OPERATING DATA REPORT DOCKET NO.
50-341 COMPLETED BY P. M. Anthony DATE
. April 17, 1989 TELEPHONE (313)586-1617 OPERATING STATUS
- 1. ~ UNIT NAME:
Fermi 2 INotes:
2.
REPORTING PERIOD: August,'1988
.I l
3 LICENSED THERMAL POWER (MWt):
3292 1
- To be det _>: mined l
4.
NAMEPLATE RATING (GROSS MWe):
1154 I
I 5. DESIGN ELECT RATING (Net MWe): 1093 I
l j
6.
MAX DEPENDABLE CAP (GROSS MWe):
l l
7 MAX DEPENDABLE CAP (Net MWE):
l l
l 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: None l
9 POWER LEVEL TO WHICH RESTRICTED, IF ANY (MWe Net):
None I
- 10. REASONS FOR RESTRICTION, IF ANY: None THIS MONTH YR TO DATE CUMULATIVE
~
- 11. HRS IN REPORTING PERIOD 744 5317 5317
- 12. HRS REACTOR WAS CRITICAL 429 3050.1 3050.1
- 13. REACTOR RESERVE SHUTDOWN HRS 0
0 0
- 14. HOURS GENERATOR ON-LINE 306.4 2824.2 2824.2
- 15. UNIT RESERVE SHUYDOWN HOURS 0
0 0
- 16. GROSS THERMAL ENERGY GEN (MWH) 699,072 7,214,612 7,214,612
- 17. GROSS ELECT ENERGY GEN (MWH) 197,093 2,316,048 2,316,048 8
- 18. NET ELECT ENERGY GEN (MWH) 183,943 2,200,282 2,200,242
- 19. UNIT SERVICE FACTOR 41.2 53 1 53 1
- 20. UNIT AVAILABILITY FACTOR 41.2 53 1 53 1 l
- 22. UNIT CAP FACTOR (USING DER NET) 22.6 37.9 37.9
- 23. UNIT FORCED OUTAGE RATE 55.7 17.6 17.6 I
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION OF EACH) i None
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 09/16/88-
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A 8904250114 8904173 1@