OPERATING DATA REPORT j
4 DOCKET NO.
50-341 COMPLETED BY P. M. Anthony DATE April 17, 1989 TELEPHONE (313)586-1617 j.
OPERATING STATUS l
1.
UNIT NAME:
Fermi 2 l Notes:
l 2.
REPORTING PERIOD: September, 1988 I
l 3
LICENSED THERMAL POWER (HWt):
3292 I
- To be determined I
4.
NAMEPLATE RATING (GROSS MWe):
1154 l
l S.
DESIGN ELECT RATING (Net MWe): 1093 I
I 6.
MAX DEPENDABLE CAP (GROSS MWe):
l l
7 MAX DEPENDABLE CAP (Net MWE):
l l
8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: None 9
POWER LEVEL TO WHICH RESTRICTED, IF ANY (HWe Net):
None
- 10. REASONS FOR RESTRICTION, IF ANY: None THIS MONTH YR TO DATE CUMULATIVE
- 11. HRS IN REPORTING PERIOD
'720 6037 6037
- 12. HRS REACTOR WAS CRITICAL 0
3072.3 3072 3
- 13. REACTOR RESERVE SHUTDOWN HRS 0
0 0
- 14. HOURS GENERATOR ON-LINE O
2850 2850 0
0
- 15. UNIT RESERVE SHUTDOWN HOURS 0
- 16. GROSS THERMAL ENERGY GEN (MWH) 0 7,214,612 7,214,612
- 17. GROSS ELECT ENERGY GEN (MWH) 0 2,316,048 2,316,048
- 18. NET ELECT ENERGY GEN (MWH) 0 2,200,242 2,200,242
- 19. UNIT SERVICE FACTOR 0
47.2 47.2
- 20. UNIT AVAILABILITY FACTOR 0
47.2 47.2
- 22. UNIT CAP FACTOR (USING DER NET) 0 33.3 33 3 j
- 23. UNIT FORCED OUTAGE RATE 100 31.7 31.7
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION OF EACH)
None
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
10/06/88
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A g4250116890417 2?
ADOCK 05000341 g
PNU -