DOCKET No.
50-341 UNIT FERHf 2 DATE February 15. 1990 COMPLETED BY
- 8. Dawson TELEPHONE (313) 586-5027 Honth January. 1990 DAY AVERAGE DA!LY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) e (MWe-Net) s 17 1051 1
1005 2
1018 18
_ 1063 3
1060 _
19 1049 i
20 1068 __
4 1011' 21 1062 1059 5
1063 6
1068 22 7
1063 23 1062 i
24-1055
-8 887 ____
1055 9
1031 25 10 1056 26 1048 11 1056 27 1066 _
1006 28 1082 __
12
~
1083 13 827 29 14 961 30 1081 if 1059 31 1083 16 1088 l-r E%
g.
R T2 :" 9: 04: 10 FM F04 2
. -. = - -.. _ -... - -
02/27/1990 16820 PLANT SAFETV 230 A!B 313 586 1615 P. 04
- OPERATING DATA REPORT DOCKET NO. 50-141 COMPLETED BY P. H. Anthony
.DATE February 15. 199 L TELEPHONE (313) 586-1617 OPERATIPO STATUS 1.
UNIT NAME:
Forni 2 INotest i
2.
REPORTING PERIOD: January _1990 l 8 To be determined l
3 LICENSED THERNAL POWER (NWt): 3293_
l.+ Revised net Rating due tol 4.
NAMEPLATE RATING (OROSS MWe):
1154 l
turbine fifth stage
(
5 DESIGN ELBCT RATING (Net NWe): 1075+
l blading removed during l
- 6. _ MAX DEPENDABLE CAP (OROSS Mlfo):
_ l 1st Refuel Outage.
I l
l 7
MAX DEPENDABLE CAP (Not NNE):
IF CHANGES OCCUR 2N CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH S.
LAST REPORT, GIVE REASONS: Line 3 revised based on Amendment 49 to the operatina license (1/18/90) Line 5 revised based upon removal _of tubine fifth state bladina.
9 POWER LEVEL TO WHICH RESTRICTED, IF ANY (MNe Net):
None
- 10. REASONS FOR RESTRICTION, IP ANY: None THIS MONTH YR TO DATE CUMULATIVE
- 11. MRS IN REPORTING PERIOD 744 744 17,750
- 12. HR$ REACTOR WAS CRITICAL 744 744 11.840.9
- 13. REAC10R RESERVE SHUTDOWN HRS 0
0 0
- 14. HOURS GENERATOR QN-LINE 744 744 11.040.8
- 15. UNIT RESERVE SNUTDOWN HOURS 0
0 0
- 16. GROSS THERNAL ENERGY GEN (MWH) 2.383.608 2.383.608 31.745.570
.17. GROSS ELECT ENERGY GEN (HWH) 804.480 804.480 10.548,837
- 18. NET ELECT ENERGY GEN (MWH) 771.723 771.723 10.084.574 100 100 62.2
- 19. UNIT SERVICE FACTOR
- 20. UNIT AVAILABILITY FACTOR 100 100 62,2
96.5 _
52.0
- 22. UNIT CAP PACTOR (USING DER NET) 96.5 l
- 23. UNIT PORCED OUTAGE RATE
_ 0 0
16.7
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTH 5 (TYPE, DATE, DURATION OF EACH)
None.
N/A
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED N/A N/A INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A__
COMMERCIAL OPERATION y--
=y w-w w
y e-
(
imtt 3sertseINIS ACS 9915I SEmuETSGNS I
i-DATE Petruerv 15 1930_
Docket 4e0.
50-3A1 COW 94.ETE9 SW P. W-antemenw '
i
-G' l
TELEPHout (3131508-9617 Q
UntT penWE Peemi 2 Ej 1 s
REPORT MOsme Jenvery. 1990
$1 I
.8 l
I I
I I
i 4
1 I
I I
I anE1Hoo or LEn I sys i Come I CAvst a comptCityE 1
l NO.
I DeTE Typt Dum NE A 5088 1~58tpfTI#G COWN eso.
I C00E I CODE I ACTIOne TO seEVEveT
- I I
I l (1)
(MRS)
(2)
I THE REACTOR (4) I (5) l RECUS#EssCE f
9 l
I I
I (3) i I
l I
~y I
I l
I I
l l
An Unuount Event ses docteered and.l l 90-001 I 91/95/9e F
l l
A i
330-001 l JC I F I
I i
seivteo.n % when a twee wee = I 8
I I
l 1
i i
sa t>. Emergency Core teet ta, Syst=1 I
I I
I I
l l
l l testsett9ty power sussply.- Entry.
I M'
I I
1 1
I i
1 i
I l
1 1
1 I
(
l
'I into fecs. Spec. 3.0.3 ese asse.
I 4
e I
g: >
I I
i 1
l 1
(
l i
i nopeirs re mese the required I
g I
I l
i i
I I
i i
1 e eture =es restorea to opersese
.I m.
i i
l i
i i
l I status, one ene shoteo.a ets-I
-4 '
I l
l 1
l l
l I continued.
l 4
I I
I I
i i
I fu (4) Eje419tf G - IteSTRUCT10ses g '-
(3) METHOD:
F0ut PREPastATION OF DATA -
U) F: FORCED (2) NEASON:
1 - maallM L D
ENTRY SDEETs FOst LICEstSEE 5: SCHEDIRED A - EQU16 FAlt.MRE (Empt.Af te) 2 - tenseunt. SCitsee S - 1enterTEm W OR TEST 3 - AUTOInnTIC Screes EvtwT rep 0 sty (LER) FILE
@L C - REFT 3Et.19e6 4 - C9erflestpEO (seWitEG-9161)
D - IEEGULATORY RESTRICTICM 5 - REDUCEO LOAD E - OPEstATest Tam 1NissG E LICEse5E EMeettaanTIOee 9 - OTHEUI F - ADIT 190tSTRATIVE G.- OP9ftAftceenL ER90st (EMPLAIN)
(5) EJette1T 1 - SAmeE SOURCE H - OTHER (EJtPtatM) g.
b 8'
e.j 5'
w l
i
- v O
s VI I
- ~ -..
,