ML17271A066: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 1: Line 1:
#REDIRECT [[IR 05000334/2018403]]
{{Adams
| number = ML17271A066
| issue date = 09/28/2017
| title = Information Request for the Cyber Security Baseline Inspection Notification to Perform Inspection 05000334/2018403 and 05000412/2018403
| author name = Dentel G T
| author affiliation = NRC/RGN-I/DRS/EB2
| addressee name = Bologna R D
| addressee affiliation = FirstEnergy Nuclear Operating Co
| docket = 05000334, 05000412
| license number = DPR-066, NPF-073
| contact person = Werkheiser D L
| document report number = IR 2017403
| document type = Inspection Plan, Letter
| page count = 8
}}
See also: [[followed by::IR 05000334/2018403]]
 
=Text=
{{#Wiki_filter:UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION I 2100 RENAISSANCE BLVD., Suite 100
KING OF PRUSSIA, PA  19406
-2713  September 28, 2017
  Mr. Richard Bologna
Site Vice President
First Energy Nuclear Operating Company
Beaver Valley Power Station
P. O. Box 4
Shippingport, PA  15077
-0004  SUBJECT:  BEAVER VALLEY POWER STATION UNITS 1 AND 2
- INFORMATION
REQUEST FOR THE "CYBER
-SECURITY" BASELINE INSPECTION NOTIFICATION TO
PERFORM INSPECTION
05000334/2018403 AND 05000412/2018403
  Dear Mr. Bologna
:  On January 29, 2018, the U.S. Nuclear Regulatory Commission (NRC) will begin
a baseline inspection in accordance with Inspection Procedure (IP)
71130.10 "Cyber
-Security ," issued May 15, 2017 at the Beaver Valley Power Station, Units 1 and 2.
  Th e inspection will be performed to evaluate and verify your ability to meet full implementation
requirements of the
NRC's Cyber
-Security Rule, Title
10, Code of Federal Regulations
(CFR), Part
73, Section
54, "Protection of Digital Computer and Communication Systems and Networks."
  The onsite portion of the inspection will take place during the weeks of
January 29
-February 2, 2018
, and February 12-16, 2018.  Experience has shown that baseline inspections are extremely resource intensive, both for the NRC inspectors and the licensee staff.  In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspection.  These documents have b
een divided into four groups. 
The first group specifies information necessary to assist the inspection team in choosing the focus areas (i.e., "sample set"
) to be inspected by
the cyber-security Inspection
Procedure.  This information should be made available via compact disc and delivered to the regional office no later than October 31, 2017.  The inspection team will review this information and, by November 17, 2017, will request the specific items that should be provided for review
The second group of additional requested documents will assist the inspection team in the evaluation of the critical systems and critical digital assets (CSs/CDAs), defensive architecture, and the areas of your station's
Cyber-Security Program selected for the cyber
-security inspection.  This information will be requested for review in the regional office prior to the inspection by December 11, 2017.  The third grou
p of requested documents consists of those items that the inspection team will review, or need access to, during the inspection.
  Please have this information available by the first day of the onsite inspection, January 29, 2018. 
R. Bologna
2  The four th group of information is necessary to aid the inspection team in tracking issues identified as a result of the inspection.  It is requested that this information be provided to the
lead inspector as the information is generated during the inspection.  It is important that all of these documents are up to date and complete in order to minimize the number of additional
documents requested during the preparation and/or the onsite portions of the inspection.
   
