504400 PRESSURE RETAINIHG COMPONENTS D 8 D2.10 VT-2 1-2-3-4-504500 INTEGRAL ATTACHMENTS D 8 02.20 VT-3 1 2-3-4-SEE AEP DWG.NO.1-CCW.48 504600 PRESSURE RETAINING COMPONENTS D 8 D2.10 VT-2 2-3-4-504700 INTEGRAL ATTACHMEHTS D.B VT-3 1 D2.20 2-3-4 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS PAGE: 11 COMPONENT COOLING WATER SYSTEM
SUMMARY
EXAHINATION AREA NUMBER IDENTIFICATION INSPECT IO}I INTERVAL I ASHE I SEC.XI I CATGY NDE I ITEM NO METH I PLAN STATUS FIRST SECOND PERIOD PERIOD THIRD PERIOD--OUTAGE--1 2 3 1 2 3 4 1 2 3 I I I I INSTRUCTIONS
~*CALIBRATIOH BLOCK**SEE AEP DWG.NO.1-CCW-49 504800 PRESSURE RETAINIHG COMPONENTS D-B D2.10 VT-2 1 2-3.4-504900 INTEGRAL ATTACHHENTS D B 02.20 VT-3 1-2-3.4-SEE AEP DWG.NO.1-CC'W-52 505000 PRESSURE RETAINING COMPONEHTS D-B 02.10 VT-2 1.2-3.4-505100 INTEGRAL ATTACHMENTS D 8 D2.20 VT-3 1 2-3-4 SEE AEP DWG.NO.1-CCW-53 505200 PRESSURE RETAINING COMPONENTS 0-B D2.10 VT-2 1 2 3 4 505300 INTEGRAL ATTACHHEHTS D 8 02'0 VT-3 1 2-3 DATE: 11/15/95 REVI S I OH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPOHEHTS PAGE: 12 COMPONENT COOLING WATER SYSTEM SUMHARY EXAMINATION AREA NUMBER IDENT IF I CAT I OH INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE I ITEM NO METH PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I-0 U T A G E------I 2 3 1 2 3 4 1 2 3 INSTRUCTIONS
- CALIBRATION BLOCK**SEE AEP DWG.NO.1.CCW.60 505400 PRESSURE RETAINIHG COHPOHENTS D.B D2.10 VT-2 1 2-3-4-505500 INTEGRAL ATTACHMENTS D-8 VT-3 1-D2.20 2-3-4-SEE AEP DWG.HO.1-CCW 61 505600 PRESSURE RETAIN IHG COMPONENTS D-8 VT-2 1 02.10 2-3-4 505700 INTEGRAL ATTACHMENTS D-8 D2.20 VT-3 1-2-3-4 SEE AEP DWG.NO.1-CCW-63 505800 PRESSURE RETAINING COMPOHEHTS D-8 D2.10 VT-2 1-2-3-4 505900 INTEGRAL ATTACHMENTS 0-B VI'-3 02.20 2.3 DATE: 11/15/95 REVI S ION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS PAGE: 13 COMPONENT COOLING WATER SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT IF ICATION PLAN STATUS FIRST SECOND PERIOD PERIOD INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE i------0 U T A G E-ITEM NO METH i 1 2 3 1 2 3 4 THIRD I PER I OO I-----I 1 2 3 I INSTRUCTIONS
<<*CALIBRATION BLOCK~~SEE AEP DWG.HO.1-CCW.65 506000 PRESSURE RETAINIHG COMPONENTS D-B D2.10 VT-2 1 2-3-4 506100 INTEGRAL ATTACHMENTS D-B 02.20 VT-3 1-2-3-4-SEE AEP DWG.HO.1-CCW.66 506200 PRESSURE RETAINIHG COMPONENTS D-B D2.10 VT-2 1-2-3-4 506300 IN'IEGRAL ATTACHMENTS 0-B D2.20 VT-3 1-2.3-4 SEE AEP DWG.NO.1-CCW.94 506400 PRESSURE RETAINIHG COMPONENTS 0-B VT.2 1 02.10 2.3-4-506500 INTEGRAL ATTACHMENTS D B D2.20 VT.3 1 2.3.4-DATE: 11/15/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS PAGE: 14 COMPONENT COOLING WATER SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATIOH INSPECTION INTERVAL I FIRST ASME PERIOD SEC~Xl CATGY HDE I ITEM NO METN I 1 2 3 PLAN STATUS SECOHD THIRD PERIOD PERIOD I I OUTAGE I 1 2 3 4 1 2 3 IHSTRUCTIOHS
- CALIBRATION BLOCK*~SEE AEP DWG.HO.1-CCW 95 506510 PRESSURE RETAI NING COMPONENTS 0-8 02.10 VT-2 1-2-3-4 506515 INTEGRAL ATTACHMENTS D-8 D2.20 VT-3 1-2-3-4 SEE AEP D'WG.NO.1-CCW.96 506520 PRESSURE RETAINING COMPOHENTS D-8 D2.10 VT-2 1 2-3-4-506525 INTEGRAL ATTACHMENTS D-8 D2.20 VT-3 1 2-3-4 SEE AEP DWG.HO.1-CCW-97 506530 PRESSURE RETAIHING COMPONENTS D-8 D2.10 VT-2 1 2-3-4-506535 INTEGRAL ATTACHMENTS D-8 D2.20 VT-3 1-2 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COHPONENTS PAGE: 15 COHPONENT COOLIHG MATER SYSTEH SUMHARY EXAHINATION AREA NUHBER IDEHT IF ICATION INSPECTION INTERVAL I FIRST ASHE I PERIOD SEC.XI I CATGY NDE J ITEH NO NETH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I I 0 U T A G E--I 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATIOH BLOCK*SEE AEP DMG.NO.1-CC'M-98 506600 PRESSURE RETAINING COHPOHEHTS D-8 VT-2 D2.10 2-3-4 506700 INTEGRAL ATTACHHENTS D-8 02.20 VT-3 1-2-3.4 SEE AEP DMG.NO.1-CCM.99 506710 PRESSURE RETAINING COHPONEHTS D-B D2.10 VT-2 1-2-3-4 506715 INTEGRAL ATTACHHENTS 0-8 VT-3 1-D2.20 2-3-4-SEE AEP DMG.NO.1-CCM-100 506720 PRESSURE RETAIHING COHPONENTS D-8 D2~10 VT-2 2.3-4 506725 INTEGRAL ATTACHHENTS D.B VT.3 1 D2.20 2.3-4 DATE: 11/'15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS PAGE: 16 ESSENTIAL SERVICE WATER SYSTEM SUHHARY EXAMINATION AREA NUMBER IDENT IF I CAT I OH INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE ITEM NO METH I PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I OUTAGE I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK**SEE AEP DWG.NO.1 ESW 1 510400 PRESSURE RETAINING COMPONENTS D-B D2.10 VT-2 1-2-3-4 510500 INTEGRAL ATTACHMENTS D.B 02.20 VT-3 1 2-3-4-SEE AEP DWG.NO.1-ESW.2 510600 PRESSURE RETAIHING COMPONENTS D-B D2~10 VT-2 1 2-3-510700 INTEGRAL ATTACNHENTS D B D2.20 VT-3 1 2-3-4 SEE AEP DWG.NO.1-ESW.S 510800 PRESSURE RETAINING COMPONENTS D-B D2.10 VT-2 1-2-3-4 510900 INTEGRAL ATTACHMENTS D B D2.20 VT.3 1-2 3 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS PAGE: 17 ESSENTIAL SERVICE HATER SYSTEM
SUMMARY
EXAMINATION AREA NUHBER IDENT IF I CAT IOH INSPECT IOH INTERVAL I , ASME I SEC~XI I CATGY NDE I ITEM HO METH I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD-OUTAGE-1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS I**CALIBRATION BLOCK*~SEE AEP DWG.HO.1-ESll-8 511000 PRESSURE RETAIHIHG COMPONENTS 0-B D2.10 VT.2 1 2 3-4-511100 INTEGRAL ATTACHMENTS D-B 02.20 VT-3 1-2-3.4 SEE AEP DNG.NO.1-ESH-13 511110 PRESSURE RETAIHING COMPONENTS D-B D2.10 VT-2 1 2-3-4 511115 IHTEGRAL ATTACHMENTS D-B VT-3 1 02.20 2-3-4-SEE AEP DWG.NO.1-ESN-15 511120 PRESSURE RETAIHIHG COMPONENTS D-B VT-2 1~D2.10 2-3-4-511125 INTEGRAl.ATTACHMENTS D-B D2.20 VT-3 1 2 3-4 DATE: 11/15/95 REVI S ION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 3 ALL STATUS COHPONENTS PAGE: 18 ESSENTIAL SERVICE MATER SYSTEH SUHHARY EXAHINAT ION AREA NUHBER IDENTIFICATION PLAN STATUS FIRST SECOND PERIOD PERIOD INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE I------0 U T A G E ITEH NO HETH I 1 2 3 1 2 3 4 THIRD I PERIOD I I---I 2 3 INSTRUCTIONS
<<<<CALIBRATION BLOCK**SEE AEP DMG.NO.1-ESM.17 511130 PRESSURE RETAINING COHPONENTS D-B D2.10 VT-2'I 2-3-4-511135 INTEGRAL ATTACHHENTS D-B VT-3'I D2.20 2-3.4 SEE AEP DMG.NO.1-ES'M-18 511140 PRESSURE RETAINING COHPONENTS D-8 D2.10 VT-2 1 2-3-4-511145 INTEGRAL ATTACHHENTS D-B VT-3 1 D2.20 2.3-4.SEE AEP DMG.NO.1-ESM 21 511150 PRESSURE RETAINING COHPONENTS D-8 D2.10 VT-2 1.2-3-4 511155 INTEGRAL ATTACHHENTS D-B 02.20 VT-3 1.2-3-4 DATE: 11/15/95 REVI SIGH: 0 COOK NUCLEAR PLANT UHIT 1 INSERVICE INSPECTION LONG TERM PLAH CLASS 3 ALL STATUS COMPONENTS PAGE: 19 ESSEH'TIAL SERVICE WATER SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENI'IF I CATION INSPECT IO}I INTERVAL I FIRST ASME PER I OO SEC.XI I CATGY HDE I ITEM NO METH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PER IOO 0 U T A G E------I 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATIOH BLOCK*>>SEE AEP DWG.NO.1-ESW-23 511160 PRESSURE RETAINING COMPONENTS D-B D2.10 VT-2 1-2-3-4-511165 INTEGRAL ATTACHMENTS D-8 VT-3 1-D2.20 2.3-4 SEE AEP DWG.NO.1-ESW-27 511200 PRESSURE RETAIHIHG COMPONENTS D-B D2~10 VT-2 1 2-3-4 511300 INTEGRAL ATTACHMENTS D-B VT-3 1 D2.20 2.3-4 SEE AEP DWG.HO.1-ESW.28 511400 PRESSURE RETAIHIHG COMPONENTS D-B D2.10 VT-2 1 2-3.511500 INTEGRAL ATTACHMENTS D-B D2.20 VT-3 1 2-3 DATE: 11/15/95 REV I S ION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 3 ALL STATUS COHPONENTS PAGE: 20 ESSENTIAL SERVICE'WATER SYSTEH SUHHARY EXAHINATI ON AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE ITEN NO HETH I 1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I----0 U T A G E------I 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATIOH BLOCK**SEE AEP DWG.NO.1-ESW.29 511600 PRESSURE RETAINING COMPONENTS 0-8 02.10 VT-2 1-2-3-4-511700 INTEGRAL ATTACHHEN'TS 0 8 D2.20 VI'-3 1-2-3-4 SEE AEP DWG.NO.1-ESW.33 511800 PRESSURE RETAINING COHPONENTS D-8 02.10 VT-2 1-2 3-4 511900 INTEGRAL ATTACNHENTS 0 8 02.20 VT-3 1-2-3-4-SEE AEP DWG.NO.1-ESW-35 512000 PRESSURE RETAINING COHPONEN'IS D 8 D2.10 VT-2 1 2-3-~4 512100 INTEGRAL ATTACHMENTS D 8 D2.20 VT-3 1 2-3-4 DATE: 11/15/95 REVI S I OH: 0 COOK NUCLEAR PLAHT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS COHPONENTS PAGE: 21 ESSENTIAL SERVICE WATER SYSTEH SUHHARY EXAHIHATION AREA NUMBER IDENT I F I CAT IOH INSPECT ION INTERVAL I ASHE I SEC.Xl CATGY HDE I ITEN NO NETH I FIRST PERIOD PLAN STATUS SECOND THIRD PERIOD PERIOD-OUTAGE-1 2 3 1 2 3 4 1 2 3 I I I I INSTRUCTIONS
~~CALIBRATION BLOCK**SEE AEP DWG.NO.1-ESW.37 512200 PRESSURE RETAINING COHPONEHTS 0-B 02.10 VT-2 1 2-3-4-512300 INTEGRAL ATTACHHENT 0 0 02.20 VT-3 1.2-3.4-SEE AEP DWG.NO.1-ES'W 39 512400 PRESSURE RETAINING COHPONENTS D-8 VT-2 1 D2.10 2.3.4-512500 INTEGRAL ATTACNHENT D-8 D2.20 VT-3 1 2-3-4-SEE AEP DWG.NO.1-ESW.41 512600 PRESSURE RETAIN!NG COHPONEHTS D.B 02.10 VT.2 1.2-3.4-512700 INTEGRAL ATTACHMENT D-B VT-3 1 D2.20 2-3.4 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UHIT 1 INSERVICE INSPECTION LOHG TERM PLAN CLASS 3 ALL STATUS COMPOHEHTS PAGE: 22 ESSENTIAL SERVICE WATER SYSTEM SUMHARY EXAHINATI OH AREA NUMBER IDENT IF I CAT ION INSPECT ION INTERVAL I ASME I SEC.XI I CATGY NDE I ITEM NO METH PLAN STATUS FIRST SECOND PERIOD PERIOD-OUTAGE 1 2 3 1 2 3 4 THIRD I PERIOD-I------I 1 2 3 I INSTRUCTIONS
<<*CALIBRATION BLOCK~*SEE AEP DWG.NO.1-ESW.43 512800 PRESSURE RETAINING COMPONENTS D.B D2~10 VI'-2 1-2-3-512900 INTEGRAL ATTACNHENT D 8 D2.20 VT-3 1 2-3-4 SEE AEP DWG.NO.1-ESW.44 513000 PRESSURE RETAINIHG COMPONENTS D 8 D2.10 VT-2 1-2-3.4-513100 INTEGRAL ATTACHMENT D 8 D2.20 VT-3 1 2-3-4 SEE AEP DWG.NO.1-ES'W-45 513200 PRESSURE RETAIHING COMPONENTS 0 8 D2.10 VT-2 1 2-3-4 513300 INTEGRAL ATTACHMENT D-8 VT-3 1-D2.20 2.3-4 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANI'HIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 3 ALL STATUS COMPONENTS PAGE: 23 ESSENTIAL SERVICE WATER SYSTEM SUMHARY EXAMIHATION AREA NUMBER IDENTIFICATION PLAN STATUS SECOND PERIOD INSPECTION INTERVAL I FIRST ASME J PF R I 00 SEC.XI CATGY NDE i-----0 U T A G E-ITEH NO METH I 1 2 3 1 2 3 4 THIRD I PER I OD I I 2 3 INSTRUCTIONS
- CALIBRATIOH BLOCK**SEE AEP DWG.NO.1-ESW.46 513400 PRESSURE RETAIHING COMPONENTS D 8 D2.10 VT-2 1 2-3-4 513500 INTEGRAL ATTACHHENT 0 8 02.20 VT-3 1.2-3-4-SEE AEP DWG.NO.1-ES'W-47 513600 PRESSURE RETAINING COMPONENTS D.B D2.'IO VT-2 1 2-3-4 513700 INTEGRAL ATTACHMENT D-8 VT-3 1 02.20 2.3-4 SEE AEP DWG.NO.1-ESW.51 513800 PRESSURE RETAINING COMPOHENTS D-8 VT-2 1 D2.10 2-3.4"-513900 INTEGRAL ATTACHMENT D-8 VT-3 1 D2.20 2.3.4 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONEN'TS PAGE: 24 ESSENTIAL SERVICE MATER SYSTEH SUMHARY EXAHI HAT ION AREA HUHBER IDENT I F ICATION INSPECTION IHTERVAL I ASHE I SEC.XI I CATGY HDE I ITEM NO METH I PLAN STATUS FIRST SECOND TNIRD I PERIOD PERIOD PERIOD I OUTAGE I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK**SEE AEP DUG.NO.1-ESW 52 514000 PRESSURE RETAINING COMPOHENTS D-B D2.10 VT-2 2-3-4 514100 INTEGRAL ATTACHHENT D-B D2.20 VT-3 1 2-3-4-SEE AEP DUG.NO.1-ES'N.56 514200 PRESSURE RETAIHING COHPONENTS D-B 02.10 VT-2 1 2-3-4-514300 INTEGRAL ATTACHHENT D B D2.20 VI'-3 1 2-3.4-SEE AEP DUG.NO.1-ESW-57 514400 PRESSURE RETAINING COMPONENTS D B D2.10 VT.2 1 2-3-4-514500 IHTEGRAL ATTACHMENI'-B VT-3 1 D2.20 2-3 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COHPOHENTS PAGE: 25 ESSEN1'IAL SERVICE WATER SYS'EM
SUMMARY
EXAMINATION AREA NUHBER IDENT IF ICATION PLAN STATUS FIRST SECOND PERIOD PERIOD INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE I------0 U T A G E-ITEM NP METH (1 2 3 1 2 3 4 THIRD I PERIOD I-----I 2 3 I INSTRUCTIONS
~*CALIBRATION BLOCK**SEE AEP DWG.NO.1-ESW.61 514600 PRESSURE RETAINING COMPOHENTS D-8 D2.10 VT-2 1 2-3-4 514700 INTEGRAL ATTACHMENT D 8 02.20 VT-3 1 2-3-4 SEE AEP DWG.NO.1-ESW 64 SH.1 OF 2 514800 PRESSURE RETAINING COMPONENTS D-8 02~10 VT-2 1-2-3-4-5'l4900 INTEGRAL ATTACHMENT D.B D2.20 VI'-3 1 2-3-4.SEE AEP DWG.NO.1-ESW-64 SH.2 OF 2 515000 PRESSURE RETAIHING COMPONENTS D 8 02.10 VI'-2 1 2-3-4-515100 INTEGRAL ATTACHHENT D 8 D2~20 VT-3 1 2.3-4 DATE: 11/15/95 REVISION: 0 COOK HUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS PAGE: 26 ESSENTIAL SERVICE WATER SYSTEM
SUMMARY
EXAMINATIOH AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I ASHE I SEC'I I CATGY NDE I ITEH NO HETH I PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I----OUTAGE----
I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATIDH BLOCK~~SEE AEP DWG.NO.1-ESW-65 SH.1 OF 2 515200 PRESSURE RETAINING COMPONENTS D-8 D2.10 VT-2 1 2-3-4-515300 INTEGRAL ATTACHMENT D-8 02.20 VT-3 1 2-3-4 SEE AEP DWG.NO.1-ESW-65 SH.2 OF 2 515400 PRESSURE RETAINING COMPONENTS D-B D2.10 VT-2 1 2.3-4 515500 INTEGRAL ATTACHMENT D-B D2.20 VT-3 1 2-3-4 SEE AEP DWG.NO.1-ESW-7 515510 PRESSURE RETAINING COMPONENTS D-B D2.10 VT-2 1 2-3-4 515515 INTEGRAL ATTACHMENT D B D2.20 VT-3 2 3.4 DATE: 11/15/95 REVISION: 0 COOK HUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LOHG TERM PLAN CLASS 3 ALL STATUS COMPONENTS PAGE: 27 ESSENTIAL SERVICE'WATER SYSTEM
SUMMARY
EXAMINATION AREA HUHBER IDENT IF ICATION INSPECT IOH INTERVAL I ASHE SEC.XI I CATGY NDE I ITEM HO MEtH PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I OUTAGE I 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK*~SEE AEP DWG.NO.1-ESW-73 515520 PRESSURE RETAINING COMPONENTS D 8 D2.10 VT-2 1-2-3-4-515525 INTEGRAL ATTACHMENT 0-8 VT-3 1 D2.20 2-3-4 SEE AEP DWG.NO.12-ESW-X-1 SH.1 OF 2 515600 PRESSURE RETAINING COMPOHEHTS D-8 VT-2 1 D2.10 515700 INTEGRAL ATTACHMENT D 8 D2.20 VT-3 1 2-3-4-SEE AEP DWG.NO.12.ESW.X.2 515800 PRESSURE RETAIHING COMPOHENtS D-8 D2.10 VT-2 1 2-3-4-515900 INTEGRAL ATTACHMENT D 8 D2.20 VT-3 1 2-3 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS PAGE: 28 FEEDWATER SYSTEM
SUMMARY
EXAMI HAT ION AREA NUMBER I DENT I F ICATION IHSPECTIOH INTERVAL I ASME I SEC.XI I CATGY HDE ITEM NO METH I 1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I-----OUTAGE-I 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK~*SEE AEP DWG.NO.1-FW-19 516000 PRESSURE RETAINING COMPONENTS D 8 D2.10 VT-2 1-2-3-4 516100 IHTEGRAL ATTACHMENT D.B VT-3 1 02.20 2-3-4-SEE AEP DWG.HO.1-FW.22 5161'IO PRESSURE RETAIHIHG COMPONENTS D-8 D2.10 VT-2 1-2-3 4-516115 INTEGRAL ATTACHMENT 0.8 VT-3 1 02.20 2-3-4 SEE AEP DWG.NO.1-FW.24 516120 PRESSURE RETAINING COMPOHEHTS D-8 D2.10 VT.2 1-2-3-4 516125 INTEGRAL ATTACHMENT D-8 VT-3 02.20 2.3-4 DATE: 11/'l5/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTIOH LONG TERM PLAN CLASS 3 ALL STATUS COMPOHEH'IS PAGE: 29 FEEDWATER SYS'EM
SUMMARY
EXAMINATION AREA NUMBER IDENT IF I CATION IHSPECI'ION INTERVAL I FIRST ASME I PERIOD SEC.XI I CATGY NDE ITEM HO METH I 1 2 3 PLAN STATUS SECOND PERIOD OUTAGE-2 3 4 THIRD I PERIOD I-----I 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK**SEE AEP DUG.NO.1-FN 25 516130 PRESSURE RETAIN!NG COMPONENTS D-8 VT-2 1 D2.10 2-3-4 516135 INTEGRAL ATTACHMENT D 8 D2.20 VT-3 1 2-3-4-SEE AEP DHG.NO.1-FH.28 516140 PRESSURE RETAIHIHG COMPOHENTS D 8 D2.10 VT-2 1 2-3-4-516145 INTEGRAL ATTACHMENT 0 8 D2.20 VT-3 1 2-3-4-SEE AEP DWG.NO.1-F'N.29 516150 PRESSURE RETAINING COMPONENTS D.B D2.10 VT-2 1 2-3-4 516155 INTEGRAL ATTACHHEHT D-8 D2.20 VT-3 1 2.3-4 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS PAGE: 30 FEEDUATER SYSTEM SUHlQRY EXAMINATION AREA NUMBER IDENT I F I CAT I OH INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE I ITEM NO METH i 1 PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD I-OUTAGE-----I 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
~~CALIBRATION BLOCK**SEE AEP DUG.NO.1-FQ-34 516200 PRESSURE RETAINING COMPONENTS D-8 D2.10 VT-2 1 2-3-4 516300 INTEGRAL ATTACHMENT D-B 02.20 VT.3 1-2.3-4-SEE AEP DUG.NO.1-FN.35 516400 PRESSURE RETAINING COMPONENTS D 8 D2.10 VT-2 1 2-3-4-516500 INTEGRAL ATTACHMENT D.B VT 3 1 D2.20 2.3.4-SEE AEP DUG.NO.1.FN.36 516600 PRESSURE RETAINIHG COMPONEHTS D B D2.10 VT 2 2.3.4.516700 INTEGRAL ATTACHMENT D-8 VT-3 1 D2.20 2.3.4-DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNI'I 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS PAGE: 31 FEEDWATER SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I F IRST ASME PERIOD SEC.XI I CATGY NDE I ITEM NO METH i 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD OUTAGE I 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATIOH BLOCK~*SEE AEP DNG.HO.1-FW 39 SH.2 516750 PRESSURE RETAIHIHG COMPOHENTS D-8 D2~10 VT-2 1 2-3-4 516755 INTEGRAL ATTACHMENT D-B D2.20 VT-3 1-2-3-4-SEE AEP OWG.NO.1-FW-40 SH.1 OF 2 516800 PRESSURE RETAINIHG COMPONENTS D-B D2.10 VT-2 1 2-3-516900 INTEGRAL ATTACHMEHT D.B VT-3 1 D2.20 2-3-4-SEE AEP DUG.NO.1-FM 40 SH.2 OF 2 517000 PRESSURE RETAINING COMPONENTS D B 02.10 VT-2 1 2-3-4 517'IOO INTEGRAL ATTACHMENT D-B D2.20 VT.3 1 2-3-4 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 3 ALL STATUS COMPONENTS PAGE: 32 FEEDWATER SYSTEM SUHHARY EXAMINATION AREA NUMBER IDEHTIFICATIOH INSPECTION INTERVAL F IRST ASHE PERIOD SEC.XI I CATGY NDE ITEH NO HETH i 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE-1 2 3 4 1 2 3 I I I I INSTRUCTIONS
~~CALIBRATIOM BLOCK**SEE AEP DNG.NO.1-FQ.43 517150 PRESSURE RETAINING COHPONENTS D B 02'0 VT-2 1 2.3.4 517155 INTEGRAL ATTACHHENT D-B D2.20 VT-3 1.2-3-4 SEE AEP DHG.NO.1-FU.46 517200 PRESSURE RETAINING COMPONENTS D-8 02.10 VT-2 1 2-3-4 517300 INTEGRAL ATTACHMENT D B D2.20 VT-3 1-2-3-4 SEE AEP DUG.NO.1-FW-47 517400 PRESSURE RETAINING COMPONENTS D-B D2.10 VT-2 1 2-3-4 517500 INTEGRAL ATTACHMENT D-8 VT-3 1-D2.20 2-3 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS PAGE: 33 FEEDWATER SYSTEM
SUMMARY
EXAMINATION AREA NUHBER IDENI'IF I CAT ION F IRST PER I OO INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE I-----ITEM NO METH i 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD I OUTAGE I 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK**SEE AEP DWG.NO.1-FW-52 SH.1 OF 2 51?600 PRESSURE RETAINING COMPONENTS D-8 D2.10 VT-2 1-2-3-4 517700 INTEGRAL ATTACHMENT D.B VI'-3 1 D2.20 2-3-4-SEE AEP DWG.NO.1-FW-52 SH.2 OF 2 517800 PRESSURE RETAINING COMPONENTS D-B D2.10 VT-2 1-2-3-4.517900 INTEGRAL ATTACHMENT D.B VI'-3 1 D2.20 2-3-4-SEE AEP DWG.NO.1-FW.BO SH.1 OF 2 5179'IO PRESSURE RETAINING COMPONENTS D-8 D2.10 VT-2 1 2.3.4.517915 INTEGRAL ATTACHMENT D-8 VI'-3 1 D2.20 2-3 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS PAGE: 34 FEEDWATER SYSTEM SUMHARY EXAHINATION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I FIRST ASME PEP IOD SEC.XI I CATGY NDE ITEM NO METH i 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I OUTAGE-.----I 1 2 3 4 1 2 3 INSTRUCTIONS
- CALIBRATION BLOCK**SEE AEP DUG.NO.T-FW.BO SH.2 OF 2 517920 PRESSURE RETAINING COMPONENTS D-B D2~10 VT-2 1 2-3-4-517925 IN'IEGRAL ATTACHHENT D 8 D2.20 VT-3 1 2-3-4 SEE AEP DUG.NO.1-FM.87 517930 PRESSURE RETAINING COMPONENTS D.B D2.10 VT.2 1-2-3-4 517935 INTEGRAL ATTACHMENT D-8 D2.20 VT-3 1-2-3-4 SEE AEP DllG.NO.1-FM 88 517940 PRESSURE RETAINING COMPOHENTS D.B D2.10 VT-2 1 2-3-4 517945 INTEGRAL ATTACHMENT D-8 VT-3 1-02.20 2-3.4 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COHPONENTS PAGE: 35 AUXILIARY FEEDWATER SYSTEM
SUMMARY
EXAMINATIOH AREA HUH GER IDENT I F I CAT ION PLAN STATUS SECOND PERIOD INSPECTION INTERVAL I F IRST ASME PERIOD SEC.XI I CATGY NDE i------0 U T A G E-ITEM NO METH (1 2 3 1 2 3 4 THIRD I PERIOD I---I 1 2 3 I IHSTRUCTIONS
~*CALIBRATION BLOCK*~SEE AEP DWG.NO.1-AFW-86 SH.1 OF 2 518000 PRESSURE RETAINING COMPONENTS D 8 D2.10 VT-2 1 2 3.4-518100 IHTEGRAL ATTACHMENT D B D2.20 VT-3 1 2-3-4-SEE AEP DWG.NO.1-AFW.86 SN.2 OF 2 518200 PRESSURE RETAIHIHG COMPONENTS D-8 D2.10 VT-2 1 2-3-4 518300 INTEGRAL ATTACHMENT D-8 VT-3 1-D2.20 2-3 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS COMPONENTS PAGE: 36 SPENT FUEL COOLING SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT IF ICATION INSPECTION INTERVAL I F IRST ASHE I PERIOD SEC.XI I CATGY HDE ITEM HO NETH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I OUTAGE I 2 3 4 1 2 3 I INSTRUCTIONS
<<*CALIBRATIOH BLOCK>>>>SEE AEP DHG.NO.12-SF-1 518400 PRESSURE RETAINING COMPONENTS D C VT-2 1 D3.10 2-3-4-518500 INTEGRAL ATTACHMENT D C D3.20 VT-3 1 2-3-4 SEE AEP DWG.HO.12-SF-2 518600 PRESSURE RETAIHIHG COMPONENTS D-C D3.10 VT-2 1-2-3-4-518700 INTEGRAL ATTACHMENT D-C VT-3 1-D3.20 2-3-4-SEE AEP DNG.NO.12-SF-3 518800 PRESSURE RETAINING COMPONENTS 0 C D3.10 VT2 1 2-3.4.518900 INTEGRAL ATTACHMENT D-C VT-3 D3.20 2-3 DATE: 11/15/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPOHENTS PAGE: 37 SPENT FUEL COOLING SYSTEM SUHHARY EXAHIHAT I ON AREA NUHBER IDENT I F ICATION INSPECTION INTERVAL I FIRST ASHE I PERIOD SEC.XI I CATGY NDE I ITEM NO METH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I 0 U T A G E--I 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATIOH BLOCK**SEE AEP DMG.NO.12-SF-4 519000 PRESSURE RETAINING COMPOHENTS D-C D3.10 VT-2 1 2-3-4 519100 INTEGRAL ATTACHMENT D-C D3.20 VT-3 1 2.3-4-~SEE AEP DUG.NO.12-SF-5 519200 PRESSURE RETAINING COMPONENTS D C D3.10 VT-2 1 2-3-4-519300 INTEGRAL ATTACHMEHT D C D3.20 VT-3 2-3-4 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COMPOHEHTS PAGE!1~PRESSURIZE
SUMMARY
EXAMINATION AREA NUMBER IDEHT IF I CATION INSPECT ION INTERVAL FIRST ASKE PERIOD SEC.Xl CATGY NDE ITEM NO METH f 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I OUTAGE------I 1 2 3 4 1 2 INSTRUCT IOHS<<*CALIBRATIOH BLOCK**SUPPORT COMPONENTS FIG HO A-4 601000 1-PRZ-SUPPORT L.CONT.F-A F1.40 VT-3 1 2-3-4.C X DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE IHSPECTION LONG TERH PLAN CLASS 1 ALL S'TATUS COHPOIEH'TS PAGE: 2 STFAH G NERATORS SUHHARY EXAHINATION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE ITEH NO HETK I PLAN STATUS F IRST SECOND THIRD I PERIOD PERIOD PERIOD I OUTAGE------I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- ~CALI BRATIOH BLOCK**VESS L SUPPORTS 602000 STH.11-SUPPORT CONTo L1 F-A F1.40 VT-3 1-2-3-602010 STH.12-SUPPORT CONT.L2 F-A F1.40 VT-3 1 2-3-4-C X 602020 STH-13-SUPPORT F-A F1.40 VT-3 1-2-3-4 602030 STH-14-SUPPORT F-A F1.40 VT-3 1-2-3.4-DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 3 REACTOR COOLANT SYSTEH
SUMMARY
EXAMINATION AREA HUHBER IDENT I F I CAT I ON INSPECTION INTERVAL I ASHE I SEC.Xl CATGY NDE I ITEN NO NETH FIRST PLAN STATUS SECOND THIRD PERIOD PERIOD PERIOD---OUTAGE-1 2 3 1 2 3 4 1 2 3 INSTRUCTIONS
- ~CALIBRATIOH'LOCK**
N--F NO-19 609700 1-GRC-R-619 PIPE SUPPORT COHPONEHTS F1~10A 2-C 3-4-F-A VT 3 1 C LINE 1 RC-6 FIG NO A 2'1 609800 1-GRC-C-602 PIPE SUPPORT COHPONEN'TS F1.10C 2C 3-4-F-A VT.3 1.609900 1-GRC-R-603 PIPE SUPPORT COHPONENTS PRESS.DH F.A VT-3 1 F1.10A 2 3-4 C C 610000 1-GRC-S-604 PIPE RES'IRAIHT COHPONENT F1.10A 2C C 3-4-F-A VT-3 1 C C'10100 1-GRC R-605 PIPE SUPPORT COHPONENTS PRESS.DH F1.10A 2-3.4 F-A VT-3 1-C 610200 1 GRC-C-606 PIPE SUPPORT COHPOHENTS PRESS.DN F1.10C 2-3-4.F-A VT-3 1 C C LIME 1-RC-6 FIG NO A-22 610700 1-GRC-C.611 PIPE SUPPORT COHPONENTS PRESS.DH F1.10C 2-3-4-F-A VT-3 1-C DATE: 12/20/95 REVI SIGH: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE IHSPECTIOH LOHG TERN PLAN CLASS 1 ALL STATUS CONPOHENTS PAGE: 4 REACTOR COOLANT SYSTEN SUNMARY EXAHINATION AREA NUNBER IDENT IF I CATION INSPECTION INTERVAL I ASHE I SEC.XI I-CATGY HDE ITEN HO NETH I 1 PLAN STATUS FIRST SECOND THIRD I PERICO PERIOD PERIOD I I-----OUTAGE-----I 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
~ICAL I BRAT I OH BLOCK*>>LINE 1-RC-10 FIG HO A-26 612800 1-GRC-R-534 PIPE SUPPORT CONPOHEHTS F1.10NB 2-3-4-F-A VT-3'I 612900 1-GRC-R-506 PIPE SUPPORT CONPOHENTS F1.10MA 2-3-4-F-A VT-3 1 C 613000 1-GRC-V.505 PIPE SUPPORT CONPONENTS F-A VT-3 F1.10NC 2.C 3-X 4-C L NE 1-RC-10 FIG HO A-7 613100 1-GRC-R.516 PIPE SUPPORT CONPOHENTS F1.'1 08 2-C 3-4 F-A VT-3 1-C 613150 1-GRC-C-515 PIPE SUPPORT CONPONEHTS F1.10B 2-3-4-F-A'l'-3 1.613200 1-GRC.R-622 PIPE SUPPORT CONPONEHTS PRESS.F1.108 2-3-4 F-A VT-3 1 C 613300 1.GRC.R-522 PIPE SUPPORT CONPOHEHTS F-A VT-3 1-F1.10NB 2-3-4-C DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLAHT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 5 REACTOR COOLANT SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDEHI'F I CAT IOH INSPECTION INTERVAL I FIRST ASME I PERIOD SEC.XI I-CATGY HDE ITEM NO METH i 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I-OUTAGE-----
I 1 2 3 4 1 2 3 I INSTRUCTIONS
~ICAL I BRAT ION BLOCK**LINE 1-RC-10 FIG NO A-27 613400 1-GRC.C.519 PIPE SUPPORT COMPONENTS PRESS.DH F1.10NC 2-3.4-F-A VT-3 1-C C 613440 1.GRC-S-519A PIPE SUPPORT COMPOHEHTS F A VT-3 1-F1.10S 2 C C 3-LINE 1-RC-11 F 0 NO A-28 613700 1-GRC R-500 PIPE SUPPORT COMPONENTS CONT.PRT F1.10A 2-3.4-F-A VT-3 1 C C X 613800 1-GRC R-521 PIPE SUPPORT COMPOHENTS F-A VT-3 1 F1.10IIA 2.3-4 C 613900 1-GRC-R-502 PIPE SUPPORT COMPONENTS F1.10A 2-3-4 F-A VT-3 1-C 614000 1-GRC-R-524 PIPE SUPPORT COMPONENTS F1.10A 2-C 3-4-F-A VT.3 1-C 614100 1-GRC-R-503 PIPE SUPPORT COMPONENTS COHT~PRT F-A VT-3 1.F1.10NB 2-3-4 C DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANI'NIT 1 INSERVICE INSPECTION LONG TERN PLAH CLASS 1 ALL STATUS COHPOHENTS PAGE: 6 EACTOR COOLANT SYSTEN SUNNARY EXAHINAT ION AREA NUHBER IDENT IF I CAT I OH INSPECTION INTERVAL I ASHE I SEC.XI I CATGY HDE ITEN HO NETH I 1 F IRS I PERIOD PLAN STATUS SECOND THIRD PERIOD PERIOD-----0 U T A 0 E-.----I 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
~~CALIBRATION BLOCK~~LIHE 1-RC-12 FIG NO A-29 614200 1.GRC-R-504 PIPE SUPPORT COHPONEH'IS F-A VT-3 F1.'lDHA 1-2 C 3 X 4-C 614300 1-GRC-R-520 PIPE SUPPORT COHPOHEHTS CONT.PRT F1.10MA 2-3-4-FA VT3 1-C C X 614400 1-GRC-R-501 PIPE SUPPORT COHPOHENTS CONT.PRT F.A VT-3 1-F1.10'-3-4 C 614500 1-GRC-R-525 PIPE SUPPORT COMPOHEHTS CONT.PRT F-A VT-3 1 F1.10'-3-4 C LINE 1-RC-13 FIG NO A-30 614600 1-GRC-R-536 PIPE SUPPORT COHPOHEHTS CONT.L1 F1.10A 2-3-4-F-A VT-3 1 C C X C 614700 1-GRC.R-535 PIPE SUPPORT COHPOHEHTS CONT.Ll F1.10~*2-3-4 F-A VT-3 1 C C**-l58 614800 1-GRC.S-538 PIPE RESTRAINT COHPONENT F-A VT-3 1 F1.10SB 2 C C 3-X 4-DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 7 REACTOR COOLAHT SYSTEH SUHHARY EXAHI HAT ION AREA NUHBER IDENTIFICATION IHSPECTION INTERVAL I FIRST ASHE PERIOD SEC.XI I CATGY NDE ITEN NO NETH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I I OUTAGE I 1 2 3 4 1 2 3 I I HSTRUCT I OHS<<ICAL I BRAT ION BLOCK**LINE 1.RC-13 FIG NO A-31 614900 1-GRC R 540 PIPE SUPPORT COHPONENTS F-A VT 3 1-F1.10HB 2-3-4 615000 1-GRC-R-539 PIPE SUPPORT COHPONENTS F1~10HA 2-3.4.F-A VT-3 1 C 615100 1.GRC.S.537 PIPE RESTRAINT COMPONEHI'-A VT-3 1 F110S 2C C 3-4 C LIHE 1.RC-14 FIG NO A-32 615200 1.GRC R 558 PIPE SUPPORT COHPONENTS CONT.L2 F-A VT.3 1-F1.10llB 2.3-4 C C X 615300 1-GRC-R-557 PIPE SUPPORT COHPOHEHTS F-A VT-3 1 F1.10HA 2-3.4-C 615400 1 GRC-S 562 PIPE RESTRAIHI'OHPOHENT F1.10S 2C C 3-4-F-A VT-3 1 C LINE 1-RC-14 FIG NO A-33 615500 1-GRC-R 556 PIPE SUPPORT COHPOHEHTS F1.10HA 2-C 3-4-F-A VT-3 1-DATE: 12/20/95 REV I S I OH: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LOHG TERN PLAN CLASS 1 ALL STATUS CONPONENTS PAGE: 8 REACTOR COOLANT SYSTEH SUNNARY EXAHINATIOH AREA NUHBER I DENT IF I CAT ION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY XDE ITEN HO NETH I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD-I OUTAGE I 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK~~LIHE 1-RC-14 FIG NO A-33 615600 1-GRC-R-554 PIPE SUPPORT CONPONEHTS CONT.L2 F1.10S 2-3-4-F-A VT-3 1-C C X 6'15700 1-GRC-S-555 PIPE RESTRAINT CONPONENT F A VT-3 F1~10SB 1-2C C 3-C C LINE 1-RC-15 FIG MO A-34 615800 1-GRC-S-575 PIPE RESTRAINT CONPONENT F-A VT-3 1-F1.10S 2C C 3-4 C 615900 1-GRC-R-576 PIPE SUPPORT CONPONEHTS F1.10NA 2-3-4-F.A VT-3 1-C 616000 1-GRC-R-577 PIPE SUPPORT CONPOMEHTS F1.10WB 2 C 3.4-F-A VT-3 1 616100 1-GRC-R-578 PIPE SUPPORT COHPOHENTS CONT.L3 F'I.10llA 2-3-4-F-A VT-3 1-C C X LIME 1-RC-15 FIG MO A-35 616200 1-GRC-R-574 PIPE SUPPORT CONPONEHTS F1.10NA 2-C 3.4-F-A VT-3 1.
DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IMSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS CONPONEHTS PAGE: 9 REACTOR COOLANT SYSTEH
SUMMARY
EXAMINATION AREA NUKBER IDENTIFICATIOH IHSPECTIOM INTERVAL I ASKE I SEC~XI I CATGY NDE ITEN NO NETH I 1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I-I'U T A G E------I 2 3 1 2 3 4 1 2 3 I IHSTRUCT I DMS**CAL I BRAT ION BLOCK**LINE 1-RC 15 FIG NO A-35 616300 1-GRC-S.573 PIPE RESTRAINT COMPONENT F-A VT-3 1-F1.10SB 2 C C 3-X 4-C C 616400 1-GRC-R-572 PIPE SUPPORT COMPONENTS CONT~L3 F-A VT-3 1 F1.10**2-4-C C X**-NAS LIME 1-RC-16 FIG NO A-36 616500 1 GRC-R-568 PIPE SUPPORT COHPOHEHI'S F A VT-3 1-F1.10NB 2-3-4-C 616600'I GRC-R 567 PIPE SUPPORT COMPONENTS F A VT-3 1-F1.10llA 2-3-4-616700 1-GRC-S-566 PIPE RESTRAIN'I COHPOHEMT F-A'T-3 1 F1.10S 2C C 3-4 C C LIHE 1-RC-16 FIG NO A 37 616800 1-GRC-R 565 PIPE SUPPORT COMPONENTS F1.10'-3-4.F-A VT-3 1 C DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UHIT 1 IHSERVICE INSPECTION LOHG TERN PLAN CLASS 1 ALL STATUS COHPOHENTS PAGE: 10 REACTOR COOLANT STSTEH SUHHARY EXAMINAT IOH AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE ITEN NO NETH I PLAN STATUS F IRST SECOND THIRD PERIOD PERIOD PERIOD-OUTAGE--1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS I++CALIBRATION BLOCK+a I.IHE 1-RC-16 FIG NO A-37 616900 1-GRC-S-564 PIPE RESTRAINT COHPONEHT F-A VT-3 1-F1.10SB 2 C C 3-4 617000 1-GRC-R-563 PIPE SUPPORT COHPOHENTS F1.10**2 C 3-FA VT3 1-C*i-MBS LINE 1-RC 501 FIG NO A-38 617050 1-GRC-R-551 PIPE SUPPORT COHPOHENTS CONT.PRT F1.108 2-3-4-F-A VT-3 1-C X LIN 1 RC 04 FIG NO A-39 617100 1-GRC-R-542 PIPE SUPPORT COHPONENTS CONT.L1 F-A VT-3 1-F1.10HA 2-3-C C X LINE 1-RC-505 FIG HO A-40 617200 1-GRC-R-544 PIPE SUPPORT COMPONENTS F-A VT-3 1 F1.10MB 2-3-4-617300 1-GRC R-545 PIPE SUPPORT COHPONEHTS CONT.L1 F-A VT-3 F1.10A 2-3-4-C C X DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERYICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPONENTS PAGE: 11 REACTOR COOLANT SYSTEH
SUMMARY
EXAHIHATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL r I ASHE I SEC~Xl I CATGY NDE I ITEH NO HETH I PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I-I OUTAGE I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS iiCALI BRAT ION BLOCK**LINE 1-RC-06 FIG HO A-41 617400 1.GRC-R-560 PIPE SUPPORT COMPONENTS F-A VT-3 1-F1.10N 2.3-4 C 617500 1-GRC-R 561 PIPE SUPPORT COHPONEHTS F'1.10MA 2-C 3-4-F.A VT-3 1.LIME 1-RC-507 FIG MO A-42 617600 1-GRC R-559 PIPE SUPPORT COMPONENTS CONT.L2 F-A VT-3 1 F1-10MA 2-3-4 C X C LIHE 1-RC-508 FIG NO A-43 617700 1-GRC-R-579 PIPE SUPPORT COHPONEHTS CONT.L3 F1.10'-3-4 F-A VT-3 1-C C 617800 1.GRC-S-582 PIPE RESTRAINT COHPONEHT F-A Vl'-3 1 F1.10S 2C C 3-X 4 LIHE 1-RC-509 FIG NO A.44 617900 1-GRC-R-580 PIPE SUPPORT COHPOHEHTS COHT~L3 F.A VT-3 1 F1.10$2-3-4-C DATE: 12/20/95 REVISIOH: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS CONPOMENTS PAGE: 12 REACTOR COOLANT SYSTEM SUHHARY EXAMINATION AREA NUMBER IDEHT IF I CAT IOH IHSPECTIOH INTERVAL I ASHE I SEC~XI I CATGY NDE I ITEH NO NETH I PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I I--OUTAGE-I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
~*CALIBRATIOH BLOCK~~LINE 1-RC-509 FIG HO A-44 618000 1.GRC-R-581 PIPE SUPPORT COHPOHENTS CONT.L3 F1~10A 2 3-4-F-A VT-3 1.C C X LIME 1 RC 510 FIG MO A-45 618050 1-GRC-R-569 PIPE SUPPORT COHPOMEHTS F-A VT-3 1-F1.10MB 2 3-4-LINE 1-RC-11 FIG MO A-46 618100 1.GRC-R-570 PIPE SUPPORT COMPONENTS F-A VT-3 F I.IOWB 2 C 3.4 618200 1-GRC-R-571 PIPE SUPPORT COHPOHEHTS F1.10NA 2-C 3-4 F-A VT-3 1-C DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 13 SAFETY INJECTION SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT IF I CAT ION INSPECTION INTERVAL I FIRST ASHE I PERIOD SEC.XI I CATGY NDE ITEN HO NETH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE-1 2 3 4'2 3 I INSTRUCTIONS
~~CALIBRATION BLOCK~*N 1-SI-1 GNOA47 619600 1-GSI-R-658 PIPE SUPPORT COHPOHEHTS F1.10A 2-3-4-F-A VT-3 1-C X 619700 1-GSI-R.659 PIPE SUPPORT COHPOMEHTS F1.10A 2-C 3-4-F-A VT-3 1-C NE 1.S-2 F G NO A-50 620900 1-GS I-R.666 PIPE SUPPORT COHPOHEHTS F1.10B 2-3-4 F A VT-3 1-C X LINE 1-SI-29 FIG MO A-53 621200 1-GSI-R-550 PIPE SUPPORT COHPONEHTS F1.10MA 2-3-4-F-A VI'-3 1 C LIHE 1-Sl-31 FIG MO A-54 621400 1-GSI-R-545 PIPE SUPPORT COHPOHEHTS F1 10NA 2-3-4-F-A VT-3 1 C INE 1-S-33 FIG NO A-55 621600 1-GSI.R-546 PIPE SUPPORT COMPONENTS F-A VT-3 F1.10NA 2-3-4 C DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LOHG TERM PLAN CLASS 1 ALL STATUS COHPOHENI'S PAGE: 14 SAFETY HJ CT ON SYST
SUMMARY
EXAMINATION AREA NUMBER IDENT I F I CAT I OH INSPECTION INTERVAL I FIRST ASME I PERIOD SEC.XI I CATGY NDE ITEM NO METH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD-I OUTAGE 1 2 3 4 1 2 3 I IHSTRUCT IOHS~*CALIBRATIOH BLOCK~~LINE 1-SI-35 FIG NO A.56 621700 1.GSI-R-549 PIPE SUPPORT COMPONENTS F1.10llA 2 C 3.4-F-A VT-3 1 L NE 1-S-545 FIG HO A-60 622000 1.GSI-R-562 PIPE SUPPORT COMPONENTS F1.10NA 2-3-4-F-A Vl'-3 1-622010 1-GSI-R-589 PIPE SUPPORT COMPOHEHTS F1.10NB 2-3-4-F.A VT-3'1 622020 1.GSI-R.588 PIPE SUPPORT COMPOHEHTS F1.10MB 2-3-4-F-A VT-3 1 622030 1-GSI-R.632 PIPE SUPPORT COMPOHENTS F1~10A 2-3-4-F-A'T'-3'I 622040 1-GSI-R-587 PIPE SUPPORT COMPONENTS F-A VT-3 1 F1.10IS 2-3-4-622050 1-GSI-R.586 PIPE SUPPORT COMPONENTS F-A VT-3 1-F1.10B 2-3-4 DATE: 12/20/95 REV IS I OH: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COHPOHEHTS PAGE: 15 SAFETY INJECTION SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT IF I CAT IOM INSPECT IOH INTERVAL I ASHE I SEC.XI CATGY NDE I ITEN NO NETH I PLAN STATUS FIRST SECOHD THIRD I PERIOD PERIOD PERIOD I I------OUTAGE----I 1 2 3 1 2 3 4 1 2 3 I INSTRUCI'IOHS
- CALIBRATION BLOCK*>>LINE 1-S-45 FIG MO A-60 622060 1-GSI-R-631 PIPE SUPPORT COMPONENTS F-A VT-3 1-F1.10A 2-3-4-LINE 1-SI 545 FIG MO A-6'I 623500 1-GSI-R-590 PIPE SUPPORT COHPOHEHTS F1.10B 2-C 3-4 F-A VT-3 1-623550 1-GSI-L-590A PIPE SUPPORT COMPONENTS F-A VT-3 1-F1.10A 2-3-4-C X LIME 1-SI.545 FIG HO A-62 623600 1-GSI-S-707 PIPE RESTRAINT COHPONEHI'-A VT 3 1 F1.10S 2 C C 3-X 4 623700 1-GSI-R-706 PIPE SUPPORT CONPOHENTS F-A VT-3 1 F1.10A 2-3-4-C 623800 1-GSI-R-705 PIPE SUPPORT COMPONENTS F A VT-3 1 F1.10B 2-C 3-4 C DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVII E INSPECTION LONG TERH PLAN CLASS 1 ALL STATUS COHPONENTS PAGE: 16 SAFETY NJECT ON SYSTE SUHHARY EXAHINATION AREA HUHBER I DENT IF I CAT ION INSPECTION INTERVAL I ASHE SEC.XI I CATGY HDE ITEH NO NETH I PLAN STATUS FIRST SECOND PERIOD PERIOD THIRD I PERIOD I------OUTAGE---
-I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS i~CALIBRAT ION BLOCK i LINE 1 SI-545 F G NO A.62 623900 1-GSI-R-704 PIPE SUPPORT COHPONEHTS CONT.L3 F1.10A 2.C 3-4-F-A VT.3 1 C 624000 1-GSI-R-703 PIPE SUPPORT COMPONENTS CONT.L3 F1.10A 2-3-4-F-A VT 3 1 C C X 624050 1-GSI-V-702 PIPE SUPPORT COHPOHENTS F1.10C 2-C 3-4 F-A VT-3 1-C LINE 1-SI 546 FIG NO A-63 624100 1-GSI-R-522 PIPE SUPPORT COHPOIIEHTS F-A VT.3 1-F1.10C 2-3-4.LINE 1 SI-546 FIG NO A-64 624150 1-GSI-R-576 PIPE SUPPORT COHPONEHTS FA VT3 1-F1.10A 2-3-4 C 624200 I-GSI-R-577 PIPE SUPPORT COHPONENTS F.A VT-3 F1.10B 2-3-4-C C DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLAN'I UNIT 1 IHSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS CONPOHEHTS PAGE: 17 SAFETY INJECTION SYSTEH SUHHARY EXAHINATION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I ASHE SEC.XI I CATGY NDE ITEN NO NETH I PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD-I------OUTAGE------I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATIOH BLOCK*~LINE 1-SI-546 FIG NO A-64 624300 1-GSI-R-578 PIPE SUPPORT COHPONENTS F1~108 2-3-F.A VT-3 1-C C X N Sl-6 F GHOA-65 624400 1-GSI-R-701 PIPE SUPPORT COHPOHEHTS F'I.10A 2C C 3-X 4 F-A VT 3 1 C 624500 1-GSI-R-700 PIPE SUPPORT COHPOHEHTS F1.108 2-C 3-4 F-A VT-3 1-C 624600 1-GSI-V-699 PIPE SUPPORT CONPOHENTS F I~10C 2-C 3-X 4 F-A VT-3 1-LINE 1-SI-546 FIG NO A-66 624700 1-GSI-R-9E PIPE SUPPORT CONPOHENTS F1.10C 2-3-4 F-A VT-3 1 624710 1-GSI-R-542A PIPE SUPPORT CONPOHEHTS F-A VT-3 1 F1~10C 2.3 DATE: '12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 18 SAFETY NJ CTION SYST H
SUMMARY
EXAllI NATION AREA NUHBER I DENT IF I CAT ION IHSPECT ION INTERVAL I ASHE I SEC.XI I CATGY MDE ITEH NO NETH I PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I------0 U T A G E------I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- ~CALIBRATIOH BLOCK**L HE 1-SI 546 FIG MO A-66 624720 1-GSI-R-542 PIPE SUPPORT COMPONENTS F-A VT-3 1 F1.10C 2-3-4-IME 1-S 54B FIG MO A-67 624800 1-GSI-R-717 PIPE SUPPORT COMPONENTS F1.10A 2-3-4-F-A VT.3 1-C C X-4 F 0 NO A-68 624900 1.GSI-R 694 PIPE SUPPORT COMPONENTS F-A VT-3 1-F1.108 2-C 3-X 4-C 625000 1.GSI-V 695 PIPE SUPPORT COMPONENTS ,F-A VT-3 F1.10C 2-3-4-IH 1-SI-549 F G NO A-69 625300 1-GSI-R-503 PIPE SUPPORT COMPONENTS F-A VT-3 1-F1'0C 2-3-4 625310 1-GSI.R.635 PIPE SUPPORT CONPOHEHTS F-A VT-3 1-F1.10C 2-3 DATE: 12/20/95 REVISION: 0 COOK HUCLEAR PLANT UNIT 1 IHSERVICE IHSPECTIOM LONG TERN PLAN CLASS 1 ALL STATUS COMPONEHTS PAGE: 19 SAFETY INJECTION SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION INSPECT ION INTERVAL I ASME I SEC.XI I CATGY HDE I ITEN NO METH I PLAH STATUS FIRST SECOND THIRD I PERICO PERICO PERIOD I------OUTAGE-----I 1 2 3 1 2 3 4, 1 2 3 INSTRUCTIONS
~~CALIBRATION BLOCK~>>LIHE 1-SI 549 F G MO A-70 625500 1-GSI.R-596 PIPE SUPPORT COMPOHEHTS F1.10C 2-3-4-F.A VT.3 1.625510 1-GS I-R-634 PIPE SUPPORT COMPONENTS F-A VT-3 1-F1.10C 2-3-4-625520 1-GSI-R-594 PIPE SUPPORT COMPONENTS F1.10C 2-3-4-F-A VT-3 1 625530 1-GSI.R-592 PIPE SUPPORT COMPOHEHTS F-A VT-3 1 F1.10C 2-3-4-625540 1-GSI-R-633 PIPE SUPPORT COMPONENTS F1.10C 2-3-4-F-A VT-3 1-625550 1-GSI-R-628A PIPE SUPPORT COMPONENTS F1.10C 2-3-4-F-A VT-3 1 625560 1-GSI R-626 PIPE SUPPORT COMPONENTS F1.10C 2-3-F-A VT-3 1 DATE: 12/20/95 REVISION: 0 COOK HUCLEAR PLANT UNIT 1 IHSERVICE IHSPECTIOH LONG TERM PLAN CLASS 1 ALL STATUS COMPOHEHTS PAGE: 20 SAFETY HJECTIOH SYSTEM
SUMMARY
EXAMIHATIOH AREA NUMBER IDENT IF ICATI OH IHSPECT ION INTERVAL I FIRST ASME PERIOD SEC.XI I CATGY HDE ITEM NO METH I 1 2 3 PLAN STATUS SECOND PERIOD OUTAGE 1 2 3 4 THIRD PERIOD 1 2 3 I I I INSTRUCTIONS
- CALIBRATION BLOCK~~LINE 1 SI-54 F G NO A-70 625570 1-GSI.R-624 PIPE SUPPORT COMPOHEHTS F A VT-3 1 F1.10C 2-3-LIME 1-SI-549 FIG HO A-72 626300 1-GSI.R.559 PIPE SUPPORT COMPONENTS F-A VT-3 1-F1.1$$2--.C 3-4-C X 626400 1-GS I-R-637 PIPE SUPPORT COMPONENTS F1.10A 2-3-4-F-A VT-3 1-C C X LINE 1 Sl-549 FIG NO A 73 626420 1.GSI-V-696 PIPE SUPPORT COMPOHEHTS F-A VT-3 1-F1.10C 2 3-4 C 626440 1-GSI-R-697 PIPE SUPPORT COMPOHEHTS F-A VT-3 1-F1.10A 2-3-4-626460 1-GSI-R-698 PIPE SUPPORT COMPONENTS F I.'IDNB 2-3-4-F-A VT-3 1 DATE: 12/20/95 REV I S ION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONEHTS PAGE: 21
SUMMARY
EXAMI NAY I OH AREA NUMBER IDENTIFICATION INSPECT I OH INTERVAL CHEHICAL AND VOLUME CONTROL SYSTEM I FIRST ASHE I PERICO SEC.XI I-CATGY NDE ITEM NO METH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD-I OUTAGE I 1 2 3 4 1 2 3 I INSTRUCTIONS
<<*CALI BRAT I OH BLOCK>>" LIHE 1-CS 9 F G NO A-74 630200 1.GCS.R-506 PIPE SUPPORT COMPONENTS F-A VT-3 1-F1.10HA 2 C 3X 4 LINE 1-CS-96 F G NO A-75 631200 1.GCS.R.543 PIPE SUPPORT COMPONEN'TS CONT.L1 F1.108 2-3-4-F A VT-3 1-C 631300 1-GCS.R.542 PIPE SUPPORT COMPONENTS CONT.L1 F1~10HA 2-3-4-F-A VT-3 1-C 631400 1-GCS.R-541 PIPE SUPPORT COMPONENTS F1.10B 2-C 3-4 F-A VT-3 1-C 631500 1-GCS.R-540 PIPE SUPPORT COMPONENTS COHT.L4 F1~10A 2-3-4 F-A VT-3 1-C C X LINE 1-CS-99 F G NO A-76 632200 1-GCS.R.511 PIPE SUPPORT COMPOHENTS F1.10HA 2-3-4-F-A VT-3 1 C DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 22 SUHWLRY EXAlllNATIOH AREA NUMBER IDEHTI F I CAT IOH INSPECTION INTERVAL CHEMICAL AMD VOLUME COHTROL SYSTEM I ASHE I SEC.XI I CATGY NDE ITEN NO NETH I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD OUTAGE------
1 2 3 1 2 3 4 1 2 3 INSTRUCTIONS I**CALIBRATIOH BLOCK~~LINE 1-CS-99 FIG MO A-76 632400 1-GCS-R-529 PIPE SUPPORT COMPONENTS F1.10MB 2-3-4-F-A VT-3 1 C 632500 1-GCS-R-505 PIPE SUPPORT COMPONENTS F1.1$$2-3-4-F A VT-3 1 C L HE 1 CS 780 FIG MO A-77 632550 1.GCS R-515 PIPE SUPPORT COMPONENTS REGEH NXRK F-A VT-3 1-F1.10WB 2-3-4 C X LIHE 1 CS 780 FIG HO A-78 639300 1-GCS-R-600 PIPE SUPPORT COHPOMEHTS CONT.PRT F-A VT.3 1-F1.10MB 2-3-4-C 639400 1.GCS.R-507 PIPE SUPPORT COMPONENTS F1.10NA 2-C 3-4 F-A VT-3 1 C 639500 1.GCS-R-601 PIPE SUPPORT CDNPOHEHTS REGEN HXRN F1.1$$2-3-4 F-A VT 3 1 C C X DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE IHSPECTIOH LOHG TERH PLAN CLASS 1 ALL STATUS COMPONENTS PAGE: 23 RESIDUAL HEAT REHOVAL SYSTEM
SUMMARY
EXAMINATION AREA NUHBER IDEHI'IF I CATION INSPECTION INTERVAL I FIRST ASME PERIOD SEC.XI I CATGY NDE ITEH NO METH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I OUTAGE------I 1 2 3 4 1 2 3 I INSTRUCTIOHS
- CALIBRATIOH BLOCK**LINE 1-RH-28 FIG NO A 80 640000 1-GRH-V-509 PIPE SUPPORT COMPONENTS F.A VT-3 1-F1'0lC 2 C 3X 4-C 641000 1-GRH-R-507 PIPE SUPPORT COMPOHEHTS F-A VT-3 1-F1.10NA 2-C 3-X 4-DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LOHG TERN PLAN CLASS 1 ALL STATUS COPOHEHTS PAGE: 24 REACTOR COOLANT PUNPS SU}}NARY EXANINAT I OH AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I FIRST ASHE PERIOD SEC.XI I CATGY NDE l ITEN NO KETH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD I-I OUTAGE-----I 1 2 3 4 1 2 3 INSTRUCTIONS
~~CALIBRATION BLOCK*PUNP SUPPOR S 650000 RC PUHP HO.11 SUPPORT F-A F1.40 VT-3 1 2.3-4 650100 RC PUHP NO.12 SUPPORT F-A F1.40 VT-3 1-2-3-4-650200 RC PUNP NO.13 SUPPORT CONT.L3 F-A F1.40 VT-3 2-3-4 C X 650300 RC PUHP NO.14 SUPPORT F-A F1.40 VT-3 1-2-3-4. DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COMPONENTS PAGE:~25 STEAM GENERATO S
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION PLAN Sl'ATUS FIRST SECOND PERIOD PERIOD IHSPECTIOH INTERVAL I ASHE I SEC~XI I CATGY HDE I 0 U T A G E ITEN NO NETH i 1 2 3 1 2 3 4 THIRD I PERIOD-I----I 1 2 3 I INSTRUCTIONS ~~CALIBRATIOH BLOCK~*UPPER LATERAL SUPPORTS 700001 SG-11-SHUBBERS 1 THRU 4 CONT.L1 F-A F1.40 VT-3 1-2-3-4 EXAMINED BY MAINTENANCE PROCEDURES PER TECHNICAL SPECIFICATIOH 3/4.7.8.700002 SG-12.SNUBBERS 1 THRU 4 CONT.L2 F A F1.40 VT-3 2-3-4-EXAMINED BY MAINTENANCE ~PROCEDURES PER TECHNICAL SPECIFICATION 3/4.7.8.700003 SG.13.SHUBBERS 1 THRU 4 COHI'.L3 F-A F1.40 VT-3 1-2-3-4-EXAMINED BY HAINTEMAMCE PROCEDURES PER TECHNICAL SPECIFICATIOH 3/4.7.8.700004 SG-14-SNUBBERS 1 THRU 4 CONT.L4 F-A F1.40 VT-3 1 2-3-4-EXAMINED BY MAINTENANCE PROCEDURES PER TECHNICAL SPECIFICATIOll 3/4.7.8. DATE: 12/20/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPONEHTS PAGE: 26 REGENERATIVE HEAT EXCHANGER SUHHARY EXANI HAT ION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I ASHE SEC.XI I CATGY HDE ITEN NO NETH I PLAN STATUS FIRST SECOHD PERIOD PERIOD-OUTAGE-1 2 3 1 2 3 4 THIRD I PERIOD I I-----I 1 2 3 I INSTRUCT I ONS i*CALI BRAT I OH BLOCK~~COMPONENT SUPPORTS FIG HO B-5 700010 CS.1 BRACKET REGEN HXRH F-A F1.40 VT-3 1-2-3-4-700020 CS.2 BRACKET REGEN HXRH F-A F1.40 VT.3 1-2-3-700030 CS-3 BRACKET F-A F'1.40 VT-3 1-2-C 3-X 700040 CS.4 BRACKET F-A F'1.40 VT-3 1-2-C 3-X 4 700050 CS-5 BRACKET REGEN HXRN F-A F1.40 VT-3 1-2-3-4-C X 700060 CS-6 BRACKET REGEH HXRH F-A F1.40 VT-3 1-2-3-4 REGUIRES INSULAT ION REHOVAL.C X DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLAHT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 27 CHEMICAL AND VOLUME CONTROL TAN
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION INSPECT ION INTERVAL I FIRST ASME PERIOD SEC.XI I CATGY NDE ITEM HO METH I 1 2 3 PLAH Sl'ATUS SECOND THIRD PERIOD PERIOD-I 0 U T A G E------I 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATIOH BLOCK**COMPOHEHT SUPPORTS FIG HO B 6 700070 1-CVCT.SC.1 F-A F1.40 VT-3 1 2 C 3 X 700080 1-CVCT-SC-2 F A F'1.40 VT-3 1 2-C 3 X 4-700090 1-CVCT-SC-3 VCT RH F-A F1.40 VT-3 1-2-3-4-700100 1.CVCT.SC.4 VCT RM F-A F1.40 VT-3 1 2-3-4 C X DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UHIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS CONPONEHTS PAGE: 28 RHR HEAT EXCHANGER EAST SUHHART EXAHI HAT I OH AREA NUNBER I DENT IF I CAT IOH INSPECTION INTERVAL I FIRST ASKE j PER IOD SEC~XI I CATGY NDE ITEN NO NETH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I-I 0 U T A G E------I 1 2 3 4 1 2 3 I I HSTRUCT I ONS<<<<CAL I BRAT ION BLOCK**COMPONEHT SUPPORTS FIG NO 8-9 700150 E-RHRHEX-SC-1 E RHR HXRN'F A F1.40 VT-3 1-2-3-4-C X 700160 E-RHRHEX-SC-2 E RHR HXRH F A F1.40 VT.3 1-2.3-4 C X DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 29 RHR HEAT EXCHANGER I!EST SUHHARY EXAHINATION AREA NUHBER IDENT IF I CAT IOH INSPECTION INTERVAL I FIRST ASHE PERIOD SEC.XI I CATGY NDE I ITEH NO NETH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD t I 0 U T A'G E----I 1 2 3 4 1 2 3 I INSTRUCTIONS i~CALIBRATION BLOCK*~COMPONENT SUPPORTS FIG NO B-10 700170 M-RHRHEX SC-1 II RNR HXRH F-A F1.40 VT-3 1-2-3-4-C X 700180 1I.RHRHEX-SC-2 IJ RHR HXRH F-A F1.40 VT.3 1-2-4-X C DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPOHENTS PAGE: 30 BORON INJECTION TANK SUHNARY EXAllINAT ION AREA NUHBER IDENT I F I CATION IHSPECTION INTERVAL I FIRST ASME PERIOD SEC.XI I CATGY NDE I ITEN NO NETH I 1 2 3 PLAN STATUS SECOND PERIOD THIRD I PERIOD-I OUTAGE--1 2 3 4 1 2 3 I INSTRUCT IOHS i+CAL I BRAT ION BLOCK**OHPOH T PP TS F G 700190 1-BIT-SC-1 F-A F1.40 VT-3 1-2 C 3X 4-700200 1-BIT-SC-2 F-A F1.40 VT.3 1-2-C 3 X 4-700210 1-BIT-SC-3 BIT RH F-A F1.40 VT-3 1-2-3-4-700220 1-BIT-SC-4 BIT RH F-A F1.40 VT-3 1-2-3-4-C X DATE: 12/20/95 REVI SIGH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE IHSPECTIOH LONG TERH PLAH CLASS 2 ALL STATUS COHPONENTS PAGE: 31 EHERGENCY CORE COO ING SYSTEH SUHHARY EXAHINATION AREA HUHBER IDENT I F I CATION INSPECTION INTERVAL FIRST ASHE I PERIOD SEC~XI I CATGY NDE ITEH NO NETH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I OUTAGE.---I 1 2 3 4 1 2 3 I INSTRUCT IOHS*~CALIBRATION BLOCK~~NE 1-S-2 FIG NO B-12 701200 1-GSI-V-124 PIPE SUPPORT COHPOHENT F1.20NC 2 C 3-4 F-A VT-3 1-701250 1.GSI.R-120 PIPE SUPPORT COHPOHEHT VEST I BULE F1.20A 2-3-4-F-A VT.3 1-C X 701340 1-GSI-L-1'19 PIPE SUPPORT COMPONEN'I F-A VT-3 1-F1.20NA 2-C 3-4-701360 1 ASI R-5006 PIPE SUPPORT COMPONENT F-A VT-3 1 F1.20SA 2-3-4 701380 1-GSI-S-128 PIPE RESTRAIN1'OHPONENT F-A VT-3 1 F1.20SA 2 C C 3 X 701440 1-GSI-R-125 PIPE SUPPORT COHPONENT W RHR PPRH F-A VT-3 1 F1.20MA 2-3-4 C 701443 1-ASI-R-5004 PIPE SUPPORT COHPOHENT'LI RHR PPRH F-A VT-3 1 F1.20NA 2.3 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTIOM LOMB TERH PLAN CLASS 2 ALL STATUS COHPOHEHTS PAGE: 32 EMERGENCY CORE COOLING SYSTEM SLNHARY EXAM INAT ION AREA NUMBER IDENT IFI CATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY HDE ITEH MO NETH/1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I I-----OUTAGE----I 2 3 1 2 3 4'I 2 3 I INSTRUCT IOHS**CALIBRATION BLOCK~LIHE 1 S FIG MO 8-12 701447 1 ASI-R-5003 PIPE SUPPORT COMPONENT ll RHR PPRH F-A VT-3 1 F1.20A 2-3-4 701450 1-GRH-L-57 PIPE RESTRAINT COMPONENT F.A VT-3 1 F1.20B 2-3-4-701460 1-GRH L-55 PIPE RESTRAINT COMPONENT II RHR PPRH F-A VT-3 1 F'I~20A 2-3-4-C 701470 1.GC'TS-R.74 PIPE SUPPORT COMPONENT F1.20A 2-3-4-F-A VT.3 1 701475 1-GCTS.R.576 PIPE SUPPORT COHPOHENT F1.20A 2-3-4-F-A VT-3 1-701480 1.GCTS-S-76 PIPE RESTRAINT CONPOHEHT F1.20MS 2C C 3.4 F A VT-3 1 701490 1-GCTS-S.161 PIPE RESTRAIHT COHPOMEHI'1.20NS 2C C 3-4-~F-A VT-3 1-DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTIOH LONG TERH PLAN CLASS 2 ALL STATUS COHPONEHTS PAGE: 33 H RGEHCY COR C ING SYST H SUHHARY EXAHINAT ION AREA NUHBER IDEN'll FI CAT ION INSPECTION INTERVAL I FIRST ASHE I PERIOD SEC.XI I CATGY NDE I ITEH NO HETH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD-I OUTAGE I 1 2 3 4 1 2 3 I INSTRUCTIONS
- aCALIBRATIOH BLOCK@a LINE 1-SI-2 FIG HO 8-12 701500 1.GCTS.R-70 PIPE SUPPORT COHPOHENT M CTS PPRH F-A VT-3 F1.20MA 2-3-4-C X 701510 1.GCTS.R.69 PIPE SUPPORT COHPOHEHT FA VT3 1 F1.20MA 2-3.4 701520 1-AS I-R-5017 PIPE SUPPORT COMPONENT FA VT3 1 F1.20A 2.3-4.LIHE 1-SI-3 FIG NO B-13 701620 1-GSI-V-123 PIPE SUPPORT CDHPOHEHT F1.20HC 2 C 3-4-F-A VT-3 1 701640 1-GCTS-R-77 PIPE SUPPORT COMPONENT VESTIBULE F-A VT-3 1 F1.20A 2-3-C 701660 1-GCTS.S-160A PIPE RESTRAINT COHPOHEHT F-A VT-3 1-F1.20**2 C C 3 X 701710 1-GCTS-S-73 PIPE RESTRAINT COHPOHENT F1.20HS 2C C 3-4 F-A VT-3 1-DATE: 12/20/95 REVI S IOH: 0 COOK NUCLEAR PLANT UNIT 1 IMSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL S'IATUS COMPONENTS PAGE: 34 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAHIHATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I F IRST ASHE PERIOD SEC.Xl CATGT NDE ITEH NO NETH i 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD I I OUTAGE I 1 2 3 4 1 2 3 J INSTRUCTIONS >>>>CALI BRAT ION BLOCK*>>N 1 S-G MO B-701750 1-GCTS-R-72 PIPE SUPPORT COMPONENT F-A VT-3 1-F1.20VA 2-3-4-701810 1-GCTS-R-67 PIPE SUPPORT COMPONENTS E CTS PPRH F1.20HA 2-3-4-F-A VT.3 1.C 701820 1-AS I-R 5015 PIPE SUPPORT COHPOHEHTS E CTS PPRH F-A VT-3 1-F1.20A 2-3-701830 1-AS I-R-5007 PIPE SUPPORT COMPONENTS E CTS PPRH F.A VT-3 1-F1.20A 2.3-4-701950'I-GSI.R-102 PIPE SUPPORT COHPOHEHT E RHR PPRN F1.20HA 2 3-4 F-A VT-3 1 C X 701990 1 GSI-S-103 PIPE RESTRAINT COHPOHEHT F1.20llS 2C C 3-4 F A VT-3 1 702000 1-ASI-R-5005 PIPE RESTRAINT COMPONENT F I.20MB 2-3.4.F-A VT-3 1 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 35 EMERGENCY CORE COOLING SYSTEM SUHHARY EXAHI HAT I ON AREA NUMBER IDENT IF ICATION INSPECT ION INTERVAL I FIRST ASHE PERIOD SEC.XI I CATGY HDE ITEM NO METH I 1 2 3 PLAH STATUS SECOND THIRD I PERIOD PERIOD-I OUTAGE I 1 2 3 4 1 2 3 I INSTRUCTIONS
