Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Cover Letter 71 9330_Request_for_NRC_Amendment_to_CoC_9330_2022". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML18060A412  + (Cover Letter - Vogtle Electric Generating Plant Units 3 and 4 LAR 17-034 - TS Changes to Support Control Rod Testing in Cold Shutdown with RCPs Not in Operation)
  • ML17332A147  + (Cover Letter - Vogtle Electric Generating Plant, Units 3 and 4 - Issuance of Amendment Nos. 106/105 (LAR-16-031)re Shield Building Roof Changes)
  • ML19133A168  + (Cover Letter - Vogtle Electric Generating Plant, Units 3 and 4 LAR 18-030)
  • ML20247J458  + (Cover Letter - Vogtle Electric Generating Plant Units 3 and 4 Amendment Nos. 185/183 (LAR 20-004))
  • ML18026A566  + (Cover Letter - Vogtle Electric Generating Plant Units 3 and 4 LAR 17-009)
  • ML18072A053  + (Cover Letter - Vogtle Electric Generating Plant Units 3 and 4 LAR 17-018)
  • ML18100A070  + (Cover Letter - Vogtle Electric Generating Plant Units 3 and 4 LAR 17-021)
  • ML18040B076  + (Cover Letter - Vogtle Electric Generating Plant Units 3 and 4 LAR 17-036)
  • ML18106A628  + (Cover Letter - Vogtle Electric Generating Plant Units 3 and 4 LAR 17-042)
  • ML20013G661  + (Cover Letter - Vogtle Electric Generating Plant, Unit 4 (LAR 19-016))
  • ML18235A030  + (Cover Letter - Vogtle LAR 17-037 - Issuance of Amendments 142 and 141 and Granting of Exemptions Re Changes to the Tier 2* Departure Evaluation Process)
  • ML18289A743  + (Cover Letter - Vogtle LAR-17-043 Containment Pressure Analysis, VEGP Units 3 and 4, Amendment 147/146)
  • ML17297A350  + (Cover Letter - Vogtle Units 3 and 4 Chemical Addition with Reactor Coolant Pumps (LAR 17-019))
  • ML18071A358  + (Cover Letter - Vogtle Units 3 and 4, Alternative ALT-08, Counterboring of Class 1 Piping, Components, and Fittings with Weld End Transitions)
  • IR 05000390/2016201  + (Cover Letter - Watts Bar, Units 1 and 2 - NRC Security Baseline Inspection Report 05000390/2016201 and 05000391/2016201)
  • ML25202A208  + (Cover Letter - Westinghouse - Approval of 2025 Triennial DFP Submittal)
  • ML22165A116  + (Cover Letter - Westinghouse Electric Co - NRC Feedback Regarding Evinci White Papers - Second Round White Paper)
  • ML23006A260  + (Cover Letter - Westinghouse Electric Company - U.S. Nuclear Regulatory Commission Feedback Regarding Evinci White Papers Wave 4)
  • ML23244A651  + (Cover Letter - Westinghouse Electric Company - U.S. Nuclear Regulatory Commission Feedback Regarding Evinci White Papers Wave 6)
  • ML21203A059  + (Cover Letter - Westinghouse Electric Company, LLC - Amendment 27 to Material License SNM-1107, Exemption of Time for Late Shipment Notifications (Enterprise Project Identifier L-2021-LLA-0013))
  • ML15356A083  + (Cover Letter - Withdrawal of an Amendment Request to Revise Battery Cell Resistances to Address Potential Non-Conservative Technical Specification)
  • ML24305A218  + (Cover Letter - X-Energy Llc. Xenith Micro-Reactor - NRC Feedback Regarding Concept of Operations White Paper)
  • ML22046A085  + (Cover Letter - for LES Amendment 94 - Approval Request for Alterations to the Physical Security Plan (LAR-21-01))
  • ML24138A115  + (Cover Letter - the U.S. Nuclear Regulatory Commission Approval Letter for Westinghouse Emergency Plan Change Request for Columbia Fuel Fabrication Facility)
  • ML13260A585  + (Cover Letter -Safety Evaluation in Support of Request for Relief Associated with the Fifth 10-Year Interval Inservice Inspection Program (TAC Nos. ME9682, ME9683, ME9684, ME9685, ME9686, ME9687, ME9688, Etc)
