Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IA-86-197, Submits Revised Schedule for 1985-86 SALP Board Meetings for Region V + (Submits Revised Schedule for 1985-86 SALP Board Meetings for Region V)
- ML20215E441 + (Submits Revised Schedule for 1985-86 SALP Board Meetings for Region V)
- ML20198N781 + (Submits Revised Schedule for Completing re-assessment of Second NRC RAI for Transtor Shipping Cask Sys.Revised RAI Response Will Be Submitted by 990216)
- ML19209B135 + (Submits Revised Schedule for Completing Evaluation of Category II & III Items Re Review of Tech Spec Setpoints)
- ML19261D497 + (Submits Revised Schedule for Completing Evaluation of Category II & III Items Re Tech Spec Setpoints,Due to Unforseen Delays)
- ML20198K742 + (Submits Revised Schedule for Completion of Category III Criticality Safety Analyses Updates)
- ML20106D476 + (Submits Revised Schedule for Completion of Corrective Actions to Address Violation Noted in Insp Rept 50-482/92-08 Re Failure to Follow Procedures by Performing Maint W/O Work Request.Coordinator Position Established)
- W3P88-1341, Submits Revised Schedule for Completion of SPDS Enhancement Program.Completion of SPDS Validation Testing Expected by 890220 + (Submits Revised Schedule for Completion of SPDS Enhancement Program.Completion of SPDS Validation Testing Expected by 890220)
- ML20041E644 + (Submits Revised Schedule for Completion of IE Bulletin 79-14, Seismic Analysis for As-Built Safety-Related Piping, Requirements & Control Rod Drive Insert Withdrawal Piping Support Mods)
- ML20042C080 + (Submits Revised Schedule for Completion of PWR (EPRI) plant- Specific Repts Re Relief & Safety Valve Tests,Per NUREG-0737 Item II.D.1.Generic Testing Program Rept Will Be Submitted by 820401 & Block Valve Qualification by 820701)
- ML20069F072 + (Submits Revised Schedule for Completion of Review of Cable Pulling Tension Per IE Insp Repts 50-454/82-05 & 50-455/82-06.Addl Analysis to Assure That Recorded Tensions Acceptable Should Be Completed by 830701)
- ML13330A870 + (Submits Revised Schedule for Completion of Mods Identified in 790919 Response to IE Bulletin 79-18.Addl Time Required to Complete Mods Due to Matl Lead Times & Significant Personnel Hours Needed for Equipment Installation)
- ML20198E595 + (Submits Revised Schedule for Completion of Responses to NRC RAI Re Transtor Shipping Cask Sys)
- ML20238C661 + (Submits Revised Schedule for Completion of Several Items in Tech Spec Upgrade Program)
- ML20115D535 + (Submits Revised Schedule for Completion of Corrective Actions Associated W/Violation Noted in Insp Rept 50-482/91-26 Re Inadequate Eop.Review of EOP Delayed from 920930 to 930201)
- W3P83-2782, Submits Revised Schedule for Completion of Suppl 1 to NUREG-0737 Re Emergency Response Capability Requirements + (Submits Revised Schedule for Completion of Suppl 1 to NUREG-0737 Re Emergency Response Capability Requirements)
- IR 05000382/1990023 + (Submits Revised Schedule for Electrical Distribution Sys Functional Insp 50-382/90-23.Insp Team Will Arrive at Plant Site on 910107)
- ML20031G561 + (Submits Revised Schedule for Expedited Implementation of Emergency Procedures & Training for Station Blackout Events, Per NRC 810826 Request.Operating Procedures & Training Will Be Completed for Majority of Personnel by 811130)
- ML20128Q366 + (Submits Revised Schedule for Facility PRA Review.Draft Rept Due 841015.Final Rept Due 2 Months After Receipt of Appropriate NRC Comments)