- ~CALIBRATION BLOCK~~LINE 1-SI-3 FIG NO 8 13 702050 1-GRH.L-51 PIPE SUPPORT COMPOHEHT E RHR PPRM F-A VT-3 1-F1.20NB 2-3-4 C 702110 1-GRH-L-50 PIPE RESTRAINT COMPONENT F.A VT.3 F1.20NA 2-C 3-4 LINE 1-SI-4 FIG NO 8-14 702180 1-GRH-V-54 PIPE SUPPORT COMPONENT F1.20NC 2 C 3-4-F-A VT-3 1-702200 1-GRH.L-59 PIPE RESTRAIHT COMPOHEH'I F1.20A 2-C 3-4-F-A VT-3 1-702260 1-GRH-V-53 PIPE SUPPORT COMPONENTS VESTIBULE F-A VT-3 1 F1.20C 2-3-4.C X 702270 1-GRH.R-60 PIPE SUPPORT COMPONENT VESTIBULE F-A VT-3 1 F1.20NA 2-3-4-C 702275 1-ASI-R-5009 PIPE SUPPORT COMPONENT VESTIBULE F1.20NA 2-3-4 F-A VT-3 1 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UHIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONEHTS PAGE: 36 PLAN STATUS FIRST SECOND PERIOD PERIOD
SUMMARY
EXAMINATION AREA NUMBER IDEHT IF I CAT ION INSPECTIOH INTERVAL EMERGEHCY CORE COOI.ING SYSTEM I ASME I SEC.XI I CATGY~NDE I-----OUTAGE-ITEM HO METH I 1 2 3 1 2 3 4 THIRD I PERIOD I-----I 2 3 INSTRUCTIONS
- iCALIBRAT ION BLOCK~>>IN 1-SI-4 F G NO B-14 702280 1-GRH-R-52 PIPE SUPPORT COMPONENT VESTIBULE F-A VT-3 1 F1.20NA 2-4-C 702290 1-ASI.R-5010 PIPE SUPPORT COMPONENT VESTIBULE F A VT-3 1-F1.20A 2-3-4.N 1-S-O 702500 1-GSI R 543 PIPE SUPPORT COMPOHEHT F-A VT 3 1-F1~208 2 3-C LINE 1-SI-21 FIG NO B-16 702510 1-GSI-R 555 PIPE SUPPORT COMPOHENT F1.20A 2 C 3-4-F-A VT-3 1-C 702520 1-GSI-R 554 PIPE SUPPORT COMPONENT F1.20B 2-C 3I 4-F-A VT-3 1 C 702530 1-GSI-R-540 PIPE SUPPORT COMPOHEHT F1.20A 2-3-4-F-A VT-3 1 C DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 37 MERGEMCY CORE COO IMG SYSTEM SUIWARY EXAHINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I F IRST ASHE PERIOD SEC.XI I CATGY NDE ITEH MO HETH I 1 2 3 PLAN STATUS SECOND PERIOD THIRD I PERIOD I 0 U T A G E------I 1 2 3 4 1 2 3 I INSTRUCTIONS i*CALIBRATIOH BLOCK*LIME 1 Sl-21 FIG NO B-16 702540 1-GSI-R-660 PIPE SUPPORT COHPOHEHT F1.20MB 2.C 3-4 F-A VT-3 1.C 702548 1-GSI-R-664 PIPE SUPPORT COMPONENTS F.A VT-3 1 F1.208 2-3-4 C 702550 1-GSI-R-661 PIPE SUPPORT COMPONENT F1.20MB 2-C 3-4 FA VT3 1-LINE 1-SI-25 FIG NO 8-18 702880 1-GSI-V.534 PIPE SUPPORT COMPONENT F1.20A 2-3-4 F-A VT-3 1 C C 702910 1-GSI-R-535 PIPE SUPPORTCOHPONENT F1.20B 2-3-4-F-A VT-3 1 C X 702940 1-GSI-S-575 PIPE RESTRAIHI'OHPOHEHT F-A VT-3 F1.20S 2C C 3-C 702970 1-GSI-R-536 PIPE SUPPORT COMPONENT F1.20A 2-3-4 F-A VT-3 1-C DATE: 12/20/95 REVI S ION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECI'ION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 38 EHERGEHCY CORE COOLIHG SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT IF I CAT IOM IHSPECTIOH INTERVAL I ASME I SEC~XI I CATGY MDE ITEM MO METH PLAN STATUS FIRST SECOND , THIRD I PERICO PERIOD PERIOD----0 U T A G E------I 1 2 3 1 2 3 4 1 2 3 I INSTRUCT IOHS~~CAL I BRAT IDH BLOCK**NE 1-SI 5 F G NO B-18 702980 1-GSI.R-537 PIPE SUPPORT COMPONENT F1.20A 2-3-4 FA VT3 1-C C 703020 1-GSI.R-538 PIPE SUPPORT COMPONENT FA VT3 1-F1.20B 2-3-4-C 703060 1-GSI-R-539 PIPE SUPPORT COMPONENT F1.20A 2-3-4-F-A VT-3 1-C C 703080 1.GSI.R-672 PIPE SUPPORT COMPONENT F-A VT-3 1 F1.208 2-C 3-4-C" 703090 1-GSI-V-673 PIPE SUPPORT COMPONENT F1.20BC 2C C 3 4-F.A VT-3 1-703170 1-GSI-R-665 PIPE SUPPORT COHPONEHT FI.20MB 2-C 3X 4-F-A VT.3 1-LINE 1-SI-28 FIG HO B-19 703290 1.GSI.R-551 PIPE SUPPORT COMPOHENT F1.20MB 2 C 3-4-F-A VT.3 1-C DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LOHG TERH PLAN CLASS 2 ALL STATUS COHPOHEHTS PAGE: 39 EHERGEHCY CORE COOL NG SYSTEH SUHHARY EXAHI HAT I ON AREA NUHBER IDEHTIFICATIOH INSPECTION INTERVAL I ASHE I SEC~Xl I CATGT NDE ITEH NO HETH I FIRST PLAN STATUS SECOND THIRD PERIOD PERICO PERIOD 0 U T A G E I INSTRUCTIONS 1 2 3 1 2 3 4 1 2 3 I~*CALIBRATION BLOCK~LIHE 1-S1-30 FIG HO 8-20 703310 1-GSI-R-544 PIPE SUPPORT COHPOHEHT F1.20MB 2-3-4 F-A VT-3 1 C C LINE 1-S1-32 FIG NO B.21 703330 1-GSI-R.547 PIPE SUPPORT COHPONEHT F1.20MB 2-C 3-4-F-A VT-3 1-C LINE 1-S 34 F G HO B-22 703350 1-GSI-R-548 PIPE SUPPORT COHPOHENT F1.2NS 2-3-4-F-A VT-3 1 C C LINE 1-Sl 68 FIG NO B-23 703780 1-GSI-R-671 PIPE SUPPORT COHPONEHT F1.20A 2 C 3-4 F-A VT-3 1 703790 1-GSI.V-604 PIPE SUPPORT COHPOHEHT F1.20C 2-C 3-4-F-A VT-3 1-C LINE 1-SI 69 FIG NO 8-24 703990 1-GSI-R-663 PIPE RESTRAINT COHPONEHT F1.20A 2-3-4-F-A VT-3 1-C DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPOHEHTS PAGE:-40 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT IF I CATION INSPECTION INTERVAL I FIRST ASHE I PERIOD SEC+XI I CATGY MDE ITEN HO NETH I 1 2 3 PLAM STATUS SECOND THIRD I PERIOD PERIOD I-I OUTAGE-----I 1 2 3 4 1 2 3 I IHSTRUCTIOHS ~iCALIBRATION BLOCK~+E1-S 6 FGMOB-24 704160 1-GSI-V-670 P!PE SUPPORT COHPOHEHT F1.20C 2-C 3-4.F-A VT-3 1-H 1 S 70 F G HO B-25 704300 1-GSI-R 662 PIPE SUPPORT COMPONENT F1.20HA 2.C 3-4 F-A VT-3 1 C 704390 1-GSI-V.606 PIPE SUPPORT COMPONENT FA Vl'3 1 F1.20C 2.3-4-LIN 1-SI-71 F G MO B-26 704400 1.GSI-R.667 PIPE SUPPORT COMPONENT F.A VT-3 1-F1.20MA 2.3-4 704410 1-GSI-R-668 PIPE SUPPORT COMPONENT F.A VT.3 1....C F1.20HA 2---C 3-4-704530 1 GSI R 669 PIPE SUPPORT COMPONENT F1.20A 2-C 3-F-A VT-3 1 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LOHG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 41 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT I F I CATION INSPECTION INTERVAL I FIRST ASME PERIOD SEC.XI I CATGY NDE ITEM NO METH r 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD-I 0 U T A G E I 1 2 3 4'1 2 3 I INSTRUCTIONS
- CALIBRATIOH BLOCK**LINE 1-SI-71 FIG HO B 26 704700 1-GS I-V-608 PIPE SUPPORT COMPOHEHT CONT.L4 F1.20C 2-3-4-F A VT-3 1 C X LINE'1-RH-1 FIG NO B-27 704740 1-ARH-R.5008 PIPE SUPPORT COMPONENT F1.20A 2-3 F-A VT-3 1 704750 1-ARH-R-5003 PIPE SUPPORT COMPOHEH'I F-A VI'.3 1-F1.20A 2-3-4-704760 1-GRH-L-7 PIPE SUPPORT COMPONENT F1.20MA 2 C 3.4-F-A VT-3 1-704800 1-GRH-L-36 PIPE SUPPORT COMPONENT F-A VT-3 1-F1.20HA 2-3-704805 1-GRH-S-78 PIPE RESTRAINT COMPONENT F1.20S 2C C 3-4-F-A VT-3 1 704810 1-GRH-S-7A PIPE RESTRAINT COMPOHEHT F1.20S 2C C 3-4.F-A VT-3 1 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 42 EMERGENCY CORE COOLIHG SYSTEM SUMHARY EXAMINATION AREA NUMBER IDENTIFICATION INSPECTIOH INTERVAL I ASHE I SEC.XI I CATGY HDE ITEN NO METH I PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I I OUTAGE I 1 2 3 1 2 3 4 1 2 3 INSTRUCT IOHS~~CALIBRATIOH BLOCK*L NE 1.RH-1 FIG NO B.27 704850 1.GRH-V-B PIPE SUPPORT COMPONENT E RHR PPRH F-A VT-3 1 F1.20C 2-3-4-C 704900 1.GRH-V-9 PIPE SUPPORT COMPONEHT E RHR PPRN F1.20NC 2-3-4-F A VT-3 1 704910 1-GRH-L-43 PIPE SUPPORT COMPOHEHT E CHG PPRN F-A VT-3 1-F1.20A 2-3-4-704920 1.GRH.L.44 PIPE SUPPORT COMPOHEHT E CHG PPRN F1'0A 2-3-F-A VT-3 1-704930 1-GRH R 10 PIPE SUPPORT COMPONENT E CHG PPRN'F A F1.20NA VT.3 1.2-3.4 C X 704933 1-ARH R 5010 PIPE SUPPORT COMPONENT E CHG PPRN F-A VT-3 1 F1.20A 2 3-4-704937 1-ARH.R-5005 PIPE SUPPORT COMPONENT E CHG PPRH F-A VT-3 1 F1.20A 2.3 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 43 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAHIHATION AREA NUMBER IDENTIFICATION INSPECTIOH INTERVAL I ASHE I SEC.XI I CATGY NDE I ITEH HO METH I 1 PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD--.--0 U T A G E-----2 3 1 2 3 4 1 2 3 I INSTRUCTIONS <<*CALIBRATIOH BLOCK~~LIHE 1-RH-1 FIG NO B-27 704940 1-GRH.V-11 PIPE SUPPORT COMPONENT E RHR HXRM F.A VT-3'I-F1.20HC 2.3-4 C 704950 1-GRH.R-12 PIPE SUPPORT COMPONENT E RHR HXRH F1.20HA 2-3-4 FA VT3 1 C LINE 1.RH.2 FIG HO B-28 705140 1-GRH.R-1 PIPE SUPPORT COHPOHENT W RHR PPRH F1.20HA 2-3-4 F-A VT-3 1-C 705150 1-GRH.R-35 PIPE SUPPORT COMPONENT iJ RHR PPRH F1.20A 2-3-4.F-A VT-3 1 C X 705153 1-ARH.R-5004 PIPE SUPPORT COMPONEHT W RHR PPRH F1.20A 2-3-4-F-A VT-3 1-705157 1-ARH-R-5009 PIPE SUPPORI'OMPONENT 'M RHR PPRH F-A VT-3 1 F1.20A 2-3-705160 1-GRH-S.48 PIPE RESTRAINT COHPOHEHT F1.20S 2 C C 3-4 F.A VT-3 1 DATE: '12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IMSERVICE INSPECTION LONG'PERH PLAM CLASS 2 ALL STATUS COMPONENTS PAGE: 44 EHE GEMCY COR DOLING SYSTEM
SUMMARY
EXAHINATIOH AREA NUHBER IDENT IF ICAT10N INSPECTION INTERVAL FIRST ASHE I PER I CO SEC.XI I CATGY NDE I ITEH NO NETH i 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE----1 2 3 4 1 2 3 I I I I IHSTRUCTIOHS ~*CALIBRATION BLOCK**LIHE 1-RH-2 F G NO B.28 705170 1.GRH-S-47 PIPE RESTRAINT COMPONENT F-A VT-3 F1'0S 2C C 3-4-705190 1-GRH-V.2 PIPE SUPPORT COHPOHENT FA VT3 1-F1.20NC 2-3-4.705240 1 GRH V 3 PIPE SUPPORT COMPONENT F1.20QC 2-3-4-F-A VT.3 1.C 705242 1.GRH-R 4 PIPE SUPPORT COHPOHEHTS U CHG PPRH F1.20MA 2-3-F-A VT-3 1.C 705244 1 GRH-R-5 PIPE SUPPORT COMPONENTS F-A VT-3 F'1.20HA 2-C 3-4-LINE 1-RH-3 F G NO 8-29 705250 1.GRH-R.6 PIPE SUPPORT COMPONENT F1.20MA 2 C 3-4-F-A VT.3 1-705260 i-GRH-V.14 PIPE SUPPORT COMPONENT E RHR HXRH F-A VT-3 1 F1.20HC 2.C 3-X 4-C DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE IHSPECTION LOHG TERH PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: '5 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAHINATIOH AREA NUMBER IDENTIFICATION INSPECTION INTERVAL F IRST ASME I PER ICO SEC XI I CATGY NDE ITEM NO METH i 1 2 3 PLAN STATUS SECOHO PER I OO-OUTAGE 1 2 3 4 THlRD PER I OO I----I 1 2 3 I IHSTRUCT I ONS**CALIBRATION BLOCK**LINE 1-RH.3 FIG NO B-29 705270 1 GRH-R-15 PIPE SUPPORT COMPONENT E RHR HXRH F1.20@A 2-3-4-F-A VT 3 1-C 705280 1-GRH-R-13 PIPE SUPPORT COMPONENT W RHR HXRM F-A VT-3 1 F1.20WA 2-3-4 C 705282 1-GRH L-46 PIPE SUPPORT COMPOHENT IJ RHR HXRH F1.20A 2-3-4 F-A VT-3 1-705284 1-GRH-L-45 PIPE SUPPORT COMPONENT N RHR HXRH F1.20A 2-3-4 F-A VT.3 1-705286 1-ARH.R-5011 PIPE SUPPORT COMPONENT N RHR HXRH F-A VT-3 1-F1.20A 2-3-4 LINE 1-RH.4 FIG NO B-30 705288 1-GRH.R-5006 PIPE SUPPORT COMPONENT F-A VT-3 F1.20A 2-3-705400 1-GRH~L-36A PIPE SUPPORT COMPONENT F1.20A 2C 3-4 F-A VT-3 1 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS KHPOHEHTS PAGE: 46 EHERGEHCY CORE COOLING SYSTEH SUHHARY EXAHINATIOH AREA NUHBER IDENT I F I CATION IHSPECTION INTERVAL I F IRST ASNE (PERIOD SEC.XI I CATGY NDE ITEN NO NETH i 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIIX)I OUTAGE----I 1 2 3 4 1 2 3 I INSTRUCT I OHS*~CALIBRATIOH BLOCK~*LINE 1-RH-4 FIG NO B-30 705410 1.GRH.R-37 PIPE SUPPORT COHPONEHT F A VI'-3 1 F1.20A 2-3-4-705420 1-ARH-R 5007 PIPE SUPPORT COHPONENT F-A VT-3 1-F1.20A 2-3-4 705740 1.GRH-L-39 PIPE SUPPORT COHPOHEHTS VESTIBULE F1.20MA 2-3-4-F A VT-3 1-C X 705770 1 GRH-V-40 PIPE SUPPORT COHPOHENT F.A VT.3 1-F1.20C 2-3-705780 1-GRH-L-41 PIPE SUPPORT COHPONEHT F-A VT-3 1 F1.20A 2 3-4-LINE 1.RH.S FIG HO 8-31 705810 1-GCTS-L-81 PIPE SUPPORT COHPOHEHTS W RHR HXRH:F1.20A 2 3-4-F A VT-3 1-C 705820 I-GRH R-16 PIPE SUPPORT COHPOHEHT F-A VT-3 F 1.20NA 2-C 3 DATE: '12/20/95 REVISION: 0 COOK HUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPONEHTS PAGE 47 EHERGENCY CORE COOLING SYSTEH SUHHARY EXAHINAT ION AREA NUHBER I DENT IF I CATION INSPECTIOH INTERVAL , I ASHE I SEC.Xl CATGY NDE I ITEN NO NETH I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD I-I-OUTAGE.-.-.I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS ~*CALIBRATIOH BLOCK i LINE 1-RH-5 FIG NO B-31 705830 1-GRH.R.17 PIPE SUPPORT COHPONENT'N RHR HXRH F1.20NA 2-3-4 F A VT-3 1-C 705840 1-GCTS-L-15 PIPE SUPPORT COHPONEHTS F A VT-3 1 F1.20B 2-3-4 706000 1-GCTS-V-80 PIPE SUPPORT COHPONENT H RNR HXRH F-A VT-3 1-F1.20C 2-3-4-C 706050 1 GCTS-L-78 PIPE SUPPORT COHPONENT F1.208 2 C 3-4 FA VT3 1 706060 1-GCTS;L-5 PIPE SUPPORT COHPONEHTS F-A VT 3 1-F1.20MB 2 C 3 X 4-706140 1-GCTS R-6 PIPE SUPPORT COHPONENT F-A VT-3 1 F1.20A 2-3-4-706190 1.GCTS-R-7 PIPE SUPPORT COHPONEHT F-A VT-3 F1.20A 2-C 3 DATE: 12/20/95 REVISIOH: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTIOH LONG TERN PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 48 EHERGENCY CORE COOLING SYSTEH SUHHARY EXAHINATIOH AREA NUHBER IDENT IF I CATION PLAH STATUS FIRST SECOND PERIOD PERIOD INSPECTION INTERVAL I ASHE I SEC.Xl CATGY NDE/-----0 U T A G E ITEH NO NETH I 1 2 3 1 2 3 4 THIRD I PERIOD I-I 1 2 3 INSTRUCTIONS seCALIBRATIOH BLOCK@*LIHE 1-RN-FIG NO B-31 706195 1-GCTS.L-79 PIPE SUPPORT COHPONENTS F-A VT-3 F1.20A 2-3-4-706200 1-GCTS-R-8 PIPE SUPPORT COHPONEHT VESTIBULE F1.20A 2-3-4 F.A Vl'-3 1-C X 706210 1.GCTS-L-9 PIPE RESTRAINT COHPONENT F1.20NB 2-3-4-F-A VT-3 1-706240 1 GCTS-R-10 PIPE SUPPORT COHPONEHT VESTIBULE FA VT-3 1-F1.20A 2-3-C LINE 1-RN.6 FIG NO B-32 706420 1-GCTS-R-18 PIPE SUPPORT COHPONEHT F-A VT-3 F1.20A 2 3 4-706440 1-GCTS-V.82 PIPE SUPPORT COHPONEHT F1.20C 2C 3.4 F-A VT-3 1-706520 1-GCTS-L-83 PIPE SUPPORT COHPONENT F A VT-3 1-F1.20B 2-3.4. DATE: 12/20/95 REVISIOH: 0 COOK NUCLEAR PLANT UHIT 1 IHSERVICE INSPECTION LOHG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 49 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAHINAT ION AREA NUMBER IDENT IF I CATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE ITEH HO METH I 1 PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD I-I OUTAGE I 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALI BRAT ION BLOCK*~LINE 1-RH-6 FIG MO 8-32 706530 1-GCTS-R-11 PIPE SUPPORT COMPONENT F.A VT.3 1-F1.20NA 2-3-4 706610 1-GCTS-R-12 PIPE SUPPORT COMPONENT VESTIBULE F-A VT-3 1 F1.20A 2-3-4 C 706620 1-GCTS-L-13 PIPE SUPPORT COHPOHEHT VESTIBULE F1.20MB 2-3.4 F-A VT-3 1 C X C 706640 1-GCTS-R-14 PIPE SUPPORT COMPONENT VESTIBULE F-A VT-3 1.F1.20A 2-3-4-C 706700 1-GC'IS-R-18 PIPE SUPPORT COMPONENT VESTIBULE F-A VT 3 1 F1.20A 2-3-4-LIME 1-RH-7 F G NO B-33 706750 1-GRH-L-42 PIPE RESTRAINT COMPONENT E RHR HXRH F-A VT-3 1 F1.20A 2-3-4-.C 706760 1-GRH-R-19 PIPE SUPPORT COMPONENT E RNR HXRH F1.20NA 2-3-4 F-A VT-3 1 C DATE: 12/20/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 50 EMERGENCY CORE COO NG SYSTEH SUHMARY EXAHI HAT ION AREA NUMBER IDENT IF ICATION INSPECTION INTERVAL I FIRST ASHE, J PERIOD SEC.XI I CATGY NDE ITEH NO HETH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I 0 U T A G E------I 1 2 3 4 1 2 3 I INSTRUCTIONS
~~CALIBRATION BLOCK~~LINE 1-RH-7 FIG NO 8-33 706770 1-GSI-L-140 PIPE SUPPORT COHPONENT E RHR HXRH F1.20NA 2-3-4-F A VT-3 1 706850 1-GSI-R.49 PIPE SUPPORT COHPONENT E RHR HXRH F'I.20llA 2-3-F.A VT.3 1-C 706860 1-GSI-L-49A PIPE SUPPORT COMPONENT E RHR HXRH F1.20NA 2-3-4-F-A VT-3 1-706950 1-GSI-L-50 PIPE SUPPORT COMPONENT F 1.20NB 2-C 3-X 4 F-A VT-3 1-706960 1-GSI R-51 PIPE SUPPORT COHPOHENT F1.20A 2 C 3-4.F-A VT-3'1 707020 1.GSI-R-52 PIPE SUPPORT COHPOHENT F'l.20A 2-3-4-F-A VT-3 1 707030 1-GSI.L.160 PIPE SUPPORT COHPONENT F-A VI'-3 1 F1.20A 2-3 DATE: 12/20/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LOMB TERN PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 51 EMERGENCY CORE COOLIHG SYSTEM
SUMMARY
EXAHINATION AREA NUMBER IDEHT I F I CATION IHSPECTIOH IHTERVAL I ASHE I SEC.XI I CATGY NDE ITEN NO HETH I PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD------OUTAGE----I 1 2 3 1 2 3 4 1 2 3 I IHSTRUCTIOHS
- ~CALIBRATION BLOCK~*LIME 1-RH-7 FIG MO 8-33 707060 1-GSI-L-53 PIPE SUPPORT COMPONENT F-A VT-3 F1.20MB 2-C 3-4-707080 1-GSI-R-54 PIPE SUPPORT COHPOHENT F-A Vl'-3 1-F1.20A 2-3-4 LINE 1-RN-8 FIG MO 8-34 707190 1-GSI-L.139 PIPE SUPPORT COHPONENT F1~20llA 2-3-F-A VT-3 1 707200 1-GSI-R-43 PIPE SUPPORT COHPOHEHI'1.20HA 2 C 3-4-F-A VT-3 1 707300 1-GSI-R-44 PIPE SUPPORT COMPONENT F1.20MB 2-3-4 F-A VI'-3 1?07370 1-GSI-R-45 PIPE SUPPORT COMPONENT F1.20A 2-C 3-4.F-A VT-3 1 707390 1-GS I-L-46 PIPE SUPPORT COHPOHEHT F-A VT-3 1 F1.208 2-3 DATE: 12/20/95 REVI SIGH: 0 COOK NUCLEAR PLAHT UNIT 1 IHSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 52 EHERGENCY CORE COOLIHG SYSTEH SUHHARY EXAHINATIOH AREA NUHBER IDENT IF I CAT ION IHSPECTIOH INTERVAL I FIRST ASHE PERIOD SEC.XI I CATGY NDE I------ITEN NO NETH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERICO-I OUTAGE I 1 2 3 4 1 2 3 I INSTRUCT IOHS**CALIBRATIOH BLOCK*~LINE 1-RH-8 FIG NO B-34 707420 1-GS I-L-47A PIPE RESTRAINT COHPOHENT VESTIBULE F'I.2$IA 2-3 4-F-A VT-3 1 C X 707430 1-GSI-R.47 PIPE SUPPORT COHPONENT F-A VT-3 F'1.20A 2-3-4-707450'I-GSI-L.48 PIPE SUPPORT COHPONEHT VEST I BULE F-A VI'-3 1 F1.20A 2-3-4-C LIHE 1-RH-9 F G NO 8-35 707570 1-GSI.L.42 PIPE SUPPORT COHPONEHT FA VT3 1 FI.2$JA, 2-C 3-X 4 C 707580 1-GSI.V-159 PIPE SUPPORT COMPONENT II RNR HXRH F-A VT-3 1 F1.20C 2-3-4 C C 707590 1.GSI-V.41 PIPE SUPPORT COHPOHENT F1.20NC 2-3-4-F-A VT-3 1 C 707600 1-GSI-L-46 PIPE SUPPORT COHPONEHT F-A VT-3 1-F1.2$JC 2-3-4 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 53 EMERGENCY CORE COOLIHG SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENT I F ICATION INSPECTION IN'IERVAL I ASHE I SEC.XI I CATGY MDE ITEM HO METH I PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I------0 U T A G E------I 1 2 3 1 2 3 4'I 2 3 INSTRUCTIONS
- ~CALIBRATION BLOCK*i NE 1-RH-9 FIG MO 8-3 707610 1-GSI-L-45 PIPE SUPPORT COMPONENT F1.20MC 2-3-4-F-A VT-3 1-707650 1.GSI-L-822 PIPE SUPPORT COMPONENT W CHG PPRH F1.20A 2-3-4-F-A VT-3 1-C C 707660 1-GSI-L.824 PIPE SUPPORT COMPONENT F-A VT-3 F1.20C 2-3-4-LIHE 1-RH-10 FIG HO B.36 707840 1.GSI L-21 PIPE SUPPORT COMPONENT E RHR MXRH F A VT-3 1 F1.20MB 2-3-C X C 707920 1-GSI-R-20 PIPE SUPPORT COHPONENT F1.20A 2 C 3-4-F-A VT-3 1 C C 707925 1.GSI.L.19 PIPE SUPPORT COMPONENT F-A VT-3 1-F1.20A 2-3-4 707930 1-GSI-V-18 PIPE SUPPORT COMPONENT'N CHG PPRH F.A VT-3 1 FI.20C 2-3-4-C C C DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLAHI'NIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPOHENTS PAGE: 54 EHERGENCY CORE COOLING SYSTEH SUHHARY EXAHINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY HDE I ITEN NO NETH I PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I I OUTAGE I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
~~CALIBRAT IOH BLOCK~~LINE 1-RH-11 F IG NO B-37 708070 1.GRH-V-21 PIPE SUPPORT COHPOHEHT F1.20NC 2-C 3-4-F.A Vl'-3 1 708080 1 GRH-L-35A PIPE SUPPORT COHPOHENT F1.20llC 2-3-4-F-A VT-3 1 LIHE 1 RH-27 FIG NO B.38 708500 1-GRH-R.508 PIPE SUPPORT COHPOHEHT F1.2$$2-3-4-FA VI'3 1-C 708520 1.GRH.R-505 PIPE SUPPORT COHPOHEHT FA VT3 F1'0A 2-3-4-C 708540 1-GRH.R-503 PIPE SUPPORT COHPOHEHT F1.20HB 2-C 3-4 F-A'T'-3 1-C LINE 1-RH-28 FIG NO B-39 708600'I GRH-R-506 PIPE SUPPORT COHPOHENT F1.201$2-C 3-4-F.A Vl'-3 1-C DATE: 12/20/95 REVISION: 0 COOK HUCLEAR PLANT UNIT'I IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPOHEHTS PAGE 55 EMERGENCY CORE COOLIHG SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDEN'I IF I CATION INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE ITEM HO METH I PLAN STATUS FIRST SECOND THIRD I PERIOD PERICO PERIOD I-I 0 U T A G E------I 1 2 3 1 2 3 4 1 2 3 IHS'IRUCTIOHS +~CALIBRATION BLOCK**NE 1 RH 30 FIG NO B-40 708700 1-GRN-R-500 PIPE SUPPORT COMPONEHT F1'0A 2-3-4-F-A VT-3 1-C C X 708720 1-GRH-R-501 PIPE SUPPORT COMPONENT F'1.20MB 2 C 3-F.A VT-3 1-708740 1-GRH~R.502 PIPE SUPPORT COMPOHEHT F-A VT-3 1-F1'0A 2-3-4 708760 1-GRH.R-504 PIPE SUPPORT COMPONENT F-A VT-3 1-F1.20WB 2-3-4-C C DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1" IHSERVICE INSPECTION LONG TERN PLAH CLASS 2 ALL STATUS COMPONENTS PAGE: 56
SUMMARY
