Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 2 to Erp 2.07, Outside Agency Liaison, Rev 1 to Erp 2.08, Initial Assessment Group Runner & Rev 2 to Erp 5.01.W/860117 Release Memo
ML20137J606
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 12/17/1985
From:
AMERICAN ELECTRIC POWER SERVICE CORP.
To:
Shared Package
ML17321B037 List:
References
PROC-851217-01, NUDOCS 8601230107
Download: ML20137J606 (33)


Text

.

  • 1 1

1 I

l l AMERICAN ELECTRIC POWF.E SEETICE CORPORATION l ERP No. 2.07 1

q 1,45 *# "'#'*ie EMEEGENCY RESPONSE MANUAL l Page 1 of 5 l

i U "11-15-as AEP i

i I

f

  • own a syst**

f g

I IPampawon BY I APPnO711

/

I I

I TITLE: OUTSIDE AGENCT LTATSON I

I I

I I

I I

l 1.0 P.URPOSE I

I I

l To describe and define the responsibilities and actions of the l

l Outside Agency Liaison during an emergency situation at the DCCNP.

I I

I l

2.0 ATTACHMENTS I

I I

l, Liaison by Position Title and Outside Agency l

l Responsibility.

l l, American Nuclear Insurers Notification Form l

l, Nuclear Network (INPO) Notification Form I

1 1

I l

3.0 INITIITING CONDITIONS AND/OR REQUIREMENT.3, l

I I

l The initiating condition will usually be an Unusual Event,113d, l

l Site Area h=reener or General Emerzency at the plant. This I

l procedure may also be activated at the request of the On-Site 1

l Emergency Coordinator or the Initial Assessment Group Manager.'

l 1

I l

4.0 RESPONSIBILITIES I

I l

l 4.1 During activation and operation of the IAG Room three AEPSC l

1 personnel will be available to act as outside agency l

l liaisons, one each for INPO, Westinghouse, and American l

Nuclear Insurers (notify at Alert or greater l

I classification). Attachment 1 'shows each liaison by position l

l title and the outside agency each will be responsible tbr.

1 I

L l

4.2 The primary responsibility of the Outside Agency Liaison will l

I be to provide an interface between the IAG and the designated l

l l

agency as requested. This interface will include initial l

j l

notification of an event at the Donald C. Cook Plant and l

l l

periodic updates as to the status of the Plant.

1 I

I l

5.0 PROCEDURE 1

i I

e l

l 5.1 Taitial Actions l

l l

l 5.1.1 Upon notification of an event by the IA0 Coordinator l

l the Outside Agency Liaisons should. stand by at their l

I regular office and obtain the phone number of the 1

1 outside agency for which they are responsible.

l l

(Notification numbers are given in ERP 5.01, I

~,-

l, Outside Agency Liaison Call Out List.)

I l

I' 8601230107 851217 PDR ADCCK 05000315 F

PDR l

E

-1 I

I I

i 1 AMERICAN ELECTMC POUR SERVICE CORPORATION l ERP No. 2.07 l

I p tnie w s u er*rei EMERGENCT RESPONSE MANUAL l Page 2 of 5 l

D l

l I Revision 2 l

l l

l Date 11-15-85 l

" owe a sv"**

'I I

I I

I i

l I

i 1

e I

I 5.1.2 Once the IAG Coordinator notifies you to contact an i

l outside agency call that agencies representative (see I

ERP 5.01). Relay the information given by the IAG l

l Coordinator and asic the representatite to standby.

I I

I I

5.1 3 The Outside Agency Liaisons for American Nuclear I

I Insurers and Nuclear Networlt (INPO) should use the l

I form shown in Attachment 2 and 3 when making l

I notifications.

I I

I 2

3 5.1.4 The Outside Agency Liaison shall obtain the I

information needed to complete the notification forms l

I I

thmugh discussions with the IAG Manager and IAG l

Coordinator.

I i-1 I

i I

5.2 Contaanin-Actions I

I I

I I

Update the outside agency representative as updated l

5.2.1 status is provided.

I*

I I

I 5.2.2 In some instances an IAG seaber any wish to I

I l

on=annicate directly with t;2e outside agency. It is l

the responsibility of the Outside Agency Liaison to l

I set up this communication.

I I

I I

5.3 Deactivation Actions 1

I I

I 5.3.1 If the situation warrants, the IAG Manager will l

I deactivate the IAG. The Outside Agency Liaison will I

I I

be notified by the IAG Coordinator to notify the l

outside agency of this deactivation and close out all I

1 communications.

l l

l l

l I

5 3.2 If the IAG is being changed to the Corporate support I

l

.I Group Mode, continue to perform the-liaison function l

l l

I as requested by the Corporate Support Group Manager.

I I

I l-I I

l l

l I

I l

1 I

i _

i I

I I

I E

I I

.I

I I

1

(

I I AMERICAN ELECTRIC POWER SERVICE CORPORATION l ERP No. 2.07 l

l,9 * " *' * "*ie l ENERGENCY RESPONSE MANUAL

! Page 3 of 5 l

5 t

I l

l Revision 2

l l

l l Date 11-15-85 i

~

I

" owe a svst**

g 1

I I

l I

l I

I i

I ATTACBIENT 1 1

~

l i

I I

l l

L AISON BY POSITION TITLE AND OUTSIDE AGENCY RESPONSIBILITT l

I l-1 I

I h

Amenor i

I I

l Sr. Engineer - Nuclear Safety &_ Licensing Westinghe.use l

I (Altemate) To be determined by the l

I Nuclear Safety and Licensing Section Manager l

I at the time of the event.

I I

I I

I l

I I

Technician - Ccaputer, Nuclear Operations INP0 l

I Support Sections I

l, I

(Altemate) To be determined by the I

I Nuclear Operations Section Manager I

I at the time of the event.

I i

1 1

I I

I I

Engineer, Nuclear Operations Support ANI - American I

l Section Nuclear Insurers l

I (Altemate) To be determined by the l

l Nuclear Operations Section Manager I

I at the time of the event.

