NRC-88-0165, Monthly Operating Rept for Jul 1988 for Fermi 2

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jul 1988 for Fermi 2
ML20207H209
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 07/31/1988
From: Anthony P, Oser W
DETROIT EDISON CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CON-NRC-88-0165, CON-NRC-88-165 NUDOCS 8808240396
Download: ML20207H209 (4)


Text

_

OPERATING DATA REPORT

, DOCKET NO. 50-341 COMPLETED BY P. M. Anthony DATE A_ugust 15, 1988 TELEPHONE (313)586-1617 OPERATING STATUS 1.

UNIT NAME:

Fermi 2 INotes:

l 2.

REPORTING PERIOD: July, 1988 l

l 3

LICENSED THERMAL POWER (MWt): 3292 l

  • To be determined l

4.

NAMEPLATE RATING (GROSS MWe):

1154 l

1 5

DESIGN ELECT RATING (Net MWe): 1093 I

I 6.

MAX DEPENDABLE CAP (GR0fS MWe):

l l

7 MAX DEPENDABLE CAP (Net MWE):

l l

8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPOPT, GIVE REASONS: None 9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (MWe Net):

None

10. REASONS FOR RESTRICTION, IF ANY: None THIS MONTH YR TO DATE CUMULATIVE
11. HRS IN REPORTING PERIOD 7 41!

4573 4573

12. HRS REACTOR WAS CRITICAL 543.2 2621.1

__2621.1

13. REACTOR RESERVE SHUTDOWN HRS 0

0 0

14. HOURS GENERATOR ON-LINE

_,,537.5 2517.8 2517.8

15. UNIT RESERVE SHUTDOWN HOURS 0

0 0

16. GROSS THERMAL ENERGY GEN (MWH) 1,669,848 6,515,540 6,515,540
17. GROSS ELECT ENERGY GEN (MWH) 557,802 2,118,955 2,118,955
18. NET FLECT ENERGY GEN (MWH) 527,608 2,006,532 2,006,532__
19. UNIT SERVICE FACTOR 72.2 57 3 57 3
20. UNIT AVAILABILITY FACTOR 72.2 57 3

,57 3

21. UNIT CAP FACTOR (USING MDC NET)
22. UNIT CAP FACTOR (USING DER NET) 64.9 40.1 40.1
23. UNIT FORCED OUTAGE RATE 27.8 4.8 4.8
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION OF EACH)

None

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A

$82go 000 41 MM R

PNV

  • /'-

AVERAGE DAf',Y UNIT POWER LEVEL DOCKET NO.

50-341

-UNIT FERMI 2 DATE August 15, 1988 COMPLETED BY P. M. Anthony TELEPHONE (313) 586-1617 t

Month July, 1988 l

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(HWe-Net) t 1

982 17 1013 l

2 951 18 1025 f

3 968 19 1035 4

961 20 1046 5'

955 21 1017 6

952 22 1035 7

9414 23 484 8

946 24 0

i l

9 1005 25 0

l 10 1005 26 0

11 1011 27 0

j 12 1020 28 0

I i

13' 1012 29 0

l 14 997 30 0

i l

15 1002 31 0

16 992 l

l 1

l l

t

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCMET NO.

50-341 DATE August 15, 1988 UNIT NAVE fural 2 COMPLETED SV p.

M.

Anthony TELEDHONE (313)$86-1617 REPORT MONTH July, 19R8 I

I I

I i

l I

i i

I l

l l

l l

1 l UETHOO OF l

  • ER l SYS l CCMD l CAUSE & CORRECTIVE I

No.

I DATE I TVPE l DUR i REASON l SHUTTING DOWN 1 NO.

I CODE I CODE I ACTION TO PREVENT l

J l (1) l (HMS)I (2) l THE PEACTOR l

t (s) l (5) l RECORRENCE 1

l 1

l l

l 1

(3) i 1

I i

1 i

i l

f f

t I

f 1

I I

i I

l 88-002 l 07/23/88 l F

$206.5 l A

l Z

188-026 DJ l

V Unidentified leakage increased

]

l

[

j

[

i l

CE I

l unti! shutdown of the plant

[

l l

l l

l l

l l inaccorosnce with Technical l

l l

l l

l l

l l Specification mas necessary.

Three I

(

[

}

(

l l

l l

t valves which mere leaking were

{

}

[

[

]

l l

1 I

l l repaired and items on the forced l

l t

j l

l l

l 1

l 1 outage schedute are being morkea.

l 1

I l

I l

f I

I I

(1) Fr FORCED (2) wEA50N:

( 3) ME THOD:

(4) E7HI61T G-INSTRUCTIONS 5: SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 8 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C - kEFUELING 3

AUTOMATIC SCRAM EVENT REPORT (LER) FILE D - kEGULATORY RESTRICTION 4 - CONTINUED (NUREG-0161)

E - OPERATOR TRAINING & LICENSE EXAMINATION 5 - REDUCED LOAD F - ADMINISTRATIVE 9 - OTHER G.- OPERATIONAL ERROR (EXPLAIN)

H - OTHER.EAPLAIN)

(S) EkHIBIT 1 - SAME SOURCE e

e O

4

W

?'at?:'

nac*ar omat*a5 Reg Guide 1.16 Detroit Edison

_r-a.o....

,mi..,

1 we-o-

r August 15 1988 NRC-88-0165 U.

S.

Nuclear Regulatory Commission Attention:

Document Control Desk Washington.

D.C.

20555 Reference Fermi 2 NRC Docket No.

50-341 NRC Operating License No.

NPF-43

Subject:

Monthly Operating Status Report for July. 1988 Enclosed for your information and use is the Fermi 2 Honthly Operating Status Report for July, 1988.

This report includes the Operating Data Report. Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 6.9.1.6.

If you have any questions, please contact Patricia Anthony at (313) 586-1617.