ML19224D522
| ML19224D522 | |
| Person / Time | |
|---|---|
| Site: | Washington Public Power Supply System |
| Issue date: | 05/31/1979 |
| From: | Engelken R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Strand N WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML19224D514 | List: |
| References | |
| NUDOCS 7907120471 | |
| Download: ML19224D522 (2) | |
Text
5
- a t %,
s UNITED STATES 9
[ '$,,
7,7.'
'g NUCLE AR REGULATORY COMMISSidN'
' j REGION V 5,]',.,. u, g Q ' %_,' (.Q 1990 N CALIF ORNi A COULEVARD d
SUIT E 202. WA LNUT CRL E K PLAZ A WALNU T CRLE K. Calif ORNIA 945rG gxf 31-69 Docket Nos.
50-460 50-513
'Jashington Public Power Supply System P. O. Box 968 Richland, Washington 39352 Attention: Mr. N. O. Strand Managing Director Gentlemen:
Thank you for your letter dated May 9,1979 informing us of the steps you have taken to correct the items which we brought to your attention in our letter dated April 3,1979.
Your corrective actions will be verified during a future inspection.
Your cooperation with us is appreciated.
Sincerely,
/
/a
/
i
// (p/
7.'li. Engb ken c,/
1 rector i
L
{\\
.,,. 3 i,-l l) 'a 'j t_1 -
790 7320/-/<
f
-7907 1067 6