EXAHINATIOH AREA NUMBER IDENT IF ICATIOH INSPECTION INTERVAL CNEHICAL AMD VOLUME COHTRDL SYSTEM ASHE I SEC~Xl I CATGY HDE ITEN NO NETH I 1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I OUTAGE I 2 3'I 2 3 4 1 2 3 INSTRUCTIONS iiCAL I BRAT I OH BLOCK~LIHE 1 CS-33 FIG NO B-41 718100 1.GCS-R-103 PIPE SUPPORT COMPONENTS F1.20A 2 C 3-F-A VT-3 1 C 718200 1.GCS-R-102 PIPE SUPPORT COHPOHEH'TS F1.208 2-3-4 F-A VT.3 1 C 718300 1.GCS-V-1038 PIPE SUPPORT COMPONENTS F1.20C 2-C 3-4 F-A VT 3 1-C 718400 1.GCS V-103A PIPE SUPPORT COMPONENTS E CMG PPRH F1.20C 2-3-4-F-A VT-3 1 C C C LINE 1-CS-35 FIG NO B-42 718500 1-GCS.V-108A PIPE SUPPORT COWPOHEHTS II CHG PPRH F-A VT-3 1 F1.20C 2 3-4 C X C C 718600 1-GCS-R-108 PIPE SUPPORT COHPOHEHTS U CHG PPRH F-A VT-3 1 F1.208 2-3-4-C 718700'I~GCS.R-107A PIPE SUPPORT COMPONENTS E CHG PPRH F1.20MB 2 3.F-A VT-3 1 C X C DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPONEN'IS PAGE: 57 SUHHARY EXAHINAT ION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL CNEHICAL AND VOLUHE CONTROL SYSTEH I FIRST ASHE I PER I CO SEC.XI I-CATGY NDE ITEH NO HETH I 1 2 3 PLAN S'TATUS SECOND THIRD PERIOD PERIOD I I-OUTAGE-I 1 2 3 4 1 2 3 INSTRUCTIONS ~~CALIBRATION BLOCK**LINE 1-CS-F G NO B-42 718800 1-GCS-R-107 PIPE SUPPORT COHPONENTS F1.20A 2-C 3-4-F-A VT-3 1-C DATE: 12/20/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 58 CONTAINHENT SPRAY SY E SUHHARY EXAHI HAT ION AREA HUNGER IDENT IF ICATION INSPECTION INTERVAL I ASNE I SEC.XI I CAT GY HDE I ITEH HO KETH I 1 PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD I-I---OUTAGE 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRAT ION BLOCK e LINE 1 CTS-1 FIG NO B-43 719020 1.GCTS R 17 PIPE SUPPORT COHPOHEHTS F-A VT 3 F1.20MA 2 C 3-4-C C 719030 1-GCTS-R-18 PIPE SUPPORT CONPOHENTS F1'0A 2-3-4-F-A VT-3 1 C 719040 1-GCTS-R-19 PIPE SUPPORT COHPONEHTS F1.20MA 2-C 3.F A VT-3 1 C 719050 1-GCTS-R-20 PIPE SUPPORT COHPOHEHTS F 1.20MA 2-3-4-F A VT-3 1 C 719053 1.GCTS-L-51 PIPE SUPPORT COHPOHEHTS F-A VT 3 1-F1.20MC 2-3.4-719057 1-GCTS-L.52 PIPE SUPPORT CONPOHEHTS F1.20MC 2-3-4-F A VT-3 1-719060 1-GCTS-V-21 PIPE SUPPORT COHPONEHTS M CTS HXRH F1.20MC 2-3-4-F A , VT-3 1 C C DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UHIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 59 COHTAINHEHT SPRAY SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDEHT IF I CAT IOM INSPECTION INTERVAL I FIRST ASNE I PERIOD SEC~Xl CATGY HDE ITEN NO KETK (1 2 3 PLAN STATUS SECOND THIRD PERICD PERIOD-I OUTAGE-I 1 2 3 4 1 2 3 I INSTRUCTIONS ~~CALIBRATION BLOCK**LIME 1-CTS-1 FIG NO 8-43 719150 1-GCTS-V-22 PIPE SUPPORT CONPOHEHTS 'N CTS NXRN F-A VT-3 1-F1.20HC 2-3-4-C C HE 1-CTS-FIG HO 8-44 719280 1-GCTS-R-28 PIPE SUPPORT COMPONENTS W CTS HXRH FA VT3 1-F1.204 2-3-4-C C 719320 1-GCTS-L-58 PIPE SUPPORT COMPONENTS F-A VT-3 1-F1.208 2-3-4 C 719330 1-GCTS-L-30 PIPE SUPPORT COMPONENTS ll CTS HXRH F1.208 2-3-4 F A VT-3 1 C C 719420 1-GCTS.R-29 PIPE SUPPORT COMPONENTS F1.20A 2.C 3.X 4-F-A'VT.3 1-C 719430 1-GCTS.R-59 PIPE SUPPORT COMPONENTS VESTIBULE F A VT-3 1 F1'0A 2.3 C C 719435 1-GCTS.L.60 PIPE SUPPORT COMPONENTS F1.20A 2-3-4 F-A VT-3 1-C DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTIOH LONG TERN PLAN CLASS 2 ALL STATUS COHPOHENTS PAGE: 60 COHTAIHKEHT SPRAY SYST H SQWARY EXANI HAT ION AREA HUHBER IDENTIFICATION INSPECTION INTERVAL I FIRST ASHE PERIOD SEC.XI I CATGY NDE ITEN NO NETH I 1 2 3 PLAH STATUS SECOND THIRD I PERICO PERIOD I OUTAGE-----I 1 2 3 4 1 2 3 I INSTRUCTIONS ~~CALIBRATION BLOCK*~LINE 1-CTS-2 FIG HO B-44 719440 1-GCTS-R.61 PIPE SUPPORT COHPOHENTS F1.20A 2 C 3-4 F-A VT-3 1-C 719470 1.GCTS-R-62 PIPE SUPPORT COHPOHENTS F-A VT 3 1 F1.20A 2 3-4.C LIHE 1-CTS-3 FIG NO B-45 719580 1-GCTS-R-31 PIPE SUPPORT COHPOHEHTS F1.20A 2-C 3-4-F.A VT-3 1 X C 719610 1-GCTS-L-32 PIPE SUPPORT COHPOHENTS N CTS HXRN F1.20B 2 3.4-F-A VT-3 1 C C 719680 1-GCTS-R-63 PIPE SUPPORT COHPONENTS VESTIBULE F1.20A 2 3-4 F-A VT-3 1-C C 719690 1-GCTS-L-64 PIPE SUPPORT COHPOHENTS VESTIBULE F1.20A 2-3.4 F-A VT 3 , 1 C C 719700 1-GCTS-R 65 PIPE SUPPORT CONPONEHTS VESTIBULE F1.20A 2-3-F-A VT-3 1-C C DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTIOH LONG TERH PLAN CLASS 2 ALL STATUS COHPOHEHTS PAGE: 61 CONTAIHHEHT SPRAY SYSTEH SUHHARY EXAHIHATIOI AREA HUHBER IDENTIFICATION INSPECTION INTERVAL I ASHE I SEC.Xl I CATGY NDE ITEH NO HETH I FIRST PLAN STATUS SECOND THIRD PERIOD PERIOD PERICO-OUTAGE------1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS ~+CALIBRATION BLOCK**L NE 1-CTS-3 FIG NO B-45 719730 1-GCTS-R-66 PIPE SUPPORT COHPOHENTS VEST I BULE F1.20A 2-3-F.A VT-3 1-C C NE 1 CTS-4 F G HO 8-46 719820 1-GCTS-R.24A PIPE SUPPORT COHPONENTS F1.20MB 2-C 3-4-F-A VT-3 1-719830 1.GCTS.R-24 PIPE SUPPORT COHPOHEN'fS F A VT-3 F1.2DMA 2 C 3.4 C 719835 1.GCTS.R.5002 PIPE SUPPORT COHPOHEHTS F1.20MA 2-3-4 F A VT-3 1*719840 1-GCTS-R-25 PIPE SUPPORT COMPONENTS E CTS PPRH F1.20MA 2-3-4 F-A VT-3 1 C X 719860 1-GCTS-L-54 PIPE SUPPORT COHPOHEHTS F1.2DMA 2-C 3-4-F-A VT-3 1-C 719880 1-GCTS.L-53 PIPE SUPPORT COHPOHEHTS F-A VT-3 1 F1.20MA-2-3 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 62 COWTAIMMEHT SPRAY SYSTEM SQDIARY EXAMINATION AREA NUMBER IDEHT IF I CATION INSPECTION INTERVAL I FIRST ASME PERIOD SEC.XI I-CATGY NDE ITEN NO NETH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I OUTAGE-----.I 2 3 4 1 2 3 I INSTRUCTIONS
- ~CALI BRAT IOH BLOCK INE 1-CTS-4 FIG HO B-46 719920 1-GCTS-V-26 PIPE SUPPORT COMPONENTS E CTS HXRN F-A VT-3 1-F1.20NC 2-3-4-C C 719930 1.GCTS-V.27 PIPE SUPPORT COMPONENTS E CTS HXRH FI.20NC 2-3-4-F-A VT.3 1-C INE 1 CTS-5 FIG NO B-46 720240 1-GCTS-R-33 PIPE SUPPORT COHPOHEHTS E CTS HXRH F-A VT-3 F1.20A 2-3-4-C L ME 1-CTS-5 FIG NO 8-47 720250 1-GCTS.R.34 PIPE SUPPORT COMPONENTS E CTS HXRH F1.20A 2-3-4-F-A VT-3 1-C C 720260 1-GCTS-R-35 PIPE SUPPORT COMPONENTS F1.208 2-C 3-4-F-A VT-3 1 C 720300 1-GCTS.R.41 PIPE SUPPORT COMPONENT F-A VT-3 1-F1.208 2-3-4 C DATE: 12/20/95 REV I S ION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPOHEHTS PAGE: 63 COHTAIHMEHT SPRAY SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION INSPECT I OH IHTERVAL I FIRST ASHE PERIOD SEC'I I CATGY NDE I ITEM NO METH I 1 2 3 PLAN STATUS SECOND PERIOD THIRD I PERIOD-I OUTAGE----I 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK~~LIHE 1-CTS-5 FIG NO B 47 720380 1-GCTS-R-42 PIPE SUPPORT COMPONENTS F-A VT-3 1 F1.20A 2-3-4 C 720390 1-GCTS-L-56 PIPE SUPPORT COMPONENTS VESTIBULE F1.20A 2-3.4-F-A VT-3 1-C 720400 1-GCTS-R.43 PIPE SUPPORT COMPONENTS VESTIBULE F1.20A 2-3-4-F-A VT-3 1 C C 1-S-6 F G 0 8-48 720490 1-GCTS-L.55 PIPE SUPPORT COMPONENI'S E CTS HXRM F1'0A 2-3-4 F-A VT-3 1-C C 720590 1-GCTS-R-36 PIPE SUPPORT COMPOHEHTS F1.20A 2 C 3-F-A VT-3 1-C 720610 1-GCTS-R-37 PIPE SUPPORT COMPOHENTS E CTS NXRM F1.208 2-3-4-F.A VT-3 1 C X C 720630 1-GCTS-R-38 PIPE SUPPORT COMPONENTS F1.20A 2-C 3.4-F-A VT-3 1-C DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPOHEHTS PAGE: 64 CONTAINMENT SPRAY SYSTEH SUNNARY EXANI NATION AREA NUNBER IDENT IF ICATION INSPECTION INTERVAL I FIRST ASNE PERIOD SEC XI I CATGY NDE I ITEN NO NETH i 1 2 3 PLAN STATUS SECOND PERIOD THIRD I PERIOD I 0 U T A G E-I 1 2 3 4 1 2 3 I INSTRUCT IOHS*~CALI BRATIOH BLOCK**LINE 1-CTS 6 FIG NO 8-48 720640 1-GCTS R-39-PIPE SUPPORT CONPOHENTS VESTIBULE F A VT-3 1 F1.208 2-3-C C 720650 1-GCTS-R 40 PIPE SUPPORT CONPOHENTS VESTIBULE F A VT-3 1-F1.20A 2-3-4.C C DATE: 12/20/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE IHSPECI'IOH LONG TERN PLAN CLASS 2 ALL STATUS COHPOHEHTS PAGE: 65 FEED'MATER SYSTEM SUNNARY EXAHINATIOH AREA NUNBER IDENTIFICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE ITEN NO NETH i 1 PLAN STATUS FIRST SECOND THIRD (PERIOD PERIOD PERIOD-I OUTAGE I 2 3 1 2 3 4 1 2 3 INSTRUCTIONS
>>*CALIBRATIOH BLOCK>>>>LINE 1-FM-10 F G HO B-49 726320 1-GFM-L-141 PIPE SUPPORT COHPOHEN'TS F-A VT-3 1 F1.20MB 2 C 3-4-726330 1-GFM-V.142 PIPE SUPPORT CONPOHEHTS NS ACC F1~20MB 2-C 3-X 4-F-A VT.3'I-C 726340 1-GFM-L 867 PIPE SUPPORT COHPOHENT NS ACC F1.20A 2-3-X 4-F-A VT-3 1-C 726350 1-GFM-V.143 PIPE SUPPORT CONPOHEHTS NS ACC F-A VT-3 1 F1.20C 2-3-4 C 726360 1-GFM-L-144 PIPE SUPPORT COMPONENTS F1~20MB 2-C 3-4-F-A VT-3 1-726370 1-GFM.V-145 PIPE SUPPORT CONPOHEHTS NS ACC F1.20C 2-C 3-F-A VT-3 1-C 726380 1-GFM.L-827 PIPE SUPPORT CONPOHENTS NS ACC F-A VT-3 1 F1.20S 2-3-4 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: " 66 FEEDIIATER SYSTEM
SUMMARY
EXAMIHATIOH AREA NUMBER IDENT IF I CATION INSPECTION INTERVAL I ASME SEC.XI I CATGY HDE 1TEM NO METH i 1 F IRST PERIOD PLAN STATUS SECOHD THIRD I PER IOD PER I CO I----OUTAGE---J 2 3 1 2 3 4 1 2 3 I INSTRUCT IOHS*>>CALI BRAT ION BLOCK>>>>LINE 1-FW-10 FIG HO B-49 726390 1.GFII-S-854 PIPE RESTRAINT COMPOHEHT F1.20NS 2-C 3-4-F-A VT-3 1-726400 1 Fil 10-HANGER PIPE RESTRAIHT COMPONEH'I F1.20WS 2.C 3.4 F A VT-3 1-NO AEP HANGER NUMBER ASSIGNED.SEE AEP DRAIIING 1-2-3952A. LINE 1-FIJ-11 FIG NO B-50 726420 1-FW-S-9 PIPE RESTRAINT COMPOHEHT F A VT-3 F1.20S 2C C 3-4 726430 1-Fll-H-3 PIPE SUPPORT COMPONENTS COHT.L3 F'1.20A 2-3-4-F A VT-3 1-C C 726440 1-FH.S-B PIPE RESTRAINT COMPONENT F1.20ilS 2C C 3-4-F-A VT-3 1-C 726450 1-FHS-7 PIPE RESTRAIHT COMPOHEHT F-A VT-3 1-F1.20NS 2 C C 3X 4-LINE 1-FW.12 FIG HO B-51 726490 1-GFil-L-147 PIPE RESTRAIHT COMPOHENI F-A VT-3 1.F1.20MB 2 3-4 C DATE: 12/20/95 REVISION: 0 COOK HUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 67 FEEDWATER STSTEN
SUMMARY
EXAMINATION AREA NUMBER IDENT I F ICATION INSPECTION INTERVAL I FIRST i ASHE PER I CO SEC.XI CATGY NDE ITEN HO NETH I 1 2 3 PLAN STATUS SECOND PERIOD THIRD I PER IOD-I 0 U T A G E-----I 1 2 3 4 1 2 3 I INSTRUCTIONS ~*CAL I BRAT ION BLOCK**LINE 1-FW-12 F G NO B-51 726500 1-GFW-L-851 PIPE RESTRAINT CONPOHEHT F1.20WA 2-3-4-F-A VT-3 1-726510 1-GFW-V-148 PIPE RESTRAINT CONPOHEHT HS ACC F-A VT-3 1-F1.20C 2.3-4-C 726520 1-GFW-R-827 PIPE SUPPORT COMPONENTS F-A VT-3 1-F1.20WB 2 3-4-GAMG SUPPORT FOR 1-FW-10/F1.20WA.726530 1.GFW-S-852 PIPE RESTRAINT COHPOHEHT F1.20WC 2-C 3-4 F-A VT-3 1 X C 726540 1-GFW-V-828 PIPE SUPPORT COMPONENTS F1.20WC 2-3-F-A VT-3 1 726550 1-FW-12-HANGER PIPE SUPPORT COMPONENTS W HS EHC F-A VT-3 1 F1.20WB 2-3-4-C HO HANGER NUMBER ASSIGNED.SEE AEP DRAWING 1 2-3952A.LIHE 1-FW-13 FIG MO B-52 726570 1-FW-S-6 PIPE RESTRAINT CONPOHEHT F-A VT-3 1 F1.20S 2 C C 3 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONEHTS PAGE: 68 FEEDNATER SYSTE SUHHARY EXAHI NATION AREA HUHBER IDENT IF I CATION INSPECTIOH INTERVAL I F IRST ASHE I PERIOD SEC.XI I CATGY NDE ITEN NO NETH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD I OUTAGE-----I 1 2 3 4 1 2 3 I INSTRUCTIONS
- ICAL I BRAT ION BLOCK*~N 1-FN-1 G NO B-5 726580 1-fll-S-5 PIPE RESTRAINT COHPOHENT F-A VT 3 F1'0S 1-2C C 3-4 726590 1-FH-H-2 PIPE SUPPORT COHPONEHTS F.A VT-3 1 F1.20A 2-3-4-C 726600 1-Fll-S-4 PIPE RESTRAINT COHPOHEHT F-A VT-3 1-F1.20MS 2 C C 3-4 X LIHE 1-FN-15 FIG NO 8-53 726630 1-GFN.R-800 PIPE SUPPORT COHPOHENTS F-A VT-3 F1.20llA 2.C 3-X 4 726640 1-GFN-S.862 PIPE RESTRAINT COHPONEHT F1.20S 2-C 3-4 F A VT-3 1 726650 1-GFM-S-866 PIPE RESTRAINT COHPONENT F1.20S 2-C 3-4-F A VT-3 1-726660 1-GFN.V-801 PIPE SUPPORT COHPONEHTS F1.20C 2 C 3-4-F-A VT-3 1-C DATE: 12/20/95 REVISIOH: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE IHSPECTIOM LONG TERN PLAN CLASS 2 ALL STATUS COHPONEHTS PAGE: 69 FEEDNATER SYSTEM SUHHARY EXAHINATION AREA NUHBER IDENT I F I CATION INSPECT I OH INTERVAL I ASHE I SEC.XI I-CATGY NDE ITEN NO NETH i 1 PLAH STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD-OUTAGE 2 3 1 2 3 4 1 2 3 I I I INSTRUCTIONS
~~CALI BRAT IOH BLOCK**LINE 1-FN-15 FIG MO B-53 726670 1.GFM.L-802 PIPE SUPPORT COHPOHEHTS F-A VT-3 F1.20A 2-3-4.C C 726680 1-Fll-15-HANGER PIPE SUPPORT COHPOHEHT F1.20A 2-4-F-A VT-3 1-1.FM-'15 IS ISOMETRIC HANGER NUMBER.MO HANGER HARK NUHBERASSIGNED. SEE AEP DRAMIMG 1-2-3952A, REV.15.LINE 1-FW-16 FIG NO 8-54 726700 1.FW-S-3 PIPE RESTRAIHT COMPONENT F-A VT-3 FIo20S 1-2 C C 3-4 726710 1 Fll-H-1 PIPE SUPPORT COMPONENTS F1.20A 2-C 3-F.A VT-3 1-726720 I-F'kS-1 PIPE RESTRAIHT COHPOHEHT F-A VT-3 F1.20HS 2C C 3.4 X 726730 1-FW-S.2 PIPE RESTRAINT COMPONENT F-A VT-3 F1.20llS 2C C 3-4-C LINE 1-FIJ-17 FIG NO B-55 726770 1.GFll-L-832 PIPE SUPPORT COMPONENTS F1.20MA 2-3.4-F-A VT-3 1-C DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLAN'I.UNIT 'I INSERVICE IHSPEC'IION LONG TERN PLAN CLASS 2 ALL STATUS COHPOHEHTS PAGE: 70 FEEDWATER SYSTEH SQNARY EXAHINATIOH AREA NUHBER IDENT I F I CATION INSPECTIOH INTERVAL I FIRST ASHE I PERIOD SEC.XI I CATGY NDE ITEN NO NETH I 1 2 3 PLAN STATUS SECOND TH I RD I PERIOD PERIOD I I OUTAGE--I 1 2 3 4'I 2 3 I INSTRUCTIONS >>>>CALIBRATION BLOCK*>>LIHE FN 7 G NO B-55 726780 1-GFll-S-861 PIPE RESTRAINT COMPONENT F-A VT 3 1 F1.20S 2-C 3-4 726790 1-GFII-V-831 PIPE SUPPORT CONPONENtS F A VT-3 1-F1.20C 2-3-4-C 726800 1 Gfll-V-830 PIPE SUPPORT CONPOHEHtS F-A VT-3 1 F1.20C 2-3-4 C 726810 1.GFII-R-829 PIPE SUPPORT CONPONENTS F1.20A 2-C 3-X 4-F-A VT-3 1 726820 1-FM-17-12F-HANGER PIPE SUPPORT CONPOHEHT E NS EHC F1.20A 2-3-4-F-A VT-3'1-C NO HANGER NUNBER ASSIGNED.SEE AEP DRANIHG 1-2-3952A. INE 1-FN-8 F NO B-56 726840 1-FN-S-12 PIPE RESTRAINT COMPOHEHt F-A VT-3 1-F1.20S 2C C 3-4-726850 1-FN-H-4 PIPE SUPPORT CONPOHEHTS CONT+L4 F-A VT-3 1 F1.20$2-I 3.4-C X DATE: 12/20/95 REVISIOH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTIOH LOHG TERM PLAN CLASS 2 ALL STATUS COMPOHENTS PAGE: 71 EEDNAT R SY T
SUMMARY
EXAMINATION AREA NUMBER IDENT I F I CAT ION INSPECTIOH INTERVAL I FIRST ASME PERIOD SEC.Xl I CATGY HDE I ITEM NO METH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD I OUTAGE------1 2 3 4 1 2 3 I IHSTRUCI'IOHS +*CAL I BRAT ION BLOCK~*LINE 1-FII-18 FIG NO B-56 726870 1-FN.S.11 PIPE RESTRAINT COMPONENT F-A VT.3 1-F'1.20WS 2 C C 3.4-726880 1-FN-S-10 PIPE RESTRAINT COMPOHENT F-A VT-3 F1.20S 2 C C 3.4-LINE 1-FN-26 FIG NO B-57 726910 I-GFN.V.803 PIPE SUPPORT COMPONENTS F-A VT 3 F1~20C 1-2 C 3-4-726920 1-CFN-L-804 PIPE SUPPORT COMPOHENTS F-A VT-3 1-F1.20B 2-3-4.726930 1-GFN.V-841 PIPE SUPPORT COMPONENTS F1.20C 2-C 3.4-F-A VT-3 1-726940 1-GFN-L-805 PIPE SUPPORT COMPONENTS 596'LAT F1.20A 2-3-4-F-A VT-3 1-C C X 726950 1-GFN.R-806 PIPE SUPPORT COMPONENTS F-A VT-3 1-F1.20NB 2-3.4-DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UHIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 72 FEEDMATER SYSTEH SUHHARY EXAHIHATIOH AREA NUHBER IDENT IF ICATION INSPECTION INTERVAL I FIRST ASHE PERIOD SEC.XI I CATGY NDE I ITEN NO NETH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I I 0 U T A G E I 1 2 3 4 1 2 3 I INSTRUCT IOHS*ICAL I BRAT ION BLOCK**IN 1-FM-27 FIG NO B-58 726960 1-GFM-L 842 PIPE RESTRAINT COHPONEHT 596 PLAT F1.20A 2-3-4-F-A VT-3 1 C C 726970 1-GFM-V.807 PIPE SUPPORT COHPONENTS 596 PLAT F-A VT.3 I-F1.20C 2-3-4-C 726980 1-GFM-L-808 PIPE SUPPORT COHPONENTS 596 PLAT F1.20A 2.3.4-F-A VT-3 1-C C 726990 I-GFM-L-809 PIPE SUPPORT COHPONEHTS M HS ENC F-A VT-3 1-F1.20MB 2-3-4 C X C LINE 1-FM.30 FIG NO B.59 727000 1-GFM-R-822 PIPE SUPPORT COHPONENTS FA VT3 1-F1.20A 2.3-4-727010 1-GFM-R.821 PIPE SUPPORT COHPONENTS F A VT-3 1-F1.20A 2-3.4-C 727020 1-GfM-L.823 PIPE SUPPORT COHPONENTS E HS ENC F-A VT-3 1 F1.20MB 2.3.4-C X DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE IHSPECTIOH LONG TERN PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 73 FEEDMATER SYSTEH
SUMMARY
EXAMINATION AREA NUMBER IDENT I F ICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY MDE I-ITEN NO NETH I 1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I-I----.OUTAGE-----I 2 3 1 2 3 4 1 2 3 INSTRUCTIONS
- ~CALIBRATIOH BLOCK*LIME'I-F'N 31 FIG MO B 60 727030 1-GFll-R-824 PIPE SUPPORT COMPONENTS F1.20A 2-3-4-F-A VT-3 1-C 727040 1-GFM.L.825 PIPE SUPPORT COHPONEHTS F1.20A 2-3-4-F-A VT-3 1 C 727050 1-GFH L-826 PIPE SUPPORT COMPONENTS E HS EHC F1.20MB 2-3-4 F-A VT-3 1 C DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPOMEMTS PAGE: 74 HAIN STEAN SYSTEH SUHHARY EXAHIHATI OH AREA NUMBER I DENT I F I CAT ION INSPECTION INTERVAL I ASHE I SEC.Xl I CATGY HDE ITEM HO NETH I 1 FIRST PERIOD PLAN STATUS SECOND THIRD PERIOD PERIOD I-I OUTAGE I 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATIOH BLOCK*HE 1-HS-1 G NO 8.61 735730 1-HSH-1 PIPE SUPPORT COHPOHEHTS F-A VT-3 1 F1.20C 2C 3X 4 C 735740 1-MSS-1 PIPE SUPPORT COHPONEHTS F-A VT-3 1 F1.20NA 2 C C 3 0 735750 1-HSS-2 PIPE SUPPORT COHPOHENTS F-A VT-3 1.F1.2$IS 2 C C 3.4.C HAIN ST AN ISOLATION VALVE L HE 1-HS-2 F G NO 8-73 8-74 735813 NSI V-HRV-210-$
1 PIPE SUPPORT CONPOHENTS F-A VT-3 1-F1~20MA 2-3-4 C 735816 HSI V-HRV-210-S2 PIPE SUPPORT COMPOHEHTS F-A VT-3 1-F1.20NA 2.3-4 LINE 1-HS-6 FIG NO 8-63 735870 1-HSH-2 PIPE SUPPORT COMPONENTS F A VT-3 1-F1.20C 2-3-4 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 75 HAIN STEAN SYSTEH SUHHARY EXAHINATION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I ASHE I SEC~XI I CATGY NDE ITEH NO NETH I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD--OUTAGE-1 2 3 1 2 3 4 1 2 3 I I I INSTRUCTIONS I iiCALIBRATIOH BLOCK**LINE 1-HS-6 FIG NO 8.63 735880 1-HSS-3 PIPE SUPPORT COHPONENTS F-A VT-3 1-F1~20MB 2C C 3-4 C X 735890 1-HSS-4 PIPE SUPPORT COHPONENTS F1.20WS 2 C C 3-4 F-A VT-3 1-C HAIN STEAN SOLAT ON VALVE-LINE 1-HS-7 FIG NO B-73 B 74 735953 HSIV.HRV-220.81 PIPE SUPPORT COHPONENTS F1'0NA 2-3.4 F-A VT-3 1 735958 HSIV.HRV-220-S2 PIPE SUPPORT COHPONENTS F1.20MA 2-3.4-F.A VT-3 1-L NE 1.HS-10 FIG NO 8-65 736010 1-HSH-3 PIPE SUPPOR'I COHPONENTS CONT.L3 F-A VT-3 1 F1.20C 2.3-4-C 736020 1.HSS-6 PIPE SUPPORT COHPONENTS F-A VT-3 1 F1.20WS 2 C C 3-4-C DATE: 12/20/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE IHSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPOHENTS PAGE: 76 HAIN STEAN SYSTEH SUHHARY EXAHI HAT I ON AREA NUHBER IDENTIFICATION FIRST PERIOD INSPECTION IHTERVAL I ASHE I SEC.Xl (CATGT NDE ITEH NO NETH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I OUTAGE I 2 3 4 1 2 3 J INSTRUCTIONS ~*CALIBRATION BLOCK*'+LIN 1~S-10 F G NO B 65 736030 1-HSS-5 PIPE SUPPORT COHPONENTS F1.20MS 2C C 3-4.F-A VT 3 1-C HA N STEAH SOLATION VALVE-LINE 1-HS-11 FIG NO B-73 B-74 736093 HS I V-HRV-230.S1 PIPE SUPPORT COHPONEHTS 'M HS EHC F-A VT-3 1 F1.20MA 2-3-4-C 736097 HSIV-HRV-230.S2 PIPE SUPPORT COHPONEHTS M HS ENC Fl.20MA 2-3-4-F-A VT-3 1 C LINE 1-HS-'f4 FIG NO B-67 736150 1-HSH.4 PIPE SUPPORT CCHPONEHTS , F-A VT-3 1 F1.20C 2 C 3-4-C 736160 1-HSS-8 PIPE SUPPORT COHPONENTS F-A VT.3 1-F1.20llS 2 C C 3-4 C 736170 1-HSS-7 PIPE SUPPORT COHPONEHI'S F-h VT 3 1-F1.20NS 2 C C 3-4 DATE: 12/20/95 REVI SIGH: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAH CLASS 2 ALL STATUS COHPONENTS PAGE: 77 HAIN STEAH SYSTEH SUHHARY EXAHINAT ION AREA HUHBER IDENT IF I CAT I OH INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE ITEH NO NETH I 1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERICO I I OUTAGE I 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS iiCAL I BRAT ION BLOCK*HAIN STEAH ISOLATION VALVE-LINE 1-HS-15 FIG NO B-73 B-74 736233 HSI V.HRV-240-S1 PIPE SUPPORT COHPOHEHTS F1.2$IA 2 C 3-4-F-A VT-3 1-736238 HSIV.HRV-240-S2 PIPE SUPPORT COHPOHEH'IS F-A VT-3 1 FI.20NA 2-3-4-LINE 1-HS-189 F G NO B-69 736240 1.GHS.V-825 PIPE SUPPORT COHPONENTS F1.20C 2 C 3-4-F-A VT-3 1 C LINE 1.HS-190 FIG NO B-70 736250'I.GHS-R.837 PIPE SUPPORT COHPONENTS F-A VT-3 1-F1.20MA 2-3-4-C 736260 1-GHS-L-829 PIPE SUPPORT COHPONENTS F-A VT-3 1-F1.20MA 2-3-4-C 736270 1-GHS-V.828 PIPE SUPPORT COHPONENTS F-A VT-3 1 F1.20C 2-C 3 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 78 HAIN STEAH SYSTEH SUHHARY EXAHINATION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I FIRST ASHE PERIOD SEC.Xl CATGY NDE ITEH NO KETH I 1 2 PLAN STATUS SECOND THIRD I PERIOD PERIOD I 0 U T A G E------I 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK~~1 HS-19 IG HO B 7 736280 1-GHS-R 836 PIPE SUPPORT COHPONENTS
'N HS EHC F A VT-3 1 F1.20MA 2-3.4-C 736290 1.QIS-L.832 PIPE SUPPORT COHPONENTS F1.20UA 2-C 3-4 F A VT-3 1-736300 1-GHS-V-831 PIPE SUPPORT COHPONENTS H HS ENC F A VT-3 I-F1.20NC 2-3-4-C X C E 1.HS-19 FIG NO B-72 736310 1.GHS-V-834 PIPE SUPPORT COHPONENTS F1.20MC 2-C 3-4-F-A VT-3 1 C DATE: 12/20/95 REV IS I OH: 0 COOK NUCLEAR PLANT UNIT 1 IHSEPVICE INSPECI'ION LONG TERN PLAN CLASS 2 ALL STATUS COHPONEHTS PAGE: 79 EMERGENCY CORE COOLING SYSTEH, SUHHARY EXAHINATION AREA NUHBER IDENT IF I CAT IOH INSPECTION INTERVAL I ASHE l SEC.XI I CATGY NDE ITEN NO HETN PLAH STATUS FIRST SECOND THIRD I PERIOD PERIOD PERICO (I OUTAGE---I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS CALIBRATIOH BLOCK a LIHE 1-Sl-5 FIG NO B-77 740000 1-GSI R-90 PIPE SUPPORT COHPOHEHTS F1.20A 2-3-4-F-A VT-3 1-740010 1-GSI-R-89 PIPE SUPPORT COHPONEHTS F1.20A 2 3-F-A VT-3 1-X 740020 1.GSI-R-94 PIPE SUPPORT COHPONENTS F1~20A 2-3-4-F-A VT-3 1-LINE 1-SI-5 FIG NO 8-78 740100 1.GS I-R-801 PIPE SUPPORT CDHPONENTS F1.208 2-3-4-F A VT-3 1-LINE 1-Sl-11 FIG NO B-79 741000 1-GSI-L-1 PIPE SUPPORT COHPONENTS F1.20HA 2-3-4 F.A VT-3 1-741010 1 GSI-V-5 PIPE SUPPORT COMPONEHTS F1.20C 2-3-F-A VT-3 1-X DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 80 EMERGENCY CORE COOLING SYS'TEH
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I ASNE I SEC+XI CATGY NDE'I ITEN HO NETH l 1 2 3 OUTAGE---- -I 1 2 3 4 1 2 3 I PLAN STATUS FIRST SECOND THIRD PERIOD PER IOD PER IOD I INSTRUCTIONS
- CALIBRATION BLOCK~L HE 1-S-11 FIG NO B-79 741020 1-GSI.L.6 PIPE SUPPORT COMPONENTS F.A VT-3 1-F1.208 2.3-741030 1-GSI-R-2 PIPE SUPPORT COMPONENTS F-A VT-3 1-F1.20A 2-3-4 741040 1.GSI.R.4 PIPE SUPPORT COMPONENTS F1.20MA 2.3-4 F-A VT-3 1-741050 1-GSI-L-7 PIPE SUPPORT COMPONENTS F1.20MA 2-3-4-F A VT-3 1-LINE 1-Sl-11 FIG MO B-80 741100 1-GS I-R-807 PIPE SUPPORT COMPONENTS F'l.20MB 2-3-4-F-A VT-3 1-741110 1-GSI-R-808 PIPE SUPPORT COMPONENTS F.A VT-3 1-F1'0MB 2-3-4-741120 1-GSI-R-809 PIPE SUPPORT COMPONENTS F1.20MB 2-3-4-FA VT3 1 X DATE: 12/20/95 REVISIOH: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 81 EMERGENCY CORE COOLIHG SYSTEH SUHHARY EXAHINATION AREA NUHBER IDENT I F I CAT IOH IHSPECTIOH INTERVAL I ASHE I SEC.Xl I CATGY NDE I!TEN NO KETH I PLAN STATUS FIRST SECOND PERIOD PERIOD THIRD PERIOD-OUTAGE---1 2 3 1 2 3 4 1 2 3 I I I INSTRUCTIONS
