Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18060A412 + (Cover Letter - Vogtle Electric Generating Plant Units 3 and 4 LAR 17-034 - TS Changes to Support Control Rod Testing in Cold Shutdown with RCPs Not in Operation)
- ML17332A147 + (Cover Letter - Vogtle Electric Generating Plant, Units 3 and 4 - Issuance of Amendment Nos. 106/105 (LAR-16-031)re Shield Building Roof Changes)
- ML19133A168 + (Cover Letter - Vogtle Electric Generating Plant, Units 3 and 4 LAR 18-030)
- ML20247J458 + (Cover Letter - Vogtle Electric Generating Plant Units 3 and 4 Amendment Nos. 185/183 (LAR 20-004))
- ML18026A566 + (Cover Letter - Vogtle Electric Generating Plant Units 3 and 4 LAR 17-009)
- ML18072A053 + (Cover Letter - Vogtle Electric Generating Plant Units 3 and 4 LAR 17-018)
- ML18100A070 + (Cover Letter - Vogtle Electric Generating Plant Units 3 and 4 LAR 17-021)
- ML18040B076 + (Cover Letter - Vogtle Electric Generating Plant Units 3 and 4 LAR 17-036)
- ML18106A628 + (Cover Letter - Vogtle Electric Generating Plant Units 3 and 4 LAR 17-042)
- ML20013G661 + (Cover Letter - Vogtle Electric Generating Plant, Unit 4 (LAR 19-016))
- ML18235A030 + (Cover Letter - Vogtle LAR 17-037 - Issuance of Amendments 142 and 141 and Granting of Exemptions Re Changes to the Tier 2* Departure Evaluation Process)
- ML18289A743 + (Cover Letter - Vogtle LAR-17-043 Containment Pressure Analysis, VEGP Units 3 and 4, Amendment 147/146)
- ML17297A350 + (Cover Letter - Vogtle Units 3 and 4 Chemical Addition with Reactor Coolant Pumps (LAR 17-019))
- ML18071A358 + (Cover Letter - Vogtle Units 3 and 4, Alternative ALT-08, Counterboring of Class 1 Piping, Components, and Fittings with Weld End Transitions)
- IR 05000390/2016201 + (Cover Letter - Watts Bar, Units 1 and 2 - NRC Security Baseline Inspection Report 05000390/2016201 and 05000391/2016201)
- ML25202A208 + (Cover Letter - Westinghouse - Approval of 2025 Triennial DFP Submittal)
- ML22165A116 + (Cover Letter - Westinghouse Electric Co - NRC Feedback Regarding Evinci White Papers - Second Round White Paper)
- ML23006A260 + (Cover Letter - Westinghouse Electric Company - U.S. Nuclear Regulatory Commission Feedback Regarding Evinci White Papers Wave 4)
- ML23244A651 + (Cover Letter - Westinghouse Electric Company - U.S. Nuclear Regulatory Commission Feedback Regarding Evinci White Papers Wave 6)
- ML21203A059 + (Cover Letter - Westinghouse Electric Company, LLC - Amendment 27 to Material License SNM-1107, Exemption of Time for Late Shipment Notifications (Enterprise Project Identifier L-2021-LLA-0013))
- ML15356A083 + (Cover Letter - Withdrawal of an Amendment Request to Revise Battery Cell Resistances to Address Potential Non-Conservative Technical Specification)
- ML24305A218 + (Cover Letter - X-Energy Llc. Xenith Micro-Reactor - NRC Feedback Regarding Concept of Operations White Paper)
- ML22046A085 + (Cover Letter - for LES Amendment 94 - Approval Request for Alterations to the Physical Security Plan (LAR-21-01))
- ML24138A115 + (Cover Letter - the U.S. Nuclear Regulatory Commission Approval Letter for Westinghouse Emergency Plan Change Request for Columbia Fuel Fabrication Facility)
- ML13260A585 + (Cover Letter -Safety Evaluation in Support of Request for Relief Associated with the Fifth 10-Year Interval Inservice Inspection Program (TAC Nos. ME9682, ME9683, ME9684, ME9685, ME9686, ME9687, ME9688, Etc)