- ML17326A383 + (Submits Revised Schedule for Final Repts on Results of Facility Analytical Evaluation)
- ML19338C429 + (Submits Revised Schedule for Fire Protection Mods. Replacement Nozzles for Booster Hoses Will Be Installed by 801031.Design Change Package for Trenches,Ramps & Curbs Will Be Completed by 801031)
- ML19241A602 + (Submits Revised Schedule for Fuel Loading Dates Due to Impact of TMI Incident)
- ML20062H176 + (Submits Revised Schedule for Implementation of Generic Ltr 89-04 Re Weaknesses in Inservice Testing Programs.Program Rev Will Be Submitted within 90 Days of Receipt of Sser or by 910430 Which Ever Comes Later)
- ML20043A639 + (Submits Revised Schedule for Implementation of Generic Ltr 89-04 Guidance.Rev to Procedures for Check Valve & Stroke Time Testing of power-operated Valves Will Be Completed by 900629)
- ML20031A922 + (Submits Revised Schedule for Implementing Procedures & Training Programs for Station Blackout.Procedure Guidelines Will Be Released to Westinghouse Owners Group by mid-Oct. Interim Procedures Will Be Availale by mid-Nov)
- ML19309C144 + (Submits Revised Schedule for Implementing Fire Protection Mods)
- ML18139B086 + (Submits Revised Schedule for Installation & Activation of Early Warning Sys at Facility.Completion Projected by 811215)
- ML20086A254 + (Submits Revised Schedule for Installation of Sparger on Steam Exhaust Line,Per Application for Amend to License DPR-30,per 900925 Meeting W/Nrc Re Util Actions to Improve Performance of Containment Isolation Valves During Testing)
- ML19340B587 + (Submits Revised Schedule for Phase II of Multiple Structure Ars Evaluation.Proposed Schedule Acceptable Since All Sys Required for Accident Mitigation.Groups 1-5 Will Be Completed by 800131)
- L-85-122, Submits Revised Schedule for Proposed Amends to Licenses DPR-31 & DPR-41.Reactor Vessel Level Monitoring Sys & Containment Purge Valve Operability Scheduled for 850415. Diesel Generator Reliability Scheduled for 850501 + (Submits Revised Schedule for Proposed Amends to Licenses DPR-31 & DPR-41.Reactor Vessel Level Monitoring Sys & Containment Purge Valve Operability Scheduled for 850415. Diesel Generator Reliability Scheduled for 850501)
- B14621, Submits Revised Schedule for Resolution of Unresolved Items Re Insp Rept 50-336/93-81 + (Submits Revised Schedule for Resolution of Unresolved Items Re Insp Rept 50-336/93-81)
- ML19256B166 + (Submits Revised Schedule for Responding to NRC Requests for Addl FSAR Info as Requested in Ref 1.Supercedes Schedule Provided in Ref 2)
- ML20205S338 + (Submits Revised Schedule for Response to NRC 990226 RAI Re 980630 Submittal of IPEEE Rept.Info Will Be Submitted by 991231)
- ML19309H362 + (Submits Revised Schedule for Response to IE Bulletin 79-01B, Environ Qualification of Class IE Equipment. Response to Items 1,2,3 & 5 Will Be Submitted by 800501.Partial Response to Item 4 Will Be Submitted by 800711)
- ML19343B932 + (Submits Revised Schedule for Response to NUREG-0737. Emergency Procedures Will Be Revised After 811201.Revisions Will Be Implemented at First Refueling Outage After 820601)
- ST-HL-AE-1670, Submits Revised Schedule for Response to 10CFR50.62, Requirements for Reduction of Risk from ATWS Events.... Response Will Be Submitted within 180 Days of Receipt of NRC SER on WCAP 18585, ATWS Mitigation Sys Actuation.. + (Submits Revised Schedule for Response to 10CFR50.62, Requirements for Reduction of Risk from ATWS Events.... Response Will Be Submitted within 180 Days of Receipt of NRC SER on WCAP 18585, ATWS Mitigation Sys Actuation..)
