JUN'. -26'6(%ED) 12:08 COOK PLANT MAINT. TEL:6164662621 P. 001 Post-i6 Fax Note 7671 Oal~f p" P 3, FcQfll

+/+ Py+~~

PhOAS I PMP 1040.SES.001 FIX I uclear Plant Safety Evaluation Screening Checklist SCREENING APPLICABLETQ (Document Number, Rev. & CSP)

Tl~: i n T tin

1.0 DESCRIPTION

OF CHANGE Summary of proposed change:

Reason for proposed change: Re ired b 10CFFl .55a.

2.0 SAFETY EVALUATIONAPPUCABILITYDETERMINATION Using a continuation page or pages, the screener must include a justification for each item marked No". Documents that were used as references must be listed, Including the specific sections.

The screener must likewfse provide a reason for each item marked "Yes". A statement shall be made as to why a specific section of an affected document vril need to be changed.

DOES THE PROCEDURE OR MODIFICATIONTO WHICH TH)S SCREENING IS APPLICABLE REPRESENT:

NOTE: Refer to the procedure text as needed for full explanation of each question.

Please circle the appropriate answer to each of the following questions:

2.1 NO A change to the plant as described In the FSAR, Emergency Plan or Security Plan?

SeePa e3.

2.2 YES 0 A change to procedures as described in the FSAR, Emergency Plan or Security Plan?

See Pa e3.

2.3 YES NO A test or experiment not described In the FSAR?

SeePa e3.

PMP 1040.SES.001 Attachment 1 Revision 1 Page1 of 3 9607020i8i 960M7 PDR ADOCK 050003i5i 9 . PDR

TEL:6164662621 P. 002 PMP 1040.SES.001 2.4 YES 0 A change to procedures, design, or a test or experiment which could affect the environment, or a change to Appendix B of the Technical Specifications (Environmental Protection Plan)?

SeePa e3.

25 S NO A change to the Technical Specifications or the Operating License?

SeePa e3.

2.6 YES (1~$ 7 isa Safety Evaluation requested heoause there h douhtas to whether this change affects the FSAFI, the Emergency Plan or the Security Plan (MASP)?

'rovkle reason.

See P e3.

3.0 Ifthe answer to ALLof the above questions is "NO", neither a Safety Evaluation or an Environmental Evaluation Is required, 4.0 Ifthe answer to any of the Questions 2.1, 2.2, 2.3, 2.5 OR 2.6 is "YES" or ifthe document ls a Design Change, a Safety Evaluation MUST be performed.

4.1 ES NO Is a Safety Evaluation required?

5.0 lfthe answer to Question 2.4 is "YES". then an Environmental Evaluation must be performed.

5.1 YES 0 Is an Environmental Evaluation required?

Screening performed by:

Print Name fgn Name Plant En . 06 11 96 Department / Date / Quallflcatlon Date Review performed by: K~RWrnt t"ttsnl Print Name Sign Nam c ~)90 Department / ate / QualiTication Date PMP 1040.SES.001 Attachment 1 Revision 1 Page 2 of 3'

'JUN.'-26'6(WED) 12:09 COOK PLANT MAINT. TEL:6164662621 P. 003 PMP 1040.SES.001 SAFETY EYALUATIONSCREENING CONTINUATIONPAGE Document

Title:

PMI-5070 Rev. 12 2.1 - Per10CFR50$ 5a, the third Intetval update to the IST Program requires Insetvlce testing be performed to ASME OM Standards and not ASME Sectton XI as referenced ln UFSAR 5.4.4.6.2.5. 9.35, 9.4.4, 9.5.6.

R2- UFSAR 4 51.1, 4512,544, 825, 944 944,996 and QAPD 1.7125, 1.722, 1.710 were reviewed for procedures that would be changed and none were noted. There is no reference to the ISI Program in the Emergency Plan and Sectlity Plan per my discussion with Jeff Smith and Lany Smead and to the best of my knowledge.

2.3-The ISI/IST Program Is described UFSAR - see 22 references.

2.4- There Is no environmental Impact resulting from the change of the instruction and the ISI Program is not referenced in the EP Plan per discussion with Rocky Seem and to the best of my knowledge.

2.5 - Tech. Spec. 4.0$ must be changed to reflect the new regulatory requirements on the IST Program as stated in 2.1 ~

2.6- There is no doubt that the Third Interval IST Program update affects the UFSAFL PMP 1040.SES.001 Attachment 1 Revision 1 Page 3 of 3

~q