ML20155E256
| ML20155E256 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 10/05/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Dewease J LOUISIANA POWER & LIGHT CO. |
| References | |
| NUDOCS 8810120204 | |
| Download: ML20155E256 (2) | |
Text
.
J OCT 5 508 In Reply Refer To:
Docket: 50-382 Louisiana Power & Light Company ATTil:
J. G. Dewease, Senior Vice President Nuclear Operations 317 Baronne Street New Orleans, Louisiana 70160 Gentlemen:
This acknowledges the granting of enforcement discretion to Waterford 3 from the prt, visions of Technical Specification 3.3.1, "Reactor Protective lastrumentation. " Your letter (W3P88-1817) to this office, dated September 30, 1988, provides your basis for the enforcement discretion request. Enforcement discretion was granted by NRC Region IV on September 29, 1988, at 7 p.m. (CDT) to allow continued power operation for a period of seismic brackets were installed in a drawer of the core 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> while missing (CPC) cabinets.
protection calculator We understand that the installation of the missing seismic brackets was completed for all four affected CPC cabinets by 10:30 a.m. (CDT) on September 30, 1988.
Sincerely, dJ. allan, Director Divi (ionofReactorProjects cc:
Louisiana Power & Light Company ATTN:
G. E. Wuller, Onsite Licensing Coordinator P.O. Box B Killona, Louisiana 70066 Louisiana Power & Light Corrpany ATTil:
N. S. Carns, Plant lianager P.O. Box B Killona, Louisiana 70066 Middle South Services ATTN:
Mr. R. T. Lally P.O. Box 61000 tiew Orleans, Louisiana 70161 C:PSA D:DR DDChamberlain;df LJCajlan k
10/<i /88 10/5/88
\\
h
- rw a%
/y io F Dt.-
p.
s Louisiana Power & Light Company Louisiana Power & Light Company ATTN:
R. F. Burski, Acting Manager Nuclear Safety and Regulatory Affairs 317 Baronne Street P.O. Box 60340 New Orleans, Louisiana 70160 Louisiana Radiation Control Program Director bec to DMB (IE01) bec distrib. by RIV:
RRI R. D. Martin, RA SectionChief(DRP/A)
DRP RPB-DRSS HIS System Project Engineer, DRP/A RSTS Operator RIV File D. Wigginton, NRR Project Manager DRS Lisa Shea, RM/ALF J
j
TATES MISSION Y COM UNITED STOR REGULAoro,o.c. m ss u
R NUCLE A w4sem tNo
'o,',
7
++
pp;r
.r
's., * * * * * }
Director imes, Division Christopher I. Gr ject ProJe tb manche Peak Proof Special Assistant c
No. 50 445 Director Docket HEMORANDUM FOR:
Office Co James H. Wilson,ProjectProjects Division for Projects Comanche Peakof 5,pecial Manager THRU:
Office ProjectDivision Helinda Malloy, rojectProjects ELECTRIC Comanche Peak Pof Special TV WITH FROM:
Office MEETING FORTHCOMING 88 day) 19 20,19 (each SUBJECT :
Octoberm6:00 pm
/
Tire:
8:00 a North One White Flintckville Pike 20852 che Peof the and ak Date Ro land ges to the Comanand prepa 11555Rockville, leary Location:
4 B-11 of proposed chan of the Technical ations Rcom Technical Specific n
DiscussioReview" versionTV ~ElectricU~' I6 1
Unit "Proof &(agenda later)
Purpose:
J Kelley N. Hood HRC R~Ma11oy j'fn,b -
Participants:
R. Giardina
/
tQ Man 6 gar ProjectDivision Melinda Malloy,ProjectProjects Comanche Peakof Special Office 7
re f James H. Wilson nse, a 92-3306 lice other next page Melinda Malloy or (301) 4 d applicants for nors, orStateme See rve (301) 492 0738chnical stof f anitioners, in cc:
ad n
CONT ACT(s):
t ngs i
et I
t.etween NRC teof che putlic, p "
rs x
N x
N