' OPERATING DATA REPORT DOCKET NO. 50-341 COMPLETED BY P. M. Anthony DATE March 15, 1988 TELEPHONE (313)586-1617 OPERATING STATUS

1. UNIT NAME: Ferni 2 INotes: l
2. REPORTING PERIOD: February, 1988 l l 3 LICENSED THERMAL POWER (MWL): 3292 l
  • To be determined I
4. NAMEPLATE RATING (GROSS MWe): 1154 I l 5 DESIGN ELECT RATING (Net MWe): 1093 I I
6. MAX DEPENDABLE CAP (GROSS MWe):
  • l l 7 MAX DEPENDABLE CAP (Net MWE):
  • l l
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: None 9 POWER LEVEL TO WHICH RESTRICTED, IF ANY (MWe Net): None
10. REASONS FOR RESTRICTION, IF ANY: None THIS MONTH YR TO DATE CUMULATIVE
11. HRS IN REPORTING PERIOD 696 902 902
12. HRS REAC'?OR WAS CRITICAL 624.7 830.7 830.7
13. REACTOR hESERVE SHUTDOWN HRS 0 0 0
14. HOURS GENERATOR ON-LINE 624 3 830 3 830 3
15. UNIT RESERVE SHUTDOWN HOURS 0 0 __,

0

16. GROSS THERMAL ENERGY GEN (MWH) 1,458,024 2,066,876 2,066,875
17. GROSS ELECT ENERGY GEN (MWH) 464,095 670,845 670,845
18. NET ELECT ENERGY GEN (MWH) 441,829 639,601 639,601
19. UNIT SERVICE FACTOR 89.7 ,,

94.9 94.9

20. UNIT AVAILABILITY FACTOR 89.7 94.9 94.9
21. UNIT CAP FACTOR (USING MDC NET) *
22. UNIT CAP FACTOR (USING DER NET) * * *
23. UNIT FORCED OUTAGE RATE 0.1 0.1 0.1
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION OF EACH)

Ferni 2 is currently in an LLRT outage which began February 26, 1988.

The outage will last forty five days.

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 04/05/88
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY 06/20/85 06/21/85 INITIAL ELECTRICITY 10/01/86 09/21/86 COMMERCIAL OPERATION 01/23/88 01/23/88 g;U 8803180096 880229 PDR ADOCK 05000341 '

'((

R DCD ,

. AVERAGE DAILY ' UNIT POWER LEVEL'~

i:.

.'e DOCXET NO. 50'341-UNIT' FERMI 2 DATE March 15, 1988 COMPLETED BY P. M. Anthony' TELEPHONE (313) 586-1617 Month Februnry, 1988 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 876 17 726 2 889 18 759 3 914 19 825 4 747 20 820 5 602 21 826 15 544 22 811 7 544 23 830 8 _,567 24 840 9- 586 25- 842 10 504 . 26 682 11 590 27 0

, 12 574 28 0 13 588 29 0 i

14 600 30 0 15 620 31 0 16 664 f .

i J

UNIT SIEMDOelS AIO PWER IEIXKTIONS DOCKET NO. 50-341 DATE March 15.1988 UNIT NAME Fermi 2 CmPIETED BY P. M. Anthony TELEPHONE (313)586-1617 REPCRT MONTH February. 1988 I I I I I I I I I I I i

I NO.

1 I DATE 1 1 1 1 ME7HCD T l IER I SYS ICWP 1 CAUSE & CORRICTIVE I I TYPE I DUR I REASON 1 SHUITING DOWN I NO. I CCDE I CWE I ACTION TO PRLVENT I l l l (1) 1 (HRS)l (2) 1 7EE RFACTOR I l (4) l (5) l REGRREtCE l l I i i 1 I (3) 1 I I I I I  ! l l l l l l l l 1 1 I I I I l l l l l l 1 88-01 1 02/27/88 i F 1 71.7 i B l 1 187-018 I EK l VE I Fermi 2 was shutdown February 27, l [

i I I i 1 1 I I l 1988, before a scheduled Plant I I I i

I

! I I I I I I I I slutdown was to begin. A review I I

I I I I I I I of the Energency Diesel Generator  !

I I I I l l 1 I I I i 1 l buses revealed that in the past i l

I I I I l l l l l Technical specificatic,a required i I

I I I I I I I I I functional testing was incorplete. I I

I I I I I I I I I l Corrective action will be to i i 1 l l l revised the surveillance procedures l I I I I I I i 1 1 1 and to include the additional logic l 1 1 I I I I I I I I I I I systen functional testing. I I I I I I I l l l l Currently Fermi 2 is in an IIRr i I

I I i i I I l outage which is scheduled to last l 1 l l I I i 1 l l until April 5, 1988.

I I I I l I I I I I I I (1) F: FOICID (2) REASON: (3) ME7 ECD:

S: SCHEDUIID (4) EXHIBIT G - INSTRCTIONS A - EUJIM FAIIURE '70CPIAIN) 1 - MANUAL FOR PREPARATION & DATA B - MAINTRA?CE OR TES'r 2 - MANUAL SCRAM ENTPI SHEETS FOR LICENSEE C - REFUELING 3 - AUICNATIC SCRAM D - REGUIATOIY RESTRICTION EVENP REPORT (IER) FILE 4 - CONTINUED (NURIG-0161)

E - OPERATOR TRAINING & LICENSE EXAMINATION 5 - REDUCED IDAD F - ADMINISTRATIVE 9 - 07HER G.- OPERATIONAL ERROR (EXPIAIN)

., H - 07HER (EXPIAIN) (5) EXHIBIT 1 - SAFE SWICE e

f *

. wmem s.o, r Ecie$f'8/[inons Reg Guide 1.16 v.,

Detroit . . -

6400 N Highway

~

Nuclear Edison w=onhD. "- March 15, 1,88 o-""-

NBC-88-0039 U. S. Nuclear Regulatory Commission Attontion: Document Control Desk Washington, D.C. 20555

Reference:

Fermi 2 NBC Docke t No. 50-341 NRC Operating License No. NPF-43

Subject:

Monthly Operating Status Report for February. 1988 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for February,1988. This report includes the Oper ating Data Repor t, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 6.9.1.6.

If you have any questions, please contact Patricia Anthony at (313) 586-1617.

Sincerely, Enclosure cci A. B. Davis J. R. Ec ker t E. G. Greenman D. R. Hahn W. G. Rogers J. J. Stefano

'\

l I