ML20062H011

From kanterella
Jump to navigation Jump to search
Submits Revised Schedule for TMI Items II.B.3.2, Post- Accident Sampling Mods & II.F.1.6, Containment Hydrogen Concentration Monitor
ML20062H011
Person / Time
Site: FitzPatrick, 05000033
Issue date: 08/09/1982
From: Bayne J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Vassallo D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.B.3, TASK-2.F.1, TASK-TM GL-82-05, GL-82-5, JPN-82-68, NUDOCS 8208130264
Download: ML20062H011 (3)


Text

-*

c> ,

POWER AUTHORITY OF THE STATE OF NEW YORK l l

lo CoLUMaus CIRCLE NEW YORK. N. Y. loo 19 E212) 397 6200 'E R C, Yg,s c, Lain e_ ,

inusTEEs **'"*""**"'*""

JOHN s.oysoN

" ,',",7,T,,7,',7,ss o

"'*,. :l"Jo."J."!.* ,0. .

UnRGE L. LNG ALLS ' " ' ' ' "

.tc r saa*=L:1 **

JOSEPH R. SCHMIEDER RicwaRo u PLve August 9, 1982 {"".*""f IE -

RosERT t WM D1 Nbb " JOHN W. BOSTON F R E DE RIC K R. CLARIC en sloan,emocacuess Director of Nuclear Reactor Regulation Twom as a.raEv U.S. Nuclear Regulatory Commission I ~~=

-  %'a*le'o"l *C "'

Washington, D.C. 20555 Attention: Mr. Domenic B. Vassallo Operating Reactors Branch No.2 Division of Licensing

Subject:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Post-TMI Requirements Generic Letter No. 82-05

References:

1. J.P. Bayne (PASNY) to D.B. Vassallo (USNRC) dated April 21, 1982. (JPN- 8 2- 3 8 )
2. D.G. Eisenhut (USNRC) to all Licensees of Operating Power Reactors dated March 17, 1982. (Generic Letter 82-05)

Dear Sir:

The Authority provided the status and schedule for fifteen NUREG-0737 items in Reference 1. This information was supplied in response to Generic Letter 82-05 (Reference 2). For the reasons detailed below, it is necessary to amend some portions of this schedule.

The Authority is in the process of changing general maintenance contractors. The current contractor is in the process of installing those modifications for which he has cognizance. Rather than to re-quest that the current general maintenance contractor start the final phases of these modifications and transfer these partially completed work phases to the new general maintenance contractor, we have decided to postpone the start of these phases until the new general maintenance contractor fully assumes his duties. The Authority considers this preferrable to having to coordinate partially completed installation phases between two contractors. It further reduces the possibility for oversights attributable to the transfer. Although the Authority has tried to minimize the impact of this change, recent contractual prob-lems have forced the postponement of the transfer by three months. A delay of this magnitude can not be absorbed into existing schedules.

~~

8208130264 820809 PDR ADOCK 05000033 '

P PDR

~

For this reason, we find it necessary to revise two of the fifteen completion dates previously provided.to you. Our integrated schedule will also'be revised to reflect these changes in the near future.

Attached to this letter is a list of these items and their new completion dates.

If you have any further questions, please contact Mr. J.A. Gray,Jr.

of my staff.

Very truly yours, f

J.P. Bayne y[yTf ir.$E (fyf[$ ten Executive Vice President c . m :'.cF> Nuclear Generation cue n:e a nr.: .u c> m'y f Comm;3sica E@im iMf;h 30* l'#h),

State of New York County of New York Subscribed and Sworn to before methisgddayof  ; g 7, 6 2 b M ., ['jh d Not,ary/Pubi~ic cc: Mr. J. Linville Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 136 Lycoming, N.Y. 13093 Mr. Ron Barton United Engineers & Constructors, Inc.

30 S. 17th Street Philadelphia,- PA 19101

g ..%

i

)

Attachment to JPN .

Revised Implementation Schedule Generic Letter No. 82-05 No. Item Description Date  !

II.B.3.2 Post-accident Sampling Modifications 3/31/82 f II.F.1.6 Containment Hydrogen Concentration Monitor 3/31/82 f

[