~~CALIBRATION BLOCK~*, LINE 1-SI-11 FIG HO B-BD 741130 1-GSI R-810 PIPE SUPPORT COHPOHEHTS F A VT-3 1-F1.20HB 2.3-4-741140 1-GS I-R-823 PIPE SUPPORT COMPONENTS F1.20A 2-3-4 F A VT-3 1-741150 1-GSI-R-811 PIPE SUPPORT CONPONEHTS F-A VT-3 1-F1.20HB 2-3-4-741160 1-GSI-R-812 PIPE SUPPORT CONPOHENTS F-A VT-3 1-F1.20MA 2-3-4 741170 1-GSI.R-813 PIPE SUPPORT COMPONENTS F1.208 2.3-4-F-A VT-3 1 741180 1-GSI-R-814 PIPE SUPPORT COHPOHENTS F.A VT-3 1 F1.20A 2-3-4-741190 1-GSI.R-815 PIPE SUPPORT COHPONENTS F-A VT-3 1-F1.20B 2-3 DATE: 12/20/95 REVI 8 IOM: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTIOH LONG TERN PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 82 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTIOH INTERVAL I ASHE I SEC.Xl CATGY NDE i-----0 U T A G E ITEN HO NETH)'1 2 3'I 2 3 4 THIRD PERIOD (l------I INSTRUCT IOHS<<<<CALIBRATION BLOCK*IHE 1-S 11 FIG NO B-80 741200 1-GS I-R-816 PIPE SUPPORT COMPONENTS F A VT.3 1-F 1.20NA 2-3.4-X 741210 1-GSI-R 817 PIPE SUPPORT COMPONENTS F1.20MB 2-3 4-F.A VT.3 1-IHE 1-S.11 F 0 NO B-81 741250 1-GSI-R.818 PIPE SUPPORT COMPONENTS F-A VT 3 1 F1.20A 0 3-4-741260 1-GSI-R.819 PIPE SUPPORT COMPONENTS F-A VT 3 1 F1.20A 2-3-4.X 741270 1-GSI-R-820 PIPE SUPPORT CONPOHEHTS F-A VT 3 1 F1.20B 2.3-4 741280 1-GSI.R.821 PIPE SUPPORT COMPONENTS F.A VT-3 1 F1.20A 2 3 4-741290 1-GS I-R.3 PIPE SUPPORT CONPOHENTS F1.20llA 0 3.F-A VT-3 1. DATE: 12/20/95 NEVI SION: 0 COOK NUCLEAR PLAHT UHIT 1 IHSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 83 EMERGEHCY CORE COOLING SYSTEH SUNHARY EXAHINATION AREA HUNGER IDENTIFICATION INSPECTIOH INTERVAL I ASHE SEC.XI I CATGY NDE ITEN HO HEIM I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERICO-I--OUTAGE----- I 2 3 1 2 3 4 1 2 3 I INSTRUC'TIOHS i~CALI BRAT ION BLOCK*LIHE 1 SI 12 FIG NO B-82 741500 1.GSI-R-B PIPE SUPPORT COHPONEHTS F-A VT-3 FI.20NA 74'1510 1-GSI.L-9 PIPE SUPPORT COHPONEHTS F-A VT-3 F1.20HA 741520 1.GSI.L-10 PIPE SUPPORT COHPONENTS F-A VT-3 F1.20NA 741530 1-GSI-L-11 PIPE SUPPORT COHPONEHTS F-A VT-3 F1.20NA 741540 1-GSI-L-12 PIPE SUPPORT COHPONENTS F-A VT-3 F1.20MA 741550 1.GSI-V-13 PIPE SUPPORT COHPONENTS F-A VT-3 F1.20NA 741560 1-GSI-L-14 PIPE SUPPORT COMPOHENTS F-A VT-3 F1.20B DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECI'IOH LONG TERH PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 84 EMERGENCY CORE COOL MG SYSTEH SUHHARY EXAHI HAT ION AREA NUMBER IDENT IF I CAT IOM INSPECTION IHTERVAL I ASHE SEC~XI I CATGY NDE I ITEN MO NETH I PLAH STATUS FIRST SECONO THIRD I PERICO PERIOO PERIOO I OUTAGE I 1 2 3 1 2 3, 4 1 2 3 INSTRUCT IOHS~~CALIBRATIOH BLOCK~LIHE 1-SI-12 FIG MO B-8 741570 1-GSI-L-15 PIPE SUPPORT COMPONENTS F1.20llA 2-3-F-A VT-3 1 741580 1-GSI-L.16 PIPE SUPPORT COMPONENTS F 1~20MA 2-3-4 F-A VT-3'I 741590 1-GSI-V-17 PIPE SUPPORT COMPONENTS F-A VT-3 1-F1~20MA 2-3-4-LIME 1-SI-19 FIG MO 8-83 741750 1-GS I-V-556 PIPE SUPPORT COHPOHEHTS F-A VT-3 1 F1'0A 2-3-4-LINE 1-SI-50 FIG NO B-84 742000 1.GSI-R-219 PIPE SUPPORT COMPONENTS F-A VT-3 1-F1.20MB 2-3-4-742010 1.GSI-L-927 PIPE SUPPORT COMPONENTS F-A VT-3 1-F1.208 2-3-4 DATE:-12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE IHSPECTIOH LONG TERH PLAN CLASS 2 ALL STATUS COHPOHEHTS PAGE: 85 EHERGEHCY CORE COOLING SYSTEH SUHHARY EXAHINATIOH AREA NUHBER IDEHTIFICATION IHSPECTIOH INTERVAL PLAN STATUS I FIRST SECOND ASHE PERIOD PERIOD SEC.XI I CATGY NDE I OUTAGE~ITEH NO METH I 1 2 3 1 2 3 4 THIRD I PER I OO I-----I 1 2 3 I INSTRUCI'ONS ++CALIBRATION BLOCK o LINE 1-SI-50 FIG NO 8-84 742020 1-GSI-R.146 PIPE SUPPORT COHPOHEHTS F A VT-3 1 F1.20NA 2-3-4 742030 1.GSI-V-143 PIPE SUPPORT COHPOHENTS F1.20WA 2-3-4 F-A VT-3 1 742040 1-GSI-L-144 PIPE SUPPORT COHPOHEHTS F1.20MA 2-3-4 F-A VT-3 1-742050 1.GSI-V-145 PIPE SUPPORT COHPOHENTS FI.20WA 2-3-4 F-A VT-3 1 LIHE 1-S1-51 FIG NO B-85 742500 1-GSI-V-147 PIPE SUPPORT COHPOHEHTS F1.20A 2-3-4~F-A VT-3 1-742510 1-GSI L 148 PIPE SUPPORT COHPOHEHTS F-A VT-3 1 F1.20MA 2-3.4-742520 1-GSI-L-149 PIPE SUPPORT COHPOHEHTS F-A VT-3 1-F1.20'IJA 2-3-4 DATE: 'l2/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 86 EMERGENCY CORE COOLING SYSTEM SUHHARY EXAMINATION AREA NUHBER IDENT IF ICATION INSPECTION INTERVAL PLAN STATUS I FIRST SECOND ASHE PERIOD PERIOD SEC.XI CATGY HDE (---;0 U T A G E ITEN NO NETH I 1 2 3 1 2 3 4 THIRD I PERIOD I r I 1 2 3 I INSTRUCTIONS
- CALIBRATION=BLOCK"~
LIME 1 Sl-51 FIG NO B 85 742530 1-GSI-L-15D PIPE SUPPORT COMPONENTS F1.20WA 2-3-4-F-A VT-3 1-742540 1.GSI.L-151 PIPE SUPPORT COMPONENTS F-A VT.3 1-F1.20MA 2-3-4.LIME 1.SI-51 FIG HO B.86 743000 1-GSI-L-152 PIPE SUPPORT COHPONENTS F-A VT-3 1 F1.20MA 2-3-4-7430'IO 1.GSI-L-154 PIPE SUPPORT COMPONENTS F1.20NA 2-3-4-F-A VT-3 1 743020 1-GS I-R-155 PIPE SUPPORT COMPONENTS F1.20HA 2-3-4-F-A VT-3 1-NE 1 SI-74 F G NO 8-87 743500 1-GSI R-558 PIPE SUPPORT COHPONEHTS F1.20WA 2-3-4-F-A VT-3 1-DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 87 EMERGENCY CORE COOLING SYSTEM
SUMMARY
EXAMIHATIOH AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I FIRST ASME PERIOD SEC.XI I CATGT NDE ITEM NO METH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD J OUTAGE----- I 2 3 4 1 2 3 I INSTRUCTIONS
- ICAL I BRAT ION BLOCK~*LINE 1-SI-80 FIG NO B-88 744010 1-ASI-R-922 PIPE SUPPORT COMPONENTS F-A VT-3 1-F1.20A 2-3.4-744020 1-ASI-L-923 PIPE SUPPORT COMPOHENTS F.A VT-3 1-F1.256 2.3X 4 744030 1.AS I.L-924 PIPE SUPPORT COMPONENTS F-A VT-3 1.F1'0B 2.3.4-744040 1-AS I-L-925 PIPE SUPPORT COMPONENTS F-A VI'-3 1-F1.20A 2-3-4-744050 1-ASI L-926 PIPE SUPPORT COMPONENTS F-A VT-3 1 F1.20B 2-3-4 DATE: 12/20/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LOHG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 88
SUMMARY
EXAMIHATION AREA NUMBER IDENT IF I CATION INSPECTION INTERVAL CHEMICAL AHD VOLUME CONTROL SYSTEM I ASME I SEC.XI I CATGY NDE ITEM NO METH I 1 PLAN STATUS FIRST SECOHD THIRD PERIOD PERICO PERIOD 0 U T A G E I INSTRUCTIONS 2 3 1 2 3 4 1 2 3 (**CAL I BRAT ION BLOCK~*IN 1-CS-32 G NO 8-89 744500 1.GCS-R-87 PIPE SUPPORT COMPONENTS F1.20A 2-3-4-F-A VT-3 1-744510 1.GCS-L-233 PIPE SUPPORT COMPONENTS F-A VT-3 1-F1.208 2-3 4-X 744520 1.GCS.L-85 PIPE SUPPORT COMPOHEHTS F.A VT-3 1-F1.20MB 2-3-4-744530 1-GCS-L-234 PIPE SUPPORT COMPONENTS F-A VT-3 F1.20A 2-3-4-744540 1-GCS-R-80 PIPE SUPPORT COMPONENTS F1'0B 2-3-4 F-A VT-3 1 X 744550 1'CS-L-2378 PIPE SUPPORT COMPONENTS F-A VT-3 1 F1.20A 2-3-4-744560 1-GCS-R-237A PIPE SUPPORT COMPONENTS F'I~20B 2-3-4.F-A VT-3 1-DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSEPVICE IHSPECTIDH LONG TERM PLAN CLASS 2 ALL STATUS COMPONENTS PAGE: 89
SUMMARY
EXAMINATION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL CHEMICAL AHD VOLUME CONTROL SYSTEM I ASME I SEC.XI I CATGY HDE l ITEM HO METH I FIRST PERIOD PLAN STATUS SECOND THIRD I PERIOD PERIOD 0 U T A G E I 1 2 3 4 1 2 3 I INSTRUCT IOHS~~CALIBRATION BLOCK~*LINE 1-CS-32 FIG NO B-89 744570 1-GCS.R-237 PIPE SUPPORT COMPONENTS F-A VT-3 1 F1.20B 2-3-4-744580 1-ACS-920 PIPE SUPPORT COMPONENTS F-A VT-3 1-F1.20B 2-3-4 744590 1.ACS.L-921 PIPE SUPPORT COMPONENTS F A VT-3 F1.20B 2.3-4 744600 1-ACYL-236 PIPE SUPPORT COMPOHEHTS F A VT-3 1-F1.208 2-3-4-744610 1-GCS.R-235 PIPE SUPPORT COMPONENTS F-A VT-3 1-F1.20A 2-3-4 744620 1.GCS-L-216 PIPE SUPPORT COMPONENTS F-A VT-3 1 F1.20B 2-3-4-744630 1.GCS-R-82 PIPE SUPPORT COMPONENTS F-A VT-3 1-F1.20A 2-3-4 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE IHSPECTIOH LONG TERN PLAN CLASS 2 ALL Sl'ATUS CONPONENTS PAGE!90 SUHHARY EXAHI HAT I ON AREA NUHBER IDEHT IF ICAT ION INSPECTION INTERVAL CHEMICAL AND VOLUHE CONTROL SYSTEH I ASHE I SEC'I I CATGY NDE ITEN NO NETH I 1 PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD OUTAGE------ 2 3 1 2 3 4 1 2 3 INSTRUCTIONS iiCAL I BRAT I ON BLOCK*i LIHE 1-CS-34 F G HO B-90~745000 1-GCS-R-94 PIPE SUPPORT COMPONENTS F1.20MA 2-3-4 F-A VT-3 1-745010 1-GCS-R-95 PIPE SUPPORT COHPOHENTS F-A VT-3 1 F1.20MA 2-3-4-745020 1-GCS-R-91 PIPE SUPPORT CONPOHEHTS F-A Vl'-3 1-F1.20A 2-3-4-745030 1-GCS R-90 PIPE SUPPORT COHPOHEHTS F-A VT-3 1-F1~20MA 2-3-4-X 745040 1-GCS-R-89 PIPE SUPPORT COHPOHENTS F1.20A 2.3-4 F-A VT-3 1 745050 1-GCS-L-88 PIPE SUPPORT CONPOHEHTS F1.20MB 2-3.4-F-A VT-3 1 745060 1-GCS-V-92 PIPE SUPPORT CONPOHENTS F1.20MC 2-3-4-F-A VT-3 1-DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 91 SUHHARY,EXAHIMAT IOM AREA NUHBER IDENTIFICATION INSPECTION INTERVAL CNEHICAL AND VOLUHE CONTROL SYSTEH l ASHE I SEC.XI CATGY MDE ITEH NO HETN l FIRST PERIOD PLAN STATUS SECOND PERIOD-OUTAGE 2 3 1 2 3 4 THIRD PERIOD-I--I 1 2 3 I INSTRUCTIONS
- ~CALIBRATION BLOCK*i LINE 1-CS-34 FIG NO B-90 745070 1-GCS.V-93 PIPE SUPPORT COHPONENTS F A VT-3 F1.20NC X LINE-CS-36 FIG MO B-91 745500 1-GCS.L-217 PIPE SUPPORT CCHPONENTS F.A VT-3 F1.20A 2 3 745510 1-GCS.C-218 PIPE SUPPORT COHPONENTS F A VT-3 F1.20B 745520'I-GCS.R-111 PIPE SUPPORT COHPONENTS F-A VT-3 F1.20MA X 745530 1-GCS.R-112 PIPE SUPPORT COHPOMEMTS F-A VT-3 F1.20MA 745540 1-GCS-R-113 PIPE SUPPORT COHPONENTS F-A VT-3 Ff.20NA X 745550 1-GCS R-114 PIPE SUPPORT COHPONEMTS F-A VT-3 F1.20MA DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS CONPDHENTS PAGE: 92 SUHNARY EXAHIHATIOH AREA HUHBER IDEHT I F I CATION INSPECTIOH INTERVAL CHEHICAL AND VOLUNE CON'TROL SYSTEN I FIRST ASHE I PERIOD SEC.XI I CATGY NDE ITEN HO NETH i 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I I-OUTAGE----I 1 2 3 4 1 2 3 I INSTRUCTIONS
<<*CALIBRATIOH BLOCK~~LINE 1-CS-36 FIG NO 8-91 745560 1-GCS-R-115 PIPE SUPPORT CONPOHEHTS F A VT-3 FI.20HA 2-3-4 745570 1-GCS-R-116 PIPE SUPPORT CONPOHENTS F A VT-3 1-F1.20llA 2-3-4-745580 1-GCS-L-117 PIPE SUPPORT CONPOHEHTS F-A VT-3 1 F1.208 2-3-4-LINE 1-CS-747 FIG NO 8-95 747000 1-ACS.R.923 PIPE SUPPORT CONPOHENTS F1.208 2-3-4-F-A Vl'-3 1-747010 1-ACS-R-924 PIPE SUPPORT CONPOHEHTS F1'08 2.3.4.F-A VT 3 1-747020 1-ACS-R-925 PIPE SUPPORT CONPONEHTS F A VT-3 1-F1.208 2-3-LINE 1-CS 748 FIG NO 8 96 747500 1-ACS-R-927 PIPE SUPPORT COHPOHEHTS F-A VT-3 1-F1.208 2-3 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 ALL STATUS COHPONENTS PAGE: 93 SUHNARY EXAHIHATIOH AREA HUHBER IDENTIFICATION INSPECTION INTERVAL CHEHICAL AHD VOLUHE CONTROL SYSTEH I ASNE I SEC.XI J CATGY HDE ITEN HO NETH I FIRST PERIOD PLAN STATUS SECOND PER IOD-OUTAGE 1 2 3 1 2 3 4 THIRD I PERIOD-I-I 1 2 3 I INSTRUCT IOHS**CALIBRATIOH BLOCK**LINE 1-CS-747A FIG HO B.97 748000 1-ACS-R.928 PIPE SUPPORT COHPONEHTS F-A VT-3 F1.20B 2-3-4-748010 1-ACS.R-929 PIPE SUPPORT COMPONENTS F-A VT-3 1 F1.20B 2-3-4 X 748020 1-ACS-R-930 PIPE SUPPORT COMPONENTS F-A VT-3 1-F1.20B 2-3 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANI'NIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 3 ALL STATUS COMPONENTS PAGE: 94 CTS HEAT EXCHANGER EAST SUHHARY EXAMINATION AREA NUMBER IDEHT IF I CAT ION INSPECTIOM IHTERVAL I FIRST ASHE i PERIOD"SEC.XI I CATGY NDE I ITEH NO NETH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I OUTAGE------I 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK**INTEGRALLY WELDED VESSEL SUPPORTS FIG NO B-7 798000 E-CTSMEX 1VS VESSEL SUPPORT F-A F1.40 VT-3 1-2-3-4 C X REFEREHCE NO.400000 FOR 1ST AMD 2ND INTERVALS.
798010 E.CTSMEX-2VS VESSEL SUPPORT F A F1.40 VT.3 1-2-C 3-X 4-REFERENCE NO.400010 FOR 1ST AND 2ND INTERVALS. 798020 E-CTSNEX 3VS VESSEL SUPPORT E CTS HXRH F-A F1.40 VT-3 1 2-3-4-C X REFERENCE NO.400020 FOR 1ST AND 2ND INTERVALS. 798030 E-CTSHEX-4VS VESSEL SUPPORT E CTS HXRH F-A F1.40 VT-3 1-2-3-4-C X REFERENCE NO.400030 FOR 1ST AND 2HD INTERVALS. DATE: 12/20/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS COHPONEHTS PAGE: 95 CTS HEAT EXCHANGER NEST SUHHARY EXAHI HAT IOH AREA NUHBER IDENTIFICATION IHSPECTIOH IHTERVAL I ASHE I SEC.XI I CATGY NDE I ITEN HD NETH r 1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD-j-----OUTAGE------I 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS ~iCAL I BRAT ION BLOCK*~INTEGRALLY 1!ELDED VESSEL SUPPORTS FIG NO B-8 798040 W-CTSHEX-1VS VESSEL SUPPORT F-A F1.40 VT-3 1-2-3-4-REFERENCE HO.300743 FOR 1ST INTERVAL.REFERENCE NO.400040 FOR 2HD INTERVAL.798050 ll.CTSHEX-2VS VESSEL SUPPORT F-A F1.4D VT-3 1.2-3-4-REFEREHCE HO.300744 FOR 1ST INTERVAL.REFERENCE HO.400050 FOR 2HD INTERVAL, 798060 M-CTSHEX-3VS VESSEL SUPPORT F-A F1.40 VT-3 1-2-3-4-REFERENCE HO.400060 FOR,1ST AND 2ND IHTERVALS. 798070 M-CTSNEX-4VS VESSEL SUPPORT F A F1.40 VT-3 1 2-3-4-REFEREHCE NO.400070 FOR 1ST AHD 2ND INTERVALS. DATE: 12/20/95 REVISION: 0 COOK HUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS CONPONENTS PAGE: 96 CTS HEAT EXCHANGER EAST SUNNARY EXAHI HAT I OH AREA NUNBER IDENTIFICATION IHSPECTION INTERVAL I ASNE I SEC~XI I CATGY NDE ITEN NO NETH I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD--OUTAGE-1 2 3 1 2 3 4 1 2 3 I I I INSTRUCTIONS ~~CALIBRATIOH BLOCK~i CONPOHENT SUPPOR S FIG NO B 7 798400 E-CTSHEX-SC 1 F-A F1.40 VT-3'I-2-C 3-X 4-REFEREHCE NO.736400 FOR 1ST AND 2HD INTERVALS. 798410 E-CTSHEX.SC.2 F-A F1.40 VT-3 1 2-C 3-4-X REFERENCE NO.736410 FOR 1ST AND 2ND INTERVALS. 798420 E-CTSHEX-SC-3 E CTS HXRH F-A F1.40 VT-3 1 2-3.4-C X REFERENCE NO.736420 FOR 1ST AND 2ND INTERVALS. 798430 E-CTSHEX-SC-4 E CTS HXRN F A F1.40 VT-3 1-2-3-4-C X REFERENCE HO.?36430 FOR 1ST AND 2ND INTERVALS' DATE: 12/20/95 REVI SIGH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS COHPONENTS PAGE: '97 CTS HEAT EXCHANGER WEST SUHMARY EXAHINATI ON AREA NUHBER IDENTIFICATION INSPECTIOH IHTERVAL I-FIRST ASHE PERICO SEC XI I CATGY HDE I ITEN HO NETH i 1 2 3 PLAN STATUS SECOND THIRD I PERICO PERIOD J I OUTAGE I 1 2 3 4 1 2 3 I INSTRUCTIONS ~iCALIBRATION BLOCK*COHPONENT SUPPORTS FIG NO 8-8 798440 M.CTSHEX-SC-1 F-A F1.40 VT-3 1.2-3.4 REFERENCE NO.700130 FOR 1ST INTERVAL.REFEREHCE NO.736440 FOR 2ND INTERVALED 798450 W-CTSNEX.SC-2 F-A F1.40 VT-3 2-3-4-REFERENCE NO.700140 FOR IST INTERVAL.REFERENCE NO.736450 FOR 2ND IN'IERVAL. 798460 W-CTSNEX-SC-3 F-A F1.40 VT-3 1-2.3.4 REFERENCE NO.736460 FOR 1ST AND 2HD INTERVALS. 798470 W.CTSNEX-SC-4 F-A F1.40 VT-3 2-3-REFEREHCE HO.736470 FOR 1ST AND 2ND INTERVALS. DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 3 ALL STATUS COMPONENTS PAGE: 98 CTS HEAT EXCHANGER EAST
SUMMARY
EXAMINATION AREA NUMBER IDENT IF I CATION INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE ITEM NO METN f 1 PLAN STATUS FIRST SECOHD THIRD I PERIOD PERIOD PERIOD--OUTAGE----I 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS ~iCAL I BRAT IOH BLOCK~*COMPONENT SUPPORTS 798800 E CTSHEX-UL SC UPPER LATERAL SUPPORT E CTS HXRM F-A F1.40 VT-3 1-2.3-4-C X REFERENCE NO.871000 FOR 1ST AND 2ND INTERVALS. DATE: 12/20/95 REVI S I OH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE IHSPECTIOH LONG TERH PLAN CLASS 3 ALL STATUS COHPOHENTS PAGE: 99 CTS HEAT EXCHANGER WEST SUHHARY EXAHI HAT ION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I FIRST ASNE I PERIOD SEC.Xl CATGY HDE ITEN NO NETH I 1 2 3 PLAN SI'ATUS SECOND THIRD I PERIOD PERIOD)I OUTAGE I 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK**CONPONEHT SUPPORTS 798900 W CTSHEX-UL-SC UPPER LATERAL SUPPORT W CTS HXRH F A F1.40 VT-3 1 2-3.4-REFERENCE NO.871100 FOR 1ST AND 2ND INTERVALS.
DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LOHG TERM PLAN CLASS 3 ALL STATUS COMPONENTS PAGE: 100 RHR HEAT EXCHANGER EAST
SUMMARY
EXAMINAT IOH AREA NUMBER IDENTIFICATION .INSPECTION IHTERVAL I FIRST ASME I PERIOD SEC~XI I CATGY HDE ITEM NO METH i 1 2 3 PLAN STATUS SECOND THIRD PEPIOO PERIOD OUTAGE------1 2 3 4 1 2 3 J I I INSTRUCT IOHS**CALIBRATION BLOCK~~COMPONENT SUPPORTS SEE DUG 12-3944C-3 799000 E-RHRHEX-UL SC UPPER LATERAL SUPPORT E RHR HXRM F-A F1.40 VT-3 2 3-4.C X REFERENCE NO.737000 FOR 1ST AND 2HD INTERVALS. DATE: 12/20/95 REVISION: 0 RHR MEAT EXCHANGER ST
SUMMARY
EXAMINATIOH AREA NUMBER IDENT IF I CAT IOH COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS INSPECT ION INTERVAL I ASME I SEC.XI I CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I-OUTAGE------I 1 2 3 1 2 3 4 1 2 3 I PAGE: 101 INSTRUCTIONS
- CALIBRATIOH BLOCK~>>COMPOHEHT SUPPORTS SEE DNG.12-3944C-3 799100'N-RHRHEX-UL-SC UPPER LATERAL SUPPORT U RHR HXRM F-A F1.40 VT-3 1-2-3-4 REFERENCE HO.737100 FOR 1ST AND 2HD INTERVALS.
DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS PAGE: 102 UXILIARY FEEDHATER SYSTEM
SUMMARY
EXAMINATIOH AREA NUMBER IDENTIFICATION INSPECT IOH INTERVAL I ASME I SEC.Xl CATGY NDE ITEM NO METH J PLAN STATUS FIRST SECOND PERIOD PERIOD OUTAGE 1 2 3 1 2 3 4 THIRD I PER I CO I I----I 2 3 INSTRUCTIONS
- iCAL IBRATI DH BLOCK~*SE AEP DWG NO 1-C 3 800000 1-GC-R 1 PIPE SUPPORT COMPONENT F-A VT.3 F1.308 2 C 3.4-800005 1-GC-R-2 PIPE SUPPORT COMPONENT F-A VT-3 1 F1.30A 2 3-4-800010 1-GC-R.3 PIPE SUPPORT COMPONENT DG PIPE TL F.A VT.3 1-F1.30llB 2-3-C 800015 1-GC-L-45 PIPE SUPPORT COMPONEHT DG PIPE TL F.A VT-3 1-F1.30A 2 3.4-C 800020 1-GC-L-4 PIPE SUPPORT COMPONENT DG PIPE TL F1.308 2-3.F-A VT-3 1 C 800025 1-GC R-5 PIPE SUPPORT COMPOHEHT DG PIPE TL F1.30llA 2-3-4-F-A VT-3 1 C 800030 1-GC-R-7 PIPE SUPPORT COMPONEHT ESII PIPE T F'I.30A 2-3-4-F A VT-3 1 C DATE: 12/20/95 REVI SION: 0 COOK NUCLEAR PLANT UHIT 1 IHSERVICE INSPECTION I.ONG TERN PLAN CLASS 3 ALL STATUS COHPOHENTS PAGE: 103 AUXILIARY FEEDMATER SYSTEH SUHHARY EXAHI HAT ION AREA HUHBER IDENTIFICATION INSPECTION INTERVAL I FIRST ASHE I PERIOD SEC~XI I CATGY NDE ITEN NO NETH i 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD-OUTAGE---1 2 3 4 1 2 3 I I I INSTRUCT IOHS I*~GAL I BRAT ION BLOCK**SEE AEP DWG.NO.1 C-32 800D35 1-GC-R-46 PIPE SUPPORT COHPOHEHT F1.30B 2 C 3-4-F.A VT-3 1-800040 1-GC-R-47 PIPE SUPPORT COHPOHEHT F-A VT-3 F1.30A 1-2-C 3-4-800045 1-GC-I.-63 PIPE SUPPORT COHPONEHT ESM PIPE T F1.30B 2-3-4 e F-A VT-3 1-C 800050 1-GC-R 64 PIPE SUPPORT CONPOHEHT ES'LI PIPE T F-A VT-3 F1.30A 2-3-4-C 800055 1-GC R-65 PIPE SUPPORT COMPONENT ES'N PIPE T F-A VT-3 1 F1.30A 2-3-4-C 800060 1-GC-R-66 PIPE SUPPORT COHPOHEHT ES'W PIPE T F1.300 2-3-4 F-A VT-3 1-C BDD065 1-GC-R.67 PIPE SUPPORT COHPOHENT F1.30A 2 C 3X 4 F-A VT 3 1.
DATE: 12/20/95 REVISIOH: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE IHSPECTIOH LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS PAGE: 104 UXILIARY FEEDNATER SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I FIRST'ASME I PERIOD SEC~XI I CATGY NDE I ITEM NO METH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I OUTAGE-I 3 4 1 2 3 INSTRUCIIONS <<<<CALIBRATION BLOCK<<*SEE AEP DUG.NO.1-C-32 800067 1.GC-R-911 PIPE SUPPORT COMPONENT F1.30WB 2-3-4-F-A VT-3 1-800070 1-GC-L-60 PIPE SUPPORT COMPONENT F-A VT-3 1-F1.30A 2-C 3-X 4-SEE A P DUG O.1-C-59 SH.1 OF 800100 1.GC-V-30 PIPE SUPPORT COMPONENT F1.30WC 2-3-4-F-A VT 3 1 C 800105 1.GC-L-29 PIPE SUPPORT COMPOHEHT F-A VT-3 1-F1.30A 2-3-4-C 800110 1.GC-L-28 PIPE SUPPORT COMPONENT F1.30MB 2-3-4-F-A VT-3 1-C 800115 1.GC-R-27 PIPE SUPPORT COMPONENT F-A VT-3 1-F1.30A 2 C 3-4-800120 1.GC-L-26 PIPE SUPPORT COMPONENT F-A VT-3 1-F1.308 2-3-4 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS PAGE: 105 AUXILIARY FEEDNATER SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDEN'TIFICATIOH INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE I ITEM HO METH I 1 PLAN STATUS FIRST SECOND THIRD PERiOD PERIOD PERIOD-----0 U T A G E---2 3 1 2 3 4 1 2 3 I I I INSTRUCTIONS
- CALIBRATIOH BLOCK**SEE AEP DWG.NO.1-C-59 SH.1 OF 2 800125 1-GC-L-25 PIPE SUPPORT COMPONENT F-A VT-3 1-F1.30B 2-3-C SEE AEP DWG.NO.1-C-59 SH.2 OF 2 800130 1.GC-L-24 PIPE SUPPORT COMPONEHI'-A VT-3 1-F1.30B 2-3-4-800135 1 GC-R-41 PIPE SUPPORT COMPOHENT F-A VT 3 1 F1.30A 2 3.C 800140 1-GC.R-23 PIPE SUPPORT COMPONENT F1.30A 2-3-4 F-A VT-3 1 C 800145 1-GC.R-22 PIPE SUPPORT COMPONENT F1~30MB 2 C 3-4 F-A VT-3 1 800150 1-GC-L-44 PIPE SUPPORT COMPOHEHT F A VT-3 1 F1.30B 2-C 3-4-800155 1-GC-R-21 PIPE SUPPORT COMPONENT F1.30A 2-3-4-F.A VT-3 1 C DATE: 12/20/95 REVISIOH: 0 COOK NUCLEAR PLAN'I UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS PAGE: 106 AUXILIARY FEED'NAT R S'STEM
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I FIRST ASME PERIOD SEC.XI I CATGY NDE ITEM HO METH i 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD-I 0 U T A G E------I 1 2 3 4 1 2 3 I INSTRUCTIONS <<<<CALIBRATION BLOCK<<<<SEE AEP DUG.NO.1-C-59 SH.2 OF 800160 1-GC-R-20 PIPE SUPPORT COMPONENT F-A VI'-3 1-F'I.30A 2-3-4-S E A P DUG.NO.1-C-63 800200 1-GC-R-42 PIPE SUPPORT COMPOHEHT F1.30llB 2-3.4 F-A VT-3 1 800210 1.GC.L.43 PIPE SUPPORT COMPONENT AFP HALL F-A VT-3 F1.30NB~2-3-4-C SEE AEP DUG.HO.1-C-65 SH.1 OF 800300 1-GC.R.50 PIPE SUPPORT COMPOHEHT F1.30A 2 C 3.4 F-A VT-3 1 800310 1-GC-R-49 PIPE SUPPORT COMPONENT F A VT-3 1-F1.30HB 2-3-4-SEE AEP 0'jIG.NO.1-C-65 SH.2 OF 2 800330 1-GC-R-52 PIPE SUPPORT COMPONENT TDAFP RM F-A VT-3 1 F1.30A 2-3-4 C DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS PAGE: 107 AUXILIARY FEEDNATER SYSTEM
SUMMARY
EXAHIHATIOH AREA NUMBER IDEHT I F I CAT I OH INSPECTION INTERVAL FIRST ASME I PERIOD SEC~XI CATGY NDE ITEM NO METH I'I 2 3 PLAN STATUS SECOND THIRD PERICO PERIOD I OUTAGE-----I 1 2 3" 4 1 2 3 I INSTRUCTIONS iiCALIBRATIOH BLOCKii SEE AEP DUG.HO 1-C-65 SN.2 OF 2 800350 1-GC-R 51 PIPE SUPPORT COMPONENT F-A VT-3 1-F1.30'IIA 2-3-4-800355 1-GC-L-62 PIPE SUPPORI'OMPONENT F-A VT.3 1-F1.308 2-3-4-SEE AEP DUG.HO.1 C 67 SN.1 OF 2 800405 1-GC-L-54 PIPE SUPPORT COMPONENT F-A VT-3 1 F1.308 2-3-4-800410 1-GC-L 59 PIPE SUPPORT COHPOHENT E MDAFP RM F1.30A 2-3-4 F-A VT 3 1-C 800415 1-GC-R-55 PIPE SUPPORT COMPONENT F-A'T-3 1-F1.30A 2-C 3-4-800417 1-GC-L-907 PIPE SUPPORT COMPONENT F-A VT-3 1 F1.30IN 2-3-4 SEE AEP DUG.NO.1-C-67 SN.2 OF 2 800420 1-GC-R-58 PIPE SUPPORT COMPONENT AFP HALL F1.308 2-3-4-FA VT3 1-C X DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTIOH LONG TERH PLAN CLASS 3 ALL STATUS COMPONENTS PAGE: 108 AUXILIART FEEDWATER SYSTEM SUHHARY EXAHI MAT I OM AREA MUHBER IDENT IF I CATION INSPECTION INTERVAL I FIRST ASHE PER IOO SEC.XI I CATGY MDE ITEH MO HETH J 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I OUTAGE.--I 1 2 3,4 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK**SEE AEP DUG MO.1-C.67 SH.2 OF 800425 1-GC.R.57 PIPE SUPPORT COHPOHENT F-A VT-3 1-F1.30A 2-3-4-800435 1-GC-R-56 PIPE SUPPORT COHPONEHT F A VT-3 F1.30llA 2 C 3X 4-800440 1-GC-R.61 PIPE SUPPORT COHPONEHT F1.308 2-3-4-F-A VT-3 1 SEE AEP DWG.NO.1-AC-159 800700 1-AC-L-900 PIPE SUPPORT COHPOHENT AFP HALL F-A VT-3 F1.30B 2-3-4-C 800710 1-AC-L.901 PIPE SUPPORT COMPONENT AFP HALL F-A VT-3 1-F1.30A 2-3-4.C 800720 1-AC-L-902 PIPE SUPPORT COHPOHENT AFP ENC F1.308 2-3.F-A VT-3 1-INACCESSIBLE DUE TO HELDED SEISHIC ENCLOSURE.