I I

I I

I I

I I

I I

l I

4 i

1 1

I I

l i

I l

l l

1 I

I I

l I

l 1

I i

l I

l l

1 I

I 1

1 I

I I

L I

I i

4 e-e-

rtrM--

w.,9---.fe.-mg.m gw+ - --.e-g.w,.--47%..g-4-a.mm.,,-.ww,,7..--,,,-,,,,,,,-gog e--we,

, -.c w - - - _w-g-,,

,,m-

__-----c, n

--m+ =, -,,,, - -.,, -

+

I I

I I

I I AMERICAN ELECTRIC POWER SERVICE CORPORATION l ERP No.

2.07 l

I,*tnicaN s 6ser*ie l EMERGENCY RESPONSE MANUAL l Page 4 of b l

m l

l

~

l EP i Revision 2 l

l I Date 11-15-85 l

  • ows. s,st**

I f

I I

I I

I I

I 1

1 1

l ATTACHMENT 2 l

1 1

I I

l AMERICAN NUCLEAR INSURERS NOTIFICATION FORM

[

l l-1 I

l This is

( *==/ Title i l

I of the American Electric Power Service Corporation. I am calling to l

l inform you of an emergency situation at the I&MEo's Donald C. Cocic 1

I Nuclear Plant locatec 2t Bridgman, Michigan. This is/is not a drill.

I I

I repeat tais is/is r.st a drill.

1 I

I I

I I

On (Qaji,gl at (Time) an Unusual Event, l

I l

Alert, Site Area Emergency, General Energency was declared at the 1

I Donald C. Coolc Nuclear Plant.

l 1

I I

I am now prepared to give you a brief description of the event:

l 1-1 I

I I

I I

I l

i I

I I

l i'

I l

I I

I l

I l

l i

I I

I I

I I

l You any confirm this notification by calling (614) 223-3320.

1 I

I I

I I

l 1

I l

i I

I I

I I

I I

I I

I I

I I

I I

b e

---*wn-,--e-n-wn,w.nw.-r--ww,,--,g-._ww m,m,,,--.-,,v-,-

w-,,---,w.,

w,,w--~,,,

,-,----,,--nm, a,- ~ - - - -w--m,+-,

m q

-,n

1 I

I I

I l AMERICAN ELECTRIC POWER SER7 ICE CORPORATION l ERP No. 2.07 l

l p* * ' * * * ' * **eei EMERGENCY RESPONSE MANUAL l Page s of s l

N l

l l Revision 2

I l AEP i

i D.te u -is-as

-l 1

~

1 l

~* **

  • 5 "'"

l 1

I 1

l l

I l

l 1

1 I

l ATIACHMENr 3 l

1 1

I I

I NUCLEAR NETWORE (INPO) NUr1F1 CATION FORM I

I I

I I

l

Subject:

Donald C. Cook Emergency Exercise l

eeeee Tnis is an Exo: mise, Drill, Actual Event e e e e e '

I I

I 1.

General Information:

I&MEco (D. C. Cook Nuclear Plant)

I I

I I

Location: (Corp. HQ.): American Electric Power, Columbus, Ohio I

I I

I Date of Event:

I Event Classification:

I I

i l

Time of Event:

Date:

I I

I I

Effective' Time:

I i

I I

I I

2.

Event

Description:

I i

l I

l I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I i

l l

eeeee I

This is an Exercise, Drill, Actual Event I

I I

I I

I I

I I

I I

i I

i I

Information

Contact:

I 4g

  • W-

=*+eu w he= ~ - -

  • 1

~

I l

l 1

l l AMERICAN ELECTRIC POWER SERVICE CORPORATION l ERP No. 2.08 l

l pt*'cAN ELgC%e l ENERGENCY RESPONSE MANUAL l Page 1 og 3 l

1 1

I Revision 1 l

i AEP I

i l Dat. 11-15-es l

" owe a svM**

l 4

l l

IPREDisd BY 11PPROViL

/

l I

i i TITLE: nG RUNNER l

I 1

1 I

I I

I 1.0 PURPOSE I

l I

To describe and define the respord bilities and actions of the l

I I

Initial Assessment Group Runners during an emergency situation at l

the DCCNP.

I I

I I

2.0 ATTACEMIFf3 I

I I

I I, Listing of IAG Runners by Name and Assigned l

Location.

I I

I I

30 IIITIATIEG CONDITIONS AND/OR REQUIREMEFfS I

I I

I I

The initiating condition will usually be an Unusual Evenc..Algi, l

I Site Area Emersency or General Emerzenov at the plant. This I

procedure may also be activated at the request of the On-Site Emergency Coordinator or the Initial Assessment Group Manager.

~

l I

4.0 RESPONSIBILITIES I

l i

I 4.1 I

The position of the IAG Runner is held by I

I I

Nuclear Operations Division Clerical Staff I

I I

I

^

4.2 I

The primary responsibility of the IAGR is to provide c'lerical I

I assistance to the IAG Room on an as-needed basis. This l

assistance will include but not be limited to typing, copying I

and courier services.

5.0 PROCEDURE l

I 5.1 tial lations I

i l

I I

5.1.1 Upon notification by the IAG Coordinator report to the I

preassigned positions (see Attachment 1).

l l

5.1.2 Provide clarical assistance as requested.

I 5.2 Continubw Actions I

4 i

l l

l I

Continue to provide clerical assistance as requested.

I 5.2.1 I

I I

l l

J 3

t i.. -

1 I

i i

l l AMERICAN ELECTRIC POWER SERVICE CORPORATION I ERP No.

2.08 l

l,** * "^~ *ie i EMERGENCI RESPONSE MANUAL l Page 2 of 3 l

l l

l Revision 1 l

l l

l Date 11-15-85 1

"owen svet*

I I

f 1

I I

I I

I I

l 5.3 Deantivation kotions l

l l

3 5.3.1 If the situation warrants, the IAG Manager will l

l deactivate the IAG. Finish all requested assistance I

and return to normal job functions.

l l

1 I

5 3.2 If the IAG is being changed to the Corporate Support l

l Group Mode, continue to provide assistance as-l I

requested.

