Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML17335A55812 October 1999Proposed Tech Specs Surveilllance Requirement 4.6.2.2.d for Spray Additive Sys to Relocate Details Associated with Acceptance Criteria & Test Parameters to Associated TS Bases
ML17335A56111 October 1999Proposed Tech Specs Pages,Correcting TS Pages Inadvertently Submitted in 990923 Submittal
ML17335A5431 October 1999Proposed Tech Specs Re Containment Recirculation Sump Water InventoryBoric Acid
Shutdown Margin
ML17326A15923 September 1999Proposed Tech Specs Re Movement of SG Sections in Auxiliary Bldg for SG Replacement ProjectSafe Shutdown
Safe Shutdown Earthquake
Control of Heavy Loads
ML17326A14617 September 1999Proposed Tech Specs Pages for Credit of Rod Cluster Control Assemblies for Cold Leg LBLOCA Subcriticality
ML17326A11810 September 1999Proposed Tech Specs Pages,Revising TS Surveillance Requirement 4.4.7,TS Tables 4.4-3,3.4-1 & TS Surveillance Requirement 4.11.2.2 Re RCS & Gas Storage Tank Sampling
ML17326A09417 August 1999Proposed Tech Specs,Removing voltage-based Repair Criteria, F* Repair Criteria & Sleeving Methodologies from Unit 1 TS & Clarifying Bases SectionOperating Basis Earthquake
Earthquake
Pressure Boundary Leakage
Power change
ML17326A14728 May 1999Non-proprietary Version of Control Rod Insertion Following Cold Leg LBLOCA at DC Cook,Units 1 & 2.Safe Shutdown Earthquake
Design basis earthquake
ML17325B60621 May 1999Proposed Tech Specs Revising Limitations on Positive Reactivity AdditionsSafe Shutdown
Boric Acid
Shutdown Margin
Fuel cladding
Hourly Fire Watch
ML17325B5897 May 1999Rev 5 to PMP 7200.RST.004, Expanded Sys Readiness Review Program.Safe Shutdown
Boric Acid
Packing leak
Mission time
Fire Barrier
Coatings
Temporary Modification
Emergency Lighting
Maintenance Rule Program
Scaffolding
ML17325B5907 May 1999Rev 1 to PMP 7200.RST.006, Expanded Sys Readiness Review Program for Level 2 Sys.Safe Shutdown
Boric Acid
Packing leak
Coatings
Temporary Modification
Maintenance Rule Program
Scaffolding
ML17325B55519 April 1999Proposed Tech Specs 3/4.8.1.2, Electrical Power Systems & Associated Bases,Providing one-time Extension of 18-month Surveillance Interval for Specific SRsSafe Shutdown
Emergency Lighting
Battery sizing
Fuel cladding
ML17325B4673 March 1999Rev 5 to Cook Nuclear Plant Restart Plan.
ML17335A3583 December 1998Proposed Tech Specs 4.6.5.1, Ice Condenser,Ice Bed & Associated Bases,Reflecting Max Ice Condenser Flow Channel Blockage Assumed in Accident Analyses
ML17335A3683 December 1998Proposed Tech Specs,Adding New TS Re Distributed Ignition SysFuel cladding
ML17335A3653 December 1998Proposed Tech Specs 3/4.7.7, Sealed Source Contamination & Associated Bases Addressing Revised Testing Requirements for Fission Detectors
ML17335A3623 December 1998Proposed Tech Specs Removing Obsolete Info to Provide Consistency Between Units 1 & 2 to Provide Consistency with Std Tech Specs,To Provide Clarification & to Correct TyposBoric Acid
Grab sample
ML17325B4432 November 1998Rev 4 to Cook Nuclear Plant Restart Plan. with 981216 Ltr
ML17335A4072 November 1998Rev 4 to Cook Nuclear Plant Restart Plan.Temporary Modification
ML17335A2788 October 1998Proposed Tech Specs Sections 3.3.3.8 & 3.3.3.6,placing Tighter Restrictions on Amount of Time RWST Water Level Instrumentation Can Be Out of Svc Before Compensatory Actions Are Required
ML17335A2698 October 1998Proposed Tech Specs 3.4.1.3 Re Reactor Coolant Loop Requirements in Modes 4 & 5
ML17335A2658 October 1998Proposed Tech Specs Changing Containment Sys TS Bases 3/4.6.1.4, Internal Pressure & 3/4.6.1.5, Air Temp.
ML17335A23414 September 1998Proposed Tech Specs Page 3/4 5-6,revising Runout Limits for SI Pump to 675 Gpm Unless Pump Is Specifically Tested to Higher Flow Rate Not Exceeding 700 Gpm
ML17335A23012 September 1998Rev 3 to Cook Nuclear Plant Restart Plan.
