Text
_ _ _ _.
OPERATING DATA REPORT KET NO. 50-341 COMPLETED BY P. M. Anthony DATE October 15, 1988 TELEPHONE (313)586-1617 OPERATING STATUS 1.
UNIT NAME:
Fermi 2 l Notes:
1 2.
REPORTING PERIOD: August, 1988 l
l 3
LICENSED THERMAL POWER (MWt): 3292 l
- To be determined I
j 4.
NAMEPLATE RATING (GROSS MWe):
1154 I
l l
1 5.
DESIGN ELECT RATING (Net MWe): 1093 6.
MAX DEPENDABLE CAP (CROSS MWe):
l l
't. MAX DEPENDABLE CAP (Net MWE):
l l
8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONSt None 9.
POWER L2 VEL TO WHICH RESTRICTED, IF ANY (MWe Net):
None
- 10. REASONS FOR RESTRICTION, IF ANYt None i
THIS MONTH YF,TO DATE CUMULATIVE
- 11. HRS IN REPORTING PERIO?
744 5317 5317 l
- 12. HRS REACTOR WAS CRITICAL 451.2 3072 3 3072.3
- 13. REACTOR RESERVE SHUTDOWN HRS 0
0 0
- 14. HOURS GENERATOR ON-LINE 332.2 2850 2850 l
- 15. UN1Y RESERVE SHUTDOWN HOURS 0
0 0
- 16. GROSS THERMSL ENERGY GEN (MWil) 699,072 7,214,612 7,214,612
- 17. GROSS ELECT ENERGY GEN (MWH) 197,093 2,316,048 2.316,048
- 18. NET ELECT ENERGY GEN (MWH) 177,443 2,183,980
_2,183,980
- 19. UNIT SERVICE FACTOR 44.7 53.6 53.6
- 20. UNIT AVAILABILITY FACTOR 44.2 53.6 53.6
- 22. UNIT CAP FAC1tR (USING DER NET) 21.8 37.6 37.6
- 23. UNIT FORCED OUTAGE RATE 58.8 12.4 12.4
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION OF EACH)
None
- 25. IF SHUT DOWN AT END OF REPORT PELIOD, ESTIMATED DATE OF STARTUP: 09/16/88
- 26. UNITS IN TEST STATUS (PRIOR TO COMMEHCIAL OPERATION):
FORECAST ACHIEVED IN1.TIAL CRITICALITY
!!/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A 8810280045 881015 Oft ADOCK 05000 1