Revised Monthly Operating Rept for Jul 1988 for Fermi 2
ML20245A247
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 07/31/1988
From: Anthony P
DETROIT EDISON CO.
To:
Shared Package
ML20244E243 List:
References
NUDOCS 8904250113
Download: ML20245A247 (1)


Text

_

OPERATING DATA REPORT-DOCKET NO. 50-341 COMPLETED BY P. M. Anthony DATE April 17, 1989 TELEPHONE (313)586-1617 OPERATING STATUS 1.

UNIT NAME:

Fermi 2 INotes:

I 2.

REPORTING PERIOD: July, 1988 l

1 3

LICENSED THERMAL POWER (MWt): 3292 l

  • To be determined l

4.

NAMEPLATE RATING (GROSS MWe):

1154 l

I 5.

DESIGN ELECT RATING (Net MWe): 1093 I

I 6.

MAX DEPENDABLE CAP (GROSS MWe):

l l'

7 MAX DEPENDABLE CAP (Net MWE):

l l

8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: None 9

POWER LEVEL TO WHICH RESTRICTED, IF ANY (MWe Net):

None

10. REASONS FOR RESTRICTION, IF ANY: None THIS MONTH YR TO DATE CUMULATIVE
11. HRS IN REPORTING PERIOD 744 4573 4573
12. HRS REACTOR WAS CRITICAL 543 2 2621.1 2621.1
13. REACTOR RESERVE SHUTDOWN HRS 0

0 0

14. HOURS GENERATOR ON-LINE 537.5 2517.8 2517.8
15. UNIT RESERVE SHUTDOWN HOURS 0

0 0

16. GROSS THERMAL ENERGY GEN (MWH) 1,669,848 6,515,540 6,515,540
17. GROSS ELECT ENERGY GEN (MWH) 557,802,

2,118,955 2,118,955

18. NET ELECT ENERGY GEN (MWH) 331, 9 2 2,016,299 2,016,299
19. UNIT SERVICE FACTOR 72.2 57.3 57 3
20. UNIT AVAILABILITY FACTOR 72.2 57 3 57 3
21. UNIT CAP FACTOR (USING MDC NET)
22. UNIT CAP FACTOR (USING DER NET) 65.3 40 3 40 3 f
23. UNIT FORCED OUTAGE RATE 27.8 8.1 8.1
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION OF EACH)

None

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A 8904250113 890417 PDR ADOCK 05000341 R