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

l l

l 1

1 I

I I

l

~

1 I

I I

I I

I I

I I

I I

I I

I I

I I

1 I

I I

I I

J i

l I

i l

I e

e m m eo me o.,-

m

,e--

am<,e-~*

a--

y-o e-o

.-w w-s s

I I

I I

I l AMERICAN ELECTRIC POWER SERVICE CORPORATION l ERP No. 2.08 l

l,,95 "' "" ' C '*reI

'EMERGENCT RESPONSE MANUAL l Page 3 of 3 l

^'

l 1'

I Revision 1 l

l EP i

i Dat. 11-1s-8s i

"own a svST**

I I

f I

i I

i l

I l

l l'

ATTACEMENI 1 1

1 1

I I

I LIST W IAG RUNNERS BY POSITION TITLE AND ASSIGNED LOCATION l

I I

I I

ESITION TITLE LOCATION 1

I.

1 I

Executive Secretary Normal Working Office l

I I

Staff Clerk-Typist vatside IAG Roon j

I Secretary - Radiological Support Section outside IAG Roca l

I l

I Secretary - Safety & Licensing Section outside IAG Room I

i l

1 I

Secretary - Nuclear Matea'JCs & Fuels Outside IAG Roca l

l Management Seotion l

l I

I Secrestry - Nuclear Operations Cutside IAG Roca l

I Support Section l

I I

I I

I I

1 l

l 1

1 I

I I

I Jg13,: Those rianners assigned to oste outside the IAG Roca shall l

I alternate on an hourly basa.s. A Nuclear Safety & Licensing I

I Secretary shall begin this bourly tutation.

I I

l l

I I

1 I

I I

I I

l 1

1 I

I I

I I

e I

i 1

1 I

I I

.s I

I I

J l

j

-g

,,,.e_,,

,,,,-g

,,-w,-,,,-q,-,,,.,,,,,,,__.,w 4

  • 8 g

1 i

l g

I 1 AMERICAN ELECTRIC POWER SERTICE CORPORATION l ERP No. 5.01 1

I **g ica reser,'e !

EMERGENCY RESPONSE MANUAL l Page 1 of 19 l

I AEP I

I Revision 2 I

I I

l Date 11-15-85 "ows a syst**

A l

l I

lPRED AWul6 BY llPPRdyAL

/

l I

i j-l TITLE: EMERGENCI NOTIFICATION PHONE NUMBERS l

i I

l l

I l

1 l

l I

1.0 PURPOSE l

I I

I To provide one location for all emergency notificatica phone l

I numbers and call out lists used by Initial Assessueat Group l

I Mosbers during an emergency situation at the Donald C. Cook l

I Plant.

I I

I I

2.0 ATTACHMElffS l

I i, Initial Assessment Group Mar.ager's Call Out List I, Initial Assessment Group Coordinator's Call Out l

1 ti,e g

I I

I, Initial Assessment Group Status Reporter's Call Out l

I tag g

I I

  • , Outside Agency Liaison Call Out List l

1 I, Initial Assessment Group Public Affairs l

Representative Call Out List l

l l,. Additional AEPSC Emergency Response Phone Numbers l

l l, Engineering, Desi'gn and Construction Manager's Call l

Out List j

I 30 IIITIATING CONDITIONS AND/OR REQUIREMENTS l

I 1

I This procedure will be initiated anytime the phone numbers or l

l call lists are needed.

l I

I l

4.0 RESPONSIBILITIES l

I I

I The Initial Assessment Group Coordinator shall be responsible for l

l I

t' a verification and updata of the phone listings in this l

I procedure on a quarterly basis.

l l

l I

I I

l I

I I

i v i j

i l

l l

I I

i

~ - - -

v-v--v--

-r-y--w&.wgym + g ry-y-y-m,,

,._p

.m w.,.*%--,yj,,e._.y.4,9,wgpp---,m.,e,,,-q.---,m_4,-

,. -,,. - -,g,,y---g* -

m-.ggw9g.3---*y,-y----_%-,g--%_-

y-y

I I

l I

l l ***,,c w stee7*'e ! AMERICAN ELECTRIC POWER SERVICE CORPORATION l ERP No. 5.01 l

(m ENERGENCY RESPONSE MAdUAL

! Page 2 of 19 l

I AEP I 8*'i=iaa 2 i

I l Date 11-15-85

[

l "o..... c s

  • I I

I I

I I

l l

]

I I

5.0 PROCEDURE I

I g

5.1 Actions of Individn=1s Unin-this Procedure l

l I

l 5.1.1 Each call out list is given a title which corresponds l

l to the title of the individual who is responsible fbr l

using the call out list. Each call out list gives l

l the primary contact and up to thrse altamates fbr l

l each emergency response position. If the caller is I

g unable to contact the primary (i.e. first name one I

l the list), then the next name listed should be I

g called.

I I

I I

I I

I I

l I

l l

I I

I I

I I

I l

l I

I I

l l

1 I

I l

l I

I e

i I

I I

I l

l I

l I

I I

I I

I l

I 1

I s:

i l

l-I e

-.,-.,w--

,,-r

,w Tww-

,.--m-y y.

ww--

s j

I P

I I

I l AMERICAN ELECTRIC POWER SERYICE CORPOR!. TION I ERP No. s.01 1

l,*** * " " *"*'e !

EMERGENCI RESPONSE MANUAL l Page 3 of 19 l

O.

I l

1 AEP l Revision 2 1

i

~

i n.e.

u-ts-as i

  • Owg, gystt" I

I I

I I

I 1

I I

I I

I I

I I

I I

I I

I I

m2Camrr i I

l I

IIITIAL ASSESSMENT GROUP pasartree3 CALL UUr LIST I

I l

Initial Assessmaet emo CooMianter I

I omoe faen.

I I

g Lasistant Scientist -

I Indiological Support g

I g

T. G. Ratshbarger l

regio.or -

1 g

Radiological Support g

J. L. Leichner I,

I l

1 l

l l

l l

I I

I I

l 1

I I

I I

f I

I I

I I

I I

l I

i i

1

.. l.

I J l I

1 I

,-.,.--***a"*-*'#"*'"

=

1 i

I I

I I

l 1 AMERICAN E!.ECTRIC POWER SERVICE CORPORATIONl ERP No. 5.01 1

A l f *nicaaELse r*ic, 1 EMERGENCT RESPONSE MANUAL l Page 4 of 19 l

4

[

]

l AEP l Re71sion 2 l

i l o.t. 11-15-85 I

"C*EasvSTE#

l 1

I I

I I

I I

AmCauxr 2 I

I j

l IIITIAL mnW GROUP C00RDIM f0R'S CALL CUT LIST I

l I

moe min.*iee re nmte in nei I

l i

11 a

ystem l

)

Initial isse* s.ont Creun Status I

secot-t e r l

l I

Oma.

mar.