The lead inspector for this inspection is Mr. David Werkheiser.  We understand that our regulatory contact for this inspection is Mr. David Wacker
of your organization.  If there are any questions about the inspection or the material requested, please contact the lead inspector at
 
610-337-5316 or via e-mail at David.Werkheiser@nrc.gov
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995
(44 U.S.C. 3501 et seq.).  Existing information collection requirements were approved by the Office of Management and Budget, control number
3150-0011.  The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
  This letter and its enclosure will be available
for public inspection and copying at http://www.nrc.gov/readi
ng-rm/adams.html
and at the NRC
's Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."
  Sincerely, 
/RA/  Glenn T. Dentel , Chief  Engineering Branch
2 Division of Reactor Safety
  Docket Nos.
50-334 and 50-412 License Nos.
DPR-66 and NPF
-73  Enclosure: Beaver Valley Power Station, Units 1 and 2
  Cyber-Security Inspection Document Request
 
cc w/encl:
  Distribution via ListServ 
 
 
    ML17271A066
  SUNSI Review
  Non-Sensitive  Sensitive  Publicly Available
  Non-Publicly Available
  OFFICE RI DRS RI DRS    NAME DWerkheiser/
DW GDentel/GD    DATE 09/28/17 09/28/17   
BEAVER VALLEY POWER STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST
1  Enclosure  Inspection Report
:  05000 334/2018 4 0 3 and 05000 412/2018 4 0 3  Inspection Dates
:  January 29
- February 2, 2018
and February 12
- 16, 2018  Inspection Procedure
: IP 71130.10 , "Cyber-Security ," issue date May 15, 2017
  Reference:  Guidance Document for Development of the Request for
    Information
(RFI) and Notification Letter for Full
-Implementation
of the Cyber - Security Inspection
, issue date May 25, 2017
  NRC Inspectors
:  David Werkheiser, Lead
  Jeff Rady    (610) 337-5316  (610) 337-5380    David.Werkheiser@nrc.gov
  Jeff.Rady@nrc.gov
  NRC Contractors
:  John Walley
    Frederick Priester
    (301) 287-3717  (301) 230-4590    John.Walley@nrc.gov
  Frederick.Priester@nrc.gov
  I. Information Requested for In
-Office Preparation
  The initial request for information (i.e., first RFI) concentrates on providing the inspection team with the general information necessary to select appropriate components and Cyber-Security Program (CSP) elements to develop a site
-specific inspection plan.
  The first RFI is used to identify the list of critical systems and critical digital assets (CSs/CDAs) plus operational and management (O&M) security control portions of the CSP to be chosen as the "sample set" required to be inspected
by the cyber-security IP.
  The first RFI
's requested information is specified below in Table RFI #1.  The Table RFI #1 information is requested to be provided to the regional office
by October 31 , 2017, or sooner, to facilitate the selection of the specific items that
will be reviewed during the onsite inspection weeks
.  The inspection team
will examin e the returned documentation from the first RFI
and identify/select specific systems and equipment
(e.g., CSs/CDAs) to provide a more focused follow
-up request to develop the second RFI.  The inspection team will submit the specific systems and equipment
list to your staff by November 17, 2017, which will identify the specific systems and equipment tha
t will be utilized to evaluate the CSs/CDAs, defensive architecture, and the areas of the licensee's CSP selected for the cyber
-security inspection.  We request that the additional information provided from the second RFI be made available to the regional office prior to the inspection by December 11 , 2017.  All requests for information shall follow the Table RFI #1 and the guidance document referenced above.
  The required Table
RFI #1 information shall be provided on compact disc (CD) to the lead inspector by October 31, 2017.  Please provide four copies of each CD submitted (i.e., one for each inspector/contactor).  The preferred file format for all lists is a searchable Excel spreadsheet file on a CD.  These CDs should be indexed and hyper
-linked to facilitate ease of use.  If you have any questions regarding this information, please call the inspection team leader as soon as possible.
BEAVER VALLEY POWER STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST
2  Table RFI #1
Reference Section 3              Paragraph Number / Title:                                   
                       
