OPERATING DATA REPORT
^
DOCKET NO. 50-341 Cr)MPLETED BY P. M. Anthony DATE April 17, 1989 TELEPHONE (313)586-1617 OPERATING STATUS 1.
UNIT NAME:
Fermi 2 l Notes:
1 2.
REPORTING PERIOD: January, 1989 l
l 3
LICENSED THERMAL POWER (MWL):
3292 I
- To be determined i
4.
NAMEPLATE RATING (GROSS MWe):
1154 I
I 5
DESIGN ELECT RATING _(Net MWe): 1093 I
I 6.
MA.X DEPENDABLE CAP (GROSS MWe):
l l
7 MAX DEPENDABLE CAP (Net MWE):
l l
8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: None 9
POWER LEVEL TO WHICH RESTRICTED, IF ANY (MWe Net):
None
- 10. REASONS FOR RESTRICTION, IF ANY: None THIS MONTH YR TO DATE CUMULATIVE
- 11. HRS IN REPORTING PERIOD 744 744 8990
- 12. HRS REACTOR WAS CRITICAL 509.2 509.2 5531.7
- 13. REACTOR RESERVE SHUTDOWN HRS 0
0 0
- 14. HOURS GENERATOR ON-LINE 470 470 5190.8 15.' UNIT RESERVE SHUTDOWN HOURS 0
0 0
- 16. GROSS THERMAL ENERGY GEN (MWH) 1,359,528 1,359,528 14,388,980
- 17. GROSS ELECT ENERGY GEN (MWH) 471,742 471,742 4,749,835
- 18. NET ELECT ENERGY GEN (MWH) 451,963 451,963 4,534,097
- 19. UNIT SERVICE FACTOR 63 2 63 2 57.7
)
- 20. UNIT AVAILABILITY FACTOR 63 2 63 2 57.7
- 22. UNIT CAP FACTOR (USING DER NET) 55.2 55.2 46.1
- 23. UNIT FORCED OUTAGE RATE 36.8 36.8 25.4
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION OF EACH)
None
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A i
INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A l
l 8904250126 890417 PDR ADOCK 05000341.