Text
~ v.,, j' 'g j.
7,
~
,.s
.1
' i, -.
?.
4 TEB 23 GB y:
M
/In Reply ReferTTo:1 3
Dockets: 498 50-499 y
J-9 h,
Houston' Oghting & Power Company
? ATTN: - J.:H. Goldberg, Group Vice
. _ ' President, Nuclear--
M' P.O. Box-1700-
!HoustonnTexas 77001-
' Gentlemen:.
m
~ his71etter acknowledges the granting of enforcement discretion on February 23,
?-
T'1989W The enforcement discretion provides temporary relief' from the operability 1 t
- requirements _ of; Technical Specification (TS). Requirement 3.7.1.2,. Action '
' Statement b, for Mode:3 operation of the turbine driven auxiliary feedwater
~
pump for:an additional 3 days; 1.e., 6 a.m.c (CST)-February 26,-1989.,
lIn your letter to this office. dated February 23, 1989, you described:that
>there:islno safety reduction _while remaining in Mode 3 to troubleshoot the.
- pump since the' plant has never been critical and has no decay heat. You
- further ' describe that ' operation in Mode' 3. is necessary to generate sufficient '
Ateam;to;testthe' pump.
h.
~
' Enforcement discretion was granted after consultation with NRR. We understand '
.s._
- 'J
' from discussions between Mr. D. M. Hunnicutt of. this office and.Mr. W.. P; Evans of your staff, that completion of the testing and repairs should take less,than thel3 additional days granted.
.Shbuld you-have.any. questions regarding' this matter, we will be pleased to Ldiscuss them with you.
y 3
Sincerely, Original 01@c"1 DJ Eabert D. Martin i
Robert D. Martin Regional Administrator i
. s s,
CC E 1
Houston Lighting & Power Company L
o ATTN:':M..A. McBurnett, Manager E0perations Support Licensing j
P.O. Box 289 l,
.Wadsworth Texas 77483 i
I RIV:DRP/D $$.
C:DRP/D, D:D %
RA cy<
j DMHunnicutt;df-EJHollel LJCallan RDMartin
' 2/AS/89 2/ro/89'
- 2g89 2/d/89-4 o
' (
h
- 3902280446 890 9y
[
- oa
^ Dock '
em t
d' j
1 1
.' Houston Lighting &' Power Compan'y,
l
~
Houston Lighting & Power Company 1 ATTN: Gerald E. Vaughn, Vice President i
Nuclear.0perations P.O. Box 289.
Wadsworth.-Texas. 77483 Houston Lighting & Power Company ATTN:- J. T. Westermeier, General Manager
. South Texas Project P.O. Box 289
- Wadsworth. Texas.77483 Central Power & Light Company, a
ATTN:. R. L. Range /R. P. Verret i
P.0T Box 2121 Corpus Christi, Texas 78403 i
City of Austin. Electric Utility ATTN: tR. J. Miner, Chief Operating Officer-7 21.. Barton Springs-Road.
.Newman & Holtzinger, P.C.
ATTN:.J. R. Newman, Esquire-1615 L Street, N.W.
Washington, D.C.; 20036 Houston Lighting & Power Company.
ATTN:. S. L. Rosen i
P.O. Box 289' Wadsworth, Texas 77483 Houston Lighting & Power Company ATTN:
.R..'W. Chewning, Chairman Nuclear Safety Review Board i
P.O. Box 289 L
Wadsworth Texas 77483 City Public Service = Board ATTN:
R.'J. Costello/M. T. Hardt P.O. Box 1771 j
San Antonio, Texas 78296-f i
l Houston Lighting & Power Company ATTN:' Licensing Representative
Houston Lighting & Power Company bec to DMB+(IE51)a bec distrib. by RIVi DRP RRI SectionChief(DRP/D)'
DRS MIS System RPB-DRSS Lisa Shea, RM/ALF RIV File R. Bachmann, OGC RSTS Operator G. Dick, NRR Project Manager (MS:
13-D-18)
Project Engineer, DRP/D R. D. Martin