Items  1. List all Identified Critical Systems and Critical Digital Assets
All 2. List CDA Facility and Site Ethernet
- Transmission
Control Protocol / Internet
Protocol (TCP/
IP) Based Local Area Networks (LANs) and identify those LANs that have Non-CDAs on t hem All 3. List CDA Facility and Site Non
-Ethernet TCP / IP Based LANs including those Industrial Networks and Identify LANs that have Non
-CDAs on them All 4. Network Topology Diagrams (Be sure to include all Network Intrusion Detection Systems (NIDS) and Security Information and Event Management (SIEMS)
for Emergency Preparedness (EP) Networks and Security Level 3 and 4 Networks)
All 8. List all Network Security Boundary Devi
c es for EP Networks and all Network Security Boundary Devices for Levels 3 and 4
All 9. List CDA Wireless Industrial Networks
All 11. NIDS Documentation for Critical Systems that have CDAs associated with t
hem 11.a.1) 11.a.2) 12. SIEM Documentation for Critical Systems that have CDAs
associated with t
hem 12.a.1) 12.a.2)  14. List EP and Security Onsite and Offsite Digital Communication Systems
All  25. Cyber-Security Assessment and Cyber-Security Incident Response Teams
All  In addition to the above information please provide the following:
  1. Electronic copy of your current Cyber Security Plan.
2. Electronic copy of summary of changes (if any), including any 10 CFR 50.54p analysis to support those changes, made to the originally approved Cyber Security Plan. 3. Electronic copy of a matrix that summarizes what controls are in place to satisfy the controls required by Policies and Procedures.
4. Electronic copy of the Updated Final Safety Analysis Report and technical specifications.
5. Name(s) and phone numbers for the regulatory and technical contacts.
6. Current management and engineering organizational chart
s.  Based on th is information, the inspection team will identify and select specific systems and equipment (e.g., CSs/CDAs) from the information requested by Table RF I #1 and submit
a list of specific systems and equipment
to your staff by November 17, 2017, for the second RFI
(i.e., Table RFI #2).  II. Additional Information Requested to be Available Prior to Inspection
  As stated above, in Sectio n I of this enclosure , th e inspection team
will examin e the returned documentation requested from Table RFI #1 and submit the list of specific systems and equipment to your staff by November 17, 2017
, for the second RFI (i.e., RFI #2).    The second RFI will request additional
information required to evaluate the CSs
/CDAs, defensive architecture, and the areas of your station's
CSP selected for the cyber
-security inspection.  The additional information requested for the specific systems and equipment
is identified in Table
RFI #2.  All requested information shall follow the Table RFI #2 and the guidance document referenced above.
 
BEAVER VALLEY POWER STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST
3  The Table RFI #2 information shall be provided on CD to the lead inspector by December 11, 2017.  Please provide four copies of each CD submitted (i.e., one for each inspector/contactor).  The preferred file format for all lists is a searchable Excel spreadsheet file
on a CD.  These CDs should be indexed and hyper
-linked to facilitate
ease of use.  If you have any questions regarding this information, please call the inspection team leader as soon as possible.  Table RFI #2
Section 3                  Paragraph Number
/ Title:                                                                        Items  5. Plant Computer System Block Diagram (If Plant Computer System is
selected for Inspection)
All 6. Plant Security System Block Diagram (if Security Computer System is
selected for Inspection)
All 7. Systems that are Distributed Block Diagrams (For Systems selected for Inspection)
  All 10. Host-Based Intrusion Detection System Documentation (for CDAs for Systems
selected for Inspection)
10.a.1) 10.a.2) 13. List all Maintenance and Test Equipment used on CDAs for Systems Selected for Inspection
All 15. Configuration Management
  All 16. Supply Chain Management
16.a.) 16.b.1) 16.b.5) 16.b.6) 17. Portable Media and Mobile Device Control
  All 18. Software Management
  All 20. Vendor Access and Monitoring
  All 21. Work Control
  All 22. Device access and Key Control
  All 23. Password / Authenticator Policy
  All 24. User Account / Credential Policy
  All 26. Corrective Actions Since Last NRC Inspection
  All 
In addition to the above information please provide the following:
  The documented CSP assessment and analysis for each CDA in each of the selected system s. 
BEAVER VALLEY POWER STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST
4  III. Information Requested to be Available on First Day of Inspection
  For the specific systems and equipment identified in this enclosure's Section II., provide the following RFI (i.e., Table 1 ST Week Onsite
) on a CD by January 29, 2018 , the first day of the inspection
.  All requested information shall follow the
Table 1 ST Week Onsite and the
guidance document referenced above.
  Please provide four copies of each CD submitted (i.e., one for each inspector/contactor).  The preferred file format for all lists is a searchable Excel spreadsheet file on a
CD.  These CDs should be indexed and hyper
-linked to facilitate ease of use.  If you have any questions regarding this information, please call the inspection team leader as soon as possible.
  Table 1 ST Week Onsite
Section 3                Paragraph Number
/ Title: Items  10. Host-Based Intrusion Detection System Documentation for CDAs for Systems selected for inspection
  10.a.3)  thru 10.a.12) 11. NIDS Documentation for Critical Systems that have CDAs associated with them
  11.a.3)  thru 11.a.15) 12. SIEM Documentation for Critical Systems that have CDAs associated with them
  12.a.3)  thru 12.a.14) 16. Supply Chain Management
  16.b.2) 16.b.3) 16.b.4) 19. Cyber-Security Event Notifications
All  In addition to the above information please provide the following:
 