- ML092510139 + (Cover Letter 09/04/2009 LaSalle County Generating Station IR 2009-404)
- ML22158A271 + (Cover Letter 71 9330_Request_for_NRC_Amendment_to_CoC_9330_2022)
- EPID:L-2022-LLA-0009 + (Cover Letter 71 9330_Request_for_NRC_Amendment_to_CoC_9330_2022)
- ML22153A089 + (Cover Letter 71-3092)
- ML24255A838 + (Cover Letter AMNMS-14-0038 - Model No. 9975 Shipping Package, Docket No. 71-9975)
- ML23317A247 + (Cover Letter AOS-025A, AOS-050A, AOS-100A, AOS-100B, and AOS-100A-S Packages)
- ML19044A501 + (Cover Letter Amendment No. 156 (LAR 18-026))
- ML24145A134 + (Cover Letter Application for Certificate of Compliance for the Model RT-200 Type B(U) Cask - Accepted for Review)
- ML24256A182 + (Cover Letter Audit Plan Westinghouse Electric Company Topical Report WCAP-18850-P/NP, Adaptation of the Full Spectrum LOCA (Fsloca) Evaluation Methodology to Perform Analysis of Cladding Rupture for High Burnup Fuel)
- ML22314A119 + (Cover Letter Audit Plan Westinghouse TR CENPD-289-NP, Supplement 1, Revision 0, Use of Inert Replacement Rods in CE 16x16 Next Generation Fuel (CE16NGFTM))
- ML24324A171 + (Cover Letter Audit Plan for the December 12-13, 2024, Regulatory Audit for Westinghouse Electric Company Topical Report WCAP-18869-P/NP, High Performance Cladding for Use in Boiling Water Reactor Fuel)
- ML24199A223 + (Cover Letter Audit Report Westinghouse Topical Report WCAP-18773-P/NP, Higher Enrichment for Westinghouse and Combustion Engineering Fuel Designs)
- ML21047A466 + (Cover Letter Audit Report for the November 9, 10, 12, and 13, 2020 Regulatory Audit for Westinghouse Electric Company WCAP-18482-P/WCAP-18482-NP, Revision 0, Westinghouse Advanced Doped Pellet Technology (Adopttm) Fuel)
- ML24060A282 + (Cover Letter BWXT Amendment 47 (Public))
- ML24278A130 + (Cover Letter Banr Un TRISO Fuel Qualification Plan White Paper BWXT EPID No L-2024-LRO-0000)
- IR 05000456/2022420 + (Cover Letter Braidwood Station Units 1 and 2 Security Baseline Inspection Report 05000456/2022420 and 05000457/2022420)
- ML24068A093 + (Cover Letter Calendar Year 2023, Annual Report (Public))
- ML20272A174 + (Cover Letter Centrus/Aco ACP Classified Matter Protection Plan Amendment)
- ML23191A150 + (Cover Letter Certificate of Compliance No. 9309, Rev. No. 13 for the Model No. RAJ-II Package)
- ML15163A155 + (Cover Letter Corrected Exh NYS000532)
- NRC 2018-0019, Cover Letter Correction - Licensee Event Report 2017-001-00 + (Cover Letter Correction - Licensee Event Report 2017-001-00)
- ML20178A655 + (Cover Letter Dated June 26, 2020 from Exubrion to NRC Regarding Second Round RAI Responses)
- ML20142A292 + (Cover Letter Dated May 15, 2020 from Exubrion to NRC Regarding RAI Responses)
- ML19190A025 + (Cover Letter Draft Safety Evaluation for Westinghouse Electric Company LTR-NRC-19-15, Notification of Changes to Westinghouse Qms)
- ML19288A128 + (Cover Letter Draft Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-17769-P/NP, Revision 0, Reference Fuel Design SVEA-96 OPTIMA3)
- ML18094A260 + (Cover Letter Draft Safety Evaluation for Westinghouse Electric Company (Westinghouse) Topical Report WCAP-17203-P/WCAP-17203-NP, Revision 0-2, Fast Transient and ATWS (Anticipated Transient Without Scram) Methodology)
- ML19364A058 + (Cover Letter Draft Safety Evaluation for Westinghouse Electric Company Request to Modify Safety Evaluation Report on WCAP-12472-P-A, Beacontm Core Monitoring and Operations Support System)