ML20155E256

From kanterella
Jump to navigation Jump to search
Ack Granting of Enforcement Discretion on 880929 from Provisions of Tech Spec 3.3.1, Reactor Protective Instrumentation, to Allow Continued Power Operation for 24 H While Missing Seismic Brackets Installed
ML20155E256
Person / Time
Site: Waterford Entergy icon.png
Issue date: 10/05/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dewease J
LOUISIANA POWER & LIGHT CO.
References
NUDOCS 8810120204
Download: ML20155E256 (2)


Text

.

J OCT 5 508 In Reply Refer To:

Docket: 50-382 Louisiana Power & Light Company ATTil:

J. G. Dewease, Senior Vice President Nuclear Operations 317 Baronne Street New Orleans, Louisiana 70160 Gentlemen:

This acknowledges the granting of enforcement discretion to Waterford 3 from the prt, visions of Technical Specification 3.3.1, "Reactor Protective lastrumentation. " Your letter (W3P88-1817) to this office, dated September 30, 1988, provides your basis for the enforcement discretion request. Enforcement discretion was granted by NRC Region IV on September 29, 1988, at 7 p.m. (CDT) to allow continued power operation for a period of seismic brackets were installed in a drawer of the core 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> while missing (CPC) cabinets.

protection calculator We understand that the installation of the missing seismic brackets was completed for all four affected CPC cabinets by 10:30 a.m. (CDT) on September 30, 1988.

Sincerely, dJ. allan, Director Divi (ionofReactorProjects cc:

Louisiana Power & Light Company ATTN:

G. E. Wuller, Onsite Licensing Coordinator P.O. Box B Killona, Louisiana 70066 Louisiana Power & Light Corrpany ATTil:

N. S. Carns, Plant lianager P.O. Box B Killona, Louisiana 70066 Middle South Services ATTN:

Mr. R. T. Lally P.O. Box 61000 tiew Orleans, Louisiana 70161 C:PSA D:DR DDChamberlain;df LJCajlan k

10/<i /88 10/5/88

\\

h

rw a%

/y io F Dt.-

p.

s Louisiana Power & Light Company Louisiana Power & Light Company ATTN:

R. F. Burski, Acting Manager Nuclear Safety and Regulatory Affairs 317 Baronne Street P.O. Box 60340 New Orleans, Louisiana 70160 Louisiana Radiation Control Program Director bec to DMB (IE01) bec distrib. by RIV:

RRI R. D. Martin, RA SectionChief(DRP/A)

DRP RPB-DRSS HIS System Project Engineer, DRP/A RSTS Operator RIV File D. Wigginton, NRR Project Manager DRS Lisa Shea, RM/ALF J

j

TATES MISSION Y COM UNITED STOR REGULAoro,o.c. m ss u

R NUCLE A w4sem tNo

'o,',

7

++

pp;r

.r

's., * * * * * }

Director imes, Division Christopher I. Gr ject ProJe tb manche Peak Proof Special Assistant c

No. 50 445 Director Docket HEMORANDUM FOR:

Office Co James H. Wilson,ProjectProjects Division for Projects Comanche Peakof 5,pecial Manager THRU:

Office ProjectDivision Helinda Malloy, rojectProjects ELECTRIC Comanche Peak Pof Special TV WITH FROM:

Office MEETING FORTHCOMING 88 day) 19 20,19 (each SUBJECT :

Octoberm6:00 pm

/

Tire:

8:00 a North One White Flintckville Pike 20852 che Peof the and ak Date Ro land ges to the Comanand prepa 11555Rockville, leary Location:

4 B-11 of proposed chan of the Technical ations Rcom Technical Specific n

DiscussioReview" versionTV ~ElectricU~' I6 1

Unit "Proof &(agenda later)

Purpose:

J Kelley N. Hood HRC R~Ma11oy j'fn,b -

Participants:

R. Giardina

/

tQ Man 6 gar ProjectDivision Melinda Malloy,ProjectProjects Comanche Peakof Special Office 7

re f James H. Wilson nse, a 92-3306 lice other next page Melinda Malloy or (301) 4 d applicants for nors, orStateme See rve (301) 492 0738chnical stof f anitioners, in cc:

ad n

CONT ACT(s):

t ngs i

et I

t.etween NRC teof che putlic, p "

rs x

N x

N