1. Copies of the
following documents do not need to be solely available to the inspection team as long as the inspectors have easy and unrestrained access to
them.  a. Original Final Safety Analysis Report Volumes; b. Original Safety Evaluation Report and Supplements;
c. Final Safety Analysis Report Question and Answers;
d. Quality Assurance (QA) Plan; e. Latest Individual Plant Examination for External Events / Probabilistic Risk Assessment Report; and f. Vendor Manuals
 
2. Assessment and Corrective Actions:
  a. The most recent Cyber-Security QA audit and/or self
-assessment; and
  b. Corrective action documents (e.g., condition reports, including status of corrective actions) generate
d as a result of the most recent Cyber-Security QA audit and/or self-assessment.
   
BEAVER VALLEY POWER STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST
5  I V. Information Requested To Be Provided Throughout the Inspection
  1. Copies of any corrective action documents generated as a result of the inspection team's questions or queries during th
e inspection.
  2. Copies of the list of questions submitted by the inspection team members and the status/resolution of the information requested (provide
d daily during the inspection to each inspection team member).
  If you have any questions regarding the information requested, please contact the inspection
team leader.
}}

Revision as of 23:40, 9 April 2019

Information Request for the Cyber Security Baseline Inspection Notification to Perform Inspection 05000334/2018403 and 05000412/2018403
ML17271A066
Person / Time
Site: Beaver Valley
Issue date: 09/28/2017
From: Dentel G T
Engineering Region 1 Branch 2
To: Bologna R D
FirstEnergy Nuclear Operating Co
Werkheiser D L
References
IR 2017403
Download: ML17271A066 (8)


See also: IR 05000334/2018403

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I 2100 RENAISSANCE BLVD., Suite 100

KING OF PRUSSIA, PA 19406

-2713 September 28, 2017

Mr. Richard Bologna

Site Vice President

First Energy Nuclear Operating Company

Beaver Valley Power Station

P. O. Box 4

Shippingport, PA 15077

-0004 SUBJECT: BEAVER VALLEY POWER STATION UNITS 1 AND 2

- INFORMATION

REQUEST FOR THE "CYBER

-SECURITY" BASELINE INSPECTION NOTIFICATION TO

PERFORM INSPECTION

05000334/2018403 AND 05000412/2018403

Dear Mr. Bologna

On January 29, 2018, the U.S. Nuclear Regulatory Commission (NRC) will begin

a baseline inspection in accordance with Inspection Procedure (IP)

71130.10 "Cyber

-Security ," issued May 15, 2017 at the Beaver Valley Power Station, Units 1 and 2.

