ML25202A208

From kanterella
Jump to navigation Jump to search

Cover Letter - Westinghouse - Approval of 2025 Triennial DFP Submittal
ML25202A208
Person / Time
Site: Westinghouse
Issue date: 08/12/2025
From: Lav S
NRC/NMSS/DFM/FFLB
To: Subosits S
Westinghouse
Shared Package
ML25202A207 List:
References
EPID L-2025-DFA-0018
Download: ML25202A208 (1)


Text

OFFICIAL USE ONLYPROPRIETARY INFORMATION OFFICIAL USE ONLYPROPRIETARY INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Stephen Subosits, Manager, Regulatory Affairs Westinghouse Columbia Fuel Fabrication Facility 5801 Bluff Road Hopkins, SC 29061-9121

SUBJECT:

APPROVAL OF TRIENNIAL UPDATE OF THE DECOMMISSIONING FUNDING PLAN FOR THE COLUMBIA FUEL FABRICATION FACILITY IN HOPKINS, SOUTH CAROLINA - ENTERPRISE PROJECT IDENTIFICATION NUMBER L-2025-DFA-0018

Dear Stephen Subosits:

We have reviewed your updated decommissioning cost estimate (DCE) submitted by letter dated May 8, 2025 (Agencywide Documents Access and Management System [ADAMS]

Accession No. ML25128A133). We approve the updated estimate for the cost of decommissioning. Specifically, we find that the cost estimate is based on reasonable and documented assumptions, and that it adequately estimates the cost, at this time, to decommission the facility, if necessary. Our safety evaluation report for the approval of the decommissioning funding plan is enclosed.

Accordingly, the U.S. Nuclear Regulatory Commission (NRC) staff considers that the Westinghouse 2025 DCE satisfies the requirements of Title 10 of the Code of Federal Regulations (10 CFR), Paragraph 70.25(e). We request that you proceed with revising the financial assurances mechanism and certification of financial assurance and submit them within 30 days of the date of this letter.

Your submittal was assigned Enterprise Project Identifier (EPID) L-2025-DFA-0018. The EPID will be closed. A new EPID will be opened for processing the review and approval of the updated financial assurance instruments and an updated certification of financial assurance.

In accordance with 10 CFR Section 2.390, Public inspections, exemptions, requests for withholding, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records component of the NRCs ADAMS. ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. The PDR is open by appointment. To make an appointment to visit the PDR, please send an email to PDR.Resource@nrc.gov or call 1-800-397-4209 or 301-415-4737, between 8 a.m. and 4 p.m. eastern time (ET), Monday through Friday, except Federal holidays. The Safety Evaluation Report will not be publicly available.

The enclosure transmitted herewith contains proprietary information. When separated from the enclosure this document is decontrolled.

August 12, 2025

OFFICIAL USE ONLYPROPRIETARY INFORMATION S. Subosits 2

OFFICIAL USE ONLYPROPRIETARY INFORMATION If you have any questions, please contact Yawar Faraz at 301-415-7220, or via email at Yawar.Faraz@nrc.gov.

Sincerely, Samantha C. Lav, Chief Fuel Facility Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards Docket No.: 70-1151 License No.: SNM-1107

Enclosure:

Safety Evaluation Report (Non-public) cc: westinghouse_ff@listmgr.nrc.gov Signed by Lav, Samantha on 08/12/25

ML25202A207 (pkg, non-public), ML25202A208 (ltr),

ML25202A209 (encl 1, non-public)

OFFICE NMSS/DFM/FFLB NMSS/DFM/FFLB NMSS/REFS/FAB NAME YFaraz JGoodridge FMiller DATE 7/31/2025 8/01/2025 8/04/2025 OFFICE NMSS/DFM/FFLB NAME SLav DATE 8/12/2025