| number = ML17271A066 | |||
| issue date = 09/28/2017 | |||
| title = Beaver Valley Power Station, Units 1 and 2-Information Request for the Cyber Security Baseline Inspection Notification to Perform Inspection 05000334/2018403 and 05000412/2018403 | |||
| author name = Dentel G T | |||
| author affiliation = NRC/RGN-I/DRS/EB2 | |||
| addressee name = Bologna R D | |||
| addressee affiliation = FirstEnergy Nuclear Operating Co | |||
| docket = 05000334, 05000412 | |||
| license number = DPR-066, NPF-073 | |||
| contact person = Werkheiser D L | |||
| document report number = IR 2017403 | |||
| document type = Inspection Plan, Letter | |||
| page count = 8 | |||
}} | |||
See also: [[followed by::IR 05000334/2018403]] | |||
=Text= | |||
{{#Wiki_filter:UNITED STATES | |||
NUCLEAR REGULATORY COMMISSION | |||
REGION I 2100 RENAISSANCE BLVD., Suite 100 | |||
KING OF PRUSSIA, PA 19406 | |||
-2713 September 28, 2017 | |||
Mr. Richard Bologna | |||
Site Vice President | |||
First Energy Nuclear Operating Company | |||
Beaver Valley Power Station | |||
P. O. Box 4 | |||
Shippingport, PA 15077 | |||
-0004 SUBJECT: BEAVER VALLEY POWER STATION UNITS 1 AND 2 | |||
- INFORMATION | |||
REQUEST FOR THE "CYBER | |||
-SECURITY" BASELINE INSPECTION NOTIFICATION TO | |||
PERFORM INSPECTION | |||
05000334/2018403 AND 05000412/2018403 | |||
Dear Mr. Bologna | |||
: On January 29, 2018, the U.S. Nuclear Regulatory Commission (NRC) will begin | |||
a baseline inspection in accordance with Inspection Procedure (IP) | |||
71130.10 "Cyber | |||
-Security ," issued May 15, 2017 at the Beaver Valley Power Station, Units 1 and 2. | |||
Th e inspection will be performed to evaluate and verify your ability to meet full implementation | |||
requirements of the | |||
NRC's Cyber | |||
-Security Rule, Title | |||
10, Code of Federal Regulations | |||
(CFR), Part | |||
73, Section | |||
54, "Protection of Digital Computer and Communication Systems and Networks." | |||
The onsite portion of the inspection will take place during the weeks of | |||
January 29 | |||
-February 2, 2018 | |||
, and February 12-16, 2018. Experience has shown that baseline inspections are extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspection. These documents have b | |||
een divided into four groups. | |||
The first group specifies information necessary to assist the inspection team in choosing the focus areas (i.e., "sample set" | |||
) to be inspected by | |||
the cyber-security Inspection | |||
Procedure. This information should be made available via compact disc and delivered to the regional office no later than October 31, 2017. The inspection team will review this information and, by November 17, 2017, will request the specific items that should be provided for review | |||
. | |||
The second group of additional requested documents will assist the inspection team in the evaluation of the critical systems and critical digital assets (CSs/CDAs), defensive architecture, and the areas of your station's | |||
Cyber-Security Program selected for the cyber | |||
-security inspection. This information will be requested for review in the regional office prior to the inspection by December 11, 2017. The third grou | |||
p of requested documents consists of those items that the inspection team will review, or need access to, during the inspection. | |||
Please have this information available by the first day of the onsite inspection, January 29, 2018. | |||
R. Bologna | |||
2 The four th group of information is necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the | |||
lead inspector as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional | |||
documents requested during the preparation and/or the onsite portions of the inspection. | |||
The lead inspector for this inspection is Mr. David Werkheiser. We understand that our regulatory contact for this inspection is Mr. David Wacker | |||
of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at | |||
610-337-5316 or via e-mail at David.Werkheiser@nrc.gov | |||
. | |||
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 | |||
(44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number | |||
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number. | |||
This letter and its enclosure will be available | |||