Th e inspection will be performed to evaluate and verify your ability to meet full implementation

requirements of the

NRC's Cyber

-Security Rule, Title

10, Code of Federal Regulations

(CFR), Part

73, Section

54, "Protection of Digital Computer and Communication Systems and Networks."

The onsite portion of the inspection will take place during the weeks of

January 29

-February 2, 2018

, and February 12-16, 2018. Experience has shown that baseline inspections are extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspection. These documents have b

een divided into four groups.

The first group specifies information necessary to assist the inspection team in choosing the focus areas (i.e., "sample set"

) to be inspected by

the cyber-security Inspection

Procedure. This information should be made available via compact disc and delivered to the regional office no later than October 31, 2017. The inspection team will review this information and, by November 17, 2017, will request the specific items that should be provided for review

.

The second group of additional requested documents will assist the inspection team in the evaluation of the critical systems and critical digital assets (CSs/CDAs), defensive architecture, and the areas of your station's

Cyber-Security Program selected for the cyber

-security inspection. This information will be requested for review in the regional office prior to the inspection by December 11, 2017. The third grou

p of requested documents consists of those items that the inspection team will review, or need access to, during the inspection.

Please have this information available by the first day of the onsite inspection, January 29, 2018.

R. Bologna

2 The four th group of information is necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the

lead inspector as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional

documents requested during the preparation and/or the onsite portions of the inspection.

The lead inspector for this inspection is Mr. David Werkheiser. We understand that our regulatory contact for this inspection is Mr. David Wacker

of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at

610-337-5316 or via e-mail at David.Werkheiser@nrc.gov

.

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995

(44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number

3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.

This letter and its enclosure will be available

for public inspection and copying at http://www.nrc.gov/readi

ng-rm/adams.html

and at the NRC

's Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."

Sincerely,

/RA/ Glenn T. Dentel , Chief Engineering Branch

2 Division of Reactor Safety

Docket Nos.

50-334 and 50-412 License Nos.

DPR-66 and NPF

-73 Enclosure: Beaver Valley Power Station, Units 1 and 2

Cyber-Security Inspection Document Request

cc w/encl:

Distribution via ListServ

ML17271A066

SUNSI Review

Non-Sensitive Sensitive Publicly Available

Non-Publicly Available

OFFICE RI DRS RI DRS NAME DWerkheiser/

DW GDentel/GD DATE 09/28/17 09/28/17

BEAVER VALLEY POWER STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST

1 Enclosure Inspection Report

05000 334/2018 4 0 3 and 05000 412/2018 4 0 3 Inspection Dates
January 29

- February 2, 2018

and February 12

- 16, 2018 Inspection Procedure

IP 71130.10 , "Cyber-Security ," issue date May 15, 2017

Reference: Guidance Document for Development of the Request for

Information

(RFI) and Notification Letter for Full

-Implementation

of the Cyber - Security Inspection

, issue date May 25, 2017

NRC Inspectors

David Werkheiser, Lead

Jeff Rady (610) 337-5316 (610) 337-5380 David.Werkheiser@nrc.gov

Jeff.Rady@nrc.gov

NRC Contractors

John Walley

Frederick Priester

(301) 287-3717 (301) 230-4590 John.Walley@nrc.gov

Frederick.Priester@nrc.gov

I. Information Requested for In

-Office Preparation

The initial request for information (i.e., first RFI) concentrates on providing the inspection team with the general information necessary to select appropriate components and Cyber-Security Program (CSP) elements to develop a site

-specific inspection plan.

The first RFI is used to identify the list of critical systems and critical digital assets (CSs/CDAs) plus operational and management (O&M) security control portions of the CSP to be chosen as the "sample set" required to be inspected

by the cyber-security IP.

