NRC-88-0223, Monthly Operating Rept for Oct 1988 for Fermi 2

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1988 for Fermi 2
ML20206E288
Person / Time
Site: Fermi 
Issue date: 10/31/1988
From: Anthony P, Orser W
DETROIT EDISON CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CON-NRC-88-0223, CON-NRC-88-223 NUDOCS 8811180035
Download: ML20206E288 (4)


Text

<

8 OPERATING DATA REPORT DOCKET NO. 50-341 COMPLETED BY P. M. Anthony DATE November 15, 1988 TELEPHONE (313)S86-1617 OPERATING STATUS 1.

UNIT NAME:

Fermi 2 l Notes:

l 2.

REPORTING PERIOD: October, 1988 l

l 3

LICENSED THERMAL POWER (MWt): 3292 l

  • To be determined l

4.

NAMEPLATE RATING (GROSS NWe):

1154 l

l 5

DESIGN ELECT RATING (Net MWe): 1093 l

1 6.

MAX DEPENDABLE CAP (GROSS MWe):

l l

7.

MAX DEPENDABLE CAP (Net MWE):

l l

8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH Y) SINCE LAST REPORT, GIVE REASONS: None 9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (HWe Net):

None

10. REASONS FOR RESTRICTION, IF ANY: None THIS MONTH YR TO DATE CUMULATIVE
11. HRS IN REPORTING PERIOD 745 6782 6782
12. HRS REACTOR WAS CRITICAL 596.6 3668 9 3668.9
13. REACTOR RESERVE SHUTDOWN HRS O

O O

14. HOURS GENERATOR ON-LINE 574.7 3424.7 3424.7
15. UNIT RESERVE SHUTDOWN HOURS 0

0 0

16. GROSS THERMAL ENERGY GEN (MWH) 1,707,384 8,921,996 8,921,996
17. GROSS ELECT ENERGY GEN (NWH) 568,141 2,884,189 2,884,189
18. NET ELECT ENERGY GEN (MWH) 540,391 2,724,371 2,724,371
19. UNIT SERVICE FACTOR 77.1 50.5 50.5
20. UNIT AVAILABILITY FACTOR 77.1 50.5 50.5
21. UNIT CAP FACTOR (USING HDC NET)
22. UNIT CAP FACTOR (USING DER NET) 66.4 36.8 36.8
23. UNIT FORCED OUTAGE RATE 22.7 20.7 20 7
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION OF EACH)

None

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 11/07/88
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED V

INITIAL CRITICALITY

___N/A N/A INITIAL ELECTRICITY h /A N/A COMMERCIAL OPERATION N/A N/A 0011180035 001031 76,2 Y PDR ADOCK 05000341 llJl -

R PNU

AVERA M DAILY UNIT POWER LEVEL o-DOCKET NO.

50-341 UNIT FERMI 2 DATE November 15, 1988 COMPLETED BY P. N. Anthony TELEPHONE (313) 586-1617 Month October, 1988 DAY AVERAGE DAILY POWER LEVEL DAY 1"ERAGE DAILY POWER LEVEL (NWe-Net)

(NWe-Net) 1 0

17-1057 2

0 18 1009 3

0 19 1072 4

0 20 1089 5

0 21 1082 6

0 22 779 7

0 23 802 8

195 24 1055 9

342 25 1073 j

10 777 26 1082 11 1015 27 1077 l

12 1036 28 1075 13 1055 29 983 l

14 1044 30 1001 15 827 31 998 16 940 e

l I

t i

s UNIT SHUTDOWNS AND POWE_*2 CEDUCTIONS DOCuET NO.

50-341 OATE November 15. 1988 UNIT MAME Feret 2 COMPLETED BY P.

M.

Antnony TELEPHONE (313)586-1617 REPORT MONTH October 1986 I

I I

I I

l l

l l

l METHOD OF 1

LER SYS COMP CAUSE & CORRECTIVE l

%O.

l OATE i TvPE l DUR l REASON SHUTTING DCWN NO.

CODE CODE ACTION TO PREVENT l

l l (n) 1 (HRS))

(2)

THE REACTOR (4)

(5)

RECURRENCE l

1 1

I I

I (3) i i

i 88-G06 1 08/28/88 i F

i 169 1

8 4

188-032 80.

V LPCI Loop Select logic still Inop-1 1

1 l

1 l

1 I

i eraDIe due to inability to close i

l i

I l

I l

! 831-F0318.

Found torque switch i

1 l

l l

l l

l l not properly #2 set following i

1 I

l l

1 replacement of operator in 1984.

1 I

l I

l i

Motor Operated valve (MOV) problems I

l l

l l

l investigated and resolved to NRC/

l l

i j

j l

l l

Region III's satisfaction per l

l l

l l

l 1

l Correctlwe Action Letter response.

l l

l 1

l l

l

{

l Plant restarted from MOV Outage i

l I

i l

l l

l l on October 8, 1988.

I I

I i

i I

j I

l 1

i I

I I

I I

I I

I i

l 1

1 i

I (1) F: FORCED (2) R E A SON :

(3) METHOD:

(4) EXHIBIT G - INSTRUCTIONS S: SCMEDULED A - EQUI PMENT F AILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C - REFUELIkG 3 - AUTOMATIC SCRAM EVENT REPORT (LER) FILE D - REGULATORY RESTRICTION 4 - CONTINUED (NUREG-0161)

E - OPER4 TOR TRAINING & LICENSE EXAMINATION 5 - REDUCED LOAD F - ADMINISTRATIVE 9 - OTHER G.- OPERATIONAL ERROR (EXPLAIN)

H - OTHER (EXPLAIN)

(5) EXHIBIT 1 - SAME SOURCE

Cittiam S. Orser Efl[.7' 5e.,x.

Reg Guide 1.16 d

L y.v, Detroit

~

.o Edison

=E400 N: vin O.se Hrwa,w -4 November 15 1988 Nuctast NRC-68-0223 U.

S.

Nuclear Regulatory Commission Attention:

Document Control Desk Washington, D.C.

20555

Reference:

Fermi 2 NRC Docket No.

50-341 NRC Operating License No.

NPF-43

Subject:

Honthly Operating Status Report for October. 1988 Enc.losed for your information and use is the Fermi 2 Monthly Operating Statuc Report for October, 1988.

This report includes the Operating Data Report. Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specific a tio n 6.9.1.6.

If you have any questions, please contact Patricia Anthony at (313) 586-1617.