for public inspection and copying at http://www.nrc.gov/readi | |||
ng-rm/adams.html | |||
and at the NRC | |||
's Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding." | |||
Sincerely, | |||
/RA/ Glenn T. Dentel , Chief Engineering Branch | |||
2 Division of Reactor Safety | |||
Docket Nos. | |||
50-334 and 50-412 License Nos. | |||
DPR-66 and NPF | |||
-73 Enclosure: Beaver Valley Power Station, Units 1 and 2 | |||
Cyber-Security Inspection Document Request | |||
cc w/encl: | |||
Distribution via ListServ | |||
ML17271A066 | |||
SUNSI Review | |||
Non-Sensitive Sensitive Publicly Available | |||
Non-Publicly Available | |||
OFFICE RI DRS RI DRS NAME DWerkheiser/ | |||
DW GDentel/GD DATE 09/28/17 09/28/17 | |||
BEAVER VALLEY POWER STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST | |||
1 Enclosure Inspection Report | |||
: 05000 334/2018 4 0 3 and 05000 412/2018 4 0 3 Inspection Dates | |||
: January 29 | |||
- February 2, 2018 | |||
and February 12 | |||
- 16, 2018 Inspection Procedure | |||
: IP 71130.10 , "Cyber-Security ," issue date May 15, 2017 | |||
Reference: Guidance Document for Development of the Request for | |||
Information | |||
(RFI) and Notification Letter for Full | |||
-Implementation | |||
of the Cyber - Security Inspection | |||
, issue date May 25, 2017 | |||
NRC Inspectors | |||
: David Werkheiser, Lead | |||
Jeff Rady (610) 337-5316 (610) 337-5380 David.Werkheiser@nrc.gov | |||
Jeff.Rady@nrc.gov | |||
NRC Contractors | |||
: John Walley | |||
Frederick Priester | |||
(301) 287-3717 (301) 230-4590 John.Walley@nrc.gov | |||
Frederick.Priester@nrc.gov | |||
I. Information Requested for In | |||
-Office Preparation | |||
The initial request for information (i.e., first RFI) concentrates on providing the inspection team with the general information necessary to select appropriate components and Cyber-Security Program (CSP) elements to develop a site | |||
-specific inspection plan. | |||
The first RFI is used to identify the list of critical systems and critical digital assets (CSs/CDAs) plus operational and management (O&M) security control portions of the CSP to be chosen as the "sample set" required to be inspected | |||
by the cyber-security IP. | |||
The first RFI | |||
's requested information is specified below in Table RFI #1. The Table RFI #1 information is requested to be provided to the regional office | |||
by October 31 , 2017, or sooner, to facilitate the selection of the specific items that | |||
will be reviewed during the onsite inspection weeks | |||
. The inspection team | |||
will examin e the returned documentation from the first RFI | |||
and identify/select specific systems and equipment | |||
(e.g., CSs/CDAs) to provide a more focused follow | |||
-up request to develop the second RFI. The inspection team will submit the specific systems and equipment | |||
list to your staff by November 17, 2017, which will identify the specific systems and equipment tha | |||
t will be utilized to evaluate the CSs/CDAs, defensive architecture, and the areas of the licensee's CSP selected for the cyber | |||
-security inspection. We request that the additional information provided from the second RFI be made available to the regional office prior to the inspection by December 11 , 2017. All requests for information shall follow the Table RFI #1 and the guidance document referenced above. | |||
The required Table | |||
RFI #1 information shall be provided on compact disc (CD) to the lead inspector by October 31, 2017. Please provide four copies of each CD submitted (i.e., one for each inspector/contactor). The preferred file format for all lists is a searchable Excel spreadsheet file on a CD. These CDs should be indexed and hyper | |||
-linked to facilitate ease of use. If you have any questions regarding this information, please call the inspection team leader as soon as possible. | |||
BEAVER VALLEY POWER STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST | |||
2 Table RFI #1 | |||
Reference Section 3 Paragraph Number / Title: | |||
Items 1. List all Identified Critical Systems and Critical Digital Assets | |||
All 2. List CDA Facility and Site Ethernet | |||
- Transmission | |||
Control Protocol / Internet | |||
Protocol (TCP/ | |||
IP) Based Local Area Networks (LANs) and identify those LANs that have Non-CDAs on t hem All 3. List CDA Facility and Site Non | |||
