NRC-90-0148, Monthly Operating Rept for Sept 1990 for Fermi 2

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Sept 1990 for Fermi 2
ML20062B695
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 09/30/1990
From: Anthony P, Dawson E, Orser W
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-90-0148, CON-NRC-90-148 NUDOCS 9010260055
Download: ML20062B695 (4)


Text

.. ~.,,.~

. ~, -

wimam S, Orser 4

Len.of Vice PresWent j

Detroit

,.,-u

@ $ Q p h [g h a N8SI5 Reg Guide 1.16 guy,egr

[

v October 15, 1990-NnC-90-0148' i

i i

5 U. S.~ Nuclear Regulatory Commission Attention:

Document' Control Desk Washington, D.C.

20555 i

Reference Fermi 2.

i NRC Docket No. 50-341 j

NRC Operating License No. NPF-43

Subject:

Monthly Operating Status Report for September. 1990 Enclosed for your-information and use is the Fermi 2 Monthly Operating Status' Report for September, 1990. This-report includes the Operating Data Report,~ Average Daily dnit Power Level, and the Summary of Unit Shutdowns and Power. Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 6.9.1.6.

If you have any questions, please contact. Patricia Anthony, Compliance Engineer, at (313) 586-1617.

l Sincerely,-

-t i

W. S. Orser Senior Vice President i

Enclosure cc A. B. Davis J. R. Eckert D. R. Hahn R. W. DeFayette W. G. Rogers J. F. St.ang i

i 000.37 9010260055 900930 ADOCK 05000341 j?

o A

i PDR R

PNV

>+:"

E 1

i f

OPERATING DATA MPORT DOCKET NO. 50-341 COMPLETED BY P. M. Anthony DATE October 15, 1990 TELEPHONE (313) 586-1617 OPERATING STATUS 1.

UNIT WAME:

Fermi 2 l Notes l

l 2.

REPORTING PERIOD: September, 1990 l

None.

l 3

LICENSED THERMAL POWER (MWt): 3293 l

l 4.

NAMEPLATE RATING (GROSS MWe):

1154 l

l 5.

DESIGN ELECT RATING (Not We): 1067 l

l i

6.

MAX DEPENDABLE CAP (GROSS MWe): 1154 l

l l

7.

MAX DEPENDABLE CAP (Net MWe):

1047 l-i 8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBFR 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

None.

9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (MWe Net):

None

10. REASONS FOR RESTRICTION, IF ANY: None THIS MONTH YR M DATE CUMULATIVE
11. HRS IN REPORTING PERIOD 720 6551 23.557

(

12. HRS REACTOR WAS CRITICAL 678.8 6.276.5 17.373.4
13. REACMR RESERVE SHUTDOWN HRS 0

0 0

14. HOURS GENERAMR ON-LINE 676 6.138.4 16.435.2
15. UNIT RESERVE SHUTDOWN HOURS 0

01 0

16. GROSS THERMAL ENERGY GEN (MWH) 2.165.376 19.093.728 48.455.690
17. GROSS ELECT ENERGY GEN (MWH) 709.880 6.303.080 16.047.437
18. MET ELECT ENERGY GEN (MWH) 677.044 6.029.404 15.342.255

+

19. UNIT SERVICE FACTOR 93.9 93.7' 69.8 l
20. UNIT AVAILABILITY FACTOR 93 9 93.7 69.8
21. UNIT CAP FACTOR (USING MDC NET) 89.8 87.2

'61.2

22. UNIT CAP FACTOR (USING DER NET) 88.1 86.3 60.0
23. UNIT FORCED OUTAGE RATE O

2.1 12 5

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS'(TYPE, DATE, DURATION.OF EACH) l l

A refueling outage is scheduled to bet,in March 15,1991. 'It is presently estimated that the outage will last 7') days (breaker to breaker).

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

10/09/90

26. UNITS IN TEST STATUS (PRIOR TO COMMF.RCIAL OPERATION):

FORECAST'

. ACHIEVED INITIAL CRITICALITY N/A-N/A INITIAL ELECTRICITi W/A N/A-COMMERCIAL OPERATION.

N/A' N 'A

.m

.u

~.

ATERA(E DAILY WilIT POWER LEVIE.

DOCEET NO.

50-341 UNIT FERMI 2 DAlt October 15, 1990 COMPLETED BY-E. Dawson TELEPHONE (313) 586-5027 Month September. 1990 DAY AVERAGE DAILY POWER LEVEL' DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(NWe-Net) 1 996 17 1045 2

1016 18 1042 3

1027 19 1034 4

1021 20 1035 5

1013 21 1031 6

1010 22 965 7

1022 23 1041 8

1006 24 1038 9

1025 25 999 10 1018 26

-966 11 980 27

~1014 12 1021 28

--832 13 1017 29 19 14 1017 30 0

15 997 31 N/A 16 1037 l

.4

UNIT SHUYDOuRS AND POWER REDUCTIONS DOCKET NO.

50-341 DATE October 15. 1990 UNIT NAME

. Fermi ?

COUPLETED BV P.

w. Anthony TELEPHONE (313)S86-1617 REPORT MONTH September. 1990 I

i i

i I

i l

l l NETHOD OF l LER l SYS-l COMP CAUSE & CORRECTIVE NO.

DATE TVPE l DUR-l REASON SHUTTING DOWN l NO.

l CODE I CODE ACTION *O PREVENT l

(1) 1 (HRS)l (2)

THE REACTOR l

l (4) l (5)' l RECURRENCE l

'l l

(3)

I i

f 6

' l.90-0G9 09/29/90' S

l'44 S

l 1

I SJ l HX Entered a scheduled maintenance

' l l

l l

l l

l l'

outage to test and repair.the feed-I

)-

l l

l.

.l l

l l

l l water beaters.

Tube leaks mere l

l' l

l l

l' l

l l

l discovered and plugged.

-- l l

1 I

i-1 I

I I

I (1)'F:cFORdED

'(2) REASON:

(3) METHOD:

.(4) EXHISIT G - INSTRUCTIONS

~ SCHEDULED-A - EQUIPMENT FAILURE (EXPLA1N) 1 - MANUAL FOR PREPARATION OF DATA

.S

.8 - WAINTENANCE OR TEST 2 - MANUAL SCRAW ENTRY SHEETS FOR LICENSEE C - REFUELING-3 - AUTOMATIC SCRAM EVENT REPORT (LER) FILE D - REGULATORY RESTRICTION

.4 - CONTINUED (NUREG-0161)

E - OPERATOR TRAINING &' LICENSE EXAMINATION.

5 - REDUCED LOAD F - ADMINISTRATIVE 9 -.OTHER G.- OPERATIONAL ERROR (EXPLAIN)'

H - OTHER (EXPLAIN).

(5) EXHIBIT 1 - SAME SOURCE l

p Y

s A'M

%='h-WW4+rae a etwr

-w yr w--,,,y W

%-hwk'

-e w--w-r-hmum-m

..uA'--.

.mam.