DONALD C.
COOK NUCLEAR PLANT UNITS NO.
1 AND 2 ASHE B
8.
PV CODE SECTION XI Pump Inservice Test Program A.
The pump test program shall be conducted in accordance with Section XI, Subsection IMP of the 1983 Edition of the ASHE Boiler and Pressure Vessel Code through Summer 1983 Addenda, except for specific code relief, requested in accordance with 10 CFR 50.55a(g)(5)(iii).
Exemptions or amendments are identified in Code Relief Request I.
B.
This pump test program is for the 2nd ten year inspection/test interval commencing July 1, 1986 for both Unit 1 and Unit 2.
C.
The pump test program was developed employing the classification guidelines contained in Regulatory Guide 1.26, Revision 2 for guali ty Groups B and C,
and the definition of the reactor coolant system boundary contained in 10 CFR 50.2 (v) for Group A.
(guality Groups A, B, and C
are the same as ASNE Class 1, 2, and 3, respectively).
Using these guidelines and IWP-)100, the pump list attached as Table A was developed.
Table A identifies the following:
i.
The pump number and service it performs along with the drawing identification number on which it is found.
ii.
The applicable test parameters:
1.
Speed 2.
Inlet Pressure 3.
Differential Pressure determined as the difference between discharge and suction pressures 4.
Flow Rate 5.
Vibration Amplitude 6.
iii. The Bearing Temperature 1
test frequency required.
9308020f36 930727 PDR "ADOCK 05000315 P
PDR Revision 3
Page 1 of 4 4/2/93
DONALD C.
COOK NUCLEAR PLANT UNITS NO.
1 AND 2 PUMP INSERVICE TEST PROGRAM TABLE A PROGRAM
SUMMARY
Pump Service
{Drawing No.)
Pump Number TEST PARAMETERS Inlet Differential Speed Pressure Pressure N
P.
DP Flow Vibration Bearing Rate Amplitude Temperature V
Tb Test Frequency (1)
Auxiliary Feedwater (5106A)
Essential Service Water (5113)
Centrifugal Charging (5129)
Boric Acid Transfer (5131)
Component Cooling Water (5135A)
Safety Injection
{5142)
Residual Heat Removal (5143)
PP-3W PP-3E PP-4 PP-7W PP-7E PP-50W PP-50E PP-46-1 PP-46-2 PP-46-3 PP-46-4 PP-10W PP-10E PP-26N PP-26S PP-35W PP-35E No No Yes No No No No No No No No No No No No No No Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Quar ter ly Quarterl Quar te Quarterly Quarterly Quarterly Quarterly Quarterly Quarterly Quarterly Quarterly Quarterly Quart Quarterly Quarterly Quarterly Quarterly Revision 3
Page 2 of 4 4/2/93
Pump Ser vice (Dr awing No.)
Pump Number TEST PARAMETERS Inlet Differenti al Speed Pressure Pressure N
P.
DP Fl ow Vibration Bearing Rate Amplitude Temperature V
Tb Test Frequency'ontainment Sp.ay (5144)
Diesel Fuel Oil Transfer (5151A & C)
Spent Fuel Pit Cooling (5136)
Jacket Hater (5151B
& D)
PP-9M PP-9E gT-106-ABl gT-106-AB2 gT-106-CDI gT-106-CD2 PP-31N PP-31S gT-130-AB1 gT-130-AB2 gT-130-CDI gT-130-CD 2 No No No No No No No No No No No No Yes Yes No No No No Yes Yes Yes Yes Yes
.Yes Yes Yes No No No No Yes Yes Yes Yes Yes Yes Yes Yes Yes 1
Yes 1
Yes 1
Yes 1
Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes No No No No Yes Yes Yes Yes Yes.
Yes quarterly quarterly quarterly quarterly quarterly quarterly quart quarter y quarter ly
(}uarterly quarterly quarterly a
These pumps are tested on test, bypass or minimum flow loops per Section XI Subarticle IMP-1400.
b Inlet pressure is in head of liquid, ft.
c Bearing temperatures will be measured annually, per Section XI IWP-3300, except as noted.
d These positive displacement pumps are tested in full accordance with ASME/ANSI OMa-1988 Addenda to ASME/ANSI Stan OM-1987, "Operation and Maintenance of Nuclear Power Plants", Part 6.
Under Part 6, differential pressure and be g
temperatures are not required test parameters for positive displacement pumps.
Per Table A, Inservice Test Parameters, discharge pressure is the required test parameter rather than differential pressure for this type of pump.
Reference values will be established for discharge pressure only.
Code relief request for exemption from bearing temperature measurement is rescinded.
Testing in accordance with Part 6 of ASME/ANSI OH-1987 is allowed per Regulatory Guide
- 1. 147, "Inservice Inspection Code Case Acceptability":
Code Case N-465, "Alternate Rules for Pump Testing Section XI, Division 1".
(1) Refer to Code Relief Request I
Revision 3
Page 3 of 4 4/2/93
DONALD C.
COOK NUCLEAR PLANT UNITS NO.
1 AND 2 PUMP INSERVICE TEST PROGRAM CODE RELIEF REQUEST I Duration of Tests Request that the duration of pump operation for testing, per Section XI Subarticle IMP-3500, be amended for the Diesel Fuel Oil Transfer Pumps.
These pumps supply the diesel generator fuel oil day tank.
A conservative level is maintained in the tank to meet the minimum capacity per Technical Specification requirements.
Due to the limited capacity of this tank, the t
test range is restricted.
It is requested to record test parameters immediately after pump operation has stabi ize Revision 3
Page 4 of 4 4/2/93