I l

Tecnolosi Vriter l

g MSAL Sectica l

D. A. Timberlake L

I g

l l

Library Assistant l

Nuclear Operations Division I

J. E. Hendrix l

g l

(alt). Technician-Engineer,

[

Nuclear OperationsSection I

g D. C. Baer l

g l

(alt.) Associate Scientist l

Radiological support Section l

l W. T. HooRae l

e Ditial Assessment creun Members l

? ice President - Nuclear operations I

M. P. Alexion

[

8 (alt.) R. 4. Jurgensen g

(alt.) D. 7. Shaller e

i e

Consulting Ifuelear Engineer

.i R. W. Jurgensen

[

e (alt.) D. 7. Smaller l

Manager, Nuclear Materials & Tuols Manas J. M. Clevelaat l

8 (alt.) 7. Tanderburg g

I' (alt.) G. John l

l g

Manager, Nuclear Safety & Licensir4 J. G. Teinstein l

(alt.) 7. R. Satyan-3 harms s

f 2

l Assistant Division Manager. Mechanical

3. B. Stainhart l

8 (alt.) 4. 3. Grimes l

(alt.) J. A. Kobyra i'

l g

Staff Electrical Engineer I

J T. E. King l

I (alt.) J. R. Anoerson l

(alt.) J. L. Corey 8

l i

,n._.--

_-n--...-~~..-----


3--

^ * * * ^ ~ ~ ~

~~

.:T

i s

1 I

I I

I I AMERICAN ELECTRIC POWER SER7 ICE CORPORATION l ERP No. 5.01 l

i,**

    • ie!

EMERGENCI RESPONSE MANUAL l Page 5 of 19 I

I l

(

AEP 1 Revisi n 2 1

I I

I Date 11-15-85 1

  • O*E m s v 5T *
  • I I

l l

1 I

1 I

I l

I Attaan= ant 2 1

I rag. Two 1

I l

I I

I I

Division Manager. Design l

l Y. A. LePor*

g (alt.) R. H. Meister I

2 l

1 g

t i

l l

Senior fios President. Public Affa I

l I

J. C. Brennan (alt.) W. W. Corbitt I

I I

l l

Ties Chairman - Engineering & Construct John E. Dolan g

g I

i l

Manager, Radiological Support Section 1

g

3. J. Brewer l

(alt.) 3. F. Elementowies 1

I 2

I Manager, Nuclear operations Section j.

..F. 3. TanPelt, Jr.

l (alt.) R. 3. Lease g

g I

i l

Ild Publio if*11rs Meerementative g

Senior Vice President. Public Affair I

J. C. Brennan l

l Vice President - Pue11e Affairs Commun1 oat W. W. Coreitt g

8 I

l Outside Arenev f f mison g

i 8

Westinghouse Liaison l

I I

Sr. Engineer - Nuclear Safety & Line l

I R. T. Founs 3

g (alt.) To be determined by J. G. Feinstein at time of tae event.

l INP0 Liaison l

Technician-Computer, i

l j

)

l Nuclear Operations section g

J. P. Blais g

i (alt.) To be determined by F. S. Vanfelt, Jr. at t me o I

]

i i

l American Nuclear Insurers Liaison g

Engineer, Nuclear Operations Section j

1 J. r. Eurian w

I (alt.) To be determined by F. S. TanFelt, Jr. at time or tne event.

I e

1 1

~

l t

I-i d 1 i

I i

1 -

i i

I.

_. - = _


~n

I I

1 I

l l AMERICAN ELECTRIC POWER SERVICE CORPORATION l ERP No. 5.01

(

p l,** * " " ' * *

  • re!

EMERGENCY RESPONSE MANUAL l Page 6 of 19 I

4 I

I I Revision 2 l

6 l

l l Date 11-15-85 l

CMremsysTE l

I I

l 1

I I

I I

I 1

l Attaan= mat 2 i

rage Tare.

g g

I

.cr.cna maa l

I g

rans., u.. - ae e,.mo m..re l

Executive Saoretary l

l F. J. Barlow l

2 1

Staff Clerk. Typist

(

4 S. J. Stauffer l

I i

l Secretary. Radioloical Support Seatic I

l E. D. Green g

l j

I l

Secretary - Nuclear Safety & t.ioensing Seatto I

2 i l

A. D. Daarson t

l C. A. Medley l

Secretary. Nuclear Materials & Fuel at Section g

i D. J. Skartey l

l

7. Danneuiller l

4 g

Soaretary - NucAsar Uperations Support See I

i L. C. Turner l

l F. C. Lockhart l

1' l

l I

i 1Amiafttrative fueecrt

{

l l

t Manager, Cffice Servisse l

i E. E. Tick e

l s

Office Serviose Aseistant l

F. J. Yanasco l

e l

l Ediruinu RESPONSE ORCANT21TICW Mamars**

5 l

l Recovery and contrei Maammer l

g Yiu Frosident. Nuclear Cperations l

M. F. Alexion l

l Consulting Nuclear Engineer l'

e l

l Nuclear Operations Division e

8

3. W. Jurgensea l

l i

l 1

l l

Radiological Support Scotion Manager l

3. J. Brewer l

l

3. P. E.'ementowies l

y e

I I

I l

. ~.

I I

I I

I I AlentIcAn ELECTRIC POWER SERVICE CORPORATION l ERP No. 5.01 l

l ***,,c,e,u e,*'e !

