| Issue date | Site | Title | Topic |
---|
L-2008-014, Inservice Inspection Plan, Third Ten-Year Interval Unit 1 Relief Request 30 | 4 February 2008 | Saint Lucie | Inservice Inspection Plan, Third Ten-Year Interval Unit 1 Relief Request 30 | |
LR-N07-0150, Unit 2, Re-Submittal of Inservice Inspection Program Relief Requests S2-I2-RR-B01 and S2-I2-RR-C01 | 27 June 2007 | Salem | Unit 2, Re-Submittal of Inservice Inspection Program Relief Requests S2-I2-RR-B01 and S2-I2-RR-C01 | Nondestructive Examination VT-2 Liquid penetrant Dissimilar Metal Weld |
NG-07-0492, Inservice Inspection Report | 12 June 2007 | Duane Arnold | Inservice Inspection Report | Non-Destructive Examination Weld Overlay Hydrostatic Coatings Anchor Darling Nondestructive Examination VT-2 Liquid penetrant |
NL-06-085, 2006 Summary Reports for In-Service Inspection and Repairs or Replacements | 14 August 2006 | Indian Point | 2006 Summary Reports for In-Service Inspection and Repairs or Replacements | Hydrostatic VT-2 Moisture barrier |
NL-06-1358, Inservice Inspection Program, Owner'S Activity Report for Outage 1R22 | 29 June 2006 | Hatch | Inservice Inspection Program, Owner'S Activity Report for Outage 1R22 | Hydrostatic Dissimilar Metal Weld |
ML052930161 | 19 October 2005 | Browns Ferry | Surveillance Instruction 3-SI-4.6.G, Inservice Inspection and Risk-Informed Inservice Inspection Program, Revision 021A | Weld Overlay Hydrostatic Probabilistic Risk Assessment Anchor Darling Nondestructive Examination VT-2 Incorporated by reference EVT-1 Liquid penetrant Dissimilar Metal Weld |
NG-05-0420, Inservice Inspection Report | 29 July 2005 | Duane Arnold | Inservice Inspection Report | Weld Overlay Hydrostatic Coatings Anchor Darling Nondestructive Examination Squib VT-2 EVT-1 Dissimilar Metal Weld |
ML051920157 | 29 June 2005 | Pilgrim | Fourth Ten-Year Inservice Inspection Program Plan and the Associated Relief Requests for NRC Approval | Safe Shutdown High Radiation Area Non-Destructive Examination Weld Overlay Hydrostatic Probabilistic Risk Assessment Coatings Nondestructive Examination VT-2 Incorporated by reference Moisture barrier Cold shutdown justification Earthquake Liquid penetrant Pressure boundary leak Dissimilar Metal Weld |
PLA-5905, Reconciliation of the Second 10-Year Interval Inservice Inspection Program Plan, PLA-5905 | 31 May 2005 | Susquehanna | Reconciliation of the Second 10-Year Interval Inservice Inspection Program Plan, PLA-5905 | High Radiation Area Non-Destructive Examination Weld Overlay Hydrostatic Probabilistic Risk Assessment Nondestructive Examination VT-2 Incorporated by reference Scram Discharge Volume Large early release frequency Liquid penetrant Dissimilar Metal Weld Scaffolding |
ML050630405 | 22 February 2005 | Indian Point | Inservice Inspection (ISI) Third Period Inspection Results and Repair/Replacement Activities for Third 10-Year Inservice Inspection Interval | VT-2 Moisture barrier |
ML042670189 | 13 September 2004 | Oconee | EOC 20 Refueling Outage Inservice Inspection Report Third Ten-Year Inservice Inspection Interval | Boric Acid Non-Destructive Examination Hydrostatic VT-2 Commercial Grade Liquid penetrant Dissimilar Metal Weld |
NL-04-0813, Third 10-Year Interval Inservice Inspection Program Owner'S Activity Report | 7 June 2004 | Hatch | Third 10-Year Interval Inservice Inspection Program Owner'S Activity Report | Hydrostatic |
ML041120324 | 9 April 2004 | Oconee | EOC 21 Refueling Outage Inservice Inspection Report, Third Ten-Year Inservice Inspection Interval | Packing leak Hydrostatic VT-2 Liquid penetrant Through-Wall Leakage Dissimilar Metal Weld |
GNRO-2004/00019, Transmittal of Inservice Inspection Summary Reports | 8 March 2004 | Grand Gulf | Transmittal of Inservice Inspection Summary Reports | Hydrostatic VT-2 |
3F0204-04, 90-Day Inservice Inspection (ISI) Summary Report | 2 February 2004 | Crystal River | 90-Day Inservice Inspection (ISI) Summary Report | Boric Acid Hydrostatic Coatings VT-2 Incorporated by reference Moisture barrier |
