Monthly Operating Rept for Dec 1989 for Fermi 2.W/900116 Ltr
ML19354D878
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 12/31/1989
From: Anthony P, Orser W
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-90-0006, CON-NRC-90-6 NUDOCS 9001230109
Download: ML19354D878 (4)


Text

. . . . _ _ _ _.

.4 .

[

t i

.i  !

Wilham S. Orser  !

. Ve(e Prepoent  !

Naclear Operations  !

Reg Guide 1.16 o~F'  !

Detron ,er->>

1 EC S O n BirE @A N Ef L January 16, 1990 l NRC-90-0006 i i

I t

U. S. Nuclear Regulatory Commission l Attention: Document Control Desk l Washington, D.C. 20555 i

Reference:

Fermi 2 t NRC Docket No. 50-341  ;

NRC Operating License No. NPF-43' i

(

Subject:

Monthly Operating Status Report ,

for December, 1989  ;

Enclosed for your information and use is the Fermi 2  !

Nonthly Operating Status Report for December, 1989. 'this  !

report includes the Operating Data Report, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and j Power Reductions identified in NRC Regulatory Guide 1.16 .

and Fermi 2 Technical Specification 6.9 1.6. l If you have any questions, please contact Patricia l Anthony at (313) 586-1617. l E

Sincerely 3

,g '

I W. S. Orser'.  !

! Vice President l

Nuclear Operations i

l l Enclosure .

cc: A. B. Davis i J. R. Eckert D. R. Hahn -

R. W. Defayette/W. L. Axelson .!

T. R. Quay W. G. Rogers 9001230109 891231 I PDR ADOCK 05000341 '

R PDC d i

1; /1 \ ,

e l 4

OPERATlWG DATA RFP0iti

,w DOCKET NO. 50-341 COMPLETED RY P. M. Anthony DATE January 16, 1990 TELEPHONE (313)586-1617  !

OPERATING STATUS _

1. UNIT NAME: Fermi 2 l Notes: I
2. REPORTING PERIOD: December, 1989 l # To be determined l !

3 LICENSED THERMAL POWER (MWL): 3292 l + This number will be I ,

4. NAMEPLATE RATING (GROSS MWe): 1154 l revised based ECAR testing.l [
5. DESIGN ELECT RATING (Net MWe): 1093+ l Removal or firth stage 1
6. MAX DEPENDABLE CAP (CROSS MWe): # l blading caused-the need to 1
7. MAX DEPENDABLE CAP (Net MWE): # l revise this. _

l

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: None l
9. POWER LEVEL TO WHICil RESTRICTED, IF ANY (MWe Net): None
10. REASONS FOR RESTRICTION, IF ANY: None CUNULATIVE THIS MONTH YR TO DATE
11. HRS IN REPORTING PERIOD 744 8760 17,006 j
12. IIRS REACTOR WAS CRITICAL 461.4 6074.4 11.096.9
13. REACTOR RESERVE SHUTDOWN HRS 0 0 0  !
14. HOURS GENERATOR ON-LINE 285.8 5576 10,296.8  ;
15. UNIT RESERVE SHUTDOWN HOURS 0 0 0  !
16. GROSS THERMAL ENERGY GEN (FWH) 478,224 16,332,510 29,361,962 t
17. GROSS ELECT ENERGY GEN (MWH) 122,360 5,466,264 9,744,357
18. NET ELECT ENERGY GEN (MWH) 104,952 _

5,222,778 9,304,912

19. UNIT SERVICE FACTOR 38.4 63.7 .__ 60.5  ;
20. UNIT AVAILABILITY FACTOR 38.4 63 7 60.5
21. UNIT CAP FACTOR (USING MDC NET)  !
22. UNIT CAP FACTOR (USING DER NET) 12.9 54.5 50.1  ;
23. UNIT FORCED OUTAGE RATE 22.3 11.4 17 7
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION OF EACH) i None. l
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A ]

I 1  ;

I

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-341 UNIT FERMI 2 DATE January 16, 1990 f COMPLETED BY P. M. Anthony  !

TELEPHOR (313) 586-1617 .

Month December, 1989 -

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL '

(MWe-Net) (MWe-Net)  ;

1 0 17 60 ,

2 0 18 101  !

3 0 19 0 4 0 20 23 5 0 _

21 95 6 0 22 293 7 0 23 62 8 0 24 100  :

9 0 25 479 ,

10 0 26 518 11 0 27 501 12 0 _

28 187 8 13 0 29 483-14 0 30 629 15 0 31 917  ;

16 32 i

t 9

h I

1

a UNIT SHUTDOWNS AND POWEM REDUCTIONS

-DOCMET NO. 50-341 DATE Jamsary 16. 1989' UNIT NAME Formt 2 COMPLETED BV P. W. Anthony -

g TELEPW*sE (313)S86-1617 REPORT WONTH December. 1989 I l 4 I I I i 4 i l l I I ] I i 1 NETHOD OF l LER l Sv5 l Comp l CAUSE & CORRECTIVE I I NO. I DATE 1 TYPE I DUR I REASON I SHUTTING DOwN l NO. I CODE I CODF l ACTION TO PREVENT I l l (1) l (HRS)l (2) l THE REACTOR l I (4) I (5) l RECURRENCE I I I I I (3) i I I I i i I I l 1 i l i i I i i i I j 89-011 'I 09/05/89 S  : 375.8 l C 4 4 N/A l --- I ---- 1 Continued =lth refueling activities l'

.l t  ? .

l l  ! 1 l Including leak rate testing and l l l l I  ! l l l 1 turbine inspection and repair. l 1 I I I I I I I I l 89-012 I 12/19/89 ] F l

, G 3 89-036 i 58 l ISV Operator accidently pushed MSIV l l l l 8 l l l I l close pushbutton while verifying l' l l l l l l l $

I thete logic to be reset.- l t i I I 1 l I 89-013 l 12/23/89 l F l 25.5 li F 2 189-038 TA TG Fire occurred in the tagging of l 'l l I i i turbine. Operator scrammed the l l 1 l 1 l ] unit. Lagging replaced; no other i i l 1 I i 1 damage occurred.

I I l' I I I _l I (1) F: FORCED (2) REASON: (3) METHOOr (4) EXHIBIT G - INSTRUCTIONS S: SCHEDULED 'A - EQUIPMENT FAILURE (EXPLAIN) 1.- MANUAL FOR PREPARATION OF DATA 8 - MAINTENANCE OR TEST 2 - WANUAL SCRAM TNTRY SHEETS FOR LICENSEE C - REFUELING. 3 - AUTOMATIC SCRAM tWNT REPORT (LER) FILE D - REGULATORY RESTRICTION 4- CONTINUED . (> ' AEG-0161)

E - OPERATOR, TRAINING & LICENSE EXAu1 NATION 5 - REDUCED LOAD F - ADw!NISTRATIVE 9 - OTHER G.- OPERATIONAL ERROR (EXPLAIN)

H - OTHER (EAPLA I N) .' (S) EMNISIT 1 - SA#E SOURCE

..a. . - . , . . ~ < - ., a ... .- - , . , , , - ....,..---;~. ,; - _ . . _ _ . . . , . . -, , , . . - . _ -- . . . _ . .