ML20154N714
| ML20154N714 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 04/30/1988 |
| From: | Anthony P DETROIT EDISON CO. |
| To: | |
| Shared Package | |
| ML20154N696 | List: |
| References | |
| NUDOCS 8806030043 | |
| Download: ML20154N714 (3) | |
Text
'
OPERATING DATO Le & 21 1
DOCKEi NO. 50-341 COMPLETED BY P. M. Anthony DATE May 15, 1988 TELEPHONE (313)586-1617 OPERATING STATUS 1.
UNIT NAME:
Fermi 2 l Notes:
I 2.
REPORTING PERIOD: April, 1988 l
l 3
LICENSED THERMAL POWER (MWt): 3292 l
- To be determined I
4.
NAMEPLATE RATING (GROSS MWe):
1154 l
l S.
DESIGN ELECT RATING (Net HWe): 1093 I
l 6.
MAI DEPENDABLE CAP (GROSS MWe):
l l
7.
l l
8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: None 9
POWER LEVEL TO WHICH RESTRICTED, IF ANY (HWe Net):
None
- 10. REASONS FOR RESTRICTION, IF ANY: None THIS HONTH YR TO DATE CUMULATIVE
- 11. HRS IN REPORTING PERIOD 719 2365 2365
- 12. HRS REACTOR WAS CRITICAL 0
830.7 830.7
- 13. REACTOR RESERVE SHUTDOWN HRS 0
0 0
- 14. HOURS GENERATOR ON-LINE o
830.3 830.3
- 15. UNIT RESERVE SHUTDOWN HOURS 0
0 0
- 16. GROSS THERMAL ENERGY GEN (MWH) 0 2,066,876 2,066,876
- 17. GROSS ELECT ENERGY GEN (MWH) 0 670,845 670,845
- 18. NET ELECT ENERGY GEN (HWH) 0 639,601 639,601
- 19. UNIT SERVICE FACTOR 0
35.1 35.1
- 20. UNIT AVAILABILITY FACTOR 0
35.1 35.1
- 22. UNIT CAP FACTOR (USING DER NET) 0 24.7 24.7
- 23. UNIT FORCED OUTAGE RATE O
1.6 1.6
- 24. SHUTDOWNS SCHEDULED OVER NEIT 6 MONTHS (TYPE, DATE, DURATION OF EACH)
Fermi 2 was in an LLRT outage which ended May 5, 1988.
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 05/05/88
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY 06/20/85 06/21/85 INITIAL ELECTRICITY 10/01/86 09/21/86 COMMERCIAL OPERATION 01/23/88 01/23/88 8806030043 880526 PDR ADOCK 05000341 R
I' AYERAGE DAILY UNIT POWER IREL
+
DOCKET NO.
50-341 UNIT FERMI 2 DATE May 15, 1988 i
COMPLETED BY P. M. Anthony TELEPHONE (313) 586-1617 Honth April, 1988 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (HWe-Net)
(MWe-Net) 1 0
17 0
2 0
18 0
l 3
0 19 0
4
_0 20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 N/A 16 0
l
UNIT Si S AND POWID REDUCTIONS
, DOCKET NO.
50-341 DATE May 15. 1988 UNIT NAME Foral 2 COMPLETED BV P.
M.
Anthony TELEPHONE (313)586-1617 REPORT MONTH Apr11 1988 METHOD OF LER SYS COMP CAUSE & CORRECTIVE NO.
DA1E TYPE DUR I REASON SHUTTING DOWN NO.
COOE CODE ACTION TO PREVENT (1)
(HRS)'
(2)
THE REACTOR (4)
(5)
RECURRENCE I
(3) 88-01 02/27/88 S
719 0
1 Fermt 2 was in an LLRT outage, work was completed and plant startup began May 5 1988.
I I
(t) F FORCEC (2) REASON:
(3) METHOD:
(4) EXHIBIT G - INSTRUCTIONS Sr SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM EVENT REPORT (LE9) FILE
~
D - REGULATORY RESTRICTION 4 - CONTINUED (NUREG-0161)
E - OPERATOR TRAINING & LICENSE EXAMINATION 5 - REDUCED LOAD F - ADMINISTRATIVE 9 - OTHER G.- OPERATIONAL ERROR (EXPLAIN)
H - OTHER (EXPLAIN)
(5) EXHIBIT 1 - SAME SOURCE l
D