800730 1.AC.L.903 PIPE SUPPOR'I COMPONENT H HDAFP RH F-A VT-3 1 F1.308 2 3-4-C DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS CONPONEHTS PAGE: 109 AUXILIARY FEEDNATER SYSTEM
SUMMARY
EXAHI HAT IOH AREA NUMBER IDENTIFICATION INSPECTION IHTERVAL FIRST ASNE I PERIOD SEC.XI I-CATGY MDE ITEN NO NETH)1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE---1 2 3 4 1 2 3 I I t INSTRUCTIOMS
- eCALIBRATIOH BLOCK+a SEE AEP DMG.NO.1-AC 159 800740 1.AC-L-904 PIPE SUPPORT CDHPOHEHT F-A VT-3 F1.30B 2C 3 X 4 BD0750 1-AC-L 905 PIPE SUPPORT COMPONENT F1.3$IB 2-C 3-4.F A VT-3 1-800760 1-AC-L 906 PIPE SUPPORT COMPONENT M NDAFP RN F1.30MB 2-3-4 o a F-A VT-3 1-C DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERH PLAH CLASS 3 ALL STATUS COHPONENTS PAGE: 110 C(HPONENT COOL NG IIAT R SYSTEH SUHHARY EXAHINATIOH AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE ITEH NO HETH I PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I OUTAGE I 1 2 3 1 2 3 4 1 2 3 I INSTRUCT IOHS~*CALIBRATION BLOCK~*SEE AEP DIIG.HO.1-CCII-I 805000 I-GCCII-V-845 PIPE SUPPORT COHPOHEHT F-A VT-3 1 F1.308 2 C 3X 4-805010 1.GCCII R-15 PIPE SUPPORT COHPOHEHT F-A VT-3 1 F1.30NB 2-C 3-4-805020 1-GCCII.R.14 PIPE SUPPORT COHPOHEHT 587 AUX F A VT-3 1 F1.30A 2-3-4-C X 805030 1-GCCH-R-13 PIPE SUPPORT COHPOHEHT 587 AUX F-A VT-3 1 F1.30A 2-3-4-C 805040 I-GCCM.R-12 PIPE SUPPORT COHPONEHT 587 AUX F-A VT-3 1 F1.30A 2.3-4 C 805050 1-GCCW.R-11 PIPE SUPPORT COHPONEHT 587 AUX F1.30A 2-3.4 F-A VT-3 1 C 805060 1-GCCM R-10 PIPE SUPPORT COHPOllEHT F1.30A 2C 3 X F-A VT-3 1 DATE: 12/20/95 RE V I S ION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 3 ALL STATUS COHPOHENTS PAGE: 111 COHPONENT COOLIHG MATER S'YSTEH SUHHARY EXAHIHATION AREA NUHBER IDENT IF I CAT IOH INSPECTIOH INTERVAL I ASHE I SEC.XI I CATGY NDE I ITEH NO HETH I 1 PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD-OUTAGE 2 3 1 2 3 4'I 2 3 INSTRUCTIONS
~~CALIBRATION BLOCK**SE AEP DMG NO.1 CC'M-1 805070 1-GCCM-R-9 PIPE SUPPORT COHPOHEHT F A VT-3 F1.30A 2-C 3-4-805080 1-GCCM-L-8 PIPE SUPPORT COHPOHEHT 587 AUX F1.308 2-3-4 F-A VT-3 1-C 805085 AS-6-228 PiPE SUPPORT COHPONENT F-A VT-3 1-F1.30B 2-3-4 805090 1-GCCM.R.7 PIPE SUPPORT COHPONENT 587 AUX F-A VT-3 1-F1.30A 2-3-4-C 805100 1-GCCM-R-4 PIPE SUPPORT COHPOHEHT 587 AUX F-A VT-3 1-F1.30A 2-3-4-C 805110 1-GCCM-R-5 PIPE SUPPORT COHPONEHT 587 AUX F-A VT-3 1 F1.308 2-3-4-C 805120 1-GCCM.R-6 PIPE SUPPORT COHPOHENT F-A VT-3 1-F1.30B 2 C 3 DATE:4'2/20/95 REVISIOH: 0 COOK NUCLEAR PLANI'NIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS CCHPONENTS PAGE: 112 CONPONENT COOL NG MATER SYSTEH SUHHARY EXAHI HAT IOH, AREA NUHBER" IDENT I F I CAT ION INSPECTION INTERVAL I FIRST ASHE I PER I CO SEC.Xl I CATGY NDE ITEH NO NETH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I 0 U T A G E------I 1 2 3 4 1 2 3 I INSTRUCTIONS ~~CALIBRATION BLOCK~~/SEE AEP DMG.NO.1-CCM.I 805130 1-GCCM-R-3 PIPE SUPPORT COHPONEHT F-A VT-3 1-F1.30A 2-3-4-805140 1-GCCM-L-139 PIPE SUPPORT COMPONENT 587 AUX F1.30A 2-3-4.F-A VT-3 1-C 805150 1-GCCM.R-1 PIPE SUPPORT COHPONENT 587 AUX F-A VT-3 1-F1.30A 2-3-4-C SEE AEP DMG.NO.1.CCM.2 805200 1-GCCM-R-96 PIPE SUPPORT COHPONEHT 587 AUX F1.30A 2-3-4-F-A VT-3 1 C 805210 1-GCCM-R-95 PIPE SUPPORT COHPONENT 587 AUX F1.30A 2-3-4-F.A'T-3 1-C 805220 1-GCCll-L-94 PIPE SUPPORT COMPONENT F-A VT-3 F1.308 2 C 3 X 4 805230'I GCCM-L-93 PIPE SUPPORT COHPONEHT F-A Vl'-3 F1.30MB 2-C 3-DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 3 ALL STATUS CONPOHEHTS PAGE: 113 COMPONENT COOL IHG MATER SYSTEH SUHNARY EXAHINATIOH AREA NUHBER IDEHT I F I CAT ION INSPECT I OH INTERVAL I ASNE I SEC.XI I CATGY HDE ITEN NO NETH PLAN STATUS FIRST SECOND PERIOD PERIOD--OUTAGE-1 2 3, 1 2 3 4 THIRD)PERIOD I I-I 2 3 INSTRUCTIONS ~*CALIBRATION BLOCK**SEE AEP DMG.NO.1-CCM-2 805240 1-GCCM-L-92 PIPE SUPPORT COMPONENT 587 AUX F1.308 2-3-4 F A VT-3 1-C 805250 1-GCCM L-91 PIPE SUPPORT CONPOHENT 587 AUX F-A VT-3 1 F1.30B 2-3 4-C 805260 1-GCCM.R-90 PIPE SUPPORT CONPOHENT 587 AUX F-A VT-3 1 F1.30A 2-3-4 o C SEE AEP DMG NO 1-CCM-6 805300 1-GCCM.V-'l6 PIPE SUPPORT COHPOHEHT SFP HX RN F1.30MC 2-3-4 FA VT3 1-C 805310 1-GCCM-R-17 PIPE SUPPORT CONPOHEHT F-A VT-3 F1.30MA 1-2 C 3-SEE AEP DMG.NO.1-CCM-7 805400 1 GCC'M R-107 PIPE SUPPORT COHPOHENT F-A VT-3 1 F1.30A 2-C 3-X 4 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLAHT UHIT 1 IHSERVICE IHSPECTIOH LONG TERH PLAN CLASS 3 ALL STATUS COHPONEH'IS PAGE: 114 F IRST PERIOD SUHHARY EXAHINATIOH AREA NUHBER IDENT IF I CATION INSPECT IOH INTERVAL COHPOHEHT COOLING MATER SYSTEH I ASHE SEC~XI I CATGY HDE)ITEH NO HETH I 1 2 3 PLAH STATUS SECOND THIRD)PERIOD PERIOD)I-0 U T A 0 E------I 2 3 4 1 2 3 I INSTRUCTIONS <<<<CALIBRATIOH BLOCK SEE AEP DMG NO.1-CCM-7 805410'I-GCCM.L-108 PIPE SUPPORT COHPONENT 587 AUX F1.308 2-3-4-F-A VT.3 1-C 805420 1-GCCM.L-109 PIPE SUPPORT COHPOHENT 587 AUX F A VT-3 1-F1.30B 2-3-4-C 805430 1 GCCM-R-110 PIPE SUPPORT COHPONEHT 587 AUX F-A VT-3 F1.30B 2-3-4-C 805440 1-GCCM-L-111 PIPE SUPPORT COHPONEHT 587 AUX F A VT-3 1-F1.30MB 2-3-C 805450 1-GCCM-R-112 PIPE SUPPORT COHPONEHT F-A VT-3 1 F1.30A 2 C 3-805460 1-GCCM R-117 PIPE SUPPORT COHPOHENT F1.30B 2-C 3-F-A VT-3 1-805470 1-GCCM.L.113 PIPE SUPPORT COHPOHENT 587 AUX FA VT3 1-F1.308 2-3.4-C DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS COHPOHEHTS PAGE: 115 COHPONENT COOLIHG MATER SYSTEH SUHHARY EXAHINATI ON AREA NUHBER I DENT I F I CATION FIRST PERIOD INSPECl'IOH INTERVAL I ASHE I SEC.XI I CATGY HDE ITEH HO NETH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD.I-OUTAGE------I 2 3 4 1 2 3 I INSTRUCTIONS ~*CALIBRATION BLOCK"*SEE AEP DMG NO 1-CCM-7 805480'l-GCCM-R-114 PIPE SUPPORT COHPONENl'87 AUX F-A VT-3 1 F1.30A 2-3-C 805490 1-GCCM.R-115 PIPE SUPPORT COHPONENT 587 AUX F1.30A 2-3-4 F-A VT-3 1-X 805500 1-GCCM.L-116 PIPE SUPPORT COHPOHEHT 587 AUX F-A VT-3 1-F1.30A 2-3-4 C 805510 1-GCCM-L-118 PIPE SUPPORT COHPOHEHT F-A VT-3 1-F1.30B 2C 3-4 SEE AEP DMG.NO.1-CCM-8 805600 1-GCCM R-14'I PIPE SUPPORT COHPOHEHT F-A VT-3 1 F1.30A 2-C 3-X 805610 1-GCCM-L-140 PIPE SUPPORT COHPOHENT 587 AUX F1.30A 2-3-4-F-A VT-3 1 C X 805620 1.GCCM.L-139 PIPE SUPPORT COHPOHEHT 587 AUX F-A VT-3'I F1.30A 2-3-4 C DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT'I INSERVICE INSPECTIOH LONG TERH PLAN CLASS 3 ALL STATUS CCHPONENTS PAGE: 116 COMPONENT COOL HG MATER SYSTEH SUHHARY EXAHI HAT I ON AREA NUHBER IDENT IF I CATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE I ITEH HO HETH I PLAN STATUS FIRST SECOHD THIRD I PERIOD PERIOD PERIOD-I---0 U T A G E------I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- ICAL I BRAT I OH BLOCK**SEE AEP DMG.NO.1-CCM.B 805630 1.GCCM-L-138 PIPE SUPPORT COHPONENT 587 AUX F1.30B 2-3-F-A VT-3 1 C 805640 1-GCN.R-137 PIPE SUPPORT COHPOHENT 587 AUX F-A VT-3 1 F1.30A 2-3-4 C 805650 1-GCCM-S-309 PIPE RESTRAINT COMPONENT F-A VT-3 1 F1.30MA 2 C C 3-4.805660 1.GCN.R-136 PIPE SUPPORT COHPONEHT F A VT-3 1 F1.30A 2-C 3-4-805670 1-CCCM-R-135 PIPE SUPPORT COHPONENT 587 AUX F-A Vl'-3 1-F1.30A 2-3-4-C 805680 1-GCCM-L-134 PIPE SUPPORT COHPONEHT 587 AUX F-A VT-3 1-F1.308 2-3-C 805690 1-GCCM-R-133 PIPE SUPPORT COHPOHEHT 587 AUX F-A VT 3 1-F1.30A 2-3-4-C DATE: 12/20/95 REVI SIGH: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAH CLASS 3 ALL STATUS COMPOHEHTS PAGE: 117 COMPONENT COOLING MATER SYSTEH SUHHARY EXAHIHAT IOH AREA NUMBER IDENT I F I CATION INSPECTION INTERVAL I FIRST ASHE PERIOD SEC.XI I CATGY HDE ITEH HO HETH i 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I I OUTAGE------1 2 3 4 1 2 3 I IHSTRUCT IOHS<<<<CALIBRATIOH BLOCK<<*SEE AEP DMG.NO.1-CCM-8 805700 1-GCCM.R-132 PIPE SUPPORT COHPOHEHT 587 AUX F-A VT-3 1 F1.30A 2-3-4 C 805710 1-GCCM-R.131 PIPE SUPPORT COMPONENT F A VT-3 F1.30A 2 C 3-4.X 805720 1-GCCM-L-130 PIPE SUPPORT COMPONENT F1.308 2-C 3-4-F-A VT-3 1-805730 1-GCCM.R-129 PIPE SUPPORT COMPONENT 587 AUX F-A VT-3 1-F1.30A 2-3-4-C 805740 1-GCCM-R-128 PIPE SUPPORT COHPOHENT 587 AUX F-A VT-3 1-F1.30A 2-3-C 805750 1-GCCM-R-127 PIPE SUPPORT COHPOHENT 587 AUX F-A VT-3 1-F1.30A 2-3-4-C 805760 I-GCCM.L.126 PIPE SUPPORT COHPOHENT 587 AUX F-A VT-3 1-F1.308 2-4 C DATE: 12/20/95 REVISIOH: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONEHTS PAGE: 118 COMPONEHT COOLING HATER SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I ASME I SEC.XI I CATGY NDE I ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD-I------0 U T A G E----..I 1 2 3 1 2 3 4 1 2 3 INSTRUCTIONS
- CAL I BRAT ION BLOCK+*SEE AEP DMG.NO.1-CCW.B 805770 1-GCCN-R-125 PIPE SUPPORT COMPONEHI'1.30A 2 C 3-4-F-A VT-3 1-805780 1.GCCII-R-119 PIPE SUPPORT COMPONENT F-A VT-3 1-F1.308 2-C 3-805790'1-GCCll-L-120 PIPE SUPPORT COMPOHEHT 587 AUX F 1.30HB 2-3-4 F-A VT-3'I C 805800 1-GCCN R-121 PIPE SUPPORT COMPONENT 587 AUX F-A VT-3 1 F1.30A 2-3-C 805810 1-GCCN.R 121A PIPE SUPPORT COMPONENT 587 AUX F-A VT-3 1-F1.30A 2-3-4 C 805820 1-GCCW.R-122 PIPE SUPPOR'I COMPONENT 587 AUX F1.30A 2-3-F-A VT-3 1-C 805830 1-GCCM-L-123 PIPE SUPPORT COMPONENT F1.308 2 C 3-4-F-A VT-3 1-DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UHIT 1 IHSERVICE INSPECTION LONG TERH PLAN CLASS 3 ALL STATUS COHPONEH'TS PAGE: 119 COHPONENT COOLING MATER SYSTEH SUHHARY EXAHIHATIOH AREA NUHBER IDENT I F I CAT IOH INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE ITEH NO NETH J 1 FIRST PERIOD PLAH STATUS SECOND THIRD I PERIOD PERIOD.----OUTAGE--
--I 2 3 1 2 3 4 1 2 3 INSTRUCTIONS ~*CALI BRAT I OH BLOCK~*SEE AEP DMG NO.1-CCM-35 805900 1.GCCM-L-18 PIPE SUPPORT COHPONENT F1.30A 2C 3-4-F-A VT-3 1 805910 1-GCCM.L-19 PIPE SUPPORT COHPOHEHT F1.30B 2-3-4-F.A VT-3 1-805920 1-GCCM.R-20 PIPE SUPPORT COHPONEHT F A VT-3 1 F1.30A 2-C 3-4-805930 1-GCCM.L-21 PIPE SUPPORT COHPONENT F1.30B 2-C 3-4-F-A VT-3 1 805940 1-GCCM-R-22 PIPE SUPPORT COHPONEHT 609 AUX F-A VT-3 1-F1.30A 2-3-4-C X 805950 1-GCCM L-276 PIPE RESTRAINT COHPOHENT F1.30MB 2-3-4 F-A VT.3 1 805960 1-GCCM-R-23 PIPE SUPPORT COHPONENT 609 AUX F-A VT-3 1 F1.30A 2 3-4 C DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UHIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS PAGE: 'I20 COMPONENT COOLING MATER STSTEM SWART EXAHIHATION AREA NUMBER IDENT IF ICATION INSPECT IOll INTERVAL PLAN STATUS I FIRST SECOND ASME PERIOD PEP IOO SEC.XI I-CATGY MDE I 0 U T A G E ITEM NO METH I 1 2 3 1 2 3 4 THIRD PERIOD 1 2 3 I INSTRUCTIONS
- CALIBRATIOH BLOCK*~SEE AEP DUG.NO.1-CCM.35 805970 I-GCCM-R-24 PIPE SUPPORT COMPONENT F1.30A 2-3-4-F-A VT-3 1-805980 1-GCCN L-25 PIPE SUPPORT COMPONENT 609 AUX F-A VT.3 1 F1.30B 2-3-4-C 805990 1 GCC'N-L-26 PIPE SUPPORT COMPONENT F1.30MB 2-3-4-F-A VT 3 1 806000 1-GCCN.L-27 PIPE SUPPORT COMPONENT 609 AUX F-A VI'.3 1-F1.30B 2-3-4-C X 806010 1.GCCN.R-28 PIPE SUPPORT COMPONENT'F-A F1.30A VT.3 1-2-3-4-806020'1.GCCW.V-54 PIPE SUPPORT COMPONENT F-A VT.3 1-F1.30C 2 C 3-4-806030 1.GCCN-R-842 PIPE RESTRAINT COMPONENT F-A VT-3 F1.30LIA 2C C 3-4 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS COHPOHEHTS PAGE: 121 COHPONENT COOLING MATER SYSTEH
SUMMARY
EXAHIHATIOH AREA NUHBER IDEN'TIFICATIOH INSPECT I OH INTERVAL I ASHE I SEC.Xl CATGY NDE ITEN NO NETH I FIRST PERIOD PLAN STATUS SECOND PERIOD THIRD I PERIOD I I------0 U T A G E-'I 2 3 1 2 3 4 1 2 3 IHSTRUCTIONS ~~CALIBRATIOH BLOCK**S E AEP DMG NO.1 CCM-35 806040 1-GCCM.R-382 PIPE SUPPORT COHPOHEHT F1.30'MA 2-C 3-4-F-A VT-3 1-SEE AEP DMG.HO.1-CCM-36 806100 1.GCCM-R-274 PIPE SUPPORT COHPOHENT 633 AUX F1.30MA 2-3-4-F-A VT-3 1-C 806120'I.GCCM.L-250 PIPE SUPPORT COHPOHENT 633 AUX FA VT-3'I-F1.30B 2.3-4 C 806130 1-GCCM-L-275 PIPE SUPPORT COHPOHEHT 633 AUX F1.30A 2.3-4 F-A VT-3 1-S E AEP DMC HO 1-CCM.37 SH.2 806200 1 GCCM-V-267 PIPE SUPPORT CONPOHENT 609 AUX F-A VT-3 1 F1.30MC 2-3-4-C 806210 1 GCCM R-252 PIPE SUPPORT COHPOHEHT 633 AUX F-A VT-3 1.F1.30A 2-3-4-C DATE: 12/20/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS CONPOHENTS PAGE: 122 COHPONENT COOLING MATER SYSTEH SUNHARY EXANIHATIOH AREA NUNBER IDENTIFICATION e INSPECTION INTERVAL I ASHE I SEC~XI I CATGY NDE ITEN NO NETH I PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD-I OUTAGE I 1 2 3 1 2 3 4 I 2 3 I I HSTRUCT IOHS~~CALIBRATIOH BLOCK**SEE AEP DMG.HO.1-CCM-37 SH.2 806220 1.GCCM-L-253 PIPE SUPPORT COHPONENT F-A VT-3 1 F1.30A 2 3-4 806222 1.GCCM-L.268 PIPE SUPPORT COMPONENT F-A VT-3 1 F1.30A 2-3.4 806224 1-GCCM-L-269 PIPE SUPPORT COHPONENT F-A VT-3 1-F1.30A 2 3--4 806226 1-GCCM-L-271 PIPE SUPPORT CONPONENT F-A VT-3 1-F1.30A 2-3-4 SEE AEP DMG.HO.1-CCM.37 SH 1 806230 1-GCCM-V-270 PIPE SUPPORT COHPOHEHT 633 AUX F-A VT-3 1 F1.30MC 2-3-4-C 806240 1-GCCM.L-46 PIPE SUPPORT COHPONENT F-A VT-3 1 F1.30A 2-3-4 806250 1-GCC'M R-47 PIPE SUPPORT COHPONEHT 609 AUX F A VT-3 1-F1.30A 2-3-4-C DATE: 12/20/95 REV I S ION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS COHPONENTS PAGE: 123 COHPONEHT COOLIHG MATER SYSTEM SUHHARY EXAHIHATION AREA NUHBER IDENTIFICATION INSPECTIOll INTERVAL I ASHE I SEC.XI I CATGY NDE ITEN NO NETH i 1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD-I OUTAGE-----t 2 3 1 2 3 4 1 2 3 IHSTRUCTIOHS ~*CALIBRATIOH BLOCK~~SEE AEP DMG.NO.1-CC'M-37 SH.806260'I GCCM-L-48 PIPE SUPPORT COHPONEHT F-A VT-3 1 F1.30B 2-3-4-806270 1-GCCM-R-49 PIPE SUPPORT COHPONEHT 609 AUX F-A VT-3 1-F1.30A 2-3-4-C 806280 1-GCCM.L-50 PIPE SUPPORT COMPONENT F-A VT-3 1 F1.30A 2.C 3-4-X 806290 1-GCCM-R-51 PIPE SUPPORT COHPOHENT FA VT3 1 F1.30A 2 C 3-4-806300 1-GCCM-R.53 PIPE SUPPORT COHPOHEHT F.A VT-3 1-F1.30A 2-3-4 806310 1-GCCM-L-52 PIPE SUPPORT COHPONEHT F1.308 2-C 3-4 F.A VT-3 1-806320 1-GCCM.S-840 PIPE RESTRAINT COHPONENT F-A VT-3 F1.30'MA 2 C C 3-4 DATE: '12/20/95 RE VI S I OH: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS COHPONEHTS PAGE: 124 COHPONENT COOL NG MATER SYSTEH SUHHARY EXAHINAT I OH AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE ITEN NO NETH I PLAN STATUS FIRST SECOND THIRD I PERIOD PERICO PERIOD I OUTAGE----I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS <<*CALIBRATION BLOCK*~SEE AEP DMG.NO.1-CCM-37 SH.'806330'I.GCCM~R-381 PIPE SUPPORT COMPONENT 609 AUX F1.30MA 2-3-4 F-A VT-3 1-C SEE AEP DMG.NO.1 CCM.40 806400 1.GCCM.V-376 PIPE SUPPORT COHPONEHT F1.30MA 2.C 3-X 4-F-A VT-3 1 806410 1-GCCM-S-837 PIPE RESTRAINT COHPONENT F1.30MA 2C C 3.4 F-A VT-3 1 806420 1-GCCM.R-60 PIPE SUPPORT COHPONENT 609 AUX F1.30A 2-3-4 F-A VT-3 1 C X 806430 1.GCCM R-58 PIPE SUPPORT COHPONEHT 609 AUX F-A VT-3 1-F1.30A 2-3-4 C 806440'1-GCCM.L-57 PIPE SUPPORT COHPONEHT 609 AUX F1.308 2 3-4 F-A VT-3 1-C 806450 1-GCCM-R-56 PIPE SUPPORT COHPONENT F1.30A 2C 3X 4-F A VT-3 1-DATE: 12/20/95 REVISIOH: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTIOH LONG TERN PLAN CLASS 3 ALL STATUS COHPOHEHTS PAGE: 125 COHPONENT COOLING MATER SYSTEM SUHHARY EXAHI HAT ION AREA HUHBER IDENT IF I CAT IOH PLAN STATUS FIRST SECOHD PERICO PERIOD INSPECTION INTERVAL I ASNE I SEC.XI CATGY NDE I--0 U T A G E-ITEH NO NETH i 1 2 3 1 2 3 4 THIRD I PERIOD I----.I 2 3 INSTRUCTIOHS ~~CALIBRATION BLOCK*~SEE AEP DMG.NO.1-CCM-40 806460 I-GCCM-R.61 PIPE SUPPORT CONPOHEHT F1.30A 2 C 3-4-F.A VT-3 1-806470 1.GCCM.R-379 PIPE SUPPORT COHPOHENT 609 AUX F1.30MA 2-3-4-F.A VT-3 1-C 806480 1-GCCM S-838 PIPE RESTRAINT COHPONEHT F1.30MB 2C C 3-4-F-A VT-3 1-806490 1-GCCM-V-62 PIPE SUPPORT COHPOHEHT 609 AUX F1.30C 2-C 3-4-F.A VT-3 1-C 806500 1-GCCM R-63 PIPE SUPPORT COHPOHENT 609 AUX F1.30A 2-3-4-F-A VT 3 1 C 806510 1-GCCM.R-53A PIPE SUPPORT CONPOHEHT F1.30A 2 C 3 X 4 F.A VT-3 1 C 806520 1-GCCM R 64 PIPE SUPPORT CONPOHEHT F1.30A 2 C C 3-4-F-A VT-3 1-DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UHIT 1 INSERVICE INSPECTIOH LONG TERN PLAN CLASS 3 ALL STATUS COHPOHEHTS PAGE: 126 CONPOMENT COOLING WATER SYSTEH SUHHARY EXAHI HAT I OH AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I FIRST ASHE I PERIOD SEC~XI I CATGY NDE I ITEN NO METH I 1 2 3 PLAN STATUS SECOND PERIOD THIRD I PERIOD-I-OUTAGE-----I 1 2 3 4 1 2 3 I INSTRUCT I OHS**CALI BRAT ION BLOCK*~SEE AEP DWG NO.1-CCW-40 806530 1-GCCW-L-65 PIPE SUPPORT CONPONEHT 609 AUX F-A VT-3 1 F1.30A 2 3.4-C SEE AEP DWG.HO.1-CCW-48 806600 1-GCCW.R-305 PIPE SUPPORT COHPOHEHI'-A VT-3 1 F1.30WA 2-C 3-4-806610 1-GCCW-S-278 PIPE RESTRAINT COHPONEHT F1.30A 2C C 3-4-F-A VT-3 1 806620 1-GCCW-L-59 PIPE SUPPOR'I COHPOHENT 609 AUX F-A VT-3 1-F1.30WB 2-3-4 C SEE AEP DWG.NO.1-CCW-49 REV.5 SHEET 3 806700 1-GCCW.R-41 PIPE SUPPORT COHPOHENT F-A VT-3 F1.30A 2 C 3-4-806710 1.GCCW R 40 PIPE SUPPORT COHPOHEHT F1.308 2-C 3-4-F-A VT-3 1-DATE: 12/20/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 3 ALL STATUS COHPONEHTS PAGE: 127 COMPONENT COOLING MATER SYSTE SUHHARY EXAHINAT I OH AREA NUHBER IDENTIFICATION PLAN STATUS FIRST SECOND PERIOD PERIOD INSPECTION INTERVAL I ASHE I SEC.Xl CATGY NDE/------0 U T A G E-ITEH HO HETH I 1 2 3 1 2 3 4 THIRD PER IOD I-----I 2 3 INSTRUCTIONS
- CALIBRATION BLOCK**SEE A P DMG NO.1-CCM-49 SH.1 806720 1-GCCM.L-39 PIPE SUPPORT COMPOHENT 609 AUX F-A VT-3 1-F1.30B 2-3-4 C 806730 1-GCCM-R-38 PIPE SUPPORT COMPONENT 609 AUX F-A VT.3 F1.30A 2-3-4-C 806740 1-GCCM-R-32 PIPE SUPPORT COHPOHEHT 609 AUX F-A VT-3 1 F1.30A 2-3-4-C 806750 1-GCCM-R-29 PIPE SUPPORT COMPONENT 609 AUX F-A VT-3 1-F1.30A 2-3-4 C 806760 1-GCCM.R-30 PIPE SUPPORT COMPONENT F-A VT-3 1-F1.30A 2 C 3-4-806770 1-GCCM-L-178A PIPE RESTRAINT COMPONENT F-A VT-3 1 F1.30A 2-3-4 806780 1-GCCM-R-31 PIPE SUPPORT COMPOHENT 609 AUX F-A Vl'-3 1 F1.30A 2-3.4.C DATE: 12/20/95 REVISIOMs 0 COOK NUCLEAR PLAMI'NIT 1 INSERVICE INSPECTION LONG TERN PLAH CLASS 3 ALL STATUS COMPONENTS PAGEs 128 COMPONENT COOLIHG MATER SYSTEM SUHHARY EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I FIRST ASNE PERIOD SEC.XI I CATGY NDE ITEN NO NETH)1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD I OUTAGE------I 1 2 3 4 1 2 3 I INSTRUCTIONS
+*CALIBRATION BLOCK*SEE AEP D}}G.HO.1-CC}}.49 SH.1 806790 1-GCC}l-R-37 PIPE SUPPORT COMPONENT 609 AUX F-A VT-3 F1.30A 2-3-4-C 806800 1-GCCM-R-33 PIPE SUPPORT COHPONEHT 609 AUX F1.30A 2-3-4-F A VT-3 1-C 806810 1-GCC}I~L-34 PIPE SUPPORT CDHPOHENI'09 AUX FA VT3 1 F1.30MB 2-3-C 806820 1.GCCM-V-35 PIPE SUPPORT COHPONEHT F-A VT 3 1 F1.30HC 2 C 3-4 SEE AEP O}IG.NO.I-CCM.5 806900 1-GCCN-R-72 PIPE SUPPORT COMPONENT F1.30A 2-C 3-4 F-A VT-3 1-806910 I-GCCll-V-316 PIPE SUPPORT COMPONENT 633 AUX F-A VT-3'I-F1~30NA 2-3-4-C C DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION I.ONG TERH PLAN CLASS 3 ALL STATUS COHPONENTS PAGE: 129 COMPONENT COOLIHG MATER SYSTEH SUHHARY EXAHINATION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGT NDE I ITEN NO NETH I FIRST PERIOD PLAN STATUS SECOND THIRD PERIOD PERIOD-----0 U T A G E-----1 2 3 1 2 3 4 1 2 3 I I I INSTRUCT I ON S>>*CALIBRATION BLOCK>>>>SEE AEP DMG NO.1-CCM-52 806930 1-GCCM.V-313 PIPE SUPPORT COHPONENT LTDN HXRH F-A VT-3 1-F1.30MA 2-3-4-C C SEE AEP DMG NO 1-CC'M.3 807000 I-GCCM.R-36 PIPE SUPPORT COHPONEHT 609 AUX F-A VT.3 1-F1.30A 2-3-C 807010 1-GCCM-L-71 PIPE SUPPORT COHPONEHT F1.30A 2 C 3-4-F-A VT-3 1-807020 1-GCCM.L-300 PIPE SUPPORT COHPOHENT F1.30MB 2-C 3-4-F-A VT-3 1-SEE AEP DMG.NO.1-CCM-60 SH.3 807100 1-GCCM-V-287 PIPE SUPPORT COHPONENT LTDN HXRH F1.308 2-3-4-F-A VT-3 1 C 807110 1-GCCM-L-262 PIPE SUPPORT COHPONENT LTDH NXRH F-a Vr-3 F1.308 2-3-4 C DATE: 12/20/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS -PAGE: 130 COMPONENT COOLING IIATER SYSTEM
SUMMARY
EXAMI HAT I ON AREA NUMBER"IDENT IF I CATION INSPECTIOH INTERVAL I F IRST ASME PERIOD SEC.Xl CATGY HDE ITEM HO METH ,I'I 2 3 PLAN STATUS SECOND THIRD I PERICO PERIOD I OUTAGE------1 2 3~4 1 2 3 INSTRUCT I OHS**CAL I BRAT I OH BLOCK>>>>SEE AEP DIIG HO.1-CCM 60 SH 3 807120 1-GCCM R-263 PIPE SUPPORT COMPOHENT 633 AUX F-A VT 3 1 F1.30HB 2-3-4-C 807130 1-GCCW.R.264 PIPE SUPPORT COMPOHENT 633 AUX F-A VT 3 F1.30MA 2-3-4-C 807140 1-GCCM-L.265 PIPE SUPPORT CnlPOHENT F-A VT-3 F1.30A 1.2C C 3-4-807150 1-GCCM.V-290 PIPE SUPPORT COMPOHEHT F1.30C~2-C 3-4-F-A VT-3 1-C X 807160 1-GCCN-L-266 PIPE SUPPORT COMPOHENT F1.30HB 2-C 3-4 F-A VT-3 1-807170 1-GCCM-L.74 PIPE SUPPORT COMPONENT 609 AUX F1.30B 2-3-4-F-A VT 3 1-C SE AEP DUG NO 1-CCll-63 807300'l-GCCM-L-236 PIPE SUPPORT COMPONENT 587 AUX F1.30A 2-3-4-F-A VT.3 1-C X DATE: 12/20/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS CONPOHEH'IS PAGE: 131 COHPONENT COOLING MATER SYSTEN SUNHARY EXAHI HAT ION AREA NUNBER IDENT IF ICATION IHSPECTIOH INTERVAL I FIRST ASHE PERIOD SEC.XI I CATGY NDE ITEN HO NETH i 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD-I OUTAGE-I 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATIOH BLOCK+SEE AEP DMG.HO.1-CCM-63 807310 1.GCCM-L.235 PIPE SUPPORT COHPONEHT 587 AUX F1.30A 2-3-4-F.A VT.3 1-C 807320 1-GCCM.L-234 PIPE SUPPORT CONPOHEHT F-A VT-3 1 F1.308 2 C 3-4-SEE AEP DMG.NO.1-GCCM.63 807330 1-GCCM-R-233 PIPE SUPPORT COMPONENT F-A VT-3 1 F1.30A 2-3-4-SEE AEP DMG.HO.1-CCM-63 807340 1-GCCM.L-232 PIPE SUPPORT COHPONEHT F-A VT-3 1-F1.30A 2-3-4 C DELETED PER RFC-3081.807350 1-GCCM-L-230 PIPE SUPPORT COMPONENT FLSHTK RH F-A VT-3 1 F1.30MB 2-3-4 C X 807360 1-GCCM-L-229 PIPE SUPPORT CONPOHENT FLSHTK RH F A VT-3 1-F1.30MB 2-3-4-C DATE: 12/20/95 REV IS IDH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 3 ALL STATUS COHPONENTS PAGE: 132 COHPONEH'I COOLING MATER SYSTEM SUHHARY EXAHINATIOH AREA NUHBER IDENT IF ICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE ITEN NO NETH I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD---0 U T A 0 E-----1 2 3 1 2 3 4 1 2 3 INSTRUCTIONS