-Ethernet TCP / IP Based LANs including those Industrial Networks and Identify LANs that have Non | |||
-CDAs on them All 4. Network Topology Diagrams (Be sure to include all Network Intrusion Detection Systems (NIDS) and Security Information and Event Management (SIEMS) | |||
for Emergency Preparedness (EP) Networks and Security Level 3 and 4 Networks) | |||
All 8. List all Network Security Boundary Devi | |||
c es for EP Networks and all Network Security Boundary Devices for Levels 3 and 4 | |||
All 9. List CDA Wireless Industrial Networks | |||
All 11. NIDS Documentation for Critical Systems that have CDAs associated with t | |||
hem 11.a.1) 11.a.2) 12. SIEM Documentation for Critical Systems that have CDAs | |||
associated with t | |||
hem 12.a.1) 12.a.2) 14. List EP and Security Onsite and Offsite Digital Communication Systems | |||
All 25. Cyber-Security Assessment and Cyber-Security Incident Response Teams | |||
All In addition to the above information please provide the following: | |||
1. Electronic copy of your current Cyber Security Plan. | |||
2. Electronic copy of summary of changes (if any), including any 10 CFR 50.54p analysis to support those changes, made to the originally approved Cyber Security Plan. 3. Electronic copy of a matrix that summarizes what controls are in place to satisfy the controls required by Policies and Procedures. | |||
4. Electronic copy of the Updated Final Safety Analysis Report and technical specifications. | |||
5. Name(s) and phone numbers for the regulatory and technical contacts. | |||
6. Current management and engineering organizational chart | |||
s. Based on th is information, the inspection team will identify and select specific systems and equipment (e.g., CSs/CDAs) from the information requested by Table RF I #1 and submit | |||
a list of specific systems and equipment | |||
to your staff by November 17, 2017, for the second RFI | |||
(i.e., Table RFI #2). II. Additional Information Requested to be Available Prior to Inspection | |||
As stated above, in Sectio n I of this enclosure , th e inspection team | |||
will examin e the returned documentation requested from Table RFI #1 and submit the list of specific systems and equipment to your staff by November 17, 2017 | |||
, for the second RFI (i.e., RFI #2). The second RFI will request additional | |||
information required to evaluate the CSs | |||
/CDAs, defensive architecture, and the areas of your station's | |||
CSP selected for the cyber | |||
-security inspection. The additional information requested for the specific systems and equipment | |||
is identified in Table | |||
RFI #2. All requested information shall follow the Table RFI #2 and the guidance document referenced above. | |||
BEAVER VALLEY POWER STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST | |||
3 The Table RFI #2 information shall be provided on CD to the lead inspector by December 11, 2017. Please provide four copies of each CD submitted (i.e., one for each inspector/contactor). The preferred file format for all lists is a searchable Excel spreadsheet file | |||
on a CD. These CDs should be indexed and hyper | |||
-linked to facilitate | |||
ease of use. If you have any questions regarding this information, please call the inspection team leader as soon as possible. Table RFI #2 | |||
Section 3 Paragraph Number | |||
/ Title: Items 5. Plant Computer System Block Diagram (If Plant Computer System is | |||
selected for Inspection) | |||
All 6. Plant Security System Block Diagram (if Security Computer System is | |||
selected for Inspection) | |||
All 7. Systems that are Distributed Block Diagrams (For Systems selected for Inspection) | |||
All 10. Host-Based Intrusion Detection System Documentation (for CDAs for Systems | |||
selected for Inspection) | |||
10.a.1) 10.a.2) 13. List all Maintenance and Test Equipment used on CDAs for Systems Selected for Inspection | |||
All 15. Configuration Management | |||
All 16. Supply Chain Management | |||
16.a.) 16.b.1) 16.b.5) 16.b.6) 17. Portable Media and Mobile Device Control | |||
All 18. Software Management | |||
All 20. Vendor Access and Monitoring | |||
All 21. Work Control | |||
All 22. Device access and Key Control | |||
All 23. Password / Authenticator Policy | |||