EMERGENCI RESPONSE MANUAL l Page 7 of -19 l

'7 I

i

~

l Revist a 2 I

- I AEP l

i Date 11-15-85 l

'O,Wam sysTE f I

I I

l l

l l

1 I

I l

ittachaeot 2 I

g rege roar l

i l

1 Orrice

EEBR, l

)

Ennineerinn. De=4-a A constraution n'ananer i

Assistant Tion <*resioent - Mechanical insering l

J. J. Mastowsky l

l I

Manager' crea.ots I

1 J. 3. Jonee i

1 g

Division Manager - Civil Engineering I

B. H. Bennett I

g l

1 1ssistant Division Massp r - Monnaniaal ines i

s. H. st.inhart l

l g

i i

I senaani. ana n-4, ma,,r l

l

,1 Manager - Projects I

s h

J. R. Jones (l

I

.s l

l Division Manager - Civil Eng3meering 3

l B. H. Bennett l

' ~

  • i l

[

maalear Operations Section Manager l

r. s. TanPelt, Jr.

l 1Am4aintrative and Lewisties n'anaro p 1

i a

l Beaton Harbor Division Manager - IAMEco l

T. E. McCsttrey l

l 1

l l

l s

Becton Earbor Division 1A=inistrative Assaistaat t

R. W. Ernstin a

i e

Becton Harbor Division Service Manager - I e

A. B. Glassburn

~

l l

News and Publie Relations Mananer j

e 8

t Senior Vice Frosident - Public Affairs 8

l J. C. Brennan i

I Vice President - Public Arrairs Comm2nication W. V. Cortritt l

l l

Director of Public Affairs - I1MEco l

jl C. W. Rasty l

l I

i'i t

~. ~...., -

m

I i

I i

l l AMERICAN ELECTRIC POWER SERVICE CORPORATION I ERP No. 5.01

'l l,** * " * "

    • "*iel ENERGENCY RESPONSE MANUAL -

! Page 8 of 19 I

l l

l Revision 2

[

l l

l I) ate 11-15-85 I

  • 0we m sv 5T**

e I

l l

l l

1 I

I I

I I

Attacament 2 l

Page Five I

l I

I l

Ecu asm zaar g

l 112. Transnoration

. - ~ ~

l vul ur corrzo.)

l g

(alt.) John Owens (Pilot)

[

(alt.) Ken 31abaugh (Pilot) g l

(alt.) Bill Graaf (Filot) l (alt.) Dave Bugnes.(Pilot) l I

talt.) Dave lureden (Pilot) l l

(alt.) varren salta (Pilot)

I 2

(alt.) Dob Doran (Pilot) l (alt.) Dave Freeman (Pilot) l (alt.) Joan Ehlers (Pilot) l (alt.) Greg Kulis (Pilot) l (alt.) Bruce Rausca trilot) g I

1 1

1 1

I I

I I

I l

l l

l l

l l

I l

l l

l l

1 1

I i

l

__ l 1

I

..)

1

~

l i

as.=.==-

e-e+-=**wa

          • 9""'*

I y

J,,

I i

I I

l l AMERICAN ELECTRIC POWER SERVICE CORPORATION l ERP No. 5.01 l

!,**,,cdat,,7*iei ENERGENCI RESPONEE MANUAL l Page 9 of 19 l

l l

EP l

l Date 11-15-85 l

Owen sysTE l

l I

]

I

~l 1

1 I

I I

I I

I I

ATTAC2H U T 3 I

l IIITIAL ASSESSNDT GROUP STATUS REPORTER'S CALL QUT LIST l

l Taahate nt Mnnnect Center's ADSC "-niantor 1

1 i

I l

Primary:

Audinet - Di I

,l 7

Secondary: Bell Phone 3 etse - Di for 1

I ext.n.to l-I 1

Emerrency i

Ceeratien Facilities' ADSC Commen.icator I

l Primary:

Audinet - Dial l

Secondary: Benton Earbor Audimet - Dial l

Tertiary:

Bell Phone System -

]

j ams rue extensio l

1 1

1 I

1 I

I I

i I

I 1

l l

l 1

I I

i i

I I

I i

i l

I l

>I l

.Jt I

I i

l

-- ~ - ~.. -.

-, -., - - -.., - - -. _ -. - ~. - -.. - ~ -. - -. - - -

  • = -

e--

~ - -

.b i

6 i

7 i

I I

l l

I i

/7 l,**sicah Es.ser*'e i AMERICAN ELECTRIC POWER SERVICE CORPORATION

! ERP No. 5.01 l

EMERCENCY RESPONSE MANUAL l Page 10 of 19 I

(_.

I I

I AEP I Date 11-15-8s !

I ""en 2 I

I

  • owg,,systt*

I I

I l

f f

I l

l l

I l

l I

l I

I I

l I

I ATTACEMENT 4 I

g l

CUT 3IDE AGENCT LIAISCE CALL CUT LIST I

I l

Cataine Agency Contacts I

g INFO (Atlanta, Georgia)

I INPO Emergency Response Center I

l 2

I i

l American Nuclear Insurers l

1 (Farmington, Connecticut)

I

[

l Westinghouse (Honroeville, PA) t e

na sma mua a

i i

l l.

1. Site Service Manager M. J. Panin g

a

2. Area Hanager Tony Suda I

1st 11temate cas Swist l

l 2nd Altemate Earl Brown I

j

3. Senice Response g

Hanager George Masch l

1st Alternate Bob Stokes 8

l 2nd Altemate Joe Leblacs e

s

4. Energency Response Director Tom AnQerson l

t

5. Emergency Response Deputy Director Ron Lebr 1

l I

.. smorgener n.

i l

Commainta ations Mike Margan f

I I

Note: Unless indicated otherwise, hone numbers are area code l

l Where an aree coce other than shown, it applice to the e

orrzo., nome, and sal numbers.

l l

1 I

I I

I I

3 l

I 1

l l

v g

l l

.-- ~..~...

e l

I

^

l 1

l l AMERIC'AN ELECTRIC POWER SERVICE CORPORATION I ERP No. 5.01 l

l7 i,,9 *"

  1. "*ee!