- CAL I BRAT ION BLOCK**SEE AEP DMG NO.1-CCM.65 807400 1-GCCM.R-241 PIPE SUPPORT COHPOHENT FLSHTK RH F1.30MA 2-3-F-A VT-3 1-C 807410 1.GCCM-L-242 PIPE SUPPORT COHPONENT F1.30MB 2 C 3-4.F A VT-3 1 807420 1.GCCM.R.243 PIPE SUPPORT COHPONENT F1.30A 2-C 3.4.F-A VT-3 1-807430 I-GCCM-L-245 PIPE SUPPORT COHPOHENT 587 AUX F-A VT-3 1-F1.30A 2-3-4 C SEE AEP DMG.NO.1-CCM.66 807500 1-GCCM-L-247 PIPE SUPPORT COHPONEHT F.A VT-3 1-F1.30MB 2 C 3-4 807510 1-GCCM-L-281 PIPE SUPPORT COHPONENT FLSHTK RH F-A VT-3 1-F1.30A 2-3.C 807520 1-GCCM.R-246 PIPE SUPPORT COHPOHEHT FLSHTK RH F1.30A 2-3.4 F.A VT.3 1-C DATE: 12/20/95 REVI 8 I OH: 0 COOK HUCLEAR PLANT UHIT 1 IHSERVICE IHSPECTIOH LONG TERH PLAN CLASS 3 ALL STATUS COHPONEHTS PAGE: 133 COHPONENT COOLING MATER SYSTEH SUHHARY EXAHI HAT ION AREA NUKBER IDENT IF I CATION INSPECTION INTERVAL I F IRST ASHE PERIOD SEC.Xl CATGY NDE ITEN HO HETN I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD I OUTAGE-----I 1 2 3 4 1 2 3 I INSTRUCTIONS
~~CALIBRATION BLOCK**SEE AEP DMG.NO.1-CCM-94 807600 1-GCCM R 586 PIPE SUPPORT COHPOHEHT F.A VT-3 1.F1.30A 2 C 3 X 4 807610 1-GCCM.R-587 PIPE SUPPORT COHPONENT F-A VT-3 1 F1.30A 2-3.4-807620 1-GCCM.R-522 PIPE SUPPORT COHPONENT F-A VT-3'I F1.308 2-3.4.C X 807630 I-GCCM-R 588 PIPE SUPPORT COHPONENT F-A VT-3 1 F1.30A 2 3-C 807640 1-GCCM.R-589 PIPE SUPPORT COHPOHEHT F-A VT-3 F1.30A 2-3-4 C 807650 1-GCCM-R-523 PIPE SUPPORT COHPOHENT F-A VT-3 1 F1.308 2-3-4-C 807660 1-GCCM R-590 PIPE SUPPORT COHPOHEHT F-A VT-3 1 F1.30A 2-3-4 C DATE: 12/20/95 REV IS I OH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAH CLASS 3 ALL STATUS COHPONENTS PAGE: 134 COHPONENT COOLIHG HATER SYSTEH SUNNART EXAHINAT I OH AREA NUNBER IDENT IF ICATION INSPECTIOH INTERVAL I FIRST ASHE PERIOD SEC.XI I CATGY NDE ITEN HO NETH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I OUTAGE-----I 1 2 3 4 1 2 3 I INSTRUCTIONS ~ICAL I BRAT ION BLOCK**SEE AEP DUG HO.1 CCll-94 807670 1-GCCll.R-591 PIPE SUPPORT COHPONEHT F1.30A 2.C 3-F A VT-3 1-807680 1-GCCM.R-525 PIPE SUPPORT COMPONEN'I F1.308 2-3-4 F.A VT-3 1-C" 807690 1-GCCH-R-592 PIPE SUPPORT COHPOHEHT F-A VT-3 1-F1.30NB 2-3-4-C 807700 1.GCCII~R-526 PIPE SUPPORT COHPONENT F1.30WB 2 3-4 F-A VT-3 1-C 807710 1-GCCH.R-594 PIPE SUPPORT COHPOHEHT F-A VT-3 1-F1.30A 2-3.4 C 807720 1.GCCM-R.595 PIPE SUPPORT COHPONEHT F1.30A 2 C 3-4 F.A VT-3 1 807730 1-GCCU.R-596 PIPE SUPPORT COHPONENT F1.30A 2-C 3-4-F-A VT-3 1. DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LOHG TERM PLAN CLASS 3 ALL STATUS COMPONENTS PAGE: 135 COHPOMEHT COOLING'WATER SYSTEM
SUMMARY
EXAM INAT ION AREA NUMBER IDENT IF I CATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE ITEN MO NETH I PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I---OUTAGE-I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS ~~CALI BRAT IOH BLOCK*~SEE AEP DUG.HO.1-CCM-94 807740 1-GCCM-R-597 PIPE SUPPORT COHPOHEHT F1.308 2-3-4-F-A VT-3 1-SEE AEP SKETCH I-EDS-327(C REV.11.SEE AEP DIIG.MO.1-CCW-98 807800 1-GCCII-R-573 PIPE SUPPORT COHPOHEHT F1.30B 2.3-4 F-A Vl'-3 1.C X 807810 1-GCS.R-625 PIPE SUPPORT COHPONENT F-A VT-3 1-F1.30A 2-3.4 C 807820 1-GCCH.R-647 PIPE SUPPORT COHPONEHT F1.308 2-3-4-F-A VT-3 1 C 807830 1-GCCH.R-626 PIPE SUPPORT COMPONENT F-A VT-3 F1.30A 2 C 3-4-FOUND TO BE PARTIALLY INACCESSIBLE DURING THE 1987 REFUELIHG OUTAGE.807840 1.GCCM.R-648 PIPE SUPPORT COHPOHEHT F-A VT-3 1 F1.308 2-C 3-4-SEE AEP DUG.MO.1-GCOl.98 807850 1.GCCM.R-627 PIPE SUPPORT COMPONENT F-A VT-3 1-F1.30A 2-3-4.C DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IMSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL Sl'ATUS COHPONENTS PAGE: 136 COMPONENT COOLING llATER SYSTEH
SUMMARY
EXAHINATIOH AREA MUHBER IDENTIFICATIOM INSPECTION INTERVAL I ASHE I SEC.XI I CATGY MDE ITEH MO HFTH I 1 PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD OUTAGE 2 3 1 2 3 4 1 2 3 I I I INSTRUCTIONS
- CALIBRATION BLOCK*S A P DUG NO.1-GCCM-98 807860 1-GCCN-R-649 PIPE SUPPORT COHPONENT F1.30A 2-3-4 F-A VT-3 1 C X 807870 1 GCCll R.628 PIPE SUPPORT COHPONENT F.A VT.3 1-F1.30A 2-3-4 C 807880 1-GCCH.R-574 PIPE SUPPORT COHPONENT F A VT-3 1-F1.308-2-3-4-C 807890 1-GCCIJ-98.HANGER PIPE SUPPORT COHPOHEHT F-A VT-3 F1.30A 2-3-4-C NO HANGER NUHBER ASSIGNED.SEE DETAIL"C" ON AEP DIIG.NO.1-GCCU.98, REV.4.S AEP DUG.MO.1-CCll.98 807900 1-GCCM R-630 PIPE SUPPORT COHPONENI'1.30A 2-C 3-4-F-A'T'3 1-807910 1-GCCN-R.567 PIPE SUPPORT COMPONENT F1.30MB 2-3-4-F.A VT-3 1-807920 1.GCCM.R.740 PIPE SUPPORT COMPONENT F.A VT.3 1 F1.30A 2-3-4-C DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE IHSPECTIOH LONG TERM PLAN CLASS 3 ALL STATUS COHPOHEHTS PAGE: 137 COHPONEHT COOLING MATER SYSTEN SUNNARY EXANINATIOH AREA NUHBER IDENT IF ICATION IHSPECT ION IN'IERVAL I FIRST ASNE I PERIOD SEC.XI I CATGY NDE ITEN HO NETH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD OUTAGE---I 1 2 3 4 1 2 INSTRUCTIONS
+*CAL I BRAT I OH BLOCK**SEE AEP DMG.HO.1-CCM.98 807930 1-GCCM.R-631 PIPE SUPPORT CONPOHEHT F-A VT-3 1 F1.30A 2-3-C 807940 1-GCCM.R-593 PIPE SUPPORT CONPOHENT F-A VT-3 1 F1.30A 2-3-4-C 807950 1-GCCM.R.638 PIPE SUPPORT CONPOHENT F-A VT-3 F1.30B 2 C 3-4.SEE AEP DMG HO.12"CCM.50 820000 12-GCCM.R-23 PIPE SUPPORT CONPOHENT F-A VT.3 I.F1.30A 2 C 3-4 820010 12-GCCM-S-841 PIPE RESTRAIHT CONPOHEHT F.A'T.3 1-F1.30MB 2 C C 3-4-820020 12-GCCM-S-844 PIPE RESTRAINT CONPONEHT F-A VT-3 F1.30MB 2C C 3-4 820030 12-GCCM-V-6 PIPE SUPPORT COHPOHEHT 609 AUX F-A VT-3 I-F1.30C 2-3-4 C DATE: 12/20/95 REVISIOH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS COMPONENTS PAGE: 138 COHPOHEHT COOLING MATER SYSTEN SUNNARY EXANIHATIOH AREA NUNBER IDENT IF I CAT IOH IHSPECTI OH INTERVAL I ASNE I SEC.XI I CATGY NDE ITEN NO NETH I 1 PLAN STATUS FIRST SECOND THIRD I PERICO PERIOD PERIOD-I-OUTAGE------I 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- ~CALIBRATIOll BLOCK~*SE AEP DMG NO.12-CCM-820200 12-GCCM.L.5 PIPE SUPPORT CONPOHENI'09 AUX F-A VT-3 F1.30A 2-3-4-C 820210 12.GCCM-S.843 PIPE RESTRAINT CONPOHEHT F.A VT-3 1-F1.30S 2-C 3-X 4-820220 12.GCCM-L-4 PIPE SUPPORT COMPONENT F A VT-3 1 F1.30A 2C 4-820230 12.GCCM-R.2 PIPE SUPPORT CONPOHEHT F-A VT-3 1-F1.30A 2-3-4-820235 12.GCCM-V-1 PIPE SUPPORT CONPOHENT F-A VT-3 1 F1.30C 2-3-4 820237 12.GCC'M.L.22 PIPE SUPPORT CONPONENT F-A VT-3 1 F1.30A 2-3-820240 12.GCCM.R-24 PIPE SUPPORT CONPONENT 609 AUX F1.30MA 2-3-4 F-A VT-3 1-C DATE: 12/20/95 REVISIOH: 0 COMPONENT COOLING MATER SYSTEM SUNHARY EXAHINATION AREA NUNBER IDENT IF I CATION INSPECTION INTERVAL I I ASNE I SEC.XI I CATGY NDE ITEN NO NETH I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD------0 U T A G E----1 2 3 1 2 3 4 1 2 3 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LOHG TERN PLAN CLASS 3 ALL STATUS CONPONEHTS PAGE:"'139 I INSTRUCTIONS I++CALIBRATION BLOCK+*SEE AEP DMG.NO.12-CCM 58 820250 12-GCCM.S.&39 PIPE RESTRAINT CONPONEHT F1.30MS 2C C 3-4-F.A VT.3 1.820260 12-GCCM-L-3 PIPE SUPPORT CONPONEHT 609 AUX F1.30A 2 3-4 F-A VT-3 1 C DATE: 12/20/95 REV IS IOH: 0 COOK NUCLEAR PLAHT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL StATUS COHPONENTS PAGE: 140 ESSENTIAL SERVICE MAT R SYSTEH SUHNARY EXAHI HAT I OH AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I ASNE I SEC.XI I CATGY NDE I ITEN NO NETH I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD--OUTAGE--1 2 3 1 2 3 4 1 2 3 INSTRUCT IOHS**CALIBRATION BLOCK~*SEE AEP DMG NO.1-ESM-1 830000 1-GESM-R-1 PIPE SUPPORT COHPOHEHT F1.30A 2C 3-4-F-A VT.3 1-830010 1.GESM-R-2 PIPE SUPPORT COHPOHENT F-A VT-3 1-F1.30A 2-3-4 S E AEP DMG.HO.1-ESM-2 830100 1-GESM.R-4 PIPE SUPPORT COHPONENI'-A VT 3 1-F1.30A-2.3-4-830110'I-GESM-R-5 PIPE SUPPORT COHPOHEHT F A VT-3 1-F1.30A 2-3-4 831100 1-GESM-V-58 PIPE SUPPORT COHPOHENT 591 TURB F.A VT-3 1-F1.30MC 2.3-4 C X SEE AEP DMG.NO.1-ESM-28 831200 1-GESM V-59 PIPE SUPPORT COHPONEHt F-A VT-3 1-F1.30MC 2-3-4 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS CONPOHEHTS PAGE: 141 ESSENTIAL SERVICE M T R SYSTEM SUNNARY EXANIHATION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I FIRST ASNE PER IOO SEC.XI I CATGY NDE ITEN HO NETH i 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I I 0 U T A G E------I 1 2 3 4 1 2 3 INSTRUCT IOHS**GAL I BRAT ION BLOCK**SEE AEP DMG.NO.1-ESM-43 831910 1-GESM-V-16 PIPE SUPPORT CONPOHEHT F1.30C 2 C 3 X 4 F A VT-3 1 831920 1.GESM-L.17 PIPE SUPPORT CONPONENT F A VT-3 1-F1.30B 2-4 831930 1-GESM-L-97 PIPE SUPPORT CONPONENT F A VT-3 1-F1.308 2-C 3-4-831940 1-GESM.R.19 PIPE SUPPORT CONPOHENT F-A VT-3 1-F1.30A 2-3-4-831950 1-GESM.L-99 PIPE SUPPORT COHPOHENT F1.30A 2-C 3-4-F-A VT-3 1 831960 1 GESM.R-20 PIPE SUPPORT CONPOHENT F-A VT-3 1-F1.30A 2-3-4 SEE AEP DMG.NO.1-ESM-44 832000 1-GESM-L-112 PIPE SUPPORT COHPOHEHT F-A VT-3 1 F1.30MB 2-3-4 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS COHPOHEHTS PAGE: 142 ESSENTIAL SERVICE MATER SYSTEM SUHHARY EXAHINATIOH AREA NUHBER IDENT IF I CATION INSPECTION INTERVAL I ASHE I SEC+XI CATGY HDE I ITEN NO NETH I 1 F IRST PERIOD 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I OUTAGE 1 2 3 4 1 2 3 I INSTRUCT IOHS~~CAL I BRAT IOH BLOCK~SEE EP MG NO 1-SM-44 832010 1-GESM-L-22 PIPE SUPPORT COHPOHENT FA VT3 F1.30B'I-2-3-832020 1-GEQI~R-21 PIPE SUPPORT COHPONENT 609 AUX F-A VT-3 F1.308 1-2.3-C 832030'I-GESM-R.23 PIPE SUPPORT COHPOHEHT F-A VT-3 F1.30A 1-2-3-4 X 832040 1-GESM.R-24 PIPE SUPPORT COHPONENT F-A VT-3 F1.30A 2-3-4-832050 1-GESM-R-41 PIPE SUPPORT COHPONENT F-A VT 3 F1.30A 1-2-3-4 832060 1-GESM.R-40 PIPE SUPPORT COMPONENT 609 AUX F-A VT-3 F1.30A 2-3-C 832070 1-GESM-L-802 PIPE SUPPORT COHPOHEHT F-A VT-3 F1.30MB 2-3 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS COHPONENTS PAGE: 143 ESSENTIAL SERV CE MATER SYSTEH SUHHARY EXAHI HAT I OH AREA NUHBER IDENT I F I CATION INSPECTIOH INTERVAL I FIRST ASHE PERIOD SEC.XI I CATGY HDE ITEN NO NETH I 1 2 3 PLAN STATUS SECOND PERIOD THIRD I PERIOD-I 0 U T A G E------I 1 2 3 4 1 2 3 I INSTRUCT IOHS**CAL I BRAT ION BLOCK**SEE AEP DMG.NO.1-ESM 44 832080 1-GESM.R-25 PIPE SUPPORT COHPOHENT F-A VT-3 1-F1.30A 2 3-4 832090 1-GESM-L-101 PIPE SUPPOR'I COHPONEHT F-A VT-3 1-F1.30A 2-3.4-832095 1-GESM R-26 PIPE SUPPORT COHPOHENT F.A VT-3 1-F1.30A 2-3-4-SEE AEP DMG.NO.1-ESM.45 832100 1-GESM.R-27 PIPE SUPPORT COHPOHEHT M CTS HXRH F1.30A 2.3-4-F-A VT-3 1 C 832110 1-GESM.L-87 PIPE SUPPORT COHPOHENT F A VT-3 1 F1.30A 2-3-4-832120 1.GESM-R-28 PIPE SUPPORT COHPOHEHT FA VT3 1 F1.30A 2.3-4-832130 1-GESM.L-29 PIPE SUPPORT COHPONEHT F-A VT-3 1 F1.308 2-3-4 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS COMPONENTS PAGE: 144 ESSENTIAL SERV CE iIATER SYSTEM
SUMMARY
EXANINATIOM AREA NUMBER IDEHT IF I CAT ION INSPECTION INTERVAL I FIRST ASHE PERIOD SEC.XI I CATGY HDE ITEN NO NETH I 1 2 3 PLAN STATUS SECOND THIRD PEPIOD PERIOD I 0 U T A G E------I 1 2 3 4 1 2 3 INSTRUCT I DMS~*CALIBRATION BLOCK+*SEE AEP DNG.MO.1-ESW-45 832140 1-GESll-L-88 PIPE SUPPORT COMPONENT 609 AUX F-A VT-3 1-F1.30A 2 3 4 C SEE AEP QG 0 1-ESU.46 832200 1-AESN-R-30 PIPE SUPPORT COHPOHENT F-A VT-3 1 F1.30A 2 C 3-4-832205 1-GESU-L-89 PIPE SUPPORT COMPONENT FA VT3 1-F1.30A-2.C 3-4-832210 I-GESM-R.31 PIPE SUPPORT COMPONENT F1.30A 2-C 3.4-F-A VT-3 1-832215 1-GESW-L-90 PIPE SUPPORT COMPONENT F-A VT-3 1 F1.30B 2-3-4 832220 1-GESN-R-32 PIPE SUPPORT COHPOHEHT 609 AUX F1.30A 2-3-4 F-A VT-3 1 C X 832225 1-GESN-R-33 PIPE SUPPORT COMPONENT F-A VT-3 1-F1.30A 2-3 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS COHPONEHTS PAGE: 145 ESSENTIAL S RV E A R SYSTEH SUHHARY EXAHINAT ION AREA NUHBER IDEHT I F I CAT IOH INSPECTION INTERVAL I F IRST ASHE PERIOD SEC.XI I CATGY NDE ITEH NO NETH I 1 2 3 PLAN STATUS SECOND THIRD I PERICO PERIOD-I OUTAGE I 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK~SEE AEP DMG.NO.1-ESM 46 832230 1-GESM-L-94 PIPE SUPPORT COHPONEHT 609 AUX F1.30A 2-3-4-F-A VT.3 1.C 832235 1-GESM R-34 PIPE SUPPORT COMPONENT F1.30A 2 3-4 F-A VT-3 1 832240 1-GESM R-35 PIPE SUPPORT COMPONENT 609 AUX F1.308 2-3-4-F-A VT-3 1 C 832245 1-GESM R-36 PIPE SUPPORT COHPONENT F-A VT 3 1 F1.308 2.3~4 SEE AEP DMG.NO.1-ESM-47 832300 1-GESW.R-39 PIPE SUPPORT COHPONEHT 609 AUX F-A VT-3 1 F1.30A 2-3-4-C 832310 1 GESM.R-38 PIPE SUPPORT COHPONENT F-A VT 3 1 F1.30A 2-C 3-4 832320 1-GESM.L-91 PIPE SUPPORT COHPONEHT F-A VT-3 1 F1.30A 2 C 3 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTIOH LONG TERH PLAN CLASS 3 ALL STATUS COHPONENTS PAGE: 146 ESSENTIAL SERVICE NAT R SYSTEH SUHHARY EXAHI HAT I ON AREA HUHBER IDENT I F I CATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE ITEH NO NETH PLAH STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I OUTAGE-----I 1 2 3 1 2 3 4 1 2 3 I INSTRUCT IOHS a*CALIBRATION BLOCK a SEE AEP DUG.NO.1.SH-47 832330 1.GESII-R-37 PIPE SUPPORT COHPONENT F-A Vl'-3 1-F1.30A 2 3-4-SEE AEP DNG.NO.1-SN-51 832400 1-GESN-L-114 PIPE SUPPORT COHPONENT 609 TURB F1.30B 2-3-4-FA VT3 1-C X 832410 I-GEQI-L-57 PIPE SUPPORT COHPOHENT F-A VT-3 1-F1.30A 2.3-4-832420 1-GESN-R-55 PIPE SUPPORT COHPOHEHT F-A VT-3 1 F1.30A 2 3-4-832430 1-GESH-V.53 PIPE SUPPORT COHPONEHT F.A'T.3 1-F1.30C 2 C 3.4-832440 1-GESN-L.115 PIPE SUPPORT COHPONENT F-A VT 3 1-F1.30B 2-3-4-832450 1-GESN-V.51 PIPE SUPPORT COHPONENT F1.30NC 2-C 3.4-F-A VT-3 1-DATE: 12/20/95 REVISION: 0 COOK HUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS COHPONENTS PAGE: 147 ESSENTIAL SERVICE ATER SYSTEH SUHHARY EXAHI HAT ION AREA NUHBER IDENT IF I CATION INSPECTION INTERVAL I FIRST ASHE PERIOD SEC.XI I CATGY NDE I ITEH NO HETH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD-I OUTAGE-----I 1 2 3 4 1 2 3 I INSTRUCTIONS
- ~CALIBRATIOH BLOCK~~SEE AEP DMG.NO.1-ESM 52 832510 1-GESM.R-56 PIPE SUPPORT COHPONENT 609 TURB F1.30A 2-3-4-F A VT-3 1-C 832520 1 GESM R-54 PIPE SUPPORT COHPOHENt F-A VT-3 1 F1.30A 2-3-4-832530 1-GESM.V-52 PIPE SUPPORT COHPONENt F-A Vt-3 1-F1.30C 2-3-4-832550 1-GESM.V-50 PIPE SUPPORt COHPONENT F1.30MC 2-C 3-4 F-A VT-3 1 SEE AEP DMG NO 1-ESM-56 832600 1-GESM-L-801 PIPE SUPPORT COHPOHEH'I 609 AUX F-A'VT-3 F1.30MB 2-3-4 C 832610 1.GESM R-45 PIPE SUPPORT COHPOHEHT F-A VT-3 1-F1.30A 2-3-4-832620 1-GESM-L-44 PIPE SUPPORT COMPONENT 609 AUX F-A VT-3'I-F1.308 2-3-4 C DATE: 12/20/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERH PLAN CLASS 3 ALL STATUS COHPONENTS PAGE: 148 ESSENTIAL SERVICE'MATER SYSTE SUHHARY EXAHIHATION AREA NUHBER IDENT IF ICATION INSPECTION INTERVAL I FIRST ASHE I PEP.IOD SEC.Xl I-CATGY NDE I ITEH NO HETH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I OUTAGE I 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATIOH BLOCK**SEE AEP DMG NO.1-ESM-56 832630 1.GESM-L-43 PIPE SUPPORT CDHPOHENT F-A VT-3 1-F1.30B 2-3-4-832640 1.GES'M-V-119A PIPE SUPPORT COHPONEHT F.A VI'-3 F1.30C 2 C 3X SEE AEP D'MG NO.1-ES'M-57 832710 1-GESM.R 49 PIPE SUPPORT COHPONENT F-A VT-3 1 F1.308 2-C 3-4-832720 1-GESM-V-118A PIPE SUPPORT COHPONEHT F1.30C 2-C 3-4 F-A VT-3 1-832730 1-GES'M.L-86 PIPE SUPPORT COHPOHEHT F.A VT-3 1 F1.30A 2-3-4-832740 1-GESM.R-47 PIPE SUPPORT COHPOHEHT 609 AUX F-AF1.30A VT-3 1-2-3-4 C X 832750 1-GESM-R-48 PIPE SUPPORT COHPONENT F-A VT-3 1-F1.30A 2-3 DATE: 12/20/95 REVISIOH: 0 COOK NUCLEAR PLANT UNIT 1 INSEPVICE INSPECTION LONG TERH PLAN CLASS 3 ALL STATUS COHPONEHTS PAGE: 149 ESSENTIAL SERVICE MATER SYSTEN SUHHARY EXAHI HAT ION AREA NUHBER IDENT IF ICATION INSPECTION INTERVAL I F IRST ASHE PERIOD SEC.XI I CATGY NDE ITEH NO NETH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD 0 U T A G E------I 1 2 3 4 1 2 3 I IHSTRUCTIOHS
~*CALIBRATIOH BLOCK**SEE AEP DMG.HO.1-ESM 61 832800 1-GESM R-109 PIPE SUPPORT COHPONEHT AFP HALL F-A VT-3 1 F'I.30A 2-3-4-C 832810 1-GESM R 108 PIPE SUPPORT COHPOHEHT F.A VT.3 1-F1.30A 2-3-4-832820 1-GEQI-L 107 PIPE SUPPORT COHPONENT TDAFP RH F1.30A 2.3-4 F A VT-3 1 X C 832830 1-GEQI.R-106 PIPE SUPPORT COHPONEHT F-A VT-3 1-F1.30MB 2-3-4-SEE AEP DMG.NO.1-ESM-64 SH.1 OF 2 832900 1.GES'M-V-79 PIPE SUPPORT COMPONENT 609 AUX F1.30C 2-3-4-F-A VT-3 1-C X 832930 l-GESM.R-73 PIPE SUPPORT COHPONENT F-A VT-3 F1.30MA 2-3-4.832940 1-GEQI-L-72 PIPE SUPPORT COHPONENT F1.308 2.3-4-F-A VT-3 1 DATE: 12/20/95 REVI SIGH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 3 ALL STATUS COHPONENTS PAGE: 150 ESSENTIAL SERV CE MATER SYSTEH SUHHARY EXAHINATION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I ASHE I SEC.XI I CAT GT NDE ITEN NO NETH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD--OUTAGE--1 2 3 1 2 3 4 1 2 3 I I I INSTRUCTIONS
- ~CALIBRATION BLOCK~~SEE AEP OMG.NO.'I-ESM 64 SH.2 OF 2 833000 1-GESM.R-66 PIPE SUPPORT COHPONEHT F-A VT-3 1-F1.30A 2-3-4-833010 1-GESM.R-65 PIPE SUPPORT COHPONENT F-A VT-3 1 F'1.30A 2 C 3-4-833020 I-GESM-R-64 PIPE SUPPORT COHPONENT F1.30A 2-3-4-F-A VT-3 1-833030 1.GES'M-L-63 PIPE SUPPORT COHPONENT F-A VT-3 1 F1.308 2-3-4 833040 1.GESM.L.62 PIPE SUPPORT COHPONENT F-A VT-3 1-F1.30B 2-3-4 833050 1-GESM-R-61 PIPE SUPPORT COHPONENT 633 AUX F-A VT.3 1-F1.30A 2-3-4-C 833060 1-GESM-V.82 PIPE SUPPORT COHPONENT F1.30C 2-3-4-F-A VT-3 1-DATE: 12/20/95 REVI SION: 0 COOK HUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS COHPOHEHTS PAGE: 151 ESSENTIAL SERVICE MATER SYSTEH SUHHARY EXAHI HAT ION AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE ITEN NO NETH I PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD-I---OUTAGE------I 2 3 1 2 3 4 1 2 3 I INSTRUCT IOHS**CALIBRATIOH BLOCK*~SEE AEP DMG.NO.1-ESM 65 SH.1 OF 2 833100 1-GESM.L-76 PIPE SUPPORT COHPOHENT F1.30B 2-3-F-A VT-3 1-833110 1-GESM-L-85 PIPE SUPPORT COHPOHENT F-A VT-3 1 F1.30A 2-3-4-833120 1-GESM.R.75 PIPE SUPPORT COHPONENT 633 AUX F A VT-3 1-F1.30A 2-3-4 C 833140 1-GES'M.L-74 PIPE SUPPORT COHPOHEHT F-A Vl'-3 1 F1.30B 2-3-4 SEE AEP D'MG.NO.1-ESM-65 SH.2 OF 2 833200'I.GESM-R-71 PIPE SUPPORT COHPOHENT F-A VT-3 1 F1.30A 2-3-4 833220 1-GESM.R-70 PIPE SUPPORT COHPONENT F-A VT-3 1 F1.30B 2-3.4-833230 1-GESM.R-69 PIPE SUPPORT COMPONENT 633 AUX F1.30B 2-3-4 F-A VT-3 1-C DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS COHPONEHTS PAGE: '52 SSEHT A S RV CE'MATER SYSTEH SUHHARY EXAHIHAT ION AREA NUHBER IDENTIFICATION INSPECTIOH INTERVAL I ASHE I SEC.XI I CATGY HDE I ITEH NO KETH I 1 PLAN STATUS FIRST SECOHD THIRD I PERIOD PERIOD PERIOD)I OUTAGE I 2 3 1 2 3 4 1 2 3 I INSTRUCT ION S**CALIBRATION BLOCK~SEE AEP DMG HO.1-ESM-65 SH.2 OF 2 833240 1-GESM-R-68 PIPE SUPPORT COHPOHEHT F1.308 2 3-4-F-A VT-3 1.833250 1-GESM-R-67 PIPE SUPPORT COHPONENT F-A VT-3 1-F1.308 2-3-4 833260 1-GESM-V-83 PIPE SUPPORT COHPOHENT'W CTS HXRH F1.30A 2-3-4-F-A VT-3 1-C 833270 1-AESM.R-4004 PIPE SUPPORT COHPOHEHT F-A VT-3 1 F1.30A 2-3 X 4 ADDED BY RFC-DC-12 3081.
DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPOHEHTS PAGE: 153 FEEDWATER SYSTEM
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I ASKE I SEC.XI I CATGY NDE ITEN HO METH I PLAN STATUS FIRST SECOND PERIOD PERIOD THIRD I PERIOD I-I----..OUTAGE.----I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATIOH BLOCK*~SEE AEP DUG NO.1-FH-19 853000 1-GFH-V-246 PIPE SUPPORT COMPONEHT F-A VT-3 1-F1.30NC 2.C 3-X 4 C 853002 1.GFH-L-247 PIPE SUPPORT COMPONENT F-A VT-3 1-F1.30A 2-3.4-853005 1-GFW.L-150 PIPE SUPPORT COMPONENT F1.30B 2 C 3-4-F-A VT-3 1 C 853010 1-GFW.R-149 PIPE SUPPORT COMPOHEHI'-A VT-3 1 F'1.30A 2-C 3-4-C 853015 1-GF1J.R-48 PIPE SUPPORT COMPONENT F-A VT 3 1 F1.30A 2-3-4-.C X C 853020 1-GFW.LE 47 PIPE SUPPORT COMPOHEHT F-A VT-3 1-F1.30B 2 3-4 C C 853025 1-GFW.R-46 PIPE SUPPORT COMPONENT F-A VT-3 1 F 1.30A 2-3-4 C C DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLAHT UNIT 1 IHSERVICE IHSPECTION LONG TERH PLAN CLASS 3 ALL Sl'ATUS COHPONENTS PAGE: 154 FEEDWATER SYSTEH SUNHARY EXAHI HAT ION AREA NUNBER IDEHI'IF I CAT ION INSPECTIOH INTERVAL I ASHE I SEC~XI I CATGY NDE ITEH HO HETN I PLAN STATUS FIRST SECOND PERIOD PERIOD THIRD I PERIOD I-----OUTAGE------I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- ~CALIBRATIOH BLOCK**SEE AEP DWG.NO.1-FW-19 853030 1.GFW-L-45 PIPE SUPPORT COHPOHEHT F1.30WA 2-3.4-F-A VT-3 1 C C 853035 1-GFW-L-44 PIPE SUPPORT COHPONENT F1.30B 2 C 3-4 F-A VT-3 1-C 853040 1-GFW.R-43 PIPE SUPPORT COHPONENT F.A VT-3 1-F1.30A 2-3-4 C C 853045 1-GFW.R.42 PIPE SUPPORT COHPONEHT F-A VT-3 1-F1.30A 2-3-853050 1-GFW-L-41 PIPE SUPPORT COHPONEHT F-A VT-3 1 F1.308 2-3-4 C C 853055 1-GFW-L-24 PIPE SUPPORT COHPONEHT F1.30WA 2-3-4-F-A VI'-3 1-C C 853070 1-GFW-L-22 PIPE SUPPORT COHPONENT F1.30WA 2-C 3-4 F A VT-3 1 C DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE IHSPECTIOH LONG TERN PLAN CLASS 3 ALL STATUS COHPOHENTS PAGE: 155 FEEDWATER SYSTEM SUSRY EXAHINATIOH AREA NUMBER IDENTIFICATION INSPECT IOH INTERVAL I FIRST ASNE PERIOD SEC.XI I-CATGY NDE ITEN NO METH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I I OUTAGE------I 1 2 3 4 1 2 3 I INSTRUCTIOHS
- eCALIBRATIOH BLOCK*a SEE AEP DWG.MO.1-FW 19 853071 1 GFW-L-5 PIPE SUPPORT COMPONENT DG PIPE TL F-A VT-3 1-F1.30A 2-3-4-C REFERENCE HO.853075 FOR 1ST C AND 2ND INTERVALS.