All 24. User Account / Credential Policy | |||
All 26. Corrective Actions Since Last NRC Inspection | |||
All | |||
In addition to the above information please provide the following: | |||
The documented CSP assessment and analysis for each CDA in each of the selected system s. | |||
BEAVER VALLEY POWER STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST | |||
4 III. Information Requested to be Available on First Day of Inspection | |||
For the specific systems and equipment identified in this enclosure's Section II., provide the following RFI (i.e., Table 1 ST Week Onsite | |||
) on a CD by January 29, 2018 , the first day of the inspection | |||
. All requested information shall follow the | |||
Table 1 ST Week Onsite and the | |||
guidance document referenced above. | |||
Please provide four copies of each CD submitted (i.e., one for each inspector/contactor). The preferred file format for all lists is a searchable Excel spreadsheet file on a | |||
CD. These CDs should be indexed and hyper | |||
-linked to facilitate ease of use. If you have any questions regarding this information, please call the inspection team leader as soon as possible. | |||
Table 1 ST Week Onsite | |||
Section 3 Paragraph Number | |||
/ Title: Items 10. Host-Based Intrusion Detection System Documentation for CDAs for Systems selected for inspection | |||
10.a.3) thru 10.a.12) 11. NIDS Documentation for Critical Systems that have CDAs associated with them | |||
11.a.3) thru 11.a.15) 12. SIEM Documentation for Critical Systems that have CDAs associated with them | |||
12.a.3) thru 12.a.14) 16. Supply Chain Management | |||
16.b.2) 16.b.3) 16.b.4) 19. Cyber-Security Event Notifications | |||
All In addition to the above information please provide the following: | |||
1. Copies of the | |||
following documents do not need to be solely available to the inspection team as long as the inspectors have easy and unrestrained access to | |||
them. a. Original Final Safety Analysis Report Volumes; b. Original Safety Evaluation Report and Supplements; | |||
c. Final Safety Analysis Report Question and Answers; | |||
d. Quality Assurance (QA) Plan; e. Latest Individual Plant Examination for External Events / Probabilistic Risk Assessment Report; and f. Vendor Manuals | |||
2. Assessment and Corrective Actions: | |||
a. The most recent Cyber-Security QA audit and/or self | |||
-assessment; and | |||
b. Corrective action documents (e.g., condition reports, including status of corrective actions) generate | |||
d as a result of the most recent Cyber-Security QA audit and/or self-assessment. | |||
BEAVER VALLEY POWER STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST | |||
5 I V. Information Requested To Be Provided Throughout the Inspection | |||
1. Copies of any corrective action documents generated as a result of the inspection team's questions or queries during th | |||
e inspection. | |||
2. Copies of the list of questions submitted by the inspection team members and the status/resolution of the information requested (provide | |||
d daily during the inspection to each inspection team member). | |||
If you have any questions regarding the information requested, please contact the inspection | |||
team leader. | |||
}} |
Revision as of 21:03, 20 January 2019
ML17271A066 | |
Person / Time | |
---|---|
Site: | Beaver Valley |
Issue date: | 09/28/2017 |
From: | Dentel G T Engineering Region 1 Branch 2 |
To: | Bologna R D FirstEnergy Nuclear Operating Co |
Werkheiser D L | |
References | |
IR 2017403 | |
Download: ML17271A066 (8) | |
See also: IR 05000334/2018403
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION I 2100 RENAISSANCE BLVD., Suite 100
KING OF PRUSSIA, PA 19406
-2713 September 28, 2017
Mr. Richard Bologna
Site Vice President
First Energy Nuclear Operating Company
Beaver Valley Power Station
P. O. Box 4
Shippingport, PA 15077
-0004 SUBJECT: BEAVER VALLEY POWER STATION UNITS 1 AND 2
- INFORMATION
REQUEST FOR THE "CYBER
-SECURITY" BASELINE INSPECTION NOTIFICATION TO
PERFORM INSPECTION
05000334/2018403 AND 05000412/2018403
Dear Mr. Bologna
- On January 29, 2018, the U.S. Nuclear Regulatory Commission (NRC) will begin
a baseline inspection in accordance with Inspection Procedure (IP)
71130.10 "Cyber
-Security ," issued May 15, 2017 at the Beaver Valley Power Station, Units 1 and 2.
