Proposed Tech Specs Involving Grammatical Correction to Wording of Unit 2 TS 3.4.8,Action a for Modes 1,2 & 3 & Returning Frequency Requirement to TS 4.7.1.2.c & 4.7.1.2.d That Was Inadvertently Deleted in Prior Amend
ML17333A833
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 03/26/1997
From:
AMERICAN ELECTRIC POWER CO., INC.
To:
Shared Package
ML17333A832 List:
References
NUDOCS 9704010335
Download: ML17333A833 (15)


Text

3/4 LIMTINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.7 PLANT SYSTEMS SURVEILLANCE RE UIREMENTS Continued 4.7.1.2

,;. t s st<<'t: t'.s.'y a.

b.

~

/t v)verifying that each motor driven auxiliary fecdwater pump's developed head at the test flow point is greater than or equal to the requi~ed developed head.

kclkcl pv Svgt.~t' S p.<gp cc+~ f.G S 6/

vVerifying that the turbine driven auxiliary feedwater pump's developed head at the test flow point is greater than or equal to the required developed head when the secondary steam supply pressure is greater than 310 psig. The provisions of Specification 4.0.4 are not applicable for entry into MODE 3.

c. $)

e lm> orttA.'pI iVerifying"that each non-automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in its correct position.

V Wt (+C.)t'n% P.V 9 ( d-d'< until at lease one spent fuel storage pool exhaust ventilation syscem is rescored to OPERABLE status' b: The provisions of Specificati'ons 3.0.3 and 3.0.4 are noc applicable.

V 'C 4.9.12 The above required fuel storage pool ventilaci.on system shall be demonstrated OPERABLE:

a. At lease once per 31 days by initi.ating flow through the HEPA filter and charcoal adsorber train and verifying thac the train operates for at least 15 minuces.
b. Ac leas o..ce per 18 months or (1) afcer any structural maincenance on the HEPA filter or charcoal adsorber housings, or (2) following painting, fire or chemical release in any vencilacion zone communicating wich the system, by:
1. Deleted.
2. Verifying that the charcoal adsorbers remove > 99% of a halogenated hydrocarbon refrigerant test gas when they are tested i.n-place in accordance wich ANSI N510-1980 while operating the exhausc ventilation syscem at a flow rate of 30,000 cfm + 10i.
  • The crane bay roll-up door and the drumming room roll-up door may be opened under administrative control during movement of fuel within che storage pool or crane operation with loads over the storage pool.

D. C. COOK - UNIT 1 3/4 9-1'3 Amendment No 124

REACTOR COOLANT SYSTEM SPECIFIC ACTIVITY LIMITING CONDITION FOR OPERATION 3.4.8 The specific activity of the primary coolant shall be limited to:

a. Less than or equal to 1 microCurie per gram DOSE EQUIVALENT I-131, and
b. Less than or equal to 100/E microCuries per gram of gross radioactivity.

APPLICABILITY: MODES 1, 2, 3, 4 and 5 ACTION:

MODES 1, 2 and 3*

With the specific activity of the reactor coolant greater than 1 microCurie per gram DOSE EQUIVALENT~I-131 for more than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> during one continuous time interval +or exceeding the limit line 0 shown on Figure 3.4-1, be in HOT STANDBY with T less than 500 F within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

b. With the specific activity of the reactor coolant greater than 100(E microCuri,es per gram, be in H01 STANDBY with Tavg less than 500 F within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

NODES 1, 2, 3, 4 and 5 a 0 With the specific activity of the reactor coolant greater than 1 microCurie per gram DOSE EQUIVALENT 1-1.31 or greater than 100/E microCuries per gram, perform the sampling and analysis requirements of item 4a of Table 4.4-4 until the specific activity of the reactor coolant is restored to within its limits.

SURVEILLANCE RE UIREMENTS 4.4.8 The specific activity of the reactor coolant shall be determined to be within the limits by performance of the sampling and analysis program of Table 4.4-4.

