OPERATING DATA REPORT e,

DOCKET NO. 50-341 COMPLETED BY P. M. Anthony DATE June 15, 1988 TELEPHONE (313)S86-1617 OPERATING STATUS 1.

UNIT NAME:

Fermi 2 INotes:

l 2.

REPORTING PERIOD: May, 1988 l

l 3

LICENSED THERMAL POWER (MWt):

3292 I

  • To be determined i

4.

NAMEPLATE RATING (GROSS MWe):

1154 l

l S.

DESIGN ELECT RATING (Net MWe): 1093 I

I 6.

MAX DEPENDABLE CAP (GROSS MWe):

l l

7.

MAX DEPENDABLE CAP (Net MWE):

l l

8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: None 9

POWER LEVEL TO WHICH RESTRICTED, IF ANY (MWe Net):

None

10. REASONS FOR RESTRICTION, IF ANY: None THIS MONTH YR TO DATE CUMULATIVE
11. HRS IN REPORTING PERIOD 744 3109 3109
12. HRS REACTOR WAS CRITICAL 527.2 1357.9 1357.9
13. REACTOR RESERVE SHUTDOWN HRS 0

0 0

14. HOURS GENERATOR ON-LINE 430 1260 3 1260 3
15. UNIT RESERVE SHUTDOWN HOURS 0

0 0

16. GROSS THERMAL ENERGY GEN (MWH) 865,896 2,932,772 2,932,772
17. GROSS ELECT ENERGY GEN (MWH) 258,361 929,206 929,206
18. NET ELECT EFERGY GEN (MWH) 238,154 877,755 877,755 _
19. UNIT SERVICE FACTOR 57.8 40.5 40.5
20. UNIT AVAILABILITY FACTOR 57.8 40.5 40.5
21. UNIT CAP FACTOR (USING MDC NET)
22. UNIT CAP FACTOR (USING DER NET) 29 3 25.8 25.8
23. UNIT FORCED OUTAGE RATE O

1.1 1.1

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION OF EACH)

None 25..IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A

26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A ll ku

, {V / \\\\

l f

8806220321 88051/i PDR ADOCK 05000341 R

DCD

AVERAGE DAII.Y UNIT POWER LEVEL

'g:s*

DOCKET NO.

50-341 UNIT FERMI 2 DATE June 15, 1988 COMPLETED BY P. M. Anthony TELEPHONE (313) 586-1617 Month May, 1988 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

17 390 2

0 18 562 3

0 19 524 4

0 20 596 5

0 21 637 6

0 22 739 7

0 23 740 8

0 24 743 9

0 25 753 10 0

26 745 11 0

27 691 l

12 0

28 477 13 0

29 548 14 121 30 670 15 142 31 713 16 271

m_

HNIT SHUTDOWNS AND POWE!! REDUCTIONS

'o DOCKET NO.

50-341 DATE June 15. 1988 j;'. -

UNIT NAME Fermt 2 COMPLETED BY P.

M.

Anthony TELEPHONE (313)586-1617 REPORT MONTH May. 1988 I

METHOD OF LER SYS COMP CAUSE & CORRECTIVE NO.

DATE TYPE DUR REASON SHUTTING DOWN NO.

CODE CODE ACTION TO PREVENT (1)

(HRS)

(2)

THE REACTOR (4)

(5)

RECURRENCE.-

(3)

N/A 05/28/88 S

O A

5 88-023 CE l XXXX Reactor power was reduced during L

the isolation of Reactor Water Cleanup (RWCU) for a surveillance test.

The power reduction was neccessary to maintain Reacter i

l Coolant Sulfate Levels belom EPRI I

guidlines.

Power was increased-l upon restoration of RWCU.

l l

I (1) F: FORCED (2) REASON:

(3) METHOD:

(4) EXHIBIT G - INSTRUCTIONS S: SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF OATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM EVENT REPORT (LER) FILE D - REGULATORY RESTRICTION 4 - CON 1INUED (NUREG-0161)

E - OPERATOR TRAINING 1 LI.INSE EXAMINATION 5 - REDUCED LOAD F - ADMINISTRATIVE 9 - OTHER G.- OPERATIONAL ERROR (EXPLAIN)

H-OTHER (EXPL AIN)

(5) EXHIBIT t - SAME SOURCE

  • N.$

l gams];ft Nactear Owes Reg Guide 1.16 L

Detroit re-a 6400 North o,mie High*ay Nuclear e*pogM igan 48106 Operations l

June 15, 1988 NRC-88-0151 U.

S.

Nuclear Regulatory Commission Attention:

Document Control Desk Washington, D.C.

20555

Reference:

Fermi 2 NRC Docket No.

50-341 NRC Operating License No.

NPF-43

Subject:

Monthly Operating Status Report for May. 1988 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for May, 1988.

This report includes the Operating Data Report. Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 6.9.1.6.

Also attached are revisions to the January and February 1988 reports in which lines 19, 20, 22 and 23 have been revised.

If you have any questions, please contact Patricia l

Anthony at (313) 586-1617.