Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML13316A294 + (Ack Efforts to Set Up & Support Meeting W/Nrc in Alhambra,Ca on 980527.Purpose of Meeting for NRC & Contractor,Ornl to Meet W/Key Load Dispatch Center & SCE to Gather Info on Routine & Nonroutine Operation of Grid That Provides Power)
- ML19225A452 + (Ack Expiration Notice Re Certificate of Compliance 4949. Requests Continued Registration as User of Model UNC-1484 Shipping Packages)
- ML20137Z249 + (Ack Facsimile Message,Dtd 970415.First Standby Trust Agreement Amend Encl)
- ML19326A904 + (Ack Forwarding Constituent Comments Re Proposed Facility.Contested Hearing in Progress to Consider AEC CP Issuance.Aec Will Comment on Matters at Issue in Facility Hearings)
- ML20149M873 + (Ack Forwarding Final post-accreditation Audit Repts & Addressing Accreditation Criteria.Next Rev Will Address Continuing Training Guideline for Licensed Operators & Continuing Training Topics & Remediation Procedures)
- ML19281A875 + (Ack Forwarding Info Re Status of Facility Attachments.Requests Further Info Re Reactor at Lung-tan, Taiwan)
- ML18052A996 + (Ack Fulfillment of Commitments Documented in Util & Confirmed by NRC 870327 Confirmatory Action Ltr.Safety Evaluation Approving Util 870413 Analysis for Operation W/ Svc Water Temps Up to 80 F Encl)
- ML20128A371 + (Ack Granting Temporary Waiver of Compliance from TS 4.4.5.2, Table 4.4-2, SG Tube Insp, to Allow Continued Plant Operation in Light of Missed Insps on Two SG Tubes,Per Util)
- ML20196G005 + (Ack Granting of 880224 Enforcement Discretion Providing Temporary Relief Until 880226,from Operability Requirements of Tech Spec 3.7.1.2,Action Statement B,For Mode 3 Operation of Turbine Driven Auxiliary Feedwater Pump)
- ML19332D850 + (Ack Granting of Enforcement Discretion from Provision of Tech Spec 3.7.12 for Essential Svcs Chilled Water Sys. Enforcement Discretion Granted by NRC on 891124,allowing Continued Operation in Mode 1 W/Only One Chiller Available)
- ML20235M830 + (Ack Granting of Enforcement Discretion on 890223,providing Temporary Relief from Operability Requirements of Tech Spec 3.7.1.2,Action Statement B,For Mode 3 Operation of Turbine Driven Auxiliary Feedwater Pump for Addl 3 Days)
- ML20006D937 + (Ack Granting of Enforcement Discretion on 900202 for Temporary Relief from Tech Spec 3.0.3 Which Was Entered When Unit Failed to Meet Operational Conditions in Tech Spec 7.3.2, Main Control Room Air Conditioning Sys)
- ML20244C656 + (Ack Granting of Enforcement Discretion on 890406,providing Temporary Relief from Requirements of Tech Spec 3.8.1.1.d, to Allow Operation in Mode 1 for No More than 48 H W/One Train of Fuel Handling Bldg Exhaust Filters Inoperable)
- ML20155E256 + (Ack Granting of Enforcement Discretion on 880929 from Provisions of Tech Spec 3.3.1, Reactor Protective Instrumentation, to Allow Continued Power Operation for 24 H While Missing Seismic Brackets Installed)
- ML20059E423 + (Ack Granting of Enforcement Discretion to Facility Re Compliance W/Provisions of TS LCO 3.0.3.Granting of Enforcement Discretion Based on Compensatory Measure Taken & Safety Significance Evaluation Described in)
- ML20154C359 + (Ack Granting of Enforcement Discretion to Plant from Provisions of Tech Spec 3.6.5.1, Secondary Containment Integrity-Operating, Per .Enforcement Discretion Granted by NRC on 880826)
- ML20042D324 + (Ack Granting of Enforcement Discretion to Facility on 891222,providing Temporary Relief Until 891226 from Provisions of Tech Spec 3.0.4 Re Entering Higher Operational Mode & Extension of Discretion Until 891228)
- ML20235V146 + (Ack Granting of Extension of 2 Days in Addition to 2 Day Enforcement Discretion Previously Granted 890223.Enforcement Discretion Extension Provides Temporary Relief from Operability Requirements of Tech Specs 3.7.1.2)
- ML20235U069 + (Ack Granting of Extension of 6 Days in Addition to 4-day Enforcement Discretion Previously Granted.Extension Provides Temporary Relief from Operability Requirements of Tech Spec 3.7.1.2)
- ML20126H339 + (Ack Granting of Temporary Waiver of Compliance to Util from Provisions of TS 2.6(1)a, Containment Sys to Allow Entry of Personnel Air Lock W/Inner Door Inoperable)
- ML20033H026 + (Ack Granting of Temporary Waiver of Compliance to Tech Spec 3.6.3.1,Action B, Containment Isolation Valves to Continue Operation in Mode 1 While Repairs Made to Reactor Makeup Water Outboard Isolation Valve 2CV-4690-2)
- ML20034F991 + (Ack Granting of one-time Temporary Waiver of Compliance to Unit 2 from Action Required in TS LCO 3.7.1.2.b.Unit Taken Into Mode 3 in Order to Conduct Testing of turbine-driven AFW Pump Following Failure of Pump to Start)
