ML17272A962

From kanterella
Jump to navigation Jump to search
Submits Revised Schedules for Fuel Load Dates
ML17272A962
Person / Time
Site: Columbia, Washington Public Power Supply System, Satsop  Energy Northwest icon.png
Issue date: 05/07/1980
From: Renberger D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8005140465
Download: ML17272A962 (5)


Text

REGULATOR NFORMATION DISTRIBUTION TEM (BIDS) NuP(ui ACCESSION NBR:8005140465 DOC ~ DATE: 80/05/07 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Projecti Unit 2P Washington Public Powe 05000397 50-460 BYNAME WPPSS Nuclear Projecti Unit 1i Washington Public Powe 05000460 50 513 WPPSS Nuclear Projecti Unit 4i Washington Public Powe 05000513 AUTH AUTHOR AFFILIATION RENBERGERPD,L. Washington Public Power Supply System RECIP ~ NAME RECIPIENT AFFILIATION DENTONPH ~ RE Office of Nuclear Reactor Regulation

SUBJECT:

Submits revised schedules for fuel load dates.

DISTRIBUTION CODE ~ B001S COPIES RECEIYED LTR g ENCL g SIZE ~

TITLE! PSAR/FSAR AMDTS and Related Correspondence NOTES:EW MMX C~<=CQ Z~~i4ul ~~ AZ>~< &~ ~CSEE~ ~

gr8IVzpgyizfbf PLbdv-. ih RECIPIENT gIISOPIES RECIPIENT COPIES ID CODE/NAME 6 L'TTR ENCL ID CODE/NAME LTTR ENCL ACTION: 05 PM &. C.P/IlC+i AD gQJR 1 BC LmrC u y iugga1 LA gCug Cg Lu)/431 INTERNAL: G FILE 02 NRC PDR 1 I~ 08 OPERA LIC BR 1 09 GEOSCIEN BR 10 QAB 1 11 MECH ENG BR 12 STRUC ENG BR 1 13 NATL ENG BR 15 REAC SYS BR 1 16 ANALYSIS BR 17 CORE PERF BR 1 18 AUX SYS BR 19 CONTAIN SYS 1 20 I 8 C SYS BR 21 POWER SYS BR 1 22 AD SITE TECH 26 ACCDNT ANLYS 1 27 EFFL TRT SYS 28 RAD ASMT BR 1 29 KIRKWOOD AD FOR ENG 1 AD PLANT SYS AD REAC SAFETY 1 AD SITE ANLYS IS DIRECTOR NRR 1 HYDRO METEOR BR MPA 1 OELD EXTERNAL: 03 LPDR u 04 NSIC 30 ACRS 10 1 QV ~s tgso 57 TOTAL NUMBER OF COPIES REQUIRED: LTTR ~ ENCL

/

~ ~ q* p 4 'U E

III t'i

8005140 +6 S '

Washington Public Power Supply System A JOINT OPERATING AGENCY P. O. aox 988 3000 Gso. WAsHtNcroN WAY RicHt.ANo. WAsHiNcroN 99352 PeeoNs 1509) 375.5000 Hay 7, 1980.

Docket Nos. 50-397 and 50-460/513 and 50-508/509 Mr. H. R. Denton, Dir ector Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

FUEL LOAD DATES FOR WPPSS NUCLEAR PROJECTS

Dear Mr. Denton:

The purpose of this letter is to advise you of recent changes in the scheduled fuel load dates for the WPPSS nuclear projects.

The revised schedules, which were approved by our Board of Directors on April 25, 1980, for budget planning pur poses, ar e as fol 1 ows:

~Pro ect Docket No. d WNP-2 50-397 July 1982 Jan. 1983 WNP-1 50-460 Dec. 1984 June 1985 WNP-3 50-508 Dec. 1985 June 1986 WNP-4 50-513 Dec. 1985 June 1986 WNP-5 50-509 Dec. 1986 June 1987 Since our schedules are continually being reviewed as a part of our budget control process, we will advise you shouTd' any future changes occur.

l-Mr . H.R. Denton Page 2 Mayl7, 1980 We will be working directly with the assigned NRC Project Licensing managers for WNP-1/4 and WNP-3/5 with regard to the submittal dates for operating license applications for those projects.

Very truly yours, D. L. RENBERGER, Assistant Dir ec tor, Technology DLR:GCS:crw cc: Mr. Anthony Bournia, NRC Mr . M. D. Lynch, NRC Mr . D. G. Eisenhut, NRC Mr. N. S. Reynolds