- ML20127B884 + (Submits Revised Schedule for Review of External Events Probabilistic Safety Assessment.Questions & Comments Will Be Provided on 840815.Site Visit Will Be Conducted in mid-Aug 1984.Draft Review Rept Will Be Submitted by 841115)
- ML20195C083 + (Submits Revised Schedule for Submittal of LER Supplemental Repts.Due to Formative Stage of Incident Analysis Group Development,Sequence of Events Occurring in 1985 & Informal Nature of Submission,Some Dates Will Not Be Met)
- ML19331E228 + (Submits Revised Schedule for Submittal of Revised Emergency Plan,As Specified by 800819 Final Rule Revising 10CFR50 & 70)
- ML20053E452 + (Submits Revised Schedule for Submittal of Addl Info Re Mark I Containment Analyses,Superseding Schedule in NRC ,In Response to Util .Description of in-plant Tests Re Safety Relief Valve Discharge Requested by 820801)
- ML20084D462 + (Submits Revised Schedule for Submittal of Tech Specs Re Snubber Surveillance.Unit 1 & 2 Specs Will Be Submitted on 840615 & 0519,respectively)
- JPN-91-045, Submits Revised Schedule for Submittal of Proposed Amend to Tech Specs to Improve Surveillance Test for Emergency Svc Water Pumps.Amend Will Be Submitted No Later than 911031 to Permit Incorporation of Ref to Inservice Insp Program + (Submits Revised Schedule for Submittal of Proposed Amend to Tech Specs to Improve Surveillance Test for Emergency Svc Water Pumps.Amend Will Be Submitted No Later than 911031 to Permit Incorporation of Ref to Inservice Insp Program)
- ML20062H011 + (Submits Revised Schedule for TMI Items II.B.3.2, Post- Accident Sampling Mods & II.F.1.6, Containment Hydrogen Concentration Monitor)
- NPL-97-0793, Submits Revised Schedule for Testing of safety-related Logic Circuits,In Response to GL 96-01.Plant Intends to Complete Required Action of GL Prior to Startup from Planned 1998 Refueling outages,U1R24 & U2R23 + (Submits Revised Schedule for Testing of safety-related Logic Circuits,In Response to GL 96-01.Plant Intends to Complete Required Action of GL Prior to Startup from Planned 1998 Refueling outages,U1R24 & U2R23)
- LIC-90-0082, Submits Revised Schedule to Replace Failed Differential Pressure Transmitter DPT-1039 & Auxiliary Feedwater Pump FW-10.Schedule for Transmitter Replacement Delayed from 900131 to 900430,subj to Receipt of Ordered Parts + (Submits Revised Schedule to Replace Failed Differential Pressure Transmitter DPT-1039 & Auxiliary Feedwater Pump FW-10.Schedule for Transmitter Replacement Delayed from 900131 to 900430,subj to Receipt of Ordered Parts)
- B13419, Submits Revised Schedule to Resolve USI A-46 Re Generic Implementation Procedures Developed by Seismic Qualification Util Group.If Final NRC SER Issued During First Quarter 1990 Walkdowns Could Be Done During Second Refueling Outage + (Submits Revised Schedule to Resolve USI A-46 Re Generic Implementation Procedures Developed by Seismic Qualification Util Group.If Final NRC SER Issued During First Quarter 1990 Walkdowns Could Be Done During Second Refueling Outage)
- GO2-90-080, Submits Revised Scheduled Completion Dates for Commitments Made in Response to Violations Noted in Insp Repts 50-397/89-06 & 50-397/89-17 + (Submits Revised Scheduled Completion Dates for Commitments Made in Response to Violations Noted in Insp Repts 50-397/89-06 & 50-397/89-17)
- ML20008F590 + (Submits Revised Scheduled Const Completion Dates for Facility.Ol Application Submittal Scheduled for Jul 1981)
- ML17272A962 + (Submits Revised Schedules for Fuel Load Dates)
- L-82-241, Submits Revised Schedules for Implementation of NUREG-0737, Items II.B.2,II.B.3 & II.F.1,per Generic Ltr 82-05 + (Submits Revised Schedules for Implementation of NUREG-0737, Items II.B.2,II.B.3 & II.F.1,per Generic Ltr 82-05)
- ML19318C479 + (Submits Revised Sdi Interest Profiles)