ML040070171 | 15 December 2003 | Mcguire | Inservice Inspection Report End of Cycle 15 Refueling Outage | Weld Overlay Hydrostatic VT-2 Liquid penetrant Dissimilar Metal Weld |
ML032680869 | 11 September 2003 | Oconee | End-of-Cycle 20 Refueling Outage, Inservice Inspection Report, Third Ten-Year Inspection Interval | Boric Acid Packing leak Hydrostatic VT-2 Dissimilar Metal Weld |
NG-03-0509, Inservice Inspection Report | 18 July 2003 | Duane Arnold | Inservice Inspection Report | Non-Destructive Examination Weld Overlay Hydrostatic Coatings Nondestructive Examination Squib VT-2 EVT-1 |
ML031780239 | 17 June 2003 | Oconee | Inservice Inspection Report Third Ten-Year Inservice Inspection Interval | Packing leak Hydrostatic VT-2 Dissimilar Metal Weld |
ML023250275 | 8 November 2002 | Browns Ferry | American Society of Mechanical Engineers (ASME) Section XI Inservice Inspection (ISI) Program - Submittal of Program Update | Hydrostatic Nondestructive Examination VT-2 Scram Discharge Volume Liquid penetrant Dissimilar Metal Weld |
ML022660436 | 17 September 2002 | Hatch | Third 10-Year Interval Inservice Inspection Program Owner'S Activity Report | |
ML022380264 | 12 August 2002 | Catawba | Inservice Inspection Report Catawba Unit 1 2002 Refueling Outage EOC 13 (Outage 5) Rev. 0, Table of Contents - Section 9.0 | Dissimilar Metal Weld |
ML022060297 | 12 July 2002 | Salem | Attachment I & II, Salem, Unit 1, Request for Additional Information Inservice Inspection Program Relief Requests S1-RR-B01 & S1-RR-C01 | Boric Acid High Radiation Area Nondestructive Examination VT-2 Through-Wall Leak Dissimilar Metal Weld Scaffolding |
ML022000045 | 22 May 2002 | Mcguire | Inservice Inspection Report, End of Cycle 14 Refueling Outage, Table of Contents - Inservice Inspection Plan Management | Dissimilar Metal Weld |
ML020720417 | 22 February 2002 | Nine Mile Point | Request for Authorization to Use Risk-Informed Inservice Inspection Alternative | Probabilistic Risk Assessment Nondestructive Examination VT-2 Large early release frequency Dissimilar Metal Weld |
3F0102-04, 90 Day Inservice Inspection (ISI) Summary Report | 22 January 2002 | Crystal River | 90 Day Inservice Inspection (ISI) Summary Report | Boric Acid Hydrostatic Coatings VT-2 Incorporated by reference |
ML011420195 | 31 May 2001 | Nine Mile Point | Approval to Use a Risk-informed Inservice Inspection Program for the Second 10-year Interval | Probabilistic Risk Assessment VT-2 Incorporated by reference Large early release frequency Dissimilar Metal Weld |
ML18018B053 | 15 October 1999 | Nine Mile Point | Third Inservice Inspection Interval - Ten-Year Inservice Inspection Plan and Schedule | Weld Overlay Hydrostatic Coatings Nondestructive Examination VT-2 Incorporated by reference |
ML18017A914 | 12 October 1999 | Harris | Forwards Addl Info Re Second 10-year ISI Program Plan Relief Requests,As Requested During 990923 Telcon | Non-Destructive Examination Hydrostatic VT-2 |
ML18018B052 | 27 September 1999 | Nine Mile Point | Third Inservice Inspection Interval | Reactor Vessel Water Level Non-Destructive Examination Weld Overlay Hydrostatic Coatings Nondestructive Examination VT-2 Incorporated by reference Scram Discharge Volume Moisture barrier Earthquake EVT-1 Liquid penetrant Through Wall Leak Dissimilar Metal Weld |
ML20212A886 | 13 September 1999 | Limerick | Safety Evaluation Authorizing First & Second 10 Yr Interval Inservice Insp Plan Requestss for Relief RR-01 | Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Liquid penetrant Pressure boundary leak |
ML20212A875 | 13 September 1999 | Limerick | Forwards Safety Evaluation of First & Second 10-year Interval Inservice Insp Plan Request for Relief | Hydrostatic VT-2 |
ML20211C129 | 17 August 1999 | Catawba | ISI Rept Unit 1 Catawba 1999 RFO 11 | Dissimilar Metal Weld |
ML20210P111 | 5 August 1999 | Crystal River | SER Accepting Evaluation of Third 10-year Interval Inservice Insp Program Requests for Relief for Plant,Unit 3 | Boric Acid Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Dissimilar Metal Weld Scaffolding |