  • ML092510139  + (Cover Letter 09/04/2009 LaSalle County Generating Station IR 2009-404)
  • ML22158A271  + (Cover Letter 71 9330_Request_for_NRC_Amendment_to_CoC_9330_2022)
  • EPID:L-2022-LLA-0009  + (Cover Letter 71 9330_Request_for_NRC_Amendment_to_CoC_9330_2022)
  • ML22153A089  + (Cover Letter 71-3092)
  • ML24255A838  + (Cover Letter AMNMS-14-0038 - Model No. 9975 Shipping Package, Docket No. 71-9975)
  • ML23317A247  + (Cover Letter AOS-025A, AOS-050A, AOS-100A, AOS-100B, and AOS-100A-S Packages)
  • ML19044A501  + (Cover Letter Amendment No. 156 (LAR 18-026))
  • ML24145A134  + (Cover Letter Application for Certificate of Compliance for the Model RT-200 Type B(U) Cask - Accepted for Review)
  • ML24256A182  + (Cover Letter Audit Plan Westinghouse Electric Company Topical Report WCAP-18850-P/NP, Adaptation of the Full Spectrum LOCA (Fsloca) Evaluation Methodology to Perform Analysis of Cladding Rupture for High Burnup Fuel)
  • ML22314A119  + (Cover Letter Audit Plan Westinghouse TR CENPD-289-NP, Supplement 1, Revision 0, Use of Inert Replacement Rods in CE 16x16 Next Generation Fuel (CE16NGFTM))
  • ML24324A171  + (Cover Letter Audit Plan for the December 12-13, 2024, Regulatory Audit for Westinghouse Electric Company Topical Report WCAP-18869-P/NP, High Performance Cladding for Use in Boiling Water Reactor Fuel)
  • ML24199A223  + (Cover Letter Audit Report Westinghouse Topical Report WCAP-18773-P/NP, Higher Enrichment for Westinghouse and Combustion Engineering Fuel Designs)
  • ML21047A466  + (Cover Letter Audit Report for the November 9, 10, 12, and 13, 2020 Regulatory Audit for Westinghouse Electric Company WCAP-18482-P/WCAP-18482-NP, Revision 0, Westinghouse Advanced Doped Pellet Technology (Adopttm) Fuel)
  • ML24060A282  + (Cover Letter BWXT Amendment 47 (Public))
  • ML24278A130  + (Cover Letter Banr Un TRISO Fuel Qualification Plan White Paper BWXT EPID No L-2024-LRO-0000)
  • IR 05000456/2022420  + (Cover Letter Braidwood Station Units 1 and 2 Security Baseline Inspection Report 05000456/2022420 and 05000457/2022420)
  • ML24068A093  + (Cover Letter Calendar Year 2023, Annual Report (Public))
  • ML20272A174  + (Cover Letter Centrus/Aco ACP Classified Matter Protection Plan Amendment)
  • ML23191A150  + (Cover Letter Certificate of Compliance No. 9309, Rev. No. 13 for the Model No. RAJ-II Package)
  • ML15163A155  + (Cover Letter Corrected Exh NYS000532)
  • NRC 2018-0019, Cover Letter Correction - Licensee Event Report 2017-001-00  + (Cover Letter Correction - Licensee Event Report 2017-001-00)
  • ML20178A655  + (Cover Letter Dated June 26, 2020 from Exubrion to NRC Regarding Second Round RAI Responses)
  • ML20142A292  + (Cover Letter Dated May 15, 2020 from Exubrion to NRC Regarding RAI Responses)
  • ML19190A025  + (Cover Letter Draft Safety Evaluation for Westinghouse Electric Company LTR-NRC-19-15, Notification of Changes to Westinghouse Qms)
  • ML19288A128  + (Cover Letter Draft Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-17769-P/NP, Revision 0, Reference Fuel Design SVEA-96 OPTIMA3)
  • ML18094A260  + (Cover Letter Draft Safety Evaluation for Westinghouse Electric Company (Westinghouse) Topical Report WCAP-17203-P/WCAP-17203-NP, Revision 0-2, Fast Transient and ATWS (Anticipated Transient Without Scram) Methodology)
  • ML19364A058  + (Cover Letter Draft Safety Evaluation for Westinghouse Electric Company Request to Modify Safety Evaluation Report on WCAP-12472-P-A, Beacontm Core Monitoring and Operations Support System)