ML20154N714

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1988
ML20154N714
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 04/30/1988
From: Anthony P
DETROIT EDISON CO.
To:
Shared Package
ML20154N696 List:
References
NUDOCS 8806030043
Download: ML20154N714 (3)


Text

'

OPERATING DATO Le & 21 1

DOCKEi NO. 50-341 COMPLETED BY P. M. Anthony DATE May 15, 1988 TELEPHONE (313)586-1617 OPERATING STATUS 1.

UNIT NAME:

Fermi 2 l Notes:

I 2.

REPORTING PERIOD: April, 1988 l

l 3

LICENSED THERMAL POWER (MWt): 3292 l

  • To be determined I

4.

NAMEPLATE RATING (GROSS MWe):

1154 l

l S.

DESIGN ELECT RATING (Net HWe): 1093 I

l 6.

MAI DEPENDABLE CAP (GROSS MWe):

l l

7.

MAI DEPENDABLE CAP (Net HWE):

l l

8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: None 9

POWER LEVEL TO WHICH RESTRICTED, IF ANY (HWe Net):

None

10. REASONS FOR RESTRICTION, IF ANY: None THIS HONTH YR TO DATE CUMULATIVE
11. HRS IN REPORTING PERIOD 719 2365 2365
12. HRS REACTOR WAS CRITICAL 0

830.7 830.7

13. REACTOR RESERVE SHUTDOWN HRS 0

0 0

14. HOURS GENERATOR ON-LINE o

830.3 830.3

15. UNIT RESERVE SHUTDOWN HOURS 0

0 0

16. GROSS THERMAL ENERGY GEN (MWH) 0 2,066,876 2,066,876
17. GROSS ELECT ENERGY GEN (MWH) 0 670,845 670,845
18. NET ELECT ENERGY GEN (HWH) 0 639,601 639,601
19. UNIT SERVICE FACTOR 0

35.1 35.1

20. UNIT AVAILABILITY FACTOR 0

35.1 35.1

21. UNIT CAP FACTOR (USING MDC NET)
22. UNIT CAP FACTOR (USING DER NET) 0 24.7 24.7
23. UNIT FORCED OUTAGE RATE O

1.6 1.6

24. SHUTDOWNS SCHEDULED OVER NEIT 6 MONTHS (TYPE, DATE, DURATION OF EACH)

Fermi 2 was in an LLRT outage which ended May 5, 1988.

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 05/05/88
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY 06/20/85 06/21/85 INITIAL ELECTRICITY 10/01/86 09/21/86 COMMERCIAL OPERATION 01/23/88 01/23/88 8806030043 880526 PDR ADOCK 05000341 R

DCD

I' AYERAGE DAILY UNIT POWER IREL

+

DOCKET NO.

50-341 UNIT FERMI 2 DATE May 15, 1988 i

COMPLETED BY P. M. Anthony TELEPHONE (313) 586-1617 Honth April, 1988 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (HWe-Net)

(MWe-Net) 1 0

17 0

2 0

18 0

l 3

0 19 0

4

_0 20 0

5 0

21 0

6 0

22 0

7 0

23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

28 0

13 0

29 0

14 0

30 0

15 0

31 N/A 16 0

l

UNIT Si S AND POWID REDUCTIONS

, DOCKET NO.

50-341 DATE May 15. 1988 UNIT NAME Foral 2 COMPLETED BV P.

M.

Anthony TELEPHONE (313)586-1617 REPORT MONTH Apr11 1988 METHOD OF LER SYS COMP CAUSE & CORRECTIVE NO.

DA1E TYPE DUR I REASON SHUTTING DOWN NO.

COOE CODE ACTION TO PREVENT (1)

(HRS)'

(2)

THE REACTOR (4)

(5)

RECURRENCE I

(3) 88-01 02/27/88 S

719 0

1 Fermt 2 was in an LLRT outage, work was completed and plant startup began May 5 1988.

I I

(t) F FORCEC (2) REASON:

(3) METHOD:

(4) EXHIBIT G - INSTRUCTIONS Sr SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM EVENT REPORT (LE9) FILE

~

D - REGULATORY RESTRICTION 4 - CONTINUED (NUREG-0161)

E - OPERATOR TRAINING & LICENSE EXAMINATION 5 - REDUCED LOAD F - ADMINISTRATIVE 9 - OTHER G.- OPERATIONAL ERROR (EXPLAIN)

H - OTHER (EXPLAIN)

(5) EXHIBIT 1 - SAME SOURCE l

D