Ack Importance of Recent Insp Finding of Borated Water Storage Tank Overtemp Condition by L Reyes.Timely Identification of safety-related Concerns Beneficial in Reaffirming on Broad Level Resident Insp Program
ML20133C209
Person / Time
Site: 05000000, Davis Besse
Issue date: 01/20/1982
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20132B273 List: ... further results
References
NUDOCS 8510070269
Download: ML20133C209 (1)


Text

  1. jo s srg'o, UNITED STATES O

NUCLEAR REGULATORY COMMISSION E

REGION 111 Q

[

799 ROOSEVELT ROAD GLEN ELLYN, ILLINOIS 60137 January 20, 1982 NOTE FOR:

R. L. Spessard, Director, Division of Resident and Project Inspection FROM:

James G. Keppler, Regional Administrator

SUBJECT:

RECENT INSPECTION FINDING AT DAVIS BESSE I wish to acknowledge the importance of the recent inspection finding of the borated water storage tank overtemperature condition by Luis Reyes at Davis Besse. The timely identification of safety related concerns such as this is beneficial in reaffirming on a broad level the value of the resident inspection program.

Please extend my congratulations and appreciation to Luis regarding this matter -- another example of the outstanding job he has done as a Senior Resident Inspector.

?

'LN n

,' James G. KeppI r Regional Administrator cc:

R. C. DeYoung, IE A. B. Davis, RIII C. E. Norelius, RIII 8510070269 50717 PDR COMMS CC CORRESPONDENCE PDR

MS'Y?Y b

2

?l-

' ' ?s.'

Docket No. 50-346 g

g Toledo Edison Company REbElVED ATIN:

Mr. Richard P. Crouse t

, MAR}$gg,,@f Vice President

~

tanumg Nuclear anusanungg Edison Plaza 4

"E 300 Madison Avenue

)

Toledo, OH 43652 N

4 y

i Gentlemen:

This refers to the management meeting conducted by me and members of my 1

staff on January 21, 1982, at the NRC Region III office with you and members of your staff.

}

The enclosed report identifies the areas discussed during the meeting.

As I

indicated in the report, the meeting was held to discuss your corrective actions in the areas of drawing control, nonconformance reports, and per-

}

sonnel errors.

No items of noncompliance with MRC requirements were ident * *ied during the J

course of this meeting.

In accordance with 10 CTR 2.790 of the Commission't 1

regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.

If this report contains any information that you (or your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-phone withis tee (10) days from the date of this letter of your intention to file a request for withholding; and (b) submit within twenty-five (25) days from the date of this letter a written application to this office to withhold sech laformation.

If your receipt of this letter has been j

deleyed such that less than seven (7) days are available for your review, please notify this office promptly so that a new due date may be estab-11shed.

Consisteat with Section 2.790(b)(1), any such applicatton aust be accespanied by an affidavit executed by the owner of the information which idectifies the document or part sought to be withheld, and which contains a full statement of the reasons which are the bases for the claim that the information should be withheld from public disclosure.

This section further requires the statement the considerations listed in 10 CFR 2.790(b)(4).to address with specificity The information sought to be withheld shall be incorporated as far as possible into a separate

- ~.,.

=.%

a :.x77p[m To!cdo E: uin Comp.iny

-2 part of the affidavit.

If we do not hear from you in this regard wittun

]

the specified periods noted above, a copy of this letter and the enclosed 4

inspection report will be placed in the Public Document Room.

3 If yoin have any questions regarding the enclosed report please feel free to call us.

Sincerely, f

6Tilsned by n.t.. sp.swe v

R. L. Spessard, Director i

1 Division of Resident and j

Project Inspection i

Enclosure:

Inspection Report No. 50-346/82-05 cc w/ encl:

T. D. fturray, Station Superintendent DN8/ Document Control Desk (RIDS)

Resident Inspector, RIII Harold W. Kohn, Power Siting Commission Helen W. Evans, State of Ohio I

i I

i l

l M '/.

Hill Rl!!

RI!f ter/4o cGr x r ter Spe sard

.tC

%q i

s u t ! E AM M.ctl.aTnHY a>T1!%IV.

s REGION III Report W. 50-346/82-05(DRPI)

Docket No. 50-346 L i ce n s e- 'e

'd : -

Licensee:

Toledo Edison Company Edison Plaza, 300 Madison Avenue Toledo, OH 43652 Facultty Name:

Davis-Besse 1 Management Meeting At: Region III Office Glen Ellyn, IL f

Nd Prepared By:

L. A. Re Approved By:

R lunter, Chief Reactor Projects Section 2B di Mee t ing Sumasa ry Meet tn1 on January 21, 1982 (Report No. 50-346/82-05(DRPI))

Scope of Meeting:

A special, announced meeting was held with corporate and site management to discuss licensee corrective actions relating to Region I!!

concerns an the sreas of Drawing Control, Nonconformance Reports, Personnel Errors, and non-Technical Specification items having safety significance.

