Ack Granting of Enforcement Discretion on 890406,providing Temporary Relief from Requirements of Tech Spec 3.8.1.1.d, to Allow Operation in Mode 1 for No More than 48 H W/One Train of Fuel Handling Bldg Exhaust Filters Inoperable
ML20244C656
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 04/11/1989
From: Martin R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20244C659 List:
References
NUDOCS 8904200323
Download: ML20244C656 (3)


Text

_ ___

j

3

~

~In-Reply Refe'r To:

Dockets:

50-498 50-499 Houston Lighting & Power Company ATTN:

J. H. Goldberg, Group Vice President, Nuclear 1

P.O. Box 1700 J

Houston, Texas 77001 Gentlemen:

This' letter acknowledges the granting of enforcement discretion on April 6, 1989. The enforcement discretion provides temporary relief from the operability requirements of Technical Specif1 cation (TS) Requirement 3.8.1.1.d '

to allow operation in' Mode 1 for no more than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> with one train of fuel handling building'(FHB) exhaust air filter heaters inoperable and the'other r

train without emergency backup power available.

In yoijr letter to this office dated April 6,1989, you conclude from an analysis performed by HL&P that the FHB exhaust air filter train could operate

'without. heaters for at least 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> with insignificant increase in offsite and control room dose which would be well within the 10 CFR 100 and 10 CFR 50, Appendix A, CDC-19 limits.

Enforcement discretion was granted after consultation with NRR. We understand that the plant condition requiring enforcement discretion terminated at 7:50 p.m. (CDT) on April 6, 1989.

Should you have'any questions regarding this matter, we will be pleased.to discuss them with you.

Sincerely, ORIGINAL SIGNED BY J.41.400lGG0ilERY Robert D. Martin Regional Administrator cc:

Houston Lighting & Power Company ATTN:

M. A. McBurnett, Manager Operations Support Licensing P.O. Box 289 Wadsworth, Texas 77483 C:D /D D

PA d hf EJFoller;df LJCallan R0f n

1 4 [ /89 4/g/89 4/ /89

\\

i m m e m e,e 1, Ax DR ADOCK 0500o49g PDC u__=__________-_

.Q si i

Houston Lighting & Power Company. Houston Lighting & Power Company-l.

ATTN: : Gerald E. Vaughn', Vice President..

. Nuclear Operations

-l P.O. -- Box. 289 '

Wadsworth, Texas.' 77483 Houston Lighting & Power Company.

ATTN:

J. T. Westermeier, General Manager South Texas Project-4 P.O. Box 289 Wadsworth, Texas.77483 Central Power & Light Company.

' ATTN:

R. L. Range /R. P. Verret-4 P.O. Box 2121

. Corpus Christi,. Texas 78403

.j

' City of Austin Electric Utility ATTN:

R. J.. Miner, Chief Operating Officer

.721 Barton Springs Road Austin,, Texas 78704:

Newman & Holtzinger. P.C.

ATTN:

J. R. Newman, Esquire 1615 L Street, N.W..

Washington, D.C.

20036 Houston Lighting & Power Company ATTN:

S. L. Rosen P.O.' Box 289 Wadsworth,' Texas 77483 Houston Lighting & Power Company ATTN:

R. W. Chewning, Chairman Nuclear Safety Review Board-P.O. Box 289 Wadsworth, Texas 77483 1

City Public Service Board ATTN:

R. J. Costello/M. T. Hardt P.O. Box 1771 San Antonio, Texas 78296 Houston Lighting & Power Company ATTN: Licensing Representative

. Suite 610 Three Metro Center Bethesda, Maryland. 20814 Texas Radiation Control Program Director

W, c.

\\bj; ;;; :

~ '

E l Houston Lighting '&' Power Company; -

ibcc to DMB (IE51) bcc. distrib.' by~ RIV: '

DRPc_...

' RRI ~-

SectionChief'(DRP/D).

DRS.

1 MIS System RPB-DRSS

Lisa Shea,'RM/ALF=

RIV' File

E R. Bachmann,'0GC. ~

' L13-D-18)

R.-D. Martin RSTS10perator G. Dict;.flRR. Project Manager' (MS:

Project Engineer;(DRP/D) s t

2 ji 4

3

+o

.