ML17272A962
| ML17272A962 | |
| Person / Time | |
|---|---|
| Site: | Columbia, Washington Public Power Supply System, Satsop |
| Issue date: | 05/07/1980 |
| From: | Renberger D WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8005140465 | |
| Download: ML17272A962 (5) | |
Text
REGULATOR NFORMATION DISTRIBUTION TEM (BIDS)
NuP(ui ACCESSION NBR:8005140465 DOC ~ DATE: 80/05/07 NOTARIZED:
NO FACIL:50-397 WPPSS Nuclear Projecti Unit 2P Washington Public 50-460 WPPSS Nuclear Projecti Unit 1i Washington Public 50 513 WPPSS Nuclear Projecti Unit 4i Washington Public AUTH BYNAME AUTHOR AFFILIATION RENBERGERPD,L.
Washington Public Power Supply System RECIP ~ NAME RECIPIENT AFFILIATION DENTONPH ~ RE Office of Nuclear Reactor Regulation
SUBJECT:
Submits revised schedules for fuel load dates.
DOCKET Powe 05000397 Powe 05000460 Powe 05000513 DISTRIBUTION CODE ~
B001S COPIES RECEIYED LTR g ENCL g
SIZE ~
TITLE! PSAR/FSAR AMDTS and Related Correspondence NOTES:EW MMX C~<=CQ Z~~i4ul~~ AZ>~<
&~ ~CSEE~
~
gr8IVzpgyizfbf PLbdv-.
ih RECIPIENT gIISOPIES RECIPIENT COPIES ID CODE/NAME 6 L'TTR ENCL ID CODE/NAME LTTR ENCL ACTION:
INTERNAL:
05 PM &. C.P/IlC+i BC LmrC u y iugga1 G FILE I~
09 GEOSCIEN BR 11 MECH ENG BR 13 NATL ENG BR 16 ANALYSIS BR 18 AUX SYS BR 20 I 8
C SYS BR 22 AD SITE TECH 27 EFFL TRT SYS 29 KIRKWOOD AD PLANT SYS AD SITE ANLYS IS HYDRO METEOR BR OELD AD gQJR 1
LA gCug Cg Lu)/431 02 NRC PDR 1
08 OPERA LIC BR 1
10 QAB 1
12 STRUC ENG BR 1
15 REAC SYS BR 1
17 CORE PERF BR 1
19 CONTAIN SYS 1
21 POWER SYS BR 1
26 ACCDNT ANLYS 1
28 RAD ASMT BR 1
AD FOR ENG 1
AD REAC SAFETY 1
DIRECTOR NRR 1
MPA 1
EXTERNAL: 03 LPDR 30 ACRS u
10 1
04 NSIC QV ~s tgso 57 TOTAL NUMBER OF COPIES REQUIRED:
LTTR ~
ENCL
/
~
~
q*
p 4
'U E
III t'i
8005140 +6 S Washington Public Power Supply System A JOINT OPERATING AGENCY P. O. aox 988 3000 Gso. WAsHtNcroN WAY RicHt.ANo. WAsHiNcroN 99352 PeeoNs 1509) 375.5000 Hay 7, 1980.
Docket Nos.
50-397 and 50-460/513 and 50-508/509 Mr. H.
R.
- Denton, Dir ector Office of Nuclear Reactor Regulation U.S.
Nuclear Regulatory Commission Washington, DC 20555
Subject:
FUEL LOAD DATES FOR WPPSS NUCLEAR PROJECTS
Dear Mr. Denton:
The purpose of this letter is to advise you of recent changes in the scheduled fuel load dates for the WPPSS nuclear projects.
The revised schedules, which were approved by our Board of Directors on April 25, 1980, for budget planning pur poses, ar e a s fol 1 ows:
~Pro ect WNP-2 WNP-1 WNP-3 WNP-4 WNP-5 Docket No.
50-397 50-460 50-508 50-513 50-509 d
July 1982 Dec.
1984 Dec.
1985 Dec.
1985 Jan.
1983 June 1985 June 1986 June 1986 Dec.
1986 June 1987 Since our schedules are continually being reviewed as a part of our budget control process, we will advise you shouTd' any future changes occur.
l-
Mr. H.R.
Denton Page 2
Mayl7, 1980 We will be working directly with the assigned NRC Project Licensing managers for WNP-1/4 and WNP-3/5 with regard to the submittal dates for operating license applications for those projects.
Very truly yours, DLR:GCS:crw cc:
Mr. Anthony Bournia, NRC Mr.
M.
D. Lynch, NRC Mr.
D.
G. Eisenhut, NRC Mr. N. S.
Reynolds D. L.
RENBERGER, Assistant Dir ec tor, Technology