ENERGENCY RESPONSE MANUAL I Page 11 of 19 I 5

l i

l EP i R.visi n 2-i l

l Date 11-15-85 1 OwgnSysT1 I

i i

I i

l i

i l

I 1

l I

i m ac u rr s I

i I

I i

1 g

minr. mmer cacar rcBuc amns amumirm C2u. our ust I

l 1

i i

i Donald C. Coole himerv YaFamtion Centar yuaner l

l 1

g Office Egg l

Manager - Donald C. Cock Energy Ikformation Center l

l E. A. smarrella t

l I

l I

I i

I I

I g

(alt.) J. Krieger i

g i

l I

I1MECo Publio Affairs Denartment. Fort Varne. f ad9 ans Director of Publio affairs - IAHEco l

C. W. Baaty l

i g

I

-l 1

1 I

(alt.) 5. s. Dyer I

(alt.) 7. F. LaBarbers l

I I

AEP Publie Affairs - New York I

I I

Manager, Public Affairs - New Yort j

Nita Gorman l

l g

l 1

l I

i

,I i

e 71ee Pn sid l

e Bruce Beaa i

' l I

l (alt.) Tom Dennia l

N, I

l

~J l

I i

l l

1 l

I l

I e.,me==-+,.**e**eg

- ~ - - * * = - * - * ~ * * * * * * ' " " ' ' ~ * ' " " " ~ * * ^

~

'~

0 i

g

).-

l l

l l AMERICAN ELECTRIC POWER SERVICE CORPORATION l ERP No.

s.01 l

l, l p*,uc tuer*ie i EMERGENCY RESPONSE MANUAL l Page 12 of 19 l

l l

l AEP l Revision 2 l

i i

i o.e. 11-15-as i "c y,g,, 5, s t t" t

t t

i I

l l

I I

1 I

g ATTACHMENT 6 I

1 l

ADDmenAr. AEF3e omacame assres3x Pecus sexsEns I

I I

l E.ers.nor Can r.inting I

1 l

I l

CITTL a,uurr.nuo DIvTSICN Ecan Phone

[

l B.H. Bennett, Division Manager 1

C.K. Togni, section Haanger l

P.H. Anderson, Saotion Manager I-l g

R.H. Hevener, Cognizant Engr.

G.A. Camporni, Senior Engineer l

i g

l DESTCN DITNTON I

l l

Dentsn Statr I

(,

l T.A. Lepore, Division Hanager I

2 g

R.M. Meister, Aast. Div. Mgr.

]

l l

T.J. Eviatreveri, CA Coordinator l

D. Petro, Design Engr.

l E. Bencivenga, Assoa. Engr.

]

+

l l

AMhitectural Desirn i

l J.P. Blakis, Section Mgr.

I g

T. DelF&vero, Sr. Arch, I

i Cognizant tagineer

[

A.C. Macksoud, supv. Designer I

g Contml Services I

l R.O. Murad, Senior Engineer l

T. Frey, Designer i

I g

Electrical Desirn l

g i

2.J. Andracki, Scotion Mgr.

)

3. Nata, Supv. Designer l

C.F. Hocarry, Supv. Designer 2

I I

l Electrical Piant l

F.J. M onald, Section Hgr.

1 g

R.L. Pastore, Asst. Soot. Mgr.

l I

T.F. Lynch, Supv. Designer, 8'

Cognizant Ecgr.

l W.R. Offineer, Superv. Designer l

T.J. Pooler, Supv. Designer, I

^ !

Cognizant Engr.

l J.M. Stone, Supt. Designer J l I

i 1

i I

1 l

l

4 l

l I

I l

l AMERICAN ELECTRIC POWER SERVICE CORPORATION l ERP No. 5.01 I

. l,** * * " *" ' # # *ie 1.

EMERGENCI RESPONSE MANUAL l Page 13 of 19 l

')

l' l

l Revision 2 l

l AEP i

i at. u-ts-as :

i

  • 0We a sv9f **

l l

1 l

l l

l l

l I

1 I

I g

I Prge Tw I

g I

j l

Design Division Cont'd.

t I

l I

Home Phone Offies Phone I

Maaamainst Deaf"

(

/

l l

J.L. Villiams, Section Mgr.

l N.J. Horonha, Asst.

l g

Seetion Manager l

i 1

J.C. Capo, Sup?. Designer g

g l

A. Dey, Senior Engineer 1

)

l J. Spica, Supv. Designer, l

Cognizant Engineer l

1 T.H. Sun, Supv. Designer, l

Pipe & Stress Analysis l

C. Tasin, Senior Engineer l

i i

I g

Stmotural Desisn i

i l

g A.S. Pus 111a, section Manager l

J. Petrucelli, Amst. Sec. Mgr.

l l

H.L.11ezander, Statt Eng.,

l Cognizant Engineer g

2 i

J. Duffy, Squad Lar.

I I

T. Sjogren, Supv. Designer l

H. Bu, Supt. Designer j

g W. Hodry, Supv. Designer l

l l

l r!rMv1ATTON & Tf??PCMMmfTCATICNS EMOINEERTYO DiviAIUm 1

I f

I M

I T.O. Argenta I

l l

3.H. Horowits l

i Electrieal Generatien Section I

R.C. Carmth, Manager l

L.F. Caso, Lead Engineer l

l T.H. King, Cogni ant Engineer l

t i

g MATERTif9 RANDt.ING ST7TSTON I

I l

H.J. Bumphrey, Division Manager I

g E. Goldberg, Section Manager

[

T. M11 bury, Engineer g

l MECHANTCit ENrtiw aim DT7T3fcM l

l Pechanical Ensincerin Staff l

0.D. Eiabenberger l

A.S. Grimes I

g J.A. Echyrs l

J.J. Markovary I

vi i

i I

+

- =

~ *.

~

i l'

l l

l I

I i

l l AMERIC8 ELECTRIC POWER SERVICE CORPORATION-l ERP No. s.01 l

l,*s a ta cr*rel EMERGENCI RESPONSE MANUAL l Page 14 of 19 l

mca l

l l

l AEP 1 Revision 2 l

~

l l o.te n-is-as !