Th e inspection will be performed to evaluate and verify your ability to meet full implementation
requirements of the
NRC's Cyber
-Security Rule, Title
10, Code of Federal Regulations
(CFR), Part
73, Section
54, "Protection of Digital Computer and Communication Systems and Networks."
The onsite portion of the inspection will take place during the weeks of
January 29
-February 2, 2018
, and February 12-16, 2018. Experience has shown that baseline inspections are extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspection. These documents have b
een divided into four groups.
The first group specifies information necessary to assist the inspection team in choosing the focus areas (i.e., "sample set"
) to be inspected by
the cyber-security Inspection
Procedure. This information should be made available via compact disc and delivered to the regional office no later than October 31, 2017. The inspection team will review this information and, by November 17, 2017, will request the specific items that should be provided for review
.
The second group of additional requested documents will assist the inspection team in the evaluation of the critical systems and critical digital assets (CSs/CDAs), defensive architecture, and the areas of your station's
Cyber-Security Program selected for the cyber
-security inspection. This information will be requested for review in the regional office prior to the inspection by December 11, 2017. The third grou
p of requested documents consists of those items that the inspection team will review, or need access to, during the inspection.
Please have this information available by the first day of the onsite inspection, January 29, 2018.
R. Bologna
2 The four th group of information is necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the
lead inspector as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional
documents requested during the preparation and/or the onsite portions of the inspection.
The lead inspector for this inspection is Mr. David Werkheiser. We understand that our regulatory contact for this inspection is Mr. David Wacker
of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at
610-337-5316 or via e-mail at David.Werkheiser@nrc.gov
.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995
(44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
This letter and its enclosure will be available
for public inspection and copying at http://www.nrc.gov/readi
ng-rm/adams.html
and at the NRC
's Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."
Sincerely,
/RA/ Glenn T. Dentel , Chief Engineering Branch
2 Division of Reactor Safety
Docket Nos.
50-334 and 50-412 License Nos.
DPR-66 and NPF
-73 Enclosure: Beaver Valley Power Station, Units 1 and 2
Cyber-Security Inspection Document Request
cc w/encl:
Distribution via ListServ
SUNSI Review
Non-Sensitive Sensitive Publicly Available
Non-Publicly Available
OFFICE RI DRS RI DRS NAME DWerkheiser/
DW GDentel/GD DATE 09/28/17 09/28/17
BEAVER VALLEY POWER STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST
1 Enclosure Inspection Report
- 05000 334/2018 4 0 3 and 05000 412/2018 4 0 3 Inspection Dates
- January 29
- February 2, 2018
and February 12
- 16, 2018 Inspection Procedure
- IP 71130.10 , "Cyber-Security ," issue date May 15, 2017
Reference: Guidance Document for Development of the Request for
Information
(RFI) and Notification Letter for Full
-Implementation
of the Cyber - Security Inspection
, issue date May 25, 2017
NRC Inspectors
- David Werkheiser, Lead
Jeff Rady (610) 337-5316 (610) 337-5380 David.Werkheiser@nrc.gov
Jeff.Rady@nrc.gov
NRC Contractors
- John Walley
Frederick Priester
(301) 287-3717 (301) 230-4590 John.Walley@nrc.gov
Frederick.Priester@nrc.gov
I. Information Requested for In
-Office Preparation
The initial request for information (i.e., first RFI) concentrates on providing the inspection team with the general information necessary to select appropriate components and Cyber-Security Program (CSP) elements to develop a site
-specific inspection plan.