The first RFI

's requested information is specified below in Table RFI #1. The Table RFI #1 information is requested to be provided to the regional office

by October 31 , 2017, or sooner, to facilitate the selection of the specific items that

will be reviewed during the onsite inspection weeks

. The inspection team

will examin e the returned documentation from the first RFI

and identify/select specific systems and equipment

(e.g., CSs/CDAs) to provide a more focused follow

-up request to develop the second RFI. The inspection team will submit the specific systems and equipment

list to your staff by November 17, 2017, which will identify the specific systems and equipment tha

t will be utilized to evaluate the CSs/CDAs, defensive architecture, and the areas of the licensee's CSP selected for the cyber

-security inspection. We request that the additional information provided from the second RFI be made available to the regional office prior to the inspection by December 11 , 2017. All requests for information shall follow the Table RFI #1 and the guidance document referenced above.

The required Table

RFI #1 information shall be provided on compact disc (CD) to the lead inspector by October 31, 2017. Please provide four copies of each CD submitted (i.e., one for each inspector/contactor). The preferred file format for all lists is a searchable Excel spreadsheet file on a CD. These CDs should be indexed and hyper

-linked to facilitate ease of use. If you have any questions regarding this information, please call the inspection team leader as soon as possible.

BEAVER VALLEY POWER STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST

2 Table RFI #1

Reference Section 3 Paragraph Number / Title:

Items 1. List all Identified Critical Systems and Critical Digital Assets

All 2. List CDA Facility and Site Ethernet

- Transmission

Control Protocol / Internet

Protocol (TCP/

IP) Based Local Area Networks (LANs) and identify those LANs that have Non-CDAs on t hem All 3. List CDA Facility and Site Non

-Ethernet TCP / IP Based LANs including those Industrial Networks and Identify LANs that have Non

-CDAs on them All 4. Network Topology Diagrams (Be sure to include all Network Intrusion Detection Systems (NIDS) and Security Information and Event Management (SIEMS)

for Emergency Preparedness (EP) Networks and Security Level 3 and 4 Networks)

All 8. List all Network Security Boundary Devi

c es for EP Networks and all Network Security Boundary Devices for Levels 3 and 4

All 9. List CDA Wireless Industrial Networks

All 11. NIDS Documentation for Critical Systems that have CDAs associated with t

hem 11.a.1) 11.a.2) 12. SIEM Documentation for Critical Systems that have CDAs

associated with t

hem 12.a.1) 12.a.2) 14. List EP and Security Onsite and Offsite Digital Communication Systems

All 25. Cyber-Security Assessment and Cyber-Security Incident Response Teams

All In addition to the above information please provide the following:

1. Electronic copy of your current Cyber Security Plan.

2. Electronic copy of summary of changes (if any), including any 10 CFR 50.54p analysis to support those changes, made to the originally approved Cyber Security Plan. 3. Electronic copy of a matrix that summarizes what controls are in place to satisfy the controls required by Policies and Procedures.

4. Electronic copy of the Updated Final Safety Analysis Report and technical specifications.

5. Name(s) and phone numbers for the regulatory and technical contacts.

6. Current management and engineering organizational chart

s. Based on th is information, the inspection team will identify and select specific systems and equipment (e.g., CSs/CDAs) from the information requested by Table RF I #1 and submit

a list of specific systems and equipment

to your staff by November 17, 2017, for the second RFI

(i.e., Table RFI #2). II. Additional Information Requested to be Available Prior to Inspection

As stated above, in Sectio n I of this enclosure , th e inspection team

will examin e the returned documentation requested from Table RFI #1 and submit the list of specific systems and equipment to your staff by November 17, 2017

, for the second RFI (i.e., RFI #2). The second RFI will request additional

information required to evaluate the CSs

/CDAs, defensive architecture, and the areas of your station's

CSP selected for the cyber

-security inspection. The additional information requested for the specific systems and equipment

is identified in Table

RFI #2. All requested information shall follow the Table RFI #2 and the guidance document referenced above.