  • With T greater than or equal to 500 F.

avg COOK NUCLEAR PLANT - UNIT 2 3/4 4-20 Amendment No. 129

v~

,Cr

3/4 LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.7 PLANT SYSTEMS SURVEILLANCE RE UIREMENTS 4.7.1.2 Each auxiliary feedwater pump shall be demonstrated O Sp ~ 6<..4~ ~.>.S OPERABLE,'.p>iZ~'.-s-~<

~y flow a.

~ verifying that each motor driven auxiliary feed pump's developed head at the test 5 ~ <

tttstr d'-"

.o,<

b.

point is greater than or equal to the required developed head.

verifying that thc turbine driven auxiliary feedwater pump's developed head at the test 1

flow point is greater than or equal to the required developed head when the secondary steam supply pressure is greater than 3 10 psig. The provisions of Specification 4.0.4 are not applicable for entry into MODE 3.

~3 1Z~S,A ovine P~v- 31 d y~

c. Perifyingfthat each non-automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in its correct position.

ldaii n>>dd id~ 3t s "'y'g

d. Verifyinglthat each automatic valve in the flow path is in the fully open position whenever the auxiliary feedwater system is placed in automatic control or when above 10% RATED THERMAL POWER. This requirement is not applicable for those portions of the auxiliary feedwater system being used intermittently to maintain steam generator level.

h/

e. 6/ drest fying at least once per ig months during shutdown that each automatic valve in the flow path actuates to its correct position upon receipt of the appropriate engineered safety features actuation test signal required by Specification 3/4.3.2.

V

f. ty/ Verifying at icast once per id months during shuteown that each auxiliary fccdwater pump starts as designed automatically upon receipt of thc appropriate engineered safety features actuation test signal required by Specification 3/4.3.2.

Verifying at least once per 18 months during shutdown that the unit cross-tic valves can g.

g cycle full travel. Following cycling, the valves will be verified to be in their closed positions.

COOK NUCLEAR PLANT-UNIT 2 Page 3/4 7-6 AME<NDMENTVV, K, 446, 434, 449, 468, 489, 188

~ e i qG 0 G 0 V 0 S **

MG C 0 0 3.9.12 The spent fuel storage pool exhaust ventilation system shall be OPERABLE.

P CAB Whenever irradiated fuel is in the storage pool.

~T~O'4:

With no fuel storage pool exhaust ventilation system OPERABLE, suspend all operations involving movement of fuel withingthe storage pool or crane operation with loads over the storage pool> until at least one spent fuel storage pool exhaust ventilation system is restored to OPERABLE status.*

The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.

SURV I 9C RE U NTS 4.9.12 The above required Euel storage pool ventilation system shall be demonstrated OPERABLE:

a. At least once per 31 days by initiating flow through the HEPA filter and charcoal adsorber train and verifying th'at the train operates for at least 15 minutes.
b. At least once per 18 months or (1) after any structural maintenance on the HEPA filter or charcoal adsorber housings, or (2) following painting, fire or chemical release in any ventilation zone communicating with the system, by:
1. Deleted.
2. Verifying that the charcoal adsorbers remove > 99% of a halogenated hydrocarbon refrigerant test gas when they are tested in-place in accordance with ANSI N510-1980 while operating the exhaust ventilation system at a flow rate of 30,000 cfm + 10%.
  • The crane bay roll-up door and the drumming room roll-up door may be opened under administrative control during movement of fuel within the storage pool or crane. operation with loads over the storage pool.

Shared system with D. C. COOK - UNIT l.

sSigegcgaAo.ggsnhgkg's. map 1cfyA)illak Pest no( bs QLsMiQd QlgatL 1

D. C. COOK - UNIT 2 3/4 9-12 Amendment No.

ATTACHMENT 3 TO AEP:NRC:0433P PROPOSED TECHNICAL SPECIFICATION PAGES

)

'P

~

3/4 LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.7 PLAbPI'YSTEMS SURVEILLANCE RE UIREMENTS ~Continned 4.7.1.2 Each auxiliary feedwater pump shall be demonstrated OPERABLE:

When tested pursuant to Specification 4.0.5 by verifying that each motor driven auxiliary feedwater pump's developed head at the test flow point is greater than or equal to the required developed head.

