Ack Licensee Request for Document to Be Withheld from Public Disclosure Pursuant to 10CFR2.790.Affidavit Must Be Executed by Owner of Info & Licensee Is Not Owner.Resubmit Affidavit within 30 Days of Ltr,Executed by Owner of Info
ML20044C501
Person / Time
Site: University of Virginia
Issue date: 03/17/1993
From: Alexander Adams
Office of Nuclear Reactor Regulation
To: Mulder R
VIRGINIA, UNIV. OF, CHARLOTTESVILLE, VA
References
NUDOCS 9303230151
Download: ML20044C501 (3)


Text

__

4.

l l

March 17, 1993 Docket No. 50-62 Dr. Robert U.- Mulder, Director University of Virginia Reactor Facility Department of Mechanical, Aerospace and i

Nuclear Engineering University of Virginia Charlottesville, Virginia 22903-2442

}

Dear Dr. Mulder:

}

l

SUBJECT:

REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE j

i By letter dated November 3,1992, you submitted your November 3,1992, affidavit along with Contacts at Spectratek and Parent Company Protechnics and Ceramic Bead _ Data and requested that this document be withheld from public disclosure pursuant to 10 CFR 2.790.

In accordance with 10 CFR 2.790(b)(1)(ii), the affidavit must be executed by the owner of the information, even though the information sought to be withheld is submitted to the Commission by another person. The affidavit that you submitted was executed by yourself and not the owner of the information sought to be withheld.

1 To make a request to protect this information, please submit an affidavit l

executed by the owner of the information sought be withheld in accordance with 10 CFR 2.790(b)(1).

j i

In accordance with 10 CFR 2.790(c), this information is being forwarded to you as notice that the information. in your November 3,1992 letter will in placed in the Public Document Room thirty (30) days from the date of this letter.

If' within thirty (30) days of this letter, you request withdrawal of these l'

documents in accordance withl10 CFR 2.790(c), your-request will be considered in light of applicable statutes and regulations and a determination made-

>j whether the documents will be returned to you.

Sincerely, 1

Original signed by:

Alexander Adams, Jr., Sr. Project Manager

.l Non-Power Reactors and Decommissioning j

Project Directorate 9303230151 930317 Division of Operating Reactor-Support PDR ADDCK 05000062 Office of Nuclear Reactor Regulation

,-i; P

PDR l

cc:

Plant Service list Licensee 7-

]

~

~

i DISTRIBUTION:

iDocketsfile:50:42-BGrimes AAdams PDRs SWeiss MSiemien, OGC ONDD r/f-220042-EHylton Region I

  • See previous concurrence

-l ONDD:IA-ONDD:PJ4-OGC*

0 b:D EByltion AAdamidmj-MSiemien SWeiss-l 3/17/93 3//b/93 3/8/93]

3/ /93

.o 0FFICIAL RECORD COPY y.

i

\\

pse acuq'o, UNITED STATES

~,

E' NUCLEAR REGULATORY COMMISSION n

5

March 17, 1993 Docket No. 50-62 Dr. Robert U. Mulder, Director University of Virginia Reactor Facility Department of Mechanical, Aerospace and Nuclear Engineering University of Virginia Charlottesville, Virginia 22903-2442

Dear Dr. Mulder:

l

SUBJECT:

REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE By letter dated November 3,1992, you submitted your November 3,1992, affidavit along with Contacts at Spectratek and Parent Company Protechnics and Ceramic Bead Data and requested that this document be withheld from public disclosure pursuant to 10 CFR 2.790.

In accordance with 10 CFR 2.790(b)(1)(ii), the affidavit must be executed by the owner of the information, even though the information sought to be withheld is sub'nitted to the Commission by another person. The affidavit that you submitted was executed by yourself and not the owner of the information sought to be withheld.

To make a request to protect this information, please submit an affidavit executed by the owner of the information sought be withheld in accordance with 10 CFR 2.790(b)(1).

In accordance with 10 CFR 2.790(c), this information is being forwarded to you i

as notice that the information in your November 3, 1992 letter will in placed in the Public Document Room thirty (30) days from the date of this letter.

If within thirty (30) days of this letter, you request withdrawal of these documents in accordance with 10 CFR 2.790(c), your request will be considered in light of applicable statutes and regulations and a determination made whether the documents will be returned to you.

Sincerely, h0WkA 44W Alexander Adams, Jr., S roject Manager Non-Power Reactors and Decommissioning Project Directorate Division of Operating Reactor Support Office of Nuclear Reactor Regulation cc: Plant Service list Licensee b

o University of Virginia Docket Nos. 50-62/396 L

cc:

i Commonwealth of Virginia Council on the Environment 903 Ninth Street Office Bldg.

Richmond, Virginia 23219 Mr. Preston Farrar Nuclear Reactor Facility University of Virginia School of Engineering and Applied Science Charlottesville, Virginia 22903 Dr. Albert B. Reynolds, Chairman Department of Nuclear Engineering and Engineering Physics University of Virginia Charlottesville, Virginia 22901 Dr. William Vernetson Director of Nuclear Facilities Department of Nuclear Engineering Sciences University of Florida 202 Nuclear Sciences Center Gainesville, Florida 32611 Dr. Ratib A. Karam, Director Neely Nuclear Research Center Georgia Institute of Technology 900 Atlantic Drive, N.W.

Atlanta, Georgia 30332 Mr. Pedro B. Perez, Associate Director Nuclear Reactor Program North Carolina State University P. O. Box 7909 Raleigh, North Carolina - 27695-7909 Office of the Attorney General 101 North 8th Street Richmond, Virginia 23219 l

Bureau of Radiological Health Division of Health Hazards Control 109 Governor Street, Room 916 Richmond, Virginia 23219

,