ML18041A071 | 30 July 1999 | Nine Mile Point | Forwards Rev 1 to NMP2-ISI-006, Second Ten Year Interval ISI Program Plan for Nine Mile Point Nuclear Power Station Unit 2. Significant Changes from Rev 0 Listed | |
ML18041A073 | 27 July 1999 | Nine Mile Point | Rev 1 to NMP2-ISI-006, Second Ten Year Interval Inservice Insp Program Plan for Nine Mile Point Nuclear Power Station Unit 2. | Safe Shutdown Weld Overlay Hydrostatic Nondestructive Examination VT-2 Liquid penetrant Dissimilar Metal Weld Scaffolding Backfit |
ML20210B808 | 6 July 1999 | Mcguire | Rev 0 to ISI Rept for Unit 2 McGuire 1999 Outage 4/EOC-12 | Hydrostatic Dissimilar Metal Weld |
ML20205P234 | 1 May 1999 | North Anna | Rev 0 to Vepc North Anna Unit 1 ISI Program for Third Insp Interval Vol 1:ISI Program for Components & Component Supports for Interval 3 990501-090430 | Boric Acid Time of Discovery High Radiation Area Hydrostatic Nondestructive Examination VT-2 Through-Wall Leak Dissimilar Metal Weld Scaffolding |
ML20206D176 | 27 April 1999 | Millstone | Rev 1 to Millstone Unit 3 ISI Program Manual,Second Ten-Yr Interval | Non-Destructive Examination Hydrostatic Nondestructive Examination Temporary Modification VT-2 Liquid penetrant Through-Wall Leak Dissimilar Metal Weld Scaffolding |
ML20205L040 | 9 April 1999 | Beaver Valley | SER Accepting Util Relief Requests for Inservice Insp Second 10-year Interval for Beaver Valley Power Station, Unit 2 | Boric Acid Nondestructive Examination VT-2 Incorporated by reference Dissimilar Metal Weld |
ML20206F072 | 31 March 1999 | Arkansas Nuclear | Technical Evaluation Rept on Third 10-Year Interval ISI Program Plan,Entergy Operations,Inc,Arkansas Nuclear One, Unit 1 | Boric Acid Nondestructive Examination VT-2 Incorporated by reference |
ML20203H859 | 17 February 1999 | Waterford | Safety Evaluation Accepting Licensee Second Ten Year ISI Program & Associated Relief Requests for Plant,Unit 3 | Boric Acid VT-2 Incorporated by reference |
ML20209H395 | 15 February 1999 | Vogtle | Rev 2 to ISI Program Second 10-Year Interval Vogtle Electric Generating Plant Units 1 & 2 | Boric Acid Hydrostatic VT-2 Scaffolding |
ML18039A787 | 31 January 1999 | Browns Ferry | Technical Evaluation Rept on Second 10-Year Interval Inservice Insp Program Plan, for Browns Ferry Nuclear Plant,Unit 3 | Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Dissimilar Metal Weld |
ML20205L043 | 31 January 1999 | Beaver Valley | Technical Evaluation Rept on Second 10-Year Interval Inservice Insp Program Plan, for Beaver Valley Power Station,Unit 2 | Boric Acid Nondestructive Examination Incorporated by reference Dissimilar Metal Weld |
ML20199K871 | 13 January 1999 | Catawba | Inservice Insp Rept for Unit 2 Catawba 1998 Refueling Outage 9 | High Radiation Area Hydrostatic Incorporated by reference Through-Wall Leakage Dissimilar Metal Weld Unidentified leakage |
ML20199D861 | 12 January 1999 | Farley | SER Accepting Relief Request for Inservice Insp Program for Plant,Units 1 & 2 | Boric Acid Hydrostatic Nondestructive Examination VT-2 Incorporated by reference |
ML20198S178 | 31 December 1998 | Vogtle | SER Re Second 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief for Southern Nuclear Operating Co,Inc Units 1 & 2 | Boric Acid Nondestructive Examination VT-2 Dissimilar Metal Weld |
ML20199F534 | 29 December 1998 | Beaver Valley | Safety Evaluation Granting Relief Requests 1-TYP-3-B3.140-1, 1-TYP-3-B5.70-1,1-TYP-3-RH-E-1-1,1-TYP-3-B-G-1, 1-TYP-3-APP-I-1,1-TYP-3-UT-1,1-TYP-3-N-509,1-TYP-3-N-521, 1-TYP-3-N-524,1-TYP-3-B3.120-1 & 1-TYP-3-C6.10-1 | Boric Acid VT-2 Incorporated by reference |
ML20198G185 | 15 December 1998 | | Safety Evaluation for Topical Rept WCAP-14572,rev 1, WOG Application of Risk-Informed Methods to Piping ISI Topical Rept | Internal Flooding Hydrostatic Probabilistic Risk Assessment Nondestructive Examination Dissimilar Metal Weld |