When tested pursuant to Specification 4.0.5 by verifying that the turbine driven auxiliary feedwater pump's developed head at the test flow point is greater than or equal to the required developed head when the secondary steam supply pressure is greater than 310 psig. The provisions of Specification 4.0.4 are not applicable for entry into MODE 3.

By verifying at least once per 31 days that each non-automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in its correct position.

By verifying at least once pcr 31 days that each automatic valve in the flow path is in the fully open position whenever the auxiliary feedwater system is placed in automatic control or when above 10% RATED THERMAL POWER. This requirement is not applicable for those portions of the auxiliary feedwatcr system being used intermittently to maintain steam generator water level.

By verifying at least once per 18 months during shutdown that each automatic valve in the flow path actuates to its correct position upon receipt of the appropriate engineered safety features actuation test signal required by Specification 3/4.3.2.

By verifying at least once per 18 months during shutdown that each auxiliary feedwater pump starts as designed automatically upon receipt of the appropriate engineered safety features actuation test signal required by Specification 3/4.3.2.

By verifying at least once per 18 months during shutdown that the unit cross-tie valves can cycle full travel. Following cycling, the valves will be verified to bc in their closed positions.

COOK NUCLEAR PLANT-UNIT I Page 3/4 7-6 AMENDMENT400) 434, 444, 444, QN,

~ ~

3/4 LIMITINGCONDITIONS FOR OPERATIQN AND SURVEILLANCE REQUIREMENTS 3/4.9 REFUELING OPERATIONS STORAGE POOL VENTILATIONSYSTEM*4 LIMITINGCONDITION FOR OPERATION 3.9.12 The spent fuel storage pool exhaust ventilation system shall be OPERABLE.

APPLICABILITY: Whenever irradiated fuel is in thc storage pool.

ACTION:

With no fuel storage pool exhaust ventilation system OPERABLE, suspend all operations involving movemcnt of fuel within the storage pool or crane operation with loads over the storage pool until at least one spent fuel storage pool exhaust ventilation system is restored to OPERABLE status.*

b. The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.

SURVEILLANCE RE UIREMENTS 4.9.12 The above rcquircd fuel storage pool ventilation system shall bc demonstrated OPERABLE:

At least once per 31 days by initiating flow through the HEPA filter and charcoal adsorber train agd verifying that thc train operates for at least 15 minutes.

At least once pcr 18 months or (I) after any structural maintenance on the HEPA filter or charcoal adsorbcr housings, or (2) following painting, fire or chemical rclcasc in any ventilation zone communicating with thc system, by:

Dclctcd.

Verifying that thc charcoal adsorbers rcmove 2 99% of a halogenated hydrocarbon rcfrigcrant test gas when they arc tested in-place in accordance with ANSI N510-1980 while operating the exhaust ventilation system at a flow rate of 30,000 cfm J 10%.

Thc crane bay roll-up door and the drumming room roll-up door may be opened under administrative control during movement of fuel within the storage pool or crane operation with loads over the storage pool.

Shared system with Cook Nuclear Plant - Unit 2.

COOK NUCLEAR PLANT-UNIT 1 Page 3/4 9-13 AMENDMENT434,

3/4 LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.4 REACTOR COOLANT SYSTEM SPECIFIC ACTIVITY LIMITINGCONDITION FOR OPERATION 3.4.8 The specific activity of the primary coolant shall be limited to:

a... Less than or equal to I microCurie per gram DOSE EQUIVALENTI-131, and

b. Less than or equal to 100/E microCuries per gram of gross radioactivity.

APPLICABILITY: MODES I, 2, 3, 4 and 5 ACTION:

MODES I, 2 and 3 With the specific activity of the <eactor coolant greater than I microCurie pcr gram DOSE EQUIVALENT1-131 for morc than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> during one continuous time interval, or cxcecding the limit line shown on Figurc 3.4-1, be in HOT STANDBY with Tayg less than 500'F within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

b, With the specific activity of thc reactor coolant greater than 100/E microCuries per gram, be in HOT STANDBY with Tayg less than 500'F within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

MODES 1, 2, 3, 4 and 5 With thc specific activity of the reactor coolant greater than I microCurie per gram DOSE EQUIVALENT 1-131 or greater than 100/E microCuries per gram, perform the sampling and analysis rcquircments of item 4a of Table 4.4-4 until the specific activity of thc reactor coolant is restored to within its limits.