The first RFI is used to identify the list of critical systems and critical digital assets (CSs/CDAs) plus operational and management (O&M) security control portions of the CSP to be chosen as the "sample set" required to be inspected
by the cyber-security IP.
The first RFI
's requested information is specified below in Table RFI #1. The Table RFI #1 information is requested to be provided to the regional office
by October 31 , 2017, or sooner, to facilitate the selection of the specific items that
will be reviewed during the onsite inspection weeks
. The inspection team
will examin e the returned documentation from the first RFI
and identify/select specific systems and equipment
(e.g., CSs/CDAs) to provide a more focused follow
-up request to develop the second RFI. The inspection team will submit the specific systems and equipment
list to your staff by November 17, 2017, which will identify the specific systems and equipment tha
t will be utilized to evaluate the CSs/CDAs, defensive architecture, and the areas of the licensee's CSP selected for the cyber
-security inspection. We request that the additional information provided from the second RFI be made available to the regional office prior to the inspection by December 11 , 2017. All requests for information shall follow the Table RFI #1 and the guidance document referenced above.
The required Table
RFI #1 information shall be provided on compact disc (CD) to the lead inspector by October 31, 2017. Please provide four copies of each CD submitted (i.e., one for each inspector/contactor). The preferred file format for all lists is a searchable Excel spreadsheet file on a CD. These CDs should be indexed and hyper
-linked to facilitate ease of use. If you have any questions regarding this information, please call the inspection team leader as soon as possible.
BEAVER VALLEY POWER STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST
2 Table RFI #1
Reference Section 3 Paragraph Number / Title:
Items 1. List all Identified Critical Systems and Critical Digital Assets
All 2. List CDA Facility and Site Ethernet
- Transmission
Control Protocol / Internet
Protocol (TCP/
IP) Based Local Area Networks (LANs) and identify those LANs that have Non-CDAs on t hem All 3. List CDA Facility and Site Non
-Ethernet TCP / IP Based LANs including those Industrial Networks and Identify LANs that have Non
-CDAs on them All 4. Network Topology Diagrams (Be sure to include all Network Intrusion Detection Systems (NIDS) and Security Information and Event Management (SIEMS)
for Emergency Preparedness (EP) Networks and Security Level 3 and 4 Networks)
All 8. List all Network Security Boundary Devi
c es for EP Networks and all Network Security Boundary Devices for Levels 3 and 4
All 9. List CDA Wireless Industrial Networks
All 11. NIDS Documentation for Critical Systems that have CDAs associated with t
hem 11.a.1) 11.a.2) 12. SIEM Documentation for Critical Systems that have CDAs
associated with t
hem 12.a.1) 12.a.2) 14. List EP and Security Onsite and Offsite Digital Communication Systems
All 25. Cyber-Security Assessment and Cyber-Security Incident Response Teams
All In addition to the above information please provide the following:
1. Electronic copy of your current Cyber Security Plan.
2. Electronic copy of summary of changes (if any), including any 10 CFR 50.54p analysis to support those changes, made to the originally approved Cyber Security Plan. 3. Electronic copy of a matrix that summarizes what controls are in place to satisfy the controls required by Policies and Procedures.
4. Electronic copy of the Updated Final Safety Analysis Report and technical specifications.
5. Name(s) and phone numbers for the regulatory and technical contacts.
6. Current management and engineering organizational chart
s. Based on th is information, the inspection team will identify and select specific systems and equipment (e.g., CSs/CDAs) from the information requested by Table RF I #1 and submit
a list of specific systems and equipment
to your staff by November 17, 2017, for the second RFI
(i.e., Table RFI #2). II. Additional Information Requested to be Available Prior to Inspection
As stated above, in Sectio n I of this enclosure , th e inspection team
will examin e the returned documentation requested from Table RFI #1 and submit the list of specific systems and equipment to your staff by November 17, 2017
, for the second RFI (i.e., RFI #2). The second RFI will request additional
information required to evaluate the CSs
/CDAs, defensive architecture, and the areas of your station's
CSP selected for the cyber
-security inspection. The additional information requested for the specific systems and equipment
is identified in Table
RFI #2. All requested information shall follow the Table RFI #2 and the guidance document referenced above.
