Pages that link to "Anthony P"
Jump to navigation
Jump to search
The following pages link to Anthony P:
Displayed 50 items.
- NRC-89-0188, Monthly Operating Rept for Sept 1989 for Enrico Fermi Unit 2. W/891016 Ltr (← links)
- NRC-89-0186, LER 89-016-01:on 890711,Div 1 of RHR Svc Water Sys Declared Inoperable Due to Low Nitrogen Pressure for Cooling Tower Fan Brake.Caused by Leak in One Hose.Leaking Hose Replaced & Nitrogen Pressure restored.W/891006 Ltr (← links)
- NRC-89-0193, LER 89-026-00:on 891010,control Ctr HVAC Shifted to Recirculation Mode of Operaton Due to Short Circuit.Caused by Failure of Lamp Filament When Being Tightened.Fuse & Lamp Replaced & Sys Returned to Normal operation.W/891109 Ltr (← links)
- NRC-89-0190, LER 89-023-00:on 890924,personnel Inadvertently Caused Trip of Essential Safety Sys Buses 64B & 64C.Caused by Failure of Personnel Involved to Review Applicable Prints Prior to Performing Test.Event Reviewed w/personnel.W/891024 Ltr (← links)
- NRC-89-0255, LER 89-031-00:on 891120,both Div II Emergency Equipment Cooling Water (EECW) & Emergency Equipment Svc Water Sys Pumps Tripped Immediately.Caused by Inadequacies in Stated Procedures.Procedures revised.W/891220 Ltr (← links)
- NRC-89-0251, LER 89-019-01:on 890819,discovered That Div I Recirculation Fan Not Rotating Which Resulted in Decrease in Control Room Air Pressure.Caused by Lack of Lubrication in Bearings. Lubrication Program Improvements evaluated.W/891130 Ltr (← links)
- NRC-89-0195, Monthly Operating Rept for Oct 1989 for Fermi Unit 2.W/ 891115 Ltr (← links)
- NRC-89-0246, LER 89-028-00:on 891020,eight safety-related Valves Failed Set Pressure Test.Cause Under Review.All Valves Removed for Testing Being Refurbished,Cleaned,Retested & Recertified to Be within Plant Accepted tolerances.W/891120 Ltr (← links)
- NRC-90-0004, LER 89-030-00:on 891026,Channel C Level 1 & 2 Replacement Transmitter Found to Be Installed Incorrectly & Condition Recognized on 891210,when Level 2 Trip Unit Was Reading Upscale.Caused by Personnel error.W/900109 Ltr (← links)
- NRC-90-0002, LER 89-033-00:on 891207,volt-ohm Meter Connected to Incorrect Terminal,Causing Div II of Emergency Equipment Cooling Water Sys to Actuate.Caused by Personnel Error.Sys Secured & Channel Test Successfully completed.W/900108 Ltr (← links)
- NRC-90-0008, LER 89-037-00:on 891220,determined That Tech Spec Stroke Time Testing for Outboard Reactor Water Sample Line Isolation Valve Not Performed.Caused by Personnel Error. Critique of Event Being developed.W/900119 Ltr (← links)
- ML19354E097 (← links)
- NRC-90-0006, Monthly Operating Rept for Dec 1989 for Fermi 2.W/900116 Ltr (← links)
- NRC-90-0048, LER 89-037-01:on 891220,determined That Tech Spec Stroke Time Testing for Outboard Reactor Water Sample Line Isolation Valve Not Performed Prior to Expiration on 891125. Caused by Personnel Error.Procedure revised.W/900322 Ltr (← links)
- NRC-90-0046, Monthly Operating Rept for Feb 1990 for Fermi 2.W/900315 Ltr (← links)
- ML20011F643 (← links)
- ML20011F640 (← links)
- NRC-89-0254, Monthly Operating Rept for Nov 1989 for Fermi 2.W/891215 Ltr (← links)
- ML20011F639 (← links)
- NRC-90-0107, LER 88-034-01:on 880831,RWCU Outboard Isolation Valve Closed,Causing RWCU Pumps to Trip.Caused by Loss of Continuity to Relay Due to Deposits Built Up on Surface of Contacts.Relay in Isolation Circuits replaced.W/900622 Ltr (← links)
- NRC-90-0092, Monthly Operating Rept for May 1990 for Fermi 2.W/900615 Ltr (← links)
- NRC-90-0073, LER 90-003-00:on 900410,Div I Reactor Protection Sys Power Supply Failure & Subsequent MSIV Closure.Caused by Coil Burn Up.Relays Replaced & MG Sets Returned to svc.W/900508 Ltr (← links)
- NRC-90-0064, Monthly Operating Rept for Mar 1990 for Fermi 2.W/900416 Ltr (← links)
- ML20058H819 (← links)
- ML20058H815 (← links)
- NRC-88-0010, Monthly Operating Rept for Dec 1987 (← links)
- ML20154N714 (← links)
- ML20154N692 (← links)
- NRC-88-0211, Monthly Operating Rept for Aug 1988 for Fermi 2 (← links)
- NRC-88-0095, Monthly Operating Rept for Mar 1988 (← links)
- NRC-88-0039, Monthly Operating Rept for Feb 1988 (← links)
- NRC-88-0032, Monthly Operating Rept for Jan 1988 (← links)
- NRC-88-0151, Monthly Operating Rept for May 1988 for Fermi 2 (← links)
- NRC-88-0223, Monthly Operating Rept for Oct 1988 for Fermi 2 (← links)
- ML20205F330 (← links)
- ML20204E861 (← links)
- NRC-88-0165, Monthly Operating Rept for Jul 1988 for Fermi 2 (← links)
- NRC-90-0169, Monthly Operating Rept for Nov 1990 for Fermi 2 (← links)
- NRC-90-0148, Monthly Operating Rept for Sept 1990 for Fermi 2 (← links)
- NRC-90-0143, Monthly Operating Rept for Aug 1990 for Fermi 2 (← links)
- NRC-90-0114, Monthly Operating Rept for Jul 1990 for Fermi 2.Rept Includes Average Daily Unit Power Level & Summary of Unit Shutdowns & Power Reductions Identified in NRC Reg Guide 1.16 & Tech Spec 6.9.1.6 (← links)
- 05000346/LER-1987-001, Errata to LER 87-001-00,correcting Incomplete Sentence on Page 2 (← links)
- ML20245A291 (← links)
- ML20245A285 (← links)
- ML20245A275 (← links)
- ML20245A269 (← links)
- ML20245A266 (← links)
- ML20245A255 (← links)
- ML20245A250 (← links)
- ML20245A247 (← links)