ML20154N714

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1988
ML20154N714
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 04/30/1988
From: Anthony P
DETROIT EDISON CO.
To:
Shared Package
ML20154N696 List:
References
NUDOCS 8806030043
Download: ML20154N714 (3)


Text

'

OPERATING DATO Le & 21

- 1 COMPLETED BY P. M. Anthony DOCKEi NO. 50-341 DATE May 15, 1988 TELEPHONE (313)586-1617 OPERATING STATUS

1. UNIT NAME: Fermi 2 l Notes: I
2. REPORTING PERIOD: April, 1988 l l 3 LICENSED THERMAL POWER (MWt): 3292 l
  • To be determined I
4. NAMEPLATE RATING (GROSS MWe): 1154 l l DESIGN ELECT RATING (Net HWe): 1093 I l S.
  1. l
6. MAI DEPENDABLE CAP (GROSS MWe): l
  1. l
7. MAI DEPENDABLE CAP (Net HWE): l
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: None 9 POWER LEVEL TO WHICH RESTRICTED, IF ANY (HWe Net): None
10. REASONS FOR RESTRICTION, IF ANY: None THIS HONTH YR TO DATE CUMULATIVE
11. HRS IN REPORTING PERIOD 719 2365 2365
12. HRS REACTOR WAS CRITICAL _

0 830.7 830.7 0 0 0

13. REACTOR RESERVE SHUTDOWN HRS
14. HOURS GENERATOR ON-LINE o 830.3 830.3 0 0 0
15. UNIT RESERVE SHUTDOWN HOURS
16. GROSS THERMAL ENERGY GEN (MWH) 0 2,066,876 2,066,876 0 670,845 670,845
17. GROSS ELECT ENERGY GEN (MWH) 0 639,601 639,601
18. NET ELECT ENERGY GEN (HWH)
19. UNIT SERVICE FACTOR 0 35.1 35.1
20. UNIT AVAILABILITY FACTOR 0 35.1 35.1
21. UNIT CAP FACTOR (USING MDC NET)
22. UNIT CAP FACTOR (USING DER NET) 0 24.7 24.7 O 1.6 1.6
23. UNIT FORCED OUTAGE RATE
24. SHUTDOWNS SCHEDULED OVER NEIT 6 MONTHS (TYPE, DATE, DURATION OF EACH)

Fermi 2 was in an LLRT outage which ended May 5, 1988.

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 05/05/88
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY 06/20/85 06/21/85 INITIAL ELECTRICITY 10/01/86 09/21/86 COMMERCIAL OPERATION 01/23/88 01/23/88 8806030043 880526 PDR ADOCK 05000341 R DCD

I'

+ AYERAGE DAILY UNIT POWER IREL DOCKET NO. 50-341 UNIT FERMI 2 DATE May 15, 1988 i

COMPLETED BY P. M. Anthony TELEPHONE (313) 586-1617 Honth April, 1988 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (HWe-Net) (MWe-Net) 1 0 17 0 2 0 18 0 l 3 0 19 0 20 0 4 _0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 N/A 16 0 l

UNIT Si S AND POWID REDUCTIONS DATE May 15. 1988

, DOCKET NO. 50-341 -

UNIT NAME Foral 2 COMPLETED BV P. M. Anthony

  • TELEPHONE (313)586-1617
  • REPORT MONTH Apr11 1988 METHOD OF LER SYS COMP CAUSE & CORRECTIVE DA1E TYPE DUR I REASON SHUTTING DOWN NO. COOE CODE ACTION TO PREVENT NO.

(1) (HRS)' (2) THE REACTOR (4) (5) RECURRENCE (3) 719 0 1 Fermt 2 was in an LLRT outage, 88-01 02/27/88 S work was completed and plant startup began May 5 1988.

I I

(t) F FORCEC (2) REASON: (3) METHOD: (4) EXHIBIT G - INSTRUCTIONS A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA Sr SCHEDULED ENTRY SHEETS FOR LICENSEE B - MAINTENANCE OR TEST 2 - MANUAL SCRAM C - REFUELING 3 - AUTOMATIC SCRAM EVENT REPORT (LE9) FILE

~

D - REGULATORY RESTRICTION 4 - CONTINUED (NUREG-0161)

E - OPERATOR TRAINING & LICENSE EXAMINATION 5 - REDUCED LOAD F - ADMINISTRATIVE 9 - OTHER G.- OPERATIONAL ERROR (EXPLAIN)

H - OTHER (EXPLAIN) (5) EXHIBIT 1 - SAME SOURCE D

_