853072 1-GFW-L-4 PIPE SUPPORT COMPONENT DG PIPE TL F-A VT-3 1-F1.308 2-3-4-C REFERENCE HO.853080 FOR 1ST C-AND 2ND IH'IERVALS ~853073 1-GFW.L-3 PIPE SUPPORT COHPOHENT DG PIPE TL F-A VT-3 1 F1.30WB 2-3-4-C REFERENCE NO.853085 FOR 1ST C AND 2MD INTERVALS'53074 1-GFW.L-2 PIPE SUPPORT COMPONENT DG PIPE TL F-A VT-3 1 F1.30B 2-3-4)C REFERENCE NO.853090 FOR 1ST C AND 2ND INTERVALS. 853075 1-GFW-R-134 PIPE SUPPORT COMPONENT F1.30A 2 C 3-4-F-A VT-3 1-C REFERENCE HO.853092 FOR 1ST AMD 2ND INTERVALS. SEE A P DWG.NO.1-FW-28 853080 1 GFW.L 845 PIPE SUPPORT COMPONENT F-A VT-3 1 F1.3DWA 2-3-4 C REFERENCE NO.853093 FOR 1ST AND 2MD INTERVALS'53081 1-GFW-L.814 PIPE SUPPORT COHPOHEHT F1.30WB 2-C 3-X 4 F-A VT-3 1 C REFERENCE NO.853094 FOR 1ST AND 2ND INTERVALS' DATE: 12/20/95 REVISION: 0 , COOK NUCLEAR PLAHT UMIT 1 IHSERVICE INSPECTIOM LONG TERN PLAN CLASS 3 ALL STATUS COMPONENTS PAGE: '156 EDWATER YST
SUMMARY
EXAHINATIOM AREA NUHBER IDENT IF I CAT IOH INSPECTION INTERVAL I FIRST ASNE I PERIOD SEC.XI I CATGY MDE I ITEN MO NETH i 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERICO I I 0 U T A G E------I I 2 3 4 1 2 3 I INSTRUC'IIONS >>*CALIBRATIOH BLOCK>>>>SEE AEP DWG.NO.1-FW-28 853082 1.GF'W.L.813 PIPE SUPPORT COHPOHENT F1.308 2-C 3-4 F-A VT-3 1-C REFERENCE NO.853095 FOR 1ST AND 2ND INTERVALS. 853083 1-GFW.L-810 PIPE SUPPORT COHPOHENT F1.30lm 2-3-4-F-A VT-3 1-C X REFERENCE NO.8541'10 FOR 1ST AMD 2MD INTERVALS. 853084 1-GFW-L-811 PIPE SUPPORT CONPOHEHT F1.30WB 2-3-4-F-A VT-3 1-C REFERENCE NO.854080 FOR 1ST AND 2ND INTERVALS. 853085 1-GFW.L-812 PIPE SUPPORT CONPOHEHT F-A VT-3 1-F1.30WB 2-3-C REFERENCE NO.854100 FOR 1ST AND 2ND INTERVALS. 853086 1-GFW.L-844 PIPE SUPPORT CONPOHEHT F1.30'WA 2-3.4 F-A VT-3 1 C REFERENCE NO.854120 FOR 1ST AND 2ND INTERVALS. SEE AEP O'WG.NO.1-FW-29 853090 1-GFW-L-820 PIPE SUPPORT COHPOHENT F1.30WB 2-3-4-F A VT-3 1-C X REFERENCE NO.853096 FOR 1ST AND 2ND IHTERVALS. 853091 1-GFW.L-846 PIPE SUPPORT COMPONENT F1.30WA 2.3-4-F-A VT-3 1-C REFERENCE NO.854170 FOR 1ST AHD 2HD INTERVALS. DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS CONPOHENTS PAGE: 157 FEEDWATER SYSTEM SWART EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I FIRST ASNE PER IOO SEC.XI I CATGY HDE ITEN NO NETH I 1 2 3 PLAN STATUS SECOND PERIOD THIRD I PERIOD I I OUTAGE--I 1 2 3 4 1 2 3 I IHSTRUCI'DMS a+CALI BRAT ION BLOCK**S E AEP D MO 1-FH.29 853092 1-GFH-L.847 PIPE SUPPORT COMPONENT F-A VT-3 1-F1.30UA 2-3-4-REFEREHCE NO.854140 FOR 1ST C AND 2ND INTERVALS. 853093 1-GFII-L-819 PIPE SUPPORT COMPONENT F-A VT-3 1-F1.30A 2-3-C REFERENCE NO.853097 FOR IST AMD 2HD INTERVALS. 853094 1.GFW-L-817 PIPE SUPPORT COMPONENT F1.30MB 2-3X 4 F-A VT-3 1-C REFERENCE NO.854150 FOR 1ST AND 2MD INTERVALS. 853095 1.GFW L-816 PIPE SUPPORT COMPONENT F1.30MB 2-3-4-F-A VT-3 1-C REFERENCE NO.854130 FOR 1ST AMD 2ND INTERVALS. 853096 1-0FN.L-818 PIPE SUPPORT COMPONENT F1.30B 2 3-4-F-A VT.3 1-REFERENCE NO.853098 FOR 1ST C AHD 2HD INTERVALS. 853097 1.GFM-L 815 PIPE SUPPORT COMPONENT FA VT3 1-F1.30MB 2-3-4 C REFERENCE NO.854160 FOR 1ST AND 2MD IHTERVALS. SEE AEP DIIG HO 1-FN-34 853100 1 GFII-V-244 PIPE SUPPORT COMPONENT F-A VT-3 1 F1.30C 2-3-4 C C DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LOHG TERN PLAN CLASS 3 ALL STATUS CONPONENTS PAGE: 158 FEEDNATER SYSTE SUHHARY EXAHI HAT ION AREA NUHBER'IDENT I F I CATION INSPECTION INTERVAL I ASHE SEC.Xl I CATGY NDE ITEN NO NETH I 1 PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD-----0 U T A G E------I 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- CAL I BRAT ION BLOCK**SEE AEP DOG NO.1-FM-34 853105 1-GFII-V-245 PIPE SUPPORT CONPOHEHT F-A VT-3 1 F1.30NA 2-3.4 853110'I-GFM.L-243 PIPE SUPPORT CONPOHENT F1.30A 2-3-4 F-A VT-3 1 C X C 853120 1-GFQ-R-242 PIPE SUPPORT COHPOHENT F-A VT-3 1 F1.308 2-3-4-C C 853125 1-GFN-L 241 PIPE SUPPORI'ONPONEHI'-A VT-3 1 F1.30NB 2-3-4 C C 853130 1-GFN.R-240 PIPE SUPPORT COHPOHEHT F1.30A 2-3-4 F-A VT-3 1 C C 853135 1-GF'N L-239 PIPE SUPPORT COHPONENT F1.30B 2-3-4-F-A VT-3 1 C C 853140 1-GFW.R-238 PIPE SUPPORT CONPONEHT F-A VT-3 1-F1.308 2-3-4-C C 0 DATE: 12/20/95 REVI SION: 0 COOK HUCLEAR PLANT UNIT 1 INSERVICE IHSPECTIOH LONG TERN PLAN CLASS 3 ALL STATUS COHPONEHTS PAGE: 159 FEEDMATER SYSTEH SUNNARY EXANINATION AREA HUNGER IDENTIFICATION INSPECT ION INTERVAL FIRST ASNE PERIOD SEC.XI I CATGY NDE ITEN HO NETH i 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I OUTAGE I 1 2 3 4 1 2 3 I HSTRUCT IOHS~*CAL I BRAT I OH BLOCK**S AEP DMG HO 1-F'M-34 853145 1-GFM R 237 PIPE SUPPORT CONPOHEN'I F-A VT-3 1-F1.30A 2-3-4-C C 853150 1-GFM.R-236 PIPE SUPPORT COHPOHEHT F1.308 2 C 3-4 F-A VT-3 1 C 853155 1-AFM.R.28 PIPE SUPPORT COHPONEHT F1.30A 2-C 3-4-FA VT3 1-C 853160 1-GFM.L-27 PIPE SUPPORT COHPOHENT F1.30MB 2-C 3-4 F-A VT-3 1-C 853165 1-GFM.L-9 PIPE SUPPORT COHPOHEHT F-A VT-3 1 F1.30A 2-3-4-Ci 853170 1-GFM.L-B PIPE SUPPORT COHPOHENT DG PIPE TL F-A VT-3 1-F1.30MB 2-3-4-C C X 853175 1-GFM.L.7 PIPE SUPPORT COHPOHEHT F1.308 2-3-4-F-A VT-3 1 C DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTIOH LONG TERN PLAN CLASS 3 ALL STATUS COHPONENTS PAGE: '160 FEEDWATER SYSTEH SUHHARY EXANINAT ION AREA NUHBER IDENT I F I CAT I OH IHSPECTIOH INTERVAL I ASHE I SEC.XI I CATGY NDE ITEN NO METH I PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I OUTAGE-----I 1 2 3 1 2 3 4 1 2 3 INSTRUCTIONS ICAL I BRAT ION BLOCK~~SEE AEP DUG.HO.1 FM 34 853180 1-GFW.R.6 PIPE SUPPORT COHPOHEHT DG PIPE TL F1.30A 2-3.4 F-A VT-3 1-C C SEE AEP DUG NO 1-FII-35 853200 1-GFll-L.177 PIPE SUPPORT COHPOHEHT F.A VT-3'I-F1.308 2-3-C 853205 1-GFN.R-176 PIPE SUPPORT COHPONEHT F-A VT-3 1-F1.30A 2 3.4-C 853210 1-GFIJ-R-175 PIPE SUPPORT COHPOHEHT F-A VT-3 1-F1.30A 2-3-4-C 853215 1.GFW-L-174 PIPE SUPPORT COHPOHEHT F-A VT 3 F1.308 2-3-4-C X 853220 1-AFU.R 929 PIPE SUPPORT COHPONENT F1.30A 2-C 3-X 4-F-A VT-3'I 853225 1-GFM-L-173 PIPE SUPPORT COHPOHEHT F-A VT-3 1-F1.30WB 2-3.4-C DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE IHSPECTIOH LONG TERN PLAN CLASS 3 ALL STATUS CONPONEHTS PAGE: 161 FEEDWATER SYSTEN SUNNARY EXANINATI OH AREA NUNBER IDEHT IF I CAT I OH INSPECTION IHTERVAL I FIRST ASNE PERIOD SEC~XI I CATGY NDE I ITEN NO NETH I 1 2 3 PLAN STATUS SECOHD THIRD I PERIOD PERIOD I I OUTAGE---I 1 2 3 4 1 2 3 I INSTRUCT I OHS*ICAL I BRAT ION BLOCK**SEE AEP DWG.NO.1-FW-35 853230 1-GFW-R-172 PIPE SUPPORT COHPOHENT F-A VT-3 1 F'I.30A 2-3-4-C 853235 1-GFW.L-171 PIPE SUPPORT CONPOHENT F1.308 2 C 3-4-F-A VT.3 1-853240 1-GFW-R-170 PIPE SUPPORT CONPOHEHT F-A VT-3 1-F1.30A 2-3-4-C 853245 1-GFW.R-169 PIPE SUPPORT CONPONEHT F-A VT 3 1-F1.30A 2-C 3-4-853250'-GFW.L-168 PIPE SUPPORT COMPONENT F-A VT-3 1 F1.308 2-3-4-C 853255 1-GFW-L-26 PIPE SUPPORT CONPOHENT F-A VT 3 1 F1.30A 2-3.4 C 853265 1-GFW-R-25 PIPE SUPPORT CONPOHEHT DG PIPE TL F1.30WA 2-3-4-F-A VT-3 1.C DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS COHPOHENTS PAGE: 162 FEEDNATER SYSTEH SUHHARY EXAHINAT ION AREA NUHBER IDENT I F I CATION INSPECTION I HTERVAL I F IRST ASHE I PERIOD SEC.XI I CATGY NDE I ITEN NO NETH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I I OUTAGE---1 2 3 4 1 2 3 I INSTRUCT IOHS~~CALIBRATIOH BLOCK**SEE AEP DIIG.NO.1 FN-35 853270 1-GFH R-13 PIPE SUPPORT COHPOHEHT DG PIPE TL F1.30A 2-3-4-F-A VT-3 1 C 853275 1-GFlJ.L-12 PIPE SUPPORT COHPOHENT F A VT-3 1 F1.30HB 2 3-4 853280 1-AFM.R-930 PIPE SUPPORT COHPOHENT F-A VT-3 F1.30A 1-2 C 3-853285 1-GFN.L-249 PIPE SUPPORT COHPOHENT F1.308 2-C 3-4 F.A VT-3 1-853287 1-GFII-L-248 PIPE SUPPORT COHPOHEHT F-A VT-3 1-F1.30A 2-3-4.853290 I-GFW-R-11 PIPE SUPPORT COHPONEHT F1.308 2-C 3.4.F-A VT-3 1 853295 1.GFN-L.10A PIPE SUPPORT COHPOHEHT F A VT-3 1-F1.30A 2-3 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS COHPOHEHTS PAGE: 163 FEEDWATER SYSTEN SUHHARY EXAHIHAT IOH AREA NUHBER IDENT I F I CAT ION INSPECTION INTERVAL I ASKE I SEC.XI I CATGY NDE I ITEN NO NETH I 1 PLAN STATUS FIRST SECOND PERIOD PERIOD THIRD I PERIOD-------I..---OUTAGE-----I 2 3 1 2 3 4 1 2 3 I INS'TRUCTIOHS
++CALIBRATION BLOCK~~SEE AEP D'WG.NO.1-FW-35 853300 1-GF'W.R 10 PIPE SUPPORT CONPOHENT DG PIPE TL F.A VT-3 1-F1.30A 2-3-4 C 853310 1-GFW-L-15 PIPE SUPPORT COHPOHENT F A VT-3 1 F1.308 2-3-4-853320 1-GFW.R.160 PIPE SUPPORT COHPOHEHT RWST TUH F-A VT-3 1-F1.30A 2 3.4-C SEE AEP DWG.NO.1-F'W-36 853400 1.GFW-L.154 PIPE SUPPORT COHPOHEHT F1.30'WA 2-3-4-F.A VT.3 1 853410 1.GFW.L-153 PIPE SUPPORT CONPOHEHT TDAFP RH F-A VT-3 1.F1.30WB 2-3-4-C 853420 1-GFW.L-152 PIPE SUPPORT COHPOHEHT F.A VT-3 1.F1.30A 2.3-853430 1-GF'W-L-151 PIPE SUPPORT CONPOHENT TDAFP RH F-A VT-3 1 F1.30WB 2-3-4-C X DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LOHG TERN PLAN CLASS 3 ALL STATUS COHPONENTS PAGE: 164 FEEDMATER SYSTEN SUHHART EXAMINATION AREA NUHBER IDEHT IF I CAT I ON INSPECTION INTERVAL I ASNE I SEC.XI I CATGY NDE ITEN NO NETH I 1 PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PER I CO I I-I--0 U T A G E---)INSTRUCTIONS 2 3 1 2 3 4 1 2 3]~*CALIBRATIOH BLOCK~SEE AEP DMG.HO 1-FM-36 853440 1-AFM-R-4010 PIPE SUPPORT COHPOHENT F-A VT-3 1 F1.30A 2-3.4-SEE AEP DMG.HO.1-FM.40 SH.1 OF 2 853500 1-GFM-R.118 PIPE SUPPORT COHPOHEHT F1.308 2-3-4-F-A VT-3 1-C X C 853505 1-GFM-L 119 PIPE SUPPORT COHPOHENT F1.30MB 2-C 3-X 4-F.A VT-3 1-C 853510 1-GFM-L-235 PIPE SUPPORT COHPONENT F1.30A 2-3-4-F-A VT.3 1-C C 853520 1-GFM-R.120 PIPE SUPPORT CONPONENT F1.30A 2-3-4-F A VT-3 1 C C 853525 1-GFM-R 121 PIPE SUPPORT COHPOHEHT F1.30A 2 C 3-4-F-A VT-3 1-C 853530 1-GFM.R-122 PIPE SUPPORT COHPONEHT F-A VT-3 1 F1.30A 2-3-4-C C DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERM PLAN CLASS 3 ALL STATUS COMPONENTS PAGE: 165 FEEDIIATER SYSTEM
SUMMARY
EXAMI HAT IOH AREA NUMBER IDENTIFICATION INSPECTION INTERVAL I FIRST ASME PER IOO SEC.Xl I CATGY NDE ITEM NO METH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PERICO-I OUTAGE----I 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATIOH BLOCK>>>>SEE AEP DUG.NO 1-FII-40 SH.1 OF 2 853535 1-GFH-L-123 PIPE SUPPORT COMPONENT F1.30B 2-C 4-F.A VT-3 1-C SEE AEP DUG.NO.1-FW-40 SH.2 OF 2 853540 1-GFH.R-124 PIPE SUPPORT COMPOHENI'1.30A 2-3-4-F-A VT-3 1 C 853545 1.GFH.L-125 PIPE SUPPORT COMPONENT F A VT-3 1-F1.30B 2-3-4 C 853550 1-GFH-R.126 PIPE SUPPORT COMPONENT F1.30A 2-3-4-F-A VT.3 1-C 853555 1-GFH-L-127 PIPE SUPPORT COMPONEHT F-A VT-3 1-F1.30MB 2.3-4 853565 T-GFM.R-128 PIPE SUPPORT COMPONENT F-A VT-3 1 F1.30B 2.3-4-C 853570 1-GF'N-R-129 PIPE SUPPORT COMPONENT F-A VT-3 1-F1.30A 2-C 3-4 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 3 ALL STATUS COHPONENTS PAGE: 166 FEEDMATER SYST H SUHHARY EXAHI HAT I ON AREA HUHBER'DEHTIFICATIOH INSPECTION INTERVAL I FIRST ASHE I PERIOD SEC.XI I CATGY NDE I------ITEH HO NETH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERICO I-I OUTAGE I 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK*~e SEE EP DMG NO 1-FM-40 SH.2 OF 853575 1-GFM.R-130 PIPE SUPPORT COHPONEH'I F1.30A 2-'3-4-F A VT-3 1 C 853580 1-GFW-L-131 PIPE SUPPORT COHPONEHT F-A VT.3 F1.308 2-3.4 C 853585 1-GFW.R-132 PIPE SUPPORT COHPONEHT F-A VT 3 F1.30A 2C 3-4-853590 1-GFW R-133 PIPE SUPPORT COHPOHEHT F1.30A 2-3.F-A VT 3 1 C SEE AEP DWG.HO.1-FM-46 853600 1-GFM-L-188 PIPE SUPPORT COHPOHEHT F-A'T-3 1-F1.30'WA 2-3.4.853610 1-GFM-L-187 PIPE SUPPORT COHPONENT E HDAFP RH F1.30MB 2-3-4 F-A VT-3 1 C X 853620 1-GFM-L-186 PIPE SUPPORT COHPOHEHT F1.30WA 2.3-4-F-A VT-3 1 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS COHPOHENTS PAGE: 167 FEEDNATER S'YSTEH SUHHARY EXAHI HAT ION AREA NUHBER IDENT IF ICATION INSPECTION INTERVAL I FIRST ASHE PERIOD SEC.XI I CATGY NDE ITEN HO NETH)1 2 3 PLAN STATUS SECOND THIRD PERIOD PERIOD I OUTAGE-----I 1 2 3 4 1 2 3 I INSTRUCTIOHS i~CAL I BRAT ION BLOCK~SEE AEP DUG.HO 1 FII-46 853630 1.GFll-L.185 PIPE SUPPORT COHPONEHT E HDAFP RH F-A VT-3 1 F1.30B 2-3-4 C 853640 1.GFll.L.184 PIPE SUPPORT COHPONENT F1.30B 2.C 3-4.F.A VT-3'I.853650 1-GFM.R-183 PIPE SUPPORT COHPOHEHT AFP HALL F1.30A 2-3-4-F-A VT-3 1-C SEE AEP DHG NO.1-FW-47 853700 I-GFW-R.159 PIPE SUPPORT COHPOHENT F-A VT-3 1 F1.30A 2 C 3-4-C 853710 1-GFM-R-158 PIPE SUPPORT COHPOHENT F.A'T.3 1-F1.308 2-3-4-C 853720 1-0FH-R-157 PIPE SUPPORT COHPOHEHT F-A VT-3 1 F1.30B 2-C 3-4 C 853730 1.GFIJ.R.156 PIPE SUPPORT COHPOHENT F1.30A 2-3-4-F-A VT-3 1-C DATE!12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LOHG TERN PLAN CLASS 3 ALL STATUS CONPOHEHTS PAGE: 168 FEEDWATER SYST N SUHHARY EXANI HAT ION AREA HUHBER IDENT I F I CAT I OH IHSPECTIOH INTERVAL I ASIDE SEC.XI I CATGY NDE ITEN HO NETH t 1 PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD I I-I 0 U T A G E I INSTRUCTIONS 2 3'I 2 3 4 1 2 3)**CALIBRATIOH BLOCK*~SEE AEP DWG.HO.1-FW-52 SH.1'OF 853800 1-GFW.R-194 PIPE SUPPORT COHPONENT F1.308 2-3-4-F A VT-3 1 C C 853805 1-GFW.L-195 PIPE SUPPORT COMPOHEHT F.A VT-3 1.F1.30WB 2-C 3-4-C 853815 1-GF'W.R-196 PIPE SUPPORT CONPOHEHT F1.30A 2-3-4 F-A VT-3 1-C X C 853820 1-GFW.R-197 PIPE SUPPORT CONPONEHT F-A VT-3 1-F1.30A 2C 3 X 4 C 853825 1.GFW.R-198 PIPE SUPPORT COMPOHENT F1.30A 2-C 3-4-F-A Vl-3 1-C 853830 1-GFW.L-199 PIPE SUPPORT COHPOHEHT F-A VT-3 1 F1.30A 2-3-4-C C 853835 1~GFW.L.200 PIPE SUPPORT COHPOHEHT F-A VT-3 1 F1.30A 2-3-4-C C DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 3 ALL STATUS COHPONEHTS PAGE: 169 FEEDMATER SYSTEK SUHHARY EXAHINATIOH AREA NUHBER IDEN'TIFICATIOH INSPECTION INTERVAL I ASHE I SEC.XI CATGY HDE I ITEN HO NETH I PLAN STATUS FIRST SECOHD THIRD PERICO PERIOD PERIOD--OUTAGE----1 2 3 1 2 3 4 1 2 3 I I I INSTRUCT IOHS*iCALIBRATIOH BLOCK**SEE AEP D'MG NO.1-FM-52 SN.1 OF 853837 1-GFM.L-848 PIPE SUPPORT COHPONENI'-A VT-3 1-F1.30A 2-3-4 SEE AEP DMG HO.1.FM-52 SH 2 OF 853840 1-GFM-L 201 PIPE SUPPORT COHPOHEHT F1.30B 2-C 3-4-F.A VT-3 1-853845 1 GFM.R 202 PIPE SUPPOR'I COHPOHENT F1.30A 2-3-4-F-A VT-3 1-C 853850 1-GFM.R-203 PIPE SUPPORT COMPONENT F1.30A 2 C 3-4 F-A VI'-3 1.853855 1-GFM.L-204 PIPE SUPPORT COHPONENT F-A VT-3 1-F1.308 2-C 3-~4 853860 1-GFM-L-205 PIPE SUPPORT COMPONENT F1.30MB 2-3-4 F.A VT-3 1-853865 1 GFM R-206 PIPE SUPPORT COHPONENT F1.30A 2-3-F-A VT-3 1 C DATE: 12/20/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS COHPOHEHTS PAGE: 170 FEEDWATER SYSTEH SUHHARY EXAHIHATIOH AREA NUNBER IDENT I F I CAT I OH IHSPECTIOH INTERVAL I F IRST ASHE I PER I CO SEC~XI I-CATGY NDE ITEH NO NETH I 1 2 3 PLAN STATUS SECOND THIRD PERIOD PER IOD OUTAGE 2 3 4 1 2 3 I I I I INSTRUCTIONS
<<~CALIBRATIOH BLOCK~SEE AEP DUG NO 1-FW-52 Sk.2 OF 2 853870 1-GFH L-207 PIPE SUPPORT COHPONENT F-A VT-3 1 F1.308 2 3-4 C 853875 1-GFH R-208 PIPE SUPPORT COHPOHEHT F A VT-3 1-F1.30A 2-3.4-C 853880 1-GFH-R-209 PIPE SUPPORT COHPONENI'-A VT-3 1 F1.30A 2 C C 3-4-853885 1-GFH-L 210 PIPE SUPPORT COHPOHENT F1.30B 2-C 3-4 F.A VT-3 1-C 853890 1-GFH.R-211 PIPE SUPPORT COMPONENT F-A VT-3 1-F1.30A 2-C 3-4-853894 I.GFW-R.212 PIPE SUPPORT COHPONEHT F A VT-3 1 F1.30A 2-3-C 853898 1-GFM-R-213 PIPE SUPPORT COHPONEHT F-A VT-3 1-F1.30A 2-3-4 DATE: 12/20/95 REVI S I OH: 0 COOK NUCLEAR PLANT UNIT 1 IHSERVICE INSPECTION LONG TERH PLAN CLASS 3 ALL StATUS COHPONEHTS PAGE: 171 FEEDWATER SYSTEH SUHHARY EXAHI HAT I OH AREA HUHBER IDENTIFICATION INSPECTION IHtERVAL I FIRST ASHE PERIOD SEC.XI CATGY NDE ITEH NO NETH i 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD-I OUTAGE------I 1 2 3 4 1 2 3 I INSTRUCTIOHS
- CALIBRATIOH BLOCK*~SEE AEP DWG.HO.1-AFW-86 SH.1 OF 2 853910 1-AFW.L.917 PIPE SUPPORT COHPONEHT F-A VT-3 1-F1.30WB 2 C 3 X 4-C 853915 1.AFW.L-918 PIPE SUPPORT COHPONENT F1.30WB 2-3.4-F-A VT-3 1-S E AEP DWG NO.1-AFW.86 SH.2 OF 853920 1.AFW.L-916 PIPE SUPPORT COHPONENT F-A VT-3 1 F1.30WB 2-C 3-4-853930 1.AFW-L-9'15 PIPE SUPPORT COHPOHEHT F1.30lJB 2-3-4-F-A VT-3 1.853940 1-AFW-L-914 PIPE SUPPORT COHPOHEHT AFP EHC F1.30B 2-3.4-F-A Vt-3 1-INACCESSIBLE DUE TO WELDED SE I SHI C ENCLOSURE.
853950 1-AFW.L-913 PIPE SUPPORT COHPOHENT F-A VT-3 1-F1.30A 2-3.4-853960 1-AFW-L-912 PIPE SUPPORT COHPONEHT AFP HALL F1.30B 2-3.4 F-A VT-3 1.C X DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UHIT 1 INSERVICE INSPECTIOH LONG TERN PLAN CLASS 3 ALL STATUS COHPONENTS PAGE: 172 FEEDWATER SYSTEN SUHHARY EXAHI NATION AREA NUHBER IDENT IF ICATION INSPECTION INTERVAL I ASNE I SEC.XI I CATGY NDE I ITEN NO NETH (1 PLAN STATUS FIRST SECOND PERIOD PERIOD THIRD I PERIOD I-----OUTAGE- ---I 2 3 1 2 3 4 1 2 3 I INSTRUCT IOHS~*CAL I BRAT I OH BLOCK**SEE EP DWG NO.1-AFW-86 SH.2 OF 2 853970 1-AFW-L-9'l1 PIPE SUPPORT CONPONEHT F1.30B 2-C 3-4-FA VT3 1 SEE AEP DWG.NO.1-FW-24 854000 1-GFW-R.833 PIPE SUPPORT COHPONEHT FI.30WB 2-3-4 F.A VT.3 1.C X 854010 1-GFW-R-834 PIPE SUPPORT CONPOHENT F-A VT-3 1-F1.30B 2-3-4-854020 1.GFW R 835 PIPE SUPPORT COHPOHEHT F A VT-3 1 F1.308 2-3-4-C 854030 1-GFW L-836 PIPE SUPPORT COMPONENT F-A F1.30WB VT-3 1 2-3-4 C 854040 1-GFW.L.837 PIPE SUPPORT CONPONENT F.A VT.3 1-F1.30WB 2-3-4-C SEE AEP DWG.NO.1-FW-25 854050 1-GFW-R-838 PIPE SUPPORT CONPOHEHT F-A VT-3 1 F1.308 2-3-4 DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS COHPOHEHTS PAGE: 173 FEEDMATER SYSTEH SUHHARY EXAHIHATIOH AREA HUNGER IDENTIFICATION INSPECT IOH INTERVAL I FIRST ASHE I PERIOD SEC.XI I CATGY NDE ITEN NO NETH I 1 2 3 PLAN Sl'ATUS SECOND THIRD I PERIOD PERIOD I-I OUTAGE I 1 2 3 4 1 2 3 I INSTRUCTIONS
- CAL I BRAT ION BLOCK~~SEE AEP DMG.NO.1-FM-25 854060 1.GFM-L-839 PIPE SUPPORT COHPOHEHT F-A VT-3 1-F1.30MB 2-3-4 C 854070 1-GFM-L-840 PIPE SUPPORT CONPOHEHT F-A VT-3 1-F1.30MB 2-3-4-C DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS COHPOHEHTS PAGE: 174 AUXILIARY FEEDMATER SYSTEH SUNHARY EXAIII HAT I OH AREA NUHBER IDENTIFICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE ITEN NO KETH I PLAN STATUS FIRST SECOND THIRD PERICO PERIOD PERIOD I I OUTAGE I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATION BLOCK**SEE AEP DMG NO.1-FM-2 854200 1-GFM.R-16 PIPE SUPPORT COHPONENT DG PIPE TL F-A VT-3 1 F1.30B 2-3-4 C X 854210 1-GFM.R-17 PIPE SUPPORT COHPOHENT DG PIPE TL F1.30A 2.3X F-A VT-3 1 C 854220 1-GFM L-18 PIPE SUPPORT COHPOHEHT DG PIPE TL F-A VT-3 1-F1.30B 2 3-4-C 854230 1.GFM.L.19 PIPE SUPPORT COHPONEHT DG PIPE TL F.A VT-3 1-F1.30MB 2-3-4-C 854240 1-GFM.R.20 PIPE SUPPORT COHPONEHT DG PIPE TL F-A VT-3 1-F1.30A 2-3-4 C 854250 1.GFM-L.21 PIPE SUPPORT COHPOHENT DG PIPE TL F-A VT-3 1-F1.308 2.3-4 C 854260 1-GFM.R.29 PIPE SUPPORT CONPONENT DG PIPE TL F.A VI.3 1-F1.30MA 2 3-4-C DATE: 12/20/95 REVI S ION: 0 COOK NUCLEAR PLAHT UNIT 1 INSERVICE IHSPECTIOH LONG TERH PLAN CLASS 3 ALL STATUS COHPONENTS PAGE: 175 AUXILIARY FEEDMATER SYSTEH SUNHARY EXAHINATION AREA NUHBER IDENT IF I CAT IOH IHSPECTIOH IHTERVAL I ASKE I SEC.XI I CATGY NDE ITEH HO NETH (PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD I------OUTAGE-----I 1 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS iiCALIBRATION BLOCK~SEE AEP DMG.NO.1 FM.22 854280 1-GFM.R-31 PIPE SUPPORT COHPONEHT ESM PIPE T F-A VT-3 F1.30'MA 2-3.4-C 854290 1.GFM.R-216 PIPE SUPPORT COHPDNENT ES'M PIPE T F.A VT-3 F1.30B 2-3-4 C 854300 1-GF'M.R-217 PIPE SUPPORT COHPOHEHT ESM PIPE T F1.30A 2-3-4 F-A VT-3 1-C 854310 1-GFM-L-218 PIPE SUPPORT COHPONENT ESM PIPE T F.A VT-3 1.F1'08 2-3-4-C 854320 1-GFM.R-219 PIPE SUPPORT COHPOHEHT ESM PIPE T F-A VT-3 1-F1.308 2-3 4 C 854330 1-GFM.L-220 PIPE SUPPORT COHPONEHT ESM PIPE T F1.30MB 2-3-4-F A VT-3 1 C 854340 1-GFM.L-221 PIPE SUPPORT COHPONEHT ESM PIPE T F.A VT-3 1 F1.30B 2-3-4-C DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTIOH LONG TERN PLAN CLASS 3 ALL STATUS CONPOHENTS PAGE: 176 AUXILIARY FEEDMATER SYSTEH SUHNARY EXAHI HAT ION AREA NUHBER IDENT IF ICATION INSPECTION INTERVAL I FIRST ASNE PERIOD SEC.XI I CATGY NDE ITEN NO NETH I 1 2 3 PLAN STATUS SECOHD THIRD I PER I CO PERIOD I I 0 U T A G E------I 1 2 3 4 1 2 3 INSTRUCTIONS
- CAL I BRAT IOH BLOCK*SEE AEP DMG N 1-FM-854350 1-GFM-R 223 PIPE SUPPORT CONPONENT ESM PIPE T F1.30A 2-3-F-A VT-3 1 C 854360 1-GFW.L-224 PIPE SUPPORT CONPONENT ESM PIPE T F-A VT-3 1 F1.30B 2-3-4-~-C 854370 1-GFM-V.225 PIPE SUPPORT CONPONENT ESM PIPE T F-A VT-3 1 F1.30C 2-3-4-C 854380 1-GFM-L 226 PIPE SUPPORT CONPOHENT AFP HALL F1.30MB 2-3-4-F-A VT-3 1-C 854390 1-GFW-R-222 PIPE SUPPORT CONPOHEHT ESM PIPE T F1.30A 2-3-4-F-A VT-3 1-C 854400 1-GFM.R-215 PIPE SUPPORT CONPOHEHT ESM PIPE T F-A VT-3 1 F1.30B 2-3-4-C 854410,1.AFM-R.4003 PIPE SUPPORT CONPOHEN'I DG PIPE TL F-A VT-3 1-F1.308 2-3-4-C DATE: 12/20/95 REVISIOH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE IHSPECTION LONG TERH PLAN CLASS 3 ALL STATUS COHPONENl'S PAGE 177 AUX IL IARY FEEDMAT SYSTE SUHHARY EXAHINAT ION AREA NUHBER IDENT I F ICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY NDE I ITEN NO NETH (1 PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD I I OUTAGE I 2 3 1 2 3 4 1 2 3 I INSTRUCTIONS iiCALIBRATIOH BLOCK~~SEE AEP DMG.NO.1-FM-22 854420 1-AFM.R-4004 PIPE SUPPORT COHPOHENT DG PIPE TL F-A VT-3 1 F1.30B 2-3-4-C 854430 1-AFM R 4005 PIPE SUPPORT COHPONEHT ESM PIPE T F-A VT-3 1-F1.30B 2-3-4-C SEE AEP DMG.NO.1-FM-39 SN.1 855000 1-GFM.R.100 PIPE SUPPORT COHPOHEHT RMST TUN F-A VT-3 1-F1.30B 2-3.4.C X 855010 1-GFM.L-101 PIPE SUPPORT COMPONENT RMST TUN F-A VT-3 1-F1.30B 2-3-4.C 855020 1-GFM.L-102 PIPE SUPPORT COHPONENl'IIST TUN F-A'T-3 F1.30MB 2.3-4-C 855030 1-GFM-L-103 PIPE SUPPORT COMPONENT RMST TUN F-A VT-3 1 F1.30B 2-3-4-X C 855040 1-GFM-R-104 PIPE SUPPORT COHPOHEH'I RMST TUH F1.30B 2-3-4 F-A VT-3 1.C DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLAHT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS CQlPONENTS PAGE: 178 AUXILIARY FEEDMATER SYSTEH SUHHARY EXAHI HAT I ON AREA NUHBER 10EHT I F I CATION INSPECTION INTERVAL I ASHE I SEC Xl I CATGY HDE ITEH NO NETH I 1 PLAN STATUS F IRSI SECOND THIRD PERIOD PERIOD PERIOD----OUTAGE------2 3 1 2 3 4 1 2 3 INSTRUCT IOHS**CALIBRATION BLOCKc*SEE AEP DMG NO 1-FM-39 SH.1 855060 1.GFM.R-106 PIPE SUPPORT COHPONENT RMST TUN F-A VT-3 1-F1.30A 2-4 C 855070 1-GFM-L-107 PIPE SUPPORT COHPOHENT R'MST TUN F A VT.3 1-F1.30B 2-3-4.C 855080 1-GFM.R-108 PIPE SUPPORT COHPONENT RMST TUH F1.308 2-3-4 F.A VT.3 1.C SEE AEP DMG NO.1-FM.39 SH.855090 1-GFM L-109 PIPE SUPPORT COHPONEN'I RMST TUH F A VT-3 1 F1.30A 2-3.4 C 855100 1-GFM-R-110 PIPE SUPPORT COHPONEHT RMST TUN F-A VT-3 1 F1.308 2-3-4-C 855110 1.GFM.L-111 PIPE SUPPORT COHPONEHT RMST TUN F.A VT-3 1-F1.30MB 2.3-4-C 855120 1-GFM.R-112 PIPE SUPPORT COHPOHEHI'UST TUN F1.30A 2-3.4-F-A VT-3 1 C DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS CONPONENTS PAGE: 179 AUXILIARY FEEDNATER SYST N SUNNARY EXAHI HAT I ON AREA HUNBER IDENTIFICATION INSPECTION INTERVAL I ASHE I SEC.XI I CATGY HDE l ITEN NO NETH PLAN STATUS FIRST SECOND THIRD I PERIOD PERIOD PERIOD-I OUTAGE I 1 2 3 1 2 3 4 1 2 3 INSTRUCT I OHS**CALI BRAT ION BLOCK+SEE AEP DUG.HO.1-FW.39 SH.2 855130 1-GFW.L-113 PIPE SUPPORT CONPONEHT RWST TUH F1.30B 2-3-4-F-A VT.3 1.C 855140 1-GFN-R-114 PIPE SUPPORT CONPOHEHT RUST TUH F1.30A 2-3.F.A VT-3 1 C 855150 1 GFM.R-115 PIPE SUPPORT COMPONENT RUST TUH F1.30A 2-3.4-F-A VT-3 1-C 855170 1-GFN;L-214 PIPE SUPPORT COMPONENT RUST TUH F-A VT-3 1 F1.30A 2-3-4 C 855180 1-AFN R 4002 PIPE SUPPORT COHPOHEHT RUST TUN F-A VT-3 1 F1.30A 2-3-4 C 855190 1-AF'N-R 4001 PIPE SUPPORT CONPONENT RUST TUH F-A VT-3 1 F1.30A 2-3-4 C SEE AEP DUG.NO.1-FIJ 43 856000 1-Gfll-L-178 PIPE SUPPORT COMPONENT AFP HALL F 1.30A 2-3-4 F-A VT-3 1-C DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERN PLAN CLASS 3 ALL STATUS COHPONENTS PAGE 180 UXILIARY FEED'MATER SYSTEH SUHHARY EXAHI HAT ION AREA NUHBER IDENT IF ICATION INSPECTION INTERVAL I ASHE I SEC~XI I CATGY NDE I ITEH NO NETH I PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD--OUTAGE---1 2 3 1 2 3 4 1 2 3 I I I INSTRUCTIONS
~~CALIBRATION BLOCK**SEE AEP DMG.NO.1 FM 43 856100 1-GFM.R-179 PIPE SUPPORT COHPONENT TDAFP RH F'1.30A 2-3-4-F A VT-3 1-C X 856200 1 GFM-L-180 PIPE SUPPORT COHPONENT TDAFP RH F1.308 2-3-F-A VT-3 1 C 856300 1-GFM.L.181 PIPE SUPPORT COHPONEHT TDAFP RH F-A VT-3 1-F1.308 2-3-4-C 856400 1-GFM-R-182 PIPE SUPPORT COHPONENT TDAFP RH F-A VT-3'I-F1.30A 2-3-4-C SEE AEP DMG NO.1 FM.49 857000 1-GFM-R-189 PIPE SUPPORT COHPONENT AFP HALL F-A VT-3 1-F1.30MA 2-3-4 C 857010 1-GFM.R-190 PIPE SUPPORT COHPONEN'I E HDAFP RH F-A VT-3 1-F1.30A 2-3-4-C 857020 1-GF'M.L 191 PIPE SUPPORT COHPONENT E HDAFP RH F-A VT-3 1-F1.308 2.3-4 C DATE: 12/20/95 REVISIOH: 0 COOK NUCLEAR PLAN'I UHIT 1 INSERVICE IHSPECTIOH LOHG TERM PLAN CLASS 3 ALL STATUS COMPONENTS PAGE: 181 AUXILIARY FEEDNATER SYSTEM
SUMMARY
EXAMI HAT ION AREA NUMBER IDENT IF ICATION IHSPECTION INTERVAL I FIRST ASME I PER I DO SEC.XI I CATGY NDE I ITEM NO METH I 1 2 3 PLAN STATUS SECOND THIRD I PER I OD PER I OD I OUTAGE-1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATIOH BLOCK*~SEE AEP DllG.NO.1 FN 49 857030 1-GFN-L-192 PIPE SUPPORT COMPONENT E MDAFP RM F1.30B 2-3-4-F.A Vl'.3 1 C 857040 1.GFM.R.193 PIPE SUPPORT COMPONENT E MDAFP RM F1.30NA 2-3-4-F-A VT-3 1-C SEE AEP DNG.NO.1-FN-87 858000 1-AFN-L-919 PIPE SUPPORT COMPONENT IJ MDAFP RM F-A VT-3 1-F1.30NB 2-3-4-C 858010 1-AFW-L-920 PIPE SUPPORT COHPOHENT ll MDAFP RM F1.30B 2-3-4 F-A VT-3 1-C 858020 1-AFW.L.921 PIPE SUPPORT COMPONENT N MDAFP RM F-A VT-3 1-F1.30B 2-3-4 C DATE: 12/20/95 REVISION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE IHSPECTIOH LONG TERN PLAN CLASS 3 ALL STATUS COHPOHENTS PAGE: 182 SPENT FUEL COOLING SYSTEH SUHHARY EXAHI HAT IOH AREA HUHBER IDENTIFICATION INSPECTION INTERVAL I FIRST ASME PERIOD SEC.XI I CATGY NDE ITEH NO NETH (1 2 3'J PLAN STATUS SECOND THIRD I PERIOD PERICO I-I OUTAGE I 1 2 3 4 1 2 3 I INSTRUCT IOHS**CALIBRATION BLOCK~~SEE AEP DMG.HO.12 SF 1 870000 12-GSF-R-57 PIPE SUPPORT COHPOHEHT F1.30A 2 C 3-4-F-A VT-3 1-X C 870010 12.GSF R-58 PIPE SUPPORT COHPONENI'-A VT-3 1 F1.30A 2.3-C C 870020 12-GSF-R-59 PIPE SUPPORT COHPONENT F1.30A 2-3-4-F-A VT-3 1 C C 870030 12-GSF-R-60 PIPE SUPPORT COHPOHEHT F1.30A 2-3.4-F-A VT-3 1-C C 870040 12-GSF-R-61 PIPE SUPPORT COHPONEHT F1.30A 2-3-4-F-A VT.3 1'-C C 870050 12-GSF-R 62 PIPE SUPPORT COHPOHENT F1.30A 2C 3X 4-F-A VT-3 1 C C SEE AEP DMG.NO.12-SF-2 870100 12-GSF-R-63 PIPE SUPPORT COHPOHEHT F-A VT-3 1-F1.30A 2 C C 3.4-C C DATE: 12/20/95 REVI SION: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTION LONG TERH PLAN CLASS 3 ALL STATUS CDMPOHEHTS PAGE: 183 SPENI'UEL COOL N SYSTEM
SUMMARY
EXANINATION AREA NUMBER IDEHTIFICATIOH INSPECTION INTERVAL I FIRST ASME I PERIOD SEC.XI I CATGY NDE ITEM NO METH I 1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I 0 U T A G E------I 1 2 3 4 1 2 3 I INSTRUCTIONS
- CALIBRATIOH BLOCK~~SEE AEP DIIG.NO.12-SF-2 8701'10 12-GSF-R-64 PIPE SUPPORT COMPONENT F1.30A 2C 3-4-F-A VT-3 1 C SEE AEP DUG.NO.12-SF-3 870200 12.GSF-R-69 PIPE SUPPORT COMPOHEHI'1.30A 2C 3-4-F-A VT-3 1.C 870210 12-GSF~R-68 PIPE SUPPORT COMPONENT F1.30A 2C C 3-4-F-A VT-3 1 C X 870220 12.GSF-R-67 PIPE SUPPORT COMPOHEHT F-A VT-3 1-F1.30A 2-3-C 870230 12.GSF-R-66 PIPE SUPPORT COMPONENT F-A VT-3 1-F 1.30A 2-3-4-C 870240 12-GSF-R 65 PIPE SUPPORT COMPONENT F1.30A 2-3-4 F-A VT-3 1 C SEE AEP DUG.NO.12-SF-4 870300 12.GSF-R-74 PIPE SUPPORT COMPONENT F1.30A 2-C 3.X 4-F-A VT-3 1-C DATE: 12/20/95 REVI S I OH: 0 COOK NUCLEAR PLANT UNIT 1 INSERVICE INSPECTIOH LOHG TERN PLAN CLASS 3 ALL STATUS CONPONEHTS PAGE: 184 ,SPENT FU L COOLING SYSTEN , SUNHART EXAHI HAT ION'AREA NUNBER'IDENTIFICATION (INSPECTION INTERVAL I FIRST ASHE PER I CO SEC.Xl CATGY NDE I ITEN NO NETN)1 2 3 PLAN STATUS SECOND THIRD I PERIOD PERIOD I-I OUTAGE I 1 2 3 4 1 2 3 I INSTRUCT IONS**CALIBRATION BLOCK**SEE AEP DUG.HO 2 SF-4 870310 12.GSF-R-73 PIPE SUPPORT'CONPONENT F1.30A 2-3-4-F-A VT-3 1-C C 870320 12-GSF-R.72 PIPE SUPPORT COHPONENT F1.30A 2-3-F-A VT-3 1.C C 870330 12.GSF-R-71 PIPE SUPPORT CONPONENT F1.30A 2-3-4-F-A VT.3 1-C C 870340 12-GSF-R-70 PIPE SUPPORT CONPOHEHT F-A VT-3 1 F1.30A 2-3-4-C C SEE AEP DUG NO.12-SF-5 870400 12-GSF-R 76 PIPE SUPPORT COMPONENT F-A VT-3 1-F1.30A 2 C 3-4 C C 870410 12-GSF-R-75 PIPE SUPPORT COHPONENT F1.30A 2 C 3-4 F-A VT-3 1-C C
~~e -~}}