Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Submits Revised Schedule for Implementing Fire Protection Mods". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • IA-86-197, Submits Revised Schedule for 1985-86 SALP Board Meetings for Region V  + (Submits Revised Schedule for 1985-86 SALP Board Meetings for Region V)
  • ML20215E441  + (Submits Revised Schedule for 1985-86 SALP Board Meetings for Region V)
  • ML20198N781  + (Submits Revised Schedule for Completing re-assessment of Second NRC RAI for Transtor Shipping Cask Sys.Revised RAI Response Will Be Submitted by 990216)
  • ML19209B135  + (Submits Revised Schedule for Completing Evaluation of Category II & III Items Re Review of Tech Spec Setpoints)
  • ML19261D497  + (Submits Revised Schedule for Completing Evaluation of Category II & III Items Re Tech Spec Setpoints,Due to Unforseen Delays)
  • ML20198K742  + (Submits Revised Schedule for Completion of Category III Criticality Safety Analyses Updates)
  • ML20106D476  + (Submits Revised Schedule for Completion of Corrective Actions to Address Violation Noted in Insp Rept 50-482/92-08 Re Failure to Follow Procedures by Performing Maint W/O Work Request.Coordinator Position Established)
  • W3P88-1341, Submits Revised Schedule for Completion of SPDS Enhancement Program.Completion of SPDS Validation Testing Expected by 890220  + (Submits Revised Schedule for Completion of SPDS Enhancement Program.Completion of SPDS Validation Testing Expected by 890220)
  • ML20041E644  + (Submits Revised Schedule for Completion of IE Bulletin 79-14, Seismic Analysis for As-Built Safety-Related Piping, Requirements & Control Rod Drive Insert Withdrawal Piping Support Mods)
  • ML20042C080  + (Submits Revised Schedule for Completion of PWR (EPRI) plant- Specific Repts Re Relief & Safety Valve Tests,Per NUREG-0737 Item II.D.1.Generic Testing Program Rept Will Be Submitted by 820401 & Block Valve Qualification by 820701)
  • ML20069F072  + (Submits Revised Schedule for Completion of Review of Cable Pulling Tension Per IE Insp Repts 50-454/82-05 & 50-455/82-06.Addl Analysis to Assure That Recorded Tensions Acceptable Should Be Completed by 830701)
  • ML13330A870  + (Submits Revised Schedule for Completion of Mods Identified in 790919 Response to IE Bulletin 79-18.Addl Time Required to Complete Mods Due to Matl Lead Times & Significant Personnel Hours Needed for Equipment Installation)
  • ML20198E595  + (Submits Revised Schedule for Completion of Responses to NRC RAI Re Transtor Shipping Cask Sys)
  • ML20238C661  + (Submits Revised Schedule for Completion of Several Items in Tech Spec Upgrade Program)
  • ML20115D535  + (Submits Revised Schedule for Completion of Corrective Actions Associated W/Violation Noted in Insp Rept 50-482/91-26 Re Inadequate Eop.Review of EOP Delayed from 920930 to 930201)
  • W3P83-2782, Submits Revised Schedule for Completion of Suppl 1 to NUREG-0737 Re Emergency Response Capability Requirements  + (Submits Revised Schedule for Completion of Suppl 1 to NUREG-0737 Re Emergency Response Capability Requirements)
  • IR 05000382/1990023  + (Submits Revised Schedule for Electrical Distribution Sys Functional Insp 50-382/90-23.Insp Team Will Arrive at Plant Site on 910107)
  • ML20031G561  + (Submits Revised Schedule for Expedited Implementation of Emergency Procedures & Training for Station Blackout Events, Per NRC 810826 Request.Operating Procedures & Training Will Be Completed for Majority of Personnel by 811130)
  • ML20128Q366  + (Submits Revised Schedule for Facility PRA Review.Draft Rept Due 841015.Final Rept Due 2 Months After Receipt of Appropriate NRC Comments)
  • ML17326A383  + (Submits Revised Schedule for Final Repts on Results of Facility Analytical Evaluation)
  • ML19338C429  + (Submits Revised Schedule for Fire Protection Mods. Replacement Nozzles for Booster Hoses Will Be Installed by 801031.Design Change Package for Trenches,Ramps & Curbs Will Be Completed by 801031)
  • ML19241A602  + (Submits Revised Schedule for Fuel Loading Dates Due to Impact of TMI Incident)
  • ML20062H176  + (Submits Revised Schedule for Implementation of Generic Ltr 89-04 Re Weaknesses in Inservice Testing Programs.Program Rev Will Be Submitted within 90 Days of Receipt of Sser or by 910430 Which Ever Comes Later)
  • ML20043A639  + (Submits Revised Schedule for Implementation of Generic Ltr 89-04 Guidance.Rev to Procedures for Check Valve & Stroke Time Testing of power-operated Valves Will Be Completed by 900629)
  • ML20031A922  + (Submits Revised Schedule for Implementing Procedures & Training Programs for Station Blackout.Procedure Guidelines Will Be Released to Westinghouse Owners Group by mid-Oct. Interim Procedures Will Be Availale by mid-Nov)
  • ML19309C144  + (Submits Revised Schedule for Implementing Fire Protection Mods)