ML17335A2724 September 1998Rev 0 to PL-CNSI-98-007, Transportation & Emergency Response Plan for DC Cook Unit 2 SG Project.Exemption Request
ML17335A2752 September 1998Rev 1 to ER-98-012, Evaluation of Dose Rate from U-Tube End of DC Cook SG Lower Assembly.Exemption Request
ML17335A19328 August 1998Proposed Tech Specs Requesting Extension of SG Surveillance TS 4.4.5.3,which TSs Require to Be Performed on 990408,until End of Current Fuel Cycle Currently Scheduled for Mar 2000Earthquake
ML17335A27321 August 1998Rev 0 to ST-307, Structural Evaluation of DC Cook Unit 2 Sgla Package.Exemption Request
ML17334A7306 May 1998Rev 2 of Cook Nuclear Plant Restart Plan.
ML17325B5277 April 1998Rev 1 to Cook Nuclear Plant Restart Plan.
ML17334B8043 April 1998Rev 1 to Valve IST Program for DCP Third 10-Yr Interval.Boric Acid
Stroke time
Cold shutdown justification
Power Operated Valves
ML17325B5267 March 1998Rev 0 to Cook Nuclear Plant Restart Plan.
ML17334B7033 March 1998Proposed Tech Specs Pages,Removing Word Immediately from Unit 1 Hydrogen Recombiner Surveillance Requirement 4.6.4.2.b.4 & Revising Unit 1 & 2 TS 3/4.6.4 Bases
ML20212A70521 October 1997Proposed Tech Specs 3/4.6.5 Re Ice Weight & Surveillance Requirement
ML17333B0758 October 1997Proposed Tech Specs 3/4.6.5 & 3/4.5.5 Re Ice Weight & SR
ML17333B04519 September 1997Proposed Tech Specs,Deleting Requirement for Automatic Valve Closure Feature on RHR Sys Suction from RCS
ML17333A98911 August 1997Proposed Tech Specs,Reflecting Changes for Moderator Temp Coefficient Measurement in Response to RAIShutdown Margin
ML17333A98511 August 1997Proposed Tech Specs,Allowing Filling of ECCS Accumulators W/O Declaring ECCS Equipment Inoperable
ML17335A2121 August 1997Proposed Tech Specs 4.7.1.2.g Deleting Wording When Secondary Steam Supply Pressure Is Greater than 310 Psig.
ML17333A83026 March 1997Proposed Tech Specs Modifying TS 4.7.5.1.e.2 Which Describes Control Room Ventilation Sys Autostart Functions
ML17333A83326 March 1997Proposed Tech Specs Involving Grammatical Correction to Wording of Unit 2 TS 3.4.8,Action a for Modes 1,2 & 3 & Returning Frequency Requirement to TS 4.7.1.2.c & 4.7.1.2.d That Was Inadvertently Deleted in Prior Amend
ML17333A82626 March 1997Proposed Tech Specs Removing Administrative Controls Related to Quality Assurance Requirements IAW Guidance of Administrative Ltr 95-06Offsite Dose Calculation Manual
Process Control Program
ML20135C37824 February 1997Revised Proposed Tech Specs Page Re 3/4, Limiting Condition for Operation & Surveillance Requirements
ML17333A71620 December 1996Proposed Tech Specs Change to Allow for Repair of Hybrid Sleeved SG Tubes in Response to RAIOperating Basis Earthquake
Nondestructive Examination
Earthquake
ML17333A71520 December 1996Proposed Tech Specs 3/4.4.10 Re Reactor Coolant Sys
ML17333A51622 July 1996Proposed Tech Specs,Informing Operations Superintendent Will Have to Hold SRO License,Have Held Senior Operator License or Been Certified to Have Senior Operator KnowledgeSafe Shutdown
ML17334B59511 July 1996Proposed Tech Specs,Supporting Operation of Facility at Increased Core Rated Thermal Power of 3,588 MwtBoric Acid
Shutdown Margin
Hydrostatic
Fuel cladding
ML17333A47719 June 1996Proposed Tech Specs Re Voltage Based Repair Criteria for Repair of Westinghouse SG Tubes Affected by Outside Diameter Stress Corrosion Cracking,Per GL 95-05Operating Basis Earthquake
Nondestructive Examination
Pressure Boundary Leakage
ML17333A48411 June 1996ISI & Testing.
ML17333A46511 June 1996Proposed Tech Specs Re Administrative Controls Related to QAShutdown Margin
High Radiation Area
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program