ML20244C656
| ML20244C656 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 04/11/1989 |
| From: | Martin R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Goldberg J HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20244C659 | List: |
| References | |
| NUDOCS 8904200323 | |
| Download: ML20244C656 (3) | |
Text
_ ___
j
- 3
~
~In-Reply Refe'r To:
Dockets:
50-498 50-499 Houston Lighting & Power Company ATTN:
J. H. Goldberg, Group Vice President, Nuclear 1
P.O. Box 1700 J
Houston, Texas 77001 Gentlemen:
This' letter acknowledges the granting of enforcement discretion on April 6, 1989. The enforcement discretion provides temporary relief from the operability requirements of Technical Specif1 cation (TS) Requirement 3.8.1.1.d '
to allow operation in' Mode 1 for no more than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> with one train of fuel handling building'(FHB) exhaust air filter heaters inoperable and the'other r
train without emergency backup power available.
In yoijr letter to this office dated April 6,1989, you conclude from an analysis performed by HL&P that the FHB exhaust air filter train could operate
'without. heaters for at least 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> with insignificant increase in offsite and control room dose which would be well within the 10 CFR 100 and 10 CFR 50, Appendix A, CDC-19 limits.
Enforcement discretion was granted after consultation with NRR. We understand that the plant condition requiring enforcement discretion terminated at 7:50 p.m. (CDT) on April 6, 1989.
Should you have'any questions regarding this matter, we will be pleased.to discuss them with you.
Sincerely, ORIGINAL SIGNED BY J.41.400lGG0ilERY Robert D. Martin Regional Administrator cc:
Houston Lighting & Power Company ATTN:
M. A. McBurnett, Manager Operations Support Licensing P.O. Box 289 Wadsworth, Texas 77483 C:D /D D
PA d hf EJFoller;df LJCallan R0f n
1 4 [ /89 4/g/89 4/ /89
\\
i m m e m e,e 1, Ax DR ADOCK 0500o49g PDC u__=__________-_
.Q si i
Houston Lighting & Power Company. Houston Lighting & Power Company-l.
ATTN: : Gerald E. Vaughn', Vice President..
. Nuclear Operations
-l P.O. -- Box. 289 '
Wadsworth, Texas.' 77483 Houston Lighting & Power Company.
ATTN:
J. T. Westermeier, General Manager South Texas Project-4 P.O. Box 289 Wadsworth, Texas.77483 Central Power & Light Company.
' ATTN:
R. L. Range /R. P. Verret-4 P.O. Box 2121
. Corpus Christi,. Texas 78403
.j
' City of Austin Electric Utility ATTN:
R. J.. Miner, Chief Operating Officer
.721 Barton Springs Road Austin,, Texas 78704:
Newman & Holtzinger. P.C.
ATTN:
J. R. Newman, Esquire 1615 L Street, N.W..
Washington, D.C.
20036 Houston Lighting & Power Company ATTN:
S. L. Rosen P.O.' Box 289 Wadsworth,' Texas 77483 Houston Lighting & Power Company ATTN:
R. W. Chewning, Chairman Nuclear Safety Review Board-P.O. Box 289 Wadsworth, Texas 77483 1
City Public Service Board ATTN:
R. J. Costello/M. T. Hardt P.O. Box 1771 San Antonio, Texas 78296 Houston Lighting & Power Company ATTN: Licensing Representative
. Suite 610 Three Metro Center Bethesda, Maryland. 20814 Texas Radiation Control Program Director
W, c.
\\bj; ;;; :
~ '
E l Houston Lighting '&' Power Company; -
ibcc to DMB (IE51) bcc. distrib.' by~ RIV: '
DRPc_...
' RRI ~-
SectionChief'(DRP/D).
DRS.
1 MIS System RPB-DRSS
- Lisa Shea,'RM/ALF=
RIV' File
E R. Bachmann,'0GC. ~
' L13-D-18)
R.-D. Martin RSTS10perator G. Dict;.flRR. Project Manager' (MS:
- Project Engineer;(DRP/D) s t
2 ji 4
3
+o
.