y m
OPERATING DATA REPORT I
L l
DOCKET NO.
50-341 COMPLETED BY P. M. Anthony DATE April 17, 1989 TELEPHONE (313)586-1617 l
OPERATING STATUS 1.
UNIT NAME:
Fermi 2 l Notes:
1 2.
REPORTING PERIOD: October, 1988 l
1 3
LICENSED THERMAL POWER (MWt):
329'2 l
- To be determined l
4.
NAMEPLATE RATING (GROSS MWe):
1154 i
I 5.
DESIGN ELECT RATING (Net MWe): 1093 I
l 6.
MAX DEPENDABLE CAP (GROSS MWe):
I l
7 MAX DEPENDABLE CAP (Net MWE):
I l
8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: None 9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (MWe Net):
None
- 10. REASONS FOR RESTRICTION, IF ANY: None THIS MONTH YR TO DATE CUMULATIVE
- 11. HRS IN REPORTING PERIOD 745 6782 6782
- 12. HRS REACTOR WAS CRITICAL 596.6 3668.9 3668.9
- 13. REACTOR RESERVE SHUTDOWN HRS 0
0 0
- 14. HOURS GENERATOR ON-LINE 574.7 3424.7 3424.7
- 15. UNIT RESERVE SHUTDOWN HOURS 0
0 0
- 16. GROSS THERMAL ENERGY GEN (MWH) 1,707,384 8,921,996 8,921,996
- 17. GROSS ELECT ENERGY GEN (MWH) 568,141 2,884,189 2,884,189
- 18. NET ELECT ENERGY GEN (MWH) 543,668 2,743,910 2,743,910
- 19. UNIT SERVICE FACTOR 77.1 50.5 50.5
- 20. UNIT AVAILABILITY FACTOR 77.1 50.5 50.5
- 22. UNIT CAP FACTOR (USING DER NET) 66.9 37.0 37.0 l
- 23. UNIT FORCED OUTAGE RATE 22.7 30.4 30.4 i
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION OF EACH)
None
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
11/07/88
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED
)
INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A l
8904250119 890417 7
ADOCK0500g411 DR