SURVEILLANCE RE UIREMENTS 4.4.8 The specific activity of the reactor coolant shall bc dctcrmincd to be within the limits by performance of thc sampling and analysis program of Table 4.4-4.

Wltll Tayg greater than or equal to 500'F.

COOK NUCLEAR PLANT-UNIT2 Page 3/4 4-20 AMENDMENT ~,

3/4 LIMITINGCONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.7 PLANT SYSTEMS SURVEILLANCE RE UIREMENTS 4.7.1.2 Each auxiliary feedwater pump shall be demonstrated OPERABLE:

a. When tested pursuant to Specification 4.0.5 by verifying that each motor driven auxiliary feed pump's developed head at the test flow point is greater than or equal to thc required developed head.
b. When tested pursuant to Specification 4.0.5 by verifying that thc turbine driven auxiliary feedwater pump's developed head at the test fiow point is greater than or equal to the required developed head when the secondary steam supply prcssure is greater than 310 psig. Thc provisions of Specification 4.0.4 are not applicable for entry into MODE 3.

C. By verifying at least once per 31 days that each non-automatic valve in the flow path that is not locked, sealed, or otherwise secured in position is in its correct position.

By verifying at least once per 31 days that each automatic valve in the flow path is in the fullyopen position whenever the auxiliary feedwater system is placed in automatic control or when above 10% RATED THERMAL POWER. This requirement is not applicable for those portions of the auxiliary feedwater system being used intermittently to maintain steam generator level.

By verifying at least once per 18 months during shutdown that each automatic valve in the flow path actuates to its correct position upon receipt of the appropriate engineered safety features actuation test signal required by Specification 3/4.3.2.

By verifying at least once per 18 months during shutdown that each auxiliary fccdwater pump starts as designed automatically upon receipt of the appropriate engineered safety features actuation test signal required by Specification 3/4.3.2.

g By verifying at least once per 18 months during shutdown that the unit cross-tic valves can cycle full travel. Following cycling, the valves will be verified to be in their closed positions.

COOK NUCLEAR PLANT-UNIT2 Page 3/4 7-6 AMENDMENT7-7., %, 446, 484, 449, 488, 4$ 9, 488,

3/4 LIMITINGCONDITIONS I'OR OPERATION AND SURVEILLANCE REQUIREMENTS 3/4.9 REFUELING OPERATIONS STORAGE POOL VENTILATIONSYSTEM" LIMITINGCONDITION FOR OPERATION 3.9.12 The spent fuel storage pool exhaust ventilation system shall be OPERABLE.

APPLICABILITY: Whenever irradiated fuel is in the storage pool.

ACTION:

a. With no fuel storage pool exhaust ventilation system OPERABLE, suspend all operations involving movement of fuel within the storage pool or crane operation with loads over thc storage pool until at least one spent fuel storage pool exhaust ventilation system is restored to OPERABLE status.
b. The provisions of Specifications 3.0:3 and 3.0.4 are not applicable.

SURVEILLANCE RE UlREMENTS 4.9.12 The above rcquircd fuel storage pool ventilation systcrn shall bc dcmonstratcd OPERABLE:

At least once pcr 31 days by initiating flow through thc HEPA filter and charcoal adsorber train aod verifying that the train operates for at least 15 minutes.

At least once per 18 months or (I) after any structural maintenance on the HEPA filter or charcoal adsorber housings, or (2) following painting, fire or chemical release in any ventilation zone communicating with the system, by:

1. Dcletcd.

Verifying that the charcoal adsorbers remove > 99% of a halogenated hydrocarbon refrigerant test gas when they are tested in-place in accordance with ANSI N510-1980 while operating the exhaust ventilation system at a flow rate of 30,000 cfm + 10%.

The crane bay roll-up door and the drumming room roll-up door may be opened under administrative control during movement of fuel within the storage pool or crane operation with loads over the storage pool.

Shared system with D. C. Cook - Unit I.

COOK NUCLEAR PLANT-UNIT2 Page 3/4 9-12 AMENDMENT444,