ML20011F643

From kanterella
Jump to navigation Jump to search
Corrected Monthly Operating Rept for Dec 1989 for Fermi Unit 2
ML20011F643
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 12/31/1989
From: Anthony P
DETROIT EDISON CO.
To:
Shared Package
ML20011F639 List:
References
NUDOCS 9003070073
Download: ML20011F643 (2)


Text

- . . . _ . -- - -.- - - .- --- - -

P.03

  1. t 02/27/1990 L16819 ~ PLfNT SAFETY.230 AlB. 313 586 1615 OPERATING DATA REPORT nt.-4 ,,

00NPLETED BY P. N. Anthony DOCEET N0. 50-341-DATE February 15. 1990 TELEPHONE (313) 586-1617 __

1 DPERATING STATUS.

1

'1. UNIT NAME: Forsi 2 l Notes:

l

  • To be determined l l
2. REPORTING PERIOD: December. 1989 l l 3 LICENSED THERNAL POWER (Wt): 3292 l + 1his number will be 1154 i revised tased on RCAR l l
4. NAMEPLATE RATING (OROSS NWe):

-5. DESIGN ELECT RATING (Net NNa): 1093+

l testing. Removal of fifth l

6. MAX DEPENDABLE CAF (GR055 We):
  1. I stage bloding' caused the I

(-

L T. . MAX DEPENDABLE CAP '(Not WE):

e I need to revise this. __l

l. 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITENS NUMBER 3 THROUGH 7) SINCE i LAST REPORT, O!VE REASONS: None

[

POWER LEVEL TO WHICH RESTRICTED, IF ANY (NNe Net):_ None

[ 9.

10. REASONS FOR RESTRICTION, IF ANY: None l

' 1 l.

THIS NONTH YR TO DATE CUNULATIVE $

744 8760 17.006

11. MRS IN REPORTING PERIOD 461.4 6074.4 _11.096.9-L 12. NRS REACTOR NAS CRITICAL 0 0 0 l
13. REACMR RESERVE SHUTDONN HR5 _

285.8 5576 10.296.8

14. HOURS GENERAMR ON-LINE 0 0 0
15. UNIT RESERVE SNUTDOWN HOURS 478,224___ 16.332.510 2

_9.361.962

16. GROSS THERMAL ENERGY GEN (MWH) 122.360 5.466.264 9.744.357
17. GROSS ELECT ENERGY GEN (MWH) 112.891 5.230.717 9.312.851 1
18. NET ELECT ENER0Y GEN (WH) 38.4 63.7 '60.5'
19. UNIT SERVICE FACTOR 38.4 63.7 60.5
20. UNIT AVAILABILITY FAC10R
21. UNIT CAP FACTOR (USINC NDC NET) 13.9 54.6 50.1- l
22. UNIT CAP FACTOR (USING DER NET) __

22.3 11.4 17.7

23. UNIT PORCED OUTAGE RATE
24. 3HUTD0NNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION OF RACH)

None.

25 1F SHUT DONN AT END OF REPORT PERIOD, ESTINATED DATE OF STARTUP: N/A

26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORBCAST ACHIEVED N/A N/A INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A 0000tERCIAL OPERATION V%

9003070073 900215 $*

JDR ADOCK0500gp1 p _ .

,,._.a s ~ m- e

', 7 l02/274990 l16:19- PLMT SAFETY 230 A1B 313 586 1613 .P.02 .

4 ' .j j _.

1

)

O.- S. Nuclear Regulatory Commission. ,

4 February 15, 1990.

NRC-90-0026-.

Page 2  ;

boct 8. A. Bauman (642 WCB)

R. L. Baird (1078 WCS) t C. Sorr (WPSC, Inc.)

8. O. Catola/0. R. Cranston-C. R. Eckhout.(1009 WCB/2 copies)

A. K. Elibe D. R. Gipson L. 8. Goodman

.C. A. Naegell' ,

J. A. Nyquist -

W. 8. Orser  ;

0. R. Overbook: L T. L. Riley I

. A. D..Seart O. E. Smith ,

" R. 8. 8t, afford

8. R. Sylvia
0. M. Trahey W. M. Tucker , ,

INFO. NOT. (140 NOC)

NRC Chron File l

Secretary's Office (2412 WCB) l Licensing File - M-1 Routing Copy Licensing Sngineer Author

[:

9 -

n e - ------ ,