.The meeting lasted approximately two hours and six Region III personnel attended h

N*,

N WO!',' S

  • M J. / C Y)GO Ja h 5

April 30 1982 Docket No. 50-346

)

l Toledo Edison Company

,,g j

ATTN:

Mr. Richard P. Crouse s' '

~-

Vice President

^

g

' "g Nuclear J

Edison Plaza

{'

E f

... ',;,7,, y

  • 300 Madison Avenue m,

l Toledo, ON 43652 4

e

  • e

,f e

.n l ~

4 c

s Gentlemen:

l'

/ '-

~

Thank you for your letter of April 20, 1982, to Mr. James G."Kegiples, regarding your scheduled actions planned in response to th'etantficant i

Appraisal findings, the Preparedness Improvement Items, the Emergency 1

Preparedness Evaluation report and the Preparedness Open Items identified 1

in our letter of March 23, 1982.

Your response is currently being reviewed 1

by our staff. Af ter the review is completed, a subsequent letter will be l

coat to you. We will esamine year corrective actions during a future inspection.

f Your cooperation with us is appreciated.

L y

1 Sincerely, i

.f I

\\

C. J. Paperiello, Chief

{

Emergency Preparedness and

(

Program Support Branch cc:

7. D. Narray, Station 3

Superistendent 1

cc w/Itr dtd 4/20/82:

DMB/Docuseet Control Desk (RIDS)

Resident laspector, RIII Marold W. Eohn, Power Siting Cometasien Nelen W. Evans, Stata of Ohio Robert N. Quillis, Ohio Departaees of Nealth

l R!!Lg RI!!

R!

R!

RI!!

bI b p Futur.

I Grant /jp Pa riello t a -..

E -. O-i r

4/29/82

$g

'9

Docket No. 50-346 tottoo 6

%" EDISON uc nse so. ner-3 Serial No. 1-283

?',7,[ "' "

July 30. 1982

' ' ' ' * * ' ' ' ~ ' '

O t.

Mr. J. A. Hind. Director Division of Emergency Preparedness

[p and Operational Support; 11.;

United States Nuclear Regulatory Coemission

, '?

199 Roosevelt Road i@,

1,

Glen Ellyn. Illinois 60137

~7. e

Dear Mr. Mind:

'Y, f 4 ' ',

W i, i

.;;.\\

m

. '?

As indicated in your letter of June 25','1982'(Los No. I'-643) and again at i MA.

our July 13. 1982 meeting to review the " Systematic Assesement of Licensee 7,lE Performance" (SALP) Report for Davis-Besse, Unit No. 1. Toledo Edison has i.f!F the opportunity to provide.writtes commients concerning the evaluation of 7R the Davis-Besse Nuclear-Power Stattee as. contained in the SALp report.

47 4

The folleping comments'as' detdrained fe'eur 'secting of July 13, 1982 are I! M.]

Q/'.

j submitted la roepenselte1khsTamb est

' t f 'fd J R.. " : UM 1

~

i Toledo Edises schasels k, 5 % n R".$tCM A.::T?T R:w -

%n

. p.mp%N.W 1 1

[

the'SALF,, report antas essentially historical i 4. p'"~ p docuneati summa ris ing operettaant ' events,thelf bacerred ' duri ng] the pe r iod o f

' ';' l5 '":

the rep'ert. Tolede Edises'feelathit SA1.F pr3cies has" improved'tremend -

. f @N/'

oesty tren'the fli g ^

that 1sftsbeeemp1fewted.i,~

i,~!'C' Toledef.Ediese' 1petatiest;eerfareas of,

!^

[

.etrength'as.well(se,i, ff

~ esetis(

. tedicated.1='.the

te ad

)s,ar,ive:4. eentlene to'be;o&;

.,b(4

. taprovessetf.yAs'.

r)

I y

. ' "evety offort Me" incorporate' i.

very, responsive lte a c

?and

' t 2,}. T;6 4

r inte:eer weakee'dirsie W isetT)oeid

'" 19e;assagement,,thet ~

b

'$@kW;

.typifi~;'ourRadiolog1(al' t

W

  • ls dad' y'Freparednese' areas.

h so

%4'$

$hQ1AD I~

a Tel (Wif8lE.%.if W$ GL ':.

L

',a eeselesione la eme area

. Y.4 m j

ised.ethok 'eemsee Jer'%2stiftsaitilse.'to prevent' possible.

,i'> gL jp1 S

afstaterpretat M gf lier with phe 3RC's wording format in

..se

,.. ?

3 If.

e on,su.w.m.

3.he,

.f3..

t a-e ~

m isotruettaea'.este d 1/percest50e3*f.ilt.eftheroutine

."1

~ ' '

1 maintensoce pew essed me

'Statisei,' sad seestitutes a small percentage

>Wt of the various"proiederse

linstractiesettlined."Q.

n.

J.'