- ML19249D693 + (Ack Hospitality & Personal Tour of Dispatch Ctr,Facility & Lookout Mountain)
- ML19249D688 + (Ack Hospitality During Week at Training Center)
- ML19249D685 + (Ack Hospitality During Week at Training Ctr)
- ML19249D684 + (Ack Hospitality Received at Training Ctr.Commends Training Program)
- ML20246G369 + (Ack Identification of NRC Position Re Reactor Bldg Closed Cooling Water Sys Containment Isolation Valves as Potential Backfit Issue)
- ML19249A186 + (Ack Imminent Transfer of Responsibility for Unit to NRC Operating Reactors Branch 4)
- ML20133C209 + (Ack Importance of Recent Insp Finding of Borated Water Storage Tank Overtemp Condition by L Reyes.Timely Identification of safety-related Concerns Beneficial in Reaffirming on Broad Level Resident Insp Program)
- ML20134H308 + (Ack Incorrect Title & Provides Correct Title for GL 96-05, Periodic Verification of Motor-Operated Valves)
- ML19224D522 + (Ack Informing NRC of Steps Taken to Correct Items Listed in NRC)
- ML20247E159 + (Ack Informing NRC of Steps Taken to Correct Noncompliance Noted in NRC)
- ML20045G065 + (Ack Informing That Util No Longer Has Need to Maintain License OP-20772 & If Individual Reapplies for NRC license,10CFR55.31 & 10CFR2.201 Requirements Would Need to Be Satisfied)
- 3F1091-11, Ack Insp Rept 50-302/91-15 Documenting Results of Insp Conducted in Response to 10CFR2.206 Ltr Alleging Certain Safety Concerns at Facility.Rept Identified No Safety Concerns + (Ack Insp Rept 50-302/91-15 Documenting Results of Insp Conducted in Response to 10CFR2.206 Ltr Alleging Certain Safety Concerns at Facility.Rept Identified No Safety Concerns)
- ML17228A869 + (Ack Intent to Group MOV Re to Reduce Dynamic Testing Scope of GL 89-10)
- ML19274G036 + (Ack Invitation to Be Included in Sampling of Opinions of Energy Elite. Invitation Must Be Declined Due to Insufficient Time)
- ML19274E810 + (Ack Invitation to Speak at Atomic Energy Law & Regulation Course on 790927-29.Due to Conflicting Schedule,Another Commissioner Should Be Asked to Attend)
- ML20056D302 + (Ack J Myers to I Selin on Behalf of TB Andrews, Under Consideration for Director of Ofc of Public Affairs. Application Being Given Appropriate Consideration)
- ML20045H702 + (Ack Jh Card to I Selin Opposing Closure of Urfo in Denver,Colorado on 940801.Closure Due to Cutbacks.Nrc Interests in Areas Covered by Urfo Will Not Be Diminished by Closing)
- ML22325A336 + (Ack Letter for Disputed Violation Received 11.14.2022 (2))
- ML20044C501 + (Ack Licensee Request for Document to Be Withheld from Public Disclosure Pursuant to 10CFR2.790.Affidavit Must Be Executed by Owner of Info & Licensee Is Not Owner.Resubmit Affidavit within 30 Days of Ltr,Executed by Owner of Info)
- ML20045H690 + (Ack Licensee to I Selin,Opposing Closure of Urfo in Denver,Colorado on 940801.Closure Due to Cutbacks. NRC Interest in Areas Covered by Urfo Will Not Be Diminished by Closing)
- ML20125B405 + (Ack Ltr & Answers Question Re Operating Staff at Tmi.Average of 200 People Employed at Facility.Stds Set by ANSI for Selection & Training of Personnel Have Been Adopted)
- ML20149M355 + (Ack Ltr Transmitting Info for Renewal of SRO License for Warren.Advises That Info Has Been Forwarded to W Eresian at NRC Headquarters for Processing)
- ML20128J192 + (Ack Ltr for Maine W/Ri Concurrence)
- ML19289B970 + (Ack Ltr of 780415 Re NRC FY78 Suppl Appropriation.Since Total NRC Appropriation for FY78 Is Less than That Permitted by P.L.95-209,no New Suppl Authorization Act Is Required. Requests Reallocation of Authorization Levels)
- ML20150E327 + (Ack Ltr of 780612 in Response to NRC Ltr of 780510 & Ltr of 780720 in Response to NRC Ltr of 780616 Re IE Inspec Repts 50-352/78-03 & 50-352/78-04.Advises That Info Presented in Ltrs Does Not Meet Standards of NRC Rules of Practice)
- ML20147J052 + (Ack Ltr of 780728 Re Establishment of Lpdrs in Nm.Lpdrs Have Been Established at Univ of Nm in Albuquerque & Nm St Library in Santa Fe.First Set of Documents Re Waste Isolation Pilot Plant Were Not Transmitted Until 780721)
- ML20148P238 + (Ack Ltr of 781018 from Delta Chapter of Sierra Club Re Subj Facils.Nrc Is Currently Considering a re-review of Financial Quals of Gsu.Exam of Recent Hydrocarbon Drilling Also Made; No Potential Hazard to Constr Site Found to Exist)
- ML20148P242 + (Ack Ltr of 781018 from Delta Chapter of Sierra Club Re Subj Facils.Nrc Is Currently Considering a re-review of Financial Quals of Gsu.Exam of Recent Hydrocarbon Drilling Also Made; No Potential Hazard to Constr Site Found to Exist)
- ML20062G163 + (Ack Ltr of 781207 Forwarding Petition for Review of Decision ALAB-507.Ltr & Petition Are Being Forwarded by Aslab to Comm for Latters Consideration)