BEAVER VALLEY POWER STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST
3 The Table RFI #2 information shall be provided on CD to the lead inspector by December 11, 2017. Please provide four copies of each CD submitted (i.e., one for each inspector/contactor). The preferred file format for all lists is a searchable Excel spreadsheet file
on a CD. These CDs should be indexed and hyper
-linked to facilitate
ease of use. If you have any questions regarding this information, please call the inspection team leader as soon as possible. Table RFI #2
Section 3 Paragraph Number
/ Title: Items 5. Plant Computer System Block Diagram (If Plant Computer System is
selected for Inspection)
All 6. Plant Security System Block Diagram (if Security Computer System is
selected for Inspection)
All 7. Systems that are Distributed Block Diagrams (For Systems selected for Inspection)
All 10. Host-Based Intrusion Detection System Documentation (for CDAs for Systems
selected for Inspection)
10.a.1) 10.a.2) 13. List all Maintenance and Test Equipment used on CDAs for Systems Selected for Inspection
All 15. Configuration Management
All 16. Supply Chain Management
16.a.) 16.b.1) 16.b.5) 16.b.6) 17. Portable Media and Mobile Device Control
All 18. Software Management
All 20. Vendor Access and Monitoring
All 21. Work Control
All 22. Device access and Key Control
All 23. Password / Authenticator Policy
All 24. User Account / Credential Policy
All 26. Corrective Actions Since Last NRC Inspection
All
In addition to the above information please provide the following:
The documented CSP assessment and analysis for each CDA in each of the selected system s.
BEAVER VALLEY POWER STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST
4 III. Information Requested to be Available on First Day of Inspection
For the specific systems and equipment identified in this enclosure'sSection II., provide the following RFI (i.e., Table 1 ST Week Onsite
) on a CD by January 29, 2018 , the first day of the inspection
. All requested information shall follow the
Table 1 ST Week Onsite and the
guidance document referenced above.
Please provide four copies of each CD submitted (i.e., one for each inspector/contactor). The preferred file format for all lists is a searchable Excel spreadsheet file on a
CD. These CDs should be indexed and hyper
-linked to facilitate ease of use. If you have any questions regarding this information, please call the inspection team leader as soon as possible.
Table 1 ST Week Onsite
Section 3 Paragraph Number
/ Title: Items 10. Host-Based Intrusion Detection System Documentation for CDAs for Systems selected for inspection
10.a.3) thru 10.a.12) 11. NIDS Documentation for Critical Systems that have CDAs associated with them
11.a.3) thru 11.a.15) 12. SIEM Documentation for Critical Systems that have CDAs associated with them
12.a.3) thru 12.a.14) 16. Supply Chain Management
16.b.2) 16.b.3) 16.b.4) 19. Cyber-Security Event Notifications
All In addition to the above information please provide the following:
1. Copies of the
following documents do not need to be solely available to the inspection team as long as the inspectors have easy and unrestrained access to
them. a. Original Final Safety Analysis Report Volumes; b. Original Safety Evaluation Report and Supplements;
c. Final Safety Analysis Report Question and Answers;
d. Quality Assurance (QA) Plan; e. Latest Individual Plant Examination for External Events / Probabilistic Risk Assessment Report; and f. Vendor Manuals
2. Assessment and Corrective Actions:
a. The most recent Cyber-Security QA audit and/or self
-assessment; and
b. Corrective action documents (e.g., condition reports, including status of corrective actions) generate
d as a result of the most recent Cyber-Security QA audit and/or self-assessment.
BEAVER VALLEY POWER STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST
5 I V. Information Requested To Be Provided Throughout the Inspection
1. Copies of any corrective action documents generated as a result of the inspection team's questions or queries during th
e inspection.
2. Copies of the list of questions submitted by the inspection team members and the status/resolution of the information requested (provide
d daily during the inspection to each inspection team member).
If you have any questions regarding the information requested, please contact the inspection
team leader.