QQR}f,N:irteen unplanned trips caused f

! l..d;.Q M:MRifW'

  • On page 12.' fires parage) :.the Q 7;)

~c n

ive of th d

by perseeeet irreinf's11:ee'

~

  • in thei<firee' ene-third of the SALP report period. During the latter pert of the, report period, we had hundreds of i.@.a construction workers on-site performing'large quantities of pre-outage uork and did not emperience any unit tripe. We feel this use due in part

'.d,

... a. (.. n.r.

t M

g 'h ;

n i

V,4

.3

". t9

.s i

TM TOLEDO fO' SON COMPANY COGON PLAZA, 300 M4000N AVENut TOLEDO. CHO 4355.7

.'?

r s.y.b,y u.

3

.a

,)

i A

^

2 h.. ww my,w'.sna.&.m Eq54.$;: s, kr m m a f

-. -. - - - - - - _ - _ - - -. ~ -

D., bet No. 50-146

[icense No. NPF-l N e r 1 i l.%. 1.' M i luly W.

l 'M /

P44 RP /

l to (h.ingen m.ide in our management controls, and shows cffective corrective

.ir t t un.

  • On page 12. under " Licensee Corrective Action" Toledo Edison acknowledges the NRC's recognition of the positive offeet of the corrective actions taken and the additional resources allocated to clie maintenance area. Additiont.1 changes in our management controls and expanded resources under development by the company should continue to 1

increase the ef f ectiveness of our asiatessace program.

1 t

t ;.

g. i. y 3 ;.,.

i

  • On page 21 the first paragraph. Tolede Edison received a Category 111

]

rating in the area of procurement,(material control).;,We would like to 3

point out that several changes are la the process of being laplemented and q

t a program to develop a Materials Managesset Organisation is in progress.

QA audit /surve111ance activities will be increased la this area, and the d

i I

Station material control procedure has been modified. The Nuclear Construction Department has lastituted changes la their asnagement

,$d i

controls and revised their meterial control procedures. The Procurement g

Division will revise procurement procedures and increase the training of personnel responsible for material headling and storage in the Davia-Besse j

Station warehouse.

t.

.(i q ~.

. r. :

o s

  • On page 21, under " Review Committees". Toledo' Edison objects to the 2

3.,

j implication here (1tems 1 and 2) that our Review Boards did not review t-l Technical Specificat. ion violations. We 'achaowledge there were a very few violations that were not recognised during the review of certata reports.

. -r i

All known violations have "always" been reviewed and all event reports are

.J

)

now scrutinized with ese of the objectives'being to identify any possible

,g g.gj q

I Technical Specification violatione. M y l.[ P - C ii -q;g ;

.q

, p j.cy,o. 4 i, J.n

. ? ~ m..

?

  • On page 22, la the area of tuviromental Controls. Toledo Edison has a

, / p) i significant technical, disagreement with the NRC.

In the last paragraph.

the NRC coactudes that "the lack of quality control over detector r,W l

etficiency calibratiana and s'too istrequent recalibration schedule is

-fp<

cause of ahe recest disagreement". Toledo Edisom has'since'peeformed a y;

recalibration of its lastruments at a coet'of several thousand dollars and

+

hundreds of eenhours.' Every one of the'32 efficiencies was within acceptable limits of agreement with the previous calibration data. Daily

"/

perforesace.checha are,'and have been performed on.the detectors as the means of determining when recalibration would be required. The NRC aust f.,

i recognise that their esbile laboratory utilises a more efficient detector j

(by a factor of 2) them that utilised at Davis-lesse. The MRC also

[

utilizes a difforent counting geometry. Toledo Edison feels it in thvee 4

variations in analytical technique and equipment which are responsible for 0

l the disagreements and not any incorrect calibration of our equipment.

.T i

Very truly yourn, 2PG - %

4 HPC:hJWalah 1

i ect DB-l NRC Resident Inspector i

a l

s m aa,w w a,._2

.x a.. css W SEP.'L Docket No. 50-3h6 Toledo Edison Courpany A?r5:

Mr. Richard P. Crouse Vice President helear Edison Plasa

%0 Madisca Avenue Toledo, ON k%52 Gentlemen:

This is to confirm our activersation with your etaff pertaining to Mr. David A. Nelace's and Mr. C. E. Wells', visit to Regica III on September 21, 1982, to discuss security mattere per+=i= inn to the Davis-Besse Nuclear Power Station. Mr. Charles E. Norelius Director, Divisica of Engineering and Techniesl Programs: Mr. James Miller, Chief. Teehaical Inspoetion Branch: and Mr. James Creed, Chief, Safeguards section will be available to discuse such matters on that date.

81acerely,

.t*.it

- T r.

., !. e, r,' '?.c.) l,g it James S. Eeppler Regicaal Adadnistrator ec:

T. D. krray, Station g r13 asiAmat t

IstB/ Document Control Desk (RIDS)

Reeldest Inspector, RIII Enrold W. Eohn, Power Siting Ceamiselom Nelen V. Evans, State of Ohio Robert M. Quillin, Director I

IA 10 Department of Health e

WO9 th02& G3'l'.

PDH A00CA 0"000 14'.

y v:u p.

?

. i.t i.

. ! ?*

. q'M l 4 ' Yi ef *.

C>

  • ~-

3,,

D

_ _ _ _ _ _ _ _ _ _ _.