  1. 0Wa st svST**

I I

I I

I I

I I

l l

l l

Pas

  • m **.

l l

l l

l HoonanloaA a:ngineering Sta*r Cont'd.

l l

1 l

Home Phcne of?ine Phone l

l D.A. Patience l

R.I. Fawliger l

l F.G. Soboept g

3.3. Steinhart l

g

]

l l

an.1vtical and e&D l

l l

l M.I. Cuba

e. c1...

l C.F. Lin I

I i

c3 1e 1 cm.er1, l

D.L. Bostoa l

R.F. Dodd l

j j

P.A. Fisher

[

j g

G.M. Larew i

M.J. O'Keefe g

l T.O. Wright j

[

Fire Pmtection & 1171C g

i l

R.T. Cooper.

l l

l D.L. Fuller I*

i l

B.J. Gerve g

J.D. Grier l

R.D. Ioating g

l L.H. Langh==

l j

l J.A. Zott l

Feat hehmeners & Puses l

A. Felloiano l

j

-l E.T. Gilabert D.R. Hafer l

I J.R. Jenseo l

1-J.J. Ripaa l

l E.V. Sohneck

[

l C.3. Swenzon

'E.F. Terest l

8.C. Mickstavage I

I l

Instrumentation & ContMis l

3.1. Farlow I

F.C. Eastings l

l J.C. Jeffrey g

3.L. Har l

j M. Perlmaa l

R.L. Shoberg l

l R.r. Snoe m c l

l l

w

j 1'

1 1

1 I

l l AMERICAN ELECTRIC POWER SERVICE CORPORATION l ERP No. 5.01 l

3 l,#6*'*** " '*"*ie l EMERGENCT HESPONSE MANUAL

! Pa4815 of la l

i l

l Revision 2 l

4 l AEP l

l'o.t. u-13-as l

0was sv5T**

I l

l l

l I

I

_i 1

l l

l l

j l

Page Four l

g g

l M==hmatoal Engineering Division Cont 'd.

l l

l Ynaten==aentian a cant-ets cont'd.

l l

i V.I. Arnold i

3.E. Ennis j

I l

D.E. Kurts l

. l-l l

J.D. Phillipa D.A. Purvis l

i I

i D.T. Sobieser l

W.G. Sotos l

j l

D.E. Sponseller

{

l l

Pinina ami Yalven Enna Phone Offine Phong l

l l

l l

l J.D. Hoffann l

[

[

B.A. Kadloo A.J. Levandovaki l

l l

1 M. Harrocco l

l K.J. Santos l

l D.E. Tadodaria t

l l

l Mine and crele Trainatien 1

I l

l J.D. Bones l

3.F. sodg.

l l

0.D. Eines

[

l S. Iederstorff l

l A. Singh l

l l

M.S. Briesob F.J. Calderene l

J.R. Friedman I

I l

NUCLEAR CPERATIONS DITI3ICR l

l m

I l

1 i

l M.P. Alexich g

P.J. Barlow l

l 1

J.E. Rendriz l

R.V. Jurgensen l

J.A. Marriott l

l D.T. Shaller

3. J. Stauffer l

l 2

l Nuclear l

1 1

g J.M. Cleveland T.V. Allen l

l J.L. Bell l

3.3. Bennett l

2 l

L.M. Bounds T. Dannea111er l

5 T.A. Georgantis i

l

0. John l

[

J.A. Krussevski

-d g

3.F. Leonard l

L E.G. Lewis l

i l

D.E. Malin l

l s.I. soyantin j

i

,,l

-\\

- - - - - - - - - - - - - ~ - - - - ~ ~

e e

1 I

I I

i l

l l AMERICAN* ELECTRIC POWER SER7 ICE CORPORATION l ERP No. 5.01

.l

] l,,***'***

        • iel EMERGENCY RESPONSE MANUAL l Page 16 of 19 l

l i

i Re,1 1 a 2 i

EP

_j l

l l

l Date 11-15-35 l

" owe a svst**

j i

i t

l l

l 1

l I

I 1

I I

n

.t.

t,

i F.e,,ve i

l I

l Enolear operations Division Coat'd.

l l

Ramlear Materf alm & Pual u.... ne h tfon Coat'd.

I l

T.M. 30eenbena l

N.2. 3 a 1

3.J. Sharkey l

l l

3. sharma l

t

)

l T. Tanderturg l

V.L. Zismaruna g

g l

Raalear Safett & f.ieansina Section I

l Home Phone Office Phone

[

J.G. Feinstein

~~

l N.3. Ackermaa l

1.5. Auvil l

i l

F.A. Barrett l

l 2

i A.D. Dawsoo 1

I M v. reart.

i i

s.r. rouaa I

]

l M.J. Gorski l

[

U.I. Harvey l

N.E. Imhoff l'

1 F.E. Infang.r I

(

l C.A. Medley l

l l

T.R. Satyan-Sharma l

l D.A. Timbeslake I

t.J. Toth l

D.E. vanDeusen l

l 2.0. Tasey l

3.0. Villiams g

l l

Radiolantaal hecort Sectica l

I I

g 3.J. Brewer l

E.D. Green i

T.O. Barshbarger 2

l 5.V. Jones l

l M.J. Jury l

3.F. Elementowies g

J.L. Leichner l

i v.T. M.ana.

I I

l g

jg lgar Onorations Suncert Section l

1 r.3. TanFelt l

D.C. Baer l

l N. Bahloda l

J.P. Blais g

l 5.8. Brugger l

J.E. Borsgren -

I l2

',l H.B.' Demetry l

1 jl J.r. Kurgan l

N.3. Lease I

r.c. Loorhart l

l v.c. nas l

L.c. Turn.c

..... ~.

e

e I

I I

I l

l AMERICAN ELECTRIC POWER SERVICE CORPORATION l ERP No.

5.01 I

l,***

"*'e i EMERGENCY RESPONSE MANUAL l Page 17 of 19 l

/

l l

l Revision 2 1

I AEP I

i nat. u-15-as l'

  1. OWEmSYSTI I

I I

I I

I I

I I

I g,

I rase 31:

g I

I I

I g

Hoan Pfrone Orrine Phone g

i SCHEDULE 11m Pf immm NamentErF STAFF '

l I

t g

5. Asisi I

B.H. Bennett l

i C.C. Cassell I

i l

C.A. Erikson l

l J.J. Gilligan l

J.A. Howarts E.J. Jayjack

'i I

J.R. Jones

.l l

C.S. Kalinowski J.F. Eurgan l

l

~

l L.C. Larsen l

A. Lannon l

W.J. Mtarphy l

l W.C. Rigg

}

}

\\.

i A.J. Samanelson g

l 1

w.T. Tabor I

i F.3. TanPelt i

I f

l A.F. Yarney l

{

l I

]

l custity insurar.e e St af f I

j l

l R.F. Eroeter I

l J.B. Brittan g

I 8.J. Sweeney i

I T.P. Beilmaa l

i I

I 1

1 1

,1 I

I i

i l

l I

i I

I I

I I

I I

I l

l I

I I

I I

I I

-s I

I l

l l

I 1

. -. -..,. -. ~...,

.*g, p

o l

l l

I l

i l

l AMERICAN ELECTRIC POWER SERVICE CORPORATION l ERP No.