BEAVER VALLEY POWER STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST

3 The Table RFI #2 information shall be provided on CD to the lead inspector by December 11, 2017. Please provide four copies of each CD submitted (i.e., one for each inspector/contactor). The preferred file format for all lists is a searchable Excel spreadsheet file

on a CD. These CDs should be indexed and hyper

-linked to facilitate

ease of use. If you have any questions regarding this information, please call the inspection team leader as soon as possible. Table RFI #2

Section 3 Paragraph Number

/ Title: Items 5. Plant Computer System Block Diagram (If Plant Computer System is

selected for Inspection)

All 6. Plant Security System Block Diagram (if Security Computer System is

selected for Inspection)

All 7. Systems that are Distributed Block Diagrams (For Systems selected for Inspection)

All 10. Host-Based Intrusion Detection System Documentation (for CDAs for Systems

selected for Inspection)

10.a.1) 10.a.2) 13. List all Maintenance and Test Equipment used on CDAs for Systems Selected for Inspection

All 15. Configuration Management

All 16. Supply Chain Management

16.a.) 16.b.1) 16.b.5) 16.b.6) 17. Portable Media and Mobile Device Control

All 18. Software Management

All 20. Vendor Access and Monitoring

All 21. Work Control

All 22. Device access and Key Control

All 23. Password / Authenticator Policy

All 24. User Account / Credential Policy

All 26. Corrective Actions Since Last NRC Inspection

All

In addition to the above information please provide the following:

The documented CSP assessment and analysis for each CDA in each of the selected system s.

BEAVER VALLEY POWER STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST

4 III. Information Requested to be Available on First Day of Inspection

For the specific systems and equipment identified in this enclosure'sSection II., provide the following RFI (i.e., Table 1 ST Week Onsite

) on a CD by January 29, 2018 , the first day of the inspection

. All requested information shall follow the

Table 1 ST Week Onsite and the

guidance document referenced above.

Please provide four copies of each CD submitted (i.e., one for each inspector/contactor). The preferred file format for all lists is a searchable Excel spreadsheet file on a

CD. These CDs should be indexed and hyper

-linked to facilitate ease of use. If you have any questions regarding this information, please call the inspection team leader as soon as possible.

Table 1 ST Week Onsite

Section 3 Paragraph Number

/ Title: Items 10. Host-Based Intrusion Detection System Documentation for CDAs for Systems selected for inspection

10.a.3) thru 10.a.12) 11. NIDS Documentation for Critical Systems that have CDAs associated with them

11.a.3) thru 11.a.15) 12. SIEM Documentation for Critical Systems that have CDAs associated with them

12.a.3) thru 12.a.14) 16. Supply Chain Management

16.b.2) 16.b.3) 16.b.4) 19. Cyber-Security Event Notifications

All In addition to the above information please provide the following:

1. Copies of the

following documents do not need to be solely available to the inspection team as long as the inspectors have easy and unrestrained access to

them. a. Original Final Safety Analysis Report Volumes; b. Original Safety Evaluation Report and Supplements;

c. Final Safety Analysis Report Question and Answers;

d. Quality Assurance (QA) Plan; e. Latest Individual Plant Examination for External Events / Probabilistic Risk Assessment Report; and f. Vendor Manuals

2. Assessment and Corrective Actions:

a. The most recent Cyber-Security QA audit and/or self

-assessment; and

b. Corrective action documents (e.g., condition reports, including status of corrective actions) generate

d as a result of the most recent Cyber-Security QA audit and/or self-assessment.

BEAVER VALLEY POWER STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST

5 I V. Information Requested To Be Provided Throughout the Inspection

1. Copies of any corrective action documents generated as a result of the inspection team's questions or queries during th

e inspection.

2. Copies of the list of questions submitted by the inspection team members and the status/resolution of the information requested (provide

d daily during the inspection to each inspection team member).

If you have any questions regarding the information requested, please contact the inspection

team leader.