5.01 l

l l,***'#"

'"*iel EMERGENCY RESPONSE MANUAL l Page 18 of 19 I

f I

l l Revision 2 l

l I

I Date 11-15-85 l

0WemsystE I

I I

I I

I l

l 1

I I

I I

t I

mAca m 7 I

I I

I I

i g

EBGINERIBO, DESIGN AED CCESTRUCTION MANACW3 CEL QUT LIST g

I I

i To call Andinet Agli I

i I

I j

g Columnus (AD )

g I

I

)

l Ft. Veyne g

(IA)GCo General urnae) l g

I l

l Secton Eartor Division l

I l

Cook Flant I

L l

E I

l

-[

g Locat ina ggI1gg Jgag g

i T.2. Adams Cook

  • I I

I I

T.F. De11 men Cock 1

J.A. D13ella Columbus i

i I

i 5.H. Bennett Columbum g

g i

J.B. Brittan Columbus l

l l

I l

R.C. Carrsth Columbus i

l l

l C. Cartwright Cook I

I l

l J.M. Cleveland Columbus l

L.F. Caso Columbus I

I i

l I

l R.K. Cock Cook g

l l

C. Crw Coc=

1 1

l l

l J.G. Feinstein Columbus l

D.V. Girardot Ft. Wayne G I

l M. Borvath Coou l

J.R. Jones Columbus 1

I l

J. toutfasa cook l

l J.A. Kobyra Columbus I

I

--l

4

'g,*

I I

I 1

i i

l l AMERICAN ELECTRIC POWER SER7 ICE CORPORATION l ERP No. s.01 l

i I p **'* " #"*ie !

EMERGENCY RESPONSE MANUAL l Page 19 of 19 l I

I I Revision.2 l

AEP 1

i i o.t.

u-ts-es i l

  1. C*s a sv5T*

g l

I l

I 1

I I

i i

I I

l I

Attaenaent 7 I

l Pge hm i

1 I

I I

Location gg, h

g i

R.F. Eroeger Columbus I

I Y.A. LaFore Columbus g

g.

I M. HoAllister Ft. Verne 0.0.

I I

I j

g D.A. Modet Columbus j

I R.5. Middleton Ft. Wayne i

i I

l N.J. Parvin Cock l

g tweetineouse) l l

l W.I. Pawliger Coluatus 1

I e

l s

P.D. Richard Cook,

li l

T. 31odertook Cook I

l l

3.5. Steinbart Columbus 1

g l

l 5.J. Sweeney Columbus I

i 1

g C.3. Tcgni Coluseus l

l J. Teach Cook I

I l

J.m. faces Columbus l

1 w.L. Zimmermann Columbus I

I I

g IA0 Accese Extension I

l l

I l

Mechantoal Engineering al Liaison to the IA0 (20th Floor) 1 I

ext.

l 1

Electrical Engineering al Liaison to the IA0 (20th Floor)

I art i

I I

g Design Division fechnic on to the 110 (20th Floor)

Est l

I l

I I

I 1

I

.I I

I i

1 1

I

m

(

EEP NDMBER UEd REVISION EFFECTI7E DAIE i

1.00 ADICNISTRAIIVE 1.01 Emergency Response Manual overviev 0

2/8/85 1.02 Preparation of AEPSC Emergency Response Procedures 0

2/8/85 2.00 IIITIAL ASSESSMENT GROUP (IAG) 2.01 IAG Organization & Function 0

2/8/85 2.02 IAG Manager 0

2/8/85 2.03 IAG Coordinator 1

4/26/85 2.04 Emergency Planning Coordinator 1

4/26/85" i

2.05 IAG Member 1

4/26/85 2.06 IAG Status Reporters 1

4/26/85

'1/15/85 2.07 Outside Agency Liaison 2

1 2.08 IAG Runner 1

11/15/85 i

j 2.09 Public Affairs Representative 1

4/26/85 3.00 EMERGENCY RE3FCESE ORGANIZATION (ERO) 3.01 ERO organization & Function 0

3.02 Recovery & Control Manager (RCM) 1 4/26/85 j

3 03 Radiation contml & waste Handling Manager and Staff 1

4/26/85 3.04 Engineering, Design &

Construction Manager and Staff 1

4/26/85 t

4 h hI 5"J1217 l

3 v

.-n en'e..

---~,w-,.-


~-,-g-,----,-.--,

pg-.,_e

,.-e-_,-,_

---g-m.

ye---v4

,m,.,,--

,e-w-

y--

---m--we.e.


w,--

O EEP NUMBER M

REVISION UFECTIYE DATE 3.05 Schedule & Plaaa4ng Manager and staff 0

2/8/85 3.06 News and Public Relations

  • Manager 4.00 m se c0RPORATE SUPPORT GROUP (CSG) 4.01 AW-CSG Organization & Function 0 2/8/85 4.02 AD-C3G Manager 0

2/8/85 5.00 MISCELLANEOUS IEFORMATION 5.01

, Emergency Not1*fication Phone Numbers 2

11/15/85 5.02 Training 0

' 2/8/85 5.03 Drills and Ezeroises 0

2/8/85

'The News and Public Relations Manager Procedure will be developed after the revised JPIC and Emergency News Source Procedures are issued.

lh&6

+f UNITED STATES

  • 8 NUCLEAR REGULATORY COMMISSION o

D j

WASHINGTON, D. C. 20555 k,.....,[

January 17, 1986 50-315/316 D. C. Cook MEMORANDUM FOR:

Chief, Document Management Branch, TIDC FROM:

Director, Division of Rules and Records, ADM

SUBJECT:

REVIEW 0F UTILITY EMERGENCY PLAN DOCUMENTATION The Division of Rules and Records has reviewed the attached document and has determined that it may now be made publicly available.

/fg# Y

)

Donnie H. Grimsley, Director f

Division of Rules and Records j7 Office of Administration

Attachment:

As stated i

i o